Agenda 04/28/2015 Item #16A 6 4/28/2015 16.A.6. EXECUTIVE SUMMARY Recommendation to approve a Resolution for Conditional Final Acceptance of the private roadway and drainage improvements, and acceptance of the plat dedications, for the final plat of Runaway Bay Replat PL20120000266, and authorize the reduction of the maintenance security to the amount of$19,262.25 which represents 150%of the cost of the remaining required improvements. OBJECTIVE: To have the Board of County Commissioners (Board) approve conditional final acceptance of the infrastructure improvements associated with the subdivision accept the plat dedications, and release the maintenance security except the amount of$19,262.25. CONSIDERATIONS: 1) On May 28, 2013, the Growth Management Department granted preliminary acceptance of the roadway and drainage improvements in Runaway Bay Replat. 2) Section 10.02.05 D of the Collier County Land Development Code allows for Conditional Final Acceptance where the required subdivision Improvements except for the final lift of asphalt, have received a satisfactory final inspection. 3) The roadway and drainage improvements will be maintained by the project's homeowners association. 4) The required improvements have been constructed in accordance with the Land Development Code. The Growth Management Department has inspected the improvements and is recommending final acceptance of the improvements with the exception of the final lift of asphalt. A performance security in the amount of 150% of the cost of the final lift of asphalt will be held by the County and the remainder of the existing security will be released. 5) A resolution for final acceptance has been prepared and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C.1 of the Land Development Code. A copy of the document is attached. 6) The developer will be required to complete all remaining improvements within a 12 month time period, in accordance with Section 10.02.05. D of the LDC. 7) This Fiddler's Creek PUD which encompasses Runaway Bay Replat has been found to be in substantial compliance. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's homeowners association. The existing security in the amount of$103,901.05 will be reduced to $19,262.25 upon Board approval. Packet Page -784- 4/28/2015 16.A.6. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this Executive Summary. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS RECOMMENDATION: To have the Board approve Conditional Final Acceptance of the roadway and drainage improvements in Runaway Bay Replat Application Number PL20120000266, and authorizes; I. The Chairman to execute the attached resolution authorizing conditional final acceptance of the improvements and plat dedications. 2. The Clerk of Courts to release of the maintenance security, except for 150% of the estimated cost of the final lift of asphalt. Prepared By: John Houldsworth, Senior Site Plans Reviewer, Development Review Division, Growth Management Department Attachments: l) Location Map, 2)Bond Basis & Bond and 3) Resolution Packet Page-785- 4/28/2015 16.A.6. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.6. Item Summary: Recommendation to approve a Resolution for Conditional Final Acceptance of the private roadway and drainage improvements, and acceptance of the plat dedications,for the final plat of Runaway Bay Replat PL20120000266, and authorize the reduction of the maintenance security to the amount of$19,262.25 which represents 150% of the cost of the remaining required improvements. Meeting Date: 4/28/2015 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior,Natural Resources 3/20/2015 7:06:52 AM Approved By Name: BeardLaurie Title: Planned Unit Development Coordinator,Transportation Planning Date: 3/23/2015 3:01:32 PM Name: McLeanMatthew Title: Project Manager, Principal, Operations and Regulatory Management Date: 3/31/2015 4:07:16 PM Name: StoneScott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 4/2/2015 12:19:45 PM Name: PuigJudy Title: Operations Analyst, Community Development&Environmental Services Date: 4/9/2015 3:14:08 PM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 4/15/2015 6:19:11 AM Name: IsacksonMark Packet Page-786- 4/28/2015 16.A.6. Title: Division Director-Corp Fin &Mgmt Svc, Office of Management&Budget Date: 4/15/2015 8:30:54 AM Name: KlatzkowJeff Title: County Attorney, Date: 4/15/2015 9:39:21 AM Name: DurhamTim Title: Executive Manager of Corp Business Ops, Date: 4/15/2015 11:42:07 AM Packet Page -787- 4/28/2015 16.A.6. `' . r '- , 1111111111NMINIMMIIINIMINIMMIIIIIMIINIIMIIIMMMIIIIIONMMMMMINIIIIMMMON . VA ( ` rf II - -- I - I I - iN - - Nit, i "' °.∎:$, e--CWAM'IONSHIP RIVE _ _ _` _ . t ,r24\,\ 1 s ' ,r 10.11'F.E' S INC TIARY a//,� m �//� �..., ' +LAN " r, a 0 '� / �\ rs f E ,� `',e ') I ra/' "~ u, ' I -� ,«`,, a MULB I RY LANE -- I [[I --- FDDLR'S CREEK x: 21 93 PARK AY EXTENSION= ION, (- y --- CLUB CE TER BLVD ` 1 ` i- --- ----------- 1-- LDDLE:IC23.,CREEK."` is (0:471 \ \ \' N SARI<WAY • —a \� , ''1(�:{ rr,ruu.,c. t` t - — - - �t \,,,,, 1l ab 1 zip - __3Z-. z� - - -�3 30 b k -------------• �+% w4 ,'iJ1�a/c_�.7-G!i rrfc •[? 1 if �I, „� 1Y it / `4/ A-P. g \\ .-•i + 1.. ' iiC ir.21,;,,: .....i > 'J 4 '1 Jl • l� 7..: -, --.5.;:x7 tf i , � �r - -- = -�`� /1'-aft'7 _ 4 --` /1 `I • hA. ,,,,./ ]11 ( I ,l -__''<f . 1 J{ _ ^ l • �T'S .) ��1 \ ti k ` \ ' - `'+ riff) ' L,), ,A l c'- \ ` _) ■ su . l —u�I , \ lit \ Ici i1 \--‘ •*---- - \ ( 3_,.. - - --- . l , 'CC' \\ ,,-------) , 1 Li I 1--- R � _�iir ` '][ ] 4' 1 /[ IN ][3 1. Packet Page-788- 4/28/2015 16.A.6. 13ID► TAIBULA.TION SUMMARY FOR R1[J 1 AWAI.' BAY AT F][.D]DLIE.R"S CREEK ROADWAY ADJUSTMENTS Prepared by: 11! (�r:I'cIIC�;5�11►�9�1;C�CI " Q. Grady Minor&Associates, P.A. 3800 Via Dell Rey, Bonita Springs, :Florida 34134 (23 9) 947-1144 ,\\\\111IlIi , / /:` -_ it r 7 09,li ".1%04-19-iiirrE OF / Florida RegAilatkpri tign,t<;6Y IC) G:\PROJ-ENCAFir'C'31CDS 06DPV)31?Y:L\ICP Roadvvay 2-12\Bond C£dc.CK)C 1 Packet Page-789- 4/28/2015 16.A.6. [i.o BI[l TAB LATior --_• -- --- -------- 1 1.1 Bid Schedule Summary SeTiffa LE DESCRIPTION REVISED TOTAL PRICE A Demo&Relocation $12,000.00---� [__----8 Paving $61,7:31.50 -------- --- C Wastewater Collection $13 -------------- ,54.0.C10 D' _—_—Potattle Wetter Dtributr'cxi $11,564.00 E_— Construction Stakeout $300.07 TOTAL. $94,455.60 1.2 Schedule"A."--Demolition and Relocation 7 _r REVISED :REVISE]) ITEM! DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE �A•1 Demo &: Relocate r • L.S —1_— 512.000.00 512.,000.00 _TOTAL $12,000.00 j Note I--Includes relocation ofli!ght poles(2),water meters(2),sign, etc. Also,the demolition or removal of stripping, cub., asphalt,force main,and water main as depicted on plans. 1.3 Schedule "B" - Paving " Roadway construction complete per the plans and County specifications including stabilized subgrade, stabilized shoulder., l:imerock base,tack coat,asphaltic concrete, required testing by an independent laboratory, roadside fill and .era.ding for full width of right-of-way and easements, finish grading, seeding and mulch. REVISED REVISED REVISED ITEM _ ----__-- DESCRIPTION ----� UNIT QTY UNIT PRICE TOTAL PRICE B-1 2' Valley Gutter _-� LP 605 .__ 512.75 57,713.75 E'.-2 TY2"E"Curb ------ LF 195 — $14.45 52,81 7.75 --- -------- - ------- B-3 1 1/2"Asphaltic.Conet-ete(Type S-III' SY' 1223 $10.50 512,841.50 B-5 r Lnnerock:Base(compacted and primed)2 --- SY 1505 59.00 513,545.00 B_612"Stabilized Subgrade'' _--_ SY 1505 S:3.00 54,515.00 *B-7 02."Concrete Band:(Flat Gutter',Smooth Finish LP 275 --w 512.10 .L 53,327.50 . .B-3 4"Concrete Sidi walk(6'Wide) SY 31 360.00 $1,850.00 B-9 S irmS:Pay:Anent Markuil - -^---- LS 1 $],980.00 $1,980.00 B-10 I3ahia Sod --- SY 1(17 53.00 $321.00 ----- ---- --------E1-11 Armor Turf SY 235 546.0(1 $13..810.00 '13.12 Densit Te_thill. -�-�- --- LS 1 $2,000.00 5'2,1))0.00 ----- -- _ __ TOTAL 561,731.50 Note 2-For Payers West of Runaway Bay plat boundary totaling 128 SY,contractor to saw cut,asphalt,Dade down limerock to 4-inches below finish wade. See Delcompare Design Works Plans for location, details, and specifications. G:IPROJ-ENGU•1FC31CDS)06C,F'10:1PPLUCP Roadway 2-12\nond Calc:.DOC 2 Packet Page-790- 4/28/2015 16.A.6. 1.4 Schedule"C" -Wastewater Collection Includes furnishing and handling of all required materials, joint restraint, thrust blocks, connections to other pipelines, all excavation (including rock and over-excavation if necessary), devvatering, bedding material (if necessary), pipeline installation, 'bat filling (imported fill if necessary), compaction, compaction testing in roadway areas, pressure testing, flushing, clean- up including resodding areas previously sodded, seeding all areas disturbed by construction, providing complete as-built drawings and other items necessary to complete the system and provide the Owner, DE1P and Coll:ier County with a complete working wastewater collection system as shown on the drawings and specified. in these contract documents. �� -- — R:EVISEI) REVISED IT DA DESCRIPTION__--- UNIT (jI'Y UNIT PRICE TOTAL PRICE _ C-1 4"PVC 0900 CL 150 Force Main :LF 190 $24.30 $4,560.00 C-2 Tie to Existing EFL 2 51,690.00 $3,380.00 * C-3 Pressrue Test LS I $600.0(1 $600.00 TOTAL $8,540.00 1.5 Schedule "D"--Potable'Water Distribution Includes famishing and handling, of all required materials, joint restraint, thrust blocks, connections to other pipelines, all excavation (including rock and over-excavation if necessary), dewatering, bedding material (if necessary), pipeline installation., back filling (imported fill if necessary), compaction, corn.pactio:n testing in road.wav areas., pressure testing, disinfecting pipelines, flushing, clean-up including resodding areas previously sodded, seeding all areas disturbed by con.structian, providing complete as-built drawings and other items necessary to complete the system and provide the Owner, DEP and Collier County with. a complete working water distribution system aS shown on the drawings and specified in these contract documents. REVISED REVISED ITEM ! DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE D. 8" PVC 0900 CL 150 Water Main 1,17 .200 $38.00 $7,600.00 D-2 Tie to 'existing; E.A 2 5 1.212.00 --$2,424.00 * :D-3 13,acT' LS 1 91,000.00 $1,000.00 * .D-4 4" Soh 40 PVC Conduit(Owner Use) LF 70 53.01) j $560.00 TOTAL :111,584.00 1.6 Schedule "E"--Construction. Stakeout ITEM DESCRIPTION UNIT QTY IJNI1f PRICE TOTAL PRICE E-1 Construction Stakeout LS 1 $50(1.00 $500.00 E-2'. R.eco:rd Survey LS, 1 5100.00 5100.00 'IOI'AL. $600.00 G:\PRO)-EN IFC3ICDS'.06DF'\03PPI!dCPRoadvrey 2-12V3ond Cale.DOC 3 Packet Page-791- 4/28/2015 16.A.6. e (Runaway Bay Repla►t) PERFORMANCE BONI) KNOW ALL PERSONS BY THESE PRE:SENITS:that GB 31,LTD. Bond a t K.03'74.25 E A a Florida limited partnership - 8:156 Fiddler's Creek:Parkway. Naples,FL341144816 (bereinafta referred to as"Owner")and WESTCE[E'STER FIRE INSURANCE COMPANY 436 Walnut Street WAIOH Philadelphia,P.A.19106 (hereinafter referred to as"Surety") are held and firmly bound unto Collier County, Florida, Ourei na:fter referred to as`County") in the total aggregate sum of One Hundred Three Thousand,Nine Hundred One and,051:100 Dollars (S103,901..05)in lawful money of the United States,for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. Owner and Surety axe used.for singular or plural, as the context requires. THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by the Board of certain improvements to the roadway within that certain subdivision plat named Runaway Bay:Replat, a replat of Runaway Bay at Fiddler's Creek and that certain. subdivision shall include specific improvements width are tequi:red. by Collier County Ondinart:es and Resolutions(hereinafter"Land Development Regulations"). This obligation of the Surety shall commence on the date this Bond is executed and shall continue until the date of final acceptance ivy the Board of County Commissioners of the specific improvements described in the Land Development Regulations(hereinafter the'Guaranty Peesiod").. NOW, THEREFORE, if the Owner shall well,, truly and faithfully perform its obligations and duties in accordance with the Land Development Regulations during the guaranty period established by the County,and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and stave harmless the County from and against alit costs and damages which it may Sift by:reason of Ow ner•'s failure to do :so, and shall reimburse and repay the County all outlay and expense which the County may muse in making good any default,then this obligation shall be void,otherwise toremain in full force and effect PROVIDED, FURTHER, that the said Surety, for value :received hereby, stipulates and agrees that no change, extension of time, alteration, addition or deletion to the proposed specific improvements shall in any way affect its obligation on this Bond,and it dices hereby waive notice of any such change, extension of time, alteration, addition or deletion to the;unposed. specific improvements. PROVIDED FURTHER, that it is expressly agreed that the Bond shall be deemed .amended automatically and immediately, without formal and separate amendments hereto, so as to hire. the Owner and the Surety to the full and faithful. performance in accordance with the: Land :Developn►ent. Regulations. The term "Amendment," whenever used in this Bond, and whether referring to this Bond,or other documents shall include any alteration,ackiition or modification of any character whatsoever. Packet Page-792- Page 1 of 3 4/28/2015 16.A.6. IN 1WrrN[ESS WHEREOF, the parties hereto have: caused this PERFORMANCE 13C)1VD to be executed this 22nd. day of At st: ,2012 1PRIN CI7PAL: GB 31,L'111.,a Florida limited partnership to By: CiI3 311,L a Florida limited.liability �h!m Nnt24-.91!"' sq_k1,Li t �L-cry_- comip 1,As General Partner /1 `/ :By.. \/r,� .Zi(%.52 7 �_ _ _____r__ Aubrey l.Fflfrao,as lidera and !r�r nee �7 k C 1 � ((01, CE:O and not cndnridy Vr STATE OF FLORIDA COUNTY'OF COLLIER The foregoing instrument was acicnowleiged before this-2_3 clay of 2:012, by Aubrey J. F'errmo, as President and CEO of GB 31, L LC:, a 'Florida limited liability company,&meta]Partner of GB 31,Ltd.,a Florida limdtexl partnership, on behalf of the limited liability company and limited partnership. He is personally la:eo•wn to me. • +fs.`v•"'141- JOSEPH I IJVI0 PARISI _ . M'f'CCMMISSK)N t EE 000484 ' (14 ��• 4� EXPIRES:August 19,2014 1. n.► aJme: JZ��� £J�,��- r.-�,rtvr it:, it, dors*'IAru luga Natty Sa kau NV airy Public C _ Ce irrlissicn No. � �=[%"�%%e`/Ci�1L My Commission Expires: C ' ';!,/r,'.4L (SEAL) Page 2 of 3 Packet Page -793- 4/28/2015 16.A.6. SURETY: 'WESTCHESTER FIRE INSIUILANCE COMPANY 1/ 4 .mthia Farrell,Attorney in Fact and Non-Resident Agent State of FL.License#E166034 STATE OF New York COUNTY OF The foregoing instrument was acknowledged before this 2.2 day of Au gu s t 2012„by Cynthia Farrell,as Attorney in fact and Non-Resident Agent of Westchester Fire Insurance Company,on behalf of Westchester Fire Ins•rrratrcx:Company,who is personally known to me or has produced(an New York (insrat State)dnivea's license as identification.. \ tom Prim Name 7 Eva.r ae 1. na L. I omi n i ck Notary Public Commission No 011)04 76 94 74 r My Commission Expires:--!x(-;31! E_'viVg.;F JNA L. ')C ':1'N'ICN: (SEAL) Not miry h ttilir, of New York: l h D )r 4; :')d- (?rr i E DIre,'i "Il l; r"/ ,37.E _�r IJ� ► • Page 3 of 3 Packet Pa:e-794- 4/28/2015 16.A.6. RESOLUTION NO. 15- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING CONDITIONAL FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN RUNAWAY BAY REPLAT, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 51, PAGES 94 THROUGH 98; RELEASE OF THE MAINTENANCE SECURITY; AND ACCEPTANCE OF THE PLAT DEDICATIONS WHEREAS, the Board of County Commissioners of Collier County, Florida, on July 24, 2012, approved the plat of Runaway Bay Replat for recording; and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04-41, as amended); and WHEREAS, the Developer is requesting conditional final acceptance of the roadway and drainage improvements pursuant to Section 10.02.05 D of the LDC, and release of his maintenance security, less 150% of the estimated cost for the final lift,of asphalt; and WHEREAS, the Growth Management Department has inspected the roadway and drainage improvements, and is recommending conditional acceptance of said facilities. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that conditional final acceptance is hereby granted for those roadway and drainage improvements in Runaway Bay Replat, pursuant to the plat thereof recorded in Plat Book 51, pages 94 through 98, and the Clerk is hereby authorized to release the maintenance security except for 150% of the estimated cost for the final lift of asphalt. BE IT FURTHER RESOLVED AND ORDERED that the future maintenance and other attendant costs for those roadway and drainage improvements are required to be maintained by GB 31, Ltd., and the Fiddler's Creek Community Development District, and Collier County has no responsibility for maintenance of these facilities. This Resolution adopted after motion, second and majority vote favoring same, this day of , 2015. ATTEST: BOARD OF COUNTY COMMISSIONERS DWIGHT E. BROCK, CLERK COLLIER COUNTY, FLORIDA By: Deputy Clerk TIM NANCE, Chairman [15-EIS-02946/1162348/1] 1 of 2 Packet Page-795- 4/28/2015 16.A.6. Approved as to form and legality: 3)acof FS Scott A. Stone Assistant Collier County Attorney [15-EIS-02946/1162348/1] 2 of 2 Packet Page -796-