Agenda 03/24/2015 Item #16C2 3/24/2015 16.C.2. EXECUTIVE SUMMARY Recommendation to approve a $468,196 work order to Douglas N. Higgins, Inc., under Request for Quotation 14-6213-22 for Underground Utility Contracting Services for the Wastewater Pump Station 151.00 Rehabilitation Project, Project Number 70046; and, authorize the necessary budget amendment. OBJECTIVE: To bring outdated utility infrastructure into compliance with current standards while meeting the demand for service, protecting public health and safety, providing proactive environmental protections and supplying backup pumping capability during power outages. CONSIDERATIONS: On June 10, 2014, as Agenda Item 11C, the Board of County Commissioners (Board) approved the Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water User Rate Study. The proposed scope of work is consistent with Project 70046, "Wastewater Pump Station TSP"on page 3-186, line 75 of the user rate study. Funding for Project 70046 is available in and is consistent with the FY2015 CIP Budget. Pump Station 151.00 is a submersible wastewater pumping station located on Bent Tree Lane servicing the Stonebridge (previously South Hampton) community. Stonebridge is a 300 +1- acre residential and golf community adjacent to the southwest intersection of Immokalee Road and Airport Pulling Road. The community consists of 801 residential households, a golf course, and a 20,000 square foot clubhouse. Wastewater service to this community is comprised of five pump stations (151.00, 151.01, 151.02, 151.03, and 151.04) that collect sewage from smaller local gravity systems. Pump station 151.00 is a community pump station that receives wastewater flow from the other pump stations. Wastewater flows pumped from pump station 151.00 are discharged into an existing six-inch diameter PVC force main. Along Bent Tree Lane, the force main increases to an eight-inch PVC force main that discharges to a 12- inch force main located in the median of Immokalee Road at the intersection with Bent Tree Lane. The force main system along Immokalee Road is manifolded with several pump stations and also has sections of parallel pipes. The force main system terminates at the North County Water Reclamation Facility. The scope of work includes the addition of a standby diesel pump as part of the emergency power program. When any of the following four conditional criteria are met, then a permanent generator or standby diesel pump operationally is required: 1) pump stations that have 25 horsepower or greater motors, 2) pump stations that are fed by four or more other pump stations, 3) pump stations that pump directly to a wastewater force main that pumps directly to the plant or, 4) pump stations that are operationally critical to hospitals, nursing homes, and environmentally sensitive areas. This project meets two of the four criteria. The condition of this asset is defined as "Red: Level 3 —Risked Compliance" as reported to the Board at the October 1, 2013 Asset Assessment and Management Workshop. The emergency diesel pump will allow the continued pumping of wastewater flows during power outages, and increases station reliability. The existing pumps are appropriate for the capacity of pump station 151.00; however, the installation of variable frequency drives will allow the station to operate at reduced speeds, which reduces pump wear and power cost. The confined space valve vault will be eliminated by moving piping and appurtenances above grade. The Procurement Services Division electronically distributed Request for Quotation 14-6213-22, Pump Station 151.00 Improvements, January 20, 2015, to the six vendors under the Fixed-Term Underground Utilities Contract No. 14-6213. Five of those contractors submitted quotations by the February 12, 2015, deadline. The quotations are summarized below. Packet Page-623- 3/24/2015 16.C.2. VENDOR QUOTE Douglas N Higgins $ 468,196.00 Quality Enterprises $ 487,245.50 Mitchell & Stark $ 528,000.00 Kyle Construction $ 535,400.00 Haskins, Inc $ 603,000.00 Southwest Utility Systems, Inc. Did Not Quote The engineer's opinion of probable construction cost was $514,000. Staff reviewed the quotations and determined Douglas N. Higgins, Inc., to be the lowest qualified and responsive bidder at approximately nine percent below the engineer's cost estimate. The quote tabulation and graph are Attachments l and 2, respectively. The Procurement Services Division concluded that bidding was competitive and representative of market conditions. The project design professional, Stantec Consulting Services, Inc., also recommends award of this work order to Douglas N. Higgins, Inc., per the attached letter dated February 19, 2015 (Attachment 3). Douglas N. Higgins, Inc. has a satisfactory performance and warranty record on other similar county utility-related construction projects. The bid specifications informed the bidders there may be unforeseen conditions associated with the project. The project cost includes an allowance of $43,000 for owner- directed work due to unforeseen corrosive or geological conditions that include, but are not limited to, repairs due to structural deterioration, and/or replacement of defective mechanical equipment and deficient electrical components. Subject to the Purchasing Ordinance, staff will negotiate a price for any additional work due to unforeseen conditions prior to commencement. FISCAL IMPACT: Funding is available in, and is consistent with, the FY2015 Capital Budget approved by the Board on June 10, 2014. The source of funding is the Wastewater User Fee Fund (414). A budget amendment is required from Project 73950,Fund (414), in the amount of$468,196. The operating budget impact of the completed project is reflected in the table below. The total capital cost to implement Project 70046 Pump Station Rehabilitation is $468,196. While this asset is being replaced due to its condition and criticality, an additional benefit is the resulting annual cost savings of approximately $414 based on an approximate 15 percent reduction in power required. There will be an increase in maintenance cost for the standby pump of approximately $1,060. The resultant operating cost increase is $646 annually. Elements FY 2013 FY 2014 FY 2014 -FY2033 Capital Outlay $468,196 $0 $0 Operating Cost Change * $0 $646 $12,920 *Approximate cost change in the annual operating budget for each fiscal year over the life of the asset. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval.—SRT Packet Page -624- 3/24/2015 16.C.2. GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio Governing Board of the Collier County Water-Sewer District, approve a $468,196 work order under Request For Quotation 14- 6213-22 to Douglas N. Higgins, Inc.; and, authorize the Chairman to sign and execute the work order after final review by the County Attorney's Office; and approve the necessary Budget Amendment to transfer funds in the amount of$468,196 from 73950—NCWRF CAP BTG 30.6, to 70046 — WW Pump Station TSP. Prepared By: Corinne Trtan, Project Manager, Public Utilities Planning and Project Management Division Attachments: Attachment 1-Quote tabulation Attachment 2-PPMD Quote Analysis Attachment 3-Recommendation Letter Attachment 4- Work Order Packet Page-625- 3/24/2015 16.C.2. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.2. Item Summary: Recommendation to approve a $468,196 work order to Douglas N. Higgins, Inc., under Request for Quotation 14-6213-22 for Underground Utility Contracting Services for the Wastewater Pump Station 151.00 Rehabilitation Project, Project Number 70046; and, authorize the necessary budget amendment. Meeting Date: 3/24/2015 Prepared By Name: TrtanCorinne Title: Project Manager,Public Utilities Engineering 2/25/2015 3:29:26 PM Submitted by Title: Project Manager,Public Utilities Engineering Name: TrtanCorinne 2/25/2015 3:29:27 PM Approved By Name: NagySteve Title: Manager- Wastewater Collection, Wastewater Date: 2/25/2015 3:43:31 PM Name: HapkeMargie Title: Recycling Coordinator, Solid &Hazardous Waste Management Date: 2/26/2015 8:57:18 AM Name: JacobsSusan Title: Operations Analyst, Wastewater Date: 2/26/2015 3:11:10 PM Name: Joseph Bellone Title: Director-Operations Support, Utilities Finance Operations Date: 2/26/2015 4:34:33 PM Packet Page-626- 3/24/2015 16.C.2. Name: MarkiewiczJoanne Title: Director-Purchasing/General Services,Purchasing& General Services Date: 2/27/2015 6:59:17 AM Name: JohnssenBeth Title: Director-Wastewater, Wastewater Date: 2/27/2015 9:30:59 PM Name: JohnsonScott Title: Manager-Procurement, Purchasing&General Services Date: 3/2/2015 8:27:09 AM Name: ChmelikTom Title: Division Director-Public Utilities Eng, Public Utilities Engineering Date: 3/2/2015 1:03:21 PM Name: HerreraSandra Title: Manager-Procurement, Purchasing&General Services Date: 3/2/2015 3:25:07 PM Name: HallSwainson Title: Procurement Specialist,Purchasing&General Services Date: 3/4/2015 2:00:33 PM Name: PajerCraig Title: Project Manager, Principal,Public Utilities Engineering Date: 3/4/2015 2:47:32 PM Name: TeachScott Title: Deputy County Attorney, County Attorney Date: 3/9/2015 11:18:19 AM Name: YilmazGeorge Title: Department Head-Public Utilities,Public Utilities Department Date: 3/13/2015 8:19:21 AM Name: KlatzkowJeff Title: County Attorney, Date: 3/13/2015 8:40:20 AM Name: IsacksonMark Title: Division Director-Corp Fin&Mgmt Svc, Office of Management&Budget Date: 3/13/2015 9:33:09 AM Packet Page -627- 3/24/2015 16.C.2. Name: OchsLeo Title: County Manager, County Managers Office Date: 3/13/2015 4:08:29 PM Packet Page-628- 3/24/2015 16.C.2. 8 8 8 4 8 8 ; 3 .Ya'. 8 m L'ii;i r; 2 _ n pp3 N S N :xSi1� O N N V S N Q • p �} p N�pp `C H O N w - 8 8 8 ,_.1.:.c a Q W IrT bn a6.:2►!�� t s+zff:- P_ o rf e 0. •`8 � ,._..,.t...: 8 v9 a Ix o" � „ a N n O M WI F m S. T 8 a ." aM .co z N N a 01 v m « 'm v_ --1.,;" w m ,r di 9 m 1111: ta '..-7. 7 m N C 0. u 1 E z o Z: o w a o : ' N n jWu! i Packet Page -629- 3/24/2015 16.C.2. a 0 C CD m raa v o o — o cD W 73 'D C a i U '.S Q -0 -6 3 -a o F. a a 1.7.; > C� O - O �, W S c-i > Y N _ _ C [6 LU (B f6 O C UJ 0 d D + o O + v U a) o I L a ,; C o_ Y f0 ....• I • I I I I I O Y I C w ct O I C 6 v •1 v co ,� I 1 Y LA I I r"1 I I Y C cp O y = ++ V) I • I I I 0. 1 1 I E I i ( 1 1 Q Q. I I 1 v C 4J I �r > f6 1 1 i N u 1 RS ■ O I r Il } I I I t I r ■ °o °o °o °0 00 °o °o voi S in 0 0 0 0 0 0 0 o 0 0 0 0 0 o i 0. 0 0 0 0 0 0 0 I lD u'7 V KJ N `-4 1 Packet Page-630- 3/24/2015 16.C.2. Stantec Consulting Services Inc. q ar 3200 Bailey L a n e, *200, Naples, Florida 34105, � February 19, 2015 File: 177310564 Attention: Ms. Corinne Trtan Project Manager Collier County PPMD 3339 Tamiami Trail East, Suite 301 Naples, FL 34112 Dear Ms. Trtan, Reference: PS 151.00 Improvements (Collier County PPMD Project#70046.20.2), Bid Tabulation Quotes for the referenced project were opened at 3:00 pm on February 12, 2015. Five (5) bids were received and subsequently tabulated by Stantec. The apparent responsive, responsible, and qualified, low bidder was Douglas N. Higgins, Inc. with a bid of$468,196.00. The Engineer's Opinion of Probable Cost for the project is $471,200.00.The bids have been tabulated, along with the engineer's estimate, and are being provided as an attachment to this letter. Please let us know if we can be of further assistance in concluding the Bidding Phase for this project. Regards, STANTEC CONSULTING SERVICES INC. Project Manager Phone:239-910-2757 marc.lean @stantec.com Attachment: Bid Tabulation, PS 151.00 Packet Page-631- 3/24/2015 16.C.2. g,1O o g 81 ry 8 ry 8 e °e 818 2 bwlw w w w u 8 10 8 t Ft .7 E § E § E § E x d i ry a U gg:. 8e $ 2 S e Q $ m u 8 gE» 2 w w « n« w 2 Y A ! ry .! 8 u o f ry a «I E E Im 12 c 9 a u n IE a G U � 2 Ts .- Packet Page -632- 3/24/2015 16.C.2. i WORK ORDER/PURCHASE ORDER Contract 14-6213 '`Annual Underground Utility Contractors" Contract Expiration Date: July 7, 2016 RFQ 14-6213-22 t./ This Work Order is for Utility Contractor services for work known as: Project Name: Pump Statign 151.00 Improvements (Stonebridge) Project No: 70046.20.3 �/ The work is specified in the proposal dated February 12, 2015 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions of thee Agreement referenced above, this Work Order/Purchase Order is assigned to:Douglas N.Higgins,Inc. Scope of Work: As detailed in the attached proposal and the following: * Task I Rehabilitation of New Pump Station * Task I1 Mobilization/Demobilization * Task III Owner Directed Allowance Schedule of Work: Complete work within 365 days(substantial completion within 305 days) from the date of the Notice to Proceed which is accompanying this Work Order. The Vendor agrees that any Work Order that extends beyond the expiration date of Agreement #14-6213 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s):) Z Negotiated Lump Sum (NLS), Lump Sum Plus Reimbursable Costs (LS+RC) ZTime & Material (T&M) (established hourly rate – Schedule A) ❑Cost Plus Fixed Fee (CPFF),as provided in the attached proposal. Task I $ 405,333.00 NLS Task [I `'$ 19,863.00 NLS - Task 11 $ 43,000.00 T&M TOTAL FEE $ 468,196.00 ��L °9 PREPARED BY: � "`7"o-Z //S g") Corinne Trtan, Project Manager Date APPROVED BY: _ _ Z (Z 3[ t Crai► Paje ' ' opal •.ject Manager Date --- APPROVED BY: 4 T Chmelik, MD Department Director Data Page 1 of 3 Packet Page -633- 3/24/2015 16.C.2. APPROVED BY: / ' ) Steve Nagy, Wastewater Collections Manager Date APPROVED: 0=*)c- Bet hnssen, astewater Director -Date APPROVED BY: 1 �µ------yam Z-3 t George Yilmaz, Division Administrator Date By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses, that, to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity(financial,contractual,organizational, or otherwise)which relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning of any actual or potential conflict of interest that arises during the Work Order and/or project duration. ACCEPTED BY: Douglas N. Higgins, Inc. Bran,y Bartolone, Vice President Date Page 2 of 3 Packet Page -634- C.) 3/24/2015 16.C.2. IN WITNESS WHEREOF, the parties hereto, have each, respectively, by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk of Courts COLLIER COUNTY, FLORIDA By: By: Tim Nance, Chairman Dated: (SEAL) Douglas N. Higgins,Inc. first fitness Brandy :a . :•- ice President ,/d/1/42,-/466r--7/i, Pri/ �, 'r Second Witness 41-vPrint AI .r. es to For and egality: III I / - ---- --- Sc''tt• R. Teach, Deputy ounty Attorney Page 3 of 3 Packet Page -635- GP 3/24/2015 16.C.2. County C13---tle?" Administrative Services Division Purchasing REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT #14-6213 "Annual Contract for Underground Utilities & General Contractors" Date: January 20, 2015 From: Swainson Hall, Procurement Strategist 239-252-8935, Telephone Number 239-252-6334, Fax Number swainsonhall(c�colliergov.net To: Potential Proposers Subject: RFQ #14-6213-22 Pump Station 151.00 Improvements As provided in the referenced contract, the Collier County Purchasing Department is soliciting quotes for the referenced project. RFQ Due Date: 3:00 PM 1/30/2015 Q&A Deadline: 5:00 PM 1/26/2015 Non-Mandatory 2:00 PM 1/23/2015 Purchasing Conference Room Pre-Quote Meeting 3327 Tamiami Trail East, Naples, FL 34112 Number of Days to Final Completion: _ 305 days substantial 60 days final/365 total Scope Provided Yes Plans and Specs: Yes Estimated Value _ Attached Liquidated Damages: $1,002.50 per day Payment & Performance Bonds _ Yes, if project value exceeds $200,000 Direct Material Purchase No Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. Douglas N. Higgins, Inc. Firm's Complete Legal Name 239-774-3130/239-774-4266 To ._r ax �um.er- ....._...._ -tu Vice • -at! Re•ional Wier. Title Brandy Bartolone _ ;,( 10- j Print Name Date C: Corinne Trtan I Project Manager 1 RI Q 14-6213-22 Packet Page -636- 3/24/2015 16.C.2. ,Or _ler County Email: SwainsonHall @colliergov.net Telephone. (239)252-8935 AdminisUat;ve Services Division FAX. (239) 252-6334 Purchasing ADDENDUM #1 Memorandum Date: January 26, 2015 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum#1 -- RFQ #14-6213-22 Pump Station 151.00 Improvements The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: _ CHANGE: Current Due Date: Friday, January 30, 2015 at 3:00 PM Updated Due Date: Thursday, February 5, 2015 at 3:00 PM If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Corinne Trtan, Project Manager 4 l f1 `V Packet Page -637- 3/24/2015 16.C.2. 0 ,f✓'f• County Email: SwainsonHall©a colliergov.net Telephone: (239) 252-8935 Administrative Services division FAX: (239) 252-6334 Purchasing ADDENDUM#2 Memorandum Date: January 26, 2015 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum #2 — RFQ #14-6213-22 Pump Station 151.00 Improvements The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: CHANGE: Issue Technical Specifications from Project Manager/Engineer If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Corinne Trtan, Project Manager 'Y\41— Packet Page-638- 3/24/2015 16.C.2. i0bt '1t crier Email: SwainsonHall@colliergov.net Telephone: (239)252-5935 Administrative Services Division FAX: (239)252-6334 Purchasing ADDENDUM#3 Memorandum Date: February 2, 2015 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum 43— RFQ#14-6213-22 Pump Station 151.00 Improvements The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: CHANGE: Change 1 — Update due date to Thursday, February 12, 2015 Change 2— Issue clarification from Project Manager/Engineer If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Corinne Trtan, Project Manager J 1 \� Packet Page -639- 3/24/2015 16.C.2. colter linty Email: SwainsonHall@colliergov.net Telephone: (239)252-8935 Administrative Services Division FAX: (239)252-6334 Purchasing ADDENDUM #4 Memorandum Date: February 5, 2015 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum#4— RFQ#14-6213-22 Pump Station 151.00 Improvements The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: CHANGE: Change 1 — Update to Technical Specifications If you require additional information please post a question on the Online Bidding site or contact me using the above contact information, c: Corinne Trtan, Project Manager Packet Page -640- 3/24/2015 16.C.2. (fa ier County Email: SwainsonHall @colliergov.net Telephone: (239)252-8935 Adrrinistsattve SeMoss Division FAX: (239)252-6334 Purchasing ADDENDUM #5 Memorandum Date: February 10, 2015 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum #5—RFQ#14-6213-22 Pump Station 151.00 Improvements The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: CHANGE: Change 1 — Updates to Plans and clarification/changes from Project Manager/Engineer; see attachments If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Corinne Trtan, Project Manager 1 " �c • Packet Page -641- 3/24/2015 16.C.2. Co .e, Cpounty Email: SwainsonHall @colliergov.net Telephone: (239)252-8935 Administrative Services Division FAX: (239)252-6334 Purchasing ADDENDUM#6 Memorandum Date: February 10, 2015 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum #6— RFQ#14-6213-22 Pump Station 151.00 Improvements The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: CHANGE: Change 1 — Updates to Quote Schedule If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Corinne Trtan, Project Manager 1 \`3 Packet Page -642- 3/24/2015 16.C.2. 8 $ 8 j N o § 6 r y M IA 0 a 8 8 ii ot1 $ 8 Np N i ,:t § g , 8 8 8 g CJ 8 8 I' 8 i. 8 S y y. 8 0 N Ng., • ,..:. 8 8 8 V to , 8 8.g § 8 N N z W to g E cC x w 3 i RU OO 8 O o r g V P a N a N 8 8 S ; 8 O O M 8 c. U ri F w 1- m - d e. 0: a E v m m m a 0 co v o H- il. O c .S .2 , V7 c 4 Z 0 0 N M 0 - Ea- • Packet Page-643-