Agenda 09/12/2017 Item #16A3409/12/2017 EXECUTIVE SUMMARY Recommendation to approve a Resolution supporting the County’s applications to Florida Department of Environmental Protection for Long Range Budget Plan Requests for Beach Renourishment Projects for Fiscal Year 2018/2019. This action mai ntains the County's eligibility for State Cost Share Funding for future renourishment projects. OBJECTIVE: To approve a Resolution supporting the County’s applications to the Florida Department of Environmental Protection (FDEP) for Long Range Budget Plan Requests for Fiscal Year 2018/2019. CONSIDERATIONS: Coastal Zone Management continues to seek funding from FDEP to augment existing tourist taxes that have been budgeted for these projects. These requests, if approved by FDEP, will provide partial funding for Collier County projects as listed below: 1. Collier County Nourishment a. FY 18/19 physical, biological, turtle, and shorebird monitoring, and tilling for the Collier County beach renourishment project; b. FY 17/18 feasibility study for coastal resiliency; c. Engineering and construction of the 2017 Naples Nourishment using the Doctors Pass borrow area; d. FY 18/19 engineering, design and permitting for the 2020 Collier County beach construction; e. FY 18/19 rehabilitation of the south jetty of Doctors Pass to restore the structure to its original design specifications; f. FY 18/19 engineering and construction of a spur groin off the south jetty of Doctors Pass and an emergent breakwater with a detached groin. The project will also rehabilitate an existing rock groin; 2. Marco Island Nourishment a. FY 18/19 engineering, design and permitting tasks for the 2019/2020 South Marco beach nourishment project; 3. Wiggins Pass Dredging a. Reimbursement of FY 16/17 funds for monitoring, engineering, permitting and Wiggins Pass Inlet Management Plan; b. Reimbursement of FY 17/18 funds engineering, monitoring and construction of the 2017 dredging of Wiggins Pass. Approval of this Resolution is required as a condition of submittal to request long range State funding to renourish Collier County beaches and Inlet Monitoring. FISCAL IMPACT: Tourist Development Tax funds are currently available and budgeted in Beach Renourishment Fund (195) to accomplish this work. State approval would lead to future state cost share participation on these projects through a FDEP grant agreement. GROWTH MANAGEMENT IMPACT: There is no impact to the growth management plan related to this action. ADVISORY COMMITTEE RECOMMENDATIONS: At the July 31, 2017 Tourist Development Council meeting this item was unanimously recommended for approval by a 6 to 0 vote. 16.A.34 Packet Pg. 641 09/12/2017 This item is time sensitive and will be presented after -the-fact to the Coastal Advisory Committee at their September 14, 2017 regular meeting. LEGAL CONSIDERATIONS: This item has been approved as to form and legality and requires majority vote for approval. - CMG RECOMMENDATION: To approve a Resolution of the Board of County Commissioners of Collier County, Florida supporting the County’s applications to the FDEP for Long Range Budget Plan Requests for Fiscal Year 2018/2019. Prepared By: J. Gary McAlpin, P.E., Coastal Zone Management, Capital Project Planning, Impact Fees and Program Management Division ATTACHMENT(S) 1. Resolution (PDF) 2. [Linked]County Beach Application WithAttachments (PDF) 3. Marco Island Beach Application with Attachments (PDF) 4. Wiggins Pass Project Application WithAttachments (PDF) 16.A.34 Packet Pg. 642 09/12/2017 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.34 Doc ID: 3502 Item Summary: Recommendation to approve a Resolution supporting the County’s applications to Florida Department of Environmental Protection for Long Range Budget Plan Requests for Beach Renourishment Projects for Fiscal Year 2018/2019. This action maintains the County's eligibility for State Cost Share Funding for future renourishment projects. Meeting Date: 09/12/2017 Prepared by: Title: Accountant – Capital Project Planning, Impact Fees, and Program Management Name: Gail Hambright 07/19/2017 2:39 PM Submitted by: Title: Division Director - IF, CPP & PM – Capital Project Planning, Impact Fees, and Program Management Name: Amy Patterson 07/19/2017 2:39 PM Approved By: Review: Growth Management Department Judy Puig Level 1 Division Reviewer Completed 07/19/2017 3:02 PM Capital Project Planning, Impact Fees, and Program Management Tara Castillo Additional Reviewer Completed 07/20/2017 10:34 AM Zoning Gary McAlpin Additional Reviewer Completed 07/24/2017 10:34 AM Growth Management Operations Support Allison Kearns Additional Reviewer Completed 08/01/2017 2:43 PM Capital Project Planning, Impact Fees, and Program Management Amy Patterson Additional Reviewer Completed 08/07/2017 3:29 PM Growth Management Department Gail Hambright Level 2 Division Administrator Skipped 07/18/2017 1:47 PM County Attorney's Office Colleen Greene Level 2 Attorney Review Completed 08/08/2017 8:02 AM Grants Edmond Kushi Level 2 Grants Review Completed 08/08/2017 10:21 AM Growth Management Department James French Additional Reviewer Completed 08/14/2017 6:19 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/15/2017 12:00 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/15/2017 3:06 PM Budget and Management Office Ed Finn Additional Reviewer Completed 08/16/2017 11:56 AM Grants Therese Stanley Additional Reviewer Completed 08/25/2017 2:34 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 08/27/2017 9:18 AM Board of County Commissioners MaryJo Brock Meeting Pending 09/12/2017 9:00 AM 16.A.34 Packet Pg. 643 16.A.34.a Packet Pg. 644 Attachment: Resolution (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.a Packet Pg. 645 Attachment: Resolution (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.a Packet Pg. 646 Attachment: Resolution (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.c Packet Pg. 647 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) PART III: EVALUATION CRITERIA 1. Project Name (as listed in the Strategic Beach Management Plan): South Marco Island Beach Renourishment 2. Project Description: (Include county, location with reference to range monuments, brief project history and description of proposed activities.): The South Marco Island Beach Renourishment Project is located on the southwest Florida coastline of Collier County between Florida Department of Environmental Protection monuments from reference monument R-144 to R-148+600 (G-4). This project has a design beach width of 100 ft. from the baseline and is nourished on a 6-year interval. The project’s borrow area is the Caxambas Pass Borrow Area with upland sand sources serving as supplemental borrow areas. This project includes yearly physical beach monitoring, beach tilling, turtle and shorebird monitoring. All the monitoring activities are required by the FDEP and USACE permits. Collier County placed approximately 77,800 cubic yards of beach compatible material in 2013 to restore approximately 2,300 feet along South Marco Island (400 feet south of R-146 to G-4). The beach fill was within the 2005 permitted project limits. The main goals of the project were to restore storm protection, natural resource habitats, and recreational beach areas to offset the storm damage caused by Tropical Storm Fay in 2008. Additionally, the structural repair of five existing erosion control structures was completed in 2013/14. The South Marco Island Beach Renourishment Project was nourished through truckhaul in November of 2016 with approximately 13,200 cubic yards of beach compatible material to offset storm damage caused by Tropical Storm Debby. 3. Use of Requested Program Funds: Funds for post-construction physical monitoring for years 2016, 2017, 2018 and 2019, construction funds for the 2016 storm repair nourishment and funds for the design and permitting for the 2016 project are included in Agreement 16CO1. This request covers the engineering, design and permitting task to prepare for the future nourishment scheduled for 2019-2020. 4. Mapping: Prepare and attach a map or maps of the project area formatted at a minimum of 1" = 200' scale. (Maps must be provided as attachments to this application). The requested maps are included with this application. 5. Length of Project Boundary in Feet (Total restored project length in the critically eroded area): 4,423’ feet. 6. Eligibility: Public Beach Access and Public Lodging Establishments: The eligibility table must be completed for all beach projects. The table can be copied from a current grant agreement if the public access locations have not changed since last agreement execution. 16.A.34.c Packet Pg. 648 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Location/Name Address R- Mon Type of Access Width of Access/ Frontage (ft) Total units No. units availa ble to Public Eligible shoreline (ft) Swallow Avenue Cape Marco Drive R-148 Secondary Access 20 72 72 1880 Hilton Marco Island Beach Resort Hotel and Spa (Englewood Beach Park) 560 S Collier Blvd R-144 Lodging 510 287 287 510 Marriott Crystal Shores (Beachcomber Lane) 600 S Collier Blvd R-144.2 Lodging 350 219 219 350 Cost Sharing Summary Reach Project Distance (ft) Total Eligible Shoreline Length (ft) Within the Critically Eroded Area South Marco R-144 to R-148 +600 (G-4) 4,423 2,740 Sub Total 2,740 Total Project Length 4,423 ft Eligible Shoreline 61.95 % State Cost Share % 30.97% Location/Name DBPR License Swallow Avenue Beach Access Hilton Marco Island Beach Resort Hotel and Spa (Englewood Beach Park) https://www.myfloridalicense.com/LicenseDetail.asp?SID=&id=488C11 4245D7F52516AA05FAD517FF46 Marriott Crystal Shores (Beachcomber Lane) https://www.myfloridalicense.com/LicenseDetail.asp?SID=&id=0C53F4 69FA707AE7B5FA401B4C3EEFF5 16.A.34.c Packet Pg. 649 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 7. Schedule and Budget: (Include estimated phases for 10 years and estimated project costs for 5 years.) Year Proposed Method Description Total Estimated Cost Federal Cost Share State Cost Share Local Cost Share 2018/ 2019 Design P&S and Pre-Con $50,000 $0 $12,165 $37,835 Monitoring Phys, Turtle, Shorebird $97,000 $0 $23,600 $73,400 2019/ 2020 Construction Nourishment and Construction Services $2,300,000 $0 $559,590 $1,740,410 Monitoring Physical, Turtle, Shorebird, Tilling $98,940 $0 $24,072 $74,868 2020/ 2021 Monitoring Physical, Turtle, Shorebird, Tilling $100,918.80 $0 $24,554 $76,365 2021/ 2022 Monitoring Physical, Turtle, Shorebird, Tilling $102,937 $0 $25,045 $77,893 2022/ 2023 Monitoring Physical, Turtle, Shorebird $94,996 $0 $23,113 $71,883 2023/2024 Monitoring Physical, Turtle, Shorebird 2024/2025 Monitoring Physical, Turtle, Shorebird Design Engineering Design, P&S and Pre-Con 2025/2026 Construction Renourishment 2026/2027 Monitoring Physical, Turtle, Shorebird 2027/2028 Monitoring Physical, Turtle, Shorebird 8. Severity of erosion: Criterion will be calculated by the Department. Additional information may be provided for consideration. The project area’s shoreline has been designated by FDEP as critically eroded shoreline. The Department has previously calculated the average rate of erosion for the project shoreline. Based on historical MHW data from 1972 to 1990 between monuments R-146 and R-148 to be -2.1 ft/yr. 9. Threat to Upland Structures: Criterion will be calculated by the Department. Additional information may be provided for consideration. We request that the Department calculate this information and forward a discussion of the calculations to the applicant. 10. Recreational and Economic Benefit: Provide the percentage of linear footage of properties within the project boundaries zoned commercial, recreational or Public Lodging Establishment (hotel, motel or vacation rental condo) as zoned in current local government land use maps. 880 feet commercial, recreational and public zoning / 4423 feet total project length. = 20% 16.A.34.c Packet Pg. 650 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 11. Availability of Federal Funds: Is the project Federally authorized by WRDA (Y/N)? No AUTHORIZATION DATE: EXPIRATION DATE: Does the project have a Project Cooperative Agreement or other Federal funding agreement (Y/N)? No If so, attach a copy of the document. What is the federal cost share percentage provided for this project? 75% Is this project funded through FEMA for storm repairs (Y/N)? Yes for 2016 project If so, attach a copy of the signed Project Worksheet. Marco Island Beach has FEMA Category G funds due to damage as a result of Tropical Storm Debby. The project was built in 2016. 12. Local Sponsor Financial and Administrative Commitment: Is funding for the project in the local sponsor’s 10-year comprehensive financial plan (Y/N)? Y Attach a copy or provide web link to the plan. A copy of the 25 year planning schedule is attached. Is funding provided through a source established by referendum (Y/N)? Y Attach a copy or provide web link to the referendum. The referendum has been previously provided to the Department. Is funding provided by a third party other than the federal government (Y/N)? N What is the percentage of total project costs provided by the third party? NA Attach a copy of the interlocal agreement or cost sharing agreement. Quarterly Report Compliance – For projects that are currently funded through the program or have historically been funded, the Local Sponsor may give the dates quarterly progress reports were submitted within the last fiscal year per terms of the agreement (for consideration of additional ranking points): Quarter Due Date Report Remit Compliant (yes/no) July-September October 30 10-4-16 Yes October-December January 31 1-11-17 Yes January-March April 30 4-19-17 Yes March-June July 31 7-17-17 Yes Active Permits Is there an active state permit for the project (Y/N)? Y Permit #: FDEP 0235209-008-JM AUTHORIZATION DATE: 9/27/2016 EXPIRATION DATE: 10/11/2027 Is there an active federal permit for the project (Y/N)? Y Permit #: SAJ-2005-2726 (IP-MN) & mod USACE Permit No. SAJ-1996-02789. Issued March 9, 2016. Expires March 9, 2026. Have local funds been secured for the project (Y/N)? Y Explain: Collier County has dedicated the majority of the Tourist Development Taxes to beach maintenance, including funding projects within Marco Island. The funding was approved by referendum. 16.A.34.c Packet Pg. 651 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Has a copy of the resolution been drafted and attached to this application (Y/N)? Pending A draft resolution must be provided with the application. The signed resolution must be received by September 30. A draft resolution is included with this submittal and a signed resolution will be forwarded to the Department by the September 30th deadline. 13. Previous State Commitment: Has the Department previously reviewed, approved and cost-shared on a feasibility or design phase for this project (Y/N)? Yes Provide previous phase and state cost share percentage: Based on FDEP Agreement 16CO1, the Department stated that the percentage eligible for State funding is 48.68% and the State Cost Share is 24.34%. Will this project enhance or increase the longevity of a previously-constructed project (Y/N)? Y Explain: Five erosion control structures were recently refurbished. This will increase the future nourishment interval along the South Marco Project area and enhance the longevity of the project. The structures will support greater retention of fill material in the project areas. Will this project nourish a previously restored shoreline (Y/N)? Y (Full beach nourishment only. Dune maintenance projects do not apply) Has a previously approved appropriation for this project phase been released in its entirety by the local sponsor due to delays in the project timelines (Y/N)? N 14. Project Performance: What is the nourishment interval (in years)? 6 years (2013 to 2019) 15. Mitigation of Inlet Effects: Criterion is calculated by the Department. Additional information may be provided for consideration. The Marco Island project is nourished in synergy with maintaining Caxambas Pass for navigation. This practice meets the objective of the Strategic Beach Management Plan and returns sand eroded from the beach back to the beach for a high level of sustainability. In 2013, approximately 78,000 cy was dredged from the pass for nourishment of the beach. The nourishment from the pass was supplemental in 2016 by 13,228 cy from an upland sand source to restore the beach. 16. Use of Innovative Applications of existing technologies: Does the project address erosion in a method that is economically competitive with nourishment, that will not adversely affect the conservation of fish and wildlife, including endangered or threatened species, or their habitats, and that is designed to demonstrate an innovative application of existing technologies (Y/N)? Y Explain: Improvements to the combined breakwater and groin system at the south end of the project area were conducted to control sand being lost off the south end of the island. The reconstruction of 16.A.34.c Packet Pg. 652 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) these erosion control structures, in conjunction with the 2016 FEMA supplemental project, will increase project life. Has the project been documented to be effective and demonstrated technologies previously untried in the state (Y/N)? N Explain: 17. Regionalization: Is this project being planned or constructed in cooperation with another local government to reduce contracting costs (Y/N)? Y Explain and attach a signed copy of the interlocal agreement. The 2016 truckhaul storm restoration project was combined with the North County renourishment project constructed at the same time. One contractor was hired for both renourishment projects. Collier County has dedicated the majority of the Tourist Development Taxes to beach maintenance, including funding projects within Marco Island. The funding was approved by referendum which acts as the interlocal agreement. 18. Significance: What is the volume of advanced nourishment lost since the last sand placement event of a beach restoration or nourishment project as measured landward of the Mean High Water Line? (Information should be consistent with annual post-construction monitoring reports) The 2013 beach renourishment project placed approximately 80,000 cubic yards of sand dredged from the Caxambas Pass Borrow Area on Marco Island Beach from 400 feet south of DEP reference monument R-146 to monitoring monument G-4. In November 2016, approximately 13,200 cubic yards of sand from an upland source were placed from R-144 to G-2 to offset impacts from Tropical Storm Debby. In February 2017, and shoreline and volume change were analyzed for beach profiles R-139 on Marco Island south to K-2 on Kice Island. Since the 2013 pre-construction survey the shoreline within the 2013 project area (R-144 to G-4) has lost approximately 35,410 cubic yards above the depth of closure shoreward of the MHW. The project retains 61% of the fill placed between 2013 and 2017. Has the project eroded into the design template (Y/N)? Y If so, provide the eroded segments by listing the R-monuments. Based on the 2017 monitoring surveys and report, the February 2017 MHW has eroded landward of the 100 ft beach width at profiles G-2 to G-4 within the 2013 project area (from R-147 to G-4). For construction projects, what is the proposed sand placement volume? The proposed South Marco Island project will place approximately 104,000 cubic yards of beach compatible fill (per nourishment event). 16.A.34.c Packet Pg. 653 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 25 Year Planning Schedule 16.A.34.c Packet Pg. 654 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Yr 1-FY18 Yr 2-FY19 Yr 3-FY20 Yr 4-FY21 Yr 5-FY22 Yr 6-FY23 Yr 7-FY24 Yr 8-FY25 Yr 9-FY26 Yr 10-FY27 Yr 11-FY28 Yr 12-FY29 Yr 13-FY30 Yr 14-FY31 Yr 15-FY32 Yr 16-FY33 Yr 17-FY34 Yr 18-FY35 Yr 19-FY36 Yr 20-FY37 Yr 21-FY38 Yr 22-FY39 Yr 23-FY40 Yr 24-FY41 Yr 25-FY42 Yr 1-5 Yr 6-10 Yr 11-15 Yr 15-20 Yr 21-25 Total $8,122,300 $8,203,500 $8,285,500 $8,368,400 $8,452,100 $8,536,600 $8,622,000 $8,708,200 $8,795,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $41,431,800 $43,545,400 $44,416,500 $44,416,500 $44,416,500 $218,226,700 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $12,500,000 $12,500,000 $12,500,000 $12,500,000 $12,500,000 $62,500,000 $38,000,000 $38,000,000 $0 $0 $0 $0 $38,000,000 $10,622,300 $10,703,500 $48,785,500 $10,868,400 $10,952,100 $11,036,600 $11,122,000 $11,208,200 $11,295,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $91,931,800 $56,045,400 $56,916,500 $56,916,500 $56,916,500 $318,726,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000 $20,000 $0 $0 $0 $0 $20,000 $500,000 $500,000 $1,000,000 $0 $0 $0 $0 $1,000,000 $100,000 $100,000 $0 $0 $0 $0 $100,000 $38,000,000 $38,000,000 $0 $0 $0 $0 $38,000,000 $1,000,000 $1,000,000 $0 $0 $0 $0 $1,000,000 $29,640,000 $0 $29,640,000 $0 $0 $0 $29,640,000 $25,600,000 $0 $0 $0 $25,600,000 $0 $25,600,000 $24,140,000 $0 $0 $0 $0 $24,140,000 $24,140,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $0 $0 $4,000,000 $2,300,000 $2,500,000 $2,750,000 $3,000,000 $3,500,000 $2,300,000 $2,500,000 $2,750,000 $3,000,000 $3,500,000 $14,050,000 $3,500,000 $7,500,000 $3,500,000 $7,500,000 $0 $0 $0 $11,000,000 $50,000 $50,000 $50,000 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $85,000 $85,000 $85,000 $85,000 $85,000 $85,000 $85,000 $90,000 $90,000 $300,000 $380,000 $400,000 $420,000 $435,000 $1,935,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $185,000 $185,000 $185,000 $185,000 $185,000 $185,000 $185,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $850,000 $865,000 $925,000 $985,000 $1,000,000 $4,625,000 Annual Shorebird Monitoring $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $125,000 $130,000 $150,000 $170,000 $175,000 $750,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $185,000 $185,000 $185,000 $185,000 $185,000 $185,000 $185,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $850,000 $865,000 $925,000 $985,000 $1,000,000 $4,625,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $180,000 $180,000 $180,000 $180,000 $180,000 $180,000 $180,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $825,000 $840,000 $900,000 $980,000 $1,000,000 $4,545,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 $340,000 $340,000 $350,000 $350,000 $350,000 $350,000 $350,000 $350,000 $350,000 $375,000 $375,000 $375,000 $375,000 $375,000 $375,000 $375,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $1,730,000 $1,775,000 $1,875,000 $1,975,000 $2,000,000 $9,355,000 Local Government Funding Requests to FDEP $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 $125,000 $125,000 $125,000 $125,000 $625,000 Naples Pier Maintenance (Category D)$0 $0 $135,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $535,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,535,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $500,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 $0 $0 $0 $900,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $0 $12,500,000 $12,500,000 $2,500,000 $0 $27,500,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $0 $400,000 $500,000 $200,000 $0 $1,100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wiggins Pass $25,000 $150,000 $25,000 $850,000 $25,000 $150,000 $25,000 $850,000 $35,000 $250,000 $35,000 $900,000 $35,000 $250,000 $35,000 $900,000 $35,000 $250,000 $35,000 $900,000 $35,000 $250,000 $35,000 $900,000 $35,000 $1,075,000 $1,310,000 $1,255,000 $2,120,000 $1,255,000 $7,015,000 Doctors Pass $600,000 $650,000 $700,000 $700,000 $700,000 $750,000 $600,000 $650,000 $700,000 $1,400,000 $750,000 $4,100,000 Clam Pass $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $1,000,000 $500,000 $500,000 $500,000 $1,000,000 $3,500,000 Gordon Pass $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $2,000,000 $2,000,000 $4,000,000 $2,000,000 $10,000,000 Collier Creek $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $1,000,000 $500,000 $3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $212,446 $214,070 $975,710 $217,368 $219,042 $220,732 $222,440 $224,164 $225,906 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $1,838,636 $1,120,908 $1,138,330 $1,138,330 $1,138,330 $6,374,534 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $1,500,000 $11,500,000 $5,500,000 $5,500,000 $0 $0 $0 $0 $5,500,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 $20,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Personnel, equipment and supplies $865,000 $865,000 $900,000 $900,000 $900,000 $900,000 $900,000 $950,000 $950,000 $950,000 $950,000 $950,000 $950,000 $950,000 $950,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,430,000 $4,650,000 $4,750,000 $5,000,000 $5,000,000 $23,830,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $150,000 $150,000 $0 $300,000 $0 $0 $0 $300,000 $100,000 $100,000 $100,000 $100,000 $100,000 $0 $200,000 $300,000 $0 $0 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $0 $0 $1,000,000 $2,500,000 $500,000 $4,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0$150,000 $150,000 $0 $0 $300,000 $0 $0 $300,000$250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $0 $0 $500,000 $1,000,000 $0 $1,500,000$750,000 $750,000 $750,000 $750,000 $750,000 $750,000 $750,000 $750,000 $0 $0 $0 $3,000,000 $3,000,000 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,397,446 $6,404,070 $48,820,710 $8,077,368 $7,804,042 $13,930,732 $8,907,440 $12,584,164 $7,220,906 $36,507,666 $6,502,666 $13,317,666 $7,152,666 $7,517,666 $7,152,666 $11,267,666 $34,637,666 $5,652,666 $5,437,666 $9,252,666 $5,687,666 $8,402,666 $4,687,666 $32,447,666 $3,942,666 $75,503,636 $79,150,908 $41,643,330 $66,248,330 $55,168,330 $317,714,534 $0 $0 $0 $0 $0 $0 $6,224,854 $4,299,430 -$35,210 $2,791,032 $3,148,058 -$2,894,132 $2,214,560 -$1,375,964 $4,074,394 -$25,124,366 $4,880,634 -$1,934,366 $4,230,634 $3,865,634 $4,230,634 $115,634 -$23,254,366 $5,730,634 $5,945,634 $2,130,634 $5,695,634 $2,980,634 $6,695,634 -$21,064,366 $7,440,634 $1,012,166 $16,428,164 -$23,105,508 $15,273,170 -$9,331,830 $1,748,170 $1,012,166 $0 Activity Study, modeling and Peer Review Permitting, Engineering and Design Construction Other Expenses Tax Collector Expenses Catastrophe Reserve Repayment Fund 183 - FY20 Operational Contingency ($800K per year) Phase 3 - Private/Public partnerships to protect coastal Infrastructure for non-critically eroded or private beaches. Study, modeling and Peer Review Construction Results monitoring Phase 4 - Bayside Activities Bayside storm roll over on the back of the beach can be a significant issue that must be addressed in a comprehensive manner with storm surge. FY41 Maintenance Renourishment (6 year design life, 400K CY's, 2% yearly escalation) History on decreasing quantity. County wide Dune Plantings Annual Maintenance/Exotic Removals Florida Department of Environmental Protection Strategic Beach Management Plan Identifies 20.6 miles of beaches in the Naples Sub-Region. This includes 8.9 miles of critically eroded beach and 5.8 miles of previously restored Beaches. The southern Islands which includes Marco Island has 10 miles of beaches which includes 5.6 miles of critically eroded beaches and 1.7 miles of restored beaches. Beach Cleaning - Collier, Naples and Marco Island Two engineered mitigation reef to offset potential Hardbottom coverage. (Design, Permit, Construct each reef one Acre) Marco South Beach Renourishment (R145 to G-2) -100,000 CY's, $500K mob, $18/CY Includes Caxambas Pass Dredging. Dune shaping/plantings Marco Island beaches R136 to R148/G2 - approximately 10,000 feet beach ($3.5M) , 50 Walkover and Boardwalks @$150K each Annual Pass and Physical Beach Monitoring Annual Turtle Monitoring Annual Biological Monitoring Revenue - Current TDC revenue allocation is $8,122,300 per year with $2,500,000 set aside for beach renourishment. An additional $2,500,000 set aside for strictly beach renourishment will increase the yearly set aside for renourishment to $5,000,000 and increase the yearly revenue to $10,622,300 to fund all program activities. Current Projected Revenue -Revenue increases as per the 10 year plan for the next 10 years with no increase after that. Incremental TDC revenue set aside for Beach Renourishment Total Revenues Expenses One time adjustment for Unrestricted 195 monies ($12M), Catastrophe reserves ($8.5M), FDEM Reserve reimbursement ($7M), Reserves from Fund 183 ($5.5M) and $5M for FY18 and FY19 incremental TDC revenues. Yearly Difference - Revenue (+) Vs. Expenses (-) Permitting, Engineering and Design Study, modeling and Peer Review Permitting, Engineering and Design Construction Results monitoring Collier County Coastal Resiliency Plan/Projections Results monitoring Inlets CZM Program Management Total Program Expense - Program Costs with Phase 1 and Phase 2 of Resiliency Program included Areas downdrift of inlets, Park Shore beach, Clam Pass Park beach, Older beach structures too close to water and beaches with significant hardbottom outcroppings too close to shore are examples of areas that will require hard structural solutions. Examples of solutions could be Permeable Adjustable Groins, Concrete seawalls encased inside sand dunes, selected new seawalls, Raising the height of existing private seawalls and submerged breakwaters. Annual Beach Tilling Beach widening permit feasibility study and cost verification Regulatory Permits, Studies, Design and NTP Phase 1 - Critically Eroded Beaches in the Naples and Marco Island Sub-Region that previously been renourished. Study to determine the optimum balance between storm level protection (30 yr, 50 yr or 100 yr storm protection) verses costs verses attainable results. Phase 2 - Hard Structural Solutions where beach widening with sand on previously renourished critically eroded beaches is not feasible. 15% of beach length requires Hard Resiliency measures. Initial Renourishment 1.1MCY's ( 1M CY's resiliency plus and 100K CY's Naples 2017), 50 ft. wider dry beach, 1 ft. higher with dune, $5M mob, $30/CY) Dune Plantings (Based on 2006 Plantings) FY27 Maintenance Renourishment (6 year design life, 700K CY's, 2% yearly escalation) History on decreasing quantity. FY34 Maintenance Renourishment (6 year design life, 500K CY's, 2% yearly escalation) History on decreasing quantity. 16.A.34.c Packet Pg. 655 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Draft Resolution 16.A.34.c Packet Pg. 656 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) [09.0031/1184261/1] 1 RESOLUTION NO. 17 - _____ A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA SUPPORTING THE COUNTY'S “FLORIDA BEACH MANAGEMENT PROGRAM 2018/2019 FUNDING REQUESTS” TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION FOR LONG RANGE FUNDING REQUESTS FOR FISCAL YEARS 2018/2019, AGREEING TO SERVE AS THE LOCAL SPONSOR, SUPPORT PROPOSED PROJECT ACTIVITIES AND COMMITTED TO PROVIDING THE REQUIRED LOCAL COST SHARE. WHEREAS, Collier County’s Coastal Zone Management, acting on behalf of the Collier County Board of County Commissioners, has prepared Florida Beach Management Program 2018/2019 Funding Requests to the Florida Department of Environmental Protection (FDEP) for long range grant funding for Fiscal Years 2018-2019; and WHEREAS, the funding requests are to fund the following three Collier County projects: 1. Collier County Nourishment a.FY 18/19 Physical, biological, turtle, and shorebird monitoring, and tilling for the Collier County beach renourishment project; b.FY 17/18 feasibility study for coastal resiliency; c.Engineering and construction of the 2017 Naples Nourishment using the Doctors Pass borrow area. d. FY 18/19 engineering, design and permitting for the 2020 Collier County beach construction; e.FY 18/19 rehabilitation of the south jetty of Doctors Pass to restore the structure to its original design specifications; f.FY 18/19 engineering and construction of a spur groin off the south jetty of Doctors Pass and an emergent breakwater with a detached groin. The project will also rehabilitate an existing rock groin; 2. Marco Island Nourishment a.FY 18/19 engineering, design and permitting tasks for the 2019-2020 South Marco beach nourishment project and monitoring for the 2013 and 2016 Beach Nourishments. 3.Wiggins Pass Dredging a.Reimbursement of FY 16/17 funds for monitoring, engineering, permitting and Wiggins Pass Inlet Management Plan; b. Reimbursement of FY 17/18 funds engineering, monitoring and construction of the 2017 dredging of Wiggins Pass. 16.A.34.c Packet Pg. 657 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) [09.0031/1184261/1] 2 WHEREAS, the timely maintenance and restoration of these high quality and readily accessible public recreational beaches is critical to preserve their value and viability, and to provide a boost to both the environment and the economy of Collier County tourism, including hotels, restaurants and related commercial activities; and WHEREAS, the role of the County government in maintaining and restoring beaches is appropriate and crucial; and WHEREAS, the Board of County Commissioners supports these three funding requests and requests approval from the FDEP for each funding request for Fiscal Years 2018-2019; and WHEREAS, the Board of County Commissioners agrees to serve as the Local Sponsor; and WHEREAS, the Board of County Commissioners is able and committed to providing the required Local Cost Share; and WHEREAS, the Board of County Commissioners agrees to support proposed project activities; and WHEREAS, the Board of County Commissioners supports funding contained in previously approved funding contracts, and WHEREAS, the Board of County Commissioners has enacted the Tourist Development Tax Ordinance No. 92-60, as amended, which commits funding to beach renourishment, beach maintenance and beach park facilities. NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that the Board supports the Florida Beach Management Program 2018/2019 Funding Requests prepared for submittal to the Florida 16.A.34.c Packet Pg. 658 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) [09.0031/1184261/1] 3 Department of Environmental Protection for long range funding for Fiscal Years 2018/2019 and requests approval from the FDEP for each funding request. 1. The Board of County Commissioners is willing to serve as the Local Sponsor and support the maintenance and renourishment projects. The Collier County’s Coastal Zone Management has the staff dedicated to provide Project Management and Administrative support. 2. The Board of County Commissioners is committed to providing the required Local Cost Share. The required funds have been committed through the Tourist Development Tax Ordinance No. 92-60, as amended. PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier County, Florida, this _____ day of _______________, 2017. ATTEST: BOARD OF COUNTY COMMISSIONERS -----------, CLERK COLLIER COUNTY, FLORIDA _____________________________ By:________________________________ , Deputy Clerk Penny Taylor, Chairman Approved as to form and legality: _____________________________ Colleen M. Greene Assistant County Attorney 16.A.34.c Packet Pg. 659 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) [09.0031/1184261/1] 4 16.A.34.c Packet Pg. 660 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Referendum 16.A.34.c Packet Pg. 661 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.c Packet Pg. 662 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.c Packet Pg. 663 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.c Packet Pg. 664 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.c Packet Pg. 665 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Project Worksheet 16.A.34.c Packet Pg. 666 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) PA-04-FL-4068-PW-01079(0) P Applicant Name: Application Title: COLLIER (COUNTY)CCGGS13 - South Marco Beach Period of Performance Start: Period of Performance End: 07-03-2012 01-03-2014 Subgrant Application - Entire Application Application Title: CCGGS13 - South Marco Beach Application Number: PA-04-FL-4068-PW-01079(0) Application Type: Subgrant Application (PW) Preparer Information Prefix Mr. First Name GREGORY Middle Initial Last Name SLATTON Title Beach Specialist Agency/Organization Name FEMA PA TAC Address 1 FEMA JFO Address 2 1940 N. Monroe Street, Ste 79 City Tallahassee State FL Zip 32303 Email steven.hyatt@em.myflorida.com Is the application preparer the Point of Contact?No Point of Contact Information Prefix Mr. First Name Len Middle Initial Last Name Price Title Administrator - Administrative Services Division Agency/Organization Collier (County) Address 1 3299 East Tamiami Trail Address 2 Suite 601 City Naples State FL Page 1 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 667 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) ZIP 34112 - 5749 Phone 239-252-8908 Fax 239-252-8720 Email lenprice@colliergov.net Alternate Point of Contact Information Prefix Mr. First Name Steve Middle Initial Last Name Hyatt Title Deputy PAO Agency/Organization Florida Division of Emergency Management Address 1 2555 Shummard Oak Blvd. Address 2 City Tallahassee State FL ZIP 32399 Phone 850-487-1660 Fax Email steven.hyatt@em.myflorida.com Project Description Disaster Number:4068 Pre-Application Number:PA-04-FL-4068-RPA-0063 Applicant ID:021-99021-00 Applicant Name:COLLIER (COUNTY) Subdivision: Project Number:CCGGS13 Standard Project Number/Title:799 - Recreational or Other Please Indicate the Project Type:Neither Alternate nor Improved Application Title:CCGGS13 - South Marco Beach Category:G.RECREATIONAL OR OTHER Percentage Work Completed?0.0 % As of Date:11-29-2012 Comments Applicant may request an Improved Project to incorporate repairs decribed in this PW with a planned renourishment project. 11/30/12 - As described in 44 CFR 13.43, applicant must maintain all work-related records for a period of three (3) years from applicant closure (final payment), all records relative this project worksheet are subject to examination and audit by the State, FEMA and the Comptroller General of the United States and must reflect work related to disaster specific costs. Attachments Damage Facilities (Part 1 of 2) Page 2 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 668 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Facility Number Facility Name Address County City State ZIP Site Previously Damaged? Action 1 South Marco Beach South Marco Island Collier Naples FL 34112 Yes Comments Attachments User Date Document Type Description Hard Copy File Reference File Name Action GREGORY SLATTON 12- 02- 2012 Additional Information DR1785 Marco Beach PW and docs DR1785 PW and docs.pdf (9.17 Mb) View GREGORY SLATTON 12- 02- 2012 Drawings/Sketches FDEP approved plans 2005 Permit%20Drawings% 20(12-22-05).pdf(1.62 Mb) View GREGORY SLATTON 12- 02- 2012 Additional Information FDEP Permit Modification adding north beach 2006 Permit Mod(12-27- 06).pdf(2.42 Mb) View GREGORY SLATTON 12- 02- 2012 Additional Information FDEP Beach Management Plan excerpt FDEP Beach Management Plan - S. Marco excerpt.pdf (28.88 kb) View GREGORY SLATTON 12- 02- 2012 Map Location Map Location Map.pdf(898.71 kb) View GREGORY SLATTON 12- 02- 2012 Photos Site Visit Photos Photo Sheet.pdf(287.75 kb) View GREGORY SLATTON 12- 02- 2012 Drawings/Sketches Marco Beach Plans SMarcoFinalDrawings.pdf (841.82 kb) View GREGORY SLATTON 12- 02- 2012 Additional Information Volume Change Table Marco Volume Change Table.pdf(39.27 kb) View Facility Name: South Marco Beach Address 1:South Marco Island Address 2: County:Collier City:Naples State:FL ZIP:34112 Was this site previously damaged?Yes PA-04-FL-4068-PW-01079(0): South Marco Island, FL Page 3 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 669 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Location: Damage Description and Dimensions: PA-04-FL-4068-PW-01079(0): DAMAGE DESCRIPTION As a result of high winds and surf associated with Tropical Storm (TS) Debby , the applicant-maintained public beach lying between FDEP R- monuments R139 and G-5 in Collier County sustained significant beach erosion. Applicant's estimated erosion along 9,594 linear feet (LF) of shoreline is based upon a pre-storm survey (December 2011) and post- storm survey (August 2012) by applicant's coastal engineer, Atkins. The attached Collier County Tropical Storm Debby Post-Storm Report, October 2012, describes survey methodology and details volume change locations in Table 16. Table 16 details losses along the full profile width of engineered beach between R139 to G-5, and shows that a total of 16,959 CY eroded during the 8-month period December 2011 – August 2012. Scope of Work: PA-04-FL-4068-PW-01079(0): ****SCOPE OF WORK**** WORK TO BE COMPLETED As an engineered, nourished, and regularly-maintained beach, South Marco Beach is eligible under Category G for PA funding to restore it to its pre-disaster condition. Applicant requests FEMA PA reimbursement of costs to replace sand erosion attributable to T.S. Debby. Debby-related sand loss is the volume lost between the applicant’s pre-and-post storm surveys minus normally-occurring background losses during that 8-month interval. The engineering report does not detail the background losses, but states that the project area lost 5,595 CY between December 2010 and December 2011, a monthly rate of 466 CY. The Debby-caused loss was 16,959 CY – 466 CY/mo x 8 months = 13,228 CY. The attached Volume Change Table details the changes over the improved beach. Applicant plans to replace the Debby-related losses as an integral part of his next scheduled beach renourishment project along with the replacement of 76,728 CY of T.S. Fay loss previously approved in Improved Project DR1785-PW 561. Applicant will include this PW's sand volume as a separate contract line item. No work has been done to date. The cost estimate for this PW is based on estimated costs for DR1785 PW 561. No additional costs for mobilization/demobilization, environmental monitoring, or a geotechnical study are included since those costs were estimated and included in the DR1785 PW. Estimated costs are comparable to historical costs experienced by other applicants for similar work in the area and are deemed reasonable. Upon completion, this site will be returned to its pre-disaster design, function and capacity within the original footprint. The applicant is responsible for obtaining all local, state and/or federal permits as they may apply to this project. ************ Notes: To be eligible under Category G the beach must meet the following criteria (ref. PA Guide, FEMA -322, June 2007, pgs 86,87): A beach is considered eligible for permanent repair if it is an improvedbeach and has been routinely maintained prior to the disaster. A beach is considered to be an “improved beach” if the following criteria apply: the beach was constructed by the placement of sand to a designed elevation, width, grain size, and slope; and the beach have been maintained in accordance with a maintenance program involving the Page 4 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 670 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) periodic re-nourishment of sand. By accepting this grant, applicant certifies that all work will done on property for which he is legally responsible and is accessible to the general public. Documentation maintained by the Applicant must typically include: a) Design documents including engineering specifications and grain size analysis b) "As-built" plans of the project c) Documentation of regular renourishment of the beach d) Pre-storm cross-sections of the beach e) Post-storm cross-sections of the beach. The project specialist has reviewed design plans, FDEP permits, and other documentation provided by the applicant and is satisfied that the facility meets FEMA’s criteria for an improved beach. An excerpt from the FDEP FL Beach Management Plan is attached and ststes that the beach has been filled and imprroved in various ways since 1991. The subgrantee is requesting direct administrative costs that are directly chargeable to this specific project. Associated eligible work is related to administration of the PA project only and in accordance with 44 CFR 13.22. These costs are treated consistently and uniformly as direct costs in all federal awards and other subgrantee activities and are not included in any approved indirect cost rates.******* 12/2/2012 - As described in 44 CFR 13.43, applicant must maintain all work-related records for a period of three (3) years from applicant closure (final payment), all records relative this project worksheet are subject to examination and audit by the State, FEMA and the Comptroller General of the United States and must reflect work related to disaster specific costs GIS Coordinates Project Location Latitude Longitude R144 25.92148 -81.7293 R148 26.91094 -81.72893 Special Considerations 1. Does the damaged facility or item of work have insurance coverage and/or is it an insurable risk (e.g., buildings, equipment, vehicles, etc)? No 2. Is the damaged facility located within a floodplain or coastal high hazard area and/or does it have an impact on a floodplain or wetland? Yes If you would like to make any comments, please enter them below. (maximum 4000 characters) FIRM 12021C0836H Zone VE 3. Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resource System Unit or an Otherwise Protected Area? No 4. Will the proposed facility repairs/reconstruction change the pre-disaster conditions (e.g., footprint, material, location, capacity, use of function)? No 5. Does the applicant have a hazard mitigation proposal or would the applicant like technical assistance for a hazard mitigation proposal? No 6. Is the damaged facility on the National Register of Historic Places or the state historic listing? Is it older than 50 years? Are there more, similar buildings near the site? No 7. Are there any pristine or undisturbed areas on, or near, the project site? Are there large No Page 5 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 671 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) tracts of forestland? 8.Are there any hazardous materials at or adjacent to the damaged facility and/or item of work? No 9.Are there any other environmental or controversial issues associated with the damaged facility and/or item of work? No Attachments User Date Document Type Description Hard Copy File Reference File Name Action GREGORY SLATTON 12-02- 2012 Map FIRM FM12021C0836H.pdf(9.44 Mb) View For Category C, D, E, F, and G Projects only Is effective mitigation feasible on this project? No If you answered Yes to the above question, the next question is required Will mitigation be performed on any sites in this project? If you answered Yes to the above question, the next question is required Do you wish to attach a Hazard Mitigation Proposal? If you answered Yes to the above question, the next two questions are required Please provide the Scope of Work for the estimate: Would you like to add the Hazard Mitigation Proposal as a cost line item to the project cost? Comments Applicant requested mitigation on DR1785 PW 561 Attachments Cost Estimate Is this Project Worksheet for Cost Estimate Format (Preferred) Repair Sequence Code Material and/or Description Unit Quantity Unit of Measure Unit Price Subgrant Budget Class Cost Estimate Action 1 9000 CEF Cost Estimate (See Attached Spreadsheet) 1 LS $ 161,194.00 CONSTRUCTION $ 161,194.00 Total Cost: $ 161,194.00 Insurance Adjustments (Deductibles, Proceeds and Settlements) Sequence Code Material and/or Description Unit Quantity Unit of Measure Unit Price Subgrant Budget Class Cost Estimate Action 1 9999 Direct Administrative Costs 1 LS $ 0.00 PERSONNEL $ 0.00 Total Cost: $ 0.00 Total Cost Estimate: $ 161,194.00 Page 6 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 672 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) (Preferred Estimate Type + Insurance Adjustments)Awarded cost line items: $ 161,194.00 Remaining cost line items: $ 0.00 Comments Attachments User Date Document Type Description Hard Copy File Reference File Name Action GREGORY SLATTON 12-09- 2012 Calculation Sheet CEF Estimate CEF CCGGS13 South Marco Island.pdf(115.93 kb) View Existing Insurance Information Insurance Type Policy No.Bldg/Property Amount Content Amount Insurance Amount Deductible Amount Years Required Comments Attachments Comments and Attachments Name of Section Comment Attachment Project Description Applicant may request an Improved Project to incorporate repairs decribed in this PW with a planned renourishment project. 11/30/12 - As described in 44 CFR 13.43, applicant must maintain all work-related records for a period of three (3) years from applicant closure (final payment), all records relative this project worksheet are subject to examination and audit by the State, FEMA and the Comptroller General of the United States and must reflect work related to disaster specific costs. Damage Facilities DR1785 PW and docs.pdf 2005 Permit%20Drawings% 20(12-22-05).pdf 2006 Permit Mod(12-27- 06).pdf FDEP Beach Management Plan - S. Marco excerpt.pdf Location Map.pdf Photo Sheet.pdf SMarcoFinalDrawings.pdf Marco Volume Change Table.pdf Special Considerations FM12021C0836H.pdf Mitigation Applicant requested mitigation on DR1785 PW 561 Cost Estimate CEF CCGGS13 South Marco Island.pdf Application Level CCGGS13 - Signed Application_Part1.pdf CCGGS13 - Signed Application_Part2.pdf CCGGS13 - Signed Page 7 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 673 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Subgrant Application - FEMA Form 90-91 Note: The Effective Cost Share for this application is 75% Application_Part3.pdf CCGGS13 - Signed Application_Part4.pdf Bundle Reference # (Amendment #) Date Awarded PA-04-FL-4068-State-0045(44)07-29-2013 FEDERAL EMERGENCY MANAGEMENT AGENCY PROJECT WORKSHEET DISASTER PROJECT NO. CCGGS13 PA ID NO. 021-99021-00 DATE 12-14-2012 CATEGORY GFEMA4068-DR -FL APPLICANT: COLLIER (COUNTY) WORK COMPLETE AS OF: 11-29-2012 : 0 % Site 1 of 1 DAMAGED FACILITY: South Marco Beach COUNTY: Collier LOCATION: PA-04-FL-4068-PW-01079(0): South Marco Island, FL LATITUDE: 26.91094 25.92148 LONGITUDE: -81.72893 -81.7293 DAMAGE DESCRIPTION AND DIMENSIONS: PA-04-FL-4068-PW-01079(0): DAMAGE DESCRIPTION As a result of high winds and surf associated with Tropical Storm (TS) Debby , the applicant-maintained public beach lying between FDEP R-monuments R139 and G-5 in Collier County sustained significant beach erosion. Applicant's estimated erosion along 9,594 linear feet (LF) of shoreline is based upon a pre-storm survey (December 2011) and post-storm survey (August 2012) by applicant's coastal engineer, Atkins. The attached Collier County Tropical Storm Debby Post-Storm Report, October 2012, describes survey methodology and details volume change locations in Table 16. Table 16 details losses along the full profile width of engineered beach between R139 to G-5, and shows that a total of 16,959 CY eroded during the 8-month period December 2011 – August 2012. SCOPE OF WORK: PA-04-FL-4068-PW-01079(0): ****SCOPE OF WORK**** WORK TO BE COMPLETED As an engineered, nourished, and regularly-maintained beach, South Marco Beach is eligible under Category G for PA funding to restore it to its pre-disaster condition. Applicant requests FEMA PA reimbursement of costs to replace sand erosion attributable to T.S. Debby. Debby-related sand loss is the volume lost between the applicant’s pre-and-post storm surveys minus normally-occurring background losses during that 8-month interval. The engineering report does not detail the background losses, but states that the project area lost 5,595 CY between December 2010 and December 2011, a monthly rate of 466 CY. The Debby- caused loss was 16,959 CY – 466 CY/mo x 8 months = 13,228 CY. The attached Volume Change Table details the changes over the improved beach. Applicant plans to replace the Debby-related losses as an integral part of his next scheduled beach renourishment project along with the replacement of 76,728 CY of T.S. Fay loss previously approved in Improved Project DR1785-PW 561. Applicant will include this PW's sand volume as a separate contract line item. No work has been done to date. The cost estimate for this PW is based on estimated costs for DR1785 PW 561. No additional costs for mobilization/demobilization, environmental monitoring, or a geotechnical study are included since those costs were estimated and included in the DR1785 PW. Estimated costs are comparable to historical costs experienced by other applicants for similar work in the area and are deemed reasonable. Upon completion, this site will be returned to its pre-disaster design, function and capacity within the original footprint. The applicant is responsible for obtaining all local, state and/or federal permits as they may apply to this project. ************ Notes: To be eligible under Category G the beach must meet the following criteria (ref. Page 8 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 674 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) PA Guide, FEMA -322, June 2007, pgs 86,87): A beach is considered eligible for permanent repair if it is an improvedbeach and has been routinely maintained prior to the disaster. A beach is considered to be an “improved beach” if the following criteria apply: the beach was constructed by the placement of sand to a designed elevation, width, grain size, and slope; and the beach have been maintained in accordance with a maintenance program involving the periodic re-nourishment of sand. By accepting this grant, applicant certifies that all work will done on property for which he is legally responsible and is accessible to the general public. Documentation maintained by the Applicant must typically include: a) Design documents including engineering specifications and grain size analysis b) "As-built" plans of the project c) Documentation of regular renourishment of the beach d) Pre-storm cross-sections of the beach e) Post-storm cross-sections of the beach. The project specialist has reviewed design plans, FDEP permits, and other documentation provided by the applicant and is satisfied that the facility meets FEMA’s criteria for an improved beach. An excerpt from the FDEP FL Beach Management Plan is attached and ststes that the beach has been filled and imprroved in various ways since 1991. The subgrantee is requesting direct administrative costs that are directly chargeable to this specific project. Associated eligible work is related to administration of the PA project only and in accordance with 44 CFR 13.22. These costs are treated consistently and uniformly as direct costs in all federal awards and other subgrantee activities and are not included in any approved indirect cost rates.******* 12/2/2012 - As described in 44 CFR 13.43, applicant must maintain all work-related records for a period of three (3) years from applicant closure (final payment), all records relative this project worksheet are subject to examination and audit by the State, FEMA and the Comptroller General of the United States and must reflect work related to disaster specific costs Does the Scope of Work change the pre- disaster conditions at the site? Yes No   Special Considerations included? Yes No  Hazard Mitigation proposal included? Yes No Is there insurance coverage on this facility? Yes No  PROJECT COST ITEM CODE NARRATIVE QUANTITY/UNIT UNIT PRICE COST 1 9000 CEF Cost Estimate (See Attached Spreadsheet) 1/LS $ 161,194.00 $ 161,194.00 2 0000 Insurance Adjustments 0/LS $ 0.00 $ 0.00 3 9999 Direct Administrative Costs 1/LS $ 0.00 $ 0.00 TOTAL COST $ 161,194.00 PREPARED BY GREGORY SLATTON TITLE Beach Specialist SIGNATURE APPLICANT REP. Len Price TITLE Administrator - Administrative Services Division SIGNATURE COLLIER (COUNTY) : PA-04-FL-4068-PW-01079 Conditions Information Review Name Condition Type Condition Name Description Monitored Status Final Review Other (EHP) Clean Water Act (CWA) CWA CONDITION: The subgrantee is responsible for coordinating with and obtaining any required section 401 and 404 permit(s) from FDEP Beaches and Coastal Management Division to obtain a Coastal Construction Control Line (CCCL) permit prior to initiating work. The subgrantee shall comply with all conditions of the required permit. All coordination pertaining to these activities No Approved Page 9 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 675 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) should be documented and compliance maintained in their permanent files. Failure to comply with these conditions may jeopardize FEMA funding; verification of compliance will be required at project closeout. Final Review Other (EHP) Standard Condition #3 If ground disturbing activities occur during construction, applicant will monitor ground disturbance and if any potential archeological resources are discovered, will immediately cease construction in that area and notify the State and FEMA. No Approved Final Review Other (EHP) Standard Condition #2 This review does not address all federal, state and local requirements. Acceptance of federal funding requires recipient to comply with all federal, state and local laws. Failure to obtain all appropriate federal, state and local environmental permits and clearances may jeopardize federal funding. No Approved Final Review Other (EHP) Standard Condition #1 Any change to the approved scope of work will require re- evaluation for compliance with NEPA and other Laws and Executive Orders. No Approved Final Review Other (EHP) National Historic Preservation Act (NHPA) NHPA: Prior to conducting repairs, applicant must identify the source and location of sand material. If the sand souce is privately owned, or is located on previously undisturbed land, FEMA consultation with the State Historic Preservation Officer will be required. Failure to comply with this condition may jeopardize FEMA funding; verification of compliance will be required at project closeout. No Approved Final Review Other (EHP) Executive Order 11988 - Floodplains No Approved ESA CONDITIONS: Per the Statewide Programmatic Biological Opinion (SPBO; Service August 22,2011), the subgrantee must adhere to the following: Sea Turtle Page 10 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 676 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Final Review Other (EHP) Endangered Species Act (ESA) Reasonable and Prudent Measures, the Standard Manatee Conditions for In- Water Work shall be implemented, commitments outlined in the SPBO regarding piping plovers must be implemented, FWC standard guidelines for the protection of nesting shorebirds must be implemented for work between February 15 to August 31, surveys shall be conducted daily throughout the construction period. All of these conditions are included in the USACE permit and consultation with USFWS. Verification that these project conditions have been met will be required as part of project closeout. Non-compliance with EHP project conditions may jeopardize federal funding. No Approved Final Review Other (EHP) Coastal Zone Management Act (CZMA) CZMA CONDITION: The subgrantee is responsible for obtaining any required FDEP Bureau of Beaches and Coastal Systems permits/waivers. Compliance with FDEP requirements constitutes compliance with Florida CZM. Failure to comply with these conditions may jeopardize FEMA funding; verification of compliance will be required at project closeout. No Approved Final Review Reporting Requirements Close out cost submission At close out this project is subject to actual cost recalculation. Applicant is required to submit at close out, line item cost that can be aligned with the CEF format used to estimate the costs for this project and the DR 1785 pw 561 project. At close out this worksheet is subject to recalculation to comply with FEMA second appeal, Collier County, DR 1393, May 14, 2012. Cory Spaulding TAC. Yes Approved EHP Review Other (EHP) Standard Condition #3 If ground disturbing activities occur during construction, applicant will monitor ground disturbance and if any potential archeological resources are discovered, will No Recommended Page 11 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 677 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) immediately cease construction in that area and notify the State and FEMA. EHP Review Other (EHP) Standard Condition #2 This review does not address all federal, state and local requirements. Acceptance of federal funding requires recipient to comply with all federal, state and local laws. Failure to obtain all appropriate federal, state and local environmental permits and clearances may jeopardize federal funding. No Recommended EHP Review Other (EHP) Standard Condition #1 Any change to the approved scope of work will require re- evaluation for compliance with NEPA and other Laws and Executive Orders. No Recommended EHP Review Other (EHP) National Historic Preservation Act (NHPA) NHPA: Prior to conducting repairs, applicant must identify the source and location of sand material. If the sand souce is privately owned, or is located on previously undisturbed land, FEMA consultation with the State Historic Preservation Officer will be required. Failure to comply with this condition may jeopardize FEMA funding; verification of compliance will be required at project closeout. No Recommended EHP Review Other (EHP) Executive Order 11988 - Floodplains No Recommended EHP Review Other (EHP) Endangered Species Act (ESA) ESA CONDITIONS: Per the Statewide Programmatic Biological Opinion (SPBO; Service August 22,2011), the subgrantee must adhere to the following: Sea Turtle Reasonable and Prudent Measures, the Standard Manatee Conditions for In- Water Work shall be implemented, commitments outlined in the SPBO regarding piping plovers must be implemented, FWC standard guidelines for the protection of nesting shorebirds must be implemented for work between February 15 to August 31, surveys shall be conducted daily throughout the No Recommended Page 12 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 678 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) construction period. All of these conditions are included in the USACE permit and consultation with USFWS. Verification that these project conditions have been met will be required as part of project closeout. Non-compliance with EHP project conditions may jeopardize federal funding. EHP Review Other (EHP) Coastal Zone Management Act (CZMA) CZMA CONDITION: The subgrantee is responsible for obtaining any required FDEP Bureau of Beaches and Coastal Systems permits/waivers. Compliance with FDEP requirements constitutes compliance with Florida CZM. Failure to comply with these conditions may jeopardize FEMA funding; verification of compliance will be required at project closeout. No Recommended EHP Review Other (EHP) Clean Water Act (CWA) CWA CONDITION: The subgrantee is responsible for coordinating with and obtaining any required section 401 and 404 permit(s) from FDEP Beaches and Coastal Management Division to obtain a Coastal Construction Control Line (CCCL) permit prior to initiating work. The subgrantee shall comply with all conditions of the required permit. All coordination pertaining to these activities should be documented and compliance maintained in their permanent files. Failure to comply with these conditions may jeopardize FEMA funding; verification of compliance will be required at project closeout. No Recommended Internal Comments No.Queue User Date/Time Reviewer Comments 7 Award Review SYSTEM 07-29-2013 02:48 PM GMT ACCEPTED Reviewed project, storm related sand quantities are calculated with normal background erosion subtracted based upon applicant supplied data. Worksheet sand quantities were calculated in compliance with May 14, 2012 second appeal for this applicant, FEMA DR 1393. Repairs for sand lost in this Page 13 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 679 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 6 Final Review TAYLOR MOODY KAREN 07-02-2013 08:47 PM GMT disaster are to be done in conjunction with the applicant’s regular beach nourishment and sand loss from DR 1785 PW 561. Project is subject to close out recalculation of actual costs. Present costs are based upon estimates. At close out the two FEMA projects from different disaster will be recalculated based upon actual costs as well as to pro rate the fixed costs proportionally as is detailed in the second appeal which describes the method of calculating FEMA eligible costs when FEMA projects are combined together and or combined with the applicants regular beach nourishment cycle. Cory Spaulding TAC 5 Final Review JOHNSON SR DAVID 06-25-2013 12:02 PM GMT 6-25-2013 PW need to have a Final Review Completed 4 Final Review JOHNSON SR DAVID 06-25-2013 12:01 PM GMT 6-25-2013 PW need to have a Final Review Completed 3 Final Review SPAULDING CORY 06-14-2013 03:48 PM GMT Reviewed project, storm related sand quantities are calculated with normal background erosion subtracted based upon applicant supplied data. Worksheet sand quantities were calculated in compliance with May 14, 2012 second appeal for this applicant, FEMA DR 1393. Repairs for sand lost in this disaster are to be done in conjunction with the applicant’s regular beach nourishment and sand loss from DR 1785 PW 561. Project is subject to close out recalculation of actual costs. Present costs are based upon estimates. At close out the two FEMA projects from different disaster will be recalculated based upon actual costs as well as to pro rate the fixed costs proportionally as is detailed in the second appeal which describes the method of calculating FEMA eligible costs when FEMA projects are combined together and or combined with the applicants regular beach nourishment cycle. Cory Spaulding TAC 2 EHP Review COLLINS DAWN 05-31-2013 01:44 PM GMT SOW: Collier County (25.92148, -81.7293), CAT G - Applicant made repairs to South Marco Beach, consisting of placing 13,228 CY of beach-quality sand on 9,594 LF of damaged beach surface, between monuments R139 and G5. Beach returned to predisaster condition. - ssander5 - 02/06/2013 18:26:33 GMT CWA: See condition. - ssander5 - 02/06/2013 18:15:00 GMT CZMA: See condition. - ssander5 - 02/06/2013 18:16:19 GMT EO 11990: Not in wetlands per review of USFWS National Wetlands Inventory (NWI) mapper, accessed 02/06/2013. - ssander5 - 02/06/2013 18:22:08 GMT ESA: Per USFWS concurrence letter dated April 24, 2013 (attached). SEE CONDITIONS. - dcollin3 - 05/31/2013 13:41:45 GMT EO 11988: The project is located in Zone AE per Collier County FIRM Panel # 12021C0836H, dated 05/16/2012. Floodplain avoidance by relocating the facility or abandoning its use is not a practicable alternative and the no-action alternative would adversely impact social or economic resources for the community. See FIRM attached in EMMIE. - ssander5 - 02/06/2013 18:19:14 GMT NHPA: See condition. - ssander5 - 02/06/2013 18:14:30 GMT 1 Quality Assurance / Quality ROCQUE RAYMOND 01-11-2013 02:28 PM Sub grantee application has been reviewed appears to be correct with required information attached. Page 14 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 680 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Control GMT Page 15 of 15Federal Emergency Management Agency E-Grants 07/31/2013https://isource.fema.net/emmie/dispatchDestination.do?menuTile=&topTile=dsHeader&b... 16.A.34.c Packet Pg. 681 Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0#0S C o l l i e r B L V DSpruce AVEF i el d s t o n e D RSycamore CTMontego CTW e l l s S aw ye r W A YJava CTR-143R-142415000 415000416000 416000417000 417000579000579000580000580000Collier County BeachLong Range Beach PlanSouth Marco SegmentDate: 06/27/17 By: HMV COMM NO: 631226141TITLE:Legend:ParcelsMarco Island Zoning:CommercialPUDResidential TouristSingle FamilyCritical Erosion Area#0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\SOUTH_MARCO_SEGMENT_LRPB_MAP_1.MXDFIGURE 4aNotes:Gulf of Mexico£NTSViewportGulf of MexicoMatchline Figure 4b1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.1 inch = 200 feetμ0 100 200FeetMarco Beach Ocean Resort2481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.16.A.34.cPacket Pg. 682Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0Hilton Marco Island Beach Resort Hotel and Spa182'Hotel 100%Marriott'sCrystalShores350'Hotel 100%S C o l l i e r B L V D Muspa WAYWinterberry DRWells Sawyer WAYLido CTR-144415000 415000416000 416000417000 417000578000578000Collier County BeachLong Range Beach PlanSouth Marco SegmentDate: 06/28/17 By: HMV COMM NO: 631226141TITLE:Legend:ParcelsMarco Island Zoning:CommercialResidential TouristSingle FamilyPublic Lodging Critical Erosion Area#0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\SOUTH_MARCO_SEGMENT_LRPB_MAP_2.MXDFIGURE 4bGulf of Mexico£NTSViewportGulf of MexicoMatchline Figure 4cMatchline Figure 4a2481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.Notes:1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.1 inch = 200 feetμ0 100 200FeetProject Area16.A.34.cPacket Pg. 683Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0#0S Collier BLVDSeagrape DRValley AVEMuspa WAYR-146R-145415000 415000416000 416000417000 417000576000576000577000577000Collier County BeachLong Range Beach PlanSouth Marco SegmentDate: 06/28/17 By: HMV COMM NO: 631226141TITLE:Legend:ParcelsMarco Island Zoning:CommercialResidential TouristSingle FamilyCritical Erosion Area#0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\SOUTH_MARCO_SEGMENT_LRPB_MAP_3.MXD£NTSFIGURE 4cViewportMatchline Figure 4dGulf of MexicoGulf of MexicoMatchline Figure 4b1 inch = 200 feetμ0 100 200FeetNotes:1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.2481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.Project Area16.A.34.cPacket Pg. 684Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0#072Parking SpacesS Collier BLVDSeagrape DRSwallow AVESwan DRR-148R-147415000 415000416000 416000417000 417000574000574000575000575000Collier County BeachLong Range Beach PlanSouth Marco SegmentDate: 06/28/17 By: HMV COMM NO: 631226141TITLE:Legend:Public Beach Access & ParkingParcelsMarco Island Zoning:Multi-FamilyPUDResidential TouristSingle FamilyPublic Lodging Critical Erosion Area#0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\SOUTH_MARCO_SEGMENT_LRPB_MAP_4.MXDFIGURE 4dGulf of Mexico£NTSViewportGulf of MexicoMatchline Figure 4eMatchline Figure 4cVeracruz at Cape MarcoProject AreaNotes:1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.1 inch = 200 feetμ0 100 200Feet2481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.Tampico at Cape MarcoBeach Club of Marco400'Vacation Rental-Condo 0%16.A.34.cPacket Pg. 685Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0#0#0#0G-5G-4G-3G-2415000 415000416000 416000417000 417000573000573000Collier County BeachLong Range Beach PlanSouth Marco SegmentDate: 06/28/17 By: HMV COMM NO: 6312261411 inch = 200 feetTITLE:Legend:ParcelsMarco Island Zoning:Multi-FamilyPUDCritical Erosion Area#0FDEP Monumentsμ0 100 200FeetG:\ENTERPRISE\COLLIER\631226141\MXD\SOUTH_MARCO_SEGMENT_LRPB_MAP_5.MXDFIGURE 4eGulf of Mexico£NTSViewportGulf of MexicoMatchline Figure 4dCozumel at Cape MarcoProject AreaNotes:1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.2481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.Belize at Cape Marco Monterrey at Cape MarcoMerida at Cape Marco16.A.34.cPacket Pg. 686Attachment: Marco Island Beach Application with Attachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.d Packet Pg. 687 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) PART III: EVALUATION CRITERIA 1. Project Name (as listed in the Inlet Management Plan or Strategic Beach Management Plan): Wiggins Pass Inlet Management 2. Project Description: (Include county, location with reference to range monuments, brief project history and description of proposed activities.): The Wiggins Pass Project is located on the southwest Florida coastline in Collier County between Florida Department of Environmental Protection monuments R-16 and R-17 and the project is adjacent to approximately 2,300 feet of critically eroded Gulf shoreline. The dredge sites are located within Wiggins Pass, South and North Channels and the Gulf of Mexico (Figure 1). The nearshore and beach disposal sites are located north of the inlet, between DEP Reference monuments R-12 to R-15.5, and south of the inlet, between R-18 and R-20. The ebb shoal disposal area is located offshore of Wiggins Pass, approximately 300-1,000 feet north of the authorized inlet channel. The South Point Escarpment Repair site is located on the beach, at the southern end of Barefoot Beach Preserve. The entire project is located in Collier County, Sections 17 and 20, Township 48 South, Range 25 East, Gulf of Mexico, Class III Waters. Portions of the project are within Outstanding Florida Waters associated with Barefoot Beach Preserve, Delnor- Wiggins Pass State Park and Wiggins Pass Estuarine Area and Cocohatchee River System. Figure 1: Wiggins Pass features. 16.A.34.d Packet Pg. 688 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) The initial phase of the latest Inlet Management Plan Study was implemented in 2013 by dredging approximately 107,000cy for maintenance dredging and initial realignment of the channel. Material was placed in disposal areas as described in Table 2 and Figure 1. In 2015, an interim maintenance dredging project excavated 13,000cy to clear the shoal across the main inlet entrance channel. Material was placed in the ebb shoal disposal area north of the channel and within the flood shoal disposal. The goal of interim dredging is to clear the shoaling across the navigation channel while dredging the minimum amount of material. Per the Inlet Management Plan study, Wiggins Pass is currently dredged at regular intervals of approximately 4 years to maintain navigable depths for recreational boaters, with optional interim dredging events ever two years. The FDEP is finalizing the inlet management plan, which will be implemented stating with the 2017 maintenance dredging event. It is anticipated that Wiggins Pass will be dredged in the fall of 2017 with up to 110,000- cy with a beach disposal split of 2/3rd of the total volume (67%) to the north and 1/3rd of the total volume (33%) to the south. The 2017 dredging will maintain navigation of the inlet and implement the new FDEP inlet management plan distribution of the dredged material. The dredging will refine and reinforce the alignment begun with the 2013 project. Dredging of Wiggins Pass will be concurrent with the dredging of Doctors Pass as a means for cost sharing of common costs, which will save money. 3. Use of Requested Program Funds: FY 16/17 - Reimbursement of funds for monitoring, engineering, permitting and Wiggins Pass Inlet Management Plan FY 17/18 – Reimbursement of monitoring, design and construction for the 2017 dredging of Wiggins Pass FY 18/19 – Reimbursement of monitoring for the 2017 dredging of Wiggins Pass 4. Mapping: Prepare and attach a map or maps of the project area formatted at a minimum of 1" = 200' scale. (Maps must be provided as attachments to this application). Maps are included with this application. 5. Length of Area of Influence in Feet (as determined by the IMP or SBMP): Inlet influence north and south of Wiggins Pass was initially investigated in 1986 (Hine, et al). By examining the offshore contours in the vicinity of Wiggins Pass, the authors concluded that the length of influence along the updrift beach (north) was approximately 3,300 feet. It is at this distance north of the inlet, that the offshore contours become parallel to one another. The authors also found that the corresponding inlet effects downdrift (south) of Wiggins Pass extended approximately 2,040 feet (CPE 2012). FDEP is finalizing an inlet management plan based on the 2012 engineering report and the 2017 physical monitoring results. 6. Schedule and Budget: (Include estimated phases for 10 years and estimated project costs for 5 years.) Collier County requests financial support for the implementation of the inlet management plan in 2017 and as shown in the budget and schedule below: 16.A.34.d Packet Pg. 689 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Table 1 Wiggins Pass Schedule and Budget Year Proposed Phase Description Total Federal Cost Share State Cost Share Local Cost Share Estimated Cost 2017/ 2018 Construction Channel Dredging $1,500,000 $0 $1,125,000 $375,000 Construction Construction Services $125,000 $0 $93,750 $31,250 2018/ 2019 Monitoring Environmental & Physical Monitoring, and Tilling $150,000 $0 $112,500 $37,500 Design Engineering and Permitting $50,000 $0 $37,500 $12,500 2019/ 2020 Monitoring Environmental & Physical Monitoring, and Tilling $153,000 $0 $114,750 $38,250 Construction Interim Channel Dredging $300,000 $0 $225,000 $75,000 Construction Construction Services $50,000 $0 $37,500 $12,500 2020/ 2021 Monitoring Environmental & Physical Monitoring, and Tilling $156,060 $0 $117,045 $39,015 Design Engineering and Permitting $75,000 $0 $56,250 $18,750 2021/ 2022 Monitoring Environmental & Physical Monitoring, and Tilling $159,181 $0 $119,385.90 $39,795 Construction Channel Dredging $1,400,000 $0 $1,217,736 $405,912 Construction Construction Services $52,020 $0 $39,015 $13,005 2022/ 2023 Monitoring Environmental & Physical Monitoring, and Tilling 165,612 $0 $124,209 $41,403 Design Engineering and Permitting 53,060 $0 $39,795 $13,265 2023/ 2024 Monitoring Environmental & Physical Monitoring, and Tilling $168,924 $0 $126,693.27 $42,231 Construction Channel Dredging $324,730 $0 $243,547 $81,182 Construction Construction Assistance $54,122 $0 $40,591 $13,530 2024/ 2025 Monitoring Environmental & Physical Monitoring, and Tilling 2025/ 2026 Construction Channel Dredging Construction Construction Assistance 2026/ 2027 Monitoring Environmental & Physical Monitoring, and Tilling 2027/ 2028 Construction Channel Dredging Construction Construction Assistance 2028/ 2029 Monitoring Environmental & Physical Monitoring, and Tilling 16.A.34.d Packet Pg. 690 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 7. Balancing the Sediment Budget: Provide a brief description of when the last sediment budget engineering analysis was completed for the inlet and area of inlet influence. Discuss any proposals to update the sediment budget: The formal Inlet Management Plan for Wiggins Pass is pending. The Inlet Management Study was completed in 2012 with a sediment budget. The 2017 beaches and inlet monitoring reports were provided to FDEP to assist them in finalizing the new Inlet Management Plan and sediment budget. What is the annual bypassing objective (cubic yards/year) adopted by the IMP or the SMBP or as determined by a department approved study? The Strategic Beach Management Plan for Wiggins Pass states the strategy for the inlet as follows: “Place beach quality maintenance dredged material on adjacent beaches north and south of Wiggins Pass within areas of greatest need; monitoring and analysis of inlet effects.” FDEP staff is in the process of preparing a new inlet management plan. An inlet sediment budget was developed for the time period 1992 to 2009 and 2006 to 2009. Based on this sediment budget and the result in Table 2, a draft bypassing strategy has been developed calling for the placement of beach placement split of 2/3’s (67%) to the north and 1/3 (33%) to the south. This year, approximately 110,000 cy of material will be dredged, and this is expected to decrease towards 56,000 cy/yr once the inlet reaches its new equilibrium and has been trained, similar to the dredging rate between 1984 and 2000. . Provide the current annual average of bypassed material (cubic yards) since adoption of a bypass objective: In 2011, 52,500 cubic yards of material was removed from Wiggins Pass. In 2013 a total 107,370 cubic yards was dredged from Wiggins Pass and in 2015 maintenance dredging excavated 13,000 cy from the inlet entrance channel and the connecting south channel. The 1995 Inlet Management Study and corresponding strategic beach management plan was implemented starting in 2001. A new study was completed in 2012, permitted and initiated in 2013. FDEP should approve the final plan this year, and it conditions will be implemented with the 2017 dredging event. The 1995 Inlet Management Plan was implement in 2001. Based on the values in Table 2, the plan has bypassed an annual average of 26,300 cy/yr to the adjacent shoreline between 2001 and 2016. The latest plan has not yet been fully implemented, but will be dredging an averaging approximately 108,000 cy every four years based on the 2013 dredging and the proposed 2017 dredging. This equates to approximately 27,000 cy/yr. Attach an updated list of the annual bypassing volumes (cubic yards/year) for the inlet for the past 10 years (starting from the last calendar year or the most recent calculation). Table 2 shows the dredging volumes and locations since 1984. 16.A.34.d Packet Pg. 691 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Table 2 Wiggins Pass Dredge and Fill Summary 1984-2016 Year Volume (cy) Sand Source North South Placement Location by Range Monument 1984 52,400 ebb shoal 0 52,400 NK* 1990 33,000 ebb shoal 33,000 0 R13-R14 1991 34,000 ebb shoal 34,000 0 R13.3-R15 1993 34,000 ebb shoal 0 34,000 NK* 1995 33,000 ebb shoal 16,500 16,500 NK* 1998 11,980 ebb shoal 11,980 0 R12.5-R13.5 2000 26,460 ebb shoal 26,460 0 R12-R15 2000 16,960 ebb shoal 0 16,960 R18-R21 March 2002 53,000 ebb shoal 0 53,000 R17.5-R20.5 December 2002 41,000 ebb shoal 41,000 0 R11-R14 2005 68,500 ebb shoal 68,500 0 R11-R14 (Nearshore Placement) 2007 48,400 ebb shoal 0 48,400 R18-R19.5 2007 6,800 interior channel 6,800 0 R12 2009 51,300 ebb shoal 38,927 12,373 R11.5-R14 and R18-R20.5 2011 49,900 ebb shoal 49,900 0 R12-R14.2 2013-2014 66,064 ebb shoal 66,064 0 R12-R16 2013-2014 34,635 NK* 0 0 Flood Shoal Meander 2013-2014 6,670 interior channel 0 0 Offshore Disposal 2015-2016 9,400 ebb shoal & interior channel 9,400 0 R15.5-R16 Summary 1984-2001 241,800 NA* 121,940 119,860 NA* 2001-2016 435,669 NA* 280,591 113,773 NA* Total 677,469 NA* 402,531 233,633 NA* 16.A.34.d Packet Pg. 692 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 8. Sand Reaching the Inlet: Provide the current estimated annual quantity of beach quality sand reaching the updrift boundary of the improved jetty or inlet channel: According to the Inlet Management study (CPE, 2012) for Wiggins Pass, for the period 1992- 2009, the amount of sand moving into the inlet annually 15,500 cy/yr, which is the value that best represents the intent of the above question. Sand moves into the inlet form both sides at an approximate equal amount. The flow from the north side comes largely from erosion of Barefoot Beach between R-14 and R-16. The updrift side is losing 7,700 cy/yr into the inlet. These rates are approximately 43% higher for the most recent period. The dredging rate in the sediment budget for the period 1992 to 2009 is 20,300 cy/yr. The dredging rates for the period since 2002 averages 29,045 cy/yr., a 43% increase. The dredging rate since 2013 will higher still with the 2017 project factored in. 9. Cost Effective Alternatives: Provide the estimated bypassing shortfall of sand (cubic yards/year) within in the inlet system: Currently dredging at the inlet accounts for 29,000 cubic yards per year based on values of dredging from 2001 to 2016. The permitted projected volume based on FDEP permit 0142538-008-JC approaches approximately 50,000 cubic yards per event. Provide the increase in annual bypassing of sand (cubic yards/year) proposed for this project: The original 1996 plan called for bypassing all the dredged material to the south, with language allowing bypassing to the north as needed. The latest studies and the proposed FDEP plan call for a split of 2/3rd of the volume being placed to the north of the inlet and 1/3rd of the volume being placed to the south. This year, approximately 107,000 cy of material will be dredged, and this is expected to decreased to 56,000 cy/yr once the inlet reaches its new equilibrium and has been trained. Based on the 1992-2009 sediment budget sediment, there is an annual deficit adjacent to the inlet (R14 to R16) of 13,200 cy/yr, which will be addressed by the new plan. The 2017 project proposes to bypass 73,700 cy to the north. 10. Local Sponsor Financial and Administrative Commitment: Is funding for the project in the local sponsor’s 10-year comprehensive financial plan (Y/N)? Y Attach a copy or provide web link to the plan. A copy of the 25-year planning schedule is attached. Is funding provided through a source established by referendum (Y/N)? Y Attach a copy or provide web link to the referendum. A copy of the referendum that established the Collier County Tourist Development Tax is included in this submission. Is funding provided by a third party other than the federal government (Y/N)? N What is the percentage of total project costs provided by the third party? N/A Attach a copy of the interlocal agreement or cost sharing agreement. Quarterly Report Compliance – For projects that are currently funded through the program or have historically been funded, the Local Sponsor may give the dates quarterly progress reports were 16.A.34.d Packet Pg. 693 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) submitted within the last fiscal year per terms of the agreement (for consideration of additional ranking points): Quarter Due Date Report Remit Compliant (yes/no) July-September October 30 10-4-16 Yes October-December January 31 1-11-17 Yes January-March April 30 4-19-17 Yes March-June July 31 7-17-17 Yes Is there an active state permit for the project (Y/N)? Y Wiggins Pass Navigation Channel Expansion and Maintenance Permit #: Permit Number: 0142538-008-JC AUTHORIZATION DATE: January 2, 2013 EXPIRATION DATE: January 2, 2023, Permit Modification No. 0142538-014-JN Is there an active federal permit for the project (Y/N)? Y Wiggins Pass Navigation Channel Expansion and Maintenance Permit #: SAJ-2004-07621 (IP-MJW) AUTHORIZATION DATE: September 25, 2012 Have local funds been secured for the project (Y/N)? Y Explain: Collier County has dedicated the majority of the Tourist Development Taxes to inlet and beach management including funding projects dedicated to dredging of Wiggins Pass. The funding is approved by referendum previously provided to the Department. Has a copy of the resolution been drafted and attached to this application (Y/N)? Pending In order to acquire state funding, the Local Sponsor must provide a resolution from the governing board which declares: •Support from the Local Sponsor for the project •Willingness to serve as the Local Sponsor •Ability to provide the full local cost share •Identification of the source of funding A draft resolution must be provided with the application. The signed resolution must be received by September 30. A draft resolution has been included in this application and a signed resolution will be provided prior to the deadline. 11. Previous State Commitment: Has the Department previously reviewed, approved and cost-shared on a feasibility or design phase for this project (Y/N)? Y Provide previous phase funded by the Department: The 1995 Inlet Management Plan was cost shared 50%. Will this project enhance or increase the longevity of a previously-constructed project (Y/N)? Y Explain: The latest studies and the proposed FDEP plan call for a split of 2/3rd of the volume being placed to the north of the inlet and 1/3rd of the volume being placed to the south. This year, approximately 110,000 cy of material will be dredged, and this is expected to decreased to 56,000 16.A.34.d Packet Pg. 694 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) cy/yr once the inlet reaches its new equilibrium and has been trained. There has already been an increase in navigability within the inlet, and the 2017 dredging will further reinforce this condition. We already have reduced interim dredging to a small quantity compared to historic practices. Will this project nourish a previously restored shoreline (Y/N)? (Full beach nourishment only. Dune maintenance projects do not apply) N Has a previously approved appropriation for this project phase been released in its entirety by the local sponsor due to delays in the project timelines (Y/N)? N 12. Inlet Management Plans: Does the project have an existing Inlet Management Plan or completed Inlet Management Study accepted by the Department that defines the sediment budget, quantifies the volumetric bypassing objective and contains specific management strategies (Y/N)? Yes 1995 and 2012: The initial Wiggins Pass IMP study was developed in 1995 and was implemented in 2002. The current plan was described in a study published in 2012 and initiated in 2013. The 2017 project is continued implementation of the previous study and the initial implementation of the pending FDEP plan. Has the Department received and approved an update to an existing Inlet Management Plan in the form of a current inlet management study/sediment budget analysis within the previous 10 years or is an update being proposed to an existing inlet management plan (Y/N)? Y Is a new inlet management study being proposed for the submittal to the Department for adoption in an Inlet Management Plan (Y/N)? Y – The department is currently reviewing the new IMP study. 13. Availability of Federal Funds: Is the project Federally authorized by WRDA (Y/N)? N AUTHORIZATION DATE: EXPIRATION DATE: Does the project have a Project Cooperative Agreement or other Federal funding agreement (Y/N)? N If so, attach a copy of the document. What is the federal cost share percentage provided for this project? NA Is this project is funded through FEMA for storm repairs (Y/N)? N If so, attach a copy of the signed Project Worksheet. 16.A.34.d Packet Pg. 695 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 25 Year Planning Schedule 16.A.34.d Packet Pg. 696 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Yr 1-FY18 Yr 2-FY19 Yr 3-FY20 Yr 4-FY21 Yr 5-FY22 Yr 6-FY23 Yr 7-FY24 Yr 8-FY25 Yr 9-FY26 Yr 10-FY27 Yr 11-FY28 Yr 12-FY29 Yr 13-FY30 Yr 14-FY31 Yr 15-FY32 Yr 16-FY33 Yr 17-FY34 Yr 18-FY35 Yr 19-FY36 Yr 20-FY37 Yr 21-FY38 Yr 22-FY39 Yr 23-FY40 Yr 24-FY41 Yr 25-FY42 Yr 1-5 Yr 6-10 Yr 11-15 Yr 15-20 Yr 21-25 Total $8,122,300 $8,203,500 $8,285,500 $8,368,400 $8,452,100 $8,536,600 $8,622,000 $8,708,200 $8,795,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $8,883,300 $41,431,800 $43,545,400 $44,416,500 $44,416,500 $44,416,500 $218,226,700 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $12,500,000 $12,500,000 $12,500,000 $12,500,000 $12,500,000 $62,500,000 $38,000,000 $38,000,000 $0 $0 $0 $0 $38,000,000 $10,622,300 $10,703,500 $48,785,500 $10,868,400 $10,952,100 $11,036,600 $11,122,000 $11,208,200 $11,295,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $11,383,300 $91,931,800 $56,045,400 $56,916,500 $56,916,500 $56,916,500 $318,726,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,000 $20,000 $0 $0 $0 $0 $20,000 $500,000 $500,000 $1,000,000 $0 $0 $0 $0 $1,000,000 $100,000 $100,000 $0 $0 $0 $0 $100,000 $38,000,000 $38,000,000 $0 $0 $0 $0 $38,000,000 $1,000,000 $1,000,000 $0 $0 $0 $0 $1,000,000 $29,640,000 $0 $29,640,000 $0 $0 $0 $29,640,000 $25,600,000 $0 $0 $0 $25,600,000 $0 $25,600,000 $24,140,000 $0 $0 $0 $0 $24,140,000 $24,140,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $0 $0 $4,000,000 $2,300,000 $2,500,000 $2,750,000 $3,000,000 $3,500,000 $2,300,000 $2,500,000 $2,750,000 $3,000,000 $3,500,000 $14,050,000 $3,500,000 $7,500,000 $3,500,000 $7,500,000 $0 $0 $0 $11,000,000 $50,000 $50,000 $50,000 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $80,000 $85,000 $85,000 $85,000 $85,000 $85,000 $85,000 $85,000 $90,000 $90,000 $300,000 $380,000 $400,000 $420,000 $435,000 $1,935,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $185,000 $185,000 $185,000 $185,000 $185,000 $185,000 $185,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $850,000 $865,000 $925,000 $985,000 $1,000,000 $4,625,000 Annual Shorebird Monitoring $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $35,000 $125,000 $130,000 $150,000 $170,000 $175,000 $750,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $170,000 $185,000 $185,000 $185,000 $185,000 $185,000 $185,000 $185,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $850,000 $865,000 $925,000 $985,000 $1,000,000 $4,625,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $165,000 $180,000 $180,000 $180,000 $180,000 $180,000 $180,000 $180,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $825,000 $840,000 $900,000 $980,000 $1,000,000 $4,545,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 $340,000 $340,000 $350,000 $350,000 $350,000 $350,000 $350,000 $350,000 $350,000 $375,000 $375,000 $375,000 $375,000 $375,000 $375,000 $375,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $400,000 $1,730,000 $1,775,000 $1,875,000 $1,975,000 $2,000,000 $9,355,000 Local Government Funding Requests to FDEP $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $25,000 $125,000 $125,000 $125,000 $125,000 $125,000 $625,000 Naples Pier Maintenance (Category D)$0 $0 $135,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $535,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,535,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $500,000 $500,000 $0 $0 $0 $0 $500,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $750,000 $0 $0 $0 $900,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $0 $12,500,000 $12,500,000 $2,500,000 $0 $27,500,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $0 $400,000 $500,000 $200,000 $0 $1,100,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wiggins Pass $25,000 $150,000 $25,000 $850,000 $25,000 $150,000 $25,000 $850,000 $35,000 $250,000 $35,000 $900,000 $35,000 $250,000 $35,000 $900,000 $35,000 $250,000 $35,000 $900,000 $35,000 $250,000 $35,000 $900,000 $35,000 $1,075,000 $1,310,000 $1,255,000 $2,120,000 $1,255,000 $7,015,000 Doctors Pass $600,000 $650,000 $700,000 $700,000 $700,000 $750,000 $600,000 $650,000 $700,000 $1,400,000 $750,000 $4,100,000 Clam Pass $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $1,000,000 $500,000 $500,000 $500,000 $1,000,000 $3,500,000 Gordon Pass $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $2,000,000 $2,000,000 $4,000,000 $2,000,000 $10,000,000 Collier Creek $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $1,000,000 $500,000 $3,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $212,446 $214,070 $975,710 $217,368 $219,042 $220,732 $222,440 $224,164 $225,906 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $227,666 $1,838,636 $1,120,908 $1,138,330 $1,138,330 $1,138,330 $6,374,534 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $1,500,000 $11,500,000 $5,500,000 $5,500,000 $0 $0 $0 $0 $5,500,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $800,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 $4,000,000 $20,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Personnel, equipment and supplies $865,000 $865,000 $900,000 $900,000 $900,000 $900,000 $900,000 $950,000 $950,000 $950,000 $950,000 $950,000 $950,000 $950,000 $950,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $4,430,000 $4,650,000 $4,750,000 $5,000,000 $5,000,000 $23,830,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $150,000 $150,000 $0 $300,000 $0 $0 $0 $300,000 $100,000 $100,000 $100,000 $100,000 $100,000 $0 $200,000 $300,000 $0 $0 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $0 $0 $1,000,000 $2,500,000 $500,000 $4,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0$150,000 $150,000 $0 $0 $300,000 $0 $0 $300,000$250,000 $250,000 $250,000 $250,000 $250,000 $250,000 $0 $0 $500,000 $1,000,000 $0 $1,500,000$750,000 $750,000 $750,000 $750,000 $750,000 $750,000 $750,000 $750,000 $0 $0 $0 $3,000,000 $3,000,000 $6,000,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,397,446 $6,404,070 $48,820,710 $8,077,368 $7,804,042 $13,930,732 $8,907,440 $12,584,164 $7,220,906 $36,507,666 $6,502,666 $13,317,666 $7,152,666 $7,517,666 $7,152,666 $11,267,666 $34,637,666 $5,652,666 $5,437,666 $9,252,666 $5,687,666 $8,402,666 $4,687,666 $32,447,666 $3,942,666 $75,503,636 $79,150,908 $41,643,330 $66,248,330 $55,168,330 $317,714,534 $0 $0 $0 $0 $0 $0 $6,224,854 $4,299,430 -$35,210 $2,791,032 $3,148,058 -$2,894,132 $2,214,560 -$1,375,964 $4,074,394 -$25,124,366 $4,880,634 -$1,934,366 $4,230,634 $3,865,634 $4,230,634 $115,634 -$23,254,366 $5,730,634 $5,945,634 $2,130,634 $5,695,634 $2,980,634 $6,695,634 -$21,064,366 $7,440,634 $1,012,166 $16,428,164 -$23,105,508 $15,273,170 -$9,331,830 $1,748,170 $1,012,166 $0 Activity Study, modeling and Peer Review Permitting, Engineering and Design Construction Other Expenses Tax Collector Expenses Catastrophe Reserve Repayment Fund 183 - FY20 Operational Contingency ($800K per year) Phase 3 - Private/Public partnerships to protect coastal Infrastructure for non-critically eroded or private beaches. Study, modeling and Peer Review Construction Results monitoring Phase 4 - Bayside Activities Bayside storm roll over on the back of the beach can be a significant issue that must be addressed in a comprehensive manner with storm surge. FY41 Maintenance Renourishment (6 year design life, 400K CY's, 2% yearly escalation) History on decreasing quantity. County wide Dune Plantings Annual Maintenance/Exotic Removals Florida Department of Environmental Protection Strategic Beach Management Plan Identifies 20.6 miles of beaches in the Naples Sub-Region. This includes 8.9 miles of critically eroded beach and 5.8 miles of previously restored Beaches. The southern Islands which includes Marco Island has 10 miles of beaches which includes 5.6 miles of critically eroded beaches and 1.7 miles of restored beaches. Beach Cleaning - Collier, Naples and Marco Island Two engineered mitigation reef to offset potential Hardbottom coverage. (Design, Permit, Construct each reef one Acre) Marco South Beach Renourishment (R145 to G-2) -100,000 CY's, $500K mob, $18/CY Includes Caxambas Pass Dredging. Dune shaping/plantings Marco Island beaches R136 to R148/G2 - approximately 10,000 feet beach ($3.5M) , 50 Walkover and Boardwalks @$150K each Annual Pass and Physical Beach Monitoring Annual Turtle Monitoring Annual Biological Monitoring Revenue - Current TDC revenue allocation is $8,122,300 per year with $2,500,000 set aside for beach renourishment. An additional $2,500,000 set aside for strictly beach renourishment will increase the yearly set aside for renourishment to $5,000,000 and increase the yearly revenue to $10,622,300 to fund all program activities. Current Projected Revenue -Revenue increases as per the 10 year plan for the next 10 years with no increase after that. Incremental TDC revenue set aside for Beach Renourishment Total Revenues Expenses One time adjustment for Unrestricted 195 monies ($12M), Catastrophe reserves ($8.5M), FDEM Reserve reimbursement ($7M), Reserves from Fund 183 ($5.5M) and $5M for FY18 and FY19 incremental TDC revenues. Yearly Difference - Revenue (+) Vs. Expenses (-) Permitting, Engineering and Design Study, modeling and Peer Review Permitting, Engineering and Design Construction Results monitoring Collier County Coastal Resiliency Plan/Projections Results monitoring Inlets CZM Program Management Total Program Expense - Program Costs with Phase 1 and Phase 2 of Resiliency Program included Areas downdrift of inlets, Park Shore beach, Clam Pass Park beach, Older beach structures too close to water and beaches with significant hardbottom outcroppings too close to shore are examples of areas that will require hard structural solutions. Examples of solutions could be Permeable Adjustable Groins, Concrete seawalls encased inside sand dunes, selected new seawalls, Raising the height of existing private seawalls and submerged breakwaters. Annual Beach Tilling Beach widening permit feasibility study and cost verification Regulatory Permits, Studies, Design and NTP Phase 1 - Critically Eroded Beaches in the Naples and Marco Island Sub-Region that previously been renourished. Study to determine the optimum balance between storm level protection (30 yr, 50 yr or 100 yr storm protection) verses costs verses attainable results. Phase 2 - Hard Structural Solutions where beach widening with sand on previously renourished critically eroded beaches is not feasible. 15% of beach length requires Hard Resiliency measures. Initial Renourishment 1.1MCY's ( 1M CY's resiliency plus and 100K CY's Naples 2017), 50 ft. wider dry beach, 1 ft. higher with dune, $5M mob, $30/CY) Dune Plantings (Based on 2006 Plantings) FY27 Maintenance Renourishment (6 year design life, 700K CY's, 2% yearly escalation) History on decreasing quantity. FY34 Maintenance Renourishment (6 year design life, 500K CY's, 2% yearly escalation) History on decreasing quantity. 16.A.34.d Packet Pg. 697 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range Draft Resolution 16.A.34.d Packet Pg. 698 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) [09.0031/1184261/1] 1 RESOLUTION NO. 17 - _____ A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA SUPPORTING THE COUNTY'S “FLORIDA BEACH MANAGEMENT PROGRAM 2018/2019 FUNDING REQUESTS” TO THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION FOR LONG RANGE FUNDING REQUESTS FOR FISCAL YEARS 2018/2019, AGREEING TO SERVE AS THE LOCAL SPONSOR, SUPPORT PROPOSED PROJECT ACTIVITIES AND COMMITTED TO PROVIDING THE REQUIRED LOCAL COST SHARE. WHEREAS, Collier County’s Coastal Zone Management, acting on behalf of the Collier County Board of County Commissioners, has prepared Florida Beach Management Program 2018/2019 Funding Requests to the Florida Department of Environmental Protection (FDEP) for long range grant funding for Fiscal Years 2018-2019; and WHEREAS, the funding requests are to fund the following three Collier County projects: 1. Collier County Nourishment a.FY 18/19 Physical, biological, turtle, and shorebird monitoring, and tilling for the Collier County beach renourishment project; b.FY 17/18 feasibility study for coastal resiliency; c.Engineering and construction of the 2017 Naples Nourishment using the Doctors Pass borrow area. d. FY 18/19 engineering, design and permitting for the 2020 Collier County beach construction; e.FY 18/19 rehabilitation of the south jetty of Doctors Pass to restore the structure to its original design specifications; f.FY 18/19 engineering and construction of a spur groin off the south jetty of Doctors Pass and an emergent breakwater with a detached groin. The project will also rehabilitate an existing rock groin; 2. Marco Island Nourishment a.FY 18/19 engineering, design and permitting tasks for the 2019-2020 South Marco beach nourishment project and monitoring for the 2013 and 2016 Beach Nourishments. 3.Wiggins Pass Dredging a.Reimbursement of FY 16/17 funds for monitoring, engineering, permitting and Wiggins Pass Inlet Management Plan; b. Reimbursement of FY 17/18 funds engineering, monitoring and construction of the 2017 dredging of Wiggins Pass. 16.A.34.d Packet Pg. 699 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) [09.0031/1184261/1] 2 WHEREAS, the timely maintenance and restoration of these high quality and readily accessible public recreational beaches is critical to preserve their value and viability, and to provide a boost to both the environment and the economy of Collier County tourism, including hotels, restaurants and related commercial activities; and WHEREAS, the role of the County government in maintaining and restoring beaches is appropriate and crucial; and WHEREAS, the Board of County Commissioners supports these three funding requests and requests approval from the FDEP for each funding request for Fiscal Years 2018-2019; and WHEREAS, the Board of County Commissioners agrees to serve as the Local Sponsor; and WHEREAS, the Board of County Commissioners is able and committed to providing the required Local Cost Share; and WHEREAS, the Board of County Commissioners agrees to support proposed project activities; and WHEREAS, the Board of County Commissioners supports funding contained in previously approved funding contracts, and WHEREAS, the Board of County Commissioners has enacted the Tourist Development Tax Ordinance No. 92-60, as amended, which commits funding to beach renourishment, beach maintenance and beach park facilities. NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that the Board supports the Florida Beach Management Program 2018/2019 Funding Requests prepared for submittal to the Florida 16.A.34.d Packet Pg. 700 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) [09.0031/1184261/1] 3 Department of Environmental Protection for long range funding for Fiscal Years 2018/2019 and requests approval from the FDEP for each funding request. 1. The Board of County Commissioners is willing to serve as the Local Sponsor and support the maintenance and renourishment projects. The Collier County’s Coastal Zone Management has the staff dedicated to provide Project Management and Administrative support. 2. The Board of County Commissioners is committed to providing the required Local Cost Share. The required funds have been committed through the Tourist Development Tax Ordinance No. 92-60, as amended. PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier County, Florida, this _____ day of _______________, 2017. ATTEST: BOARD OF COUNTY COMMISSIONERS -----------, CLERK COLLIER COUNTY, FLORIDA _____________________________ By:________________________________ , Deputy Clerk Penny Taylor, Chairman Approved as to form and legality: _____________________________ Colleen M. Greene Assistant County Attorney 16.A.34.d Packet Pg. 701 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) [09.0031/1184261/1] 4 16.A.34.d Packet Pg. 702 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) Referendum 16.A.34.d Packet Pg. 703 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.d Packet Pg. 704 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.d Packet Pg. 705 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.d Packet Pg. 706 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) 16.A.34.d Packet Pg. 707 Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0#0R-11R-10382000 382000383000 383000384000 384000717000717000Collier County Long Range Beach PlanWiggins PassTITLE:Legend:ParcelsCollier County Zoning:PUDResidential Single FamilyPublicly-Owned Property #0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\WIGGINS_PASS_LRPB_MAP_1.MXDFIGURE 1aViewport1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.Notes:Gulf of Mexico£NTSGulf of MexicoMatchline Figure 1bBarefoot Beach Preserve County ParkDate: 07/07/17 By: HMV COMM NO: 6312261412481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.1 inch = 200 feetμ0100200Feet16.A.34.dPacket Pg. 708Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0#0R-13R-12383000 383000384000 384000385000 385000715000715000716000716000Collier County Long Range Beach PlanWiggins PassTITLE:Legend:ParcelsCollier County Zoning:Agricultural Special Treatment AreaConservation DistrictPUDPublicly-Owned Property #0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\WIGGINS_PASS_LRPB_MAP_2.MXDFIGURE 1bNotes:Gulf of MexicoMatchline Figure 1cMatchline Figure 1a1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.Date: 07/07/17 By: HMV COMM NO: 6312261412481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.Viewport£NTSGulf of MexicoBarefoot Beach Preserve County Park1 inch = 200 feetμ0100200FeetOn & NearshoreDisposal Project Area16.A.34.dPacket Pg. 709Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0R-14383000 383000384000 384000385000 385000714000714000Collier County Long Range Beach PlanWiggins PassTITLE:Legend:ParcelsCollier County Zoning:Agricultural Special Treatment AreaConservation DistrictPUDPublicly-Owned Property Critical Erosion Area#0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\WIGGINS_PASS_LRPB_MAP_3.MXDFIGURE 1cNotes:Gulf of MexicoMatchline Figure 1dMatchline Figure 1b1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.Date: 07/07/17 By: HMV COMM NO: 6312261412481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.Viewport£NTSGulf of MexicoBarefoot Beach Preserve County Park1 inch = 200 feetμ0100200FeetOn & NearshoreDisposal Project Area16.A.34.dPacket Pg. 710Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0#0R-16R-15383000 383000384000 384000385000 385000712000712000713000713000Collier County Long Range Beach PlanWiggins PassTITLE:G:\ENTERPRISE\COLLIER\631226141\MXD\WIGGINS_PASS_LRPB_MAP_4.MXDFIGURE 1dNotes:Gulf of MexicoMatchline Figure 1eMatchline Figure 1c1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.Date: 07/07/17 By: HMV COMM NO: 6312261412481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.Viewport£NTSGulf of MexicoBarefoot Beach Preserve County Park1 inch = 200 feetμ0100200FeetLegend:ParcelsDredge AreaCollier County Zoning:Agricultural Special Treatment AreaConservation DistrictPUDPublicly-Owned Property Critical Erosion Area#0FDEP MonumentsFlood Shoal Disposal AreaOn & NearshoreDisposal Project AreaEbb ShoalDisposal Project Area( Offshore)16.A.34.dPacket Pg. 711Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0R-17383000 383000384000 384000385000 385000711000711000Collier County Long Range Beach PlanWiggins PassTITLE:Legend:ParcelsDredge AreaCollier County Zoning:Agricultural Special Treatment AreaConservation DistrictPUDPublicly-Owned Property #0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\WIGGINS_PASS_LRPB_MAP_5.MXDFIGURE 1eNotes:Gulf of MexicoMatchline Figure 1fMatchline Figure 1d1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.Date: 07/07/17 By: HMV COMM NO: 6312261412481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.Viewport£NTSGulf of Mexico1 inch = 200 feetμ0100200FeetDelnor WigginsState Recreation AreaWiggins Pass16.A.34.dPacket Pg. 712Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0#0R-19R-18384000 384000385000 385000386000 386000709000709000710000710000Collier County Long Range Beach PlanWiggins PassTITLE:Legend:ParcelsCollier County Zoning:Conservation DistrictPUDPublicly-Owned Property #0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\WIGGINS_PASS_LRPB_MAP_6.MXDFIGURE 1fNotes:Gulf of MexicoMatchline Figure 1gMatchline Figure 1e1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.Date: 07/07/17 By: HMV COMM NO: 6312261412481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.Viewport£NTSGulf of Mexico1 inch = 200 feetμ0100200FeetDelnor WigginsState Recreation AreaOn & NearshoreDisposal Project Area16.A.34.dPacket Pg. 713Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019) #0#0R-11R-10382000 382000383000 383000384000 384000717000717000Collier County Long Range Beach PlanWiggins PassTITLE:Legend:ParcelsCollier County Zoning:PUDResidential Single FamilyPublicly-Owned Property #0FDEP MonumentsG:\ENTERPRISE\COLLIER\631226141\MXD\WIGGINS_PASS_LRPB_MAP_1.MXDFIGURE 1aViewport1. Coordinates are in feet based on the Florida State Plane Coordinate System, East Zone, North American Datum of 1983. (NAD83). 2. 2016 aerial imagery provided by Collier County Property Appraisers Office, flown February 12, 2016.3. Publicly-Owned Property and Public Lodging based on the 2017 parcel data.Notes:Gulf of Mexico£NTSGulf of MexicoMatchline Figure 1bBarefoot Beach Preserve County ParkDate: 07/07/17 By: HMV COMM NO: 6312261412481 NW BOCA RATON BLVD.BOCA RATON, FL 33431PH. (561) 391-8102FAX.(561) 391-9116CB&IEnvironmental &Infrastructure, Inc.1 inch = 200 feetμ0100200Feet16.A.34.dPacket Pg. 714Attachment: Wiggins Pass Project Application WithAttachments (3502 : Resolution for Long Range budget Plan Request 18/2019)