Agenda 12/12/2017 Item #16A1912/12/2017
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the amended final plat of Bent Creek Preserve Phase 2A (Application Number
PL20170001771) approval of the standard form Construction and Maintenance Agreement and
approval of the amount of the performance security.
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the amended
final plat of Bent Creek Preserve Phase 2A, a subdivision of lands located in Section 26, Township 48
South, Range 26 East, Collier County, Florida, following the alternative procedure for approval of
subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat
and associated construction documents for construction purposes and recording purposes concurrently.
CONSIDERATIONS: On September 26, 2017, the Board approved the plat of Bent Cr eek Preserve
Phase 2A for recording. The developer has since made significant revisions to the plat, necessitating this
approval of the amendments to the plat. According to Section 10.02.04 B.5.b of the Land Development
Code, following approval by the Board of the final subdivision plat, but prior to recordation, the Board
may approve amendments to the final subdivision plat.
The Development Review Division of the Growth Management Department has completed the review of
the construction drawings, specifications, and final plat of Bent Creek Preserve Phase 2A. These
documents are in compliance with the County Land Development Code and Chapter 177, Florida
Statutes. This project is within the Bent Creek Preserve PUD Ord. 12-26, as amended. All fees have been
paid.
Security in the amount of 10% of the total cost of the required improvements associated with this
amendment, and 100% of the cost of any remaining improvements, together with a Construction and
Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County
Manager or his designee and the County Attorney’s office prior to the recording of the amended final plat.
The Board already approved the amount of performance security for the originally approved plat on
September 26, 2017. This procedure is in conformance with Section 10.02.04 F.2 of the Land
Development Code.
The Development Review Division recommends that the amended final plat of Bent Creek Preserve
Phase 2A be approved for recording.
FISCAL IMPACT: The project cost is associated with this amendment is $1,290,091.33 (estimated) to
be borne by the developer.
The cost breakdown is as follows:
a) Water & Sewer $520,744.50
b) Drainage, Paving, Grading $769,346.83
The additional Security amount, equal to 110% of the
Project revision cost, is $1,419,100.46
The County will realize revenues as follows:
Fund: Growth Management Fund 131
12/12/2017
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $39,842.73
The Fees are based on a construction estimate of $1,290,091.33 and were paid in September 2017.
The breakdown is as follows:
a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,140.00
b) Construction Drawing Review Fee
Water & Sewer (.75% const. est.) $ 3,905.58
c) Drainage, Paving, Grading
(.75% const. est.) $ 5,770.10
d) Construction Inspection Fee
Water & Sewer (2.25% const. est.) $11,716.75
e) Drainage, Paving, Grading
(2.25% const. est.) $17,310.30
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public
Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation,
except when the applicant elects to delay obtaining a COA for non-residential developments that are
required to obtain approval of a site development plan prior to the issuance of a building permit.
LEGAL CONSIDERATIONS: The applicant is requesting approval of the amended final subdivision
plat and construction and maintenance agreement. The Board shall consider the County Manager or
designee’s recommendation and shall take evidence and testimony in regard to the final subdivision plat
requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well
as Chapter 177, Florida Statutes. If the Board denies or places conditions on the final subdivision plat, it
shall state reasons for such denial or conditions. This item has been approved as to form and legality, and
requires a majority vote for Board approval. -SAS
RECOMMENDATION: To endorse staff’s recommendation to approve the amended final plat of Bent
Creek Preserve Phase 2A (Application Number PL20170001771) for recording with the following
stipulations:
1. Approve the additional amount of $1,419,100.46 as performance security for the required
improvements associated with this plat amendment; or such lesser amount based on work completed,
and as is approved by the Growth Management Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the County
Manager or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the amended plat until suitable security and an appropriate
Construction and Maintenance Agreement is approved and accepted by the County
Attorney’s office and the Board of County Commissioners or the County Manager or his
designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development
Code.
Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division
12/12/2017
ATTACHMENT(S)
1. Location Map (PDF)
2. Plat Map (PDF)
3. Opinion of Cost (PDF)
12/12/2017
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.19
Doc ID: 4148
Item Summary: This item requires that ex parte disclosure be provided by Commission members.
Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to
approve for recording the amended final plat of Bent Creek Preserve Phase 2A (Application Number
PL20170001771) approval of the standard form Construction and Maintenance Agreement and approval
of the amount of the performance security.
Meeting Date: 12/12/2017
Prepared by:
Title: Site Plans Reviewer, Senior – Growth Management Development Review
Name: John Houldsworth
11/06/2017 2:28 PM
Submitted by:
Title: Project Manager, Principal – Growth Management Department
Name: Matthew McLean
11/06/2017 2:28 PM
Approved By:
Review:
Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 11/07/2017 8:58 AM
Growth Management Development Review Chris Scott Additional Reviewer Completed 11/07/2017 12:11 PM
Growth Management Department Judy Puig Level 1 Reviewer Completed 11/09/2017 9:54 AM
Growth Management Department Matthew McLean Additional Reviewer Completed 11/09/2017 4:40 PM
Growth Management Department James French Deputy Department Head Review Completed 11/12/2017 10:46 PM
County Attorney's Office Scott Stone Level 2 Attorney Review Completed 11/14/2017 7:57 AM
Growth Management Department Thaddeus Cohen Department Head Review Completed 11/14/2017 10:14 AM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 11/15/2017 8:37 AM
Budget and Management Office Mark Isackson Additional Reviewer Completed 11/15/2017 9:49 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 11/15/2017 4:03 PM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 11/26/2017 3:22 PM
Board of County Commissioners MaryJo Brock Meeting Pending 12/12/2017 9:00 AM
f s
WHE
LOCATION
r
IIIIIIIIIIIIIIII . "'�l►l[!�►i1[^]..
junnl Ilmnnrr`
IRI[IIlIV
k� iuiluq
►��,��.I;�,I�� nnunnlq
IIIIIIIIIIIIIl11111111 AIIIIIIIIInEnllllCRYSTAL LAKE 4.:
�I�,Illllllll,llu►� �►VIIIIli7(�a7 �����������
DR
�� �a •+
,rr
r�
J�1TREE FARM. _
VICINITY MAP
HOT TO SCALE
“
”
6610 WILLOW PARK DRIVE, SUITE 200 NAPLES, FLORIDA 34109
(239) 597-0575 FAX: (239) 597-0578 WWW.CONSULT-RWA.COM
FLORIDA CERTIFICATE OF AUTHORIZATION LB #6952
THIS INSTRUMENT PREPARED BY DENNIS A. MILLER, P.S.M. #5626
LEGAL DESCRIPTION
UNPLATTED
BENT CREEK PRESERVE PHASE 1A
P.B.56, PG. 61
UNPLATTED
BLOCK A BLOCK B
BLOCK C
BLOCK D
BENT CREEK PRESERVE
P.B. 55, PG. 61
BLOCK D
BLOCK C
6610 WILLOW PARK DRIVE, SUITE 200 NAPLES, FLORIDA 34109
(239) 597-0575 FAX: (239) 597-0578 WWW.CONSULT-RWA.COM
FLORIDA CERTIFICATE OF AUTHORIZATION LB #6952
THIS INSTRUMENT PREPARED BY DENNIS A. MILLER, P.S.M. #5626
BENT CREEK PRESERVE PHASE 1A
P.B.56, PG. 61
BLOCK C
BLOCK F
BLOCK GBLOCK H
BLOCK D
BLOCK D
BLOCK F
BENT CREEK PRESERVE PHASE 1A
P.B.56, PG. 61
6610 WILLOW PARK DRIVE, SUITE 200 NAPLES, FLORIDA 34109
(239) 597-0575 FAX: (239) 597-0578 WWW.CONSULT-RWA.COM
FLORIDA CERTIFICATE OF AUTHORIZATION LB #6952
THIS INSTRUMENT PREPARED BY DENNIS A. MILLER, P.S.M. #5626
UNPLATTED
BENT CREEK PRESERVE
P.B. 55, PG. 61
BLOCK E
BLOCK F
BLOCK F
BLOCK D
BLOCK C
CRYSTAL LAKE RV
RESORT PHASE FOUR
P.B. 22, PG. 83
6610 WILLOW PARK DRIVE, SUITE 200 NAPLES, FLORIDA 34109
(239) 597-0575 FAX: (239) 597-0578 WWW.CONSULT-RWA.COM
FLORIDA CERTIFICATE OF AUTHORIZATION LB #6952
THIS INSTRUMENT PREPARED BY DENNIS A. MILLER, P.S.M. #5626
RWA, Inc.
6610 Willow Park Drive
Naples, Florida 34109
Phone: 239-597-0575
Fax: 239-597-0578
10/17/2017
Certificate of Business Certificate No. EB-0007663
SANITARY SEWER SUB-TOTAL $303,756.50
POTABLE WATER SUB-TOTAL $216,988.00
ESTIMATED UTILITY CONSTRUCTION COST $520,744.50
STORM DRAINAGE SUB-TOTAL $377,699.00
PAVING AND GRADING SUB-TOTAL $376,120.03
IMMOKALEE ROAD TURN LANE IMPROVEMENTS SUB-TOTAL $9,436.00
LANDSCAPING AND IRRIGATION SUB-TOTAL (2)$6,091.80
ESTIMATED SITE CONSTRUCTION COST $769,346.83
Due at
Permit
Approval
$11,716.75
$17,310.30
$29,027.05
Note:
2. Landscaping cost provided by Chuck Yanette, signed and sealed 9/1/2017.
Michael C. Pappas, P.E. #60910
Bent Creek Preserve Phase 2A
Engineer's Opinion of Probable Construction Costs
SUMMARY
1. This Engineer's Opinion of Probable Cost represents the estimated cost for constructing the above listed
infrastructure for Bent Creek Preserve Phase 2A (RWA, Inc. File No. 030008.11.04 dated August 2017, REV 4).
PPL Fee Calculations for Utility Construction
TOTAL PPL FEE BASED ON OPC
PPL Fee Calculations for Site Construction
2.25% for Construction Inspection
2.25% for Construction Inspection
2017-10-17 Phase 2A OPC 10/17/2017
Certificate of Business Certificate No. EB-0007663
Project: Bent Creek Preserve Phase 2A
Date: October 17, 2017
Estimated By: David Poteete
Checked By: Michael Pappas
SANITARY SEWER
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
S-1 8" PVC Sanitary Sewer Main (0'-6' cut)LF 705 $33.00 $23,265.00
S-2 8" PVC Sanitary Sewer Main (6'-8' cut)LF 1,014 $44.00 $44,616.00
S-3 8" PVC Sanitary Sewer Main (8'-10' cut)LF 481 $54.00 $25,974.00
S-4 8" PVC Sanitary Sewer Main (10'-12' cut)LF 550 $64.00 $35,200.00
S-5 8" PVC Sanitary Sewer Main (12'-18' cut)LF 193 $78.00 $15,054.00
S-6 4' Diameter Manhole (0'-6' depth)EA 4 $4,800.00 $19,200.00
S-7 4' Diameter Manhole (6'-8' depth)EA 3 $5,500.00 $16,500.00
S-8 4' Diameter Manhole (8'-10' depth)EA 2 $6,300.00 $12,600.00
S-9 4' Diameter Manhole (10'-12' depth)EA 3 $7,200.00 $21,600.00
S-10 4' Diameter Manhole (12'-18' depth)EA 1 $11,800.00 $11,800.00
S-11 Drop Manhole Connection EA 0 $2,000.00 $0.00
S-12 Single Sewer Lateral EA 15 $850.00 $12,750.00
S-13 Double Sewer Lateral EA 53 $980.00 $51,940.00
S-14 Television Inspection LF 2,943 $2.50 $7,357.50
S-15 Connect to Existing Manhole EA 1 $3,400.00 $3,400.00
S-16 Connect to Existing 8" PVC Sanitary Main EA 1 $2,500.00 $2,500.00
Sanitary Sewer Sub-Total $303,756.50
Engineer's Opinion of Probable Construction Costs
2017-10-17 Phase 2A OPC 10/17/2017
Certificate of Business Certificate No. EB-0007663
Project: Bent Creek Preserve Phase 2A
Date: October 17, 2017
Estimated By: David Poteete
Checked By: Michael Pappas
POTABLE WATER
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
W-1 6" PVC Water Main (C-900, DR 18, PC150) LF 95 $20.00 $1,900.00
W-2 8" PVC Water Main (C-900, DR 18, PC150) LF 3,138 $25.00 $78,450.00
W-3 8" PVC Water Main (C-900, DR 14, PC200) LF 71 $28.00 $1,988.00
W-4 18" Steel Casing LF 10 $50.00 $500.00
W-5 6" Gate Valve w/ Box EA 1 $1,200.00 $1,200.00
W-6 8" Gate Valve w/ Box EA 8 $1,400.00 $11,200.00
W-7 Air Release Valve (AFD-TSP-BOV)EA 1 $4,200.00 $4,200.00
W-8 Fire Hydrant Assembly w/ Valve EA 7 $4,500.00 $31,500.00
W-9 Permanent Sample Point EA 2 $1,500.00 $3,000.00
W-10 Hot-Tap (Includes 12"x8" Tapping Sleeve and Valve)LS 1 $4,500.00 $4,500.00
W-11 Single Water Service EA 31 $750.00 $23,250.00
W-12 Double Water Service EA 46 $900.00 $41,400.00
W-13 Temporary Gap Configuration EA 3 $3,800.00 $11,400.00
W-14 Testing LS 1 $2,500.00 $2,500.00
Potable Water Sub-Total $216,988.00
Engineer's Opinion of Probable Construction Costs
2017-10-17 Phase 2A OPC 10/17/2017
Certificate of Business Certificate No. EB-0007663
Project: Bent Creek Preserve Phase 2A
Date: October 17, 2017
Estimated By: David Poteete
Checked By: Michael Pappas
STORM DRAINAGE
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
D-1 15" RCP LF 634 $28.00 $17,752.00
D-2 18" RCP LF 204 $36.00 $7,344.00
D-3 24" RCP LF 895 $55.00 $49,225.00
D-4 30" RCP LF 295 $72.00 $21,240.00
D-5 42" RCP LF 1,367 $98.00 $133,966.00
D-6 3' x 4' Valley Gutter Inlet EA 14 $3,300.00 $46,200.00
D-7 5' x 5' Valley Gutter Inlet EA 2 $4,500.00 $9,000.00
D-8 Type 'C' Inlet EA 6 $2,600.00 $15,600.00
D-9 Type 'G' Inlet EA 4 $3,800.00 $15,200.00
D-10 5' X 5' Junction Box EA 2 $4,300.00 $8,600.00
D-11 18" FES EA 1 $1,000.00 $1,000.00
D-12 24" FES EA 2 $1,400.00 $2,800.00
D-13 42" FES EA 1 $2,800.00 $2,800.00
D-14 Yard Drain EA 10 $1,200.00 $12,000.00
D-15 10" Yard Drain Pipe LF 851 $14.00 $11,914.00
D-16 12" Yard Drain Pipe LF 456 $18.00 $8,208.00
D-17 Rock Excavation LF 990 $15.00 $14,850.00
Storm Drainage Sub-Total $377,699.00
Engineer's Opinion of Probable Construction Costs
2017-10-17 Phase 2A OPC 10/17/2017
Certificate of Business Certificate No. EB-0007663
Project: Bent Creek Preserve Phase 2A
Date: October 17, 2017
Estimated By: David Poteete
Checked By: Michael Pappas
PAVING AND GRADING
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
P-1 Mobilization LS 1 $12,000.00 $12,000.00
P-2 Staked Silt Fence LF 1,872 $1.25 $2,340.00
P-3 Double Silt Fence LF 3,104 $2.50 $7,760.00
P-4 12" Stabilized Subgrade (LBR 40)SY 9,329 $2.80 $26,121.20
P-5 8" Limerock Base (LBR 100)SY 7,198 $8.50 $61,183.00
P-6 3/4" Type S-III ACSC (1st Lift)SY 7,198 $4.70 $33,830.60
P-7 3/4" Type S-III ACSC (2nd Lift)SY 7,198 $6.00 $43,188.00
P-8 Concrete Valley Gutter LF 6,297 $8.00 $50,376.00
P-9 24" Ribbon Curb LF 48 $28.00 $1,344.00
P-10 5' Sidewalk LF 6,296 $12.00 $75,552.00
P-11 ADA Curb Ramps EA 4 $500.00 $2,000.00
P-12 Sod (4' strip between curb and sidewalk)SY 2,799 $1.72 $4,825.23
P-13 Signing and Striping LS 1 $5,000.00 $5,000.00
P-14 Street Lights EA 23 $2,200.00 $50,600.00
Paving and Grading Sub-Total $376,120.03
Engineer's Opinion of Probable Construction Costs
2017-10-17 Phase 2A OPC 10/17/2017
Certificate of Business Certificate No. EB-0007663
Project: Bent Creek Preserve Phase 2A
Date: October 17, 2017
Estimated By: David Poteete
Checked By: Michael Pappas
IMMOKALEE ROAD TURN LANE IMPROVEMENTS
DESCRIPTION UNIT QUANTITY UNIT TOTAL
COST
P-1 Remove and Dispose Type 'F' Curb LF 176 $2.50 $440.00
P-2 12" Stabilized Subgrade (LBR 40)SY 206 $2.50 $515.00
P-3 8" Limerock Base (LBR 100)SY 206 $8.50 $1,751.00
P-4 2" Type SP-12.5 ACSC SY 206 $11.00 $2,266.00
P-5 Type 'F' Curb LF 176 $14.00 $2,464.00
P-6 Signing and Striping LS 1 $2,000.00 $2,000.00
Immokalee Road Turn Lane Improvements Sub-Total $9,436.00
Engineer's Opinion of Probable Construction Costs