Agenda 08-08-2017 Item #16E108/08/2017 EXECUTIVE SUMMARY Recommendation to approve the administrative reports prepared by the Procurement Services Division for change orders and other items as identified. OBJECTIVE: To promote accountability and provide transparency to the public and gain th e Board’s approval/ratification for various procurement -related transactions. CONSIDERATIONS: In accordance with the Board’s Procurement Ordinance 2017-08 and the Procurement Manual, the Procurement Services Division produces a regular Administrative Repo rt which provides for Board approval of the following transactions: Contract change orders/Amendments that do not exceed ten (10%) of the current Board approved aggregate amount; Modifications to the current Board approved performance schedule (number of days); Other items as determined by the County Manager or designee. Also, included in this report are “After the fact” memos from various County Divisions, as requested by the Clerk’s Finance staff for process of invoices. Approval of the following documents by the County Manager is subject to formal ratification by the Board of County Commissioners. If the decision by the County Manager is not ratified by that Board, the document(s) shall be enforceable against Collier County only to the extent authorized by law in the absence of such ratification by that Board. FISCAL IMPACT: The net total for 7 changes to contracts is ($8,477.37). The total number of days added to contracts is 56. LEGAL CONSIDERATIONS: This item is approved for form and legality and requires a majority vote for Board action. - JAK GROWTH MANAGEMENT IMPACT: There is no Growth Management Impact associated with this action. RECOMMENDATION: To ratify/approve change orders and/or Contract Amendments, and other items as determined by the County Manager or designee in accordance with Procurement Ordinance 2017-08. Prepared By: Adam Northrup, Procurement Strategist, Procurement Services ATTACHMENT(S) 1. 0808 Change Order Backup - FY17 (PDF) 2. 0808 Change Order Report - FY17 (PDF) 3. 0808 After the Fact Memos - FY17 (PDF) 16.E.1 Packet Pg. 11 08/08/2017 COLLIER COUNTY Board of County Commissioners Item Number: 16.E.1 Doc ID: 3572 Item Summary: Recommendation to approve the administrative reports prepared by the Procurement Services Division for change orders and other items as identified. Meeting Date: 08/08/2017 Prepared by: Title: Procurement Specialist – Procurement Services Name: Adam Northrup 08/03/2017 12:19 PM Submitted by: Title: – Procurement Services Name: Ted Coyman 08/03/2017 12:19 PM Approved By: Review: Procurement Services Adam Northrup Additional Reviewer Completed 08/03/2017 12:35 PM Administrative Services Department Paula Brethauer Level 1 Division Reviewer Completed 08/03/2017 12:41 PM Procurement Services Ted Coyman Additional Reviewer Completed 08/04/2017 4:17 PM Administrative Services Department Amy Lyberg Level 2 Division Administrator Review Completed 08/07/2017 10:07 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/07/2017 10:54 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 08/07/2017 3:28 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 08/07/2017 3:40 PM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 08/08/2017 9:21 AM Board of County Commissioners MaryJo Brock Meeting Pending 08/08/2017 12:00 AM 16.E.1 Packet Pg. 12 1 16.E.1.a Packet Pg. 13 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 2 16.E.1.a Packet Pg. 14 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCC Rpt BCC ES Contract Modification Work Order Modification Amendment Contract #: Change #: Purchase Order #: Project #: Contractor/Firm Name: Contract/Project: Project Manager Name: r: Division Name: Original Contract/Work Order Amount $ 152,247.78 7/12/16 16A15 Original BCC Approval Date; Agenda Item # Current BCC Approved Amount $ 195,745.59 6/13/17 16E1a Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 195,745.59 6/30/2017 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ (8,477.37)23.00%Total Change from Original Amount Revised Contract/Work Order Total $ 187,268.22 -4.33%Change from Current BCC Approved Amount Cumulative Changes $ 35,020.44 -4.33%Change from Current Amount Completion Date, Description of the Task(s) Change, and Rationale for the Change Notice to Proceed Original Last Approved Revised Date Date Completion Date Date (Includes this change) # of Days Added Select Tasks Add new task(s) Delete task(s) Change task(s) Other (see below) Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s) to the task(s) and / or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. Procurement Services Change Order Form 60149 Hannula Landscaping and Irrigation 4500170607 16-6607 5 Collier Blvd. Highway Beautification Road Maintenance, Landscape Operations Pamela Lulich 6/30/2017 3/7/2017 NA 9/8/2016 Line Item 6 - The change increases mulch bag quantity by 70 bags ($331.10 cost increase): 1. The bid schedule requested 2,173 bags of mulch, and the awarded Contractor bid $4.73 per bag totaling $10,278.29 . An additional 70 bags was required thereby increasing the total quantity to 2,243 bags @ $4.73 per bag increasing costs by $331.10 for a grand total of $10,609.39. 2. The additional mulch was required to widen a bed, that was not included in the original bid schedule. The widening of the bed was ordered in the field . 3. If the change is not processed, the aesthetics of the bed would not be up to county standards and could elicit complaints from residents. Line Item 14 – The change resulted in purchasing plant material in a 1 gal. size, increasing the quantity, and reducing the cost per each plant ($12.38 credit (five less plants installed)): 1. The bid schedule requested Beach Sunflower, 3 gallon size, a quantity of 241 plants, and the awarded Contractor bid $4.95 each for a total cost of $1,192.95. The size was changed to1 gallon due to the unavailability of plant material originally requested on the bid schedule. A work directive was issued changing the size to 1 gallon which decreased the cost to $2.475 each and increased the quantity to 482 plants. The original total cost of $1,192.95 remains the same. A field audit was conducted counting installed plant material. The audit revealed a shortage of five (5) plants that were not installed (477 plants installed versus 482 plants). A credit will be issued to the County for $12.38. 2. To keep the project on schedule, a work directive was issued authorizing the Contractor to purchase Beach Sunflower in the 1 gallon size rather than 3 gallon. If the change is not processed, the correct plant size, quantity, and price will not be accurately identified on the pay application. 3. If this change was not processed, the Beach Sunflowers would not be installed, given that they weren’t available. This would effect the aesthetics of the project and could elicit complaints from residents. Line Item 17 – A change in Bahia sod square footage decreasing the quantity ($464.00 cost reduction): 1. The bid schedule line item requested 2,0000 square feet (SF) of Bahia sod, and the awarded Contractor bid $.29 per SF totaling $580.00. The actual area reduces the sod by 1,600 SF for an actual quantity of 400 SF resulting in a $464.00 cost reduction. 2. The bid schedule and plans anticipated a larger refurbishment area but less Bahia sod was required. 3. If the change is not processed, the County would spend money on a surplus of sod that is uneeded for this project. Line Item 64 – A change in Floratam sod square footage (SF) increasing the quantity to install in medians and over counduit trench ($288.00 (trench) + $525.24 (medians) = $813.24 cost increases): 1. The bid schedule line item requested 36,941 square feet (SF) of Floratam sod, and the awarded Contractor bid $.36 per SF totaling $13,298.76. 2. The plans were not completely accurate for the area disturbed during wire trenching to the existing controller which added 800 SF of sod @ $.36 per SF; costs increased by $288.00. An additional 1,459 SF of sod was installed in the medians @ $.36 per SF increasing costs by $525.24. 3. If the change is not processed, there would be an area of exposed dirt not covered by sod, which would effect the aesthetics of the project and could elicit complaints from residents. 3 16.E.1.a Packet Pg. 15 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin BCC Rpt BCC ES Line Item 80 - Change decreasing irrigation part quantity and reducing costs($350.00 cost reduction): “Irrigation 12” High Pop- Up Spray Hydrants : Toro 570Z-12P, 570Z Series 12” High Pop-Up Spray head body with Precision Spray nozzle. 1. A change in irrigation head quantity from 25 installed heads @ $35.00 each for $875.00 in costs, and reducing the quantity to15 installed heads @$35.00 each decreasing actual costs to $525.00. 2. The correct quantity was not in the contract because the base plans were inaccurate because autocad files were not available and the bases were created from aerial drawings. 3. If the change is not processed,the County would be spending more money for irrigation heads installed than actually needed to insure the health of the plants. Line Item 81 - Change in irrigation part quantity and reducing costs ($567.00 cost reduction): “Irrigation 6” High Pop-Up Spray Hydrants : Toro 570Z-6P, 570Z Series 6” High Pop-Up Spray head body with Precision Spray nozzle: 1. A change in irrigation part quantity from 416 heads @ $27.00 each for $11,232.00 in costs and reducing the quantity to 395 heads @$27.00 each for a decreased actual costs of $10,665.00. 2. The purpose of the change is due to plan descrepancies where the spacing was less than the typical for this type of head. 3. If the change is not processed, the County would spend money for irrigation heads that is uneeded for this project. Increase costs to add 50 Linear Feet of Directional Bore HDPE SDR 11 2” Across North Bound Lane to Activate the Master Valve ($800.00 cost increase): 1. The master valve is located next to the water source and was included in the original bid plan set. 2. The directional bore for the master valve control wire was not included in the original bid plan set, but was added to the final revised plan set in order to connect to the water source. The exact location of the water tap was unknown and installed by a separate Utility. This required an additional 50 LF of directional bore @ $16.00/LF for $800.00 cost increase. 3. If the change is not processed, the water source would not be connected to the irrigation system and the plants would die. This would effect the aesthetics of the project and could elicit complaints from residents. Delete 275 Cubic Yards of Compost Soil, Placed, and Graded reducing costs($9,028.3325 cost reduction):. 1. Less soil was needed to meet the median profile deleting 275 CY of compost soil, placed, and graded @ $32.83030 unit cost for a total cost reduction of $9,028.3325. 2. The change was part of a previous change order and the soil quantities were estimated based on a typical cross-section. 3. If the change was not made, more dirt would have been installed than needed to reach the final median profile, this would increase the slope of the median and produce run-off from the median into the roadway. This would effect the aesthetics of the project and could elicit complaints from residents. 4 16.E.1.a Packet Pg. 16 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) GHANGE ORDER NUMBER FIVE Date: June 19,2017 tdd/Delet Unit Cost Across North Bound Lane To Aclivate the MasterVafue. 5 16.E.1.a Packet Pg. 17 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) ame WORK DIRECTIVE CHANGE CONTRACT # /PROJECT NAME: DATE OF ISSUANCE: 6nn0fi OWhIER: Collier County Board of Commissioners COI{TRACTOR: Hannuta I^andscaping and Irrigation Windham Studio Inc. 164607 / Collier Blvd. Highway Beautification CHANGE # 5 EFFECTIVE DATE: 6nl20t7 PROJECT#:60149 ENGINEER/DESIGN PROFESSIONAL: You are directed to proceed promptly with the following change(s): -tTtiplq: Request to change line item #14: Beach Sunflower, 3 gallon, lE,, spread, quantity of Z4l @$4'95 each for a total cost of $1,192.95 toa I gallon size increasing t[e quantity to +gz @$z.47seach for atotal cost of @1,192.95. Purpose of Work Directive Change: The p-urpose of the change is to purchase Beach Sunflower I gallon size inlieu ofthe 3 gallon size because it is unavailable to procure atihis time. If a claim is made th Change order basod thereon will invoive one or more of the following methods oia.t"r*ining the effect of thechanges(s). Method of detennining change in Contract price: fil unit prices fJ Lump Sumfl other Estimated increase (decrease) in Contract price $o Method of determining change in Contact Times:I Conkactor's records fl Engineer's recordfl other Estimated change in Conhact Time: Increase or decrease byocalendar days. Attachments: There axe no attachments. Nursery Certifications will be obtained at pnrject close out. 06102t17 2:28 PM 6 16.E.1.a Packet Pg. 18 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 'j ,,, t I{o.SB$S ,-lOF t,tqr.S*{ -t" it'bl--.t t ,'tri"-&_.*** .tt' . c tur'& dtr{tdsr. i mcilru 7 16.E.1.a Packet Pg. 19 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) Undetgrcund Utilities Grp DBA Cabco Gro P.O, Box 60537 FL Myery Fla 3390G Offie: (239) 334-/H27 Fax: (239) 334-3997 abaorp@em[r,rqmail.om BillTo: Hannula Irrigation, Inc 7050 Pennsylvania St, ft. Myers,FL.339L2 f nvoice Exchange Collier Blvd Invoice# HI-CFR Work Orderlnvoice Date slrslzotT N/A QTY/rr,ITEM DESCRIPTION RATE AMOUNT 50 2'D.B Crossing the Nofth Bound lane of Collier Blvd (1) 2" HDPE SDR 11 Directional Bore 16.00 800.00 Terms: Net 30 days.Total ggoo,oo 8 16.E.1.a Packet Pg. 20 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) MarcellaJeanne From: Sent: To: FrenchJames Tuesday, June 20, 2017 12:24PM ShueGene; KovenskyKenneth; GossardTravis; AhmadJay; BosiMichael; McleanMatthew; PattersonAmy; OssorioMichael; LongRichard; MarcellaJeanne; ClevelandMarisa; BowmanMagaly; PuigJudy; StrainMark; AshtonHeidi LevyMichael; SantabarbaraGino, GurrolaSandra JF - June 23 through July 5,2017 Team, I will be out of the office from June 23,2017 through July 4,20L7, returning on July 5, 2077.1will monitor my emails (very lightly) and will have limited access to my phone. Marisa or Magaly will check my emails and phone messages while l'm away. Gene Shue and Ken Kovensky have my full signature authority for GMD Transportation a rd Capital Service (South) and Development Services and Regulation (North) respectively. Jay Ahmad will cover any BCC meeting obligations that I have for June 27,20L7 and possibly June 28, 2077, and Mike Bosi and Matt McLean will be on hand to assist with allof the GMD listed land use items on that BCC agenda. For all of the other GMD items at thir,;meeting, please keep an eye on the agenda to be sure that you are at the meeting on time and prepared to cover'1our item. I appreciate all of your efforts and the great work that you and your teams continue to deliver on a daily basis. I will be back on Wednesday, July 5,2017. Best regards, Jamie James C. French, Deputy Department Head Growth Management Department, Collier County Government Development Services Bldg. 2800 N. Horseshoe Drive, Naples, Florida 34104 office (239) 2s2-s7L7 - Mobile (239) 289-6267 Ji&r*ftY1,; Under Florida Law, e-mail addresses are public records. lf you do not want your e-mail address released i r response to a public records request, do not send electronic mail to this entity. lnstead, contact this office by telephone o'in writing. 9 16.E.1.a Packet Pg. 21 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 10 16.E.1.a Packet Pg. 22 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) Adam Northrup cn=adamnorthrup@colliergov.net '00'04- 12:03:43 2017.07.21 11 16.E.1.a Packet Pg. 23 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 12 16.E.1.a Packet Pg. 24 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 13 16.E.1.a Packet Pg. 25 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 14 16.E.1.a Packet Pg. 26 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 15 16.E.1.a Packet Pg. 27 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 16 16.E.1.a Packet Pg. 28 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 17 16.E.1.a Packet Pg. 29 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) Adam Northrup cn=adamnorthrup@collier gov.net '00'04- 12:06:22 2017.07.21 18 16.E.1.a Packet Pg. 30 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 19 16.E.1.a Packet Pg. 31 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 20 16.E.1.a Packet Pg. 32 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 21 16.E.1.a Packet Pg. 33 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 22 16.E.1.a Packet Pg. 34 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 23 16.E.1.a Packet Pg. 35 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 24 16.E.1.a Packet Pg. 36 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) 25 16.E.1.a Packet Pg. 37 Attachment: 0808 Change Order Backup - FY17 (3572 : 0808 Administrative Services Change Order Report) Administrative Services Change Order Report Item page #Contract/ Grant No.Change #DateProject Name Vendor Name Division - Project Manager Original Contract Amount Current Contract Amount Change Order Amount Revised Contract Amount % Over Board Approved Amount Contract Length Change in length (Days) Updated contract length Change in length (%) 1 1 16-6597 2 6/27/2017 Jail Master Plan AECOM Technical Services Inc.Facilities - Leandro Goicoechea $381,852.00 $381,852.00 $0.00 $381,852.00 0.00%163 30 193 18.40% 2 3 16-6607 5 6/29/2017 Collier Blvd Highway Beautification Hannula Landscaping Road Maintenance - Pamela Lulich $152,247.78 $195,745.59 ($8,477.37)$187,268.22 -4.33%295 0 295 0.00% 3 10 16-7018 2 7/21/2107 Logan Blvd Extension Bonness, Inc.Transportation Engineering - John Conti $4,444,063.00 $4,444,063.00 $0.00 $4,444,063.00 0.00%275 4 279 1.45% 4 16 16-6621 2 7/19/2017 Learning Management System Cornerstone On Demand, Inc Human Resources - Amy Lyberg $135,500.00 $152,300.00 $0.00 $152,300.00 0.00%1460 0 1460 0.00% 5 18 16-6572R 1 7/21/2017 Golden Gate Parkway at Livingston Intersection Quality Enterprises USA, Inc. Transportation Engineering - James Zuver $289,128.70 $289,129.70 $0.00 $289,129.70 0.00%90 4 94 4.44% 6 19 14-6342 15 7/10/2017 Collier Blvd (Golden Gate to Green)Community Asphault Transportation Engineering - Kevin Dugan $22,688,000.00 $2,268,800.00 $0.00 $2,268,800.00 0.00%897 18 915 2.01% 7 22 14-6350 3 7/21/2017 Plumbing Contractors BC Plumbing Service of SWFL Facilities - Rady Edreva NA NA $0.00 $0.00 0.00%1095 0 1095 0.00% Meeting Date Total number of Change orders Total Dollar Change Total Change in Days 8/8/2017 7 -$8,477.37 56 16.E.1.b Packet Pg. 38 Attachment: 0808 Change Order Report - FY17 (3572 : 0808 Administrative Services Change Order 16.E.1.c Packet Pg. 39 Attachment: 0808 After the Fact Memos - FY17 (3572 : 0808 Administrative Services Change Order Report) 16.E.1.c Packet Pg. 40 Attachment: 0808 After the Fact Memos - FY17 (3572 : 0808 Administrative Services Change Order Report) 16.E.1.c Packet Pg. 41 Attachment: 0808 After the Fact Memos - FY17 (3572 : 0808 Administrative Services Change Order Report)