Loading...
Agenda 07/05/2017 PELICAN BAY SERVICES DIVISION Municipal Services Taxing & Benefit Unit NOTICE OF PUBLIC MEETING WEDNESDAY, JULY 5, 2017 THE PELICAN BAY SERVICES DIVISION BOARD WILL MEET AT 1 PM ON JULY 5 AT THE COMMUNITY CENTER AT PELICAN BAY, LOCATED AT 8960 HAMMOCK OAK DRIVE, NAPLES, FLORIDA 34108. AGENDA 1. Pledge of Allegiance 2. Roll call 3. Agenda approval 4. Approval of 06/07/17 Regular Session meeting minutes 5. Audience comments 6. Administrator's report (30 minutes) a. Clam Pass excavation and re-grading b. Cobblestones removal update c. Irrigation project update d. Phase 2 lake bank erosion study update e. June financial report 7. Committee reports (60 minutes) a. Clam Bay b. Landscape & Safety i. *LED conversion throughout Pelican Bay ii. *Median cut-through project on Gulf Park Drive iii. Discussion on taking over responsibility for PB sidewalks c. Beach Renourishment i. *Decision on 2017 beach renourishment d. Budget e. Water Management 8. Chairman's report (5 minutes) 9. Old business 10. New business 11. Adjournment *indicates possible action items ANY PERSON WISHING TO SPEAK ON AN AGENDA ITEM WILL RECEIVE UP TO THREE (3) MINUTES PER ITEM TO ADDRESS THE BOARD. THE BOARD WILL SOLICIT PUBLIC COMMENTS ON SUBJECTS NOT ON THIS AGENDA AND ANY PERSON WISHING TO SPEAK WILL RECEIVE UP TO THREE (3) MINUTES. THE BOARD ENCOURAGES YOU TO SUBMIT YOUR COMMENTS IN WRITING IN ADVANCE OF THE MEETING.ANY PERSON WHO DECIDES TO APPEAL A DECISION OF THIS BOARD WILL NEED A RECORD OF THE PROCEEDING PERTAINING THERETO,AND THEREFORE MAY NEED TO ENSURE THAT A VERBATIM RECORD IS MADE,WHICH INCLUDES THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL IS TO BE BASED. IF YOU ARE A PERSON WITH A DISABILITY WHO NEEDS AN ACCOMMODATION IN ORDER TO PARTICIPATE IN THIS MEETING YOU ARE ENTITLED TO THE PROVISION OF CERTAIN ASSISTANCE. PLEASE CONTACT THE PELICAN BAY SERVICES DIVISION AT (239) 597-1749 OR VISIT PELICANBAYSERVICESDIVISION.NET. 06/29/2017 2:06:09 PM PELICAN BAY SERVICES DIVISION BOARD REGULAR SESSION JUNE 7,2017 The Pelican Bay Services Division Board met on Wednesday, June 7, 2017, at 1:00 p.m. at the Community Center at Pelican Bay, 8960 Hammock Oak Drive,Naples, Florida 34108. In attendance were: Pelican Bay Services Division Board Ken Dawson Scott Streckenbein, Chairman Bohdan Hirniak Mike Shepherd, Vice-Chairman Susan O'Brien Joe Chicurel Peggy Pinterich Tom Cravens Dave Trecker Jacob Damouni Gary Ventress Pelican Bay Services Division Staff Mary McCaughtry, Operations Analyst Neil Dorrill, Administrator Lisa Jacob, Associate Project Manager Marion Bolick, Operations Manager Barbara Shea; Recording Secretary Also Present Dave Cook, Pelican Bay Foundation John Chandler, Pelican Bay Foundation Tim Corcoran, Pelican Bay Foundation APPROVED AGENDA (AS PRESENTED) 1. Pledge of Allegiance 2. Roll call 3. Employee recognition 4. Agenda approval 5. Approval of 05/03/17 Regular Session meeting minutes 6. Approval of 04/21/17 Budget Committee meeting minutes 7. Audience comments 8. Administrator's report (25 minutes) a. Lake bank erosion study update b. Update on the intersection of Gulf Park Dr. &US 41 and median cut c. Bay Colony Brazilian pepper update d. Cobblestones removal update e. May financial report 9. Committee reports (25 minutes) a. Clam Bay b. Landscape& Safety i. Street lighting project c. Beach Renourishment i. *Decision on 2017 beach renourishment d. Budget e. Water Management 10. Chairman's report (10 minutes) 1 Pelican Bay Services Division Board Regular Session June 7,2017 a. Meetings with Commissioner Solis 11. Old business (10 minutes) a. Preliminary discussion on establishing priorities for PBSD projects 12. New business 13. Adjournment *indicates possible action items ROLL CALL All members were present and a quorum was established EMPLOYEE RECOGNITION The PBSD Board and Mr. Dorrill recognized PBSD employee Pedro Montero for his 24 years of dedicated service, as well as referenced positive comments on his hard work, received from Pelican Bay residents Mr. and Mrs. Byczek. He will be nominated for a "Values in Practice" award, a recognition program sponsored by Collier County. AGENDA APPROVAL Mr. Cravens motioned, Mr. Dawson seconded to approve the agenda as presented. Dr. Trecker requested that item #9c be heard before the committee reports. The motion carried unanimously. APPROVAL OF 05/03/17 REGULAR SESSION MEETING MINUTES Mr. Cravens motioned, Mr. Shepherd seconded to approve the 05/03/17 regular session meeting minutes as amended. The motion carried unanimously. APPROVAL OF 04/21/17 BUDGET COMMITTEE MEETING MINUTES Mr. Cravens motioned, Dr. Trecker seconded to approve the 04/21/17 Budget Committee meeting minutes as presented. The motion carried unanimously. AUDIENCE COMMENTS Mr. Ray Kretz commented on the history of the removal of exotics near his property lines by the PBSD over the past few years. He requested that the PBSD address noise abatement in this area as this is a primary responsibility of the PBSD, as stated by ordinance. Ms. Janet Rathbun commented on the noise abatement responsibility of the PBSD, and suggested that additional landscaping be planted along the Oak Lake Sanctuary/The Village border with US 41. Ms. Lynn Eccleston commented on the US 41 noise issue and the PBF ownership of the US 41 berm. Mr. Vincent Vespo requested an update on his US 41 noise abatement request, as discussed at the PBSD May board meeting. 2 Pelican Bay Services Division Board Regular Session June 7,2017 Mr. Dorrill commented that staff has requested a sketch and approximate cost to construct a 200 foot berm from our AB&B engineer, which is expected to be completed in a few weeks, and will be forwarded to the Landscape & Safety Committee for review and discussion of possible cost-sharing with other entities. Mr. Jim Issenmann commented on the possibility of Oak Lake Sanctuary residents cost- sharing in the Gulf Park Dr. median cut project in order to expedite this project. ADMINISTRATOR'S REPORT LAKE BANK EROSION STUDY UPDATE Mr. Dorrill reported that our AB&B engineer is working on the final phase of the lake bank erosion study. UPDATE ON THE INTERSECTION OF GULF PARK DR. & US 41 & MEDIAN CUT Mr. Dorrill reported that the County Transportation Dept. had their quarterly safety meeting for prioritization of capital projects, and staff has been informed that our proposed Gulf Park Dr. median cut project is projected to receive County funding in 2025. Dr. Chicurel requested that Mr. Issenmann poll Oak Lake Sanctuary residents to determine whether they would be receptive to cost- sharing for the median cut project. Mr. Dorrill reported on the related right-turn only Gulf Park Drive egress project which would require funding from the PBSD or Collier County. Ms. O'Brien suggested that a majority of PB residents may not favor changing the intersection to "right-turn only." Mr. Ventress suggested that the execution of one of the projects (not both) would sufficiently solve the intersection's safety issues. By consensus, the board referred both projects for further discussion to the Landscape & Safety Committee. BAY COLONY BRAZILIAN PEPPER UPDATE Mr. Dorrill reported that two drainage-improvement projects in Bay Colony have been completed. Remaining funds from these projects will be used to clean out the drainage swale behind the County beach parking garage; staff will solicit a proposal from Earth Tech for this work. COBBLESTONES REMOVAL UPDATE Mr. Dorrill reported that our engineer has completed construction plans and submitted a permit application for the cobblestone removal at the three remaining crosswalks on Pelican Bay Blvd. The permit is expected to be issued within a few weeks, and work is expected to begin soon thereafter. MAY FINANCIAL REPORT Mr. Cravens motioned, Dr. Trecker seconded to accept the May financial report. The motion carried unanimously. 3 Pelican Bay Services Division Board Regular Session June 7,2017 COMMITTEE REPORTS CLAM BAY REPORT Ms. O'Brien summarized her May 2017 Clam Bay update included in the agenda packet and specifically noted: (1) although April tidal gauge data was good, May data was not; this data will continue to be closely monitored, (2) the bathymetric survey has been completed and a report is expected soon, (3) water quality results look good for the first five months of 2017, with total nitrogen, total phosphorus, and copper meeting state standards, and (4) the next FWC hearing on a possible Clam Bay manatee protection zone designation is expected to be in July. LANDSCAPE & SAFETY REPORT Dr. Chicurel reported that the Landscape & Safety Committee met on May 16 and the following items were discussed. 1. Upon receipt of the lighting consultant's report next month, the committee will vote on the recommendation to change out all existing metal halide bulbs to LED bulbs. 2. Resident comments, e-mails, and discussion concerning the pathways (sidewalks) in Pelican Bay highlighted a long ignored issue in Pelican Bay, namely its unsafe, dangerous, poorly maintained, and inadequate pathways. These county owned pathways are used by pedestrians, joggers, and cyclists. The inadequacy of the pathways has resulted in pedestrian/bicycle accidents, injuries, near misses, and an overall unsafe feeling for all users. The design, material nature, multiple usage, and volume of usage will be studied by the committee and staff to find a remedy for this unsafe and poorly maintained infrastructure. Mr. Dorrill reported on a discussion with Mr. Tim Durham, County Manager's Office, concerning the possibility of the PBSD taking over maintenance of the PB pathways and the expectation of a County contribution if this were to occur. Mr. Dorrill commented that this issue will require significant strategizing and planning by the Landscape & Safety Committee. Ms. O'Brien provided a summary of her observations (between May 29 and June 6) of pathways in PB maintained by the County, which was added to the record. 3. The proposed Gulf Park Dr. cut-through at Oak Lake Sanctuary will be more clearly addressed by the County so that the PBSD and community will know our options. 4. It was the consensus of the committee that our use of full-time vs. part-time employees is a non issue and that efficient management will dictate the proper ratio utilized. Ms. O'Brien commented on her recent observations of the 3 new street lights on the Ridgeway/Laurel Oak corridor; one of the street lights, which was installed between two palm trees, is providing less lighting than the other two. Mr. Dorrill will follow up on her concern. Mr. Dorrill reported that he has had discussions with County Public Utilities personnel and Mr. Tim Durham concerning future improvements to the PBSD maintenance site. BEACH RENOURISHMENT REPORT Dr. Trecker provided an update on possible near term and long term solutions to beach erosion. Dr. Trecker provided background on the County's truck haul renourishment program in the agenda packet and commented that the PBSD board must make a "near term" decision on 4 Pelican Bay Services Division Board Regular Session June 7,2017 participation in the County's 2017 renourishment program. The Coastal Zone Management Dept. needs a decision from the PBSD by early July. Dr. Trecker suggested that the PBSD board study long term solutions to beach erosion, including (1) participating in a large resiliency project (forward renourishment), under consideration by the County, which would extend widths up to 150 feet and source sand from offshore, (2) dune plantings, (3) mangrove plantings, and(4) de-watering systems. Dr. Trecker has scheduled a PBSD beach workshop for Oct. 16 from 1:00 — 3:00 p.m. at the Community Center, which will include participation by Mr. Gary McAlpin and a representative from Humiston& Moore. Dr. Trecker suggested and the board agreed to postpone any vote on beach renourishment until the July PBSD board meeting. Dr. Trecker commented on the beach escarpment (approximate height of 4 feet) located just north of the PBF buildings. He commented that the County has agreed to regrading this area, subsequent to a formal request from Mr. Dorrill or the PBF. Mr. Cravens questioned whether the regrading process would be affected by turtle nesting season. Mr. Dorrill commented that he will coordinate the beach regrading with Mr. McAlpin, with consideration of turtle nesting season. BUDGET REPORT Mr. Shepherd commented that the FY18 PBSD budget will be reviewed by the BCC at the June 15 budget workshop. The first public hearing for FY18 County budgets is scheduled for Sept. 7. WATER MANAGEMENT REPORT Mr. Cravens reported that all PB lakes are currently algae-free, as a result of the start of the rainy season. He commented that two aerators (St. Maarten's lake and a Golf Course lake) are not functioning properly and staff is troubleshooting these issues. Mr. Cravens provided photos of areas of missing sod on the west side of the berm. Sod has been ordered to fill in these areas. Mr. Dorrill commented on"hydro-seeding" and the possibility of looking at experimenting with this alternative method of grass installation. CHAIRMAN'S REPORT THREE MEETINGS WITH COMMISSIONER SOLIS Mr. Streckenbein commented on his May 24 meeting with Commissioner Solis, Ms. Mary Johnson (PBF), and Mr. Jim Hoppensteadt (PBF) regarding the rejection of a Manatee Protection Zone designation for Clam Bay and the July 18 appeal. Mr. Streckenbein reported that Commissioner Solis provided suggestions and options for moving forward and is very supportive of Pelican Bay. Dr. Trecker characterized his meeting with Commissioner Solis and Mr. Dorrill as friendly and productive. He concluded that Commissioner Solis is very supportive and a friend to Pelican Bay. Mr. Shepherd commented on his meeting with Commissioner Solis and Mr. Dorrill regarding a general review of the PBSD assessments and budgetary needs over the past 12 years. Mr. Shepherd concluded that Commissioner Solis is very supportive of Pelican Bay. 5 Pelican Bay Services Division Board Regular Session June 7,2017 OLD BUSINESS PRELIMINARY DISCUSSION ON ESTABLISHING PRIORITIES FOR PBSD PROJECTS Ms. O'Brien provided a list of projects/topics committed to by the PBSD board. Mr. Streckenbein commented that the items are in various stages of completion. He suggested that board members review the list, provide any missing items to staff, and provide priorities to staff. He suggested that staff add any missing items to the list, as well as provide information on each item, such as (1) percentage of completion, (2) expected time of completion, and (3) whether the item is fully budgeted,to the PBSD board at the July 5 meeting. AVERAGE COST OF NONSUPERVISORY LANDSCAPING WORKERS Ms. O'Brien provided a document entitled, "PBSD FY17 nonsupervisory landscaping worker costs" which was added to the record. She commented that at the May PBSD board meeting she reported that the average cost of a landscaping field worker was about $72,000/year. At the last Landscape & Safety Committee meeting it was brought to her attention that the salaries of the manager and two supervisors should not have been included in the calculation. Consequently, Ms. O'Brien chose to correct the record with the new document she provided which shows an average cost of a nonsupervisory landscaping worker for next year of approximately $67,000/year. NEW BUSINESS None ADJOURNMENT The meeting was adjourned at 2:30 p.m. Scott Streckenbein, Chairman Minutes approved [ ] as presented OR [ ] as amended ON [ ] date 6 Agenda Item#6a Page 1 of 2 EXECUTIVE SUMMARY Recommendation to approve and authorize expenditure of Category "A" Tourist Development Tax funds up to $57,600 for excavation of the Clam Pass inlet and re-grading of the adjacent beaches, authorize necessary budget amendment in the amount of$30,000, and make a finding that this expenditure promotes tourism. OBJECTIVE: To quickly mobilize a site work contractor to excavate the inlet and re-grade the affected areas of the beach to avoid further impacts to Clam Pass. CONSIDERATIONS: The Clam Bay NRPA is a 560 acre estuarine system consisting of beaches, shallow bays, tidal creeks, seagrass beds, mangrove forests, and Clam Pass. This environmentally sensitive asset is managed by the Pelican Bay Services Division (PBSD). In March, 2016, PBSD obtained a 10-year maintenance dredging permit from the Army Corps of Engineers and the work being contemplated is applicable to the permit. Over the past year, severe weather conditions that included Tropical Storm Colin (June 2016), Hurricane Hermine (September 2016), and most recently Tropical Storm Cindy, have contributed to reduced inlet stability. These storms have pushed a portion of the ebb shoal onto the beach creating a spit that pushes the inlet to the north. In addition, wave action has eroded a portion of the upland beach causing a steep escarpment that will require re-grading to a more natural slope. To avoid further impacts to the Pass, engineering firm Humiston & Moore have recommended excavation of the recently formed spit, which will restore the inlet channel to its original permitted location, refill the channel that has meandered, and re-grade the inlet banks to the original permitted design template. Staff is working with the engineering firm Humiston & Moore to prepare engineering design plans and obtain the required approvals from Florida Department of Environmental Protection and U.S. Army Corps of Engineers, and with Procurement Services to obtain competitive quotes to quickly mobilize a contractor. TDC RECOMMENDATION: At its meeting on June 26, 2017, the TDC voted unanimously to endorse staff's recommendation to recommend to the Board that TDC funds in the amount of $30,000 be authorized for excavation of the inlet and re-grading of the public portion of the beach, and make a finding that this expenditure promotes tourism. The TDC was advised that the Pelican Bay Foundation will reimburse the County the proportionate share of any sand that it receives for its beaches. The amount is not known today. FISCAL IMPACT: Total estimated cost for the Clam Pass inlet excavation and re-grading ' project is $57,600. Engineering, permitting, surveying, and monitoring fees are estimated to be $27,600 and the engineer's estimate of probable cost for construction is $30,000. Funding in the amount of$27,600 is presently available in Clam Pass Dredging project 88032 in TDC Beach Renourishment and Inlet Maintenance Fund (195). The balance of required funding, $30,000, will be provided from TDC Fund (195) reserves. A budget amendment moving funding from reserves into project 88032 will be required. Agenda Item#6a Page 2 of 2 The Pelican Bay Foundation will reimburse Collier County for the proportionate share of any sand that it receives on its beach. GROWTH MANAGEMENT IMPACT: None LEGAL CONSIDERATIONS: Ordinance No. 92-60, as amended, provides that pass and inlet maintenance is an authorized expenditure for tourist development taxes with a finding that the expenditure promotes tourism. This item has been approved as to form and legality and requires majority vote for approval.—CMG RECOMMENDATION: That the Board of County Commissioners approves and authorizes expenditure of Tourist Development Category "A" funds up to $57,600 for excavation of the Clam Pass inlet and re-grading of the public portion of beach, authorizes necessary budget amendment, and makes a finding that the expenditure promotes tourism. Prepared by: Lisa Jacob,Project Manager, Pelican Bay Services Division ,./ .. 3g / .".- . .'',if ill ! • xz st I r 4 _� i H ` . o �r .. ajj r ' r . 5 �i ' f" tigt 5 Y.4' i 4 ,j 4 t It t' - \ :'- , !... :, • r,,,t,i, I' . , ."4. t. t :. { y • to `i > y$ *.x is at. ,, r (?4 4 :.: 4i n ;;i .,� ; to X. y : i ' i ,' .. / �' 4 � ti t i " '�5 t �� .. '. �1 ,.i! ., _ ,. .. ..„„ .. .. Sip '4.1 V� '` e.,. 4. N .., '* a R N ts... al (NI. =.,. C•1 C\1,.. C,) C = N, . ,.., f ifil0=;* 0 h C NI ... I .: ,Akzu :3 s-, I . 1i: : 4# , . , r . .' .. .. --_..., ..: . , . ,.,. its. . ...._,.. , , ,....... . . . '',',• , '.• , .., .. , • :,. 1 , gi l . : i . A , . ., ,.... ,,>•-, i -. "•e N..,.. .•e >% , . ., No=(g) • . . . t . `.1 Cl) . A ' i- . - .4..• (I) i , !..4... 4 . , .1' 3 l ; ....A.x .4i.,:,:wv.:, ttt,:o:t,,,sl ,00.41.51 :4e. ,, EO ' L. t� jilick d (0 syg hH;AIM n r m tv c : 0 0 0 0 0 0 0 0 _rte -- • ••••'''',.-:,.;„\ .:•';-."--0: c y?• r b(• .. r 2 ;, • i,..,„:.: r s. < r '' d L c • t i"e:. '', _ gs d ,yS a At- . x + •!••1" + . r + 'i' � C # t. xgyS+l , ty •"r 04, Mf . • ge • rittokT.,,,i RI 4 • ith • • • • 411r/co • • . . • o01, • 47ii . . - • .. •..... — • • . A 0 N „, ........ N ,_;,___....y ` • -------- ,:_ r /— g ; • : C C V m I I. (w) 14 C -o G1 L _ Q 6N m o 4....0t- co (w)2,40 PJ6!+FI gnaM ,^ u, v m ni v+ 0 0 0 0 0 0 0 0 •0 m • LV ai �_ KCQ 0 l _ COC). �tf ' 4Yi i, §C -tra " - 1 #3 L, �fy �a :4-,-,72,..,.....--,,,,:, , -..,,,,„,,,,,.,•„:„ . . Ca ¢ "fir. �r' l.l .s .,r i „4,..;,.. ,-„,..,;,,,-a r {„ r Yl'-'41,,, t9 a� i:.w,,.. T ' • •t" ` ,t, 4 7 ' `fir a -4, .as P * i 1.4',- .-:-.,« a+ • o °' m .it • • Ili N \ ' ni NCO • Z N 11111 1 g .... . .__________,...----Ve n ,_ _ Q V = z • • ca 5 •• I` • N •• 0 ..— o N ce (w)sH ,cl I laatladea:— I a m o 1.1 " 11.§R3 0 4 6 4 M L-C) W T3 CT) 1116,11. ,10:011111C„ " fie ","'" ' 04•I' ; ;‘,:r',",14:::;•7 11.11 CtYi;471T,e'S:14^1:4'*.' *W:arr 4 - CL) a) Cl) 0 C2. 0 . aq,� .r _ C 4n 'T h- O c u E CI —' a� h .. a a - a i i s-v 0 jas a uz 0') / Q —_ (•y i \--------- . \ ------,,,,s....„.\\, • /F a.. 4,, / ...,. 1 Ir k 'V ....>3 .... .‘ / i ,r _ 111111 — 401. 4) b , . �. . 00 O , co � c -o > co co .a CO w CD 4) p (...9 S– (r) a� CO 0 2 a 0 a m t � I i xtt- ,,i) ,giX w,x«t3ba%3sS>t.#a ^ Q�.. � , t ' } C g Cll ? , 5 / 'ii.,.''..., tis ° •,spi, t �y y tQ -ft.' a y�W / • 1 i g +&d we-dam ,,•% '- I' 4 i }t „ , . J , 4 •a tit ° , F �J ! ist ;, ,I'' ' 4f.-1-.t::1:4 - - 't I '•W!''''.".4!!''''ii''* 7 .". .i#, , I' ..,,,,,!,,. ' k , L''' s 1` ( cy fit � s; Q� 1 '.. 1 1�kl 1S �d +h3 ; a' , ,tw4.,,, , ., ,. i ': C '! '. 'a .i . i *t•„,,, ) t l,3" ) 1 rfq7.g+ f, ;Sr '�-- 4 f ,,-,. 't' is ) flestaligfilivilifiti ' 1 ! 4 ..",1,,, ; ';'' ' • - i 4' e _,, , ,. ..._ ..., . , ,,, , ,,...,,t,„,. 1.... 4,, ,,.,, .. ,. N.., ''. ! ! ' .At„.?!!. . ": ..', , k$ .t, :., , . ...,:.• . , i.:_„i......w.. .. ,. .;. ' W ......, ` .: o 5 / ., • , .. ....„ ., ...i ‘;'.1.a r. y t 1• 1 , ,, G M 4 , ,:.',1k:<, ��< " CO � g + ^d'`c`j +c� .. y i t'a 14.14 .4. , 4 ., 4. f,Ik!,,,itt,,,: ' ! '.st•,,i,'...' 1,4 s,,,,,.....4,4„,„, .,t 1\.4 I, C Ca - . „ ...,- ,,,g- 4ott, . "�.�'i t Y '+1 ' jt j. ms: { R6o -,,,,i,„. t ' qq. gg. t. 0 ct.,. ° a .""R� -C\ rd:.err � ; 7 c @� 1 F\CalliarA.O1-C,, -Pass,:017-D ndun1DV'GV2G77-CF 311-?Isry a tLX Zd c Prn,Jun -i X1.117 .> .. ... [C3 9Pi A. b . n # x .' � �.w` *a g 4fi n p ? a "4t• wa ",�. °.' ,: It' t -7 .._1 fry 79 m Z ,,,,„0. —I .., -07. 0 30 'i, 1 71 r a+ g D 23 . UW !StJ, --»0 G7 �wB r, S. m Z m fr w �> 0 r D > .....4Tf -a D O Z7 t c 1 I D I-9 CO > '-, '-r �;' fTt _ r * it1 lk, "4,:-,,' I. Inkfalleffilig Imre ibt, ,\\ ..,.tur.,,,,,, ,, 4,::„,, • ;Z7 Cri ri 7 C7 • i_ ', I vz o C. cn g D -o ;n —I Z � "— :,,,, p D ori —I rrl O3 i 14_ ,4,. ' WN Z ; �''1 ; ; n .,0;-1 -. of ZVl'0D f'1 0 r k4 rrir O m XI PIcn77Z b. D MI 0 XI !7 —I 4;4!!Ilii!I ' EC ! *I _���0-1 HTN 91 Mal -7 -2 ec--. (0D —1 FTI 0 O W NZVZi C � y - ar:n r 44..m ON C TZ � , ,i.irp Mix 7J D D 2 O —I < Om =mz4DDmD r O N p Q C) y r 0 r- z Cnt� vD C m g ri CD -0 'gym Z € ON n yr O=f Z = r-e ,-w,, q„, rn co ( D c 0 -r fn Z I—ITIM _0 O m O) m -O .Z�7 f44 -44"'" tea. t �. v m � �y co Z -9 (g „j am � a > m to ZN % D •• m M ril Z D m A Z D nn }'. > ZV) rZ yrn moi""- .� 0 I ,,, t: p �Z Z --^� 7c pp < C7 D > �'r 71 V= ^-I ti` L I IZ co O Tt TIO O < kk: r" Dpa f+7 = A nJ +. 0 -< zi cn m 14-0 O 71 rn �' '4 m t4 r -74i Pi iii W aO G o. opIle 4.s 3�oNOC coo o 4-.. 1 t r ,15 r:.G=�93a �?if ":kvr p .?�;F I)..e. G: t'�0^:7-0,:;-:13,1-01.71,01.9�r=Yii?_d< Pdn;-,lur f :l017 v cn p !r.1 N .7.. Z A O cn m —18 DDO mG� OmOc�nmm 0701;2 -<72. Dr" *� OODN W P N -< x2 < C —IcnXA -oOZ 3r �- — SGS � m � n ooD p � m �DrnvD-` �Z� ❑ co D z 3 om- � cop-r G) ocnwv� _cool-<� OO+i+- v D D I l �n p Z W > o C C -1 0 O C N m m O v A W W W W W W W W W W W W co W co w W W CO W W W w W W W W co W m m D V7 < co co co N W N co N W W W au co W W W N N co W W 0o W W ao W W W D Uf �_ c0 V1 '� _Co" ao ao ,, co w w w w w co a w co co w-c° w ao w 0., 0o w CO co T E (� c� �DCaOco m� =�� (0 � c�n � (00) `wc°o No~o a � wAowoc, wAo Co' Nrn m —I O i Z Cl) A co c N W cd -, O C A N 0) !DN.) <0- 0 Q 0 O O O V CO W co co A Z O Z C O Z Z O O D I a """` CO C0 N (T (Il A W W W A C0 N V 0) O (T A (0 d) (T O Q) W W O A CO +n ,ZJ O 3 r - �� zmr < DmZ� ❑� z �o � mra � - n�v 00+F- �+ OornZ ��0 - CO~ rnrnrnrn rnrnrn rnrnrnrnrnrn rnrn 0) 0, rnrn rnrnrnrnrn rnrn rnrn Z T (I) V7 O Z Dp rn N Cl) � rn 0) rn 0) co 0) rn co co co 0) co 0) co rn rn 0) rn rn 0) Co 0) 0) 0) 0) 0) 0) 0)m = O ( .-- W W W W --1" A(n Q) V V co V V V cd cd cd o._, v C) cT (7) A A A A A m "� A D m (O— m� r 01 a) N V Cp V Co W W U) A W 0) 0) W N 0) N N W 0 0 2 '-{0 rel Z rri W.. 2 O W W A W -, W N , W U) C) (-,4, -• 0) Q) 07 CO W CO N W W O Z _. -ri in 'Z Chi "0 OD-d.- A N co W N O C) N O Ut A W V (T cd Ut Cr) A Cn cd a) Q) W O W W O O _ c.+ � vr*i -moi = 0 W � I m e El VI D it-.,,,r /`� Z I r*i Pi Z } 'r o -+ 3 °a o _ �r='IWDm Z O Z + � � N3 Z z 1 �_ _ O -DOD I*1 i 0 _-i Z O CD rim -c � � oncooO z , _HC i-,,--=.. p Z rn, i coD D C7 p 2 D r _ 1>1 cn Z '1 00 0 D ca ��� 00+0 tO n c -� t— (.4 0 M ,,T,.,.,; \ r I r r� I, � � � - *44 I CI D *eh nz "F, I ..� Crri ' co C Rt .r ...- i 1 0 xi r--- A D y ., < ,,,, Alifiw (j , _ 05+z ‘11, -----E1 ---- � - 1 I> — ‘ n, ,/,`" ,,,...,, '. / / ill.tri' ,<:,,t, ,4.a , ' , , ''' 133 ; , C) 4 . � D ' u , j 6 rc .r q w IV 20 0 (0 „ r_ a ,... o D O ..q. ,, ___ 0r, > z e rn IN) o � -� / ' 1 11 f/ln rnmD �D � � %� Fa , cn�z ''� ` v i 11_ � V mD rA f7 f� o zN �� Dry I\ A �� CI cZ � cZ j / \ 0 oD� ar:5‘<t/; �' I 0 0 < oz N -oc� N c) c) m- o Z 1 N zm c D O m x� m v vrcno v � � z D > > C')�_ v) \ _ = c7Z _0 < T. Q <O O , mrD- D� � n � D Z Z DZ Z -i r*7 y�-c Z- 0 N N � 0 D X , .. \ �� 2 N m r C Z-O C7 a :c ' _,,,(\„. o r� r -i D D , *� A\ / CN r- O Z t F v-r z cn 0 fi \ ... ,, 2X�� 1114 i d - a , .w r z g„ - , - 4, ".4v,.,?:4.1,7, l'.,,' ' ,.,:',411‘,N, 1 ...„,,,.,, ,„. „„, ,,, ,„. . ,,,- - ,,, ,,,. -4- \ 3 0 .... , \ \ \ , \co,-1 1 _0 ..., . ...,,.0R sts, -----�,__._.,..___.___-.--N , -.._._.. r `a ... ,. "86,61te " )100, \ , x ,,, , \ d 9 , , . o k Agenda Item#6e Page 1 of 15 Pelican Bay Services Municipal Services Taxing Unit Balance Sheet-June 30,2017 Operating Fund 109-FY 2017 (Unaudited) Assets Current Assets Cash and Investments $ 2,214,673.26 Interest Receivable - Improvements,Vehicles& Equipment 764,064.85 Due from Property Appraiser - Due from Tax Collector - Total Current Assets $ 2,978,738.11 Total Assets $ 2,978,738,11 Liabilities and Fund Balance Current Liabilities Accounts/Trade Payable $ 46,553.84 Accrued Wages Payable - Goods Received/Inventory Recv'd 12,079.13 Total Liabilities $ 58,632.97 Fund Balance Fund Balance- unreserved $ 907,381.04 Excess Revenues(Expenditures) 2,012,724,10 Total Fund Balance $ 2,920,105.14 Total Liabilities and Fund Balance $ 2,978,738.11 Agenda Item#6e Page 2 of 15 Pelican Bay Services Municipal Services Taxing Unit Income Statement w/Budget-lune 30,2017 Operating Fund 109-FY 2017 (Unaudited) Annual YTD YTD Budget Budget Actual Variance Operating Revenues: Carryforward $ 608,800.00 $ 608,800.00 $ 608,800.00 $ - Special Assessment-Water Management Admin 1,009,100.00 968,700.00 972,368.09 3,668.09 Special Assessment-Right of Way Beautification 2,941,100.00 2,823,500.00 2,833,758.42 10,258.42 Plan Review Fees 1,500.00 - - - Miscellaneous(Surplus Sales,Ins.Refunds,tax coil) - - 7,701.12 7,701.12 Revenue Reserve(est.5%) (197,900.00) - - - Interest 6,300.00 4,725.00 12,064.84 7,339.84 Total Operating Revenues $ 4,368,900.00 $ 4,405,725.00 $ 4,434,692.47 $ 28,967.47 Operating Expenditures: Water Management Administration Payroll Expense $ 75,000.00 $ 50,700.00 $ 46,631.29 $ 4,068.71 Emergency Maintenace and Repairs 3,500.00 700.00 554.58 145.42 IT Direct Capital 1,100.00 825.00 825.00 - IT Office Automation/Billing Hr. 5,300.00 5,300.00 5,419.51 (119.51) Indirect Cost Reimbursement 104,900.00 104,900.00 104,900.00 - Inter Payment/Mnt.Site Ins. Assessment 13,600.00 10,200.00 10,200.00 - Other Contractural Services 51,500.00 34,300.00 31,015.50 3,284.50 Telephone 5,200.00 3,500.00 2,268.88 1,231.12 Postage and Freight 1,200.00 - - - Rent Buildings and Equipment 13,700.00 11,400.00 10,981.45 418.55 Insurance-General 2,200.00 1,700.00 1,650.00 50.00 Printing,Binding and Copying 1,800.00 100.00 85.12 14.88 Clerk's Recording Fees 1,000.00 - - - Legal Advertising 1,000.00 - - - Other Office and Operating Supplies 1,500.00 1,100.00 1,186.74 (86.74) Training and Education(Tuition Reimb.) 1,500.00 1,300.00 1,683.95 (383.95) Total Water Management Aclmin Operating $ 284,000.00 $ 226,025.00 $ 217,402.02 $ 8,622.98 Water Management Field Operations Payroll Expense $ 145,500.00 $ 106,800.00 $ 103,693.07 $ 3,106.93 Engineering Fees 60,000.00 40,300.00 39,246.40 1,053.60 IT Office Automation 700.00 700.00 888.38 (188.38) Flood Control Berm and Swale Mntc. 66,000.00 9,000.00 3,740.00 5,260.00 Flood Control Replanting Littorals 8,500.00 - - Flood Control Water Quality Testing Supplies 1,500.00 - (34.24) 34.24 Interdepartmental Payment(Water Quality Lab) 17,700.00 17,700.00 17,800.05 (100.05) Plan Review Charges 1,500.00 - - Other Contractural Services 8,300.00 7,100.00 6,900.79 199.21 Temporary Labor 77,800.00 58,400.00 58,466.35 (66.35) Cell Phones 1,300.00 1,000.00 1,053.41 (53.41) Trash and Garbage 5,900.00 4,000.00 3,702.00 298.00 Motor Pool Rental Charge 100.00 - - - Insurance-General 2,500.00 1,875.00 1,875.00 - Insurance-Auto 1,000.00 750.00 750.00 Building Repairs&Mntc. 500.00 175.00 132.13 42.87 Fleet Maintenance and Parts 10,300.00 6,900.00 6,932.85 (32.85) Fuel and Lubricants 2,300.00 1,500.00 1,028.64 471.36 Tree Triming 121,800.00 86,300.00 86,050.00 250.00 Page 1 of 3 Agenda Item#6e Page 3 of 15 Clothing and Uniforms 1,600.00 1,400.00 1,357.61 42.39 Personal Safety Equipment 800.00 300.00 - 300.00 Fertilizer and Herbicides 100,500.00 49,400.00 31,677.60 17,722.40 Other Repairs and Maintenance 1,500.00 800.00 409.04 390.96 Other Operating Supplies and Equipment 2,500.00 1,900.00 2,010.95 (110.95) Total Water Management Field Operating $ 640,100.00 $ 396,300.00 $ 367,680.03 $ 28,619.97 Right of Way Beautification-Administration Payroll Expense $ 76,500.00 $ 60,500.00 $ 56,531.40 $ 3,968.60 Emergency Repairs and Maintenance 4,500.00 200.00 25.00 175.00 IT Capital - - - Office Automation 500.00 500.00 536.50 (36.50) Other Contractural Services 52,400.00 34,900.00 30,360.66 4,539.34 Telephone 5,200.00 3,500.00 2,129.00 1,371.00 Postage 2,000.00 200.00 15.08 184.92 Rent Buildings/Equipment/Storage 15,000.00 12,500.00 11,811.15 688.85 Insurance-General 500.00 375.00 375.00 - Printing,Binding and Copying 2,300.00 100.00 57.36 42.64 Clerk's Recording 1,200.00 - - Legal Advertising 1,200.00 - - - Office Supplies General 2,000.00 1,700.00 3,069.77 (1,369.77) Training and Education(Tuition Reimb.) 8,500.00 5,000.00 2,393.00 2,607.00 Total Right of Way Beautification Admin Operating $ 171,800.00 $ 119,475.00 $ 107,303.92 $ 12,171.08 Right of Way Beautification-Field Operations Payroll Expense $ 1,032,600.00 $ 740,400.00 $ 727,654.24 $ 12,745.76 IT Capital&Office Automation&Hr.Billing 16,200.00 16,200.00 21,044.89 $ (4,844.89) Emergency Maintenance and Repairs 3,300.00 - - - Recycled Water Use 110,000.00 85,000.00 84,719.76 280.24 Pest Control 1,000.00 500,00 400.00 100.00 Landscape Incidentals 2,500.00 1,300.00 1,262.58 37.42 Other Contractural Services 31,100.00 21,500.00 13,648.88 7,851.12 Temporary Labor 562,300.00 326,500.00 311,655.13 14,844.87 Cellular Telephone 5,800.00 3,400.00 1,948.71 1,451.29 Electricity 4,000.00 3,300.00 3,976.38 (676.38) Trash and Garbage 17,700.00 13,700.00 12,545.72 1,154.28 Cable TV/Internet 1,200.00 - - - Rent Equipment 5,000.00 3,300.00 3,003.68 296.32 Insurance-General 8,800.00 6,600.00 6,600.00 - Insurance-Auto 10,100.00 7,600.00 7,575.00 25.00 Insurance Claims Paid430.44 (430.44) Building Repairs and Maintenance 500.00 300.00 170.19 129.81 Fleet Maintenance and Parts 42,600.00 32,000.00 28,221.34 3,778.66 Fuel and Lubricants 33,300.00 25,000.00 19,862.56 5,137.44 Licenses,Permits,Training 1,700.00 1,300.00 1,027.50 272.50 Tree Triming 181,000.00 162,900.00 161,375.00 1,525.00 Clothing and Uniforms 12,000.00 7,000.00 6,339.28 660.72 Personal Safety Equipment 5,000.00 2,900.00 2,167.83 732.17 Fertilizer and Herbicides 80,000.00 80,000.00 94,256.71 (14,256.71) Landscape Maintenance/Mulch 75,000.00 47,000.00 33,948.95 13,051.05 Landscape Materials 73,200.00 70,500.00 72,075.80 (1,575.80) Road/Pathway Repairs(Sharrows) 2,000.00 2,000.00 2,453.42 (453.42) Sprinkler Maintenance 25,000.00 16,800.00 16,294.71 505.29 Painting Supplies 500.00 - - - Traffic Signs 10,000.00 5,800.00 3,721.85 2,078.15 Minor Operating Equipment 12,000.00 7,000.00 6,791.66 208.34 Other Operating Supplies 11,000.00 8,300.00 7,879.52 420.48 Page 2 of 3 Agenda Item#6e Page 4 of 15 Total Right of Way Beautification-Field Operating $ 2,376,400.00 $ 1,698,100.00 $ 1,653,051.73 $ 45,048.27 Total Operating Expenditures $ 3,472,300.00 $ 2,439,900.00 $ 2,345,437.70 $ 94,462.30 Capital Expenditures: Water Management Operations Other Machinery and Equipment-Field $ 17,000.00 $ 15,640.00 $ 15,425.04 $ 214.96 General-Admin 1,000.00 - - Total Water Management Field Operations Capital $ 18,000.00 $ 15,640,00 $ 15,425.04 $ 214.96 Right of Way Beautification Autos and Trucks $ - - $ - $ Other Machinery and Equipment 89,000.00 84,550.00 84,267.78 $ 282.22 General-Admin 1,000.00 - - $ - Total Right of Way Beautification-Field Capital $ 90,000.00 $ 84,550.00 $ 84,267.78 $ 282.22 Total Capital Expenditures $ 108,000.00 $ 100,190.00 $ 99,692.82 $ 497.18 Total Operating Expenditures $ 3,580,300.00 $ 2,540,090.00 $ 2,445,130.52 $ 94,959.48 Non-Operating Expenditures: Transfer to Fund 322 $ - $ - $ - $ - Tax Collector Fees 98,800.00 83,980.00 76,122.53 7,857.47 Property Appraiser Fees 60,000.00 57,000.00 54,083.93 2,916.07 Reserves(2 1/2 months for Contingencies) 432,700.00 - - - Reserves for Capital 217,900.00 - - - Reserved for Attrition (20,800.00) - - - Total Non-Operating Expenditures $ 788,600.00 $ 140,980.00 $ 130,206.46 $ 10,773.54 Total Expenditures $ 4,368,900.00 $ 2,681,070.00 $ 2,575,336.98 $ 105,733.02 Net Profit/(Loss) $ - $ 1,724,655.00 $ 1,859,355.49 $ 134,700.49 Page 3 of 3 Agenda Item#6e Page 5 of 15 Pelican Bay Services Municipal Services Taxing Unit Balance Sheet-June 30,2017 Street Lighting Fund 778-FY 2017 (Unaudited) Assets Current Assets Cash and Investments $ 1,370,769.36 Interest Receivable Improvements,Vehicles& Equipment 15,725.76 Due from Tax Collector - Total Current Assets $ 1,386,495.12 Total Assets $ 1,386,495.12 Liabilities and Fund Balance Current Liabilities Accounts/Trade Payable $ 2,165.53 Goods Received/Inventory Recv'd 565.85 Accrued Wages Payable - Total Liabilities $ 2,731.38 Fund Balance Fund Balance-unreserved $ 1,146,299.39 Excess Revenue (Expenditures) 237,464.35 Total Fund Balance $ 1,383,763.74 Total Liabilities and Fund Balance $ 1,386,495.12 Agenda Item#6e Page 6 of 15 Pelican Bay Services Municipal Services Taxing Unit Income Statement w/Budget-June 30,2017 Street Lighting Fund 778-FY 2017 (Unaudited) Annual YTD YTD Budget Budget Actual Variance Operating Revenues: Carryforward $ 1,119,300.00 $ 1,119,300.00 $ 1,119,300.00 $ - Curent Ad Valorem Tax 535,300.00 513,900.00 515,753.87 1,853.87 Transfer from Tax Collector - - 31.21 31.21 Miscellaneous(i.e. Ins. Refunds,surplus, eti - - - - Revenue Reserve (est. 5%) (26,900,00) - - - Interest 2,500.00 1,875.00 7,835.06 5,960.06 Total Operating Revenues $ 1,630,200.00 $ 1,635,075.00 $ 1,642,920.14 $ 7,845.14 Operating Expenditures: Street Lighting Administration Payroll Expense $ 75,700.00 $ 60,000.00 $ 55,076.73 $ 4,923.27 Indirect Cost&IT Automation 8,300.00 8,200.00 8,175.00 25.00 Other Contractural Services 33,700.00 25,300.00 24,683.50 616.50 Telephone 5,200.00 3,500.00 1,556.66 1,943.34 Postage and Freight 1,500.00 300.00 132.00 168.00 Rent Buildings/Equipment/Storage 14,500.00 12,100.00 11,444.63 655.37 Insurance-General 400.00 300.00 300.00 - Printing, Binding and Copying - - - - Office Supplies General 800.00 500.00 328.38 171.62 Tuition Reimbursement - - - - Other Operating Supplies 1,000.00 - - - Total Street Lighting Admin Operating $ 141,100.00 $ 110,200.00 $ 101,696.90 $ 8,503.10 Street Lighting Field Operations Payroll Expense $ 69,400.00 $ 50,100.00 $ 48,937.01 $ 1,162.99 Enginnering Fees 10,000.00 9,000.00 8,872.00 128.00 IT Office Automation 300.00 300.00 225.00 75.00 Emergency Maintenance& Repairs 9,600.00 7,200.00 7,265.32 (65.32) Other Contractual Services 800.00 500.00 458.10 41.90 Temporary Labor 42,400.00 31,800.00 24,584.81 7,215.19 Cellular Telephone 1,100.00 800.00 1,003.43 (203.43) Electricity 30,000.00 22,500.00 21,311.94 1,188.06 Insurance-General 1,000.00 750.00 750.00 - Insurance-Auto 1,000.00 750.00 750.00 - Building Maintenace&Repairs 500.00 125.00 71.00 54.00 Page 1 of 2 Agenda Item#6e Page 7 of 15 Fleet Maintenance and Parts 5,400.00 3,600.00 2,347.80 1,252.20 Fuel and Lubricants 700.00 500.00 375.30 124.70 Other Equipment Repairs/Supplies 500.00 200.00 59.12 140.88 Personal Safety Equipment 800.00 600.00 660.55 (60.55) Electrical Contractors* 77,000.00 32,083.33 24,292.73 7,790.60 Light Bulb Ballast 16,800.00 11,100.00 7,793.37 3,306.63 Total Street Lighting Field Operating $ 267,300.00 $ 171,908.33 $ 149,757.48 $ 22,150.85 Total Street Lighting Expenditures $ 408,400.00 $ 282,108.33 $ 251,454.38 $ 30,653.95 Capital Expenditures: Street Lighting Operations Other Machinery/Equipment** $ 39,400.00 $ 39,400.00 $ 38,266.79 $ 1,133.21 General Improvements-Admin 1,000.00 - - - Total Capital Expenditures $ 40,400.00 $ 39,400.00 $ 38,266.79 $ 1,133.21 Total Operating Expenditures $ 448,800.00 $ 321,508.33 $ 289,721.17 $ 31,787.16 Non-Operating Expenditures: Tax Collector Fees $ 14,000.00 $ 11,200.00 $ 10,359.08 $ 840.92 Property Appraiser Fees 7,500.00 $ 3,800.00 - 3,800.00 Reserve for Future Construction* 900,000.00 - - - Reserves(2 1/2 mos.for Contingencies) 124,700.00 - - - Reserves for Capital 135,200.00 - - - Total Non-Operating Expenditures $ 1,181,400.00 $ 15,000.00 $ 10,359.08 $ 4,640.92 Total Expenditures $ 1,630,200.00 $ 336,508.33 $ 300,080.25 $ 36,428.08 Net Prof it/(Loss) $ - $ 1,298,566.67 $ 1,342,839.89 $ 44,273.22 *BA Transferred$100K to Operating **Transferred$39,400 from Elec Contr Page 2 of 2 Agenda Item#6e Page 8 of 15 • Pelican Bay Services Municipal Services Taxing Unit Balance Sheet-June 30, 2017 Capital Projects Fund 322-FY 2017 (Unaudited) Assets Current Assets Cash and Investments $ 1462,958.81 interest Receivable - Improvements,Vehicles& Equipment 2,537,868.66 Due from Tax Collector - Total Current Assets $ 3,700,827.47 Total Assets $ 3,700,827.47 Liabilities and Fund Balance Current Liabilities Accounts/Trade Payable $ 2,006.55 Goods Received Inv. Received 4,296.50 Total Liabilities $ 6,303.05 Fund Balance Fund Balance-unreserved $ 1,291,916.45 Excess Revenues(Expenditures) 2,402,607.97 Total Fund Balance $ 3,694,524.42 Total Liabilities and Fund Balance $ 3,700,827.47 Agenda Item#6e Page 9 of 15 Pelican Bay Services Municipal Services Taxing Unit Income Statement w/Budget-June 30,2017 Capital Projects Fund 322-FY 2017 (Unaudited) Adopted Amended YTD YTD Budget Budget Budget Actual Variance Operating Revenues: Carry Forward $1,280,442.46 $ 1,280,442.46 $ 1,280,442.46 $ 1,280,442.46 $ - Transfer from Fund 109 General - - - - - Miscellaneous - - - - - Special Assessment 428,100.00 428,100.00 411,000.00 412,388.24 1,388.24 Transfer from Tax Collector - - 25.04 25.04 Revenue Reserve (est.5%) (21,400.00) (21,400.00) - - Interest 5,000.00 5,000.00 3,300.00 8,411.79 5,111.79 Total Operating Revenues $1,692,142.46 $1,692,142.46 $1,694,742.46 $ 1,701,267.53 $ 6,525.07 Operating Expenditures: Irrigation&Landscaping Landscape Imp.Project(50066) Engineering Fees $ - $ 42,729.82 $ 4,300.00 $ 3,561.50 $ 738.50 Other Contractural Services - 311,282.02 43,579.48 37,339.51 6,239.97 Rent Equipment - 1,900.00 1,900.00 2,645.00 (745.00) Sprinkler System Repairs - - - 2,777.09 (2,777.09) Landscape Materials 175,000.00 232,210.50 92,900.00 75,839.95 17,060.05 Other Operating Supplies - 3,489.25 900.00 791.50 108.50 Sign Restoration Project(50103) Traffic Signs - 36,952.00 - - - Lake Aeration (50108) Improvements 100,000.00 117,522.77 17,600.00 15,307.00 2,293.00 Field Site Improvements(50143) - Improvements 64,100.00 64,100.00 28,845.00 28,612.09 232.91 Beach Renourishment(50126) Other Contractural Services 200,000.00 600,000.00 342,000.00 341,616.11 383.89 Lake Bank Project(51026) Swale&Slope Maintenance 406.17 - - - Engineering Fees 72,736.31 21,818.89 19,986.54 1,832.35 Landscape Materials 178.00 - - - Other Contractural Services 75,000.00 56,316.24 - - - Upgrade Irrigation System(51145) - Improvements 116,000.00 135,619.38 27,100.00 25,116.53 1,983.47 Total Project Expenditures $ 730,100.00 $1,675,442.46 $ 580,943.38 $ 553,592.82 $ 27,350.56 Page 1 of 2 Agenda Item#6e Page 10 of 15 Non-Operating Expenditures: Tax Collector Fees $ 10,700.00 $ 10,700.00 $ 9,600.00 $ 8,247.76 $ 1,352.24 Property Appraiser Fees 6,000.00 6,000.00 6,000.00 5,522.04 477.96 Rolled Project Funds 945,342.46 - - - - Total Non-Operating Expenditures: $ 962,042.46 $ 16,700.00 $ 15,600.00 $ 13,769.80 $ 1,830.20 Total Expenditures $1,692,142.46 $1,692,142.46 $ 596,543.38 $ 567,362.62 $ 29480.76 Net Profit/(Loss) $ - $ - $ 1,098,199.08 $1,133,904.91 $ 35,705.83 Page 2 of 2 Agenda Item#6e Page 11 of 15 Pelican Bay Services Municipal Services Taxing Unit Balance Sheet-June 30,2017 Clam Bay Fund 320-FY 2017 (Unaudited) Assets Current Assets Cash and Investments $ 162,778.56 Interest Receivable - Improvements,Vehicles& Equipment 229,723.43 Due from Tax Collector - Total Current Assets $ 392,501.99 Total Assets $ 392,501.99 Liabilities and Fund Balance Current Liabilities Accounts/Trade Payable $ - Goods Received/Inventory Recv'd 3,803.75 Accrued Wages Payable - Total Liabilities $ 3,803.75 Fund Balance Fund Balance-unreserved $ 113,012.86 Excess Revenues(Expenditures) 275,685.38 Total Fund Balance $ 388,698.24 Total Liabilities and Fund Balance $ 392,501.99 Agenda Item#6e Page 12 of 15 Pelican Bay Services Municipal Services Taxing Unit Income Statement w/Budget-June 30,2017 Clam Bay Fund 320-FY 2017 (Unaudited) Adopted Amended YTD YTD Budget Budget Budget Actual Variance Operating Revenues: Carry Forward $ 97,579.20 $ 97,579.20 $ 97,579.20 $ 97,579.20 $ - Special Assessment 126,900.00 126,900.00 120,600.00 121,243.30 643.30 Transfer from Tax Collector - - 7.44 7.44 Miscellaneous Income - - 46.00 46.00 Revenue Reserve(est. 5%) (6,400.00) (6,400,00) - - - Interest 500.00 500.00 400.00 899.44 499.44 Total Operating Revenues $ 218,579.20 $ 218,579.20 $ 218,579.20 $ 219,775.38 $ 1,196.18 Operating Expenditures: Clam Bay Restoration Engineering Fees $ 55,000.00 $ 76,657.93 $ 46,000.00 $ 45,565.27 $ 434.73 Other Contractural Services 13,000.00 19,966.89 $ 15,000.00 13,385.00 1,615.00 Tree Trimming 38,000.00 43,390.00 $ 8,700.00 5,000.00 3,700.00 Other Equipment Repairs 500.00 1,577.77 $ - - - Aerial Photography 7,500.00 25,698.60 $ 7,100.00 6,590.00 510.00 Minor Operating 500.00 9,688.01 $ - - - Other Operating Supplies 2,000.00 $ - - - Total Clam Bay Restoration $ 114,500.00 $ 178,979.20 76,800.00 $ 70,540.27 $ 6,259.73 Clam Bay Ecosystem Engineering Fees $ - $ - $ - $ - $ - Licenses and Permits - - - - - Other Contractual Services - - - - - Total Clam Bay Ecosystem $ - $ - $ - $ - $ - Capital Expenditures: Clam Bay Restoration Other Machinery and Equipment $ - $ 11,000.00 $ 2,750.00 $ 2,600.00 $ 150.00 Total Capital Expenditures $ - $ 11,000.00 $ 2,750.00 $ 2,600.00 $ 150.00 Total Operating Expenditures $ 114,500.00 $ 189,979.20 $ 79,550.00 $ 73,140.27 $ 6,409.73 Page 1 of 2 Agenda Item#6e Page 13 of 15 Non-Operating Expenditures: Tax Collector Fees $ 3,800.00 $ 3,800.00 $ 2,850.00 $ 2,448.29 $ 401.71 Property Appraiser Fees 2,700.00 2,700.00 1,755.00 1,639.17 115.83 Rolled Project Funds 75,479.20 - - - - Reserves for Contingencies 22,100.00 22,100.00 - - - Total Non-Operating Expenditures $ 104,079.20 $ 28,600.00 $ 4,605.00 $ 4,087,46 $ 517.54 Total Clam Bay Expenditures $ 218,579.20 $ 218,579.20 $ 84,155.00 $ 77,227.73 $ 6,927.27 Net Profit/(Loss) $ - $ - $ 134,424.20 $ 142,547.65 $ 8,123.45 Page 2 of 2 Agenda Item#6e Page 14 of 15 Pelican Bay Services Municipal Services Taxing Unit Income Statement w/ Budget-June 30,2017 Clam Bay Ecosystem Fund 111-FY 2017 (Unaudited) Adopted YTD YTD Budget Budget Actual Variance Operating Revenues: Fund 111 Distribution $ 150,000.00 $ 150,000.00 $ 150,000.00 $ - Total Operating Revenues $ 150,000.00 $ 150,000.00 $ 150,000.00 $ - Operating Expenditures: Clam Bay EcoSystem Engineering Fees $ - $ $ - $ - Other Contractural Services 150,000.00 $ 90,000.00 82,942.55 7,057.45 Total Clam Bay Dreging $ 150,000.00 $ 90,000.00 $ 82,942.55 $ 7,057.45 Capital Expenditures: Clam Bay Restoration Improvements General $ - $ - $ - $ - Total Capital Expenditures $ - $ - $ - $ - Total Clam Bay Operating Expenditures $ 150,000.00 $ 90,000.00 $ 82,942.55 $ 7,057.45 Net Profit/(Loss) $ - $ 60,000.00 $ 67,057.45 $ 7,057.45 Agenda Item#6e Page 15 of 15 Pelican Bay Services Municipal Services Taxing Unit Income Statement w/Budget-June 30, 2017 Clam Pass Dredging Fund 195/88032.1-FY 2017 (Unaudited) Adopted Amended YTD YTD Budget Budget Budget Actual Variance Operating Revenues: Fund 195 Distribution $ $ - $ - $ - $ - Total Operating Revenues $ - $ - $ - $ - Operating Expenditures: Clam Pass Dredging(88032) Engineering Fees $ 20,000.00 $ 20,000.00 $ 11,000.00 $ 10,417.25 $ 582.75 General Improvements - 30,000.00 - - - Total Clam Pass Dredging $ 20,000.00 $ 50,000.00 $ 11,000.00 $ 10,417.25 $ 582.75 Pelican Bay Beach (90070) Improvements General $1,250,000.00 $ 43,029.27 $ - $ - $ - Total Capital Expenditures $ 1,250,000.00 $ 43,029.27 $ - $ - $ - Total Clam Bay Expenditures $ 1,270,000.00 $ 93,029.27 $ 11,000.00 $ 10,417.25 $ 582.75 Agenda Item#7a Page 1 of 2 Clam Bay Update-July 2017 Clam Pass. The excavation and grading work is expected to begin soon. Information about this work will be provided at the July Board meeting. H&M's June tidal gauge data report and report on the recent bathymetric survey of Clam Pass are expected soon. Mangrove die-off. THA's June report on the mangrove die-off states that there does not appear to be any appreciable change in the expanse of the die-off area. In February THA estimated the die-off area to be about 8.7 acres, down from 11.66 acres in November. The report noted some possible mangrove stress in the area between Upper Clam Bay and the bay near Vizcaya. This is a new area, and it will continue to be monitored. Water Quality. In April copper samples at Stations 1 and 2 in northern Clam Bay exceeded the FDEP standard. The March copper samples at Stations 1 and 2 also exceed the FDEP standard. Since November five of 45 copper results have exceeded the FDEP standard, an 11% exceedance rate. A 16%or less exceedance rate for the year is acceptable. Dr.Tomasko's second quarterly report on TN and TP for Feb., March, and April is expected in August. The Clam Bay Committee will review the results of sediment testing at 12 sampling sites in Clam Bay at its meeting on July 6, and a summary of the results will be provided to PBSD Board members at the September Board meeting. Manatee Protection Zone. The Administrative hearing requested by the Pelican Bay Foundation to appeal the decision by FWC not to designate Clam Bay a Manatee Protection Zone is scheduled for July 18, 19, and 20 in Tallahassee. Prepared by Susan O'Brien June 29, 2017 Hurniston &Moore Engineers 1 ClamPass-TIDE Page 4 of 5 Agenda Item#7a Page 2 of 2 CLam Pass Tide Monitoring-Click hece for Maintenance Dredging Project details Gtd(of 'a7co 4, MARKER 4 MARKET 14 MARKER 26 MARKER 32 ,' Ch am Pa -t ', r ,_- ...,r t. - ( ;' to 9 r "tit i 4 , -• + '' : 4 r ' ; c ', F3c7 -N ....t.ide Ga:es Location � � a. � r � , ? , tj Monthly Time Series 2017(Click on Thumbnails to Expand) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1. it i j i ' Mean Low TideTime Lag-2017 300.0 250.0 1 e200.0 , y; - El Marker " 150.0 Marker 14 u n Marker 26 100.0 1; c:Marker 32 50.0 r Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Gage/Gulf Mean Tide Ratios-2017 0.9 0.110.7 40.6 t ui J _ i ®Marker 4 0.5 r Marker 14 0.4 ■Marker 26 . 0.3 1 I u Marker 32 E � �{ Zp k{C a l:a , :Fe' s Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 4611. Gage/Gulf Mean Tide Ratios-2016 0.9 PASS T.S. 0.8 DREDGING i..., i T.S.COLIN HERMINE ` 0.7 P' ®Markets t 0.5 j I r,Marker 14 t 0.4 ' ' a Marker 26 0.3 j Marker 32 I }I 0.2 i l } i creipt 0.1 f � • r I crahely iP ,,. Jy } l et for 0 , ' , " 7 , r t ,_ '"_ ' Markers Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 4&14. http://www.humistonandmoore.com/clampass-tide 6/29/2017 Agenda Item#7b Page 1 of 2 LANDSCAPE & SAFETY COMMITTEE REPORT TO THE PBSD BOARD JULY 5, 2017 The Landscape & Safety Committee met on June 20, 2017 at 10:15 AM at the Pelican Bay Community Center. The following items were discussed and/or acted upon: 1 . Sgt. Thad Rhodes introduced Cpl. Natalie Ashby to the committee as Pelican Bay's CCSO liaison officer. 2. By a unanimous vote, the committee recommends that the PBSD not build a berm and wall along US 41 in Oak Lake Sanctuary to achieve noise mitigation in an area ordered cleared by the county due to invasive vegetation. In an effort to help the property owners affected by the clearing, staff will investigate what effective noise mitigation is available. An onsite meeting of the committee will then take place in order to evaluate the recommendations both for noise and sight issues. 3. A unanimous vote of the committee recommends that the PBSD complete the conversion to LED bulbs throughout the remaining streets in Pelican Bay (80W bulbs along Pelican Bay Blvd. and 30W bulbs along the residential streets). 4. The committee voted unanimously to recommend that the PBSD fund the construction of a cut through in the median opposite the street exit in Oak Lake Sanctuary. We expect Collier County to provide the necessary engineering of the project. Agenda Item#7b Page 2 of 2 5. It was the unanimous consensus of the committee not to proceed with making Gulf Park Drive & US 41 a "Right Turn Only". 6. It was the unanimous consensus of the committee to recommend to the full PBSD Board that the PBSD begin the process to replace the crumbling, cracking, poorly maintained, unsafe, non-ADA (Americans with Disabilities Act) and unattractive asphalt County owned sidewalks. The process can be broken down into 3 steps: (1 ) Seek County support (i.e. county contribution in lieu of county maintenance) and an ordinance modification allowing the PBSD to take full responsibility for our sidewalks and their maintenance. (2) Determine design specifications. (3) Determine the material nature of the sidewalk. The next committee meeting is scheduled for July 18, 2017 at 10:15 AM at the Pelican Bay Community Center. Submitted By: Joe Chicurel, Chairman PBSD Landscape & Safety Committee Agenda Item#7bi Page 1 of 1 Estimated Cost to Replace Metal Halide Bulbs with LED Bulbs on all Remaining Pelican Bay Streets MH Bulbs Already Replaced with LED Bulbs No. Description Location 38 480V 80W LED Gulf Park Dr(from US 41 to Pelican Bay Blvd) 2 480V 87W LED Pelican Bay Blvd at Gulf Park Dr 1 480V 120W LED Gulf Park Dr at Green Tree Dr 1 480V 120W LED Pelican Bay Blvd at Ridgewood Dr 1 240V 30W LED Ridgewood Dr at Pelican Bay Blvd 1 240V 30W LED Pelican Bay Blvd at Glenview PI crosswalk REMAINING 480V MH BULBS Remaining 480V MH Bulbs to be Replaced with LED Bulbs and Estimated Costs OPTION 1 No. Description Unit Price Extended Price 241 480V 250W LED $ 179 $ 43,139 Shipping 7% $ 12.53 $ 3,020 $ 46,159 with 10%Contingency $ 4,616 $ 50,775 Subtotal REMAINING 240V MH BULBS Remaining 240V MH Bulbs to be Replaced with LED Bulbs and Estimated Costs No. Description Unit Price Extended Price 179 240V 30W LED $ 71 $ 12,673 Shipping 7% $ 5 $ 887 $ 13,560 with 10%Contingency $ 1,356 $ 14,916 Subtotal $ 65,691 Total N ,- H v] °� m 0 o O o o O o 0 0 O o 0 0 00 0 o O o 0 O 0 O O 0 O 0 0 COc d C O p O O p O• O O O O O O O O r aa) `< 0 0 0 0 0 ,0 o g O 'C ' o0 00 o '' a H _ bb bNs 64 EA 6s ds ER 69 69 EA 0 H J Q I- 0 F- H F- C/] O O O O O O O O O 0 O O O O O O p O p 0O O O O 0 U O O O O O O O O O O O O O W O O O O O O O O OO O O O O H O O O O 69NNO O fl NN64 -. 6964EA 0CK 64 ,., ER 64 En669 69 EA d I— C CD O L 0 CC 08 O F- z 00 N ,6 N — .- CD cnz a a) O O H CI U Uv) vp CA CA CA >, >- >. zz L>.. CA CA w z - - .-7 a - v cn F- a .a .a X .0 WO d C Z _ O Z >• 'a O N O ct U Q C• ? z al▪ J • W a CO) • a o ° z o a O O F CL --ate. Q U ¢ x U •L U U U 0 W ¢ O ',',1 W C + o c, L4 Q co v U U a O .7.-,Cs. U F" . ,.- o > U w Z z U' z F-' w U L-': Z o ¢ F C oa- W WQ F-, U O O- F- FH 7 N c Z CO O . O , C7 N o oU w ZW U ". m z MPG tea' U UU .— U a w y z F- U u, U Cox ou O ¢ U z o o F- co w U w z w N ¢ v H ¢ ,J �, up . > H 0.¢ ¢ j o N z ¢ W W ¢ ¢ Pa ¢ 0. U C7 Z E w U cC U O H O p U q z F- N n °a w o z C U a H a z z z z N 0 00 O ,� w ¢ C7 Z a 0 U g x pe w H O D oU U co oU c0'n mo Z - Z C N M V '!1 'O N 00 Q, ON M V U• a. C .(1> F- a.. 0 a 4P,...-.;`: ` t GREEN TKE ��" :� ,,,, ,,•...- *;: ° ',`''' - ... : milos0e ,,,,, ''' k Air,' „...**-.,,, ' ' ''', 1 .1#114- ' 4 �'� — ''''..-':: " ,,: ' - ,' , ,, 4# „I-144(F' T j ' -`' .1k, 1 1 ' ,,:v,„,,, , ,,, ..„, ,..„.„.„,_ ,, : „ ,.,,,.,.. , ' .,,,,. .gt.t.„ ' . , � �., �. '" - ' ll; O" . 3*, .,„, ., , , �� .„„„„ , 7,,,,, , I:=4,1°,'-:. 4�.`.° ear; r,:''''1'1:-,`''; t : ` .I t.�t' .7C7 I OT �, {a ALI- te '''.. 1:.-,,':-.'11.'-':',.. 1.;4-1';.,','‘ ---:'-' ,.*11'4:-.,:f3,,,,,,'',:'''..,„......: .., '., 1 ",47.,I:: ,g,j. 4„.,,,,,,-'74i,,. ,H III'',.0,1t..I40.--„ ",-..::1:1 .k.,.4.$,I. ' „„ m o L.1 „_--4, ;--,- ;; �e , °"M � ' - r YZ 'c �: -D o mss at4 d � ass ,I -' s i;\t i., -� N-�+ mD US 41 . iI 5/16/2017 Collier County,FL Land Development Code Agenda Item#7biii Page 1 of 7 6.06.02- Sidewalks, Bike Lane and Pathway Requirements A. All developments must construct sidewalks , bike lanes , and pathways , as described below. For projects subject to architectural design standards, see LDC section 5.05.08 F. for related provisions. 1. Sidewalks and bike lanes must be constructed within public and private rights-of-way or easements, which are adjacent to the site prior to issuance of the first certificate of occupancy for construction authorized by a final subdivision plat, site improvement, or site development plan, unless otherwise determined by the County Manager or designee, as follows: Typical Sidewalks Z loth sides 1, Bike Lanes—Both sides 1,2'3 Cross Section 6 feet wide 5 feet wide Arterials and collectors X X Local/Internal Accessway X 1 - Except that only required on one side (closest to the development)where right-of-way is adjacent to, but not within,the subject development and except as set forth below in this section. 2- Unless otherwise determined by the County Manager, or designee, that the existing ROW cross- section is physically constrained or construction would result in unsafe conditions. 3- Unless otherwise identified on the Collier County Comprehensive Pathways Plan Update, as amended, as a potential off-street pathway corridor. 2. Sidewalks and bike lanes must be constructed within public and private rights-of-way or easements ,which are internal to the site, as follows: Typical ks—Both sides 1, Bike Lanes—Both sides 1,2,3,4,6 zS, ,� Cross Section 6 feet wide 5 feet wide Arterials and collectors X X https://www.municode.com/librarylfl/collier_county/codes/land development_code?nodeld=CH6lNIMADPUFARE_6.06.00TRSYST 6.06.02SIBILAPARE 1/7 5/16/2017 Collier County,FL Land Development Code Agenda Item#7biii Page 2 of 7 Local/Internal Accessway X 1 - Except that only required on one side (closest to the development )where right-of-way is adjacent to, but not within, the subject development and except as set forth below in this section. 2- Unless otherwise determined by the County Manager, or designee, that the existing ROW cross- section is physically constrained or construction would result in unsafe conditions. 3- Except that for residential development projects where 75 percent or more of that project's land area has been approved as of March 8, 2005 for site development plans or final subdivision plats with sidewalks or bike lanes that are only required on one side of the ROW, then all applications for subsequent site development plans or final subdivision plat may be approved with sidewalks or bike lanes on only one side of the ROW . 4- For development projects seeking approval of a final subdivision plat or site development plan of 4 or fewer dwelling units per gross acre and where 15 or fewer dwelling units front on a ROW that terminates in a cul-de-sac , then sidewalks will only be required on one side of the ROW and not around the circumference of the cul-de-sac . 5- Prior to the issuance of individual certificates of occupancy, the required sidewalks along the individual parcels frontage shall be constructed. 6- Prior to the issuance of 75 percent of the certificates of occupancy authorized by a final subdivision plat, site improvement or site development plan, all sidewalks and bike lanes shall be constructed, unless otherwise determined by the County Manager or designee. 3. Required pathways , as identified in the Collier County Comprehensive Pathways Plan, must be constructed a minimum of 12 feet in width, within public and private rights-of-way or easements, which are adjacent to or internal to the site. Prior to issuance of the first permanent certificate of occupancy for construction, authorized by a final subdivision plat, site improvement, or site development plan, all required pathways shall be provided, unless otherwise determined by the County Manager or designee. 4. For single-family and multi-family site development and site improvement projects within all conventional zoning districts and all single-family and multi-family residential components of PUD districts: a. Sidewalks , Five feet in width, must be provided within a dedicated public or private right-of- way or other internal access. Where there is no public or private right-of-way or internal access way proposed within a development, sidewalks must be constructed in accordance with Code https://www.municode.com/Iibrary/fl/cdlier_county/codes/land development_code?nodeld=CH6INIMADPUFARE_6.06.00TRSYST 6.06.02SIBILAPARE 2/7 5/16/2017 Collier County,FL Land Development Code Agenda Item#7biii Page 3 of 7 standards contained herein to connect from each on-site residential building to a sidewalk within an adjacent private or public right-of-way or, if no sidewalk exists therein, must connect to the edge of the adjacent paved road within the right-of-way. b. Alternative sidewalk designs that are determined by the County Manager, or designee, to be at least equivalent in function and area to that which would otherwise be required and would serve each dwelling unit, may be approved. Should a two-directional shared use pathway be proposed as an alternative design, then the minimum paved width of the pathway must not be less than 10 feet. 5. All sidewalks and bike lanes must also be constructed in accordance with design specifications identified in subsection F., below. 6. All bicycle lanes must also have signage and be marked in accordance with the latest edition of the U.S.D.O.T.F.H.W.A. Manual on Uniform Traffic Control Devices. 7. Sidewalks and bike paths at intersections shall continue to the edge of curb as depicted by Illustrations 1 and 2. https://www.municode.com/library/fl/collier_county/codes/land development_code?nodeld=CH6INIMADPUFARE_6.06.00TRSYST 6.06.02SIBILAPARE 3/7 5/16/2017 Collier County,FL Land Development Code Agenda Item#7biii Page 4 of 7 Illustration 1 https://www.municode.com/library/fl/collier_county/codes/land development_code?nodeld=CH6INIMADPUFARE_6.06.00TRSYST 6.06.02SIBILAPARE 4/7 5/16/2017 Collier County,FL Land Development Code Agenda Item#7biii Page 5 of 7 Illustration 2 8. Two curb ramps shall be provided for sidewalks and bike paths at each street corner of an intersection. Curb ramps shall be a minimum of 36 inches in width and shall not rise at a ratio greater than as outlined by the Florida accessibility code for building construction. 9. Crosswalks shall be required at any intersection where the distance to the nearest crosswalk is greater than 1,000 feet. B. All developments required to provide interconnections to existing and future developments must dedicate sufficient right-of-way or easement for all required roads, sidewalks , and bike lanes . Bike lanes and sidewalks interconnections must be constructed concurrently with the required road interconnection. C. Payment-in-lieu of construction or construction at an alternate site, as set forth below, may be authorized or required as part of any corresponding development order or permit, at the discretion of the County manager or designee, for any or all of the following circumstances: 1. Where planned right-of-way improvements are scheduled in the County's capital improvements program (CIP), any governmental entity's adopted five-year work program, or any developer's written commitment approved by the County. 2. https://www.municode.com/library/fl/collier_county/codes/land development code?nodeld=CH6INIMADPU FARE_6.06.00TRSYST 6.06.02SIBILAPARE 5/7 5/16/2017 Collier County,FL Land Development Code Agenda Item#7biii Page 6 of 7 The cost of proposed sidewalks or bike lanes would be greater than 25 percent of the development's cost of improvements as determined by the project engineer's estimate approved by the County Manager, or designee, or 3. An existing development has not been constructed with sidewalks or bike lanes and no future connectivity of one or more of these facilities is anticipated by the Comprehensive Pathways Plan or within the Plan's current five-year work program. D. In lieu of construction of required sidewalks , bike lanes and pathways , all developments approved or required to make payments-in-lieu must either: 1. Provide funds for the cost of sidewalks , bike lanes and pathways construction prior to the release of the corresponding development review for final subdivision plat, site improvement, or site development plan , except as stipulated within an approved zoning ordinance or resolution as set forth in the Schedule of Development of Review and Building Permit Fees adopted in the Collier County Administrative Code into a Pathway fund or identified CIP project; or 2. Identify and commit to constructing a project with an equivalent length of sidewalk in an area identified in the Needs Plan of the Comprehensive Pathway Plan and approved by the County Manager or designee. The selected project must connect to an existing sidewalk on at least one side and if the remaining side does not connect with an existing sidewalk, it must be connected to the edge of the existing pavement. The construction of the sidewalk must be completed prior to issuance of the first certificate of occupancy for construction authorized by a final subdivision plat, site improvement, or site development plan, unless otherwise determined by the County Manager or designee. E. If payment-in-lieu is the recommendation by the County Manager or designee, such funds will be used by the County for future construction of required sidewalks, bike lanes and pathways , and system improvements to the bicycle and pedestrian network at locations as close in proximity to the subject site as is feasible. Funds provided as payments-in-lieu do not release the developer from meeting these requirements if the payment-in-lieu amount is less than what would otherwise be required to completely construct all of the required sidewalks , bike lanes and pathways . In that event, the development will continue to be obligated to pay or construct the outstanding requirements until fully paid or constructed, except that partial payments previously made will fully vest that portion paid. Any future payments-in-lieu will be applied to the developer's continuing obligation to construct sidewalks , bike lanes and pathways under the current LDC specifications. F. Sidewalk,Bike Lane, andPathwayDesign& Construction/Materials. All workmanship materials, methods of placement, curing,forms,foundation, finishing, etc. shall be in conformance to the latest edition of FDOT Standard Specifications for Road and Bridge Construction and FDOT Design Standards. 1. All sidewalks shall be designed and constructed in accordance with the following: a. Concrete sidewalks for roads with a functional classification as an arterial or collector or that is County maintained shall be a minimum of 6 inches thick of concrete and constructed over a compacted subgrade. https://www.municode.com/library/fl/collier_county/codes/land_development_code?nodeld=CH6INIMADPUFARE_6.06.00TRSYST_6.06.02SIBILAPARE 6r/ 5/16/2017 Collier County,FL Land Development Code Agenda Item#7biii Page 7of b. Concrete sidewalks for non-County maintained roads with a functional classification as local or with no functional classification (i.e., drive or accessways) shall be a minimum of 4 inches thick of concrete and constructed over a compacted subgrade. c. Paver brick sidewalks or paver brick accents in sidewalks must be installed over a 4-inch thick, compacted limerock base and sand cushion per manufacture specifications, except as otherwise allowed above for sidewalks. 2. All bike lanes shall be designed and constructed in accordance with the most current "Florida Bicycle Facilities Design Standards and Guidelines" or the "Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Streets and Highways" (commonly known as the "Florida Greenbook") requirements. 3. All pathways shall be designed in accordance with the most current FDOT Bicycle Facilities Planning and Design Handbook as it pertains to shared use pathways . Below are the preferred standards for pathway construction; however, if the applicant can demonstrate that a lesser cross-section will meet the requirements of the County, then upon the approval of the County Manager, or designee, it may be permitted. Pathways may be constructed of the following types of materials: a. Concrete- County maintained pathways shall be constructed of a minimum of 6 inches of Portland cement concrete over a compacted subgrade. Pathways on non-County maintained roads with a functional classification as local or with no functional classification shall be constructed of a minimum of 4 inches of Portland cement concrete over a compacted subgrade. b. Asphalt-All pathways constructed of asphalt shall contain a minimum of 6 inches stabilized subgrade (LBR 40), 6 inches compacted limerock base, and 1.5 inches Type S-III asphaltic concrete, unless an alternate cross-section is otherwise determined to be acceptable by the County Manager, or designee. (Ord. No. 05-17, § 3; Ord. No. 06-63, § 3.JJ; Ord. No. 12-38, § 3.AA; Ord. No. 13-56, § 3.EE; Ord. No. 14-33, § 3.X; Ord. No. 16-22, § 3.M) https://www.municode.com/library/fl/collier_county/codes/land development code?nodeld=CH6INIMADPUFARE_6.06.00TRSYST 6.06.02SIBILAPARE 7/7 Agenda Item#7biii-a Page 1 of 5 From: Joseph Chicurel To: SheaBarbara Cc: JacobLisa;NeilDorrlll; McCaughtrvMary Subject: Resident Sidewalk Issues for 7/5/17 PBSD Mtg. Date: Wednesday,June 28,2017 7:56:07 AM Attachments: VoiceMessaae.wav ATT00001.htm Collier County,FL Land Development Code Sidewalk,Pathway reouirements.odf ATT00002.htm Original Message From: Maureen Mitchell [mailto:maureen18Ame.com] Sent: Sunday, May 07, 2017 7:46 PM To: officeApelicanbayservicesdivision.net Subject: Landscape and Safety Committee I would like to make a complaint about bicycle riders on the sidewalks of Pelican Bay. Saturday,April 15, I was walking on Pelican Bay Boulevard in front of the St Raphael at about 2:00 pm. A young man on a bicycle came from behind me going very fast. He hit my shoulder with his elbow and arm and sped past me. Fortunately, I did not fall down and was not injured. I yelled out in surprise and but he never looked back or slowed down. I have normal hearing, and was not wearing headphones, and feel certain that he did not warn me of his approach. Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. Begin forwarded message: From: ResnickLisa <LResnick@colliergov.net> Subject: Update: RE: Resident Request to Repair Greentree Drive Agenda Item#7biii-a Page 2 of 5 Pathway Date: July 17, 2015 at 3:03:13 PM EDT To: LynchDiane <DianeLynch ancolliergov.net>, BolickMarion <MarionBolick@colliergov.net>, McCaughtryMary <MaryMcCaughtryancolliergov.net>, "Joe Chicurel (jchicurel@gmail.com)" <jchicurel@gmail.com>, "Dee Emerson (Dee@dmgfl.com)" <Dee@dmgfl.com> An update on resident request earlier today to repair pathways on Greentree adjacent to Oakmont: I just spoke with Matthew Graham. A substantial portion of this pathway will be scheduled to be repaired and signs informing the public of the imminent repairs will be placed on site by next Tuesday. I called Mrs. Johnson back to let her know the good news. She is extremely happy and asked that I pass along her great big thank you to Diane and Matthew! Thanks, Lisa From: LynchDiane Sent: Friday, July 17, 2015 11:31 AM To: ResnickLisa Cc: BolickMarion; McCaughtryMary Subject: RE: Resident Request to Repair Greentree Drive Pathway Thanks Lisa, I have forwarded Service Request 10733 to Matthew for his review. Diane From: ResnickLisa Sent: Friday,July 17, 2015 10:42 AM To: LynchDiane Cc: BolickMarion; McCaughtryMary Subject: Resident Request to Repair Greentree Drive Pathway Hello Diane, We just received a call from Pelican Bay resident Irma Johnson (239-598-2063) who informed us that the pathway on Greentree Drive adjacent to Oakmont has some damage/cracks due to tree roots that makes it difficult for her to walk on with a walker. Would you please have someone check this? Thanks, Lisa Lisa Jacob,MSM Pelican Bay Services Division Municipal Services Taxing&Benefit Unit Collier County Government Agenda Item#7biii-a Page 3 of 5 801 Laurel Oak Drive,Suite 302 Naples,FL 34108 (239)597-1749 office (239)438-5239 mobile (239)597-4502 fax Iresnick@colliergov.net Under Florida Law,e-mail addresses are public records.If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this entity.Instead,contact this office by telephone or in writing. Begin forwarded message: From: JacobLisa <LisaJacob@colliergov.net> Subject: Fwd: Pelican Bay Walkways Date: May 2, 2017 at 12:52:48 PM EDT To: Joe Chicurel <jchicurel( gmail.com> Cc: SheaBarbara <BarbaraShea@colliergov.net>, McCaughtryMary <MaryMcCaughtryt7colliergov.net>, BolickMarion <MarionBolick@colliergov.net>, Dee Emerson <Dee@dmgfl.com>, NeilDorrill <neil@dmgfl.com>, "Scott William Streckenbein" <sstreckenbeinc yahoo.com>, Frank Laney <flaney@pelicanbay.org> Hello Dr. Chicurel, this is just an FYI member comment that was received by the PBF and forwarded to us. Lisa Sent from my iPhone Begin forwarded message: From: Arlene Harper <aharper@pelicanbay.org<mailto:aharper@pelicanbay.org>> Date: April 29, 2017 at 10:33:38 AM EDT To: Lisa Warren <LWarren@pelicanbay.org<mailto:LWarren@pelicanbay.org>>, James Hoppensteadt<jimh@pelicanbay.org<mailto:jimh@pelicanbay.org>> Cc: Jilberto Nieto <JNieto@pelicanbay.org<mailto:JNieto@pelicanbay.org>> Subject: FW: Pelican Bay Walkways Member comment. Arlene Harper Pelican Bay Foundation From: Linda Harden [lindamharden@gmai l.com<mailto:1 indamharden@gmai i.com>] Sent: Saturday, April 29, 2017 10:31 AM To: Pelican Bay Foundation Subject: Pelican Bay Walkways Agenda Item#7biii-a Page 4 of 5 Just an FYI -- a friend of ours tripped and fell on the EXTREMELY poorly maintained asphalt walkways in Pelican Bay. He ended up cracking 3 ribs. I sincerely wish that while Pelican Bay is spending money hand over fist that the powers that be would consider doing what Collier County cannot seem to do and that is to replace the cheap, asphalt walkways...which are dangerous....with real cement sidewalks which you would think would be demanded in an upscale community that you claim to be. Sent from my iPad. Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. Begin forwarded message: From: Frank Laney <flaney@pelicanbay.org> Subject: RE: Pelican Bay Walkways Date: May 3, 2017 at 10:08:21 AM EDT To: 'JacobLisa' <LisaJacob@colliergov.net> Cc: SheaBarbara <BarbaraShea@colliergov.net>, McCaughtryMary <MaryMcCaughtry@colliergov.net>, BolickMarion <MarionBolick@colliergov.net>, Dee Emerson <Dee@dmgfl.com>, NeilDorrill <neil@dmgfl.com>, "Scott William Streckenbein" <sstreckenbein@yahoo.com>, Joe Chicurel <jchicurel@gmail.com> Hey Lisa, Just a follow-up on that fall I asked you about yesterday. Mrs. Hardin is reporting this incident on behalf of her friend David Eskra. He walks to Waterside and back from Bay Colony on the east side of Pelican Bay Blvd. so it could be anywhere. I've asked that he give me a call with a specific location. I'll let you know what I hear. From: Cisco Unity Connection Messaging System [mailto:unityconnection@pelicanbay.org] Sent: Wednesday,May 3, 2017 9:31 AM To:Janeyf@pelicanbay.org Subject: Message from Harden Linda(2395941332) Follow up message. Original Message From: JacobLisa [mailto:LisaJacob@colliergov.net] Sent: Tuesday, May 2, 2017 12:53 PM To: Joe Chicurel Cc: SheaBarbara; McCaughtryMary; BolickMarion; Dee Emerson; NeilDorrill; Scott William Streckenbein; Frank Laney Subject: Fwd: Pelican Bay Walkways Agenda Item#7biii-a Page 5 of 5 Hello Dr. Chicurel,this is just an FYI member comment that was received by the PBF and forwarded to us. Lisa Sent from my iPhone Begin forwarded message: From: Arlene Harper <aharper@pelicanbay.org<mailto:aharper@pelicanbay.org>> Date: April 29, 2017 at 10:33:38 AM EDT To: Lisa Warren <LWarren@pelicanbay.org<mailto:LWarren@pelicanbay.org>>, James Hoppensteadt<jimh@pelicanbay.org<maiIto jimh@pelicanbay.org>> Cc: Jilberto Nieto <JNieto@pelicanbay.org<mailto:JNieto@pelicanbay.org > Subject: FW: Pelican Bay Walkways Member comment. Arlene Harper Pelican Bay Foundation From: Linda Harden [lindamharden@gmail.com<mailto:lindamharden@gmai l.com>] Sent: Saturday, April 29, 2017 10:31 AM To: Pelican Bay Foundation Subject: Pelican Bay Walkways Just an FYI -- a friend of ours tripped and fell on the EXTREMELY poorly maintained asphalt walkways in Pelican Bay. He ended up cracking 3 ribs. I sincerely wish that while Pelican Bay is spending money hand over fist that the powers that be would consider doing what Collier County cannot seem to do and that is to replace the cheap, asphalt walkways...which are dangerous....with real cement sidewalks which you would think would be demanded in an upscale community that you claim to be. Sent from my iPad. Under Florida Law, e-mail addresses are public records. If you do not want your e-mail address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by telephone or in writing. Agenda Item#7biii-b Page 1 of 5 From: ,)oseDh Chicurel To: SheaBarbar8 Subject: Resident Complaints Re:PB Sidewalks Date: Wednesday,June 28,2017 7:58:33 AM Begin forwarded message: From: Joseph Chicurel <jchicurel@gmail.com> Subject: Re: Bicycles on sidewalk Date: April 30, 2014 at 10:49:31 PM EDT To: Mary McClean Johnson <sellnaples@hotmail.com> Hi Mary, As you may know the PBSD formed a standing committee to address safety issues in Pelican Bay and it was overdue. Now that there is a forum to address resident's concerns and issues,we need to hear from the community. I thank you for adding your voice and experience to the dialogue that I hope to create. Please make any suggestions that you think may help the PBSD and my committee better address these problems. I realize that only courtesy and respect for the wellbeing of others, and compliance with the law can truly change most of these issues but we will try our best. Thanks again for your e-mail and informations, Joe On Apr 30, 2014, at 10:44 AM,Mary J. Johnson<sellnaples@hotmail.com> wrote: Dear Joe, as part of the everyday walkers in Pelican Bay I have had several bad experiences with bikers this season. Most annoying and dangerous was a group of 12 bikers who came up behind me with no bells. This was an organized group as they all had matching t-shirts. I don't believe they were from Pelican Bay. Any group that large should be in the street. They expected me to get off the sidewalk...no thank you or excuse me. It was a Tuesday morning and I have watched for them again but have not seen them. I did yell at the man bringing up the rear that they should be in the street, but he must have Agenda Item#7biii-b Page 2 of 5 been deft as he didn't respond. I feel that many of the sidewalk riders are tourists that are riding rental bikes so I don't know how easy it will be to educate them on bike rules. Thanks for your efforts in protecting those of us who enjoy are daily walks. Mary Johnson Sent from Mary Johnson Begin forwarded message: From: Kathy Forte <kfortel2@gmail.com> Subject: Another Close Call Date: May 28, 2014 at 8:53:49 AM EDT To: Joe Chicurel <jchicurel@gmail.com> Hi, Joe -- I have another one for you. Ed Massaglia, who lives in the Montenero, said that while he was walking Monday morning on the pathway, he was brushed by a bike. The woman on the bike (who was of our vintage in age) only sounded her bell and said "On your left" when she was a few feet behind him. As he moved to get out of the way, she passed him and nicked him with her arm (he thought it was her arm). He said: "I have the right of way." Her response, "No you don't, asshole!" Can you believe it?Not only does he almost get hit,he gets verbally abused. And he's a very nice, low key guy. For what it's worth .... Kathy Begin forwarded message: From: Kathy Forte <kfortel2@gmail.com> Subject: SUGGESTION: Pelican Bay Pedestrian/Bike Safety Date: April 4, 2014 at 12:43:42 PM EDT To: Iresnick@colliergov.net Cc: Joe Chicurel <jchicurel@gmaii.com>, Jim Forte <james.v.forte@gmail.com> Dear Mr. Trecker-- I am writing to you in your role as chair of the PBSD Board. I have been a resident of Pelican Bay for 6 years. I have a suggestion to improve pedestrian safety, particularly as it relates to bikes.. First, a little background: I have been a longtime walker/jogger(almost daily) on the pathways parallel to Pelican Bay Blvd., Gulf Park Dr., and Greentree Rd. I have always been very tuned into safety issues, but even more so since March 6, when I was hit by a Agenda Item#7biii-b Page 3 of 5 bike. A friend and I were walking north on the sidewalk on the east side of PB Blvd., about 30-40 ft. north of the Interlachan entrance. Suddenly,we saw a bike wheel between us; no bell, no verbal warning. We both tried to jump out of the way, but the bike turned into me, gouging my right calf with the pedal and bumping my hip and shoulder. The biker was a women in her early 20s; she had ear buds on. I asked her why she didn't warn us she was behind us with either her bell (she had one)or voice, and why in the world she tried to pass between us. No response. Just a meek apology. My husband reported the incident to the Services Division and, at their request, also to the Sheriffs Office. It was a nasty gash and it is still healing. Happily, I am walking again, but with a lot of nervousness. My observations: 1. Most of the bikers on the sidewalk expect pedestrians to get out of THEIR way 2. Many do not sound a warming if approaching from behind--either by bell or voice. 3. About 30% of the bikers are wearing head sets or ear buds. 4. The majority of the transgressors are visitors(who don't read the articles in the PB Post or the e-mail newsletter on bike rules). Ideally, all bikes would have to ride on the road, leaving the sidewalk for pedestrians; I know this was already proposed and shot down several years ago. I also know that the proposal to widen the sidewalks was shot down 3 years ago. My husband and I supported both of these proposals; it's unfortunate they were rejected. My suggestion: Put up signs at to-be-determined intervals along the sidewalks, particularly on PB Blvd & Gulf Park Dr., that tell bikers what the rules are. The signs could be on posts or affixed to trees(without harming the trees, of course) so that those riding bikes on the sidewalk would have to see them. They should say something like this: BIKES ALWAYS yield to pedestrians-- both ways. Give sufficient warning with bell or voice. Pass on the left. No headphones or ear buds. It's the law!!! Of course there has to be a way to enforce the rules. I was not able to get the name or number the biker who hit me because I was focused on my injury and how to get help. Maybe the hosts of the transgressors need to be cited too, because they are obviously not relaying the rules to their guests. Separately, I have recently noticed more and more people (mostly visitors, but also residents) who are NOT crossing PB Blvd. at the designated crosswalks (i.e. they are jaywalking) and they expect cars to stop for them. Some cars do, some don't (which creates more confusion). This is a very unsafe practice on pedestrians' part; they should be aware that if they choose to jaywalk, they will have to wait for the cars to pass first. Thank you very much for your consideration of my suggestion. I love living Agenda Item#7biii-b Page 4 of 5 in Pelican Bay and want to do whatever I can to make it the best it can be. Thanks also for your efforts on our behalf. Kathy Forte 1705 Montenero 239-431-5612 Begin forwarded message: From: "Mary J. Johnson" <sellnaples@hotmail.com> Subject: Bicycles on sidewalk Date: April 30, 2014 at 10:44:04 AM EDT To: "jchicurel@gmail.com" <jchicurel@gmail.com> Dear Joe, as part of the everyday walkers in Pelican Bay I have had several bad experiences with bikers this season. Most annoying and dangerous was a group of 12 bikers who came up behind me with no bells. This was an organized group as they all had matching t-shirts. I don't believe they were from Pelican Bay. Any group that large should be in the street. They expected me to get off the sidewalk...no thank you or excuse me. It was a Tuesday morning and I have watched for them again but have not seen them. I did yell at the man bringing up the rear that they should be in the street, but he must have been deft as he didn't respond. I feel that many of the sidewalk riders are tourists that are riding rental bikes so I don't know how easy it will be to educate them on bike rules. Thanks for your efforts in protecting those of us who enjoy are daily walks. Mary Johnson Sent from Mary Johnson Begin forwarded message: From: Dean Malenfant <pparis1958@yahoo.com> Subject: Cyclists Date: April 22, 2014 at 11:41:44 AM EDT To: "jchicurel@gmail.com" <jchicurel@gmail.com> Reply-To: Dean Malenfant <pparis1958 anyahoo.com> Dear Joe, I was talking to Kathy Forte this morning, and she was telling me about her accident when a cyclist knocked her down and took a gouge out of her leg. I am a daily walker(do not drive anymore), and I have more concerns with cyclists than I do with motorists. I walk from L'Ambiance, along Pelican Bay Boulevard and then walk along the berm, I would say that at least 95% of the cyclists do not use their bells, It's surprising how quiet cyclists can come up behind you; and saying "On your left" isn't quite adequate enough-especially for people with hearing problems. Whereas a shrill bell is obvious and can be heard very well. My first suggestion is that cyclists should be banned from using the narrow sidewalk. Or, widen the sidewalk. Best of all have a dedicated cycling path in the roadway. And single file only-last week a family came swooping up from behind me and one almost Agenda Item#7biii-b Page 5 of 5 clipped me, as he was cycling alongside his family. That's not the first time that has happened. Make the speed limit very low indeed, so that if they want to go faster they should be on the road. The berm is for observing nature, strolling, conversing with friends, or jogging - it is not an exercise route for bicycles and roller blades. The latter swoop from side to side, last week on Pelican Bay Blvd. a man got quite angry with me because I didn't go on the grass as he swept by me-yelling: "Hey Lady, didn't you hear me"-needless to say my blood pressure rose!!! Well enough. I chat with other walkers and they all agree with me re the above concerns. Aida Malenfant See my photos of Boston, Paris&the UK at http://www.bostonbyaida.com/ Agenda Item#7biii-c Page 1 of 2 From: )acobLisa To: SheaBarbara Subject: FW: Sidewalk or Pathway? Date: Friday,June 30,2017 4:20:39 PM This is the email but without the attachment. Original Message From:Jim Carr[mailto:jim.carr@abbinc.com] Sent:Wednesday,May 17,2017 12:08 PM To:JacobLisa Cc:Joe Chicurel;SheaBarbara Subject:RE:Sidewalk or Pathway? Lisa, This might be more than you need,but here are some definitions,and attached is section from the Collier County Land Development Code(LDC): SIDEWALK Chapter 8 of the FDOT Plans and Preparation Manual Volume 1. 8.3.1 Sidewalks: "Sidewalks are walkways parallel to the roadway and designed for use by pedestrians.Generally,sidewalks should be constructed along both sides of arterial roadways that are not provided with shoulders" The min width of sidewalk is 5'on both curb and gutter and flush shoulder roadways,with a minimum separation from back of curb of 2'. If the sidewalk is adjacent to the curb the minimum width is 6'. Grades shall allow adequate drainage but maintain ADA requirements. A clear I'wide graded area with 1:6 max slope shall be provided,and edge drops off should be avoided. Collier County Land Development Code: Sidewalk:That portion of a right-of-way or cross or crosswalk,paved or otherwise surfaced,intended for pedestrian use and bicycle use.(See Chapters 4 and 10). Sidewalks must be 5'wide and provided with dedicated public or private right of way or internal access. Construction material consist of a minimum 4"concrete for non-county maintained roads and 6"minimum for country maintained roads,both constructed over compacted subgrade. Sidewalks can also be paver brick over 4" thick compacted limerock base w/paver sand per manufacture specs. PATHWAY Chapter 8 of the FDOT Plans and Preparation Manual Volume 1. 8.6 Shared Use Paths: "Shared use paths are typically facilities on exclusive rights of way and with minimal cross flow of motor vehicles. They are almost always used by pedestrians,joggers,in-line skaters,bicyclists,and in some cases equestrians. However,the bicycle's operating characteristics will dictate the design of shared use paths.The criteria in this section apply to paved shared use paths" Typically, 10'-14'wide depending on use and variety of users(bicyclist,pedestrians,joggers,skaters).ADA Requirements shall be met regarding sloping and ramps etc... 4-foot lateral offset to obstruction shall be maintained,as well as 2 feet wide, 1:6 max slope adjacent to both sides. Collier County Land Development Code: Pathway:A defined corridor for the primary use of non-motorized travel. All pathways shall be designed in accordance with the most current FDOT Bicycle Facilities Planning and Design Handbook as it pertains to shared use pathways. Pathways Construction material consist of a minimum 4"concrete for non-county maintained roads and 6"minimum for county maintained roads,both constructed over compacted subgrade. Or Pathways can be Asphalt at a minimum of 6 inches stabilized subgrade(LBR 40),6 inches Agenda Item#7biii-c Page 2 of 2 compacted limerock base,and 1.5 inches Type S-III asphaltic concrete. James A.Carr,P.E. Agnoli,Barber&Brundage,Inc. 7400 Trail Boulevard,Suite 200 Naples,FL 34108 239.597.3111 ext 215 239.566.2203 fax Original Message From:JacobLisa[Ynailto:LisaJacob@colliergov.nel] Sent:Tuesday,May 16,2017 11:43 AM To:Jim Carr<jim.carr@abbinc.com> Cc:Joe Chicurel<jchicurel@gmail.com>;SheaBarbara<BarbaraShea@colliergov.net> Subject:Sidewalk or Pathway? Hello Jim, The landscape and safety committee wants to know what the difference is between a"sidewalk"and a"pathway". Would you please help answer this question? Thanks,Lisa Sent from my iPhone Under Florida Law,e-mail addresses are public records.If you do not want your e-mail address released in response to a public records request,do not send electronic mail to this entity.Instead,contact this office by telephone or in writing. Agenda Item#7c Page 1 of 9 TO: PBSD Board of Directors FROM: Dave Trecker SBUJECT: Pelican Bay Beach Renourishment DA'L'E: June 29, 2017 The Beach Renourishment Committee met on 5/31/17 and unanimously passed the following resolution: To recommend to the PBSD Board that no sand-haul renourishment of the Pelican Bay beach be carried out in 2017 and that the PBSD Board so notify Coastal Zone Management. Background information is given in Attachments 1 — 3. Humiston& Moore indicated the four Collier beaches recently surveyed were by-and-large healthy, including the Pelican Bay beach, where average width increased slightly since 2016. They recommended no renourishment this year (Attachment 4). Gary McAlpin, head of Coastal Zone Management, agreed that additional renourishment was not warranted at this time. The Beach Renourishment Committee considered three options. (1) Fund no truck-haul renourishment this year. (2) If the county proceeds with a major truck haul in 2017, fund renourishment of one or more sections where the width remains short of the 100-foot county target (R-35, R-36, R-40). Since the 5/31/17 committee meeting, McAlpin advised he plans no county truck- haul renourishment this year. That eliminates this option. (3) If the county does not proceed with a truck haul this year, go it alone and fund renourishment as indicated above. Option 1 would allow us to retain the $422,175 beach reserve, build toward major projects in 2018 and beyond and hedge against sand loss from a major storm. Option 3 would deplete much or all of the beach reserve. The PBSD Board needs to inform CZM of its decision in early July. Agenda Item#7c Page 2 of 9 ATTACHMENT 1 ORDINANCE NO.2013-61 AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA,AMENDING ORDINANCE NO. 2002-27, AS AMENDED, WHICH CREATED THE PELICAN BAY MUNICIPAL SERVICE TAXING AND BENEFIT UNIT, BY AMENDING SECTION FOUR, PURPOSE AND POWERS, TO CLARIFY THAT BEACH RENOURISHMENT IS ONE OF THE PURPOSES OF THE UNIT; PROVIDING FOR CONFLICT AND SEVERABILITY;PROVIDING FOR INCLUSION IN THE CODE OF LAWS AND ORDINANCES; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on May 28, 2002, the Board of County Commissioners (Board), adopted Ordinance No.2002-27,which superseded,repealed,and consolidated prior ordinances relating to the Pelican Bay Municipal Service Taxing and Benefit Unit("Unit');and WHEREAS, the Board subsequently amended Ordinance;No. 2002-27 by adopting Ordinance No,2006-05,Ordinance No.2009-05,and Ordinance 2013-19;and WHEREAS, the Board desires to further amend Ordinance No. 2002-27, as amended, in order to clarify that beach renourishment is one of the purposes of the Unit. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY,FLORIDA,that: SECTION ONE: AMENDMENT TO SECTION FOUR OF ORDINANCE NO.2002-27, AS AMENDED. Section Four is hereby amended as follows: SECTION FOUR: Purpose;powers. The Unit is formed for the purpose of providing street lighting,water management,beach renourishment, ambient noise management, extraordinary law enforcement service and beautification,including but not limited to beautification of recreation facilities,sidewalk, street and median areas, identification markers, the maintenance of conservation or preserve areas including the restoration of the mangrove forest preserve arid to finance the landscaping beautification of only that portion of U.S.41 from Pine Ridge Road to Vanderbilt Beach Road in the above-described taxing and benefit unit and to that end shall possess all the powers to do all things reasonably necessary to provide such services. The Unit will be solely responsible for advising the County on dredging and maintaining Clam Pass for the purpose of enhancing the health of the affected mangrove forest,and will manage such activities for the County, Words Underlined are added;Words Struckrough are deleted. • Page I of 2 Agenda Item#7c Page 3 of 9 SECTION TWO: CONFLICT AND SEVERABILITY. In the event this Ordinance conflicts with any other ordinance of Collier County or other applicable law,the more restrictive shall apply. If any phrase or portion of the Ordinance is held invalid or unconstitutional by any court of competent jurisdiction,such portion shall be deemed a separate,distinct and independent provision and such holding shall not affect the validity of the remaining portion. SECTION THREE: INCLUSION IN THE CODE OF LAWS AND ORDINANCES. The provisions of this Ordinance shall become and be made a part of the Code of Laws and Ordinances of Collier County, Florida. The sections of the Ordinances may be renumbered or relettered to accomplish such,and the word"ordinance"may be changed to"section," "article," or any other appropriate word. SECTION FOUR: EFFECTIVE DATE. This Ordinance shall be effective upon filing with the Department of State. PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier County,Florida,this 2,..rtklay ofOc .\=ey— ,2013. ATTEST: ;; BOAa2ILOF OUNT COMMISSIONERS DWIGI-� 'E;BRGIOt-,CIerkCOLLF C• TY,FLORIDA \l;1 By: yi • By.i _, ll; Cle0� GE• ' i. r- LER,ESQ. Attest as • lo.Chalim i • CHA .t7V• AN sig ature • App t v ' •-;,wand legality: Jefl're4A..Matzkow County A twiny This ordinance filed with the ]]i Set etary of State'; Off e hC 02.1 day of , and acknowledgement o that 9 filin received this day of A - By Words Underlined are added;Words Stfoek-Through are deleted. Page 2 of 2 Agenda Item#7c • • Page 4 of 9 ATTACHMENT 2 July 7,2014 Gary McAlpin,Director Coastal Zone Management 2800 N.Horseshoe Drive Naples,FL 34104 Dear Gary: At a recent meeting,you told me county funds could not be used for renourishing portions of the Pelican Bay beach beyond a half-mile public entry point—in this case the western terminus of Vanderbilt Beach Road.You said the section from marker R-33 to Clam Pass would be the responsibility of Pelican Bay. Please be advised the Pelican Bay Services Division (PBSD) will assume responsibility for sand renourishment of that portion of the Pelican Bay beach. Based on county surveys,the PBSD will,on an annual basis,designate which sections within those boundaries should receive sand and will fund the designated renourishment. To that end,the PBSD Board of Directors passed the following resolution: The Pelican Bay Services Division acknowledges its authority,as directed by ordinance,to determine annually an acceptable level and disposition of sand renourishment for the Pelican Bay beach for which it is responsible, this renourishment to be consistent with county design standards and available PBSD funds. Please let the PBSD know when the'county is planning its annual renourishment activities.We will coordinate with you any sand placement that may be warranted on the sections of the Pelican Bay beach for we have responsibility. Agenda Item#7c Page 5 of 9 Pelican Bay Services Division Board of Directors Dave Trecker,Chairman cc: PBSD Board of Directors Neil Dorrill,Administrator Collier County Board of Commissioners Leo Ochs,County Manager Jim Hoppensteadt,Pelican Bay Foundation President Agenda Item#7c Page 6 of 9 ATTACHMENT 3 State statute defines a public beach in terms of access to the public. All beach is public below mean high water. Above mean high water, it is public up to one-half mile of public access. For Pelican Bay, that means the beach is "public" from Vanderbilt Beach Road to between markers R-32/R-33. The county funds renourishment of that portion of the beach. The PBSD is responsible for renourishing the portion of the beach from R-32/R-33 to Clam Pass,just south of R-41. In 2016, the PBSD funded renourishment, with about 9,000 CY of sand, of an eroded section of the beach (R-34/R-35 to R-36/R-37) as part of an overall county truck-haul project that included Vanderbilt Beach, Gulf Shore and Naples beaches. Surveys showed the beach at R-35, R-36 and R-37 gained an average of six feet in width (2017). Agenda Item#7c Page 7 of 9 • • - r -,. . , -•-,i I, 0-`'''''—gf r -1-' .." ..': - - ., • • ...„,,," . — .,,, A, t "".f• I , 4 a 1 •'a , ,._ '''. r. ....' -•,.....,.. 4 • 4.4 m 44' r,..., k • . • . . . . 4A . ..3' : •1 '.. '--, t: ›'.... „- - -..."'*-- —--,..„,_•''..Ct.%-al G . ' • '' ..," ',,' ' ON 0 11;A; -.7"-----.• E %,R-30 '- • i. I , its 41-4 ' ' ' Y5-.-= •••• .0 s a 1 -' I . A i 1 ,el ,,oilifib .• .. • 4,,;•.„•'! *O. m -.. :„. . ..3,..,.c.. ,,, i.„. ,,ie 111,70 q r•,,...{. . . . . . . I . , , s'114 1- -..• , 4. /.i.*r,P '''•, 'tY '' 1 ' ''' \‘4 4' 9':-.1‘Et.4*'' •a;. ., , 07'•,, 4 . • -• ' '' 4- . . t t„ •'V,' • -.6.,..'., • gob,' , . • -• . . 093 .f 4'.' ell • . , .. •0- , ,. le,,e :4. I..6, . / . -; a' .. , . V .• , - .i.1 .',A .:. t . • k V.si .-,4'1. - .''. • b ,-.:? x . ',14 Rt33 . . 1.043 :- '1 : it • c. • • h 1 • ti - ,-14• •-•'' .. -i-:''i- • • , .. r.•,,,,,,j • • • • • . I .. . ' R=35 ki ?-, :-!•-4.‘, I n t i • , . , • a 11k, . .,.. . , • -141 0.41 0 . 4P. . •. . r,- g...a.„%..I(, .'' R-36 Lc*, ffitki • f' •., 1, ' ",.*: '";-4. . . t a Z t . . •- 544„ .'c, ' , I •. R-37 'N , , ..' — ' . . I ..1 k, '•".4 ' . . ..:a.3:e!. ' • • • • •:i.•.; 1 R-38 .,/,‘•-t:' -"......:7 C'.1;':'1:...4'.. . A / ,i, le,CI\ - f• 1. t. ,... 6\ • s. 4 ... OP ''•• • CIMI 14 1 • . '.• j,,, , I, 1 ,‘ • 4*, ' .1,1' • 1 • . • • - ---40 1,•• %,.) ' • I i , lk__.,-- • ,. . • ,,,. - ' - • '0 s, ' t , J •••• • • 1,' • :, , • • •• . tOX .b'' " , - N.A.• .) ' •- ' • *.• . ' / '( i... t . • % ' ,...,„•,••' ,..' .._ i: . '.--, 1 . , 1, tl:ti v• •:NW.......!...........•it.•.'.,::,;• ,1,47,.....- 4 1.,.;'• .1•.4.4 74A : ,,. '.. .,. 4....:.1' . , •!•-::•• •-•:-.', .4'',....4'4, , . ', Mit';17,01.' 1,•/,1 .'""....'".'-''. "' .,-otniasrosi I , A -i •4 41 'I. L1 1&MOORE , -,..?? • .ENGINEER — .I . f 1 I mum / . ....11411G 015 GU 0,,--r:t-ec.r.t,-&p41 APO tilt141111sta . . ), L..4P,....,,,, 1 - ,,....1 .. - lit.\ _ .,,..,... It . ..p"...—j Agenda Item#7c ATTACHMENT 4— Collier County Beach Nourishment Project Sure 8 of 9 CONCLUSIONS • The monitoring area from monuments R-17 to R-21 within Delnor-Wiggins State Park outside le of the project limits has been stablein 5a) and gain of overarison to previous rng 2 600xiods with a(2,670 Table 5b)for average shoreline change (-3;Table ) nd volumetric this most recent monitoring period. Although there was erosion from R-18 to R-21, monument R-17 recovered from the previous monitoring sand. In spite of the recentd gaining 30 feet in vstabil atth 0'�onaat the north ble 5a) and over 4,800 cubic yards (4,850;Table 5b) end of the park shoreline near Wiggins Pass, the remainder of the park beach has eroded since the April 2013 survey losing an average of This ser m5ent of the ble torin)g 5ain are'atcould potentially be h and almost 7,500 � cubic yards (-7,480;Table 5b) of sand. g Pass, and ongoing monitoring �s renourished with a portion of the sand dredged from Wiggins Lrecommended. Vanderbilt Beach, nourished as part of the in the reach with an average twidth of 1 6ained the efeet gn Standard width for all monuments contained (116;Table 5a). Since 2013 the project area shows accretion with volu etof theric sand almost 87,000 cubic yards (86,870;Table 5b) since 2013 and approximately placed in 2013 and 2016 (86%;Table 8b) hasremained Beach.within the project limits. Evaluation for renourishment is not recommended for Van Pelican Bay Beach, nourished as part of the 20 the monutruck umentsl e ctn the southern h, has an aif of the beach width (102;5a) over the Design Standard although reach from R-34 to R-37 have widths approximately 10 feet less (87-96;Table 5a) than the standard. The Pelican Bay project reach contains almost 50,000 cubic yards (49,250;Table 813) of sand in excess of the April 2013 condition; of the 1 ditionallQO foot standarthe beaches d rth Although evaluation and south of the reach (from R-34 to R-37) have widths in excess for renourishment is not recommended for Pelican Bal e Be dedach aor if the areas below the Design tinued monitoring is recommended to determine if renourishment Standard are within normal ranges of variability. Park Shore Beach, nourished as part of the 2016 truck haul project, maintained the Design Standard of 85 feet at all monuments in the project reach with he exc ptiios n of R-44 at 75 I feet (75 (75;Tab1e 6a) at the north end of. this reach. The reach shows 013 post-construction survey containing over 66,000 cubic yards (66,740;Table 8b) of sand li. representing over 70% (68%;Table 8b) of the fill placed Che 0 a3 this time6 The and 201 . Evaluation for renourishment is not recommended for Park Shore Bea is 1. currently pursuing permits to extend this beach fill segment further north improving the shoreline stability at the north end of this reach. Naples Beach, not nourished as part of the 20Pass south to monument R-60,project, is considered in two S influenced by the eparate reaches.,. The northernmost reach ranges from Doctors effects of the inlet; and from approximately R-61 south, south of the immediate influence of the to inlet. Sand dredged from Doctors Passrrt area ofcan eNaptely be s BeaclhCen conjunction with d south of the tthe address the erosion in the northernmosttting the construction of erosion control structurNepr°lonuments R-59 south to R-9ects currently in the final rhaveswidths atrger time of this most recent monitoring survey -79 than the 100 foot Design Standard for Naples fill taper) having wieach with the dths 2 feet cess than the (located at the terminus point of the south Design Standard. Although Naples Beach contains be ch exceedsRhe Design Standard bye �` placed in 2013 and 2014,the average width of the 28 r. I Agenda Item#7c Page 9(TT' than 20 feet. Evaluation for renourishment is not recommended for Naples Beach although if Doctors Pass were to be dredged this year in conjunction with construction of the erosion control structures, then the beach in the vicinity of R-63, having a design width less than otf the Design Standard, could be addressed with a portion of the sand dredged from the inlet with the balance of the fill placed south of the south jetty if deemed necessary. All of the four project areas for the Collier Beach Nourishment Project collectively show an average beach width gain of 2 feet(+2;Table 8a) and a volumetric gain of approximately 20,000 cubic yards (20,430;Table 8b) in the most recent monitoring period. Since the preconstructiion survey dated April 2013, the project beaches have retained an average gain of 12 feet in width representing 60% (12/19;Table 8a) of the average gain derived from the 2013project, and approximately 225,000 cubic yards of the 353,000 cubic yards (225,070 + 52,350 + 75,790) of sand placed or 64%. This should be considered good performance and stability fora beach fill project and placement of maintenance renourishment material is not recommended at this time. •'.sem ',- �-., f ,.y..#. -�•- vis .,,....-.A.�'o-+ -.. -- ��� ... .,. rr< rte: '!' . Lowdermilk Park Courtesy of the Naples Virtual Museum 29