CWIP Minutes 04/07/2017 April 7,2017
MINUTES OF THE COLLIER COUNTY COMPREHENSIVE WATERSHED
IMPROVEMENT PROGRAM COMMITTEE
Naples, Florida, April 7, 2017
LET IT BE REMEMBERED, the Collier County Watershed Improvement Program
Committee in and for the County of Collier, having conducted business herein, met on this
date at 1:15PM in a REGULAR SESSION at the Growth Management Department
Building, Room 609/610 2800 N. Horseshoe Drive, Naples,FL with the following persons
present:
Chairman: Jocelyn Nageon De Lestang
Vice Chairman: Dennis Vasey
Gregg Strakaluse
Chadd Chustz
Brent Bachelder
Jeff Carter
(Vacancy)
ALSO PRESENT: Jerry Kurtz, Stormwater Planning, Staff Liaison
Tabitha Stadler, Stormwater Planning
Kris Van Lengen, Community Planning Manager
1
April 7,2017
Any persons in need of the verbatim record of the meeting may request a copy of the audio recording
from the Collier County Growth Management Department—Contact Mr.Evy Ybaceta at 239-252-2400.
1. Call to order
The meeting was called to order at 1:15 pm and a quorum was established.
2. Approval of Agenda—Committee action requested
Mr.Strakaluse moved to approve the Agenda. Second by Mr. Vasey. Carried unanimously 5-0.
3. Approval of Minutes—Committee action requested
Mr. Vasey moved to approve the minutes of the January 29, 2016 meeting as presented. Second by
Mr.Strakaluse. Carried unanimously 5—0.
4. Staff Announcements—Jerry Kurtz,Collier County Government •
None
5. Workshop/Discussion Session—Tabitha Stadler, Collier County
a. City of Naples Stormwater Utility and Master Plan Update- Gregg Strakaluse,Streets and
Stormwater Director
Mr.Strakaluse presented the PowerPoint"City of Naples Stormwater Master Plan Update-Public
Information Meeting" for information purposes highlighting:
• The City of Naples receives an average annual rainfall of 56 inches per year yielding
approximately 14 billion gallons of water.
• The stormwater is discharged into the Gulf of Mexico,Naples Bay, local lakes and
waterbodies and the groundwater.
• In 1993 a Stormwater Enterprise Fund was developed to address flooding in the City which
imposed a fee of$4.00 per Average Residential Unit(ARU)
• In 2008,the fee was increased to$11.40 per ARU to address projects identified in the
Stormwater Master Plan.
• Also, included in the changes at the time were a 30 percent credit for properties with
stormwater management systems and a requirement for new single family homes to provide
onsite stormwater management systems.
• The rate was increased again in 2017 to its current rate of$13.06 per ARU with the
allocation of payers as follows: Commercial—47%; Multi Family—33%; Single Family
Residential 20%.
• The program also allows an option for multi-family properties being billed based on
impervious area or number of residential units providing they submit a certification from a
licensed land surveyor identifying the total impervious area of the site and any common area
used by the property.
• The City has a Stormwater Master Plan which identifies goals for the City by tracking and
evaluating current stormwater management practices and measuring the components of
management including flooding and recovery,water quality and ecology,stormwater
infrastructure operations and maintenance,regulatory activities and capital projects.
During Committee discussion,the following was noted:
• Do the multi family options encourage large roof area construction with creating greater
quantities of runoff which may impact water quality?—Staff noted data indicates many
2
April 7,2017
• The project will improve habitat and water quality,enhance the marine life environment and
provide a better overall experience for those utilizing the area.
• The cost of the project is estimated at$10.5M for the south end and$10.0M for the north
end.
c. City of Naples ASR program- Gregg Strakaluse and Andy Holland
Mr. Strakaluse presented the PowerPoint "Stormwater Reuse Through Aquifer Storage &Recovery
dated April 7, 2017 highlighting the following:
• The City's has four ASR wells with the goal of:
• Developing up to 5 MGD of additional water sources to reduce consumption of
potable water from 270 gallons per capita per day(GPCD)to below 200 GPCD.
• Conserving existing potable water supply from the Lower Tamiami Aquifer and
increasing supply of supplemental water for irrigation.
• Reducing reliance on expanding water treatment facilities and meet the conditions of
the renewed water use permit, 100%reclaimed status.
• The critical period is March through May,the height of the dry season.
• The program assumes a 30%recovery rate with the volume to meet irrigation during critical
periods= 1,000,000,000 gallons(6.24 mgd for 90 days)and one ASR well can deliver 1 to 2
mgd.
• The program is heavily regulated to protect underground drinking water sources with
permitting and construction being a multi-year endeavor including an Exploratory Well
Construction permit,ASR Well Construction Permit,Cycle Testing the Storage Zone Permit
and an Operating Permit.
• The program is cost effective given the high demand for irrigation water and the low
availability of the resource during the dry times.
Under Committee discussion, it was noted a recent goal for the County is to reduce discharges into
the overall system with items such as a new policy decreasing the allowable discharge rates from
certain watershed basins into the canals. A concern was expressed there is a Land Development
Code amendment proposed to allow single family residences constructed in Golden Gate Estates to
discharge waters directly off site providing less than 25 percent of the land is developed into
impervious areas.
6. Member and Citizen Comments
None
7. Old Business
None
8. New Business
None
9. Set or announce next meeting date
The next meeting will be held on May 9,2017.
There being no further business for the good of the County,the meeting was adjourned by the
order of the Chair at 3:15PM.
4
April 7,2017
developers incorporate the roof drain components of the building into the stormwater
management systems as opposed to direct runoff.
• The Utility was well received by environmental groups and residents as they realized the
flooding issue needed to be addressed.
• The City of Marco Island has begun investigating the feasibility of a Stormwater Utility and
a workshop is being held by the Waterways Committee on the item in the near future.
b. Naples Bay Water Quality Project at the Cove Pump Station and Beach Outfalls Project-
Andy Holland,P.E.,Engineering Manager
Mr. Holland presented the PowerPoint"The Cove Stormwater Pump Station Outfall Improvements
and Water Quality Project and Naples Beach Restoration"dated Thursday January 28, 2017"
noting:
Cove Inn Outfall
• The project involves reconstructing the outfall area at the Cove Inn to minimize erosion at
the end of the outfall,improve the aesthetics of the area and improve water quality.
• The area will be redeveloped with the introduction of an oyster bed,developing a living
shoreline, improving sidewalks, installing benches and providing educational signage.
• Approximately 1,000 cubic yards of sand will be removed in constructing the 40-foot-wide
outflow channel which will follow the path of the current flows.
During Committee discussion,the following was noted:
• Consideration should be given to installing rock rip rap along Coast Guard Station edge to
ensure the area is not scoured by the water flows.
• The stormwater entering the system is currently pretreated to remove debris and the City is
considering upgrading the treatment with additional separators upstream of the discharge.
• A portion of the sand may be reused on site if deemed suitable, or disposed of at the landfill
if it is comprised by contaminants or organic matter.
Naples Beach Restoration
• The project involves combining the 10 Naples Beach outfall pipes with individual discharge
pipes located at the north and south ends of the beach.
• The project is moving from the 30 percent to 100 percent design stage.
• The water will be centrally collected at a pump station and dispersed via a series of diffusers
along the pipe located approximately 1,000 feet offshore of the beach
• The discharge pipe at the south end will be located at 3rd Avenue North.
Under Committee discussion the following was noted:
• The existing water quality protocols will remain in place and if specific standards are not
met,measures need to be taken to address the deficiencies(this has not been an issue in the
past).
• The predominant flow of water does not contain suspended solids as the stormwater flows
through a series of roadside swales as opposed to the curb and gutter street designs prevalent
in the Cove Inn discharge areas.
• Given the water depth of the discharge pipe,there should not be a problem for boat
navigation; however,precautions may need to be taken to ensure boat anchors do not get
caught on the diffusers or pipe.
3
April 7, 2017
COMPREHENSIVE WATERSHED
IMPROVEME T PROGRAM COMMITTEE
,;
i/ 1/
Chair' an;Jocelyn Nageon De Lestang
t
These Minutes were approved by the Committee on g 7 / 7 , as presented 1G , or as
amended
5