Agenda 04/14/2015 Item #16A 5 4/14/2015 16.A.5. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the private roadway and drainage improvements for the final plat of Gaspar Station, Phase 1 (Application PL20120000409) and authorize the acceptance of the plat dedications and release of the maintenance security in the amount of$25,895. OBJECTIVE: To have the Board of County Commissioners (Board) accept final approval of the infrastructure improvements associated with the subdivision, accept the plat dedications, and release the maintenance security in the amount of$25,895.00. CONSIDERATIONS: 1) On May 24, 2013, the Growth Management Department granted preliminary acceptance of the roadway and drainage improvements in Gaspar Station,Phase 1. 2) The roadway and drainage improvements will be maintained by the project's homeowners association. 3) The required improvements have been constructed in accordance with the Land Development Code. The Growth Management Department has inspected the improvements and is recommending final acceptance of the improvements. 4) A resolution for final acceptance has been prepared and approved by the County Attorney's Office. The resolution is a requirement of Section 10.02.05 C.1 of the Land Development Code.A copy of the document is attached. 5) The Gaspar Station CPUD, Ord. 07-75 which encompasses Gaspar Station, Phase 1 has been found to be in substantial compliance. FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's property-owners association. The existing security in the amount of$25,895.00 will be released upon Board approval. The original security in the amount of $256,316.00 has been reduced to the current amount of $25,895.00 based on the previous work performed and completed and pursuant to the terms of the Construction and Maintenance Agreement. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this Executive Summary. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval.-SAS RECOMMENDATION: To have the Board accept final acceptance of the roadway and drainage improvements in Gaspar Station, Phase 1 (Application Number PL20120000409), and authorize; •'■ Packet Page-257- 4/14/2015 16.A.5. 1. The Chairman to execute the attached resolution authorizing final acceptance of the improvements and plat dedications. 2. The Clerk of Courts to release of the maintenance security. Prepared By: John Houldsworth, Senior Site Plans Reviewer, Development Review Division, Growth Management Department Attachments: 1)Location Map,2)Bond Basis and 3)Resolution /1 Packet Page-258- 4/14/2015 16.A.5. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.5: Item Summary: Recommendation to approve final acceptance of the private roadway and drainage improvements for the final plat of Gaspar Station, Phase 1 (Application PL20120000409) and authorize the acceptance of the plat dedications and release of the maintenance security in the amount of$25,895. Meeting Date: 4/14/2015 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior,Natural Resources 3/17/2015 5:48:34 AM Approved By Name: McLeanMatthew Title: Project Manager,Principal, Operations and Regulatory Management Date: 3/17/2015 3:08:54 PM Name: BeardLaurie Title: Planned Unit Development Coordinator,Transportation Planning Date: 3/17/2015 3:35:04 PM Name: PuigJudy Title: Operations Analyst, Community Development&Environmental Services Date: 3/17/2015 4:23:59 PM Name: MarcellaJeanne Title: Executive Secretary,Transportation Planning Date: 3/23/2015 10:43:20 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 3/24/2015 9:22:59 AM Name: IsacksonMark Title:Division Director-Corp Fin&Mgmt Svc, Office of Management&Budget Packet Page-259- 4/14/2015 16.A.5. Date: 3/24/2015 10:02:51 AM '^ Name: KlatzkowJeff Title: County Attorney, Date: 3/30/2015 2:50:09 PM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 3/31/2015 11:43:13 AM Packet Page-260- 4/14/2015 16.A.5. c 14 13 18 17 in w PROJECT Q f '� SITE c 23 24 19 20 i z o - a ° C.R. 846 )M(vIOALEE ROAD ■ • r - ' o R fi z J _, , 26 25 • 29 . o _ 0 o o R 0 c i Q z. I °. v3. 35 36 z 31 32 J LOCATION MAP GASPAR STATION PHASE 1 PP L-P L20120000409 PUD ORD. 2007-75 Packet Page-261- ' 4/14/2015 16.A.5. PPL-PL20120pp0409 GASPAR STATION PHASE REV:z 1 DATE:8124112 DUE: 9124112 WilsOnMiller Stantec Gaspar Station Phase I PPL 8/21/2012 Opinion of Probable Cost of Construction SUMMARY . Paving $ 30,491 Drainage S 87,863 Sanitary Sewer $ 21.446 Potable Water S 35.600 Irrigation $ 15,700 Landscape S 34,090 Lighting S 2,500 �^ Erosion Control $ 5.325 Subtotal: $ 233,015 10% Contingency: $1 23,301 Total: $I 256,316 Notes: 1 ) This Opinion of Probable Cost (OPC) is based on WilsonMiller's understanding of the current rules. regulations, ordinances, and construction costs in effect on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost, and may reguir,.eradjustments to delete, decrease, or increase portions of this OPC. i« 4';. 2 ) All costs provided in this OPC are based on recent contract prices, or ttie rg.ineers.Jatest'pawn unit costs These costs cannot be guaranteed at this time due to unpredictable and uricrcit'trQ4iabte'rpeteases in the cost of concrete, petroleum, or the availability of materials and labor -N,r K-„7 3 ) This OPC does not include materials and labor costs for installationof site specific*atilities such as=gas. communications. and electrical I? sr =_ . t ry I- "� ALLYS0N M.SWANSO. .■••• LICENSE#70177 Wtt:SONMILL,ER,INC.-FL LIC.#LC-CM70 WilsanMilier,Inc.CbrtIfigsitp of Arrthorizatiotl#43 Packet Page-262- 4/14/2015 16.A.5. WILSONMILLER STANTEC 1 Gaspar Station PPL OPC for Construction n Paving Estimated Description Quantity Unit Unit Price Amount ACCESS DRIVE 3/4"Asphaltic Concrete, Type S-III (first lift) 697 SY $ 4 95 S 3,450.15 3/4"Asphaltic Concrete, Type S-III (second lift) 697 SY $ 5.15 $ 3,589.55 6" Limerock Base (compacted & primed) 821 SY $ 6 60 $ 5,418 60 12" Stabilized Subgrade (compacted) 852 SY $ 1.45 S 1.235 40 SIDEWALK. Demo Existing Sidewalk 1 ,LS $ 1,000.00 $ 1,000.00 4"Thk Reinforced Concrete(Juliet Blvd) 2,077 SF $ 2.50 $ 5,192.50 4"Thk Reinforced Concrete(Useppa Way) 2,182 SF $ 2.50 $ 5,455 00 MISCELLANEOUS Saw-Cut and Connect to Ex, Pavement 1 LS $ 150,00 $ 150 00 Valley Gutter Crossing 1 LS $ 1,500 00 S 1,500.00 Type"F"Curb 411 LF $ 13 50 Signing and Striping 1 LS S 1,000 00 $ 1,000 00 Juliet Blvd Median Improvements (demo existing median, patch asphalt, replace curb) 1 LS $ 2,500.00 $ 2.500 00 Paving Total $ 30,491.20 Packet Page-263- 4/14/2015 16.A.5. WILSONMILLER STANTEC 1 Gaspar Station PPL OPC for Construction Drainage r� Estimated Description Quantity Unit Unit Price Amount 15" RCP 69 LF $ 21.00 $ 1,449.00 18"RCP 293 LF 5 28.00 $ 8,204.00 18" PVC 210 LF $ 26.00 $ 5,460.00 18" Flared End 1 LF $ 1,850.00 $ 1.850.00 Grate Inlet 3 EA $ 1,800.00 $ 5,400.00 Throat Inlets 2 EA $ 2,200.00 $ 4,400.00 Control Structure 1 EA $ 3,350.00 $ 3,350.00 Directional Bore Storm Sewer(Immokalee Road) 210 LF 5 275.00 $ 57,750.00 Drainage Total $ 87,863.00 Packet Page -264- 4/14/2015 16.A.5. WILSONMILLER STANTEC 1 Gaspar Station PPL OPC for Construction i-. Sanitary Sewer Estimated Description Quantity Unit Unit Price Amount 6" PVC Cleanout, Complete 1 EA $ 250.00 $ 250.00 6" PVC Sanitary Sewer Lateral 29 LF $ 14.00 $ 406.00 8" PVC Sanitary Sewer(SDR 26) (10'- 12'cut) 205 LF $ 38.00 $ 7,790.00 Manhole, 4' Diameter (10' - 12'cut) 2 EA $ 6,500.00 $ 13,000.00 Sanitary Sewer Total $ 21,446.00 Packet Page-265- 4/14/2015 16.A.5. WILSONMILLER STANTEC 1 Gaspar Station PPL OPC for Construction Potable Water --., Estimated Description Quantity Unit Unit Price Amount Connect to Existing 12"Water Main with Gap Configuration 1 EA S 1,500 00 $ 1,500.00 1-1/2"Water Service 7 LF 5 5.00 $ 35.00 6" PVC Water Main (C-900, CL-150) 16 LF 5 20 00 S 320.00 6" PVC Water Main (0-900, CL-200) 45 LF 5 25.00 5 1,125.00 8" PVC Water Main (C-900, CL-150) 380 LF $ 20.00 S 7,600.00 8" PVC Water Main (0-900, CL-200) 80 LF 5 28.00 5 2,240.00 8"DIP Water Main (C-900, CL-200) 175 LF $ 45.00 $ 7,875.00 Fire Hydrant Assembly, Complete 2 EA $ 3,300.00 5 6,600.00 Blue-Blue Reflectors 2 EA $ 15.00 $ 30 00 6"Gate Valve 1 EA $ 875.00 $ 875.00 Air Release Valve 1 EA $ 1.200 00 5 1,200 00 Automatic Flushing Device w/Gate Valve 1 EA $ 4,850.00 S 4,850.00 4"3M Magnetic Ball Markers Allowance (Every 200 LF and at Each Pipe Elbow Location) 1 EA $ 100.00 $ 100.00 n Chlorination &Testing 1 EA $ 1.250 00 $ 1,250.00 Potable Water Total $ 35 600,00 Packet Page -266- 4/14/2015 16.A.5. WILSONMILLER STANTEC 1 Gaspar Station PPL OPC for Construction Irrigation Estimated Description Quantity Unit Unit Price Amount Irrigation Distribution System 31,400 SF $ 0.50 $ 15,700.00 Irrigation Total $ 15,700.00 Packet Page-267- 4/14/2015 16.A.5. WILSONMILLER STANTEC Gaspar Station PPL OPC for Construction Landscape Estimated Description Quantity Unit Unit Price Amount TREES Pigeon Plum 19 EA S 200.00 $ 3,800.00 Holly 25 EA $ 200.00 $ 5,000.00 Oak 15 EA $ 200.00 $ 3.000.00 Mahogany 13 $ 200.00 $ 2,600.00 Sabal Palm 12 EA $ 175.00 $ 2,100.00 GENERAL LANDSCAPE Cocoplum -3 gal 905 EA $ 12.00 S 10,860.00 Bahia Sod 27,250 SF $ 0.20 $ 5,450.00 Mulch 32 CY $ 40.00 5 1.280.00 Landscape Total $ 34,090.00 .r1 Packet Page-268- 4/14/2015 16.A.5. WILSONMILLER STANTEC 1 Gaspar Station PPL OPC for Construction Lighting Estimated Description Quantity Unit Unit Price Amount Lighting Allowance 1 LS $ 2,500.00 $ 2,500.00 Lighting Total $ 2,500.00 Packet Page -269- WILSONMILLER STANTEC 4/14/2015 16.A.5. Gaspar Station PPL OPC for Construction Erosion Control Estimated Description Quantity Unit Unit Price Amount Silt Fence 3,819 LF $ 1.30 $ 4.964.70 Inlet Guard (Hay Bale and Mirafi) 3 EA $ 120.00 $ 360.00 Erosion Control Total $ 5,324.70 Packet Page-270- 4/14/2015 16.A.5. RESOLUTION NO. 15- A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA AUTHORIZING FINAL ACCEPTANCE OF CERTAIN ROADWAY AND DRAINAGE IMPROVEMENTS IN GASPAR STATION, PHASE 1, ACCORDING TO THE PLAT THEREOF RECORDED IN PLAT BOOK 52, PAGES 13 THROUGH 15; RELEASE OF THE MAINTENANCE SECURITY; AND ACCEPTANCE OF THE PLAT DEDICATIONS. WHEREAS, the Board of County Commissioners of Collier County, Florida, on November 13, 2012, approved the plat of Gaspar Station, Phase 1 for recording; and WHEREAS, the Developer has constructed and maintained the roadway and drainage improvements in accordance with the approved plans and specifications as required by the Land Development Code (Collier County Ordinance No. 04-41, as amended); and WHEREAS, the Developer is requesting final acceptance of the roadway and drainage improvements and release of his maintenance security; and WHEREAS, the Engineering Services Department has inspected the roadway and drainage improvements, and is recommending acceptance of said facilities. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that final acceptance is hereby granted for those roadway and drainage improvements in Gaspar Station, Phase 1,pursuant to the plat thereof recorded in Plat Book 52, pages 13 through 15, and the Clerk is hereby authorized to release the maintenance security. BE IT FURTHER RESOLVED AND ORDERED that the roadway and drainage improvements within Gaspar Station, Phase 1 will be maintained privately in the future and will not be the responsibility of Collier County. This Resolution adopted after motion, second and majority vote favoring same, this day of , 2015. ATTEST: BOARD OF COUNTY COMMISSIONERS DWIGHT E. BROCK, CLERK COLLIER COUNTY, FLORIDA By: Deputy Clerk TIM NANCE, Chairman [14-EIS-02730/1161998/1] 1 of 2 Packet Page -271- 4/14/2015 16.A.5. Approved as to form and legality: ,11 3/t7 /LS Scott A. Stone Assistant County Attorney 2 of 2 Packet Page -272- t�l