Loading...
Agenda 01/13/2015 Item #16C 3 1/13/2015 16.C.3. EXECUTIVE SUMMARY Recommendation to award Bid No. 14-6327, "Elevator and Stairs for the South County Water Reclamation Facility," to Heatherwood Construction Company, in the amo nt of $495,623 for Project No.73969,South County Water Reclamation Facility Technical Suppoit for ADA,Fire and Building Code compliance and safety enhancements. OBJECTIVE: To provide building safety enhancements for the South County Water Reclamation Facility (SCWRF) main building to bring it into compliance with the Americans with Disabilities Act (ADA),Fire and Building Code and gain a Certificate of Occupancy(CO). CONSIDERATIONS: The South County Water Reclamation Facility was built tin 1986 and services approximately 25,000 residents. The SCWRF has the permitted capacity to treat up to 16 million gallons of wastewater per day. The plant returns approximately 90% of the treated wastewater flow back to the community as irrigation quality water for beneficial reuse by the local communities to keep up with demand and continuous growth. The facility and buildings have been expanded over the years requiring modifications. As part of a comprehensive building review and asset management study, it was deemed necessary to bring the main building into ADA,NFPA, and Building Code compliance. These improvements ilclude the addition of several improvements to provide compliant building egress and access, as well as compliant fire protection. To meet the building and fire codes, a new exterior stairway must be constructed an existing stairway needs to be widened, and existing windows adjacent to the new stairs need to be replaced with fire-rated, impact resistant windows.To meet and comply with the ADA standards,an elevator must be added which will allow the County to gain a permanent CO. Bid No. 14-6327 was posted July 21, 2014, with 2,041 email notices sent to vendors that provide these services. Forty-nine bidders downloaded full packages, and four bids were timely received. The four qualified bids are summarized below and in the bid tabulation information in the attachments. Bidder Total Bid Amount Heatherwood Construction Company $495,623.0.0 Wright Construction Group $548,346.00 Surety Construction Company $583,707.00 Stultz,Inc. $638,087.15 County staff and the project design architect, Schenkel Shultz, determined the 1dw bid to be fair and reasonable and recommend awarding the contract to Heatherwood Construction Company, the lowest responsive and qualified local bidder. The low bid was above the design architect's estimate of$450,000. The architect's letter of recommendation is Attachment 3. The bid specifications informed the bidders there may be unforeseen conditions associated with the project. The bid amount incorporates a$50,000 allowance for owner-directed additional work including, but not limited to, modifications to concrete footing locations due to existing underground piping, etc. The price for additional work will be negotiated prior to commencement in accordance with the county's t"-■ Packet Page-1020- 1/13/2015 16.C.3. Purchasing Ordinance and the terms of the agreement. A constructability review has been completed by AMEC to ensure planned construction will address all current building code requirements. FISCAL IMPACT: Funding is available in, and is consistent with, the FY15 Capital Budget approved by the Board on September 18, 2014. Funds are available in the Wastewater User Fee Fund(414). The project is expected to be completed by May 31, 2015. The operating budget impact of the completed project is reflected in the table below, based on an estimated useful life of 25 years. The operating budget impact funding source will be user fees. Elements FY 2015 FY 2016-FY2040 Capital Outlay $495,623 0 Inspections&maintenance costs $1,100 $3,300 per year(average) LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval.—SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, award Bid No. 14-6327 for Project No. 73969, "SCWRF Technical Support Project," to Heatherwood Construction Company in the amount of $495,623 and authorize the Chairman to sign the attached Agreement following final review by the County Attorney's Office. Prepared By:Dayne Atkinson,Project Manager,Public Utilities SHWMD Attachments: (1)Bid Tabulation Information (2)PPMD Bid Analysis (3)Architect's Letter of Recommendation (4)Agreement-(Due to the size of the document,a web link is provided for viewing at: http://www.colliergov.net/ftp/AgendaJan 1315/PubUtilities/Agreement.pd£ A hard copy is also available at the County Manager's Office.) Packet Page-1021- 1/13/2015 16.C.3. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.C.16.C.3. Item Summary: Recommendation to award Bid No. 14-6327, "Elevator and Stairs for the South County Water Reclamation Facility,"to Heatherwood Construction Company, in the amount of$495,623 for Project No. 73969, South County Water Reclamation Facility Technical Support for ADA, Fire and Building Code compliance and safety enhancements. Meeting Date: 1/13/2015 Prepared By Name: Dayne Atkinson Title: Project Manager, Solid &Hazardous Waste Management 12/10/2014 10:27:34 PM Approved By Name: Joseph Bellone Title: Director-Operations Support,Utilities Finance Operations Date: 12/16/2014 8:20:05 AM Name: ChmelikTom Title: Director-Public Utilities Engineering,Public Utilities Engineering Date: 12/16/2014 2:26:05 PM Name: JohnssenBeth Title: Director-Wastewater, Wastewater Date: 12/17/2014 7:37:50 AM Name: HerreraSandra Title: Manager-Procurement, Purchasing&General Services Date: 12/17/2014 2:38:58 PM Name: HallSwainson Title:Procurement Specialist,Purchasing&General Services Date: 12/18/2014 10:42:53 AM Name: MarkiewiczJoanne Title: Director-Purchasing/General Services, Purchasing& General Services Packet Page-1022- 1/13/2015 16.C.3. Date: 12/18/2014 11:19:37 AM Name: JohnsonScott Title: Manager-Procurement,Purchasing&General Services Date: 12/18/2014 12:00:40 PM Name: JacobsSusan Title: Operations Analyst, Wastewater Date: 12/18/2014 12:45:02 PM Name: JacobsSusan Title: Operations Analyst, Wastewater Date: 12/18/2014 12:58:35 PM Name: TeachScott Title: Deputy County Attorney, County Attorney Date: 12/22/2014 4:26:03 PM Name: YilmazGeorge Title:Administrator-Public Utilities,Public Utilities Division Date: 12/23/2014 2:00:10 PM Name: KlatzkowJeff P"'\ Title: County Attorney, Date: 12/24/2014 8:48:23 AM Name: UsherSusan Title: Management/Budget Analyst, Senior, Office of Management&Budget Date: 12/30/2014 3:52:05 PM Name: DurhamTim Title: Executive Manager of Corp Business Ops, Date: 1/5/2015 1:48:00 PM Packet Page-1023- 1/13/2015 16.C.3. M 01 0 er a .. O - N a N q w N CO co O N 0 O o E N Oil 6 r O m M ri o 6. o C � J M ui Q N -co N M c 3 T N u O M M O O O D y 2}2 Y m 2 2 T m 2 }m Y m T m �.0 O 0 N N M p N m b - 0 w W w w F w y+ Z C W M Q N O !6 o O 6 0•- N r p O o4 p - n c-,,- < 0 o N en G y g 7. w O V 9 N O w .4 WI w w w N O ^O m a g O p e H N Oi es ten O M W aa, N GO N ' m N J O^i a ,- c7 go a tOO w w w w w w w ca o O o 0 o o 0 O 0 O O m O O N g m ^ O g OD 0 O o < O }}N 2}T}N}2>f'-'Y 2}N }2 _ N- O r; N O N C w H 2 2 a J $F- g Q 08 g o o g 8 0 O < N m < O O 2 2 2 2 N 2 2 V N O O Of O M O! g O 2 2 2 2 2 2 2 2 2 2 Z 25 o m m 0 0 T T T T T T T}Y Y>- N M ,J 1- Z 0 G rnw N W N Mw W w wN ,mw .� m V y n a J < 5 a m °o o g 0 0 °op o °O• M N Z 4:r W 0 N r.. v 8 6 0 Le F"' O V1 SC �o N c!i ai m 0 N 0 ~ tiJ O w tw w w w w o w Q F w °z rn yap 0 g g o 0 g 8,65 N U O - ,,=.5 i� - < O /ate 0 Q V .-'N R M V M M. CO 0 0 Ed O re V J O Ni N (Opi N O } F.W.. Q' m w w is w w w w w z Q - WD CI } E. o 0 0 g 0 g g o C oa ;q S o Z U I- ° o g N N g ° 0 0022222222 W Al O m W Cr Q i- 7 O m a, L i 8 N N O Y}TTT}Y}}} J 9 w W w W w W W F =V O m p U W o0 o O o 0 0 0 0 Z _i A O O O o O O O ce n O °, 2 p O N 0 N en 0 �O Q y w w 0 0 0 0 0 0 $0 W Y'a_ g g 0 g 8 g fn 2 O O O O co u7 M w w w w w w w OC U_ 7 V 2 c< c m0 E W V a 3 �p f0 U'- T U m - m e 2 2 y 2 g C d N 3_,-c c 0] a, r V o O 2 W V)a o" 0 N 2 o "5 _ F- F am0g 2in> c3di 1/13/2015 16.C.3. 0 0 0 Q o 0 0 T�2 4..o 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 b I — Q ri W 4/1". D H M DJ i • ...< illy • m h 1I 1 °o I I W �, , = I 1 Q w Crt W =-`. r,_v;tSr4i..)•A•'v*v4*-o,e..*,--,,,vp.,rwv,-,ioP.Y---1:-w-wst:;'n„..,tf.-:=4e.4,1t;-'' -- i = ...... ara n I n r CC + = 3 cis I I r. .... rat 7 tn V 17 O 1 CD I cn rp)� p 1 r.P l I n rb + p p p 1T. 0 0 s... 0 v C m O4 , r7t S� - ,vy N 3 N O • < t✓ - s 2 O e c Q QQ to D A O. _. _ _`' O?D O' ��D a, CA _i ('-'■ Packet Page -1025- Attachment 3 1/13/2015 16.C.3. SCHEN ELSHULTZ L. :3ARCHITECTU RE D CI U September 3,2014 Mr.Oscar Martinez, P.E., PMP Collier County Public Utilities Division 3301 East Tamiami Trail,Building H Naples, FL 34112 RE: South County Water Reclamation Facility Elevator and Stair Addition for Process Control Building Collier County Quote No. : 14-6327 Dear Mr. Martinez: With respect to the above referenced Project and recently received competitive bids,SchekelShultz Architecture,as Architect of Record for the Project,offers the following: 0 Responsive bids were received August 25,2014 from four(4)General Contractors. The bid tab as provided by the County is as follows: Heatherwood Construction Company $495,623.00 Wright Construction Group $548,346.00 Surety Construction Company $583,707.00 Stultz Inc. $638,087.00 0 The Architect's Opinion of Probable Construction Cost prepared by SchenkelShultz Architecture was$450,000.00. 0 Based upon our review of the bid tab provided and the bid document information submitted by Heatherwood Construction Company relative to the subject quote,SchenkelShultz takes no exception to the County's award of the construction of the Project to Heatherwood Construction in the amount of$495,623.00. 0 At this time SchekelShultz has not been in contact with the references listed by the low bid construction firm within the bid documents. Please advise if it is necessary to do so on the County's behalf regarding further verification of the firm's qualifications and capabilities. 9 All Contractor's bonds and insurance limits as required by the Collier County contract documents should be varified prior to formal execution of the construction contract. Should you require further information regarding this recommendation, please contact me at your earliest convenience. Sinc- ely, i Gary rueger,AIA Partner—SchenkelShultz Architecture Packet Page-1026-