Backup Documents 09/26/2017 Item #16A 4 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 6 A 4 '
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to he forwarded to the County A.Itorney Office
at the lime the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3. County Attorney Office County Attorney Office
./t-Z? ...SAS 7)€
4. BCC Office Board of CountyRSb•k
Commissioners cc/1 te` LkkiS
5. Minutes and Records Clerk of Court's Office c—i lo—ft
3 61512.vk
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Jodi Hughes Phone Number x-5744
Contact/ Department
Agenda Date Item was 9/26/17 Agenda Item Number 16A4
Approved by the BCC
Type of Document Plat Number of Original
Attached Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applioable)
1. Does the document require the chairman's original signature? SAS
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name; Agency;Address; Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman,with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney. JH
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JH
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JH
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 9/26/17 and all changes made
during the meeting have been incorporated in the attached document. The County I �
Attorney's Office has reviewed the changes,if applicable. b fp.
9. Initials of attorney verifying that the attached document is the version approved by the
BCC,all changes directed by the BCC have been made,and the document is ready for the ti,LtiiI t �.
Chairman's signature. a ili
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP Z 6 A 4
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to he forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3. County Attorney Office County Attorney Office A5 /1
4. BCC Office Board of County {�S
Commissioners 7s Skk .``.%
5. Minutes and Records Clerk of Court's Office /'�1�� 31,7S-
PRIMARY
S
PRIMARY CONTACT INFORMATION a.J J
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or missing information.
Name of Primary Staff Jodi Hughes Phone Number x-5744
Contact/ Department
Agenda Date Item was 9/26/17 Agenda Item Number 16A4 s-
Approved by the BCC
Type of Document Bond, Maintenance Agreement Number of Original 2
Attached Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? 0.444-' SCIN5
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be
signed by the Chairman, with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney. JH
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JH
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JH
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 9/26/17 and all changes made during
the meeting have been incorporated in the attached document. The County tf,t
Attorney's Office has reviewed the changes, if applicable A:
9. Initials of attorney verifying that the attached document is the version approved by t
BCC,all changes directed by the BCC have been made,and the document is ready fo the
Chairman's signature.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
16 A4
MEMORANDUM
Date: May 17, 2018
To: Jodi Hughes, Project Manager
Development Review
From: Teresa Cannon, Deputy Clerk
Minutes & Records Department
Re: Plat/Performance Bond/Maintenance Agreement—
Fronterra Phase 2
Attached is a copy of the aforementioned document as referenced above, (Item
#16A4) approved by Board of County Commissioners on Tuesday, September
26, 2017.
If you need anything further, please feel free to contact me at 252-8411.
Thank you.
Attachment
16 A4
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS
THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS
entered into this day of April / / , 20 18 between
CCC Fronterra,LLC hereinafter referred to as "Developer," and the Board of County Commissioners of Collier
County, Florida, hereinafter referred to as the "Board.
RECITALS:
A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the
Board of certain plat of a subdivision to be known as: Fronterra Phase 2
B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post
appropriate guarantees for the construction of the improvements required by said subdivision
regulations, said guarantees to be incorporated in a bonded agreement for the construction of the
required improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set
forth, Developer and the Board do hereby covenant and agree as follows:
1. Developer will cause to be constructed: Roadways, storm drainage and utility infrastructure.
within 36 months from the date of approval said subdivision plat, said improvements
hereinafter referred to as the required improvements.
2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and
by reference made a part hereof) in the amount of$1,964,461.55 - which amount represents 10% of
the total contract cost to complete the construction plus 100% of the estimated cost of to complete
the required improvements at the date of this Agreement.
3. In the event of default by the Developer or failure of the Developer to complete such improvements
within the time required by the Land Development Code, Collier may call upon the subdivision
performance security to insure satisfactory completion of the required improvements.
4. The required improvements shall not be considered complete until a statement of substantial
completion by Developer's engineer along with the final project records have been furnished to be
reviewed and approved by the County Manager or his designee for compliance with the Collier
County Land Development Code.
5. The County Manager or his designee shall, within sixty (60) days of receipt of the statement of
substantial completion, either: a) notify the Developer in writing of his preliminary approval of the
improvements; or b) notify the Developer in writing of his refusal to approve improvements,
therewith specifying those conditions which the Developer must fulfill in order to obtain the County
Manager's approval of the improvements. However, in no event shall the County Manager or his
designee refuse preliminary approval of the improvements if they are in fact constructed and
submitted for approval in accordance with the requirements of this Agreement.
6. The Developer shall maintain all required improvements for a minimum period of one year after
preliminary approval by the County Manager or his designee. After the one year maintenance period
by the Developer has terminated, the Developer shall petition the County Manager or his designee to
inspect the required improvements. The County Manager or his designee shall inspect the
improvements and, if found to be still in compliance with the Land Development Code as reflected by
final approval by the Board, the Board shall release the remaining 10% of the subdivision
performance security. The Developer's responsibility for maintenance of the required improvements
shall continue unless or until the Board accepts maintenance responsibility for and by the County.
16 A4
7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter
the Developer may request the County Manager or his designee to reduce the dollar amount of the
subdivision performance security on the basis of work complete, Each request for a reduction in the
dollar amount of the subdivision performance security shall be accompanied by a statement of
substantial completion by the Developer's engineer together with the project records necessary for
review by the County Manager or his designee. The County Manager or his designee may grant the
request for a reduction in the amount of the subdivision performance security for the improvements
completed as of the date of the request.
8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon
certification of such failure, the County Manager or his designee may call upon the subdivision
performance security to secure satisfactory completion, repair and maintenance of the required
improvements. The Board shall have the right to construct and maintain, or cause to be constructed
or maintained, pursuant to public advertisement and receipt and acceptance of bids, the
improvements required herein. The Developer, as principal under the subdivision performance
security, shall be liable to pay and to indemnify the Board, upon completion of such construction, the
final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent
costs, together with any damages, either direct or consequential, which the Board may sustain on
account of the failure of the Developer to fulfill all of the provisions of this Agreement.
9. All of the terms, covenants and conditions herein contained are and shall be binding upon the
Developer and the respective successors and assigns of the Developer.
IN WITNESS WHEREOF, the Board and the Developer have caused this Agreement to be executed by
their duly authorized representatives this '?c'1, day of /fit,_ , I / / , 2018 .
SIGNED IN THE PRESENCE OF: (Name of Entity)CCC Fronterra, LLC
By: `� 4�
Printed Name p jS (j 111G�` CL( U Cti Brian Gog n, Vice President
Lei Printed Name/Title
1 iiJ (President,VP, or CEO)
Igrr t - RS tb‘k t_ (Provide Proper Evidence of Authority)
Printed Name
ATTEST:
DWIGHT E. BROCK, CLERK BOARD OFC% NT OMMIS e
OF COLLI ' CO Y, •
By: �A ,-L�
u Clerk Attest as to Chal,rmati's "I: 7 c inq:r ^eNe,n
App oved to form artlipadity0111y.
S `oft- A S ff,nt-
Assistant County Attorney
Exhibit 16 A 4
PERFORMANCE BOND
No. 106819619
KNOW ALL PERSONS BY THESE PRESENTS: that
CCC Fronterra, LLC
2020 Salzedo Street, Suite 200
Coral Gables, Florida 33134
(hereinafter referred to as "Owner") and
Travelers Casualty and Surety Company of America
One Tower Square, 3B
Hartford, CT 06813
(800)873-1477
(hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, (hereinafter
referred to as "County") in the total aggregate sum of One million nine hundred sixty-four thousand four
hundred sixty-one dollars and 55 cents ($1,964,461.55) in lawful money of the United States, payment of
which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors
and assigns, jointly and severally, firmly by these presents. Owner and Surety are used for singular or
plural, as the context requires.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by
the Board a certain subdivision plat named Fronterra Phase 2 and that certain subdivision shall include
specific improvements which are required by Collier County Ordinances and Resolutions (hereinafter
"Land Development Regulations"). This obligation of the Surety shall commence on the date this Bond is
executed and shall continue until the date of final acceptance by the Board of County Commissioners of
the specific improvements described in the Land Development Regulations (hereinafter the "Guaranty
Period")
NOW, THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in
accordance with the Land Development Regulations during the guaranty period established by the
County, and the Owner shall satisfy all claims and demands incurred and shall fully indemnify and save
harmless the County from and against all costs and damages which it may suffer by reason of Owner's
failure to do so, and shall reimburse and repay the County all outlay and expense which the County may
incur in making good any default, then this obligation shall be void, otherwise to remain in full force and
effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby, stipulates and agrees that
no change, extension of time, alteration, addition or deletion to the proposed specific improvements shall
in any way affect its obligation on this Bond, and it does hereby waive notice of any such change,
extension of time, alteration, addition or deletion to the proposed specific improvements.
PROVIDED FURTHER, that it is expressly agreed that the Bond shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, so as to bind the Owner
and the Surety to the full and faithful performance in accordance with the Land Development Regulations.
The term "Amendment," wherever used in this Bond, and whether referring to this Bond, or other
documents shall include any alteration, addition or modification of any character whatsoever.
16 A4
IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be
executed this 30th day of April, 2018.
WITNESSES: CCC Front-rra, LLC
[)j,tu.0
LIlaBy: _•-
Printed Name Pr (9► t'` 0 Brian Goguen, Vic- ' esident
Printed Name/Title
(Provide Proper Evidence of Authority)
Printed Name
ACKNOWLEDGEMENT
STATE OF FLORIDA
COUNTY OF COLLIER
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS L3 DAY OF
A�I^t , BY Brian Goguen the Vice President OF CCC Fronterra, LLC WHO IS PERSONALLY
KNOWN TO ME, OR HAS PRODUCED AS IDENTIFICATION.
Notary Public- State of Florida ;.,;,,;,;;,,,, KIM D DAVIDSON
� C17�a) NoCtaorymrPusbslicor-#01o5f 4a8r2da
K}� 11 My Comm.Exp res Feb 19,2022
Boded lhronh Nalrn;i.Notary Assn
(SEAL)
Printed Name
WITNESSES: Tray r Casualty and Surety Company of America
w„) /t
By: ,�(t_C ( i1LQ4
Printed Name: Robin Griffin
r
Or
Yrt,L )2\
t-cG,Lat Charity A. Moser, Attorney-In-Fact
(Provide Proper Evidence of Authority)
Printed Name: Emily Strassel
ACKNOWLEDGMENT
STATE OF Florida
COUNTY OF Collier
THE FOREGOING PERFORMANCE BOND WAS ACKNOWLEDGED BEFORE ME THIS 30th DAY OF
April, 2018, BY Charity A. Moser AS Attorney-In-Fact OF Travelers Casualty and Surety Company of
America WHO IS PERSONALLY KNOWN TO ME, OR HAS PRODUCED AS
IDENTIFICATION.
o ary P blic State of Florida SEAL
JL ,�94%''••. KRISTIN M.NEIERT
1 f . �� L' . MY COMMISSION#GG 079764
EXPIRES:May 5,2021
Printed Name: Kristin Neiert -,Eo;;ridThruNosUnderwriters
3
WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
POWER OF ATTORNEY 1 6
TRAVELERSFarmington Casualty Company St.Paul Mercury Insurance Company A 4
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America
St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
St.Paul Guardian Insurance Company
Attorney-In Fact No. 229466 Certificate No.O 0 7 0 0 3 3 6 6
KNOW ALL MEN BY THESE PRESENTS: That Farmington Casualty Company. St. Paul Fire and Marine Insurance Company. St. Paul Guardian Insurance
Company.St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company.Travelers Casualty and Surety Company of America.and United States
Fidelity and Guaranty Company are corporations duly organized under the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a
corporation duly organized under the laws of the State of Iowa.and that Fidelity and Guaranty Insurance Underwriters,Inc..is a corporation duly organized under the
laws of the State of Wisconsin(herein collectively called the"Companies").and that the Companies do hereby make.constitute and appoint
Huntley A.Hornbeck II,Kristin M. Neiert, Marc E.Williams,Stephen J. Benza,Charity A. Moser,and Dawn Y.Colecchio
of the City of Naples .State of_ Florida .their true and lawful Attorney(s)-in-Fact.
each in their separate capacity if more than one is named above,to sign.execute,seal and acknowledge any and all bonds,recognizances.conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons.guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF,the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed.this 5th
day of October 2016
Farmington Casualty Company St.Paul Mercury Insurance Company
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America
St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
St.Paul Guardian Insurance Company
. I`l .IJ'I
�Z"(rq''l+rr ♦is ., ' Fy64•,es ., _:\....$.�U:a�' Jr j...N.S.... •(.,:r, `>^k, CtOo N.ItN'.'�Lato \`F
U
R E1•, 2 eynF
\.Z8Y 9
'
s
0
)2V00RL .4%
/ to.'°R,,7f P4_ pP9RAt'C_ II.
• bn moRpoRAttD • te, iMCORPCM
9 8 2 O ♦191! I - 195 w HARTFORD9 ;j" WSEAL;a:
: 'rM1 "k. . .
�1ATN
�1S1 OP
State of Connecticut By: —
City of Hartford ss. Robert L.Raney.Senior Vice President
On this the 5th day of October 2016 ,before me personally appeared Robert L.Raney.who acknowledged himself to
{ be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company.Fidelity and Guaranty Insurance Underwriters.Inc..St.Paul
Fire and Marine Insurance Company,St.Paul Guardian Insurance Company,St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company.Travelers
3- Casualty and Surety Company of America,and United States Fidelity and Guaranty Company,and that he.as such,being authorized so to do,executed the foregoing
instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
In Witness Whereof,I hereunto set my hand and official seal. "DIAR V\. " • ..4 ^�
My Commission expires the 30th day of June.2021. * Pomo # W�'Marie C.Tetreault.Notary Public
58440-5-16 Printed in U.S.A.
WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
•
WARNING:THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER 1 6 A 4
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Farmington Casualty Company,Fidelity
and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwriters,Inc..St. Paul Fire and Marine Insurance Company.St. Paul Guardian Insurance
Company.St.Paul Mercury Insurance Company,Travelers Casualty and Surety Company,Travelers Casualty and Surety Company of America.and United States
Fidelity and Guaranty Company,which resolutions are now in full force and effect,reading as follows:
RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President,any Vice President.any Second Vice
President,the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf
of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the
Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of a bond.recognizance,or conditional undertaking,and any
of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is
FURTHER RESOLVED,that the Chairman,the President.any Vice Chairman,any Executive Vice President.any Senior Vice President or any Vice President may
delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy
thereof is filed in the office of the Secretary;and it is
FURTHER RESOLVED,that any bond,recognizance.contract of indemnity.or writing obligatory in the nature of a bond,recognizance.or conditional undertaking
shall be valid and binding upon the Company when(a)signed by the President.any Vice Chairman.any Executive Vice President.any Senior Vice President or any Vice
President,any Second Vice President.the Treasurer,any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the
Company's seal by a Secretary or Assistant Secretary:or(b)duly executed(under seal,if required)by one or more Attorneys-in-Fact and Agents pursuant to the power
prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED.that the signature of each of the following officers:President,any Executive Vice President.any Senior Vice President.any Vice President.
any Assistant Vice President.any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any
certificate relating thereto appointing Resident Vice Presidents.Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds
and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal
shall he valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on
the Company in the future with respect to any bond or understanding to which it is attached.
I.Kevin E.Hughes.the undersigned,Assistant Secretary.of Farmington Casualty Company.Fidelity and Guaranty Insurance Company.Fidelity and Guaranty Insurance
Underwriters.Inc..St.Paul Fire and Marine Insurance Company,St.Paul Guardian Insurance Company.St.Paul Mercury Insurance Company.Travelers Casualty and
Surety Company,Travelers Casualty and Surety Company of America,and United States Fidelity and Guaranty Company do hereby certify that the above and foregoing
is a true and correct copy of the Power of Attorney executed by said Companies,which is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this 3%) day of ___1_Li .20 I
Kevin E.Hughes.Assistant Sec tary
GASU q' St t,0.0 6vW,. \�,M iMf4 •a*!!!'F'
HS
ED
gyp ylA,jy�3� `\fig 5 1'INRTFOfiI,`'f CONY, �8,,,.... `''!"'/1 �r^�.`' AO'
To verify the authenticity of this Power of Attorney,call 1-800-421-3880 or contact us at www.travelersbond.com.Please refer to the Attorney-In-Fact number,the
above-named individuals and the details of the bond to which the power is attached.
WARNING'THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
16 A4
� � Project: Fronterra PPL-PH2
P E � I N S U
Task: Engineer's OPC for Subdivision Fee Calculation(Rev02)
ENGINq Prepared By: LMB Date: 3/23/2017
f` Checked By: DJH Date: 3/23/2017
PHASE 2
CONTINGENCY
Calculation Summary SUB-TOTAL PERCENT DOLLAR TOTAL
EARTHWORK $ 1,022,009.00 5% $ 51,100.45 $ 1,073,109.45
PAVING $ 174,076.70 5% $ 8,703.84 $ 182,780.54
DRAINAGE $ 131,412.30 5% $ 6,570.62 $ 137,982.92
POTABLE WATER $ 92,967.00 5% $ 4,648.35 $ 97,615.35
SANITARY SEWER $ 161,867.50 5% $ 8,093.38 $ 169,960.88
IRRIGATION $ 48,000.00 5% $ 2,400.00 $ 50,400.00
LIGHTING $ 50,000.00 5% $ 2,500.00 $ 52,500.00
LANDSCAPING $ 20,500.00 5% $ 1,025.00 $ 21,525.00
Total Probable Construction Cost: $ 1,700,832.50 5% $ 85,041.63 $ 1,785,874.14
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND Paving,Drainage and Site
SEALED BY DAVID J HURST,P.E.ON 03/31/17 100%Construction Cost: $ 1,518,297.91
USING A SHA-1 AUTHENTICATION CODE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT Water and Sewer
CONSIDERED SIGNED AND SEALED AND THE SHA-1 100%Construction Cost: $ 267,576.23
AUTHENTICATION CODE MUST BE VERIFIED ON
ANY ELECTRONIC COPIES
Estimated 110%Bond Amount $ 1,964,461.55
NOTES:
1)This Opinion of Probable Cost shall be used for Review Fee Calculations Purposes Only.
2)This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules,regulations,ordinances,and construction costs in
effect on the date of this document.Interpretations of these construction costs may affect this Opinion of Probable Cost,and may require adjustments to
delete,decrease,or increase portions of this Opinion of Probable Cost.
3) All costs provided in this OPC are based on recent contract prices,or the Engineers'latest known unit costs.These costs cannot be guaranteed at this time
due to unpredictable and uncontrollable increases in the cost of concrete,petroleum,or the availability of materials and labor.
4)This cost estimate does not include the cost of any building construction. David J. Digitally signed by David
J.Hurst,P.E.
5)This cost estimate assumes dry utilities(LCEC,cable,telephone)will be installed at no-cost to the developer. DN:cn=David J.Hurst,P.
H u rst P E., i Peninsula
6) Due to the preliminary nature of the project,this cost estimate includes a 5%contingency in each section. .Enggineering,ou,
email=Dhurst@barronco
7) Review Fees for lake excavation provided in separate Review Fee,with the lake excavation permit. r Ilier.com,c=1.15t Date:2017.03.31
15:15:14-04'00'
David J.Hurst,P.E.
FL Registration#60727
Peninsula Engineering
Certificate of Authorization#28275
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Desig n_P4rofi9OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02
1 6 A 4
Project: Fronterra PPL-PH2
Task: Engineer's OPC for Subdivision Fee Calculation(Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
EARTHWORK
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
EW-1 CLEARING 9.50 AC $ 3,000.00 $ 28,500.00
EW-2 EMBANKMENT-(IMPORT FILL) 90,319 CY $ 11.00 $ 993,509.00
EW-3 SILT FENCE(ACCOUNTED FOR IN PHASE 1) 0 LF $ 2.00 $ -
$
SUB-TOTAL EARTHWORK= $ 1,022,009.00
5%CONTINGENCY= $ 51,100.45
TOTAL EARTHWORK= $ 1,073,109.45
P:Wctive_Projects\P-BCN I-002\002_EastGateway_PPL\Design_P@rrpWPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02
16 A4
Project: Fronterra PPL-PH2
Task: Engineer's OPC for Subdivision Fee Calculation(Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
PAVING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
PAV-1 3/4"ASPHALTIC CONCRETE TYPE S-III(FIRST LIFT) 4,004 SY $ 4.95 $ 19,819.80
PAV-2 3/4"ASPHALTIC CONCRETE TYPE S-Ill(SECOND LIFT) 4,004 SY $ 4.95 $ 19,819.80
PAV-3 8"LIMEROCK BASE 4,971 SY $ 6.50 $ 32,311.50
PAV-4 12"STABILIZED SUBGRADE 5,164 SY $ 1.55 $ 8,004.20
PAV-5 2'VALLEY GUTTER 3,517 LF $ 7.95 $ 27,960.15
PAV-6 CONCRETE SIDEWALK 17,067 SF $ 3.75 $ 64,001.25
PAV-7 BLUE-BLUE REFLECTORS 4 EA $ 15.00 $ 60.00
PAV-8 SIGNING AND STRIPING 1 LS $ 1,500.00 $ 1,500.00
PAV-9 ADA CURB RAMP 2 EA $ 300.00 $ 600.00
SUB-TOTAL PAVING= $ 174,076.70
5%CONTINGENCY= $ 8,703.84
TOTAL PAVING= $ 182,780.54
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PemeOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02
16 A4
Project: Fronterra PPL - PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
DRAINAGE
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
DRA-1 10" PVC SECONDARY DRAINAGE LINES 1,242 LF $ 19.00 $ 23,598.00
DRA-2 15" RCP STORM SEWER 264 LF $ 22.20 $ 5,860.80
DRA-3 24" RCP STORM SEWER 327 LF $ 38.10 $ 12,458.70
DRA-4 30" RCP STORM SEWER 108 LF $ 55.10 $ 5,950.80
DRA-5 36" RCP STORM SEWER 194 LF $ 82.00 $ 15,908.00
DRA-6 YARD DRAIN 32 EA $ 1,030.00 $ 32,960.00
DRA-7 DITCH BOTTOM INLET (TYPE D) 2 EA $ 2,750.00 $ 5,500.00
DRA-8 VALLEY GUTTER INLET(DOUBLE) 6 EA $ 3,546.00 $ 21,276.00
DRA-9 24" FLARED END 2 EA $ 2,500.00 $ 5,000.00
DRA-10 36" FLARED END 1 EA $ 2,900.00 $ 2,900.00
SUB-TOTAL DRAINAGE= $ 131,412.30
5%CONTINGENCY= $ 6,570.62
TOTAL DRAINAGE= $ 137,982.92
P:\ActiveProjects\P-BCNI-002\002_EastGateway_PPL\Design_Perm it\OPCs\2017-03-14-Rev02\Fronterra-
FeeCalc__Ph2_Rev02 4 of 9
16 A4
Project: Fronterra PPL-PH2
Task: Engineer's OPC for Subdivision Fee Calculation(Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
POTABLE WATER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
WAT-1 6"PVC WATER MAIN(C900,DR-18) 1,602 LF $ 13.00 $ 20,826.00
WAT-2 6"GATE VALVE 5 EA $ 1,000.00 $ 5,000.00
WAT-3 8"PVC WATER MAIN(C900,DR-14) 54 LF $ 18.00 $ 972.00
WAT-4 8"PVC WATER MAIN(C900,DR-18) 230 LF $ 15.80 $ 3,634.00
WAT-5 8"GATE VALVE 1 EA $ 1,286.00 $ 1,286.00
WAT-6 FIRE HYDRANT ASSEMBLY(COMPLETE)* 4 EA $ 3,500.00 $ 14,000.00
WAT-7 1"SINGLE SERVICE(SHORT SIDE)(COMPLETE) 7 EA $ 575.00 $ 4,025.00
WAT-8 1"SINGLE SERVICE(LONG SIDE)(COMPLETE) 2 EA $ 799.00 $ 1,598.00
WAT-9 1-1/2"DOUBLE SERVICE(SHORT SIDE)(COMPLETE) 15 EA $ 969.00 $ 14,535.00
WAT-10 1-1/2"DOUBLE SERVICE(LONG SIDE)(COMPLETE) 20 EA $ 1,250.00 $ 25,000.00
WAT-11 TEMPORARY BACTERIAL SAMPLE POINT 1 EA $ 175.00 $ 175.00
WAT-12 PERMANENT BACTERIAL SAMPLE POINT 1 EA $ 1,916.00 $ 1,916.00
*Fire Hydrant Assembly(Complete)includes gate valve at hydrant. SUB-TOTAL POTABLE WATER= $ 92,967.00
5%CONTINGENCY= $ 4,648.35
TOTAL POTABLE WATER= $ 97,615.35
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Desig n_PrEmayttOPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02
16 A4
Project: Fronterra PPL-PH2
Task: Engineers OPC for Subdivision Fee Calculation(Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
SANITARY SEWER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
SAN-1 8"PVC GRAVITY SEWER MAIN(6'-8'CUT) 313 LF $ 35.00 $ 10,955.00
SAN-2 8"PVC GRAVITY SEWER MAIN(8'-10'CUT) 680 LF $ 40.00 $ 27,200.00
SAN-3 8"PVC GRAVITY SEWER MAIN(10'-12'CUT) 313 LF $ 45.00 $ 14,085.00
SAN-4 8"PVC GRAVITY SEWER MAIN(12'-14'CUT) 353 LF $ 50.00 $ 17,650.00
SAN-5 4'SANITARY SEWER MANHOLE(8'-10'CUT) 4 EA $ 5,500.00 $ 22,000.00
SAN-6 4'SANITARY SEWER MANHOLE(10'-12'CUT) 1 EA $ 7,050.00 $ 7,050.00
SAN-7 4'SANITARY SEWER MANHOLE(12'-14'CUT) 2 EA $ 9,000.00 $ 18,000.00
SAN-8 6"SERVICE LATERAL(SINGLE) 8 EA $ 824.00 $ 6,592.00
SAN-9 6"SERVICE LATERAL(DOUBLE) 36 EA $ 908.00 $ 32,688.00
SAN-10 TELEVISION INSPECTION 1,659 LF $ 2.50 $ 4,147.50
SAN-11 TESTING 1 LS $ 1,500.00 $ 1,500.00
SUB-TOTAL SANITARY SEWER= $ 161,867.50
5%CONTINGENCY $ 8,093.38
TOTAL SANITARY SEWER= $ 169,960.88
P:\Active_Projects\P-BCN I-002\002_EastGateway_PPL\Design_PeEirittJPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02
16 A4
Project: Fronterra PPL-PH2
Task: Engineer's OPC for Subdivision Fee Calculation(Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
IRRIGATION
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
IRR-1 IRRIGATION(PRIMARY ALLOWANCE) 1 EA $ 30,000.00 $ 30,000.00
IRR-2 IRRIGATION(SECONDARY ALLOWANCE) 1 EA $ 18,000.00 $ 18,000.00
$
$ 48,000.00
5%CONTINGENCY= $ 2,400.00
TOTAL IRRIGATION= $ 50,400.00
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Pgn tDPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02
16 A4
Project: Fronterra PPL-PH2
Task: Engineer's OPC for Subdivision Fee Calculation (Rev02
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
LIGHTING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
LL-1 SITE LIGHTING(ALLOWANCE) 1 LS $ 50,000.00 $ 50,000.00
S -
$
$
$
S -
SUB-TOTAL LIGHTING= $ 50,000.00
5%CONTINGENCY= $ 2,500.00
TOTAL LIGHTING= $ 52,500.00
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_P€8g>dg)PCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02
l6 A4
Project: Fronterra PPL-PH2
Task: Engineer's OPC for Subdivision Fee Calculation(Rev02)
Prepared By: LMB Date: 3/23/2017
Checked By: DJH Date: 3/23/2017
LANDSCAPING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
LA-1 LANDSCAPING(ALLOWANCE) 1 LS $ 20,500.00 S 20.500.00
$
S -
S -
S -
S -
$
$
$
$
SUB-TOTAL LANDSCAPING= $ 20,500.00
5%CONTINGENCY= $ 1,025.00
TOTAL LANDSCAPING= $ 21,525.00
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_PEg-Otti3PCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02