Agenda 06/27/2017 Item #16A 206/27/2017
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the final plat of Maple Ridge Amenity Center at Ave Maria, (Application Number
PL20170000724) approval of the standard form Construction and Maintenance Agreement and
approval of the amount of the performance security.
_____________________________________________________________________________________
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat
of Maple Ridge Amenity Center at Ave Maria, a subdivision of lands located in Section 4, Township 48
South, Range 29 East, Collier County, Florida, following the alternative procedure for approval of
subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat
and associated construction documents for construction purposes and recording purposes concurrently.
CONSIDERATIONS: The Development Review Division of the Growth Management Department has
completed the review of the construction drawings, specifications, and final plat of Maple Ridge Amenity
Center at Ave Maria. These documents are in compliance with the County Land Development Code and
Chapter 177, Florida Statutes. This project is within the Ave Maria SRA. All fees have been paid.
Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any
remaining improvements, together with a Construction and Maintenance Agreement for Subdivision
Improvements, shall be provided and accepted by the County Manager or his designee and the County
Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Section
10.02.04 F.2 of the Land Development Code.
The Development Review Division recommends that the final plat of Maple Ridge Amenity Center at
Ave Maria be approved for recording.
FISCAL IMPACT: The project cost is $555,769.78 (estimated) to be borne by the developer.
The cost breakdown is as follows:
a) Water & Sewer $293,380.89
b) Drainage, Paving, Grading $262,388.89
The Security amount, equal to 110% of the project cost, is $611,346.76
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $9,039.67
16.A.2
Packet Pg. 558
06/27/2017
The Fees are based on a construction estimate of $262,388.89 (does not include Ave Maria Utilities) and
were paid in September, 2016 in association with PL20160001559, the Maple Ridge Phase 4 Amenity
Center Site Development Plan.
The breakdown is as follows:
a) Plat Review Fee ($1,000.00 + $5./ac) $1,168.00
b) Construction Drawing Review Fee
Water & Sewer (.75% const. est.) n/a
c) Drainage, Paving, Grading
(.75% const. est.) $1,967.92
d) Construction Inspection Fee
Water & Sewer (2.25% const. est.) n/a
e) Drainage, Paving, Grading
(2.25% const. est.) $5,903.75
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public
Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation,
except when the applicant elects to delay obtaining a COA for non-residential developments that are
required to obtain approval of a site development plan prior to the issuance of a building permit.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval. - SAS
RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of Maple Ridge
Amenity Center at Ave Maria (Application Number PL20170000724) for recording with the following
stipulations:
1. Approve the amount of $611,346.76 as performance security for the required improvements; or such
lesser amount based on work completed, and as is approved by the Growth Management Department.
2. Approve the standard form Construction and Maintenance Agreemen t and direct the County Manager
or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction and
Maintenance Agreement is approved and accepted by the County Attorney’s office and the
Board of County Commissioners or the County Manager or his designee on behalf of the
Board pursuant to Section 10.02.04 F.2 of the Land Development Code.
Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division
ATTACHMENT(S)
1. Location Map (PDF)
2. Opinion of Cost (PDF)
3. Plat Map (PDF)
16.A.2
Packet Pg. 559
06/27/2017
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.2
Doc ID: 3189
Item Summary: This item requires that ex parte disclosure be provided by Commission members.
Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to
approve for recording the final plat of Maple Ridge Amenity Center at Ave Ma ria, (Application Number
PL20170000724) approval of the standard form Construction and Maintenance Agreement and approval
of the amount of the performance security.
Meeting Date: 06/27/2017
Prepared by:
Title: Site Plans Reviewer, Senior – Growth Management Development Review
Name: John Houldsworth
05/10/2017 11:34 AM
Submitted by:
Title: Project Manager, Principal – Growth Management Department
Name: Matthew McLean
05/10/2017 11:34 AM
Approved By:
Review:
Growth Management Department Judy Puig Level 1 Division Reviewer Completed 05/11/2017 2:25 PM
Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 05/12/2017 2:36 PM
Growth Management Development Review Chris Scott Additional Reviewer Completed 05/15/2017 11:25 AM
Growth Management Department Matthew McLean Additional Reviewer Completed 05/26/2017 10:11 AM
Growth Management Department John Houldsworth Level 2 Division Administrator Skipped 05/10/2017 11:09 AM
Growth Management Department James French Additional Reviewer Completed 05/26/2017 4:27 PM
County Attorney's Office Scott Stone Level 2 Attorney Review Completed 05/30/2017 1:24 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/30/2017 3:54 PM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 06/05/2017 1:18 PM
Budget and Management Office Mark Isackson Additional Reviewer Completed 06/16/2017 9:55 AM
County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 06/16/2017 10:35 AM
Board of County Commissioners MaryJo Brock Meeting Pending 06/27/2017 9:00 AM
16.A.2
Packet Pg. 560
16.A.2.a
Packet Pg. 561 Attachment: Location Map (3189 :
P:\Active_Projects\P-CCAM-009\001_AmenityCenter\Design_Permit\OPC's\Bond\AmenityCenter_OPC_PPL-Bond(Rev00).xlsx1 of 8
Project:
Task:
Prepared By:CW Date:4/18/2017
Checked By:JCE Date:4/18/2017
MAPLE RIDGE AMENITY CENTER AT AVE MARIA (BRIGATA WAY)
PERCENT DOLLAR
EARTHWORK 18,654.00$ 10%1,865.40$
PAVING 106,655.65$ 10%10,665.57$
DRAINAGE 57,110.00$ 10%5,711.00$
POTABLE WATER 56,239.00$ 10%5,623.90$
SANITARY SEWER 210,470.90$ 10%21,047.09$
IRRIGATION 22,815.70$ 10%2,281.57$
LANDSCAPE, LIGHTING, & FEATURES 33,300.00$ 10%3,330.00$
Total Probable Construction Cost:505,245.25$ 10%50,524.53$
NOTES:
1)
2)
3)
4)
5)
6)
John C. English, P.E.
FL Registration #56171
Peninsula Engineering
Certificate of Authorization #28275
231,517.99$
Calculation Summary SUB-TOTAL
CONTINGENCY
TOTAL
61,862.90$
20,519.40$
117,321.22$
100% Construction Bond:262,388.89$
10% Maintenance Bond:26,238.89$
Collier County (Earthwork, Paving, Drainage, Irrigation, Landscape and Lighting)
Maple Ridge Amenity Center at Ave Maria
(Brigata Way) (Rev. 00)
Engineer's OPC for Final Plat Bond
62,821.00$
555,769.78$
25,097.27$
36,630.00$
This item has been electronically signed and sealed by John C. English, PE
on April 18, 2017 using a SHA-1 authentication code.
Printed copies of this document are not considered signed and sealed and the SHA-1
authentication code must be verified on any electronic copies.
This Opinion of Probable Cost shall be used for Bonding Purposes only.
This cost estimate assumes dry utilities (LCEC, cable, telephone) will be installed at no-cost to the developer.
This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances, and construction costs in effect
on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost, and may require adjustments to delete,
decrease, or increase portions of this Opinion of Probable Cost.
Due to the preliminary nature of the project, this cost estimate includes a 10% contingency in each section
This cost estimate does not include the cost of any building construction.
All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time due
to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor.
293,380.89$
10% Maintenance Bond:29,338.09$
Total Bond Amount:
Total Bond Amount:322,718.98$
288,627.77$
100% Construction Bond:
AMUC (Potable Water and Sanitary Sewer)
16.A.2.b
Packet Pg. 562 Attachment: Opinion of Cost (3189 : Final Plat Maple Ridge Amenity Center)
P:\Active_Projects\P-CCAM-009\001_AmenityCenter\Design_Permit\OPC's\Bond\AmenityCenter_OPC_PPL-Bond(Rev00).xlsx2 of 8
Project:
Task:
Prepared By:CW Date:4/18/2017
Checked By:JCE Date:4/18/2017
EARTHWORK
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
EW-1
EROSION CONTROL (TURBIDITY BARRIER, INLET
PROTECTION, SEED AND MULCH)0 LF 1.00$ -$
EW-2 CLEAR AND DISC 0 AC 800.00$ -$
EW-3 SOD - DPT SWALE 4570 SY 2.20$ 10,054.00$
EW-4 EMBANKMENT (COMPACTED IN-PLACE)0 CY 1.25$ -$
EW-5 FINAL GRADING 1 LS 5,000.00$ 5,000.00$
EW-6 NDPES MAINTENANCE 6 MONTH 600.00$ 3,600.00$
-$
-$
-$
SUB-TOTAL EARTHWORK =18,654.00$
10% CONTINGENCY =1,865.40$
TOTAL EARTHWORK =20,519.40$
Note:
Maple Ridge Amenity Center at Ave Maria
(Brigata W
Engineer's OPC for Final Plat Bond
1.) At the time of this plat application, all activities involving erosion control, clearing, and embankment have been completed.
16.A.2.b
Packet Pg. 563 Attachment: Opinion of Cost (3189 : Final Plat Maple Ridge Amenity Center)
P:\Active_Projects\P-CCAM-009\001_AmenityCenter\Design_Permit\OPC's\Bond\AmenityCenter_OPC_PPL-Bond(Rev00).xlsx3 of 8
Project:
Task:
Prepared By:CW Date:4/18/2017
Checked By:JCE Date:4/18/2017
PAVING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-III (FIRST LIFT)2,522 SY 4.95$ 12,483.90$
PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-III (SECOND LIFT)2,522 SY 4.95$ 12,483.90$
PAV-3 8" LIMEROCK BASE 3,014 SY 8.75$ 26,372.50$
PAV-4 12" STABILIZED SUBGRADE 3,112 SY 1.55$ 4,823.60$
PAV-5 TYPE "D" CURB 54 LF 9.00$ 486.00$
PAV-6 2' VALLEY GUTTER 1,465 LF 8.00$ 11,720.00$
PAV-7 CONCRETE SIDEWALK (4" THICK)7,298 SF 3.75$ 27,367.50$
PAV-8 SODDING 1,306 SY 2.00$ 2,612.00$
PAV-9 SIGNAGE 1 LS 2,000.00$ 2,000.00$
PAV-10 STRIPING 1 LS 2,500.00$ 2,500.00$
PAV-11 TEMPORARY LIMEROCK TURNAROUND 435 SY 8.75$ 3,806.25$
SUB-TOTAL PAVING =106,655.65$
10% CONTINGENCY =10,665.57$
TOTAL PAVING =117,321.22$
Maple Ridge Amenity Center at Ave Maria
(Brigata W
Engineer's OPC for Final Plat Bond
ROADWAY
16.A.2.b
Packet Pg. 564 Attachment: Opinion of Cost (3189 : Final Plat Maple Ridge Amenity Center)
P:\Active_Projects\P-CCAM-009\001_AmenityCenter\Design_Permit\OPC's\Bond\AmenityCenter_OPC_PPL-Bond(Rev00).xlsx4 of 8
Project:
Task:
Prepared By:CW Date:4/18/2017
Checked By:JCE Date:4/18/2017
DRAINAGE
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
DRA-1 15" RCP STORM SEWER 79 LF 32.10$ 2,535.90$
DRA-2 18" RCP STORM SEWER 615 LF 36.80$ 22,632.00$
DRA-3 24" RCP STORM SEWER 73 LF 53.70$ 3,920.10$
DRA-4 VALLEY GUTTER INLET (DOUBLE)6 EA 3,546.00$ 21,276.00$
DRA-5 JUNCTION BOX 1 EA 2,887.00$ 2,887.00$
DRA-6 TYPE "D" INLET (WITH SIDE INLETS)1 EA 2,299.00$ 2,299.00$
DRA-7 RIP-RAP W/ FILTER FABRIC UNDERLAYMENT 10 SY 156.00$ 1,560.00$
SUB-TOTAL DRAINAGE =57,110.00$
10% CONTINGENCY =5,711.00$
TOTAL DRAINAGE =62,821.00$
Maple Ridge Amenity Center at Ave Maria
(Brigata W
Engineer's OPC for Final Plat Bond
ROADWAY
16.A.2.b
Packet Pg. 565 Attachment: Opinion of Cost (3189 : Final Plat Maple Ridge Amenity Center)
P:\Active_Projects\P-CCAM-009\001_AmenityCenter\Design_Permit\OPC's\Bond\AmenityCenter_OPC_PPL-Bond(Rev00).xlsx5 of 8
Project:
Task:
Prepared By:CW Date:4/18/2017
Checked By:JCE Date:4/18/2017
POTABLE WATER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
WAT-1 8" PVC WATER MAIN (C900, DR18)785 LF 15.80$ 12,403.00$
WAT-2 8" PVC WATER MAIN (C900, DR14)195 LF 18.00$ 3,510.00$
WAT-3 8" GATE VALVE 12 EA 1,286.00$ 15,432.00$
WAT-4 FIRE HYDRANT ASSEMBLY (COMPLETE)3 EA 3,798.00$ 11,394.00$
WAT-5 TEMPORARY BLOW-OFF 3 EA 3,087.00$ 9,261.00$
WAT-6 TEMP. BACTERIAL SAMPLE POINT 3 EA 176.00$ 528.00$
WAT-7
REMOVE EX BLOW-OFF AND CONNECT TO EX.WATER
MAIN 1 EA 2,211.00$ 2,211.00$
WAT-8 TESTING 1 LS 1,500.00$ 1,500.00$
-$
SUB-TOTAL POTABLE WATER =56,239.00$
10% CONTINGENCY =5,623.90$
TOTAL POTABLE WATER =61,862.90$
Maple Ridge Amenity Center at Ave Maria
(Brigata W
Engineer's OPC for Final Plat Bond
ROADWAY
16.A.2.b
Packet Pg. 566 Attachment: Opinion of Cost (3189 : Final Plat Maple Ridge Amenity Center)
P:\Active_Projects\P-CCAM-009\001_AmenityCenter\Design_Permit\OPC's\Bond\AmenityCenter_OPC_PPL-Bond(Rev00).xlsx6 of 8
Project:
Task:
Prepared By:CW Date:4/18/2017
Checked By:JCE Date:4/18/2017
SANITARY SEWER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
SAN-1 8" SDR 26 PVC GRAVITY SEWER MAIN (16'-18' CUT)464 LF 98.30$ 45,611.20$
SAN-2 8" SDR 26 PVC GRAVITY SEWER MAIN (18'-20' CUT)424 LF 122.90$ 52,109.60$
SAN-3 4' SANITARY SEWER MANHOLE (16'-18' CUT)5 EA 12,500.00$ 62,500.00$
SAN-4 4' SANITARY SEWER MANHOLE (18'-20' CUT)2 EA 13,657.00$ 27,314.00$
SAN-5 6" PVC FORCE MAIN (C900 DR18)118 LF 15.00$ 1,770.00$
SAN-6 6" PVC FORCE MAIN (C900 DR14)687 LF 16.90$ 11,610.30$
SAN-7 6" FORCE MAIN PLUG VALVE 1 EA 1,195.00$ 1,195.00$
SAN-8 CONNECT TO EX. FORCE MAIN 1 EA 1,000.00$ 1,000.00$
SAN-9 TELEVISION INSPECTION 888 LF 6.60$ 5,860.80$
SAN-10 TESTING 1 LS 1,500.00$ 1,500.00$
SUB-TOTAL SANITARY SEWER =210,470.90$
10% CONTINGENCY =21,047.09$
TOTAL SANITARY SEWER =231,517.99$
Maple Ridge Amenity Center at Ave Maria
(Brigata W
Engineer's OPC for Final Plat Bond
ROADWAY
16.A.2.b
Packet Pg. 567 Attachment: Opinion of Cost (3189 : Final Plat Maple Ridge Amenity Center)
P:\Active_Projects\P-CCAM-009\001_AmenityCenter\Design_Permit\OPC's\Bond\AmenityCenter_OPC_PPL-Bond(Rev00).xlsx7 of 8
Project:
Task:
Prepared By:CW Date:4/18/2017
Checked By:JCE Date:4/18/2017
IRRIGATION
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
IRR-1 4" PVC IRRIGATION MAIN (C900,DR18)746 LF 10.40$ 7,758.40$
IRR-2 4" PVC IRRIGATION MAIN (C900, DR14)181 LF 11.30$ 2,045.30$
IRR-3 4" GATE VALVE 6 EA 809.00$ 4,854.00$
IRR-4
REMOVE EX. BLOW-OFF AND CONNECT TO EX.
IRRIGATION MAIN 1 EA 731.00$ 731.00$
IRR-5 TESTING 1 LS 2,000.00$ 2,000.00$
IRR-6 TEMPORARY BLOW-OFF 3 EA 1,809.00$ 5,427.00$
SUB-TOTAL IRRIGATION =22,815.70$
10% CONTINGENCY =2,281.57$
TOTAL IRRIGATION =25,097.27$
Maple Ridge Amenity Center at Ave Maria
(Brigata W
Engineer's OPC for Final Plat Bond
ROADWAY
16.A.2.b
Packet Pg. 568 Attachment: Opinion of Cost (3189 : Final Plat Maple Ridge Amenity Center)
P:\Active_Projects\P-CCAM-009\001_AmenityCenter\Design_Permit\OPC's\Bond\AmenityCenter_OPC_PPL-Bond(Rev00).xlsx8 of 8
Project:
Task:
Prepared By:CW Date:4/18/2017
Checked By:JCE Date:4/18/2017
LANDSCAPE, LIGHTING, & FEATURES
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
LL-1 STREET LIGHTING 6 EA 2,250.00$ 13,500.00$
LL-2 STREET TREES (PER LF OF ROAD)800 LF 18.50$ 14,800.00$
LL-3 SECONDARY IRRIGATION SERVICE ALLOWANCE 1 LS 5,000.00$ 5,000.00$
-$
-$
-$
SUB-TOTAL LANDSCAPE, LIGHTING, & FEATURES =33,300.00$
10% CONTINGENCY =3,330.00$
TOTAL LANDSCAPE, LIGHTING, & FEATURES =36,630.00$
Maple Ridge Amenity Center at Ave Maria
(Brigata W
Engineer's OPC for Final Plat Bond
ROADWAY
16.A.2.b
Packet Pg. 569 Attachment: Opinion of Cost (3189 : Final Plat Maple Ridge Amenity Center)
Digitally signed by Lance T Miller, PSM LS#5627 DN: cn=Lance T Miller, PSM LS#5627, o=Stantec Consulting Services Inc, ou=Digitally signed and sealed using a SHA-1 authentication code; and, Printed copies of this document are not considered signed and sealed and the SHA-1 authentication code must be verified on any electronic copies., email=lance.miller@stantec.com, c=US Date: 2017.04.05 14:45:47 -04'00'16.A.2.c
Packet Pg. 570 Attachment: Plat Map (3189 : Final Plat Maple Ridge Amenity Center)
“”“”“”16.A.2.c
Packet Pg. 571 Attachment: Plat Map (3189 : Final Plat Maple Ridge Amenity Center)