Agenda 09/26/2017 Item #16 A309/26/2017
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the final plat of Price Street Plaza, (Application Number PL20170001084) approval of
the standard form Construction and Maintenance Agreement and approval of the amount of the
performance security.
_____________________________________________________________________________________
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat
of Price Street Plaza, a subdivision of lands located in Section 33, Township 50 South, Range 26 East,
and Sections 3 and 4, Township 51 South, Range 26 East, Collier County, Florida, following the
alternative procedure for approval of subdivision plats pursuant to Resolution 99 -199. This procedure
allows for the Board to approve the plat and associated construction documents for construction purposes
and recording purposes concurrently.
CONSIDERATIONS: The Development Review Division of the Growth Management Department has
completed the review of the construction drawings, specifications, and final plat of Price Street Plaza.
These documents are in compliance with the County Land Development Code and Chapter 177, Florida
Statutes. This project is within the Price Street & 41 CPUD, Ord. 2016-43, as amended. All fees have
been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the
cost of any remaining improvements, together with a Construction and Maintenance Agreement for
Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and
the County Attorney’s office prior to the recording of the final plat. This procedure is in conformance
with Section 10.02.04 F.2 of the Land Development Code.
The Development Review Division recommends that the final plat of Price Street Plaza be approved for
recording. There is a companion Site Development Plan (SDP) associated with this plat. The required
improvements for the Price Street Plaza SDP are included in application PL20150000343.
FISCAL IMPACT: The project cost $1,218,848.14 (estimated) to be borne by the developer.
The cost breakdown is as follows:
a) Water & Sewer $348,997.36
b) Drainage, Paving, Grading $869,850.78
The Security amount, equal to 110% of the
project cost, is $1,340,732.95
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $37,631.44
16.A.3
Packet Pg. 542
09/26/2017
The Fees are based on a construction estimate of $1,218,848.14 and were paid in August 2015 and March,
2017.
The breakdown is as follows:
a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,066.00
b) Construction Drawing Review Fee
Water & Sewer (.75% const. est.) $ 2,617.48
c) Drainage, Paving, Grading
(.75% const. est.) $ 6,523.88
d) Construction Inspection Fee
Water & Sewer (2.25% const. est.) $ 7,852.44
e) Drainage, Paving, Grading
(2.25% const. est.) $19,571.64
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public
Facilities (COA) prior to the issuance of the construction plan final approval l etter and plat recordation,
except when the applicant elects to delay obtaining a COA for non-residential developments that are
required to obtain approval of a site development plan prior to the issuance of a building permit.
LEGAL CONSIDERATIONS: The applicant is requesting approval of the final subdivision plat and
construction and maintenance agreement. The Board shall consider the County Manager or designee’s
recommendation and shall take evidence and testimony in regard to the final subdivision plat
requirements identified in LDC sections 10.02.04 B, 10.02.04 C, and other provisions of the LDC, as well
as Chapter 177, Florida Statutes. If the Board denies or places conditions on the final subdivision plat, it
shall state reasons for such denial or conditions.
This item has been approved as to form and legality, and requires a majority vote for Board approval -
SAS
RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of Price Street
Plaza (Application Number PL20170001084) for recording with the following stipulations:
1. Approve the amount of $1,340,732.95 as performance security for the required improvements; or such
lesser amount based on work completed, and as is approved by the Growth Management Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the County
Manager or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction and
Maintenance Agreement is approved and accepted by the County Attorney’s office and the
Board of County Commissioners or the County Manager or his designee on behalf of the
Board pursuant to Section 10.02.04 F.2 of the Land Development Code.
Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division
ATTACHMENT(S)
1. Location Map (PDF)
2. Plat Map Sheet 1 (PDF)
3. Plat Map Sheet 2 (PDF)
4. Opinion of Probable Cost (PDF)
16.A.3
Packet Pg. 543
09/26/2017
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.3
Doc ID: 3457
Item Summary: This item requires that ex parte disclosure be provided by Commission members.
Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to
approve for recording the final plat of Price Street Plaza, (Application Number PL20170001084) approval
of the standard form Construction and Maintenance Agreement and approval of the amount of the
performance security.
Meeting Date: 09/26/2017
Prepared by:
Title: Site Plans Reviewer, Senior – Growth Management Development Review
Name: John Houldsworth
06/30/2017 6:36 AM
Submitted by:
Title: Project Manager, Principal – Growth Management Department
Name: Matthew McLean
06/30/2017 6:36 AM
Approved By:
Review:
Growth Management Department Judy Puig Level 1 Division Reviewer Completed 06/30/2017 2:33 PM
Growth Management Development Review Chris Scott Additional Reviewer Completed 08/03/2017 4:56 PM
Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 08/08/2017 11:40 AM
Growth Management Department Matthew McLean Additional Reviewer Completed 08/09/2017 9:17 AM
Growth Management Department John Houldsworth Level 2 Division Administrator Skipped 06/30/2017 6:35 AM
Growth Management Department James French Additional Reviewer Completed 08/15/2017 10:38 AM
County Attorney's Office Scott Stone Level 2 Attorney Review Completed 08/15/2017 4:15 PM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/16/2017 8:18 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/16/2017 11:02 AM
Budget and Management Office Mark Isackson Additional Reviewer Completed 08/21/2017 11:33 AM
County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 08/24/2017 4:26 PM
Board of County Commissioners Michael Cox Meeting Completed 09/12/2017 9:00 AM
16.A.3
Packet Pg. 544
aGa
O"l {<l .El -
>1 Il-rt :(;dl l)-iPl (a
8l e
trl s
Hei*s
E
.tl*
tt,
rS
g)
ffi
cn
!o
s
,u
l.i
(,
td
r{l
r
LtoIE(t16.A.3.aPacket Pg. 545Attachment: Location Map (3457 : Final Plat Price Street Plaza)
16.A.3.bPacket Pg. 546Attachment: Plat Map Sheet 1 (3457 : Final Plat Price Street Plaza)
16.A.3.cPacket Pg. 547Attachment: Plat Map Sheet 2 (3457 : Final Plat Price Street Plaza)
Phase 1 Phase 2 Phase 3 Price St.6 US-416 Total
Wastewater $189,757.25 $0.00 $0.00 $0.00 $26,364.11 $216,121.36
Potable Water $109,326.00 $0.00 $0.00 $0.00 $23,550.00 $132,876.00
Sub-Total $299,083.25 $0.00 $0.00 $0.00 $49,914.11 $348,997.36
Earthwork $17,766.50 $0.00 $0.00 $0.00 $0.00 $17,766.50
Paving $282,423.85 $67,218.24 $69,762.10 $44,207.45 $38,234.65 $501,846.28
Drainage $164,432.00 $21,206.00 $5,260.00 $6,340.00 $0.00 $197,238.00
Landscaping $100,000.00 $0.00 $0.00 $0.00 $0.00 $100,000.00
Lighting $29,400.00 $8,400.00 $11,200.00 $4,000.00 $0.00 $53,000.00
Sub-Total $594,022.35 $96,824.24 $86,222.10 $54,547.45 $38,234.65 $869,850.78
Total $893,105.60 $96,824.24 $86,222.10 $54,547.45 $88,148.76 $1,218,848.14
Notes:
1)
2)
3)
4)Does not include permit fees or soft costs.
5)Does not include enhanced landscape or hardscape features.
6)Offsite work on Price Street and US-41 (Tamiami Trail) to be completed at same time as Phase 1.
Jeremy H. Arnold, P.E.
Date
Florida License # 66421
COA #8636
This OPC is based on the engineer's understanding of the current rules, regulations, ordinances, and construction costs in
effect on the date of this document. Interpretations of these construction costs may affect this OPC, and may require
adjustments to delete, decrease, or increase portions of this OPC.
All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. Unit prices are
subject to change due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of
materials and labor.
This Opinion of Probable Cost (OPC) shall be used for permitting purposes only.
Date: 06/26/2017
SUMMARY
OPINION OF PROBABLE COST - REV03
(US 41 & Price Street)
Price Street Plaza
Waldrop Engineering File No. : 423-01-01, Rev05
Jeremy H. Arnold State of Florida Professional Engineer, License
No. 66421
This item has been electronically signed and sealed by Jeremy H.
Arnold, PE on 06/26/2017 using a Digital Signature.
Printed copies of this document are not considered signed and
sealed and the signature must be verified on any electronic copies.
16.A.3.d
Packet Pg. 548 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)
Item Description Estimated
Quantity Unit Unit Price Amount
Phase 1
WW-1 1.5" PVC Force Main (C900, DR-14)263 LF $4.00 $1,052.00
WW-2 1 1/4" PVC Force Main (C900, DR-14)19 LF $3.00 $57.00
WW-3 Grinder Pump Station, Complete 2 EA $45,000.00 $90,000.00
WW-4 8" PVC Sanitary Sewer SDR-26 (0-6')204 LF $28.00 $5,712.00
WW-5 8" PVC Sanitary Sewer SDR-26 (6-8')336 LF $34.00 $11,424.00
WW-6 8" PVC Sanitary Sewer SDR-26 (8-10')479 LF $40.00 $19,160.00
WW-7 8" PVC Sanitary Sewer SDR-26 (8-10')14 LF $47.00 $658.00
WW-8 Manhole 4' Diameter with IET Coating (0-6')3 EA $4,200.00 $12,600.00
WW-9 Manhole 4' Diameter with IET Coating (6-8')2 EA $5,000.00 $10,000.00
WW-10 Manhole 4' Diameter with IET Coating (8-10')4 EA $5,800.00 $23,200.00
WW-11 Air Release Valve 1 EA $7,200.00 $7,200.00
WW-12 6" Single PVC Sewer Service w/ Cleanout 10 EA $602.00 $6,020.00
WW-13 Television Inspection 1,033 LF $2.25 $2,324.25
WW-14 Sanitary Sewer Service Cleanout 1 EA $350.00 $350.00
SUBTOTAL =$189,757.25
Offsite Improvements: US-41 (Tamiami Trail South)
WW-15 Connect to Existing 20" Force Main with Valve 1 EA $5,000.00 $5,000.00
WW-16 4" PVC Force Main (C900, DR-14)56 LF $13.00 $728.00
WW-17 Directional Drill 4" HDPE DR-11 Force Main with 8" Casing 80 LF $240.45 $19,236.11
WW-18 4" Check Valve w/ Vault 1 EA $1,400.00 $1,400.00
SUBTOTAL =$26,364.11
TOTAL =$216,121.36
WASTEWATER
16.A.3.d
Packet Pg. 549 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)
Item Description Estimated
Quantity Unit Unit Price Amount
Phase 1
PW-1 8" Master Meter Backflow Assembly 1 EA $42,000.00 $42,000.00
PW-2 8" PVC Water Main (C900, DR 14)1,245 LF $22.00 $27,390.00
PW-3 8" Gate Valve 4 EA $1,350.00 $5,400.00
PW-4 6" PVC Water Main (C900, DR 14)85 LF $16.60 $1,411.00
PW-5 6" Gate Valve 1 EA $900.00 $900.00
PW-6 1" Single Water Service, Complete 3 EA $250.00 $750.00
PW-7 1.5" Single Water Service, Complete 9 EA $1,875.00 $16,875.00
PW-8 6" Single Fire Service, Complete 1 EA $450.00 $450.00
PW-9 8" Single Fire Service, Complete 2 EA $875.00 $1,750.00
PW-10 Fire Hydrant, Complete 3 EA $4,000.00 $12,000.00
PW-11 Temporary Bacterial Sample Point 1 EA $400.00 $400.00
SUBTOTAL =$109,326.00
Offsite Improvements: Price Street
PW-1 Connect to Existing 10" Water Main with Valve 1 EA $2,250.00 $2,250.00
PW-2 Directional Drill 8" HDPE DR-11 Water Main with 16" Casing 71 LF $300.00 $21,300.00
SUBTOTAL =$23,550.00
TOTAL =$132,876.00
POTABLE WATER
16.A.3.d
Packet Pg. 550 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)
Item Description Estimated
Quantity Unit Unit Price Amount
Phase 1
E-1 Clearing and Grubbing 6.56 AC $2,000.00 $13,120.00
E-2 Turbidity Barrier 55 LF $12.00 $660.00
E-3 2' Silt Fence (Single Row)2,278 LF $1.75 $3,986.50
SUBTOTAL =$17,766.50
EARTHWORK
16.A.3.d
Packet Pg. 551 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)
Item Description Estimated
Quantity Unit Unit Price Amount
Phase 1
P-1 3/4" Asphaltic Concrete (Type SP-9.5) First Lift 8,210 SY $4.45 $36,534.50
P-2 3/4" Asphaltic Concrete (Type SP-9.5) Second Lift 8,210 SY $4.45 $36,534.50
P-3 8" Limerock Base (Compacted and Primed)8,210 SY $7.00 $57,470.00
P-4 12" Stabilized Subgrade (Onsite Material)10,673 SY $2.25 $24,014.25
P-5 Type "D" Curb & Gutter 1,338 LF $11.25 $15,052.50
P-6 Type "F" Curb & Gutter 1,544 LF $12.30 $18,991.20
P-7 4" Concrete Sidewalk (Reinforced) 405 SY $28.38 $11,493.90
P-8 ADA Detectable Surface 20 EA $400.00 $8,000.00
P-9 6" Concrete Canopy/Parking Pad (Reinforced) 878 SY $34.50 $30,291.00
P-10 8" Concrete Tank Mat (Reinforced) 358 SY $55.00 $19,690.00
P-11 Concrete Building Sidewalk (Reinforced)1,196 SY $12.00 $14,352.00
P-12 Signing and Marking 1 LS $10,000.00 $10,000.00
SUBTOTAL =$282,423.85
Phase 2
P-1 3/4" Asphaltic Concrete (Type SP-9.5) First Lift 2,283 SY $4.45 $10,159.35
P-2 3/4" Asphaltic Concrete (Type SP-9.5) Second Lift 2,283 SY $4.45 $10,159.35
P-3 8" Limerock Base (Compacted and Primed)2,283 SY $7.00 $15,981.00
P-4 12" Stabilized Subgrade (Onsite Material)2,968 SY $2.25 $6,677.78
P-5 Type "D" Curb & Gutter 358 LF $11.25 $4,027.50
P-6 Type "F" Curb & Gutter 418 LF $12.30 $5,141.40
P-7 4" Concrete Sidewalk (Reinforced) 147 SY $28.38 $4,171.86
P-8 ADA Detectable Surface 1 EA $400.00 $400.00
P-9 Signing and Marking 1 LS $10,000.00 $10,000.00
P-10 Wheel Stops 10 EA $50.00 $500.00
SUBTOTAL =$67,218.24
Phase 3
P-1 3/4" Asphaltic Concrete (Type SP-9.5) First Lift 2,343 SY $4.45 $10,426.35
P-2 3/4" Asphaltic Concrete (Type SP-9.5) Second Lift 2,343 SY $4.45 $10,426.35
P-3 8" Limerock Base (Compacted and Primed)2,343 SY $7.00 $16,401.00
P-4 12" Stabilized Subgrade (Onsite Material)3,046 SY $2.25 $6,853.28
P-5 Type "D" Curb & Gutter 364 LF $11.25 $4,095.00
P-6 Type "F" Curb & Gutter 169 LF $12.30 $2,078.70
P-7 4" Concrete Sidewalk (Reinforced) 209 SY $28.38 $5,931.42
P-8 ADA Detectable Surface 5 EA $400.00 $2,000.00
P-9 Signing and Marking 1 LS $10,000.00 $10,000.00
P-10 Wheel Stops 31 EA $50.00 $1,550.00
SUBTOTAL =$69,762.10
PAVING
16.A.3.d
Packet Pg. 552 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)
Item Description Estimated
Quantity Unit Unit Price Amount
US-41 (Tamiami Trail South)
P-1 Mill Existing Driveway 108 SY $2.55 $275.40
P-2 1-1/2" Type SP-12.5 (Two Lifts)663 SY $18.75 $12,431.25
P-3 8" Limerock Base (compacted and primed)663 SY $12.50 $8,287.50
P-4 12" Type "B" Stabilization (Min LBR 40)837 SY $4.20 $3,515.40
P-5 6" Concrete Sidewalk (Reinforced) 63 SY $39.50 $2,488.50
P-6 Type "F" Curb & Gutter 442 LF $12.30 $5,436.60
P-7 ADA Detectable Surface 2 EA $400.00 $800.00
P-8 Signage and Striping 1 LS $5,000.00 $5,000.00
SUB-TOTAL =$38,234.65
Price Street
P-1 Remove Existing Valley Gutter 117 LF $8.25 $965.25
P-2 Signage and Striping 1 LS $5,000.00 $5,000.00
P-3 Type "F" Curb & Gutter 364 LF $12.30 $4,477.20
P-4 1" Type SP-9.5 Friction Course 500 SY $8.50 $4,250.00
P-5 1-12" Type SP-12.5 Structural Course 500 SY $15.00 $7,500.00
P-6 8" Limerock Base (compacted and primed)500 SY $12.50 $6,250.00
P-7 12" Type "B" Stabilization (Min LBR 40)650 SY $4.20 $2,730.00
P-8 6" Concrete Sidewalk (Reinforced) 330 SY $39.50 $13,035.00
SUB-TOTAL =$44,207.45
TOTAL = $501,846.28
Offsite Improvements
16.A.3.d
Packet Pg. 553 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)
Item Description Estimated
Quantity Unit Unit Price Amount
Phase 1
D-1 12" x 18" ERCP 64 LF $25.00 $1,600.00
D-2 15" RCP 788 LF $18.00 $14,184.00
D-3 18" RCP 729 LF $27.00 $19,683.00
D-4 24" RCP 205 LF $193.00 $39,565.00
D-5 12" x 18"" Flared End 2 EA $1,200.00 $2,400.00
D-6 24" Mitered End 1 EA $2,100.00 $2,100.00
D-7 Type "C" Grate Inlet 13 EA $2,600.00 $33,800.00
D-8 Modified Type "9" Inlet 12 EA $4,000.00 $48,000.00
D-9 Control Structure 1 EA $3,100.00 $3,100.00
SUBTOTAL =$164,432.00
Phase 2
D-1 15" RCP 367 LF $18.00 $6,606.00
D-2 Type "C" Grate Inlet 1 EA $2,600.00 $2,600.00
D-3 Modified Type "9" Inlet 3 EA $4,000.00 $12,000.00
SUBTOTAL =$21,206.00
Phase 3
D-1 15" RCP 70 LF $18.00 $1,260.00
D-2 Modified Type "9" Inlet 1 EA $4,000.00 $4,000.00
SUBTOTAL =$5,260.00
Offsite: Price Street
D-1 15" RCP 130 LF $18.00 $2,340.00
D-2 Modified Type "9" Inlet 1 EA $4,000.00 $4,000.00
SUBTOTAL =$6,340.00
Demolition
D-1 Remove Existing 18" RCP 66 LF $12.00 $792.00
D-2 Remove Existing Catchbasin #5 1 EA $300.00 $300.00
D-3 Relocate Exsitng Catchbasin #6 1 EA $2,250.00 $2,250.00
SUBTOTAL =$3,342.00
TOTAL =$200,580.00
DRAINAGE
16.A.3.d
Packet Pg. 554 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)
Item Description Estimated
Quantity Unit Unit Price Amount
LA-1 Code Minimum Landscaping 1 LS $100,000.00 $100,000.00
LANDSCAPING
16.A.3.d
Packet Pg. 555 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)
Item Description Estimated
Quantity Unit Unit Price Amount
Phase 1
L-1 Street Lighting 1 LS $31,500.00 $31,500.00
SUBTOTAL =$29,400.00
Phase 2
L-1 Street Lighting 1 LS $9,000.00 $9,000.00
SUBTOTAL =$8,400.00
Phase 3
L-1 Street Lighting 1 LS $12,000.00 $12,000.00
SUBTOTAL =$11,200.00
Price Street
L-1 Street Lighting 1 LS $4,000.00 $4,000.00
SUBTOTAL =$4,000.00
TOTAL=$53,000.00
LIGHTING
16.A.3.d
Packet Pg. 556 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)
Current Plan
Permit Fees
REV00
Permitted
Fees
REV01
Permitted
Fees
REV02
Permitted
Fees
Current
(REV03)
Permit Fees
Due
SDP Review Fees:
N/A Residential only: $5,000.00 Plus $100 per residential structure plus $40 per dwelling unit $N/A N/A N/A N/A N/A
Residential Structures =
Dwelling Units =
X Non-residential only: $5,000.00 Plus $200 per non-residential structure, plus $0.10 per sq. ft. $$9,092.30 $5,811.90 $0.00 $3,071.20 $209.20
Number of Buildings =3
Total Square footage=34923
N/A N/A N/A N/A N/A N/A
$5,000.00 Base fee $
$200.00 per structure
$40.00 per residential dwelling unit
$0.10 per square foot of non-residential floor area (sq.ft. __ x$0.10) except for parking garage
structures shall be calculated at $0.05 per gross square foot of floor area (sq.ft. ___ x$0.05)
Residential Structures =
Dwelling Units =
Total Square footage=
Plan Review & Inspection – Utilities (Required as per Ordinance 2004-31 Section 8.2.4)
X Construction document review – 0.75% of potable water/sewer construction costs $2,617.48 $1,953.45 $398.28 $241.42 $24.33
Cost Estimate =$348,997.36
Construction inspection – 2.25% of potable water/sewer construction costs $7,852.44 $5,860.36 $0.00 $0.00 $1,992.08
Cost Estimate =$348,997.36
*Rev 02 Amount of $1,919.09 refunded to client, inspection fees to be paid prior to pre-con.
X $200.00 $200.00 $0.00 $0.00 $0.00
Plan Review & Inspection – Paving, Grading, Drainage, Lighting, Code Minimum Landscaping
X Construction document review – 0.75% of paving, grading, drainage, lighting, landscape construction costs $6,523.88 $4,004.22 $1,811.41 $665.62 $42.63
Cost Estimate =$869,850.78
Construction inspection – 2.25% of paving, grading, drainage, lighting, landscape construction costs $19,571.64 $12,012.66 $0.00 $0.00 $7,558.98
Cost Estimate =$869,850.78
*Rev 02 Amount of $7431.08 refunded to client, inspection fees to be paid prior to pre-con.
Utilities
N/A Utility Modeling and Analysis Fee - $1,000 (applies only if zoned PUD or DRI)N/A N/A N/A N/A N/A
Separate Check for Traffic Impact Study Review Fees $500.00 $500.00 $0.00 $0.00 $0.00
X $ 500.00 - Methodology Review $
*Additional fees to be determined at Methodology Meeting
Other Fees
X $600.00 $600.00 $0.00 $0.00 $0.00
Site Are (acres)6.56
X
N/A $2,500 Environmental Impact Statement review N/A N/A N/A N/A N/A
X $1,000 Listed Species Survey (when EIS is not required)$1,000.00 $1,000.00 $0.00 $0.00 $0.00
N/A $300 Conservation Easement application fee plus the following additional site fee:N/A N/A N/A N/A N/A
$200.00 for CE acres less than 5 acres; $400.00 for CE area between 5 acres and 10 acres;
$600.00 for CE area greater than 10 acres and less than 20 acres; $800.00 for CE areas between
20 and 50 acres; and an additional $200.00 for every 40 acres of CE area over 50 acres.
X COA application fee $200 + $25 per D.U. or per 1,000 sq. ft. commercial ($5,000 max.) $$1,073.08 $244.35 $0.00 $776.43 $52.30
Dwelling Units =
Total Square footage=34923
N/A Excavation Permit Fees (see next page for calculations)N/A N/A N/A N/A N/A
N/A [reserved] School Concurrency Review Fee, if required N/A N/A N/A N/A N/A
X Resubmittal Fee (3rd Resubmittal)$1,000.00 $0.00 $0.00 $0.00 $1,000.00
FEE SUB-TOTAL:$50,030.82 $32,186.94 $2,209.69 $4,754.67 $1,328.46
PRE-APP CREDIT:$500.00 $500.00 $0.00 $0.00 $0.00
TOTAL FEES DUE:$49,530.82 $31,686.94 $2,209.69 $4,754.67 $1,328.46
SDP Fee Calculations
* Mitigation Fees, if applicable, to be determined by the School District in coordination with the County
When a building consists of both residential and non-residential uses, the fees shall be calculated as follows:
Right-of-way Permit ~ To be submitted directly to the Transportation Department, Contact 774-8260 for
required fees
$250 Site Clearing fee (first acre or fraction of an acre, round acres up to next whole acre) plus $50 for each
additional acre or fraction of an acre :($3,000 maximum)
Right-of-way Permit ~ contact Transportation (252-8260) for required fees (submit this directly to the
Transportation Department)
All costs provided in this OPC are based on recent contract prices, or the engineer's latest known unit costs. Unit
16.A.3.d
Packet Pg. 557 Attachment: Opinion of Probable Cost (3457 : Final Plat Price Street Plaza)