Loading...
Ordinance 2003-48ORDINANCE NO. 03- 4 8 AN ORDINANCE AMENDING ORDINANCE NUMBER 91-102, THE COLLIER COUNTY LAND DEVELOPMENT CODE, WHICH INCLUDES THE COMPREHENSIVE ZONING REGULATIONS FOR THE UNINCORPORATED AREA OF COLLIER COUNTY, FLORIDA, BY AMENDING THE OFFICIAL ZONING ATLAS MAP NUMBERED 0501N BY CHANGING THE ZONING CLASSIFICATION OF THE HEREIN DESCRIBED REAL PROPERTY FROM "PUD" TO "PUD" PLANNED UNIT DEVELOPMENT KNOWN AS RADIO SQUARE, FOR PROPERTY LOCATED ON THE SOUTHWEST CORNER OF RADIO ROAD (CR-856) AND DONNA STREET, IN SECTION 1, TOWNSHIP 50 SOUTH, RANGE 25 EAST, COLLIER COUNTY, FLORIDA, CONSISTING OF 9.4 + ACRES; PROVIDING FOR THE REPEAL OF ORDINANCE NUMBER 97-42, THE FORMER RADIO SQUARE PUD; AND BY PROVIDING AN EFFECTIVE DATE. WHEREAS, Thomas E. Killen, Architect, representing Naples Elks Lodge Number 2010, petitioned the Board of County Commissioners to change the zoning classification of the herein described real property. NOW, THEREFORE, BE IT ORDAINED BY the Board of County Commissioners for Collier County, Florida: SECTION ONE: The zoning classification of the herein described real property located in Section 1, Township 50 South, Range 25 East, Collier County, Florida, is changed from "PUD" to "PUD" Planned Unit Development in accordance with the PUD Document, attached hereto as Exhibit "A", which is incorporated herein and by reference made a part hereof. The Official Zoning Atlas Map numbered 0501N, as described in Ordinance Number 91-102, the Collier County Land Development Code, is hereby amended accordingly. SECTION TWO: Ordinance Number 97-42, known as the Radio Square PUD, adopted on September 9, 1997, by the Board of County Commissioners of Collier County, is hereby repealed in its entirety. SECTION THREE: This Ordinance shall become effective upon filing with the Department of State. PASSED AND DULY ADOPTED by the Board of County Commissioners Collier County, Florida, this 2.~t4day of :~-tY~:~c ,2003. ATTEST: DWIGHT E. BROCK, Clerk Marj ori¢~.lCl. Student ' Assistant County Attorney PUDAo2001 -AR-956/FR/sp BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA BY: ..~~rl----~., TOM HENNING, CHAIRMAN This brdinance filed with the .~c~arY of State's Office the yof~, __2~IX~___ and acknowledgement~._ot that filing_ recqived this ~ day of De~ut~ Clerk ~1 PLANNED UNIT DEVELOPMENT FOR RADIO SQUARE PUD Prepared For: NAPLES LODGE 2010 BENEVOLENT AND PROTECTIVE ORDER OF ELKS OF THE US, INC. 3950 Radio Road Naples, Florida 34104 Prepared By: THOMAS E. KILLEN ARCHITECT & PLANNER 3940 Radio Road, Suite 107 Naples, Florida 34104 (941) 436-1975 Date Filed: Date Reviewed By CCPC: Date Approved By BCC: 9/23/03 Ordinance # 91-95 Amendments & Repeals Amended Repeals 97-~2 Exhibit "A" TABLE OF CONTENTS SECTION I STATEMENT OF COMPLIANCE ..................................... 1 SECTION II PROPERTY OWNERSHIP, LEGAL DESCRIPTION AND SHORT TITLE ...... 2 SECTION Ill STATEMENT OF INTENT AND PROPERTY DESCRIPTION .............. 3 SECTION IV GENERAL DEVELOPMENT REGULATIONS ........................... 6 SECTION V ENVIRONMENTAL STANDARDS ................................... 14 SECTION VI TRANSPORTATION REQUIREMENTS .............................. 15 SECTION VII UTILITIES REQUIREMENTS ...................................... 16 SECTION VIII WATER MANAGEMENT REQUIREMENTS .......................... 18 SECTION IX SUBDIVISION EXCEPTIONS ....................................... 19 PAGE LIST OF EXHIBITS ATTACHMENT A - CONCEPTUAL PUD MASTER PLAN ATTACHMENT B - LEGAL DESCRIPTION SECTION I STATEMENT OF COMPLIANCE The development of this project will be in compliance with the planning goals and objectives of Collier County as set forth in the Growth Management Plan. This compliance includes: o o The subject property is located in an area identified as Urban in the Growth Management Plan for Collier County. The project shall be in compliance with all applicable County regulations including the Growth Management Plan. The project will be served by a complete range of services and utilities as approved by the County. The project is compatible with adjacent land uses through the internal arrangement of tracts, the placement of land use buffers, and the proposed development standards contained herein. The Planned Unit Development includes open spaces and natural features which are preserved from future development in order to enhance their natural functions and to serve as project amenities. On this site, the project combines land uses, including industrial and office uses, with extensive open spaces and buffer zones to satisfy the guidelines in the Growth Management Plan pertaining to the mix land uses. Specifically, the proposed project complies with the Collier County Growth Management Plan as follows: a. The requested re-zoning is in the form of a PUD as required. b. The proposed site is not "spot industrial" and is adjacent to existing land zoned industrial. Co do The proposed development is compatible with adjacent land uses in general. Specific development standards and limitations on uses have been provided in Section IV, General Development Requirements to ensure compatibility with existing non-industrial type uses located along Donna Street east of the project. The current PUD came about because it was deemed consistent' with the criteria for additional industrial under criteria, while the amendment is further consistent with provisions of the F.L.U.E. relative to transitional commercial uses. 2.1 2.2 2.3 SECTION II PROPERTY OWNERSHIP, LEGAL DESCRIPTION, AND SHORT TITLE PROPERTY OWNERSHIP The subject property is currently owned by B.P.O.E. Elks Lodge 2010. LEGAL DESCRIPTION The subject property is described in Exhibit "B" SHORT TITLE This Ordinance shall be known and cited as the "Radio Square Planned Unit Development Ordinance". SECTION III STATEMENT OF INTENT AND PROJECT DESCRIPTION 3.1 INTRODUCTION 3.2 It is the developer's intent to establish a Planned Unit Development. The purpose of this Document is to set forth flexible guidelines for the future development of the project that meet accepted planning principles and practices and to implement the Growth Management Plan. PROJECT DESCRIPTION 3.3 It is the developer's intent to establish a Planned Unit Development for a Business Park. This Business Park will be a campus style arrangement of buildings, cohesive and aesthetically pleasing, containing a number of separate office, light manufacturing, wholesale, and warehousing, and open space integration. This project is, by design, to be compatible with the adjacent land uses. This goal is achieved through the internal road network which is oriented away from abutting residential property; placement of water management features along the eastern edge of the development; and through extensive use of buffers. GENERAL mo Co Regulations for the development of the Radio Square PUD shall be in accordance with the contents of this Document, PUD-Planned Unit Development District and other applicable sections and parts of the Collier County Land Development Code and other applicable regulations in effect at the time of building permit application. Should these regulations fall to provide developmental standards, then the provisions of the most similar district in the Collier County Land Development Code shall apply. Unless otherwise noted, the definitions of all terms be the same as the definitions set forth in Collier County Land Development Code in effect at the time of building permit application. All conditions imposed and all graphic material presented depicting restrictions for the development of the Radio Square PUD shall become part of the regulations which govern the manner in which this site may be developed. D. If not specifically set forth or provided for in this Ordinance, then provisions of the Collier County Land Development Code shall apply. 3.4 SITE CLEARING AND DRAINAGE Clearing, grading, earthwork, and site drainage work shall be performed in accordance with applicable Collier County codes and ordinances and the standards and commitments of this Document in effect at the time of construction plan approval. 3.5 EASEMENTS FOR UTILITIES Easements, where required, shall be provided for water management areas, utilities and other purposes as may be required by Collier County. All necessary easements, dedications or other instruments shall be granted to insure the continued operation and maintenance of all services and utilities. This will be in compliance with applicable regulations in effect at the time construction plans and plat approvals are requested. 3.6 AMENDMENTS TO THIS ORDINANCE Amendments to this Ordinance and Master Plan shall be pursuant to Section 2-7.3.5 of the Collier County Land Development Code as revised, at the time the amendment is requested. 3.7 PROJECT PLAN APPROVAL REQUIREMENTS Prior to the recording of the record plat, when required by the Collier County Land Development Code, final plans of the required improvements shall receive the approval of all appropriate Collier County governmental agencies to insure compliance with the PUD Master Plan, the Collier County Land Development Code and the platting laws of the State of Florida. Attachment "A," PUD Master Plan, constitutes the required PUD Development Plan. Subsequent to, or concurrent with, PUD approval, a subdivision master plan shall be submitted for the entire area covered by the PUD Master Plan. All division of property and the development of the land shall be in compliance with the Collier County Land Development Code. The provisions of Section 3.3 of the Collier County Land Development Code shall apply to the development of all platted tracts, or parcel of land, as provided 4 in said Division 3.3 prior to the issuance of a building permit or other development order. The area illustrated as a detention area on Attachment "A" shall be constructed as a lake and it shall conform with the requirements of Division 3.5 of the Collier County Land Development Code. However, parts thereof may be constructed as shallow depressions for water retention purposes as long as they meet the minimum requirements for wet and dry retention areas in accordance with South Florida Water Management District criteria. Such areas, the lake and shallow depressions shall be in the same general configuration and contain the same general acreage as shown by Attachment "A." In addition to the various areas and specific items shown in Attachment "A," easements, as necessary (utility, private, semi-public, etc.), shall be established within, or along, the various tracts. 3.8 SUNSET AND MONITORING PROVISIONS The Radio Square PUD shall be required to abide by any provisions in the Collier County Land Development Code pertaining to sunsetting and monitoring as provided by Section 2.7.3.4 and 2.7.3.6 of the Land Development Code. SECTION IV GENERAL DEVELOPMENT REQUIREMENTS 4.1 PURPOSE The purpose of this Section is to delineate the development regulations that accompany the PUD Master Plan. 4.2 GENERAL 4.3 Where development standards are not specifically provided for in this Document, applicable standards of the Collier County Land Development Code shall apply. LAND USE INTENSITY AND PROJECT PHASING PARCEL USES Tract B. Office, financial institutions, Medical facilities, Decorator/furnishings use only. Veterinarian or pet grooming with no outside kenneling Accessory retail sales, not to exceed ten percent of floor area Tracts A and C. Commerce and related business park uses. Master detention area shall be incorporated into Tract A. There are three tracts of land platted for development within this PUD. The full range of office uses, as listed above will be permitted on Tract B. Tracts A and C will be limited to industrial uses, office uses, fraternal lodges, warehouse distribution facilities including other land uses which are non-retail in character. All tracts will be developed in accordance with the Collier County Land Development Code. 4.4 mo USES PERMITTED No building or structure, or part thereof, shall be erected, altered or used, or land used, in whole or part, for other than the following: Principal Uses 1. Corporate headquarters; 2. Assembling, packaging, and fabricating operations only within fully enclosed structures; 3. Financial institutions; 4. Laboratories; light manufacturing and product assembly, only within fully enclosed structures; 5. Technological research offices; office supply businesses; 6. Medical laboratories, clinics, treatment facilities, and research and rehabilitative centers; 7. Printing, lithographing, and publishing; 8. Warehousing, wholesaling, storage, and distribution facilities, including comparable uses, only within fully enclosed structures; 9. Business and professional offices; banks; financial institutions; 10. Medical laboratories; medical clinics; medical offices for humans; 11. Real estate offices; research design and development activities: 12. Transportation, communication and utility offices; 13. Child care centers; 14. Fraternal organizations- Their customary and incidental functions, including on-premise preparation and consumption of food, alcoholic beverages, and recreational activities. Bo Accessory Uses 1. Service establishments catering to commerce and industries; Recreational centers, child care centers, and restaurants available for use by employees of businesses located within the permitted or accessory use buildings of this PUD; o Retail sales and/or display areas as accessory to the principal use, not to exceed any area greater than 10% of the gross floor area of the permitted principal use; Any other commercial use or professional service which is comparable in nature with the foregoing uses and which the Board of Zoning Appeals determines to be compatible in the District. Co Development Standards - Tracts A and C. 1. Minimum Setback Requirements from Property Lines and Tract Boundaries a. Except that setbacks for Tract C shall be Measured from the inside edge of the landscape buffer. b. Front Yard - Twenty-five (25) feet. c. Side Yard - Ten (10) feet, except that no side yard shall be less than fifty (50) feet from any abutting residentially zoned lot. d. Rear Yard - Fifteen (15) feet, except that no rear yard shall be less than fifty (50) feet from any abutting residentially zoned lot. Lot Size Requirement a. Minimum lot width - One hundred (100) feet. b. Minimum lot size ~ 10,000 square feet Minimum Floor Area One thousand (1,000) square feet Off-street Parking Requirements As required by the Collier County Land Development Code, except that if medical offices are constructed on Tract B, 20 parking spaces on Tract A shall be shared by Tract A and Tract B. This shared parking condition is only valid if a fraternal organization is the sole occupant of Tract A. 5. Maximum Height Two stories, or thirty-five (35) feet, however, Tract B is permitted two (2) stories over parking with a maximum of thirty-five (35) feet. 6. Distance Between Structures None, or if provided, fifteen (15) feet or one-half (I/2) the sum of the heights, whichever is greater. 7. Landscaping Tracts A and B:' The developer shall provide a twenty five (25) foot wide buffer consisting of a minimum of fourteen (14) foot high native trees spaced no more than twenty five (25) feet on center along the entire eastern project perimeter boundary in accordance with the landscaping standards of the Collier County Land Development Code. In addition, the developer must provide the following on Tracts A and B: The augmentation of the landscape buffer along the eastern boundary of Tract A is to include a 3 gallon meandering, native, single row hedge planted three (3) feet on center. The landscape buffer along Tract B shall have a buffer consisting of a minimum fourteen (14) foot high native trees spaced no more than twenty five (25) feet on center and a six foot high single row native hedge planted four (4) feet on center and shall be installed prior to the issuance of any certificate of occupancy. Co Along the southern property line of Tract B, for the first 100 linear feet measured from the south east comer of Tract B and continuing west along the Tract B property line, a ten (10) foot wide Type B landscape buffer shall be provided prior to the issuance of any certificate of occupancy. Tract C: The developer shall provide a ten (10) foot wide Type D landscape buffer adjacent to the north property line along Radio Road where a deceleration 9 turn lane is located. A ten (10) foot wide shared landscape buffer shall be provided along the common landscape buffer adjacent to Tract A. In each. of these cases, the square footage of landscape area lost due to these turn lanes and shared landscape buffers shall be mitigated in the form of an equivalent square footage of additional landscape area elsewhere within the PUD. 8. Signage As required by the Collier County Land Development Code. 9. Outside Storage Repair No outside storage or repair of products shall be allowed on any tracts. 10. Loading and Unloading No loading and unloading activities shall take place to the rear of the building abutting residential uses along the eastern property line. Loading and unloading shall not occur before 7:00 a.m. or after 7:00p.m. Loading and unloading will only be permitted from trucks onto the loading platforms within enclosed structures. 11. All warehouse, wholesaling, storage, and distribution facilities shall be subject to all applicable Collier County Noise Regulations. Water Management/Detention Area as Buffer The principal water management/detention area is required to be located along the eastern edge of the project to create a greater separation between planned uses on this site and residential uses to the east of this Planned Unit Development. 12. Master Association 14. A master association shall be established for the purpose of maintaining all landscaped areas, the water management system and other common open spaces areas to insure healthy plant material, that is free of trash, debris, or any other unsightly conditions. Lighting No glare from lights shall be permitted beyond the boundary of the Property. All lights shall be shielded and oriented towards the 10 building to minimize impacts on adjoining properties. The intensity of light shall be limited to a maximum of one (1) foot-candles. 15. Construction Vehicles Construction vehicles shall be parked as far away from Donna Street as is practical during the course of construction. 16. Burglar Alarms Burglar alarms shall be placed only along the west side of the building and shall be properly maintained at all times. 17. Architectural Standards Should metal buildings be erected on Tracts A and C, they shall be covered with a brick, stucco or similar type of facade on the north, south and east sides, for the purpose of enhancing compatibility with residential properties in the vicinity of the property. D. Developmental Standards - Tract B. 1. Setback Requirements a. Front Yard - Twenty five (25) from Donna Street and Radio Road. b. South Side Yard: Ten (10) feet c. West Side Yard - Twenty (20) feet 2. Lot Size Requirements a. Minimum Lot Width - 100 feet b. Minimum Lot Size - Ten thousand (10,000) square feet. 3. Minimum Floor Area One thousand (1,000) square feet 4. Maximum Height Two stories above parking with a maximum of thirty five (35) feet as measured from minimum flood elevation. 11 5. Distance Between Structures None, or if separated, fifteen (15) feet or one-half (1/2) the sum of the heights, whichever is greater. 6. Off Street Parking As required by the Collier County Land Development Code. 7. Signage As required by the Collier County Land Development Code. In addition, no wall signs shall be permitted to front onto Donna Street and free- standing signs shall only be permitted on the west side of the proposed office building. 8. Landscaping See Paragraph 4.4.C.7. 9. Architectural Controls As required by the Collier County Land Development Code Section 2.8. Air conditioning units for Tract B shall be located away from residential structures. 10. Lighting No glare from lights shall be permitted beyond the boundary of the property. All lights shall be shielded and oriented towards the building to minimize impacts on adjoining properties. The intensity of light shall be limited to a maximum of one (1) foot-candle. 12 SECTION V ENVIRONMENTAL STANDARDS 5.1 PURPOSE The purpose of this Section is to set forth the stipulation established by the Environmental Advisory Board. A. The developer shall be subject to Division 2.4 of the Land Development Code (use of native species in landscaping). Bo Co Do Fo Go The developer shall be subject to Division 3.9 of the Land Development Code (use of native species in landscaping). The developer shall be subject to Section 2.2.25.8.1. of the Land Development Code and the Collier County Comprehensive Plan Policy contained in the Conservation and Coastal Management Element (discovery of an archaeological or historical site, artifact or other indicator of preservation). The developer shall obtain and submit documentation of all necessary local, state, and federal permits. The developer shall be subject to all environmental ordinances in effect at the time of development order approvals. The developer shall retain existing native vegetation within all proposed buffers. Retention shall include all three strata. The developer shall retain all native vegetation outside the lake boundary, on Tract A, unless the configuration of the water management system within Tract A cannot accommodate the retention of native vegetation in specific areas. 13 SECTION VI TRANSPORTATION REQUIREMENTS 6.1 PURPOSE The purpose of this Section is to set forth the transportation commitments of the project developer. A. The developer shall provide arterial level street lighting at the project entrance prior to the issuance of any certificate of occupancy. B. Road Impact Fees will be paid in accordance with Collier County Ordinance 01- 13, as amended. Co Access improvements shall not be subject to impact fee credits and shall be in place before any certificates of occupancy are issued, and shall not be subject to impact fee credits. D. Access to the project shall be restricted to right turn-in/right turn-out. Eo Naples Lodge 2010, Benevolent and Protective Order of Elks of the US, Inc. may utilize existing regularly delineated parking areas for handicapped parking areas over and above those required by the Americans With Disabilities Act without the need to provide corresponding additional parking spaces. 14 SECTION VII UTILITIES REQUIREMENTS 7.1 PURPOSE The purpose of this Section is to set forth the engineering and utilities requirements which are required of this project developer. A. Engineering: Detailed paving, grading, site drainage, and utility plans shall be submitted to The Engineering Services Department for review. No construction permits shall be issued unless and until approval of the proposed construction in accordance with the submitted plans is granted by the Engineering Services Department. 2. Design and construction of all improvements shall be subject to compliance with the appropriate provisions of the Collier County Land Development Code. The project shall be platted in accordance with Division 3.2 of the of the Collier County Land Development Code to define the right-of- way and tracts as shown on the PUD Master Plan. The developer and any successors in interest are required to satisfy the requirements of all County ordinances or codes in effect prior to or concurrent with any subsequent development order relating to this site. This includes, but is not limited to, subdivision master plans, site development plans, and any other application that will result in the issuance of a final or final local development order. The i0 foot landscape buffer along the northern property line shall be in separate platted tract (not within a right-of-way) or within the platted lots that directly back-up to the off-site County right-of-way, provided the buffer is not located within any utility or drainage easement. All landscape buffers required by the Collier County Land Development-Code must be designed, bonded, permitted, and constructed as part of the subdivision improvements for the project. Utilities: Sewage collection, sewage transportation, and interim sewage treatment facilities to serve the project are to be designed, constructed, conveyed, owned, and maintained in accordance with Collier County Ordinanc6 No. 01-57, as amended, and other applicable County rules and regulations, as applicable. 15 o o All customers connecting to the sewage collection facilities to be constructed will be customers of the County and will be billed by the County in accordance with the County's established rates. Should the County not be in position to provide sewer services to the project, the sewer customers shall be customers of the interim utility established to serve the project until the County's off-site facilities are available to serve the project. Prior to construction plans and plat approval, a letter from the City of Naples Water District stating that the District has reviewed and approved the water facilities construction documents for service to the project shall be submitted. The utilities construction documents for the project's sewage system shall be prepared so that all sewage flowing to the County's master pump station is transmitted by one (1) main on-site pump station. Due to the design and configuration of the master pump station, flow by gravity into the station will not be possible. The developer' s engineer shall meet with County staff prior to commencing preparation of construction drawings, so that all aspects of the sewage system design can be coordinated with the County's sewer master plan. The existing off-site sewage transmission facilities of the District shall be evaluated for hydraulic capacity to serve this project and improved as required outside the project's boundary to provide adequate capacity to transport the additional wastewater generated without adverse impact to the existing transmission facilities. Sewer lines on-site shall be privately owned and maintained. Homeowners' association documents shall be provided with the final site plan and provide for the property ownership and maintenance. 16 SECTION VIII WATER MANAGEMENT REQUIREMENTS 8.1 PURPOSE The purpose of this Section is to set forth the stipulations established by the Water Management Advisory Board, which shall be required of the project developer. Detailed paving, grading, and site drainage plans shall be submitted to the Project Review Services for review. No construction permits shall be issued unless and until approval of the proposed construction in accordance with the submitted plans is granted by the Project Review Services. 2. Design and construction of all improvements shall be subject to compliance with the appropriate provisions of the Collier County Land Development Code. An excavation permit will be required for the proposed wet retention area in accordance with Division 3.5 of the Collier County Land Development Code and SFWMD Rules. 4. Landscaping shall not be placed within the water management areas unless specifically approved by Project Review Services. o The developer shall provide an analysis of the adequacy of the existing downstream swale off-site. If the swale does not have adequate capacity to handle the run-off, improvements shall be made to make the swale functional. If the Corps of Engineers claims part of the detention area as wetlands, the developer shall obtain a South Florida Water Management District permit or early work permit prior to construction plans approval. However, if the South Florida Water Management District determines that a wetland does not exist, Collier County will issue the surface water permit 17 SECTION IX SUBDIVISION EXCEPTIONS 9.1 PURPOSE The purpose of this Section is to list approved subdivision exceptions. Subsection 3.2.8.3.19 of he LDC - Street Names, Markers, and Traffic Control Devices: Waive the requirements for street name markers, but traffic control devices shall meet the U.S.D.O.T.F.H.W.A.M.U.T.C.D. Also, waive the requirements for street pavement painting, striping, and reflecting edges provided roads have a valley gutter section. Twenty four-inch stop-bars shall be required at all intersections with public or private streets, and parking lot markings shall be 6 inches in width. B. Subsection 3.2.8.4.16.5 - Street Right-Of-Way Width: Waived to a minimum of a 50-foot width. All internal streets shall be private. C. Subsection 3.2.8.4.16.6 - Curb Radii: Waived to a minimum 30 foot radius internally and a minimum 40 foot radius externally. Do Division 3.2, Section 3.2.8.3.11 - Monuments: Waived the requirements for reference markers to be placed in water valve covers, subject to monuments installed in accordance with Florida Administrative Code, Rule 21-HH-6. Subsection 3.2.8.3.17 - Sidewalks: A sidewalk, a minimum of six-feet in width, shall be constructed along the Donna Street frontage of the PUD prior to the issuance of any certificate of occupancy for any building on Tract B. 18 ATTACHMENT "B" PROPERTY DESCRIPTION The Northeast IA of the Northeast lA of the Northwest_iA of Section 1, Township 50 South, Range 25 East, Collier County, Florida, less the Northerly 50.00 feet thereof. 19 STATE OF FLORIDA) COUNTY OF COLLIER) I, DWIGHT E. BROCK, Clerk of Courts in and for the Twentieth Judicial Circuit, Collier County, Florida, do hereby certify that the foregoing is a true and correct copy of: ORDINANCE 2003-48 Which was adopted by the Board of County Commissioners on the 23rd day of September, 2003, during Regular Session. WITNESS my hand and the official seal of the Board of County Commissioners of Collier County, Florida, this 26th day of September, 2003. DWIGHT E. BROCK ....~ Clerk of Courts and Clerk ... Ex-officio to Board of County CommiSsioners · By: Patricia L ..,'~Mor~an, .'~% ...... C"erJ. ~ ~i~7~' .- Deputy