Loading...
Agenda 04/14/2015 Item #16C2 4/14/2015 16.C.2. t" EXECUTIVE SUMMARY Recommendation to approve a $354,900 work order to Youngquist Brothers, Inc., under Board approved contract 12-5871 for Well Drilling,Testing and Maintenance Contracting Services(Quote #5) for the Livingston Road Irrigation Quality Water Aquifer Storage and Recovery Well System Monitoring Well Modification,Project Number 74030. OBJECTIVE: To deepen the existing monitoring well, LHZ2MW-1, at the Livingston Road Irrigation Quality(IQ)Water Aquifer Storage and Recovery(ASR)Well site,as required by the Florida Department of Environmental Protection(FDEP)-issued Underground Injection Control(UIC)permit for cycle testing ASR Well#2. CONSIDERATIONS: On June 10, 2014, as Agenda Item 11C, the Board of County Commissioners (Board) approved the Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water User Rate Study. The proposed scope of work is consistent with Project 74030, "IQ Aquifer Storage and Recovery —Livingston Road"on page 3-188, line 121 of the user rate study. Funding for project 74030 is available in and is consistent with the FY2015 CIP Budget. Collier County has developed a robust and sustainable IQ water program that provides more than five billion gallons of reclaimed water annually. However, even with the extensive reuse program, excess IQ water must be disposed of via deep injection wells during rainy periods when irrigation demand is low. To expand and maximize the effectiveness of its existing reuse program, the county embarked on the Livingston Road IQ Water ASR project. ASR wells provide the most cost-effective means to store IQ and supplemental well water during wet weather conditions for use during the dry season. With adequate seasonal storage, reclaimed water can be used much more effectively, reducing water withdrawals from surface or groundwater systems during critical dry season periods, and reducing the loss of valuable freshwater resources. The goal is to operate five ASR wells with the potential of storing 375 million gallons of IQ water annually for use during the dry season. Two ASR wells have been constructed. On September 11, 2012, as Agenda Item 11F,the Board approved the construction of ASR Well #1. On December 10, 2013, as Agenda Item 11D, the Board approved the construction of ASR Well #2. During the permitting of ASR Well #2, the FDEP changed the UIC monitoring well permit conditions for cycle testing the two ASR wells. To meet these new FDEP requirements, monitoring well LHZ2MW-1 must be drilled deeper to approximately 620 to 840 feet below land surface. The Procurement Services .Division electronically distributed Request for Quotation 12-5871-05, Livingston Road IQ Water ASR System Monitor Well Modification, on February 18, 2015, to the two vendors under the Well Drilling, Testing and Maintenance Contract No. 12-5871 - Category 4. One contractor submitted a letter declining to submit a quote (Attachment 1) and the other contractor submitted a quote by the February 27,2015,deadline as summarized below. VENDOR QUOTE Youngquist Brothers,Inc. $398,765 Layne Christensen Company Did Not Quote Packet Page-607- 4/14/2015 16.C.2. Staff reviewed the quotation and determined Youngquist Brothers, Inc. (Youngquist), to be qualified and responsive;however,the original $398,765 quote was considered to be too high. Per the Board approved contract, staff met with the contractor on March 9, 2015, to negotiate terms and conditions. During the negotiation meeting, Youngquist stated that their price included repair of an adjacent pond liner because the pond needed to be temporarily filled to support the drill rig. To address this, a lesser base cost of . $319,900 was agreed to, plus the addition of a$35,000 owner-directed time and materials allowance for pond liner and site repairs should damage occur during construction. This negotiation reduced the cost by $43,865 if the entire $35,000 allowance is used. If the $35,000 allowance is not used,there is a $78,865 cost reduction. As a result of the negotiation, the contractor provided a revised quotation on March 12, 2015 (Attachment 2) for $354,900 including the allowance. As a result of this revised quote, staff considered two options: 1)Accept the revised quote from Youngquist for$354,900;or,2)Bid the project out to more contractors. Public Utilities staff and CDM Smith, Inc. recommend accepting the quote and awarding the work order to Youngquist because the resultant quote is within 6% of the Engineer's estimate once allowances are accounted for(Attachment 3). VENDOR BASE POND LINER REVISED COST ALLOWANCE TOTAL QUOTE Youngquist Brothers,Inc. $319,000 $35,000 $354,900 FISCAL IMPACT: Funding is available in,and is consistent with,the FY2015 Capital Budget approved by the Board on September 18, 2014. The source of funding is Wastewater User Fees, Fund (414), as reflected in the table below. Once an operating permit is obtained, production operating costs will be available in Water/Sewer Operating Fund(408). Elements FY 2015 FY 2016 FY 2016-FY2036 (s.1 Capital Outlay $354,900 $0 $0 Operating Cost Change* $0 TBD* TBD* *Once drilling and testing is complete,production operating costs will be determined. LEGAL CONSIDERATIONS: This item is approved as to form and legality,and requires majority vote for Board approval.—SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, approves the attached $354,900 work order under contract 12- 5871 (Quote # 05) to Youngquist Brothers, Inc.; and, authorizes the Chairman to sign and execute the work order after fmal review by the County Attorney's Office. Prepared By: Zamira DelToro, Project Manager, Public Utilities Planning and Project Management Division Attachment 1-Layne Christensen Company Letter declining to submit a quote Attachment 2-Youngquist Brothers Inc.Revised Quote Attachment 3-CDM Smith April 7,2015 Recommendation Letter Attachment 4-Work Order Packet Page-608- 4/14/2015 16.C.2. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.2. Item Summary: Recommendation to approve a $354,900 work order to Youngquist Brothers, Inc., under Request for Quotation 12-5871-05 for Well Drilling,Testing and Maintenance Contracting Services for the Livingston Road Irrigation Quality Water Aquifer Storage and Recovery Well System Monitoring Well Modification, Project Number 74030. Meeting Date: 4/14/2015 Prepared By Name: DeltoroZamira Title:Project Manager,Public Utilities Engineering 3/24/2015 2:06:11 PM Submitted by Title:Project Manager,Public Utilities Engineering Name: DeltoroZamira 3/24/2015 2:06:12 PM Approved By Name: HapkeMargie Title: Recycling Coordinator, Solid&Hazardous Waste Management Date: 3/24/2015 2:43:38 PM Name: JohnssenBeth Title: Division Director-Wastewater, Wastewater Date: 3/24/2015 2:53:50 PM Name: ChmelikTom Title: Division Director-Public Utilities Eng, Public Utilities Engineering Date: 3/24/2015 3:00:55 PM Name: Joseph Bellone Title: Division Director-Operations Support,Utilities Finance Operations Date: 3/24/2015 3:56:28 PM Packet Page-609- 4/14/2015 16.C.2. Name:MarkiewiczJoanne Title: Division Director-Purchasing&Gen Svc,Purchasing&General Services Date: 3/24/2015 4:31:44 PM Name:JacobsSusan Title: Operations Analyst, Wastewater Date: 3/24/2015 8:51:06 PM Name:HallSwainson Title: Procurement Specialist, Purchasing&General Services Date: 3/25/2015 8:53:38 AM Name: PajerCraig Title:Project Manager, Principal,Public Utilities Engineering Date: 3/25/2015 9:51:08 AM Name: HerreraSandra Title: Manager-Procurement,Purchasing&General Services Date: 3/25/2015 9:56:39 AM Name: JohnsonScott Title: Manager-Procurement,Purchasing&General Services Date: 3/25/2015 10:40:38 AM Name: HapkeMargie Title: Recycling Coordinator, Solid&Hazardous Waste Management Date: 3/26/2015 3:15:49 PM Name: TeachScott Title: Deputy County Attorney,County Attorney Date: 3/26/2015 3:59:21 PM Name: YilmazGeorge Title: Department Head-Public Utilities,Public Utilities Department Date: 3/27/2015 8:35:51 AM Name: KlatzkowJeff Title: County Attorney, Date: 3/30/2015 3:02:05 PM Name: UsherSusan Title: Management/Budget Analyst, Senior, Office of Management&Budget Date: 4/6/2015 1:41:12 PM Packet Page-610- 4/14/2015 16.C.2. Name: OchsLeo Title: County Manager, County Managers Office Date: 4/6/2015 1:56:45 PM Packet Page-611- 4/14/2015 16.C.2. cot Administrative Services Division Purchasing REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT#12-5871 "Well Drilling, Testing and Maintenance" Date: February 18, 2015 From: Swainson Hall, Procurement Strategist 239-252-8935, Telephone Number 239-252-6334, Fax Number SwainsonHall{a colliergov.net To: Awarded Vendors—Category 4 Subject: RFQ#12-5871-05 Livingston Road IQ Water ASR System Monitor Well Modification As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: 3:00 PM February 27, 2015 Pre-Quote Meeting Date/Time: No Pre-Quote Meeting Needed Q&A Deadline: By 5:00 PM February 24, 2015 Number of Days to Final Completion: 60 Days Substantial, 30 Days Final—Total 90 Liquidated Damages $1,500 per day Direct Material Purchase N/A Specifications and Plans: Attached 'Provide pricing in attached quote schedule.*" Owner will pay for all Collier County-issued permits via interdepartmental transfer. All permits required outside of County-issued permits shall be paid for by the contractor. Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. Layne Christensen Company Firm's Complete Legal Name 2 • 275-1029/23• 75-1025 Tel-.phhz umb A Number Sign f�+'ed oiect anager ' e Christopher Bannon February 23, 2015 Print Name Date C: Zamira Del Toro, Project Manager Packet Page-612- 4/14/2015 16.C.2. azazyne : WATER MINERAL • ENERGY February 23,2015 VIA ELECTRONIC MAIL Collier County Purchasing Department Attn.: Swainson Hall, Procurement Strategist 3327 Tamiami Trail East Naples,FL 34112 Re.: RFQ# 12-5871-05 Livingston Road IQ Water ASR System Monitor Well Modification Dear Mr. Hall: Layne Christensen Company appreciates the invitation to participate in this particular project but we shall not be providing a quote.Thank you for the consideration. Respectfully, Layne Christensen Company C4 / Chris Bannon, Project Manager WATER RESOURCES 5061 Luckett Road,Fort Myers.FL 33905 I Office:239.275.1029 I Fax:239.275.1025 I layne.com Packet Page-613- 4/14/2015 16.C.2. it , ` AanIrdstrative Services Nestor Purchawr4 REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT#12-5871 "Well Drilling, Testing and Maintenance" Date: February 18, 2015 From: Swainson Hall. Procurement Strategist 239-252-8935, Telephone Number 239-252-6334, Fax Number SwainsonHall(a�collleraov.net To: Awarded Vendors-Category 4 Subject: RFQ#12-5871-05 Livingston Road IQ Water ASR System Monitor Well Modification As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: 3:00 PM February 27, 2015 Pre-Quote Meeting Date/Time: No Pre-Quote Meeting Needed Q&A Deadline: By 5:00 PM February 24, 2015 Number of Days to Final Completion: 60 Days Substantial, 30 Days Final -Total 90 Liquidated Damages $1,500 per day Direct Material Purchase N/A Specifications and Plans: Attached ***Provide pricing in attached quote schedule,' Owner will pay for all Collier County-issued permits via interdepartmental transfer. All permits required outside of County-issued permits shall be paid for by the contractor. Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically,your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. YouNiGautt ET to i-veRs, I>'c.F Firm's Complete Legg! Name 2'S°i • . -4 1-1rLI / .3c. Li act . 5 4 Telep1 neFNumber-1 Fax Numb r / ( T""`i _ ,- Signature �� t.f iP'� N.W I CE -' c.5►1 Title C.,4‘4. ( `11) ISs H-s1-E- 71Z-7/7-614 Print Name Date C: Zamira Del Toro, Project Manager Packet Page-614- 4/14/2015 16.C.2. ^ 00 0 0 00 00 00 0 00 O 4-' O0 0 00 00 00 CD 0 0 O 0 0 0 C) rn 0 CD 0 0 rn 0 CO CO Cr)( o c`i CC.,J I) Q r M O h O 0 0 O 0 W O 0 0 O 0 0 O —)f U O CO (y) DM M N C' CL . 0 LL. ca 4-4 o U f r CD r •— ft = n. us wa o E CO +O' J co CO _ .E J J J L.L. Cl) J 0 S of 0 W ,0 F- F- 0 CO d.' Q V c6 oa' Q ' U 0 .0 m m c c ° o O -0 o m it m � o c m u cc E f m y m a m . r CY -- _ o m e = d o y 9 0 �z h o p d U) O O m � to a w � E a 0 iii cc--, zz ,a a 0 .rt a-+ -o c w u�O • c a E p a) ° . F � a o N Eo a m � c ? a m O O N a m � m ac (11 a 2 m m m y E. c o m 2 N 0 E c a m s rC _ o o ,a m a 0 c a c _ a co a) h c�co e £ c m > 0 J CO o • m` a o m c u E [' o " c m r _0 ° a a y N a ]. S + c m m 2 Q L U -. N = U m a N C = £ O O V E. Q 'Q) ` .c ` m a ` _ e s 3 t6 y m m w o c s a c is, m , (f) 0 E 5 � O 0 AT-. c v a — O m m g, Q` t, .. c O a' = m c .2 co m Q L, &3 . c co E ` c £ a) ° � Um > ts t6 ry 0 Oo ¢ " C . a O ` a _m h o IL N _m c . + E Q t ° °a A V) m m £ _ o - a m z m 0 25 ai m ,7, J m d 3 fzL O Eo E No c t • m• .j co E Z. a > P ;6-. ra CI O £ CU 0 ci a m m 'a O . a) a° O Q> ' m m — — .y O L U m Gt c6 C U m m �• .n o tea° t0 `m 't3 a � m 2•c -� .� Cu = a c t- me o m ° COCi a m = .0 Q c m o Oi :a O O � ti o " u a„... ..t., L._ o L 0 c s- o 0 c°' £ 3 m w . c O m O o m � OE 0) `mm C c L C .N .4Zm � W 3 ,L N O o p)m 0y :c !_ z6J � � O e, 3 "-0 = d1 V — 0 0 c O a y 2 Q o o a 0 a, a c c CS (A d a O E £ c m t a a ° CO >' 0 O a) a O E C6 0 () O .3 0 L' ^ C= a` Q a) m a'a u 3 CI CI P U a a > a) Ugh a�i u- � mlL c°> .sa'.. � £ h �' aaia"i � m° �-.,, d - N Cr) ct• t() CO ti CO • Packet Page-615- • 4/14/2015 16.C.2. CDM Smith 2180 W.First Street Suite 400 Fort Myers,Florida 33901. tel: 239 938-9600 fax: 239 339-6418 April 7,2015 Ms.Zamira DelToro Project Manager Public Utilities Planning and Project Management Division 3339 Tamiami Trail East, Suite 303 Naples,FL 34112 Subject: Livingston Road IQ Water ASR System Monitor Well Modification Quote Evaluation-Recommendation for Contract Award Dear Ms. DelToro: On March 12, 2015,a quote was received by Collier County for the Livingston Road IQ Water ASR System Monitor Well Modification project.The quote was solicited through the Well Drilling,Testing and Maintenance contract (#12-5871). The quote submitted by Youngquist Brothers, Inc. (YBI)was in the amount of$398,765.0o. Layne Christensen,the other well driller under the 12-5871 contract, declined to submit a quote. Subsequent to receipt of the YBI quote,a meeting was held between Public Utilities Planning and Project Management Division, Purchasing,YBI and CDM Smith. Based on the meeting a negotiated project price of$354,900 was reached. The project price includes an owner directed time and materials allowance of$25,000 and a time and materials pond liner repair allowance line item in the amount of$35,000. The negotiated project price less the allowances is$294,900. This amount is approximately 18 percent higher than the$250,000 estimate provided on September 25, 2014 by CDM Smith. CDM Smith has reviewed the quote provided by YBI and while it is above the planning level estimate obtained early in the design phase, it appears reasonable given the requirements of the final design and the level of risk in the project. When the planning level estimate was requested in September 2014, CDM Smith provided draft design plans of the monitoring well improvements. Specifications for the project were not provided at that time. Subsequent to the request for the cost estimate,the County identified several modifications to the design plans and identified specific project requirements which were to be included in the project specifications. The major changes reflected in the final design are the inclusion of a flow meter and additional piping on the discharge of the monitoring well, strict requirements for protection of existing infrastructure and landscaping and limitation on the techniques which may be used for performing the drilling work. The cost for the flow meter and additional piping is included in line item six of the quote,which was $30,000. Adjusting for the difference in cost for the flow meter and piping results in a variance of approximately 6%above the estimate. The cost of the protection of existing infrastructure and limitation on the construction techniques is likely carried in the Mobilization and Demobilization and Well Construction line items. to Packet Page-616-)NMENT+TRANSPORTATION+ENERGY+FACILITIES 4/14/2015 16.C.2. CDM Smith Ms.Zamira DelToro April 7,2015 Page 2 CDM Smith believes that YBI is qualified to perform the construction of the Livingston Road IQ Water ASR System Monitor Well Modification project and that the negotiated price represents a reasonable project cost. CDM Smith recommends that Collier County award the project for the total Quote, for Base Quote Items 1 through 7 plus the project allowance. Should you have any questions or wish to discuss the quote further,please do not hesitate to call us. Respectfully, Jason A.Sciandra, P.E. Senior Project Manager CDM Smith Inc. Packet Page-617- 4/14/2015 16.C.2. WORK ORDER/PURCHASE ORDER Contract 12-5871 "Well Drilling, Testing and Maintenance" Contract Expiration Date: October 7, 2015 ✓ This Work Order is for professional well testing and maintenance services for work known as: Project Name: Livingston Road IQ Water ASR System Monitor Well Modification ✓ Project No: 74030.2.5 ,/ / The work is specified in the proposal dated March 12, 2015 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced above, this Work Order/Purchase Order is assigned to: Youngquist Brothers, Inc. ./ Scope of Work: As detailed in the attached proposal and the following: * Task I Well Drilling Construction Services * Task II Well Construction Allowance Schedule of Work: Complete work within 120 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date of Agreement # 12-5871 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the /Firm in accordance with following method(s): Negotiated Lump Sum (NLS) ['Lump Sum Plus Reimbursable Costs (LS+RC) Time & Material (T&M) (established hourly rate — Schedule A) ❑ Cost Plus Fixed Fee (CPFF), as provided in the attached proposal. Task I $294,900.00 NLS Task II $ 60,000.00 T&M ✓ TOTAL FEE $354,900.00 PREPARED BY: _ x'e.A.- v _ t l y 14 6 ,,i) Zamira DelToro, Project Pro Manager J g Date APPROVED BY: Lta ` _ iii_________ Craig Nei, Priz e{pal Proj t Manager D to I APPROVED i' ,.S' PPROVED BY: / t Tom Chmelik, PPMD Director Date f Page 1 of 3 Packet Page-618- e , 4/14/2015 16.C.2. / , APPROVED BY f 3/r/it '" Rob Kaine. Interim IQ Manager Date APPROVED IJ Bet -ohnssen. astewater Director Da e 10d1. APPROVED BY: e'' { / 1 ,■/)`- George Yilmaz, Department Administrator Date ` i By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past,present, or currently planned interest or activity (financial, contractual, organizational, or otherwise) which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Younaquist prrot rs. Inc. 3/7/5-- /7 / 5 Harvey ".. Y un,• . ,ice President Date (Remainder of page intentionally left blank) Page 2 of 3 Packet Page -619- 4/14/2015 16.C.2. IN WITNESS WHEREOF,the parties hereto,have each,respectively,by an authorized person or agent,have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk of Courts COLLIER COUNTY, FLORIDA By: By: Tim Nance, Chairman Dated: (SEAL) Youngquist Brothers, Inc. Niftzi" ,"1-- aLtriv -604 First Witness J- 1 re w L. "I /1v I f Harvey B. Youngquist, Jr.,Vice President Print, / if ici -'i r',r' iL L-4---e-r---<-% ...-.... Sepin.d Witness Print A, •rove. o Fo rd Bali : IP Scott R. Teach, Deputy County Attorney Page 3 of 3 Packet Page -620-