Agenda 01/09/2018 Item #16A 601/09/2018 EXECUTIVE SUMMARY Recommendation to approve an extension for completion and acceptance of subdivision improvements associated with the Arrowhead Reserve at Lake Trafford - Block ‘B’ (AR-8686). OBJECTIVE: To approve an extension for the completion and acceptance of subdivision improvements associated with the Arrowhead Reserve at Lake Trafford - Block ‘B’ subdivision. CONSIDERATIONS: On February 28, 2006, the Board of County Commissioners (Board) approved the final plat of Arrowhead Reserve at Lake Tra fford - Block ‘B’ for recording. Section 10.02.05 C.2 of the Land Development Code (LDC) requires that all required subdivision improvements must receive final acceptance by the Board within 36 months from the date of plat approval, unless extended by the County Manager or his designee, the Board, or general law. The LDC allows the developer to request two (2) two-year extensions for completion and acceptance of the required improvements, which the developer has applied for and received. Moreover, the developer received additional extensions via state legislation and executive orders. As such, the Board must approve any further extensions. The developer is now requesting an additional Board approved extension through April 13, 2019. The required subdivision improvements have been found to be substantially complete, and received preliminary acceptance on April 13, 2007. A performance security is in place to ensure completion of the remaining improvements such as final lift of asphalt and sidewalks. The Construction and Maintenance Agreement for Subdivision Improvements is attached. FISCAL IMPACT: The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $150 Extension Fee GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for approval. - SAS RECOMMENDATION: To approve the extension application for completion and acceptance of subdivision improvements for the Arrowhead Reserve at Lake Trafford - Block ‘B’ (AR-8686) subdivision. The new expiration date would be April 13, 2019. Prepared by: John Houldsworth, Senior Site Plan Reviewer, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Construction & Maintenance Agreement (PDF) 3. Arrowhead Letters of Credit (PDF) 16.A.6 Packet Pg. 201 01/09/2018 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.6 Doc ID: 4211 Item Summary: Recommendation to approve an extension for completion and acceptance of subdivision improvements associated with the Arrowhead Reserve at Lake Trafford - Block ‘B’ (AR- 8686). Meeting Date: 01/09/2018 Prepared by: Title: Site Plans Reviewer, Senior – Growth Management Development Review Name: John Houldsworth 11/14/2017 10:52 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 11/14/2017 10:52 AM Approved By: Review: Growth Management Department Judy Puig Level 1 Reviewer Completed 11/15/2017 10:51 AM Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 11/27/2017 9:12 AM Growth Management Development Review Chris Scott Additional Reviewer Completed 11/27/2017 1:10 PM Growth Management Department Matthew McLean Additional Reviewer Completed 11/27/2017 5:01 PM Growth Management Department Thaddeus Cohen Department Head Review Completed 11/28/2017 9:42 AM Growth Management Department James French Deputy Department Head Review Completed 12/04/2017 5:56 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 12/19/2017 10:50 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 12/19/2017 11:09 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 12/19/2017 11:43 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 12/20/2017 9:30 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 12/27/2017 12:39 PM Board of County Commissioners MaryJo Brock Meeting Pending 01/09/2018 9:00 AM 16.A.6 Packet Pg. 202 16.A.6.a Packet Pg. 203 Attachment: Location Map (4211 : 16A15 CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS entered into this I..../' ..,-L1 day of ~\L ,2005 between MDG LAKE TRAFFORD COMMERCIAL, L.L.c., a Florida Limited Liability Company; MDG LAKE TRAFFORD, L.L.c., a Florida Limited Liability Company; ARROWHEAD APARTMENTS, LTD., a Florida Limited Partnership; ARROWHEAD APARTMENTS II, LTD., a Florida Limited Partnership hereinafter referred to as "Developer," and the Board of County Commissioners of Collier County, Florida, hereinafter referred to as the "Board." RECITALS: A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the Board of a certain plat of a subdivision to be known as: ARROWHEAD RESERVE AT LAKE TRAFFORD - PHASE ONE B. Section 10.02.04 of the Collier County Land Development Code requires the Developer to post appropriate guarantees for the construction of the improvements required by said subdivision regulations, said guarantees to be incorporated in a bonded agreement for the construction of the required improvements. NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set forth, Developer and the Board do hereby covenant and agree as follows: 1. Developer will cause to be constructed: Site improvements including roadways, excavation, drainage facilities, water and sewer facilities, and lighting and signage, within 18 months from the date of approval said subdivision plat, said improvements hereinafter referred to as the required improvements. 2. Developer herewith tenders its subdivision performance security (Letter of Credit from Colonial Bank, N.A. ($826,123.15) and a cash bond in the amount of $42,456.00 from America's First Home of Southwest Florida, LLP (bonding the 5' wide concrete sidewalk) attached hereto as Exhibit "A" and by reference made a part hereof) which amount represents 1 0% of the total contract cost to complete construction plus 1 00% of the estimate cost of to complete the required improvements at the date of this Agreement. 3. In the event of default by the Developer or failure of the Developer to complete such improvements within the time required by the Land Development Code, Collier County, C:\Documents and Settings\Administrator\Local Settings\Temporary Internet Files\OLKC28\Construction Maintenance for Subdivision Improvements M Phase One Revised 050426 doc 16.A.6.b Packet Pg. 204 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) 16A15 may call upon the subdivision performance security to insure satisfactory completion of the required improvements. 4. The required improvements shall not be considered complete until a statement of substantial completion by Developer's engineer along with the final project records have been furnished to be reviewed and approved by the Development Services Director for compliance with the Collier County Land Development Code. 5. The Development Services Director shall, within sixty (60) days of receipt of the statement of substantial completion, either: a) notify the Developer in writing of his preliminary approval of the improvements; or b) notify the Developer in writing of his refusal to approve improvements, therewith specifying those conditions which the Developer must fulfill in order to obtain the Director's approval of the improvements. However, in no event shall the Development Services Director refuse preliminary approval of the improvements if they are in fact constructed and submitted for approval in accordance with the requirements of this Agreement. 6. The Developer shall maintain all required improvements for a minimum period of one year after preliminary approval by the Development Services Director. After the one year maintenance period by the Developer has terminated, the Developer shall petition the Development Services Director to inspect the required improvements. The Development Services Director or his designee shall inspect the improvements and, if found to be still in compliance with the Collier County Land Development Code as reflected by final approval by the Board, the Board shall release the remaining 10% of the subdivision performance security. The Developer's responsibility for maintenance of the required improvements shall continue unless or until the Board accepts maintenance responsibility for and by the County. 7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter the Developer may request the Development Services Director to reduce the dollar amount of the subdivision performance security on the basis of work complete, Each request for a reduction in the dollar amount of the subdivision performance security shall be accompanied by a statement of substantial completion by the Developer's engineer together with the project records necessary for review by the Development Services Director. The Development Services Director may grant the request for a reduction in the amount of the subdivision performance security for the improvements completed as of the date of the request. 8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon certification of such failure, the County Administrator may call upon the subdivision performance security to secure satisfactory completion, repair and maintenance of the required improvements. The Board shall have the right to construct and maintain, or cause to be constructed or maintained, pursuant to public advertisement and receipt and acceptance of bids, the improvements required herein. The Developer, as principal under the subdivision performance security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the final total cost to the C:\Documents and Settings\Administrator\Local Settings\Temporary Internet Files\OLKC28\Construction Maintenance for Subdivision Improvements - Phase One Revised OS0426.doc 16.A.6.b Packet Pg. 205 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) 16A15 Board thereof, including, but not limited to, engineering, legal and contingent costs, together with any damages, either direct or consequential, which the Board may sustain on account of the failure of the Developer to fulfill all of the provisions of this Agreement. 9. All of the terms, covenants and conditions herein contained are an shall be binding upon the Developer and the respective successors and assigns of the Developer. IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by their duly authorized representatives this Z.l- 1"'\ day of ~ '\>J-' l.-., 20 c> ç SIGNED, SEALED AND DELIVERED IN MDG LAKE TRAFFORD COMMERCIAL, THE PRESENCE OF: LLC., A Florida Limited Liability Company By: By: Cor Title: President MDG LAKE TRAFFORD, LLC., A Florida Limited Liability Company By: MDG Capital Corporation a Florida Cor oration, as its Mana in Member Signatut By: rI"^"-Title: C:\Documents and Settings\Administrator\Local Settings\Temporary Internet Files\OLKC28\Construction Maintenance for Subdivision Lmprovements - Phase One Revised 050426.doc 16.A.6.b Packet Pg. 206 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) 16A15 ARROWHEAD APARTMENTS, LTD., A Florida Limited Partnership By: MDG Capital Arrowhead Apartments, LLC, a Florida Limited Liability Company, as its Managing General Partner By: MDG Capital Corporation, A Florida Corporation, as its Ma 'ng Member D~·~ lJe/øK B :'f;\I\ ARROWHEAD APARTMENTS II, LTD., A Florida Limited Partnership By: MDG Capital Arrowhead Apartments, LLC, a Florida Limited Liability Company, as its Sole General Partner Approved as to form and Ie al sufficienc By: Title: Assistant County Attorney William L. Klohn, as its President Title: President C:\Documents and Settings\Administrator\Local Settings\Temporary Internet Files\OLKC28\Construction Maintenance for Subdivision Improvements - Phase One Revised 050426.doc 16.A.6.b Packet Pg. 207 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) 16A15 COLONIAL BANK~N.A. embef FDIC Financial Strength in Local Hands" March 22, 2005 IRREVOCABLE STANDBY LETTER OF CREDIT No. 34001065 ISSUER:Colonial Bank, N.A., 27200 Riverview Center Blvd., Bonita Springs, FL 34134 (hereinafter "Issuer") PLACE OF EXPIRY: Bonita Springs, Florida 34134 DATE OF EXPIRY: This Credit shall be valid until March 22, 2006, and shall thereafter be automatically renewed for successive one-year periods on the anniversary of its issue unless at least sixty (60) days prior to any such anniversary date, the Issuer notifies the Beneficiary in writing by registered mail that the Issuer elects not to so renew this Credit. APPLICANT: MDG Capital Corporation (hereinafter "Applicant"), 2180 Immokalee Rd" Suite 309, Naples, Florida, 34110. BENEFICIARY: The Board of County Commissioners, Collier County, Florida hereinafter "Beneficiary") c/o Office of the County Attorney, Collier County Courthouse Complex, Naples, Florida. AMOUNT: $826,123.15 US up to an aggregate thereof. CREDIT AVAILABLE WITH: Issuer. BY: Payment against documents detailed herein and Beneficiary's draft at sight drawn on the Issuer. DOCUMENTS REQUIRED: AVAILABLE BY BENEFICIARY'S DRAFT(S) AT SIGHT DRAWN ON THE ISSUER AND ACCOMPANIED BY BENEFICIARY'S STATEMENT PURPORTEDLY SIGNED BY THE COUNTY MANAGER, CERTIFIYING THAT: "MDG Capital Corporation has failed to construct and/or maintain the improvements associated with that certain plat of a subdivision known as Arrowhead Reserve at Lake Trafford or a final inspection satisfactory to Collier County has not been performed prior An Affiliate of The Colonial BancGroup, Inc. 27200 Riyeryiew Center Bh·d., P.O. Drawer 2648, Bonita Springs, Florida 34134 Telephone 239/992-2201 www.coìoniaibank.com AN EQUAL OPPORTUNITY EMPLOYER 16.A.6.b Packet Pg. 208 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) 16.A.6.b Packet Pg. 209 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) 16A15 ENGINEER'S OPINION OF PROBABLE COST TO COMPLETE HM File No, 2001106 ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 Block A Roadwork Lincoln Street (Spine Road) Landscape & Irrigation Street Lighting Total Cost to Complete 333,205.17 104,288,53 100,000,00 37,200,00 574,693.70 S\2001\2001106\PROBABLE COST ESTIMATE PHASE ONE\Cost to Complete Breakdown 050215 per MTR.xls Cover Sheet 16.A.6.b Packet Pg. 210 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) HOL::: ViONTES ENGINEER'S OPINION OF PROBABLE COST TO COMPLETE ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 16A15 HM File No. 2001106 Block A Roadwork Description Quantitv Units Unit Cost Total 12" Stabilized Subgrade 14,111 SY $3.68 $51,928.48 6" Limerock Base 11 ,433 SY $7,28 $83,232.24 1.5" Asphalt (2 lifts) 11 ,433 SY $6,65 $76,029.45 2' Valley Gutter 7,680 LF $7.60 $58,368.00 Type E Modified Curb 580 LF $8.95 $5,191.00 5' Wide Concrete Sidewalk 3,660 LF $11.60 $42,456,00 Valley Gutter Aprons 15 EA $400.00 $6,000.00 Pavement Markings & Signage 1 LS $1,900.00 $1,900.00 Mobilization 1 LS $1,600.00 $1,600,00 Final Grade (ROW) 1 LS $6,500.00 $6,500.00 Total Block A Roadwork $333,205.17 S:'2001\2001106\PROBABLE COST ESTiMATE PHASE ONE\Cost to Complete Breakdown 050215 per MTR.xls Block A 16.A.6.b Packet Pg. 211 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) ItA!n~ o· 5CL'= .VìGNTE3 ENGINEER'S OPINION OF PROBABLE COST TO COMPLETE HM File No, 2001106 ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 Lincoln Street (Spine Road) 12" Ribbon Curb Brick Pavers 3/4" Asphalt (2nd Course) Total Lincoln Street 264 LS 14,098 EA 6,515 SY 20,00 3,95 6.65 5.280.00 55,687,10 43,321.43 104,288.53 S.20012001106\PROBABLE COST ESTIMATE PHASE ONE\Cost to Complete Breakdown 050215 per MTR.xls Lincoln (Spine) Roadwork 16.A.6.b Packet Pg. 212 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) HCLE MONTES ENGINEER'S OPINIONOF PROBABLE COST TO COMPLETE ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 LandscaDe & Irriåé1tiòn Landscaping Irrigation Total LandscaDe & Irriaation LS LS 50,000,00 50,000,00 16A15 HM File No. 2001106 50,000,00 50,000.00 100~000.00 S:\2001\2001106\PROBABLE COST ESTIMATE PHASE ONE\Cost to Complete Breakdown 050215 per MTR.xls Landscape & Irrigation 16.A.6.b Packet Pg. 213 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) t. HCL:: NiONTES ENGINEER'S OPINION OF PROBABLE COST TO COMPLETE ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 Street LiQhtinQ 16A15 HM File No, 2001106 Street Lighting Total Street LiQhtinQ 31 EA 1,200.00 $37,200.00 37,200.00 S:\2001\2001106\PROBABLE COST ESTIMATE PHASE ONE\Cost to Complete Breakdown 050215 per MTR.xls Street Lighting 16.A.6.b Packet Pg. 214 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) M::·······r....·.c- HOLE ;V¡ONTES ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 H1ile6°,ð;!O~ PHASE 1 - SITE UTILITIES: Water Distribution Sewer Collection Stormwater Drainage Total Site Utilities PHASE 1 - ROADW()R~ Carson Rd. Ext. & Immokalee Dr. Offsite Improvements to Lake Trafford at Lincoln Blvd. Offsite Improvements to Lake Trafford at Carson Road Lincoln Street (Spine Road) Block A Total Roadwork PHASE 1 - LANDSCAPE &. IRRIGA'TION Landscape & Irrigation Total Landscape & Irrigation PHASE 1 - STREET LIGHTING Street Lighting Total Street Lighting TOTAL PHASE 1 269,262.50 675,950,50 401.422,00 1,346,635.00 368,738.54 192,020.44 42,011.60 519,043.73 333,205,17 1,455,019.48 100,000,00 100,000.00 37,200.00 37,200.00 2,938,854.48 S:\2001 \20011 06\PROBABLE COST ESTI MATE PHASE ONE\Probable Cost Breakdown 050215 per MTR.xls Cover Sheet 16.A.6.b Packet Pg. 215 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) M':";:' HCLE MONTES 16A1SENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 HM File No, 2001106 Water Distribution System Description Quantitv Units Unit Cost Total 8" x 8" Hot Tap (Carson Road) 1 EA $3,250.00 $3,250.00 Open Cut Lake Trafford Road 1 EA $5,000,00 $5,000,00 Cut in Tee & (3) Gate Valves 1 EA $2,500,00 $2,500.00 8"DR-14 1 ,910 LF $12,50 $23,875.00 8" DR - 18 6,525 LF $10,50 $68,512.50 8" Gate ValveS 36 EA $900.00 $32,400.00 Fire Hyd. 16 EA $2,400,00 $38,400.00 Flushing Hyd. 2 EA $2,500,00 $5,000,00 ARV 20 EA $900.00 $18,000.00 Temp Blow-off (no gate valve) 9 EA $600,00 $5,400.00 8" Deflection 13 EA $1,800,00 $23,400.00 Single Service 18 EA $225,00 $4,050.00 Double Service 55 EA $385,00 $21,175.00 Fittings 1 LS $18,300.00 $18,300.00 Potable Water Main $269,262.50 16.A.6.b Packet Pg. 216 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) M,.·.,··'·'···',i HOLE MONTES 16A15ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 HM File No. 2001106 Sewer Collectior1Svstem Description Quantitv Units Unit Cost Total Pump Station #1 (WITH lET) 1 EA $69,000,00 $69,000,00 Pump Station #2 (WITH lET) 1 EA $68,000.00 $68,000,00 Pump Station #3 (WITH lET) 1 EA $80,300.00 $80,300.00 Master Manhole 18' - 20' (NO lET) 3 EA $3,550,00 $10,650.00 Manhole 16' - 18' (NO lET) 4 EA $2,850.00 $11,400.00 Manhole 14' - 16' (NO lET) 5 EA $2,700.00 $13,500.00 Manhole 12' - 14' (NO lET) 4 EA $2,550.00 $10,200.00 Manhole 10' - 12' (NO lET) 2 EA $2,300.00 $4,600.00 Manhole 8' - 10' (NO lET) 2 EA $2,050.00 $4,100.00 Manhole 6' - 8' (NO lET) 6 EA $1,550.00 $9,300.00 Manhole 0' - 6' (NO lET) 4 EA $1,400.00 $5,600.00 8" SDR-26 18' - 20' 120 LF $60.00 $7,200.00 8" SDR-26 16' - 18' 1,088 LF $52.00 $56,576.00 8" SDR-26 14' - 16' 1,157 LF $45.00 $52,065.00 8" SDR-26 12' - 14' 1,133 LF $32.50 $36,822.50 8" SDR-26 10' - 12' 460 LF $26.00 $11,960,00 8" SDR-26 8" - 10' 424 LF $21.50 $9,116.00 8" SDR-26 6' - 8' 2,152 LF $18.50 $39,812.00 8" SDR-26 0' - 6' 449 LF $16.00 $7,184,00 8" Clean Out 7 EA $175,00 $1,225.00 6" Lateral 2,600 LF $9,50 $24,700.00 6" Double Clean Out 43 EA $160,00 $6,880.00 6" Single Clean Out 20 EA $125,00 $2,500,00 TV SEWER MAIN 1 LS $16,600.00 $16,600,00 10" x 6" Hot Tap 1 EA $3,500.00 $3,500.00 6" DR - 18 3,565 LF $9.00 $32,085.00 6"DR-14 120 LF $10.00 $1,200.00 8" DR - 18 1,920 LF $11,50 $22,080,00 8"DR-14 170 LF $13.50 $2,295.00 10"DR-18 480 LF $15.00 $7,200.00 10"DR-14 80 LF $17,50 $1,400,00 6" Plug Valve 3 EA $800,00 $2,400.00 10" Plug Valve 2 EA $2,100.00 $4,200.00 10" Deflection 1 EA $2,300.00 $2,300.00 8" Deflection 4 EA $2,000.00 $8,000.00 6" Deflection 3 EA $1,450.00 $4,350.00 ARV 9 EA $2,050.00 $18,450.00 Fittings 1 LS $7,200.00 $7,200,00 Total Sanitary Sewer System $675,950.50 S:\2001\2001106\PROBABLE COST ESTIMATE PHASE ONE\Probable Cost Breakdown 050215 per MTR.xls Sewer 16.A.6.b Packet Pg. 217 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) M HOLE MONTES 16A15 1;::ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBURARY 15, 2005 HM File No, 2001106 STORM DRAINAGE Description Quantitv Units Unit Cost Total 48" RCP 400 LF $80,00 $32,000.00 36" RCP 3,650 LF $52,00 $189,800.00 24" RCP LF $28.00 $0.00 18" RCP 697 LF $21,00 $14,637.00 15" RCP 735 LF $19.00 $13,965.00 12" HDPE 105 EA $14,00 $1,470.00 12" x 18" RCP 250 EA $24,00 $6,000,00 36" FES 16 EA $1,300,00 $20,800.00 18" FES 3 EA $750,00 $2,250.00 15" FES 5 EA $700,00 $3,500.00 18" MES 2 EA $400,00 $800.00 Twin 12" x 18" MES 2 EA $900.00 $1,800.00 36" Triple Headwall Sand Cement 4 EA $3,600,00 $14,400.00 Water Control Structure 9 LS $2,800,00 $25,200.00 3' x 4' Valley Gutter Inlet 20 LS $1,800.00 $36,000,00 Conflict Box 3 EA $2,500.00 $7,500,00 Junction Box 2 EA $2,200.00 $4,400.00 Type A Grate Inlet 12 EA $1,400,00 $16,800.00 Type B Grate Inlet 5 EA $1,430,00 $7,150.00 Type D Grate Inlet 2 EA $1,200.00 $2,400.00 Yard Drain 1 EA $550,00 $550.00 STORM DRAINAGE $401,422.00 16.A.6.b Packet Pg. 218 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 HM HOLE MONTES C__"i ~-,.....U~:',:,~ {;,~:;,:' CARSON ROAD EXT.& IMMOKALEE DR. Description 12" PVC Casing (Carson Road) Cut, Balance & Fill for Subgrade 12" Stabilized Subgradee 8" Limerock Base 6" Limerock Base 3" Asphalt (2 lifts) 1-1/2 Asphalt (One lift) Type E Modified Curb 8' Wide Concrete Sidewalk Pavement Markings Final Grade R.O.W, Traffic Control (ALLOWANCE) Mobilization al Carson Road Ext. & lmmokalee Drive Quantitv Units Unit Cost 16A15 HM File No, 2001106 Total 8,000,00 46,000,00 48,980.80 104,262.30 10,068.24 80,252.20 7,714.00 1,611.00 39,432.00 18,00 13,800,00 6,800,00 1,800.00 368,738.54 S:\2001\2001106\PROBABLE COST ESTIMATE PHASE ONE\Probable Cost Breakdown 050215 per MTR.xls 400 LF 1 LS 13,310 SY 11 ,211 SY 1,383 SY 8,189 SY 1 ,160 SY 180 SY 2,120 LF 1 LF 1 LS 1 LS 1 LS 20.00 46,000.00 3.68 9,30 7.28 9.80 6,65 8,95 18.60 18.00 13,800.00 6,800,00 1,800.00 16.A.6.b Packet Pg. 219 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) HM HOLE MONTES 16A15 i ,I ~ ~ ;::: .. 'r -.;'ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 HM File No, 2001106 OFFSITE IMPROVEMENTS TO LAKE TRAFFORD @ LINCOLN BLVD. Description Quantity Units Unit Cost Total Cut, Balance & Fill for Subgrade 1 LS $10,200,00 $10,200,00 12" Stabilized Subgrade 2,887 SY $3.68 $10,624.16 8" Limerock Base 2,750 SY $9,30 $25,575.00 3" Asphalt 2,362 SY $9.80 $23,147.60 Asphalt Restoration 1,000 SF $4.30 $4,300.00 Type E Modified Curb 160 LF $10,50 $1,680,00 8' Wide Concrete Sidewalk 4,150 LF $18,60 $77,190,00 Pavement Markings 1 LF $6,200,00 $6,200,00 Final Grade R.O,W. 1 LS $6,950,00 $6,950.00 Traffic Control (ALLOWANCE) 1 LS $6,800,00 $6,800.00 Mobilization 1 LS $1,600.00 $1,600.00 1" Overlay (Lake Trafford) 2,588 SY $6,86 $17,753,68 Total Lake Trafford Road Turn Lane $192,020.44 S:\2001 \20011 06\PROBABLE COST ESTIMATE PHASE ONE\Probable Cost Breakdown OãQ~ffi"ØéDrMãRl.Ji:Jttcoln 16.A.6.b Packet Pg. 220 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) HM HOLE MONTES 1 A15 j; ',~:;::~~ ,_-~rH;~~~} '~J~'~f<:R~)ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKETRAFFORD, PHASE 1 FEBRUARY 15, 2005 HM File No. 2001106 OFFSITE IMPROVEMENTS TO lAKE TRAFFORD @ CARSON RD Description Quantitv Units Unit Cost Total Cut, Balance & Fill for Subgrade 1 LS $4,200,00 $4,200.00 9" Asphaltic Cone Base 250 SY $56,00 $14,000,00 2" Asphaltic Cone Type S-1 250 SY $20.80 $5,200,00 1" Asphaltic Cone Type S-3 250 SY $4,66 $1,165,00 Final Grade R.O,W. 1 LS $1,600,00 $1,600,00 1" Overlay (Lake Trafford) 2,310 SY $6,86 $15,846.60 Total lake Trafford Road Turn lane $42,011.60 S:\2001\2001106\PROBABLE COST ESTIMATE PHASE ONE\Probable Cost Breakdown 050215 per MTR.xls Lake Trafford at Carson 16.A.6.b Packet Pg. 221 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) HM HOLE MONTES r',JG,~ ~E~RS ~Uir,f(.KS ,~UR\lEYCqS f! ~:I L .. .'"f't,:.' ~ HM File No. 2001106ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 Lincoln Street(SDine Road) Description Quantitv Units Unit Cost Total 12" Stabilized Subgrade 17 ,530 SY $3,68 $64,510.40 6" Limerock Base 14,596 SY $7.28 $106,258.88 1-1/2" Asphalt (2 Lifts) 13,029 SY $6,65 $86,642.85 2' Valley Gutter 2,610 LF $7,60 $19,836.00 Type "0" Trench-in Curb 530 LF $10,00 $5,300.00 Type "F" Curb 5,480 LF $8,65 $47,402,00 Type E Modified Curb 1,190 LF $8.95 $10,650.50 5' Wide Concrete Sidewalk 8,510 LF $11,60 $98,716.00 12" Ribbon Curb 264 LS $20.00 $5,280.00 Throat Inlet Top 16 LS $710.00 $11,360,00 Brick Pavers 14,098 $3,95 $55,687.10 Pavement Markings & Signage 1 $5,400.00 $5,400.00 Mobilization 1 LS $2,000.00 $2,000.00 Lincoln Street (SDine Road) $519,043.73 S:\2001\2001106\PROBABLE COST ESTIMATE PHASE ONE\Probable Cost Breakdown 050215 per MTR,xls Lincoln (Spine Rd) 16.A.6.b Packet Pg. 222 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) 1.:1.'...',.... Mn HOLE MONTES S·iE:"S :LAN~JERS 3UF!:'tORS ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 t; .k ~ J: .;"."y Ic;;; HM File No. 2001106 Description Quantitv Units Unit Cost Total 12" Stabilized Subgrade 14,111 SY $3,68 $51,928.48 6" Limerock Base 11 ,433 SY $7,28 $83,232.24 1 .5" Asphalt (2 lifts) 11,433 SY $6.65 $76,029.45 2' Valley Gutter 7,680 LF $7.60 $58,368.00 Type E Modified Curb 580 LF $8.95 $5,191.00 5' Wide Concrete Sidewalk 3,660 LF $11.60 $42,456.00 Valley Gutter Aprons 15 EA $400.00 $6,000,00 Pavement Markings & Signage 1 LS $1,900.00 $1,900,00 Mobilization 1 LS $1,600,00 $1,600.00 Final Grade (ROW) 1 LS $6,500,00 $6,500.00 Total Block A $333,205.17 S:\2001\2001106\PROBABLE COST ESTIMATE PHASE ONE\Probable Cost Breakdown 050215 per MTR.xls Block A n'__' 16.A.6.b Packet Pg. 223 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) HM HOLE MONTES ENGiNEERS, PLANNERS, SURVEYORS 16A15 HM File No. 2001106ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKE TRAFFORD, PHASE 1 FEBRUARY 15, 2005 LandscaDe&Jrriaation " 50,000.00 50,000.00 50,000.00 50,000.00 100,000.00 Landscaping Irrigation Totàl LandscaDe&:lrriaation 1 1 LS LS S:\2001\20011 06\PROBABlE COST ESTIMATE PHASE ONE\Probable Cost Breakdown 050215 per MTR,xls landscape & Irrigation 16.A.6.b Packet Pg. 224 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) HM HOLE MONTES ENGINEERS, PLANNERS' SURVEYORS ENGINEER'S OPINION OF PROBABLE COST ARROWHEAD RESERVE AT LAKETRAFFORD, PHASE 1 FEBRUARY 15, 2005 1_ I .81. r; HM File No. 2001106 Street Lighting . Total street Uåhtina 31 EA 1,200.00 $37,200.00 37~200.00 S:\2001\2001106\PROBABLE COST ESTIMATE PHASE ONE\Probable Cost Breakdown 050215 per MTR,xls Street Lighting 16.A.6.b Packet Pg. 225 Attachment: Construction & Maintenance Agreement (4211 : Arrowhead Block B Subdivision Extension) 16.A.6.c Packet Pg. 226 Attachment: Arrowhead Letters of Credit (4211 : Arrowhead Block B Subdivision Extension)