Loading...
Agenda 04/14/2015 Item #16A 2 4/14/2015 16.A.2. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the water and sewer utility facilities for Reflection Lakes at Naples Unit 2, Phases 2 and 3 PL20120002681 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of $4,000 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of County Commissioners (Board), as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of these water and sewer facilities and to release the Final Obligation Bond in the total amount of $4,000.00, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Reflection Lakes at Naples Unit 2, Phases 2 and 3, has constructed the water and sewer facilities within dedicated easements to serve this development. (See attached Location Map) 2) Preliminary acceptance of these utility facilities was approved by the Engineering Services staff on December 19, 2012. At that time, the value of these utility facilities (assets) was $23,071.00 for the water facilities and $6,430.00 for the sewer facilities. (See attached Asset Sheets) 3) Staff recorded all preliminary utility conveyance acceptance documents in the public records of Collier County, which were reviewed and approved by the County Attorney's office as to form and legality. 4) The water and sewer utility facilities have been operated and maintained during the required one (1)year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Engineering Services staff on January 23, 2014 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Final Obligation Bond in the total amount$4,000.00. (See attached Exhibit A) 7) This final acceptance is in accordance with Collier County Ordinance No. 2004-31, as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. •'■ Packet Page-229- 4/14/2015 16.A.2. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water- Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of$29,501.00(no depreciation applied). GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no growth management impact. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval- SAS RECOMMENDATION: That the Board, as Ex-Officio Governing Board of the Collier County Water-Sewer District, authorizes final acceptance of these water and sewer utility facilities for Reflection Lakes at Naples Unit 2, Phases 2 and 3, PL20120002681 and authorizes the County Manager, or his designee, to release the Final Obligation Bond in the total amount of$4,000.00 to the Project Engineer or the Developer's designated agent. Prepared by: Jodi Hughes,Assistant Project Manager,Planning and Regulation Division, Growth Management Department Attachments: 1)Location Map,2)Asset Sheets and 3)Exhibit A n Packet Page-230- 4/14/2015 16.A.2. �-. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.2. Item Summary: Recommendation to approve final acceptance of the water and sewer utility facilities for Reflection Lakes at Naples Unit 2, Phases 2 and 3 PL20120002681 and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the total amount of$4,000 to the Project Engineer or the Developer's designated agent. Meeting Date: 4/14/2015 Prepared By Name: BuchanTami Title:VALUE MISSING 3/2/2015 4:04:07 PM Submitted by Title:VALUE MISSING Name: BuchanTami 3/2/2015 4:04:08 PM Approved By Name: Pam Libby Title: Manager-Water Distribution&Wellfield, Water Date: 3/4/2015 10:37:58 AM Name:NagySteve Title:Manager-Wastewater Collection, Wastewater Date: 3/5/2015 10:05:03 AM Name: JohnssenBeth Title: Division Director-Wastewater, Wastewater Date: 3/5/2015 10:31:02 AM Name: Steve Messner Title: Division Director-Water, Water Date: 3/6/2015 9:55:00 AM Packet Page-231- 4/14/2015 16.A.2. Name: PuigJudy Title: Operations Analyst,Community Development&Environmental Services Date: 3/11/2015 11:39:55 AM Name: KovenskyKenneth Title: Manager Financial &Operational Support, Operations&Regulatory Management Date: 3/11/2015 6:00:14 PM Name: McKennaJack Title: Manager-Engineering Review Services,Natural Resources Date: 3/13/2015 4:09:45 PM Name: LorenzWilliam Title: Division Director-CDES Engineering Svc,Natural Resources Date: 3/13/2015 4:54:44 PM Name: ChmelikTom Title:Division Director-Public Utilities Eng, Public Utilities Engineering Date: 3/13/2015 5:53:54 PM Name: StoneScott n Title:Assistant County Attorney, CAO Land Use/Transportation Date: 3/16/2015 8:37:46 AM Name: MarcellaJeanne Title:Executive Secretary,Transportation Planning Date: 3/23/2015 10:48:08 AM Name: IsacksonMark Title: Division Director-Corp Fin&Mgmt Svc, Office of Management&Budget Date: 3/24/2015 9:27:05 AM Name: KlatzkowJeff Title: County Attorney, Date: 3/30/2015 2:42:58 PM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 3/31/2015 11:33:36 AM n Packet Page-232- 4/14/2015 16.A.2. 4T1'.4111-. .- -. .. : . .. .. .. .. .. .. .. . Z . .. ..0.. .. .. -.... . /ice �� vana fig :: . .- ..:.-,.-_-- -111�fff-- — oI ANNE 3 -- -- .- -- -- O BBBp�� 9 2 -- .- -- - .- M -- . i." 8881 . .. .. mil .. .. ..rI NiNNNiNNN 1. P AN NENNINNNttt� f����4�,� �` o_ ilgt17-- ahh :.:.dig gt,,,::::•:::::::.,..iliiiliiim,144 ag,TgAetk,......:•'••-.....::::4::. .1' • E ,0...9..00-40 irtiMPPftiifflifff .. ..1 40 ,44,).. l __ Cn di4t7 t,1 'I irnttr' ��p 61111111.1111\1..111.111 4rff i i �i i; . �9�b .' 1 r" gun quur�y♦ fgyff�,l• • iii 11:11:111:1041 i i �r.:.: Jima 9 G�e - yy rimmtmlle iiIil::�, aem C'. „ �I ,.�.i�%G ►�. 7 aff• t ..�."n19" Wag. 111111111111�'�- �� - •• .1. �i n f J . . a 7...T1■.1.nnnw m t :.:....:.:. .:.. ..:...:... ......:.......... . . :...... ...:.:.:..:........:.:.::::.:.. fe a a — a CB , Y < ,31, UO W J LL /- L= Z / W O v Z ao / 6 Q' li Z_ < 1 11 i I. _. J O..,1 IFY = r Al '� o __ .".1 :. , _.„,,,,,,r ; 1I 1 flg 1 III) i . o . �`s $� /MINA, ,:..eo,— a.., .,e _�. I e .� - ,? lit s n Packet Pare -233- • • 4/14/2015 16.A.2. Certification of Contributory Assets Project Name:Reflection Lakes at Naples Unit II—Phase H and HI Legal Description: Reflection Lakes at Naples—Unit II(Phase II and III)as recorded in Plat Book 46 Pages 33-42,of the public records of Collier County,Florida I � - Name&Address of Owner: SLV Reflection lakes LLC 6310 Capital Drive,Suite 130 Lakewood Ranch,Florida 34202 Type of Utility System Potable Water(Material Only) Item Size Cuantity Unit Cost Total Doude Water Service Long 12 EA $685.00 $8.340.00 Sinn Water$etvice,Lentt 13 EA $387,00 $5,Q31.00 Donde Water Service Short 7 EA $6115.00 $4,865.00 Single Water Service Short 5 EA $387.00 $1,965.00 AubrrlaticFkehiro Device 1 EA $1,200.00 $1,200.00 Relocate Fire Hvdrent End Valve 4 EA $400.00 $1,600.00 Remo.*Master Mater Assembly 1 EA $100.00 $100.00 Total Costs $23,071.00 I do hereby certify the labors to complete the installation/fabrication of the quantities of materials listed above are a true and accurate representation of the system. Certifying Contractor e: Haskins,Inc. By. ii/L- SKINS Print Name of Auth zed Agent/Owner Contractor Address: 10956 Enterprise Avenue Bonita Springs,Florida 34135 State of Florida ) )SS County of LW The F go' g ins ant was signed and acknowledged before me this the day of���fl -2012 by � l S 1&I S as Authorized Agent/Owner of Haskins.Inc. who is personally known to me and did take an oath. CYNleiAvverSTEAD x Notary Public,Mat"or Ronda Mn t Conte E�lnt Aup 16 20ri l Et W - et -;- i' cca mtaabn No.EE " l / (Seal) (Priited Name of Notary) FNOBS M PROORESS\REFLECfON LAKES PHASE 11 d 1111Resecoon lake,W.ro,Mueriel doc J Packet Pa:e -234- • 4/14/2015 16.A.2. Certification of Contributory Assets Project Name:Reflection Lakes at Naples Unit II—I'hase II and III Legal Description: Reflection Lakes at Naples—Unit II(Phase II and III)as recorded in Plat Book 46 Pages 33-42,of the public records of Collier County,Florida Name&Address of Owner SLV Reflection Lakes LLC 6310 Capital Drive,Suite 130 Lakewood Ranch,Florida 34202 Type of Utility System Sanitary Sewer(Material Only) teem Slze 011arltily Unit Cost Total Double 6-Lateral with Cut-In Wye 8 EA $220.00 $1,760.00 Single 8"Lateral with Cut-In Waye 5 EA $150.00 $750.00 Cut-In Wye into existing lateral 10 EA $275.00 $2,750.00 Change Single Clean-out to Double Cleanout 6 EA $195.00 $1,170.00 Total Costs $6,430.00 I do hereby certify the quantities of materials listed above are a true and accurate representation of the system. Certifying C' tract. ame: Haskins Inc. BY:.4 •-..red Name of Auth.rized Agen Owner Contractor Address: 10956 Enterprise Avenue Bonita Springs,Florida 34135 State of Florida ) )SS County of The Foregoing instrument was signed Authorized Agent/Owner of Haskins,Inc who is personally known to by>LIARt.RN Ftt15k1N5 F me and did take an oath. (Printed Name of No Notary) (Seal) 4,•;•&,. RYAN MACPHEE of ,t, t.{, Notary Public,Stete of Florida My Comm.Expires April 27,2015 Commission No.EE 88352 Mien`OwnerUppData LocalNicroset1Wiedowaemporary Intemet FilesContent.Outlaok186)06VBC■Reneclion lake.Sewer Material.doe Packet Pa:e -235- 4/14/2015 16.A.2. Exhibit A Utilities Performance Security(UPS) and Final Obligation Bond Reflection Lakes at Naples, Unit 2 Phases 2 &3 Amount Receipt Number 10%UPS Bond $ w/Plat Final Obligation Bond $4,000.00 2012095925 Total Amount $4,000.00 The 10%UPS Bond,if applicable,is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials,not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond,if applicable,in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment Packet Pa:e -236- • IP 4/14/201516,A.2. Verification of Final Cost Project Name:Reflection Lakes at Naples Unit II—Phase II and III Legal Description: Reflection Lakes at Naples—Unit H(Phase II and III)as recorded in Plat Book 46 Pages 33-42,of the public records of Collier County,Florida Name&Address of Owner: SLV Reflection Lakes,LLC 6310 Capital Drive,Suite 130 Lakewood Ranch,Florida 34202 Type of Utility System Sanitary Sewer(Labor and Material) Item Size Quantity Unit Cost Total Double 6"Lateral with Cut-In Wye 8 EA $1,750.00 $14,000.00 Single 6"Lateral with Cut-In Wye 5 EA $1,750.00 $8,750.00 Cut-In Wye into existing lateral 10 EA $775.00 $7,750.00 Change Single Clean-out to Double Cleanout 6 EA $575.00 $3,450.00 Remove Existing Cleanout and Pipe(Labor Only) 2 EA $150.00 $300.00 Total Costs $ 34,250.00 I do hereby certify that the quantities of materials and services listed above are a true and accurate representation of the as-installed cost of the system. Certifying Contractor Name: Haskins,Inc. ,o/By:_ P t-.Name of Authorized Agent/Owner Contractor Address: 10956 Enterprise Avenue Bonita Springs,Florida 34135 State of Florida ) )SS County of ,.EE) The Foregoing instrument was signed and acknowledged before me this the /41'"day of OLTOBEIC 2012 by //Rtta Ad //,9sit/NS as Authorized Agent/Owner of Haskins,Inc. who is personally known to me and did take an oath. " "j RYAN , MA of � ; Motery Public,State of Florida l. (Printed Name of Notary)ry) (Seal) •.��`.•` My Comm.Expires April 27,2015 •44. Commission No.EE 88352 C:\Users\OwnerWppData\Local Vvficrosoft\Windows\Temporary Internet Files\Conten(.Outlook\88106VBC\Refl ction lakes Verification Sewer.doc Packet Pare -237- r • • 4/14/2015 16.A.2. Verification of Final Cost Project Name:Reflection Lakes at Naples Unit II—Phase II and III ^ Legal Description: Reflection Lakes at Naples—Unit I1(Phase II and III)as recorded in Plat Book 46 Pages 33-42,of the public records of Collier County,Florida Name&Address of Owner: SLV Reflection lakes,LLC 6310 Capital Drive,Suite 130 Lakewood Ranch,Florida 34202 Type of Utility System Potable Water(Labor and Material) Item Size Quantity Unit Cost Total $ $ Double Water Service Long 12 EA 1,150.00 13,800.00 $ $ Single Water Service Long 13 EA 1,150.00 14,950.00 $ $ Double Water Service Short 7 EA 850.00 5,950.00 $ $ Single Water Service Short 5 EA 850.00 4,250.00 $ $ Automatic Flushing Device 1 EA 2,250.00 2,250.00 $ $ Relocate Permanent Sample Point 1 EA 350.00 350.00 $ $ Remove Existing Fire Hydrant&Valve 4 EA 950.00 3,800.00 $ $ Remove Master Meter Assembly 1 EA 300.00 300.00 $ �.., Total Cost 45,650.00 I do hereby certify that the quantities of materials and services listed above are a true and accurate representation of the as-installed cost of the system. Certifying Contractor Name: Haskins,Inc. :: •• Notary Public,State of Florida •-1�...a My Comm.Expires April 27,2015 '.1t,'e' Commission Na.EE 88352 By: .4111.010.4.i ' �% P . ted Name of Authorized Agent/Owner C:\Users\Owner\AppData\Local\Microsoa\Windows\Temporary Internet Files\ContentOutlook\L8J06VBC1Reaection lakes Verification Water.doc r, Packet Pare -238- • • 4/14/201516.A.2. Verification of Final Cost Contractor Address: 10956 Enterprise Avenue Bonita Springs,Florida 34135 State of Florida ) )SS County of LEE) The Foregoing instrument was signed and acknowledged before me this the /(o day of OOToodz 2012 by NA141.l1A/ i-A5k1s15 as Authorized Agent/Owner of Haskins,Inc. who is personally known to me and did take an oath. ,, RYAN MACPHEE ...‘#."11111(Printed Name of Notary) (Seal) F t Notary Public,State of Rorkle My Comm.Expires April 21,2f{t Commission No.EE 88352 C:\Users\OwnerAppDatall.ocaMAicrosoft\Windows\Temporary Internet Files\Can ntOutloo16$8106VBC\nneflaction lakes verification Water.doc Packet Pa:e-239- 4/14/2015 16.A.2. Growth Management Division er County 28X Horseshoe Drive N. Naples,Fl. 34104 239-252-2400 .1"1 RECEIPT OF PAYMENT Receipt Number: 2012095925 Transaction Number: 2012-044786 Date Paid: 12/19/2012 Amount Due: $4,000.00 Payment Details: Payment Method Amount Paid Check Number Check $4,000.00 1206 Amount Paid: $4,000.00 Change/ Overage: $0.00 Contact: SLV Reflection Lakes, LLC 6310 Capital Drive# 130 Lakewood Ranch, FL 34202 FEE DETAILS: Fee Description Reference Number Qdgimal Amount GL Account Etc Paid Refundable Bonds PL20120002681 $4,000.00 $4,000.00 670-000000-220113 Cashier Name: LeaDerence Batch Number: 2878 Entered By: hughesj ".1 Packet Pare -240-