Agenda 09/26/2017 Item #16B109/26/2017 EXECUTIVE SUMMARY Recommendation to award Bid No. 17-7150 Bayshore CRA Fire Suppression System to Quality Enterprise USA, Inc. for a bid price of $520,282.44, authorize the Community Redevelopment Agency Board Chair to execute a contract and authorize a $73,282.44 budget amendment. OBJECTIVE: To improve and increase the level of fire protection Bayshore Gateway Triangle Community Redevelopment Area. CONSIDERATIONS: The purpose of the project is to upgrade existing potable water mains and install new, and/or upgraded fire hydrants along three streets in the Bayshore Area. The improvements will be located along Peters Avenue, Collee Court and Gordon Street. The CRA is at the periphery of the City of Naples water service area. The existing distribution system has mains varying in size from 2 to 6 inch diameter within this area. The age of the water system varies with some portions being more than forty (40) years of age. There are also a limited number of fire hydrants present for fire protection. Those hydrants located in public right of way are generally owned and maintained by the City of Naples and those within private developments are either owned or maintained by the fire district or the development. On August 16, 2016, Q. Grady Minor and Associates provided a report identifying the current water system deficiencies; they include undersized water mains not capable of supporting fire flows, lack of fire hydrants at adequate spacing and dead end pipe segments with no looping (many streets are finger streets ending at canals). In Q. Grady’s discussions with the fire district and in accordance with generally accepted standards, fire hydrants in single family residential areas should be spaced approximately at 500 feet, hydrants in multifamily residential at 250 feet and those in commercial areas at 250 feet. Fire hydrants should be installed on mains with a minimum diameter of 6”. Where multiple hydrants exist (or within multi-family and commercial areas), the main size should be 8” or larger. The BGTCRA is partnering with the City of Naples. The City of Naples is the Engineer of Record and has provided Construction Documents and Specifications for this project. The BGTCRA applied for and was awarded $330,000 from the FY2016-2017 U.S. Housing and Urban Development (HUD) Community Development Block Grant (CDBG) program. The Sub-recipient Agreement was approved by the Board on October 11, 2016 (Item # 16B2). An Interlocal agreement between the City of Naples and Collier County was recorded on March 10, 2017. The agreement (Instrument No. 5376880) outlines the County and City responsibilities when the project begins. The County will utilize the HUD CDBG funds identified above and the City will provide the balance of the construction cost. On April 26, 2017, the Procurement Services Division released notices of Invitation to Bid No 17-7150 to vendors for construction of the Bayshore CRA Fire Suppression System, thirty (30) bid packages were downloaded and three (3) bids were submitted on June 5, 2017, as shown below in the Bid Tabulation. The bids are consistent with engineer’s opinion of probable construction costs provided by Q. Grady Minor and Associates in its August 16, 2016 report. Ranking Bidder Amount 1 Quality Enterprises USA, Inc. $520,282.44 2 Coastal Concrete Products, LLC $645,435.00 3 Andrew Sitework, LLC $672,077.00 FISCAL IMPACT: The Bayshore Gateway Triangle Community Redevelopment Agency applied for and was awarded $330,000 from the FY2016 - 2017 U.S. Housing and Urban Development (HUD) 16.B.1 Packet Pg. 1230 09/26/2017 Community Development Block Grant (CDBG) program. The Sub-recipient Agreement was approved by the Board on October 11, 2016 (Item # 16B2). The City of Naples will reimburse the County the balance of the project as outlined in the interlocal agreement. The original project budget estimate was $447,000.00 as provided in Bayshore CRA Grant Fund 717 project 33494. In order to award the bid the budget needs to be increased to $520,282.44. This will be accomplished through a budget amendment that reflects the City of Naples share of the project being increased from $117,000 to $190,282.44. The City of Naples is aware of the updated project cost and has confirmed the cost share amount of $190,282.44. The updated City of Naples contribution of $190,282.44 is based on the bid price; any change orders that may occur during construction could further increase the City of Naples contribution. No cap has been placed on the City of Naples contribution for this project. In addition to the monetary contribution, the City of Naples has agreed to provide Construction Engineering and Inspection Services throughout the project. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: Approval of this item is in accordance with the current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: To award Bid No. 17-7150 Bayshore CRA Fire Suppression System Quality Enterprises USA, Inc., for a bid price of $520,282.44, authorize the Community Redevelopment Agency Board Chair to execute the attached contract and authorize the necessary budget amendment. Prepared By: Tami Scott, Senior Project Manager, Bayshore Gateway Triangle Community Redevelopment. ATTACHMENT(S) 1. 17-7150 Construction Agreement CAO approved (PDF) 2. 17-7150 NORA Signed (PDF) 3. Fire Suppression- City of naples recommendation-contribution confirmation (PDF) 4. City Executed Interlocal Agreement (PDF) 16.B.1 Packet Pg. 1231 09/26/2017 COLLIER COUNTY Board of County Commissioners Item Number: 16.B.1 Doc ID: 3490 Item Summary: Recommendation to award Bid No. 17-7150 Bayshore CRA Fire Suppression System to Quality Enterprise USA, Inc. for a bid price of $520,282.44, authorize the Community Redevelopment Agency Board Chair to execute a contract and authorize a $73,282.44 budget amendment. Meeting Date: 09/26/2017 Prepared by: Title: – Bayshore CRA Name: Tami Scott 07/12/2017 11:11 AM Submitted by: Title: – County Manager's Office Name: Debrah Forester 07/12/2017 11:11 AM Approved By: Review: Procurement Services Barbara Lance Level 1 Purchasing Gatekeeper Completed 07/27/2017 9:50 AM Procurement Services Sandra Herrera Additional Reviewer Completed 07/28/2017 8:11 AM Procurement Services Ted Coyman Additional Reviewer Completed 07/28/2017 1:22 PM Procurement Services Swainson Hall Additional Reviewer Completed 07/31/2017 8:44 AM County Manager's Office Debrah Forester Director - CRAs Completed 07/31/2017 10:19 AM Procurement Services Michael Cox Additional Reviewer Skipped 07/31/2017 11:25 AM County Manager's Office Tim Durham Executive Director- Corp Business Ops Completed 07/31/2017 11:49 AM Grants Edmond Kushi Additional Reviewer Completed 08/25/2017 1:46 PM Grants Therese Stanley Additional Reviewer Completed 08/28/2017 2:59 PM Office of Management and Budget Laura Wells Level 3 OMB Gatekeeper Review Completed 08/01/2017 9:34 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/17/2017 8:47 AM Budget and Management Office Ed Finn Additional Reviewer Completed 08/29/2017 11:26 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 08/29/2017 2:49 PM Board of County Commissioners Michael Cox Meeting Completed 09/12/2017 9:00 AM 16.B.1 Packet Pg. 1232 1 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System Bayshore CRA Fire Suppression System COLLIER COUNTY BID NO. 17-7150 COLLIER COUNTY, FLORIDA Evelyn Colon, Procurement Strategist Email: evelyncolon@colliergov.net Telephone: (239) 252 - 2667 FAX: (239) 252 - 2810 Design Professional: City of Naples Public Utilities Department 16.B.1.a Packet Pg. 1233 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 2 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System TABLE OF CONTENTS PUBLIC NOTICE ....................................................................................................................... 3 PART B - INSTRUCTIONS TO BIDDERS ................................................................................. 5 CONSTRUCTION BID ..............................................................................................................12 BID SCHEDULE .......................................................................................................................13 MATERIAL MANUFACTURERS ..............................................................................................14 LIST OF MAJOR SUBCONTRACTORS ..................................................................................14 STATEMENT OF EXPERIENCE OF BIDDER ..........................................................................16 TRENCH SAFETY ACT ............................................................................................................17 IMMIGRATION LAW AFFIDAVIT CERTIFICATION .................................................................18 COLLIER COUNTY SOLICITATIONS SUBSTITUTE W – 9 .....................................................19 BID BOND ................................................................................................................................23 BIDDERS CHECK LIST ...........................................................................................................24 CONSTRUCTION AGREEMENT..............................................................................................25 EXHIBIT A 1: PUBLIC PAYMENT BOND ................................................................................32 EXHIBIT A 2: PUBLIC PERFORMANCE BOND ......................................................................35 EXHIBIT B: INSURANCE REQUIREMENTS............................................................................38 EXHIBIT C: RELEASE AND AFFIDAVIT FORM ......................................................................42 EXHIBIT D: FORM OF CONTRACT APPLICATION FOR PAYMENT .....................................43 EXHIBIT E: CHANGE ORDER .................................................................................................44 EXHIBIT F: CERTIFICATE OF SUBSTANTIAL COMPLETION ...............................................45 EXHIBIT G: FINAL PAYMENT CHECKLIST ............................................................................47 EXHIBIT H: GENERAL TERMS AND CONDITIONS ................................................................48 EXHIBIT I: SUPPLEMENTAL TERMS AND CONDITIONS ......................................................75 EXHIBIT J: TECHNICAL SPECIFICATIONS ...........................................................................76 EXHIBIT K: PERMITS ..............................................................................................................77 EXHIBIT L: STANDARD DETAILS ..........................................................................................78 EXHIBIT M: PLANS AND SPECIFICATIONS ..........................................................................79 EXHIBIT N: CONTRACTOR’S KEY PERSONNEL ASSIGNED TO THE PROJECT ...............80 16.B.1.a Packet Pg. 1234 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 3 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System PUBLIC NOTICE INVITATION TO BID Bayshore CRA Fire Suppression System COUNTY BID NO. 17-7150 Sealed bids for the construction of Bayshore CRA Fire Suppression System will be received electronically until 3:00 P.M. LOCAL TIME, on the 5th day of June on the County’s on-line bidding system: www.colliergov.net/bid. All bids will be publicly opened and read aloud. Any bids received after the time and date specified will not be accepted and shall be returned unopened to the Bidder. A non-mandatory pre-bid conference shall be held at the Procurement Services Division, Conference Room A, at 11:00 A.M. LOCAL TIME on the 15th day of May, at which time all prospective Bidders may have questions answered regarding the Bidding Documents for this Project. Bids shall be received on line by the Bid Date of June 5, 2017. No bid shall be considered unless it is made on unaltered Bid forms which are included in the Bidding Documents. One contract will be awarded for all Work. Bidding Documents may be examined on the Collier County Procurement Services Division Online Bidding System website: www.colliergov.net/bid. Copies of the Bidding Documents may be obtained only from the denoted website. Bidding Documents obtained from sources other than the Collier County Procurement Services Division website may not be accurate or current. Each bid shall be accompanied by a certified or cashier’s check or a Bid Bond in an amount not less than five percent (5%) of the total Bid to be retained as liquidated damages in the event the Successful Bidder fails to execute the Agreement and file the required bonds and insurance within ten (10) calendar days after the receipt of the Notice of Award. The Successful Bidder acknowledges and agrees that it shall execute the Agreement in the form attached hereto and incorporated herein. The Successful Bidder shall be required to furnish the necessary Payment and Performance Bonds, as prescribed in the General Conditions of the Contract Documents. All Bid Bonds, Payment and Performance Bonds, Insurance Contracts and Certificates of Insurance shall be either executed by or countersigned by a licensed resident agent of the surety or insurance company having its place of business in the State of Florida. Further, the said surety or insurance company shall be duly licensed and qualified to do business in the State of Florida. Attorneys-in-fact that sign Bid Bonds or Payment and Performance Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. In order to perform public work, the Successful Bidder shall, as applicable, hold or obtain such contractor's and business licenses, certifications and registrations as required by State statutes and County ordinances. Before a contract will be awarded for the Work contemplated herein, the Owner shall conduct such investigations as it deems necessary to determine the performance record and ability of the apparent low Bidder to perform the size and type of work specified in the Bidding 16.B.1.a Packet Pg. 1235 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 4 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System Documents. Upon request, the Bidder shall submit such information as deemed necessary by the Owner to evaluate the Bidder's qualifications. The Successful Bidder shall be required to finally complete all Work within One Hundred Eighty (180) calendar days from and after the Commencement Date specified in the Notice to Proceed. The Owner reserves the right to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents, and to postpone the award of the contract for a period of time which, however, shall not extend beyond one hundred twenty (120) days from the bid opening date without the consent of the Successful Bidder. Dated this 4th day of May. BOARD OF COUNTY COMMISSIONERS COLLIER COUNTY, FLORIDA BY: /s/ Edward F. Coyman, Jr. Director, Procurement Services Division 16.B.1.a Packet Pg. 1236 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 5 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System PART B - INSTRUCTIONS TO BIDDERS Section 1. Definitions 1.1 The term "Owner" used herein refers to the Board of County Commissioners, or its duly authorized representative. 1.2 The term "Project Manager" used herein refers to the Owner's duly authorized representative and shall mean the Division Administrator or Department Director, as applicable, acting directly or through duly authorized representatives. 1.3 The term "Design Professional" refers to the licensed professional engineer or architect who is in privity with the Owner for the purpose of designing and/or monitoring the construction of the project. At the Owner’s discretion, any or all duties of the Design Professional reference d in the Contract Documents may be assumed at any time by the Project Manager on behalf of the Owner. Conversely, at the Owner’s discretion the Project Manager may formally assign any of his/her duties specified in the Contract Documents to the Design Professional. 1.4 The term "Bidder" used herein means one who submits a bid directly to the Owner in response to this solicitation. 1.5 The term "Successful Bidder" means the lowest, qualified, responsible and responsive Bidder who is awarded the contract by the Board of County Commissioners, on the basis of the Owner's evaluation. 1.6 The term "Bidding Documents" includes the Legal Advertisement, these Instructions to Bidders, the Bid Schedule and the Contract Documents as defined in the Agreement. 1.7 The term "Bid" shall mean a completed Bid Schedule, bound in the Bidding Documents, properly signed, providing the Owner a proposed cost for providing the services required in the Bidding Documents. Section 2. Preparation of Bids 2.1 The Bids must be submitted on the standard form herein furnished by the Owner (pages 15 - 29 as bound in these Bidding Documents). By submitting a Bid, Bidder acknowledges and agrees that it shall execute the Agreement in the form attached hereto and incorporated herein. The Bidder shall complete the Bid and shall sign the Bid correctly. The Bid may be rejected if it contains any omission, alteration of form, conditional bid or irregularities of any kind. Bids must be submitted on www.colliergov.net/bid Section 3. Bid Deposit Requirements 3.1 No Bid shall be considered or accepted unless at the time of Bid filing the same shall be accompanied by a cashier’s check, a cash bond posted with the County Clerk, a certified check payable to Owner on some bank or trust company located in the State of Florida insured by the Federal Deposit Insurance Corporation, or Bid Bond, in an amount not less than 5% of the bidder's maximum possible award (base bid plus all add alternates) (collectively referred to herein as the "Bid Deposit"). The Bid Deposit shall be retained by Owner as liquidated damages if the Successful Bidder fails to execute and deliver to Owner the unaltered Agreement, or fails to deliver the required Performance and Payment Bonds or Certificates of Insurance, all within ten (10) calendar days after receipt of the Notice of Award. Bid Bonds shall be executed by a corporate surety licensed under the laws of the State of Florida to execute such bonds, with 16.B.1.a Packet Pg. 1237 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 6 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System conditions that the surety will, upon demand, forthwith make payment to Owner upon said bond. Bid Deposits of the three (3) lowest Bidders shall be held until the Agreement has been executed by the Successful Bidder and same has been delivered to Owner together with the required bonds and insurance, after which all three (3) Bid Deposits shall be returned to the respective Bidders. All other Bid Deposits shall be released within ten (10) working days of the Bid Opening. No Bid including alternates, shall be withdrawn within one hundred and twenty (120) days after the public opening thereof. If a Bid is not accepted within said time period it shall be deemed rejected and the Bid Deposit shall be returned to Bidder. In the event that the Owner awards the contract prior to the expiration of the one hundred twenty (120) day period without selecting any or all alternates, the Owner shall retain the right to subsequently award to the Successful Bidder said alternates at a later time but no later than one hundred twenty (120) days from opening, unless otherwise agreed by the Procurement Director and the Successful Bidder. 3.2 The Successful Bidder shall execute two (2) copies of the Agreement in the form attached and deliver same to Owner within the time period noted above. The Owner shall execute all copies and return one fully executed copy of the Agreement to Successful Bidder within thirty (30) working days after receipt of the executed Agreement from Successful Bidder unless any governmental agency having funding control over the Project requires additional time, in which event the Owner shall have such additional time to execute the Agreement as may be reasonably necessary. Section 4. Right to Reject Bids 4.1 The Owner reserves the right to reject any and all Bids or to waive informalities and negotiate with the apparent lowest, qualified Bidder to such extent as may be necessary for budgetary reasons. Section 5. Signing of Bids 5.1 Bids submitted by a corporation must be executed in the corporate name by the president, a vice president, or duly authorized representative. The corporate address and state of incorporation must be shown below the signature. 5.2 Bids by a partnership must be executed in the partnership name and signed by a general partner whose title must appear under the signature and the official address of the partnership must be shown below said signature. 5.3 If Bidder is an individual, his or her signature shall be inscribed. 5.4 If signature is by an agent or other than an officer of corporation or general partner of partnership, a properly notarized power of attorney must be submitted with the Bid. 5.5 All Bids shall have names typed or printed below all signatures. 5.6 All Bids shall state the Bidder's contractor license number. 5.7 Failure to follow the provisions of this section shall be grounds for rejecting the Bid as irregular or unauthorized. 16.B.1.a Packet Pg. 1238 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 7 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System Section 6. Withdrawal of Bids Any Bid may be withdrawn at any time prior to the hour fixed in the Legal Advertisement for the opening of Bids, provided that the withdrawal is requested in writing, properly executed by the Bidder and received by Owner prior to Bid Opening. The withdrawal of a Bid will not prejudice the right of a Bidder to file a new Bid prior to the time specified for Bid opening. Section 7. Late Bids No Bid shall be accepted that fails to be submitted prior to the time specified in the Legal Advertisement. Section 8. Interpretation of Contract Documents 8.1 No interpretation of the meaning of the plans, specifications or other Bidding Documents shall be made to a Bidder orally. Any such oral or other interpretations or clarifications shall be without legal effect. All requests for interpretations or clarifications shall be in writing and addressed on the County’s Online Bidding System to be given consideration. All such requests for interpretations or clarification must be received as directed in the Online Bidding System instructions and prior to the Bid opening date. Any and all such interpretations and supplemental instructions shall be in the form of written addendum which, if issued via the Online Bidding System at their respective email addresses furnished for such purposes no later than three (3) working days prior to the date fixed for the opening of Bids. Such written addenda shall be binding on Bidder and shall become a part of the Bidding Documents. 8.2 It shall be the responsibility of each Bidder to ascertain, prior to submitting its Bid, that it has received all addenda issued and it shall acknowledge same in its Bid. 8.3 As noted in the Legal Advertisement, attendance by all bidders at the Pre-Bid Conference is non-mandatory. Section 9. Examination of Site and Contract Documents 9.1 By executing and submitting its Bid, each Bidder certifies that it has: a. Examined all Bidding Documents thoroughly; b. Visited the site to become familiar with local conditions that may in any manner affect performance of the Work; c. Become familiar with all federal, state and local laws, ordinances, rules, and regulations affecting performance of the Work; and d. Correlated all of its observations with the requirements of the Bidding documents. No plea of ignorance of conditions or difficulties that may exist or conditions or difficulties that may be encountered in the execution of the Work pursuant to these Bidding Documents as a result of failure to make the necessary examinations and investigations shall be accepted as an excuse for any failure or omission on the part of the Successful Bidder, nor shall they be accepted as a basis for any claims whatsoever for extra compensation or for an extension of time. 16.B.1.a Packet Pg. 1239 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 8 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System 9.2 The Owner will make copies of surveys and reports performed in conjunction with this Project available to any Bidder requesting them at cost; provided, however, the Owner does not warrant or represent to any Bidder either the completeness or accuracy of any such surveys and reports. Before submitting its Bid, each Bidder shall, at its own expense, make such additional surveys and investigations as may be necessary to determine its Bid price for the performance of the Work within the terms of the Bidding Documents. This provision shall be subject to Section 2.3 of the General Conditions to the Agreement. Section 10. Material Requirements It is the intention of these Bidding Documents to identify standard materials. When space is provided on the Bid Schedule, Bidders shall specify the materials which they propose to use in the Project. The Owner may declare any Bid non-responsive or irregular if such materials are not specifically named by Bidder. Section 11. Bid Quantities 11.1 Quantities given in the Bid Schedule, while estimated from the best information available, are approximate only. Payment for unit price items shall be based on the actual number of units installed for the Work. Bids shall be compared on the basis of number of units stated in the Bid Schedule as set forth in the Bidding Documents. Said unit prices shall be multiplied by the bid quantities for the total Bid price. Any Bid not conforming to this requirement may be rejected. Special attention to all Bidders is called to this provision, because if conditions make it necessary or prudent to revise the unit quantities, the unit prices will be fixed for such increased or decreased quantities. Compensation for such additive or subtractive changes in the quantities shall be limited to the unit prices in the Bid. Subsequent to the issuance of a notice to proceed, the Project Manager and the Successful Bidder shall have the discretion to re-negotiate any unit price(s) where the actual quantity varies by more than twenty-five percent (25%) from the estimate at the time of bid. 11.2 Alternate Bid Pricing: In the event that alternate pricing is requested, it is an expressed requirement of the bid invitation to provide pricing for all alternates as listed. The omission of a response or a no-bid or lack of a submitted price may be the basis for the rejection of the submitted bid response. Section 12. Award of Contract 12.1 Any prospective bidder who desires to protest any aspect(s) or provision(s) of the bid invitation (including the form of the bid documents or bid procedures) shall file their protest with the Procurement Director prior to the time of the bid opening strictly in accordance with Owner’s then current procurement ordinance and policies. 12.2 Statement of Award: The Award of Contract shall be issued to the lowest, responsive and responsible Bidder determined by the base bid, and any, or all, selected alternates, and the Owner's investigations of the Bidder. In determining the lowest, responsive and responsible bidder, the Owner shall consider the capability of the Bidder to perform the contract in a timely and responsible manner. When the contract is awarded by Owner, such award shall be evidenced by a written Notice of Award, signed by a Procurement professional of the Owner’s Procurement Services Division or his or her designee and delivered to the intended awardee or mailed to awardee at the business address shown in the Bid. 12.3 Award recommendations will be posted on the Procurement Services Division Web Site. Award of Contract will be made by the Board of County Commissioners in public session. Any 16.B.1.a Packet Pg. 1240 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 9 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System actual or prospective bidder who desires to formally protest the recommended contract award must file a notice of intent to protest with the Procurement Director within two (2) calendar days (excluding weekends and holidays) of the date that the recommended award is posted. Upon filing of said notice, the protesting party will have five (5) days to file a formal protest, said protest to strictly comply with Owner’s then current procurement ordinance and policies. A copy of the procurement ordinance is available at: http://www.colliergov.net/Index.aspx?page=762 12.4 For Bidders who may wish to receive copies of Bids after the Bid opening, The Owner reserves the right to recover all costs associated with the printing and distribution of such copies. 12.5 Certificate of Authority to Conduct Business in the State of Florida (FL Statute 607.1501) In order to be considered for award, firms must be registered with the Florida Department of State Divisions of Corporations in accordance with the requirements of Florida Statute 607.1501 and provide a certificate of authority (www.sunbiz.org/search.html) prior to execution of a contract. A copy of the document may be submitted with the solicitation response and the document number shall be identified. Firms who do not provide the certificate of authority at the time of response shall be required to provide same within five (5) days upon notification of selection for award. If the firm cannot provide the document within the referenced timeframe, the County reserves the right to award to another firm. Section 13. Sales Tax 13.1 The Successful Bidder acknowledges and agrees that Owner may utilize a sales tax savings program and the Successful Bidder agrees to fully comply, at no additional cost to Owner, with such sales tax savings program implemented by the Owner as set forth in the Agreement and in accordance with Owner’s policies and procedures. Section 14. Exclusion of County Permits in Bid Prices 14.1 To ensure compliance with Section 218.80, F.S., otherwise known as “The Public Bid Disclosure Act”, Collier County will pay the Contractor for all Collier County permits and fees applicable to the Project, including license fees, permit fees, impact fees or inspection fees applicable to this Work through an internal budget transfer(s). Hence, bidders shall not include these permit/fee amounts in their bid offer. However, the Successful Bidder shall retain the responsibility to initiate and complete all necessary and appropriate actions to obtain the required permits other than payment for the items identified in this section. Owner will not be obligated to pay for any permits obtained by Subcontractors. 14.2 The Successful Bidder shall be responsible for procuring and paying for all necessary permits not issued by Collier County pursuant to the prosecution of the work. Section 15. Use of Subcontractors 15.1 To ensure the Work contemplated by the Contract Documents is performed in a professional and timely manner, all Subcontractors performing any portion of the work on this Project shall be “qualified” as defined in Collier County Ordinance 2017-08, as amended, meaning a person or entity that has the capability in all respects to perform fully the Agreement 16.B.1.a Packet Pg. 1241 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 10 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System requirements and has the integrity and reliability to assure good faith performance. A Subcontractor’s disqualification from bidding by the Owner, or other public contracting entity within the past twelve months shall be considered by the Owner when determining whether the Subcontractors are “qualified.” 15.2 The Owner may consider the past performance and capability of a Subcontractor when evaluating the ability, capacity and skill of the Bidder and its ability to perform the Agreement within the time required. Owner reserves the right to disqualify a Bidder who includes Subcontractors in its bid offer which are not “qualified” or who do not meet the legal requirements applicable to and necessitated by this Agreement. 15.3 The Owner may reject all bids proposing the use of any subcontractors who have been disqualified from submitting bids to the Owner, disqualified or de-certified for bidding purposes by any public contracting entity, or who has exhibited an inability to perform through any other means. 15.4 Notwithstanding anything in the Contract Documents to the contrary, the Bidder shall identify the subcontractor(s) it intends to use for the categories of work as set forth in the List of Subcontracts attached hereto, said list to be submitted with its bid. Bidders acknowledge and agree that the subcontractors identified on the list is not a complete list of the subcontractors to be used on the Project, but rather only the major subcontractors for each category of Work as established by Owner. Bidders further acknowledge that once there is an Award of Contract, the Successful Bidder shall identify, subject to Owner’s review and approval, all the subcontractors it intends to use on the Project. Once approved by Owner, no subcontractor shall be removed or replaced without Owner’s prior written approval. Section 16. Prohibition of Gifts No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan, fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III, Florida Statutes, Collier County Ethics Ordinance No. 2003-53, as amended, and County Administrative Procedure 5311. Violation of this provision may result in one or more of the following consequences: a. Prohibition by the individual, firm, and/or any employee of the firm from contact with County staff for a specified period of time; b. Prohibition by the individual and/or firm from doing business with the County for a specified period of time, including but not limited to: submitting bids, RFP, and/or quotes; and, c. immediate termination of any contract held by the individual and/or firm for cause. Section 17. Lobbying All firms are hereby placed on NOTICE that the Board of County Commissioners does not wish to be lobbied, either individually or collectively about a project for which a firm has submitted a response. Firms and their agents are not to contact members of the County Commission for such purposes as meeting or introduction, luncheons, dinners, etc. During the process, from solicitation closing to final Board approval, no firm or their agent shall contact any other employee of Collier County in reference to this solicitation, or the vendor’s response, with the exception of the Procurement Director or his designee(s). Failure to abide by this provision may serve as grounds for disqualification for award of this contract to the firm. Section 18. Public Entity Crimes By its submitting a Bid, Bidder acknowledges and agrees to and represents it is in compliance with the terms of Section 287.133(2)(a) of the Florida Statutes which read as follows: 16.B.1.a Packet Pg. 1242 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 11 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity’; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list.” 16.B.1.a Packet Pg. 1243 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1244 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) Department of State /Division of Corporations /Search Records /Detail By Document Number / Document Number FEI/EIN Number Date Filed State Status Detail by Entity Name Foreign Profit Corporation QUALITY ENTERPRISES USA, INC. Filing Information F95000002550 54-0947002 05/25/1995 VA ACTIVE Principal Address 3494 SHEARWATER STREET NAPLES, FL 34117 Changed: 11/04/2016 Mailing Address 3494 SHEARWATER STREET NAPLES, FL 34117 Changed: 11/04/2016 Registered Agent Name & Address C T CORPORATION SYSTEM 1200 SOUTH PINE ISLAND ROAD PLANTATION, FL 33324 Name Changed: 11/08/2011 Address Changed: 11/08/2011 Officer/Director Detail Name & Address Title PD MURRELL, HOWARD JJR. 3494 Shearwater Street NAPLES, FL 34117-8414 Title VPD MURRELL, JOHN DIVISION OF CORPORATIONSFlorida Department of State Page 1 of 3Detail by Entity Name 6/19/2017http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=Entity... 16.B.1.a Packet Pg. 1245 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 208 TINTERN COURT CHESAPEAKE, VA 23320 Title ST MURRELL, STACEY 3494 Shearwater Street NAPLES, FL 34117-8414 Title O AUGUSTIN, RONALD E 208 TINTERN COURT CHESAPEAKE, VA 23320 Title Officer / Assistant Secretary Murrell, Allison B 3494 Shearwater Street NAPLES, FL 34117-8414 Title VP Gaudio, Louis J 3494 SHEARWATER STREET NAPLES, FL 34117 Annual Reports Report Year Filed Date 2016 01/25/2016 2017 02/06/2017 2017 05/02/2017 Document Images 05/02/2017 -- AMENDED ANNUAL REPORT View image in PDF format 02/06/2017 -- ANNUAL REPORT View image in PDF format 01/25/2016 -- ANNUAL REPORT View image in PDF format 01/29/2015 -- ANNUAL REPORT View image in PDF format 01/08/2014 -- ANNUAL REPORT View image in PDF format 01/09/2013 -- ANNUAL REPORT View image in PDF format 01/06/2012 -- ANNUAL REPORT View image in PDF format 11/08/2011 -- Reg. Agent Change View image in PDF format 01/27/2011 -- ANNUAL REPORT View image in PDF format 02/05/2010 -- ANNUAL REPORT View image in PDF format 01/14/2009 -- ANNUAL REPORT View image in PDF format 09/26/2008 -- ANNUAL REPORT View image in PDF format 01/24/2008 -- ANNUAL REPORT View image in PDF format 02/05/2007 -- ANNUAL REPORT View image in PDF format 01/23/2006 -- ANNUAL REPORT View image in PDF format 01/12/2005 -- ANNUAL REPORT View image in PDF format Page 2 of 3Detail by Entity Name 6/19/2017http://search.sunbiz.org/Inquiry/CorporationSearch/SearchResultDetail?inquirytype=Entity... 16.B.1.a Packet Pg. 1246 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1247 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1248 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1249 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1250 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 13 Construction Services Agreement: Revised 02132017, 17-7150 Bayshore CRA Fire Suppression System BID SCHEDULE Bayshore CRA Fire Suppression System Bid No. 17-7150 Please insert your prices via www.colliergov.net/bid "Also attached, hereto, following this page" 16.B.1.a Packet Pg. 1251 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) BID SCHEDULE: 17-7150 BAYSHORE CRA FIRE SUPPRESSION SYSTEM LINE # ITEM ITEM DESCRIPTION UNIT QT UNIT COST TOTAL COST 1 1-1 MOBILIZATION/DEMOBILIZATION LS 1 $102,905.26 $102,905.26 2 1-2 PRECON AUDIO/VIDEO LS 1 $900.00 $900.00 3 1-3 MAINTENANCE OF TRAFFIC LS 1 $25,560.00 $25,560.00 4 1-4 AS-BUILT DRAWINGS LS 1 $2,592.00 $2,592.00 5 DIVISION 1 SUB TOTAL $131,957.26 2-1 FURNISH & INSTALL WATER MAIN 6 2-1A 8" PVC C900 DR18/14 - OPEN TRENCH LF 3,015 $41.02 $123,675.30 7 2-1B 6" PVC C900 DR18/14 - OPEN TRENCH LF 430 $41.81 $17,978.30 2-2: FURNISH & INSTALL VALVES AND BOXES 8 2-2A 6" RS MJ GATE VALVE W/RESTRAINTS & V-BOX EA 2 $1,617.15 $3,234.30 9 2-2B 8" RS MJ GATE VALVE W/RESTRAINTS & V-BOX EA 8 $1,953.13 $15,625.04 2-3: FURNISH & INSTALL FIRE HYDRANT ASSEMBLIES 10 2-3A FIRE HYDRANT ASSEMBLY EA 5 $4,207.51 $21,037.55 2-4: FURNISH & INSTALL WATER SERVICES & BLOW OFF 11 2-4A 1" SHORT SERVICE SINGLE METER ASSEMBLY EA 25 $890.48 $22,262.00 12 2-4B 1" LONG SERVICE SINGLE METER ASSEMBLY EA 23 $1,474.10 $33,904.30 13 2-4C 1" LONG SERVICE SAMPLE STATION EA 1 $1,288.07 $1,288.07 14 2-4D 1.5" SHORT SERVICE TWO METER ASSEMBLIES EA 3 $1,438.67 $4,316.01 15 2-4E 2" LONG SERVICE TWO METER ASSEMBLIES EA 5 $1,873.86 $9,369.30 16 2-4F 2" LONG SERVICE THREE METER ASSEMBLIES EA 1 $2,311.46 $2,311.46 17 2-4G 2" BLOW-OFF ASSEMBLY PER DETAIL EA 1 $2,331.90 $2,331.90 2-5: FURNISH & INSTALL CONNECTIONS TO EXISTING WATER MAIN 18 2-5A CONNECT TO EXISTING WM: GORDON & US 41 LS 1 $3,806.60 $3,806.60 19 2-5B CONNECT TO EXISTING WM: PETERS & US 41 LS 1 $6,925.99 $6,925.99 20 2-5C CONNECT TO EXISTING WM: PETERS @ ~04+05' LS 1 $4,118.15 $4,118.15 21 DIVISION 2 SUB TOTAL $272,184.27 3-1: FURNISH ABANDONMENT & RESTORATION ACTIVITIES 22 3-1A SURFACE RESTORATION ASPHALT SF 1,400 $20.31 $28,434.00 23 3-1B SURFACE RESTORATION CONCRETE CURB LF 30 $69.20 $2,076.00 24 3-1C SURFACE RESTORATION CONCRETE SIDEWALK LF 30 $76.10 $2,283.00 25 3-1D CUT AND REPLACE DRIVEWAYS EA 36 $1,736.83 $62,525.88 26 3-1E ABANDON & GROUT 6" AC WM: PETERS LF 910 $8.93 $8,126.30 27 3-1F ABANDON & CAP 6" PVC WM: GORDON EA 1 $1,881.03 $1,881.03 28 3-1G ABANDON & CAP 2" WM REMOVE VALVE BOXES EA 15 $720.98 $10,814.70 29 DIVISION 3 SUB TOTAL $116,140.91 30 PROJECT TOTAL $520,282.44 16.B.1.a Packet Pg. 1252 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1253 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1254 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1255 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1256 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1257 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1258 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1259 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1260 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1261 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1262 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1263 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1264 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1265 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1266 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1267 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1268 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1269 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1270 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1271 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1272 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1273 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1274 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1275 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1276 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1277 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1278 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1279 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1280 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1281 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1282 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1283 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1284 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1285 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1286 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1287 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1288 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1289 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1290 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1291 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1292 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1293 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1294 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1295 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1296 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1297 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1298 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1299 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1300 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1301 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1302 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1303 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1304 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1305 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1306 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1307 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1308 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1309 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1310 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1311 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1312 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1313 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1314 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1315 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1316 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1317 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1318 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1319 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1320 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1321 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1322 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1323 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1324 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1325 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1326 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1327 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1328 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1329 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1330 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1331 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1332 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1333 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1334 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1335 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.a Packet Pg. 1336 Attachment: 17-7150 Construction Agreement CAO approved (3490 : Fire Suppression) 16.B.1.bPacket Pg. 1337Attachment: 17-7150 NORA Signed (3490 : Fire Suppression) 16.B.1.cPacket Pg. 1338Attachment: Fire Suppression- City of naples recommendation-contribution confirmation (3490 : Fire Suppression) 16.B.1.cPacket Pg. 1339Attachment: Fire Suppression- City of naples recommendation-contribution confirmation (3490 : Fire Suppression) 16.B.1.d Packet Pg. 1340 Attachment: City Executed Interlocal Agreement (3490 : Fire Suppression) 16.B.1.d Packet Pg. 1341 Attachment: City Executed Interlocal Agreement (3490 : Fire Suppression) 16.B.1.d Packet Pg. 1342 Attachment: City Executed Interlocal Agreement (3490 : Fire Suppression) 16.B.1.d Packet Pg. 1343 Attachment: City Executed Interlocal Agreement (3490 : Fire Suppression) 16.B.1.d Packet Pg. 1344 Attachment: City Executed Interlocal Agreement (3490 : Fire Suppression) 16.B.1.d Packet Pg. 1345 Attachment: City Executed Interlocal Agreement (3490 : Fire Suppression) 16.B.1.d Packet Pg. 1346 Attachment: City Executed Interlocal Agreement (3490 : Fire Suppression)