Loading...
Agenda 01/23/2018 Item #16A 301/23/2018 EXECUTIVE SUMMARY Recommendation to approve final acceptance of the potable water and sewer facilities for Memory Care Facility at Creekside East, PL20150001743, accept unconditional conveyance of a portion of the potable water facilities, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $16,503.68 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance of the potable water and sewer facilities, accept unconditional conveyance of a portion of the potable water facilities, and to release the Uti lities Performance Security (UPS) and Final Obligation Bond in the total amount of $16,503.68, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Memory Care Facility at Creekside East, has constructed the potable water and sewer facilities within dedicated easements to serve this private development (see attached location map). A portion of the potable water facilities will be conveyed to the County, as described in Official Records (O.R.) Book 5189, Page (PG) 2781. The remaining potable water and sewer facilities will be private. 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on August 27, 2015. At that time, the value of these potable water utility facilities (assets) was $40,821.48. (See attached asset sheet). 3) Staff recorded all preliminary acceptance documents associated with the potable water facilities conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its interest in a portion of the potable water facilities by Utilities Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5189, at page 2781 of the Public Records of Collier County, Florida. 4) The potable water utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by staff on April 6, 2017, an re-inspected on December 5, 2017 post Hurricane Irma, in coordination with Public Utilities, and these facilities have been found to be satisfactory and acceptable. 6) The on-site potable water and sewer utilities, less the potable water utilities described in O.R. Book 5189, PG 2781, are owned and maintained by the developer. 7) Staff recommends final acceptance of the subject utility facilities and to release the Utility Performance Security (UPS) and Final Obligation Bond in the total amount of $16,503.68. (See attached Exhibit A). 8) This final acceptance is in accordance with Collier County, Ordinance No. 2004-31, as amended. 9) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. 16.A.3 Packet Pg. 195 01/23/2018 FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water-Sewer District receiving unconditional title to a portion of the potable water utility facilities, which at the time of preliminary acceptance, had a total gross value of $40,821.48 (no depreciation applied). GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval -SAS RECOMMENDATION: To approve final acceptance of the potable water and sewer facilities for Memory Care Facility at Creekside East, PL20150001743, accept unconditional conveyance of a portion of the potable water facilities, and to authorize the County Manager , or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $16,503.68 to the Project Engineer or the Developer’s designated agent. Prepared by: Lucia S. Martin, Technician, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Assets Sheet (PDF) 3. Exhibit A (PDF) 16.A.3 Packet Pg. 196 01/23/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.3 Doc ID: 4380 Item Summary: Recommendation to approve final acceptance of the potable water and sewer facilities for Memory Care Facility at Creekside East, PL20150001743, accept unconditional conveyance of a portion of the potable water facilities, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obl igation Bond in the total amount of $16,503.68 to the Project Engineer or the Developer’s designated agent. Meeting Date: 01/23/2018 Prepared by: Title: Technician – Growth Management Development Review Name: Lucia Martin 12/14/2017 9:56 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 12/14/2017 9:56 AM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 12/14/2017 11:16 AM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 12/14/2017 3:48 PM Growth Management Department Judy Puig Level 1 Reviewer Completed 12/14/2017 4:46 PM Water Steve Messner Additional Reviewer Completed 12/18/2017 11:21 AM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 12/26/2017 11:06 AM Growth Management Department Matthew McLean Additional Reviewer Completed 12/26/2017 1:39 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 12/26/2017 1:53 PM Growth Management Department James French Deputy Department Head Review Completed 12/29/2017 10:06 AM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 01/05/2018 8:08 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 01/05/2018 9:20 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 01/05/2018 2:12 PM Budget and Management Office Mark Isackson Additional Reviewer Completed 01/09/2018 10:29 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 01/12/2018 8:53 AM Board of County Commissioners MaryJo Brock Meeting Pending 01/23/2018 9:00 AM 16.A.3 Packet Pg. 197 16.A.3.a Packet Pg. 198 Attachment: Location Map (4380 : Final Acceptance of Utilities - Memory Care Facility at Creekside East) CERTIFICATibfToF CONTRIBUTORY COSTS (WATER) PROJECT NAME: Bayshore Memory Care Section 27 Township 48 S Range 25 E Collier County, Florida LOCATION: NAME & ADDRESS OF OWNER: Creekside East, Inc. 2600 Golden Gate Parkway Naples, FL 34105 TYPE OF UTILITY SYSTEM: POTABLE WATER Total] 1^3 - , r„ .. Meter w/ Backflow Assembly Quantity Units Cost Size - $40,821.48 $40.821.48 $40,821.48 EA 8" x 8" 1 TOTAL COST I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed system. CERTIFYING: NAME & TITLE OF ENGINEER CERTIFYING Peninsula Engineering 2600 Golden Gate Parkway OF: Naples, FL 34105 I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed cost of the system. CERTIFYING^ A Kevin resident se OF: JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 4th day of August, 2015 by ^who is personally known to me and who did not take an oath. Kevin Jesnen A AJ, >AL SEAL: onna L. Ventre Notary Public —ai «"ii. DONNA L VENTRE f.Y A MY COMMISSION IFF 206604 EXPIRES: June 1,2019 X$'' 8ond«i Thru Not»y Public Undswriters 16.A.3.b Packet Pg. 199 Attachment: Assets Sheet (4380 : Final Acceptance of Utilities - Memory Care Facility at Creekside East) Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number 10% UPS Bond $12,503.68 2015263343 Final Obligation Bond $4,000 2015261480 Total Amount $16,503.68 The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 Attachments: 1. Verification of Final Cost 2. Receipt of Payment 16.A.3.c Packet Pg. 200 Attachment: Exhibit A (4380 : Final Acceptance of Utilities - Memory Care Facility at Creekside East) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2015263343 Transaction Number:2015-043811 Date Paid:08/10/2015 Amount Due:$12,503.68 Payment Details:Payment Method Amount Paid Check Number Check $12,503.68 151015828 Amount Paid:$12,503.68 Change / Overage:$0.00 Contact:Synovus Bank Member FDIC PO Box 30707 Tampa, FL 33603 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Refundable Bonds PL20150001743 $12,503.68 $12,503.68 670-000000-220113 Cashier Name:AmandaBayoumi Batch Number:4654 Entered By: melissaalvarez 16.A.3.c Packet Pg. 201 Attachment: Exhibit A (4380 : Final Acceptance of Utilities - Memory Care Facility at Creekside East) Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 RECEIPT OF PAYMENT Receipt Number:2015261480 Transaction Number:2015-041948 Date Paid:07/30/2015 Amount Due:$4,000.00 Payment Details:Payment Method Amount Paid Check Number Check $4,000.00 1266 Amount Paid:$4,000.00 Change / Overage:$0.00 Contact:Bayshore Retirement Partners LLC 701 S Howard Ave. Ste 106-392 Tampa, FL 33606 FEE DETAILS: Fee Description Reference Number Original Fee Amount Paid GL Account Refundable Bonds PL20150001743 $4,000.00 $4,000.00 670-000000-220113 Cashier Name:LeaDerence Batch Number:4633 Entered By: melissaalvarez 16.A.3.c Packet Pg. 202 Attachment: Exhibit A (4380 : Final Acceptance of Utilities - Memory Care Facility at Creekside East) VERIFICATION OF FINAL COST PROJECT NAME: Bayshore Memory Care Section 27 Township 48 S Range 25 E Collier County, Florida LOCATION: NAME & ADDRESS OF OWNER: Creekside East, Inc. 2600 Golden Gate Parkway Naples, FL 34105 TYPE OF UTILITY SYSTEM: POTABLE WATER Total I |/tem Size Quantity Units Cost $24.47 $6,557.96 $16.90 $3,498.30 $12.38 $1,621.78 $9.48 $1,279.80 $44,651.48 $44,651.48 $1,816.36 $1,816.36 $1,213.23 $1,213.23 $883.60 $883.60 $3,893.40 $11,680.20 $6,799.63 $6,799.63 $1,822.70 $1,822.70 $1,643.10 $1,643.10 $1,300.35 $1.300.35 $84,768.49 C-900 DR 14 C-900 DR 14 C-900 DR 14 C-900 DR 14 Meter w/ Backflow Assembly Gate Valve Gate Valve Gate Valve 10" 268 LF 8" 207 LF 6" 4" 8" x 8" 131 LF 135 LF 1 EA 10" 1 EA 8" 1 EA 4" 1 EA Fire Hydrant Assembly Fire Backflow Assembly 3 EA 6" 1 EA 6" 1 EA PIV 6" 1 EA Check Valve FDC 1 EA • TOTAL COST I do hereby certify that the quantities of material and services described above are true and an CERTIFYING: Name and Title of Engineer Certifying Peninsula Engineering 2600 Golden Gate Parkway Naples, FL 34105 OF: I do hereby certify that the quantifies of material and services described above are true and an CERTIFYI Kevin Jensen, President JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Naples, Florida 34109 OF: STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 4th day of August, 2015 by Kevin Jensen , who is personally known to me and who did not take an oath. DONNA L VENTRE A TA MY COMMISSION #FF 206604 £ u-. 16.A.3.c Packet Pg. 203 Attachment: Exhibit A (4380 : Final Acceptance of Utilities - Memory Care Facility at Creekside East) Donna L. Ventre , Notary Public 16.A.3.c Packet Pg. 204 Attachment: Exhibit A (4380 : Final Acceptance of Utilities - Memory Care Facility at Creekside East) f Bayshore Memory Care PROJECT NAME: Section 27 Township 48 S Range 25 E Collier County, Florida LOCATION: NAME & ADDRESS OF OWNER: Creekside East, Inc. 2600 Golden Gate Parkway Naples, FL 34105 TYPE OF UTILITY SYSTEM: |/fern Size Quantity Units Cost Igtal\ $10,892.25 $5,189.80 $1,760.60 $1,523.08 $20.902.62 $40,268.35 SANITARY SEWER $46.35 $5,189.80 $1,760.60 $13.13 $6,967.54 235 LF 8" SDR 26 Manhole Connect to Existing Manhole SDR 26 Cleanout Assembly EA 1 1 EA 116 LF 3 LF TOTAL COST 6" 6" v I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as-installed system. CERTIFYING: Name and Title of Engineer Certifying Peninsula Engineering 2600 Golden Gate Parkway Naples, FL 34105 OF: I do hereby certify that the quantities of material and services described above are true and an accurate representation of the as-installed cost of the system. CERTIFYING: resident Kevin nsej JENSEN UNDERGROUND I TILITIE? INC. 5585 Taylor Road Naples, Florida 34109 OF: STATE OF FLORIDA ) ) SS: COUNTY OF COLLIER ) The foregoing instrument was signed and acknowledged before me this 1st day of December, 2014 by is personally known to me and who did not take an oath. Kevin Jensen L0! SEAL: TNotary Public Donna L. Ventr u DONNA L. VENTRE -•U NotarV Public - State of Florida 1 . VoKJKdfc? My Comm. Expires Jun 1, 2015 i 4 Commission # EE 97879 , i <: urn 16.A.3.c Packet Pg. 205 Attachment: Exhibit A (4380 : Final Acceptance of Utilities - Memory Care Facility at Creekside East)