Agenda 02/10/2015 Item #16A 2 2/10/2015 16.A.2. EXECUTIVE SUMMARY Recommendation to approve final acceptance of the water utility facility for Gaspar Station, Phase 1, PL20130000666, and to authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount of $4,000 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of this water facility, and to release the Final Obligation Bond in the amount of$ 4,000.00, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Gaspar Station, Phasel has constructed the water facility within dedicated easement to serve this development. (See attached location map) 2) Preliminary acceptance of this utility facility was approved by the Engineering Services staff on May 14, 2013. At that time, the value of this utility facility (asset) was $29,864.67 for the water facility. See attached Asset Sheet. 3) Staff recorded all preliminary acceptance documents in the public records of Collier County, which were reviewed and approved by the County Attorney's office as to form and legality. 4) The water utility facility has been operating and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by the Engineering Services staff on July 2, 2014 in coordination with Public Utilities, and this facility has been found to be satisfactory and acceptable. 6) The subject utility is located off-site. The on-site sewer utility is owned and maintained by the owner. 7) Staff recommends final acceptance of the subject utility facility and to release the Final Obligation Bond in the amount $4,000.00. (See attached Exhibit A) 8) This final acceptance is in accordance with Collier County, Ordinance No. 2004-31, as amended. 9) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. Packet Page-165- 2/10/2015 16.A.2. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water- Sewer District receiving unconditional title to the utility facility, which at the time of preliminary acceptance, had a total gross value of$29,864.67 (no depreciation applied). GROWTH MANAGEMENT IMPACT: Approval of this Executive Summary will have no Growth Management Impact. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS RECOMMENDATION: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance of this water utility facility for Gaspar Station, Phase 1, PL20130000666, and authorize the County Manager, or his designee, to release the Final Obligation Bond in the amount of$4,000.00 to the Project Engineer or the Developer's designated agent. Prepared by: Jodi Hughes, Associate Project Manager, Growth Management Division Attachments: 1) Location Map, 2) Asset Sheet and 3) Exhibit A Packet Page -166- 2/10/2015 16.A.2. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.2. Item Summary: Recommendation to approve final acceptance of the water utility facility for Gaspar Station, Phase 1, PL20130000666, and to authorize the County Manager, or his designee,to release the Final Obligation Bond in the amount of$4,000 to the Project Engineer or the Developer's designated agent. Meeting Date: 2/10/2015 Prepared By Name: HughesJodi Title: Project Manager, Associate,Natural Resources 12/23/2014 3:02:07 PM Approved By Name: Pam Libby Title: Manager-Water Distribution &Wellfield, Water Date: 12/23/2014 3:20:50 PM Name: Steve Messner Title: Director-Water, Water Date: 12/23/2014 3:23:29 PM Name: SunyakMark Title:Project Manager,Principal, Public Utilities Engineering Date: 12/24/2014 11:10:54 AM Name: KovenskyKenneth Title: Manager Financial &Operational Support, Operations&Regulatory Management Date: 12/24/2014 4:30:39 PM Name: LorenzWilliam Title: Director-CDES Engineering Services,Natural Resources Date: 12/27/2014 9:57:06 AM Name: PuigJudy Title: Operations Analyst,Community Development&Environmental Services Packet Page-167- 2/10/2015 16.A.2. Date: 1/6/2015 4:24:36 PM Name: McKennaJack Title: Manager-Engineering Review Services,Natural Resources Date: 1/15/2015 11:37:13 AM Name: MarcellaJeanne Title: Executive Secretary, Transportation Planning Date: 1/20/2015 9:41:20 AM Name: StoneScott Title: Assistant County Attorney, CAO Land Use/Transportation Date: 1/20/2015 1:46:34 PM Name: KlatzkowJeff Title: County Attorney, Date: 1/21/2015 10:54:28 AM Name: IsacksonMark Title: Director-Corp Financial and Mngmt Svs, Office of Management&Budget Date: 1/30/2015 8:38:19 AM Name: DurhamTim Title: Executive Manager of Corp Business Ops, Date: 1/30/2015 5:03:33 PM Packet Page -168- 2/10/2015 16.A.2. SL 3111.1.50011 GC 31Y15a314 i iyy �� C i Z 11.1 0 F < RR c O I i 9 S J I Q 0�\ • —71.7— _ 1 a I i1 i i I i 1 $ ____ g I I __________ 7 f i i t � g d . - r w 0 3NJS 01 1041 F cc w O- W iga oCd - 't �J r W$ C . 4 Otivn3�nOS Ntl90'1 II of O.' H a jr. 3',53 L� 'C'' 0 J, S° /l�a. �� ° r w5 S['31V1Sa31Nl < NDLUW!°1N I � 9Rb.1Nl.nP.IVO SWUM SS3ad10 All ; ._ 5 3 s..3.15tl31N1 -1 /- W iWil � Iwo <W) �{VINGSTON:Is � ++SSgg � � wuvn rmrm- = g., a0 �m 75 r:r.2 J g6y m s 0 � o R <__, aeotl No1s�Nwi a .4 J .dN V.,.i rid' 0 g i . — in ca�Y� � 68; p.. uc-a�ol `> �o�I .. i 4� � °� 1____T_3� 3C avow ONITno-ltloaan �' 1 I /117 s'i• kli o� II �� X11 ....9 Packet Page-169- CERTIFFTION OF CONTRIBUTORY COSTS (WJ, 2/10/2015 16.A.2. PROJECT NAME: GASPAR STATION PHASE ONE LOCATION: Section 30 Township 48S Range 26E Collier County, Florida NAME &ADDRESS OF OWNER: BOOS DEVELOPMENT GROUP, INC. 2651 MCCORMICK DR CLEARWATER, FLORIDA 33759 TYPE OF UTILITY SYSTEM: POTABLE WATER(MATERIALS ONLY) M:cft 1i .4 rM 01...h .W. I P ° 4i1 .tZ,.� ,� i . ` .t _ � -. py!1 � -� : o YI. g q"� T 2 i° 7 W :: :1:sa -5 'Z,it ' 5: �imui Win. _ E _ 11lik iiiae-1 �, ° Tapping Saddle and Valve 12"x 8" 1 EA $2,490.37 $2,490.37 HDPE Casing 14" 120 LF $41.00 $4,920.00 HDPE Pipe 8" 130 LF $12.93 $1,680.90 Gate Valve 8" 2 EA $980.84 $1,961.68 Gate Valve 6" 2 EA $763.56 $1,527.12 Fire Hydrant 2 EA $1,601.55 $3,203.10 Ductile Iron Pipe 8" 175 LF $23.65 $4,138.75 C900 DR18 Pipe 8" 340 LF $9.01 $3,063.40 C900 DR14 Pipe 8" 185 LF $11.23 $2,077.55 Water Service 1 1/2" 1 EA $418.03 $418.03 Automatic Flushing Device 1 EA $4,383.77 $4,383.77 TOTAL COST $29,864.67 I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed system. CERTIFYING: NAME&TITLE OF ENGINEER CERTIFYING OF: STANTEC 3200 Bailey Lane Suite 200 Naples, FL 34105 I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed cost of the system. CERTIFYIN -. Kevin -nse President OF: JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 7 day of March,2013 by Jesnen o is perso•ally l • • did not take an oath. ,, J , 4�nr(,, , P� 9,, DONNA L.VENTRE 1, ( _` .' ".`r. Notary Public-State of Florida imp. �P L 4 , a.• -fi1-10y Comm. Expires Jun 1,2015 on a Ventre , No ary Public , ; -F `,o-s` Commission # EE 97879 t Packet Page-170- 2/10/2015 16.A.2. Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Gasper Station, Phase 1 Amount Receipt Number 10%UPS Bond w/plat Final Obligation Bond $4,000.00 2013109101 Total Amount $4,000.00 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment Packet Page -171- Bi 40 2/10/2015 16.A.2. OFICATION OF FINAL COST PROJECT NAME: GASPAR STATION PHASE ONE LOCATION: Section 30 Township 48S Range 26E Collier County,Florida NAME&ADDRESS OF OWNER: BOOS DEVELOPMENT GROUP,INC. 2651 MCCORMICK DR CLEARWATER,FLORIDA 33759 TYPE OF UTILITY SYSTEM: POTABLE WATER Tapping Saddle and Valve 12"x 8" 1 EA $7,490.00 $7,490.00 HDPE Casing 14" 120 LF $41.00 $4,920.00 HDPE Pipe 8" 130 LF $23.00 $2,990.00 Gate Valve 8" 2 EA $1,185.84 $2,371.68 Gate Valve 6" 2 EA $968.56 $1,937.12 Fire Hydrant 2 EA $1,796.55 $3,593.10 Ductile Iron Pipe 8" 175 LF $29.65 $5,188.75 C900 DR18 Pipe 8" 340 LF $15.01 $5,103.40 C900 DR14 Pipe 8" 185 LF $17.23 $3,187.55 Water Service 1 1/2" 1 EA $968.03 $968.03 Automatic Flushing Device 1 EA $4,883.77 $4,883.77 TOTAL COST $42,633.40 I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as-installed system. CERTIFYING: Name and Title of Engineer Certifying OF: STANTEC 3200 Bailey Lane Suite 200 Naples,FL 34105 I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as-installed cost of the system. CERTIFYING: Kevin Jense ,Pres'•- t OF: JENSEN UNDERGROUND UTILITIES,INC. 5585 Taylor Road Naples,Florida 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 7 day of March,2013 by Kevin Jense• ,who is p-rsonally kn•wn to me and who did not take an oath. jj�� L t J Iii,.....-..t_...11�. !�� SEAL: .nna L. entre ,Notary Public • .`k 'd�e‘,, DONNA L.VENTRE • �* ` _ Notary Public-State of Florida =_7I : My Comm.Expires Jun 1F 2015 :,, .u° Commission#EE 97879 Packet Page -172- NM& 2/10/2015 16.A.2. IIFICATION OF FINAL COST PROJECT NAME: GASPAR STATION PHASE ONE LOCATION: Section 30 Township 48S Range 26E Collier County,Florida NAME&ADDRESS OF OWNER: BOOS DEVELOPMENT GROUP,INC. 2651 MCCORMICK DR CLEARWATER,FLORIDA 33759 TYPE OF UTILITY SYSTEM: SANITARY SEWER SDR 26 Pipe 8" 205 LF $58.60 $12,013.00 SDR 26 Pipe 6" 30 LF $11.48 $344.40 Cleanout 6" 1 EA $366.24 $366.24 Manhole 2 EA $5,097.20 $10,194.40 TOTAL COST $22,918.04 I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as-installed system. CERTIFYING: Name and Title of Engineer Certifying OF: STANTEC 3200 Bailey Lane Suite 200 Naples,FL 34105 I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as-installed cost of the system. CERTIFYING: / ' Kevin Jensen,Pre '.tnt OF: JENSEN UNDERGROUND UTILITIES,INC. 5585 Taylor Road Naples,Florida 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 7 day of March,2013 by Kevin Jensen ,who' personally known to me and who did not take an oath. Arta hat I)�r ;V 2,10.170100 SEAL: '7■.-a L.Ventre ,Notary Pubic a.;kr";,o DONNA L.VENTRE rr«. .\.S Notary Public-State of Florida My Comm.Expires Jun 1,2015 Commission # EE 97879 Packet Page-173- • 2/10/2015 16.A.2. Growth Management Division �'�s�/"� 2800 Horseshoe Drive N. �.../L) der County Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number: 2013109101 Transaction Number: 2013-011984 Date Paid: 03/28/2013 Amount Due: $4,000.00 Payment Details: Payment Method Amount Paid Check Number Check $4,000.00 1026 Amount Paid: $4,000.00 Change / Overage: $0.00 Contact: Stiles Investment Inc. PMB PTY 3977 PO BOX 25207 MIAMI, FL 33102 FEE DETAILS: Fee Description Reference Number ri inal Amount GL Account Fee Paid Recording Fee PL20130000666 $4,000.00 $4,000.00 131-138327-344920 Cashier Name: EvelynTrimino Batch Number: 3057 Entered By: hughes_j Packet Page -174-