Loading...
Agenda 06/27/2017 Item # 9B06/27/2017 EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve an Ordinance amending Ordinance Number 04-41, as amended, the Collier County Land Development Code, which includes the comprehensive zoning regulations for the unincorporated area of Collier County, Florida, by amending the appropriate zoning atlas map or maps by changing the zoning classification of the herein described real property from Planned Unit Development (PUD) to Residential Planned Unit Development (RPUD) for a project known as the Triad RPUD to allow development of 44 single-family dwelling units. The subject property is located on the northeast corner of Palm Springs Boulevard and Radio Lane in Section 34, Township 49 South, Range 26 East, Collier County, Florida, consisting of 10.75± acres; providing for repeal of Ordinance No. 05-11, as amended by Ordinance No. 05-23, the former Triad Planned Unit Development, and by providing an effective date. [PUD-PL20160002564] OBJECTIVE: To have the Board of County Commissioners (Board) review staff’s findings and recommendations along with the recommendations of the Collier County Planning Commission (CCPC) regarding the above referenced petition and render a decision regarding the petition; and to ensure the project is in harmony with all the applicable codes and regulations in order to ensure that the community's interests are maintained. CONSIDERATIONS: The proposed Planned Unit Development (PUD) rezone will change the land uses from the currently approved 86 multi-family dwelling units to 44 single-family dwelling units. The Board approved the original Triad RPUD on September 27, 2005, under Ordinance 05-11 (see attached Exhibit B), and the subject site was rezoned from Commercial Professional and General Office District (C-1) and Commercial Convenience District (C-2) to PUD. The residential structures shall remain at a height of 35 feet. The preserve area shall remain in a similar location, as originally approved, along the north and east property lines. The petitioner is also requesting the following changes to the PUD, and they are listed below: - Removal of a commitment to provide a wall along the north boundary of the PUD - Removal of commitments related to phasing, a bus shelter, and Land Development Code (LDC) redundancies related to transportation, planning, water management, and environmental requirements The petitioner is also requesting Deviations related to: - Private street right-of-way width - Roadway drainage design - Size and height of a temporary banner sign - Reduction in landscape buffer width - Relaxing of a required sidewalk in “roadway stub” locations - Removal of one of the required amenities around a lake For further information, please see the Deviations Section located on page 13 of the Staff Report. FISCAL IMPACT: The PUD rezone by and of itself will have no fiscal impact on Collier County. There is no guarantee that the project, at build out, will maximize its authorized level of development. However, if the PUD is approved, a portion of the land could be developed and the new development will result in an impact on Collier County public facilities. 9.B Packet Pg. 114 06/27/2017 The County collects impact fees prior to the issuance of building permits to help offset the impacts of each new development on public facilities. These impact fees are used to fund projects identified in the Capital Improvement Element of the Growth Management Plan as needed to maintain adopted Level of Service (LOS) for public facilities. Additionally, in order to meet the requirements of concurrency management, the developer of every local development order approved by Collier County is required to pay a portion of the estimated Transportation Impact Fees associated with the project in accordance with Chapter 74 of the Collier County Code of Laws and Ordinances. Other fees collected prior to issuance of a building permit include building permit review fees. Finally, additional revenue is generated by application of ad valorem tax rates, and that revenue is directly related to the value of the improvements. Please note that impact fees and taxes collected were not included in the criteria used by staff and th e CCPC to analyze this petition. GROWTH MANAGEMENT PLAN (GMP) IMPACT: Future Land Use Element (FLUE): The Conditional Use request has been determined to be consistent with the FLUE of the GMP and therefore creates no impact. COLLIER COUNTY PLANNING COMMISSION (CCPC) RECOMMENDATION: The CCPC heard petition PUDA-PL20160002564, Triad RPUD on June 1, 2017, and by a vote of 6 to 0 recommended to forward this petition to the Board with a recommendation of approval subject to the following conditions: 1. Denial of Deviation #2 related to an inverted crown roadway design as it is a reduced standard from the current County Standard. In addition, the CCPC had the following concerns: - the negative impact on the health, safety and welfare of the residents who will be living in the proposed development; - a crowned street design is safer as the water drains to the edges rather than to the middle during high rain events; - reduction of the current drainage standard by eliminating a redundant route for stormwater; - the inverted drainage design requires additional maintenance that is passed along to future homeowners; - the potential savings from the inverted roadway design will result in a greater cost to future homeowners; - the subject development has a roadway system, not a private driveway. In a typical shopping center or apartment complex, an inverted roadway design is used to keep the parking spaces/stalls on either side of the driveway, drained. A residential road is not comparable to a private driveway; - the typical consumer will not likely realize the difference when they purchase - the applicant offers nothing to support his claim of affordability of the units 2. Removal of Deviation #6 as it does not apply to residential developments such as this. 3. Add a commitment to the PUD Document that states: when measuring from the north boundary of the PUD, the preserve area shall be no less than 52 feet in width at its narrowest point, and the combined area of the preserve and water management area shall be no less than 204 feet at its narrowest point. 4. Removal of “any other comparable use” category listed under Residential Permitted Uses. 5. Removal of “gatehouses” category listed under Residential Accessory Uses. 6. Reduction of the Accessory Structures Building Height. 7. Removal of the bisecting easement located in the Preserve. The requested conditions have been added to the PUD Document and Master Plan. Letters of objection have been received. Therefore, this petition has been placed on the Regular Agenda. 9.B Packet Pg. 115 06/27/2017 LEGAL CONSIDERATIONS: This is a site specific rezone from a Residential Planned Unit Development Zoning District to a Residential Planned Unit Development (RPUD) Zoning District for a project to be known as the Triad RPUD. The burden falls upon the applicant to prove that the proposed rezone is consistent with all the criteria set forth below. The burden then shifts to the Board of County Commissioners (BCC), should it consider denying the rezone, to determine that such denial would not be arbitrary, discriminatory or unreasonable. This would be accomplished by finding that the proposal does not meet one or more of the listed criteria below. Criteria for RPUD Rezones Ask yourself the following questions. The answers assist you in making a determination for approval or not. 1. Consider: The suitability of the area for the type and pattern of development proposed in relation to physical characteristics of the land, surrounding areas, traffic and access, drainage, sewer, water, and other utilities. 2. Is there an adequacy of evidence of unified control and suitability of agreements, contract, or other instruments or for amendments in those proposed, particularly as they may relate to arrangements or provisions to be made for the continuing operation and maintenance of such areas and facilities that are not to be provided or maintained at public expense? Findings and recommendations of this type shall be made only after consultation with the County Attorney. 3. Consider: Conformity of the proposed RPUD with the goals, objectives and policies of the Growth Management Plan. 4. Consider: The internal and external compatibility of proposed uses, which conditions may include restrictions on location of improvements, restrictions on design, and buffering and screening requirements. 5. Is there an adequacy of usable open space areas in existence and as proposed to serve the development? 6. Consider: The timing or sequence of development (as proposed) for the purpose of ass uring the adequacy of available improvements and facilities, both public and private. 7. Consider: The ability of the subject property and of surrounding areas to accommodate expansion. 8. Consider: Conformity with RPUD regulations, or as to desirable modifications of such regulations in the particular case, based on determination that such modifications are justified as meeting public purposes to a degree at least equivalent to literal application of such regulations. 9. Will the proposed change be consistent with the goals, objectives, and policies and future land use map and the elements of the Growth Management Plan? 10. Will the proposed RPUD Rezone be appropriate considering the existing land use pattern? 11. Would the requested RPUD Rezone result in the possible creation of an isolated district unrelated to adjacent and nearby districts? 12. Consider: Whether existing district boundaries are illogically drawn in relation to existing conditions on the property proposed for change. 13. Consider: Whether changed or changing conditions make the passage of the proposed amendment necessary. 14. Will the proposed change adversely influence living conditions in the neighborhood? 15. Will the proposed change create or excessively increase traffic congestion or create types of traffic deemed incompatible with surrounding land uses, because of peak volumes or projected types of vehicular traffic, including activity during construction phases of the development, or otherwise affect public safety? 16. Will the proposed change create a drainage problem? 9.B Packet Pg. 116 06/27/2017 17. Will the proposed change seriously reduce light and air to adjacent areas? 18. Will the proposed change adversely affect property values in the adjacent area? 19. Will the proposed change be a deterrent to the improvement or development of adjacent property in accordance with existing regulations? 20. Consider: Whether the proposed change will constitute a grant of special privilege to an individual owner as contrasted with the public welfare. 21. Are there substantial reasons why the property cannot (“reasonably”) be used in accordance with existing zoning? (a “core” question…) 22. Is the change suggested out of scale with the needs of the neighborhood or the county? 23. Consider: Whether it is impossible to find other adequate sites in the county for the proposed use in districts already permitting such use. 24. Consider: The physical characteristics of the property and the degree of site alteration which would be required to make the property usable for any of the range of potential uses under the proposed zoning classification. 25. Consider: The impact of development resulting from the proposed RPUD rezone on the availability of adequate public facilities and services consistent with the levels of service adopted in the Collier County Growth Management Plan and as defined and implemented through the Collier County Adequate Public Facilities Ordinance [Code ch.106, art.II], as amended. 26. Are there other factors, standards, or criteria relating to the RPUD rezone request that the Board of County Commissioners shall deem important in the protection of the public health, safety, and welfare? The BCC must base its decision upon the competent, substantial evidence presented by the written materials supplied to it, including but not limited to the Staff Report, Executive Summary, maps, studies, letters from interested persons and the oral testimony presented at the BCC hearing as these items relate to these criteria. The proposed Ordinance was prepared by the County Attorney’s Office. This item has been approved as to form and legality, and requires an affirmative vote of four for Board approval (HFAC) RECOMMENDATION: Staff concurs with the recommendation of the CCPC and further recommends that the Board of County Commissioners approves the request for PUDA-PL20160002564, Triad RPUD subject to the denial of Deviation # 2 (related to an inverted crown roadway design). Prepared by: Nancy Gundlach, AICP, PLA, Zoning Division ATTACHMENT(S) 1. Staff report-PL20160002564-Triad RPUD (PDF) 2. Ordinance - 060517(3) (PDF) 3. Location Map 1-5-16 (PDF) 4. Exhibit C-FLUE Memo-PL20160002564-Triad RPUD (PDF) 5. Master Plan 5-22-17 (PDF) 6. Exhibit D-NIM meeting notes-PL20160002564-Triad RPUD (PDF) 7. [Linked] PL20160002564-Triad RPUD application (PDF) 8. Letters of Concern 6-6-17 (PDF) 9. Legal Ad - Adenda ID # 3274 (PDF) 9.B Packet Pg. 117 06/27/2017 COLLIER COUNTY Board of County Commissioners Item Number: 9.B Doc ID: 3274 Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve an Ordinance amending Ordinance Number 04-41, as amended, the Collier County Land Development Code, which includes the comprehensive zoning regulations for the unincorporated area of Collier County, Florida, by amending the appropriate zoning atlas map or maps by changing the zoning classification of the herein described real property from Planned Unit Development (PUD) to Residential Planned Unit Development (RPUD) for a project known as the Triad RPUD, to allow development of 44 single-family dwelling units. The subject property is located on the northeast corner of Palm Springs Boulevard and Radio Lane in Section 34, Township 49 South, Range 26 East, Collier County, Florida, consisting of 10.75± acres; providing for repeal of Ordinance No. 05-11, as amended by Ordinance No. 05-23, the former Triad Planned Unit Development, and by providing an effective date. [PUD- PL20160002564] Meeting Date: 06/27/2017 Prepared by: Title: Planner, Principal – Zoning Name: Nancy Gundlach 06/02/2017 5:25 PM Submitted by: Title: Division Director - Planning and Zoning – Zoning Name: Michael Bosi 06/02/2017 5:25 PM Approved By: Review: Growth Management Department Judy Puig Level 1 Division Reviewer Completed 06/05/2017 1:33 PM Zoning Michael Bosi Additional Reviewer Completed 06/05/2017 2:41 PM Zoning Ray Bellows Additional Reviewer Completed 06/05/2017 4:44 PM County Attorney's Office Heidi Ashton-Cicko Level 2 Attorney of Record Review Completed 06/07/2017 3:37 PM Growth Management Department James French Additional Reviewer Completed 06/13/2017 1:43 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/14/2017 10:34 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 06/14/2017 4:04 PM Budget and Management Office Mark Isackson Additional Reviewer Completed 06/16/2017 10:59 AM County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 06/16/2017 11:27 AM Board of County Commissioners MaryJo Brock Meeting Pending 06/27/2017 9:00 AM Growth Management Department Nancy Gundlach Level 2 Division Administrator Skipped 05/25/2017 3:35 PM 9.B Packet Pg. 118 9.B.1 Packet Pg. 119 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 120 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 121 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 122 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 123 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 124 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 125 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 126 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 127 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 128 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 129 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 130 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 131 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 132 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 133 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 134 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 135 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 136 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 137 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 138 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.1 Packet Pg. 139 Attachment: Staff report-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 140 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 141 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 142 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 143 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 144 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 145 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 146 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 147 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 148 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 149 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) 9.B.2 Packet Pg. 150 Attachment: Ordinance - 060517(3) (3274 : Triad RPUD-PL20160002564) Davis BLVDRadio RD I75 PINE CON E LAN E PINE CR EST LANE PALM SPRINGS BLVDRADIO LANE 3 6 6531122445 4 5 6123124343 21 5 641212343 7 65123 52 61443 3 3121 524434 7 2132112 5 6443 CONSRV ESMT OR 3996 PG 3495 1.30 ACRES VACAT ED R/W RESOL # 89-06 6 À4À3 À5 À6À2À3À1À1À2À4 À5 À6À2À3À1À1À2À4À4À3 À3À3 À5 À6À4À2À1À1À2À4 X48 À1 À1 X9 X4.1 RMF-6 RMF-12(7) C-3 PUD RPUD RSF-4 PUD RPUD RPUD Location Map Zoning Map Petition Number: PL-2016-2564 PROJEC TLOCATION SITELOCATION ¹ 9.B.3 Packet Pg. 151 Attachment: Location Map 1-5-16 (3274 : Triad RPUD-PL20160002564) 9.B.4 Packet Pg. 152 Attachment: Exhibit C-FLUE Memo-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.4 Packet Pg. 153 Attachment: Exhibit C-FLUE Memo-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) 9.B.4 Packet Pg. 154 Attachment: Exhibit C-FLUE Memo-PL20160002564-Triad RPUD (3274 : Triad RPUD-PL20160002564) DATEREVISION#DRAWN0RGE:TWP:SEC:DATE:TITLE:CLIENT:PROJECT:OFPROJECT NO.:SHEET NUMBER:DESIGNED:DRAWN:Florida Certificates of Authorization EB 7663 LB 69526610 Willow Park Drive, Suite 200 | Naples, FL 34109Office: 239.597.0575 Fax: (239) 597-0578www.consult-rwa.comTRIAD RPUD D.R. HORTON, INC.MASTER PLAN EXHIBIT C12130019.02.00OCT.,201615 51S 26EPVMDA20 40 80 MASTER PLAN NOTES1. THIS MASTER PLAN ISCONCEPTUAL IN NATUREAND SUBJECT TO CHANGESDUE TO AGENCY REVIEWAND SITE CONDITIONS.2. ACREAGE AND THE DESIGN,LOCATIONS ANDCONFIGURATIONS OF THELAND IMPROVEMENTS AREAPPROXIMATE ANDSUBJECT TO REFINEMENTAT THE TIME OF PLANS AND PLAT APPROVAL.3. INTERNAL ROADWAYDEPICTED ON MASTER PLANIS CONCEPTUAL, ROW FORSINGLE FAMILY.4. REQUIRED PRESERVE: ±1.40AC (15% OF ±9.37 AC OFEXISTING NATIVEVEGETATION). PRESERVEPROVIDED: ±1.40 AC.PRESERVES MAY BE USED TO SATISFYTHE LANDSCAPE BUFFER REQUIREMENTSAFTER EXOTIC VEGETATION REMOVAL INACCORDANCE WITH LDC SECTIONS4.06.02 AND 4.06.05.E.1. SUPPLEMENTALPLANTINGS WITH NATIVE PLANTMATERIALS SHALL BE IN ACCORDANCEWITH LDC SECTION 3.05.07.”SITE DATATOTAL SITE AREA: 10.75± ACRESMAXIMUM DWELLING UNITS:44 SINGLE-FAMILY RESIDENCESSCALE 1"=40'9.B.5 Packet Pg. 155 Attachment: Master Plan 5-22-17 (3274 : Triad RPUD-PL20160002564) DATEREVISION#DRAWN0RGE:TWP:SEC:DATE:TITLE:CLIENT:PROJECT:OFPROJECT NO.:SHEET NUMBER:DESIGNED:DRAWN:Florida Certificates of Authorization EB 7663 LB 69526610 Willow Park Drive, Suite 200 | Naples, FL 34109Office: 239.597.0575 Fax: (239) 597-0578www.consult-rwa.comTRIAD RPUD D.R. HORTON, INC.MASTER PLAN EXHIBIT C22130019.02.00OCT.,201615 51S 26EPVMDA30 60 120DEVIATIONSSITE SUMMARYACREAGELAKE/ WATER MANAGEMENTACCESS DRIVE/ RIGHT OF WAYPRESERVE AREATOTALRESIDENTIALOTHER OPEN SPACEUSE±5.34±1.62±0.92±1.47±1.40±10.75DEVIATION #1 SEEKS RELIEF FROM LDC SECTION 6.06.01.N, “STREET SYSTEM REQUIREMENTS,” WHICHREQUIRES MINIMUM LOCAL STREET RIGHT-OF-WAY WIDTH OF 60 FEET, TO ALLOW FOR A 50-FOOTRIGHT-OF-WAY MINIMUM WIDTH FOR THE PRIVATE STREETS. DEVIATION #2 SEEKS RELIEF FROM LDC SECTION 6.06.01.N, “STREET SYSTEM REQUIREMENTS,” WHICHREQUIRES THAT STREETS SHALL BE CLASSIFIED BY THE CROSS-SECTIONS CONTAINED IN APPENDIX B, TOALLOW FOR AN INVERTED ROADWAY DESIGN, AS DEPICTED IN EXHIBIT C. DEVIATION #3 SEEKS RELIEF FROM LDC SECTION 5.04.06.A.3.E, WHICH ALLOWS TEMPORARY SIGNS ONRESIDENTIALLY ZONED PROPERTIES UP TO 4 SQUARE FEET IN AREA OR 3 FEET IN HEIGHT, TO ALLOW ATEMPORARY BANNER SIGN UP TO A MAXIMUM OF 32 SQUARE FEET IN AREA AND 8'HEIGHT. THETEMPORARY BANNER SIGNS SHALL BE LIMITED TO A MAXIMUM OF 90 DAYS DURING SEASON DEFINED ASJANUARY 1ST TO MARCH 31TH PER CALENDAR YEAR. DEVIATION #4 SEEKS RELIEF FROM LDC SECTION 4.06.02.C, TABLE 2.4, WHICH REQUIRES A 15-FOOT WIDETYPE B LANDSCAPE BUFFER WHERE SINGLE-FAMILY RESIDENTIAL ZONING ABUTS MULTI-FAMILYRESIDENTIAL ZONING ALONG THE EASTERN PUD BOUNDARY, TO ALLOW FOR A 15-FOOT WIDE TYPE ALANDSCAPE BUFFER ALONG THE EXISTING MASONRY WALL. DEVIATION #5 SEEKS RELIEF FROM LDC SECTION 6.06.02.A.1 WHICH REQUIRES THAT SIDEWALKS BECONSTRUCTED ON BOTH SIDES OF PUBLIC AND PRIVATE RIGHTS-OF-WAY, TO ALLOW FOR SIDEWALKS ONONE SIDE OF THE ROW FOR ROADWAY STUBS WHERE INDICATED ON THE MASTER PLAN. DEVIATION #6 SEEKS RELIEF FROM LDC SECTION 4.06.05.N.1.c WHICH REQUIRES ALL BODIES OF WATER,INCLUDING RETENTION AREAS EXCEEDING 20,000 SQUARE FEET, AND WHICH ARE LOCATED ADJACENT TO APUBLIC RIGHT-OF-WAY, MUST INCORPORATE INTO OVERALL DESIGN OF THE PROJECT AT LEAST 2 OF THEFOLLOWING ITEMS: I. A WALKWAY 5 FEET WIDE AND A MINIMUM OF 200 FEET LONG, WITH TREES OF ANAVERAGE OF 50 FEET ON CENTER AND WITH SHADED BENCHES, A MINIMUM OF 6 FEET IN LENGTH ORPICNIC TABLES WITH ONE LOCATED EVERY 150 FEET. II. FOUNTAINS. III. PARTIALLY SHADEDPLAZA/COURTYARD, A MINIMUM OF 200 SQUARE FEET IN AREA, WITH BENCHES AND/OR PICNIC TABLESABUTTING THE WATER-BODY, OR RETENTION AREAS; TO ALLOW FOR ONLY THE INSTALLATION OF ANAERATOR/FOUNTAIN.9.B.5 Packet Pg. 156 Attachment: Master Plan 5-22-17 (3274 : Triad RPUD-PL20160002564) 9.B.6 Packet Pg. 157 Attachment: Exhibit D-NIM meeting notes-PL20160002564-Triad RPUD (3274 : Triad RPUD- 9.B.6 Packet Pg. 158 Attachment: Exhibit D-NIM meeting notes-PL20160002564-Triad RPUD (3274 : Triad RPUD- 9.B.6 Packet Pg. 159 Attachment: Exhibit D-NIM meeting notes-PL20160002564-Triad RPUD (3274 : Triad RPUD- 9.B.6 Packet Pg. 160 Attachment: Exhibit D-NIM meeting notes-PL20160002564-Triad RPUD (3274 : Triad RPUD- 9.B.6 Packet Pg. 161 Attachment: Exhibit D-NIM meeting notes-PL20160002564-Triad RPUD (3274 : Triad RPUD- 9.B.6 Packet Pg. 162 Attachment: Exhibit D-NIM meeting notes-PL20160002564-Triad RPUD (3274 : Triad RPUD- 1250 Tamiami Trail North, Suite 203B Naples, Florida 34102 239-228-7742 Chris@HaganEng.com Douglas A. Lewis May 31, 2017 Thompson Lewis Counselors at Law 850 Park Shore Drive, Suite 201-A Naples, FL 34103 Re: MAC and Triad RPUD Applications Review Engineer’s Report Dear Mr. Lewis, This letter is submitted to provide a brief review of the pending zoning applications for the referenced projects. This is done consistent with our previous correspondence and May 25, 2017 agreement. This report is submitted to outline my engineering findings from the applications available on the County’s posted zoning files, a site visit and discussions with you and the adjoining neighbors. Consistent with the agreement we have addressed drainage, access, and utility issues below: 1. Drainage  The proposed land use breakdown only allows approximately 9% of the site for stormwater management. This is well below the typical industry standards of 15% percent for a dense single family project.  The preserve should be left outside of the water management area.  The project has more than 2 acres of impervious area and will require an SFWMD Permit.  County and SFWMD drainage rules will require a reduced discharge from the site. This should help with any overburdened outfall ditches.  The smaller than average water management facilities onsite will result in the need for additional fill.  A floodplain analysis should be done to show that regional floodplain issues are not adversely impacted by the proposed development.  Inverted crown roadways proposed for the project should be efficient in directing stormwater internally and reducing costs. This also supports the higher density proposed.  Palm Springs Blvd. roadside drainage swales are inconsistent at the south end. The developer should bring Palm Springs Blvd. up to current code including improved drainage swales.  Existing outfall drainage system for the subdivision to the north includes swales on the east and west side of the subdivision along with an interconnection of roadside swales and ditches down to a lake and discharging out into I-75. Review of these swales (photos in link) find that they do not meet County minimum standards and do not appear to have been regularly maintained. Some of the single family homeowners 9.B.8 Packet Pg. 163 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 1250 Tamiami Trail North, Suite 203B Naples, Florida 34102 239-228-7742 Chris@HaganEng.com have built intrusions into the swales that impact the flow. As the County is to maintain these. A stipulation of the approval should include rehabilitation of the swales from the County and/or developer.  The developer’s proposed interconnection of the drainage systems under the roadway show that the projects should be processed as a single application.  Proof of existing swale problem is historic photos from the residents of flooded backyards and roadways.  Preliminary assessment of the existing roadway, proposed roadways and finished floor elevations should be requested to see how high above existing grade the new construction will be in relation to the adjoining properties. Accommodating the perimeter berm and roadways without discharging drainage out onto Palm Springs Boulevard will be difficult. A couple of cross sections should be requested from the developer showing the slopes and heights of these elements.  The elevation differential may require that the reconstruction of Palm Springs Boulevard be elevated also to prevent discharge from the subdivisions.  The developer proposes inverted crown roadways internally. This is an exception to the LDC and is inconsistent with any County owned, operated, and maintained roadways to our knowledge. This design has some inherent challenges that need to be accommodated so that roadway maintenance is improved.  The fact that the site is going to have to be elevated above the existing roadway with side yards directly abutting the roadway will result in a negative visual impact. The request to reduce the perimeter buffer type should not be accepted, but should include a 6 or 8 foot tall concrete block wall to provide additional screening. Homes are going to be set close together it is possible that side yard equipment and would be readily seen from Palm Springs Boulevard. 2. Utilities  Utility provisions should be made to accommodate the project with connections to the existing utilities on Palm Springs Boulevard.  Looped water distribution system will benefit the community with better fire protection and water quality.  The sanitary sewer system will need to have two onsite pump stations to accommodate the centralized sewage collection.  A sewage force main connection will be required on Palm Spring Boulevard.  A regional pump station network analysis will need to be done to make sure that the existing pumps remain online when the new pump(s) are added.  The County’s utility services should be more than adequate to accept the proposed development. 9.B.8 Packet Pg. 164 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 1250 Tamiami Trail North, Suite 203B Naples, Florida 34102 239-228-7742 Chris@HaganEng.com  The interconnect between the two projects will cross County water and force main lines requiring air release valves (ARVs). These ARVs should be hidden in the perimeter buffer landscaping to protect them so they will not be an eyesore. 3. Access/Traffic  The Traffic Impact Statement shows only the single project. As this project is being processed with both applications. Cumulative impacts should be analyzed and distribution should be handled accordingly.  The Traffic Impact Statement for the project does not address the necessary improvements that may be required on Palm Springs Boulevard and/or the Radio Lane to accommodate turning movements.  Alignment of the driveways between the MAC and Triad project will require coordination to prevent awkward driving motions.  The elimination of sidewalks and bike lanes in these neighborhood though will put people in the road right of way. The internal roadways are proposed with an inverted crown. This means that the middle of the road will have water in it during rainfall events. This puts pedestrians walking on the apron, which could be a hazard.  The tie in of the project inverted crown roads with the existing Palm Springs Boulevard will result in some grading challenges at the project entries. This will be exacerbated by needing to maintain the perimeter berm for the stormwater management requirements. The new roadway may need to be considerably higher than the existing roadway.  The swale along Palm Springs Boulevard will need to be maintained outside of the turning radii for traffic safety. Below is the link to my site photos: https://app.box.com/s/5bwxbg5tgb547fk0bn4vxlct2h5mnhw0 I believe this provides an outline of the drainage, utility, and traffic issues associated with the referenced application. These projects need to be considered together as the impacts of both need to be considered as one. Please look this over and let me know if you have any comments, questions, or require any additional information regarding this. Sincerely, Chris Hagan 9.B.8 Packet Pg. 165 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) TRIAD PUDA & MAC PUDA comments from Sabina Hardy resident of Palm Springs Estates. 5/31/17 1. Density – questionable - appears to be excessive - trusting the county expertise to allow. 2. The existing TRIAD RPUD implements policy 5.6 of the FLUE in that more than 60% of the project will provide useable open space or lands reserved for conservation purposes. 3. Once you add accessory structures, will there be enough open space? The projects are relying heavily on the preserves for open space. Minimal within the actual development. 4. Conceptual site plans note that the plans are conceptual in nature and intended for planning purposes only and that “the overall configuration, density, and/or intensity depicted may change significantly”. In other words, The Conceptual Master Plan represents just one idea of what will actually be built. This is significant reason that it is crucial to establish the proper guidelines and deny the majority of deviations proposed for both the MAC and TRIAD PUDA applications. 5. Regarding the landscape commitment in the existing PUD relating to the landscape and wall at the northern boundary of the property. First, the County Attorney does not agree with the deviation and has requested that the condition in the existing PUD to provide a wall and a Type B Landscape Buffer along the north property line be upheld. Second, the residents of the Palms Springs Neighborhood demand the same. Any request to delete the “wall” and current requirements for landscape buffering need to be denied. 6. Deviation 1: Deny this request. Keep 60 foot width ROW. This community is being built like sardines in a can. The developer is cutting every corner so they can build the maximum number of homes possible. This is not desirable. You might as well build apartments. 7. Deviation 2: Deny this request. The justification to allow for deviation 2 is not adequate. The County standards established and required, need to be adhered to. The developer wants to save money and that is the bottom line. If it allows for them to sell the homes for less, that only brings in a less desirable resident. The deviation they request will not address drainage adequately. I don’t believe this design has been used in “numerous” communities. Where? 8. Deviation 3: Only on Radio Lane – Not Palm Springs 9. Deviation 6: In my opinion, this would encourage people to cross the street in various locations which would be a safety hazard due to vehicular traffic. Nullifying the statement made in the justification :The proposed deviation will not affect public health and safety” 10. Both the TRIAD and MAC PUDA seeks a deviation of allowing for a 10’ buffer along Palm Springs Blvd in lieu of the 20’ landscape buffer along Palm Springs Blvd. due to the decrease in density. Deny this request. As a resident of the Palm Springs Estates community, we believe the established guidelines need to be adhered to in order to preserve the natural (being nature) ambiance of our community. If the developer is going to squeeze the maximum number of structures in the 10+/- acres on each side of Palm Springs Blvd, we need to buffer it with the current requirement of 20 feet. No exceptions! 11. Both the TRIAD and MAC PUDA seeks a deviation of the removal of the requirement for a fence separating the property from the Palm Springs neighborhood to the north. This is just another attempt to save money on the Developers side. Both the MAC and TRIAD PUDA requests must adhere to the requirement of a wall (not fence) along the north boundary along the Palm Springs neighborhood. 9.B.8 Packet Pg. 166 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 12. I noted in the Triad Narrative a statement that proposed to eliminate the need to prohibit the rental of units on the property (currently in the existing RPUD) although I do not see it requested as a deviation. This restriction will remain and will be required to be incorporated into the HOA rules and regulations. 13. The development standards attempt to eliminate many elements that ensure a desirable development/community as follows: - The 1500 sf min floor area attracts more than the current average person per household of the area. Was that figured into the density? 

 - The requested exception of allowing a setback of 12' from the road if the unit has a recessed or side-entry garage is not acceptable. These houses will be sitting right on the road or right on the sidewalk. The front setback of 15' needs to be consistent throughout the community. 

 - Accessory structures cannot be granted the 0 lot set back. People will be building sheds, etc. 15' from the neighbor’s house. Nobody wants that! This community is going to be maxed out with structures. 

 - The building height needs to be as originally established in the TRIAD/MAC RPUD. Maximum building height is not to exceed 35 feet. This developer is trying to squeeze another 5 feet in. This should be denied. 
 - TRANSPORTATION: Were the studies performed with both the TRIAD and MAC RPUD new communities combined together? The TIS is not clear as to the numbers used. If you double the figures (because they both have 44 new homes) you will have approximately 500 daily (2-way) trips added to the neighborhood. Access for the new communities need to be on/off Radio Lane. With 88 new residences commuting to and from their homes via Palm Springs Blvd, the intersection will not accommodate the numbers. If the developer puts the entrance to the MAC and TRIAD development onto Radio Lane, this will establish three accesses to Radio Lane vs. one. Are you going to add a light at the David Blvd/Radio Lane intersection? Note: During construction – Current PUD states that a construction entrance will be established at the east side of the property line for TRIAD development. 9.B.8 Packet Pg. 167 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 168 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 169 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 170 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 171 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 172 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 173 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 174 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 175 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 176 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 177 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 178 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 179 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 180 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 181 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 182 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 183 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 184 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 185 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 186 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 187 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 188 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 189 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 190 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 191 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.8 Packet Pg. 192 Attachment: Letters of Concern 6-6-17 (3274 : Triad RPUD-PL20160002564) 9.B.9 Packet Pg. 193 Attachment: Legal Ad - Adenda ID # 3274 (3274 : Triad RPUD-PL20160002564) Triad Residential Planned Unit Development PUDA Narrative The Triad Planned Unit Development (PUD) is located on 10.75 acres at the NE corner of the intersection of Radio Ln. and Palm Springs Blvd. The property is currently vacant and zoned PUD. The current PUD was established under ordinance 05-11, but was never developed due to changing economic and market conditions. The property has since changed ownership a number of times with no subsequent action taken towards its development. Triad PUD received ERP approval on December 6, 2005 under application # 050817-5 (permit # 11-02482-P). A subsequent permit modification was applied for under application # 091224-16, however, it was withdrawn before being completed. Triad PUD received SDP approval on January 19, 2007 under AR 8347. The applicant is under contract to purchase this property from the current owner, with the intention of developing it in a manner consistent with current market demand. The Applicant is requesting an amendment to the existing PUD to allow a reduction from 86 multi-family units to 44 single-family units. Residential structures will be limited to two stories and a maximum of 35 feet in height. The proposed project will be compatible with surrounding uses and will be consistent with the LDC and compliant with the Growth Management Plan. In addition to the reduction in units, the amendment request includes the removal of several conditions from the previous PUD. Some of these condition no longer apply due to the change in unit type and overall project intensity, while others are reflective of revised regulation and policy positions from the Board of County Commissioners. Due to the smaller number of units being constructed and the inclusion of individual yards for each unit, a dedicated recreational area will no longer be included as part of the master plan. Because the proposed unit type is consistent with the abutting single family neighborhood, density is being greatly reduced, and the reconfigured preserve along the northern boundary exceeds buffer requirements both from a separation and vegetation standpoint, the need for a wall and enhanced buffering at the boundary with the Palm Springs neighborhood no longer exists. The reduction in total units and density will also eliminate the need for enhancements to the required buffers along Palm Springs Boulevard and Radio Lane. The change to single-family units and reduction in density will eliminate the need to prohibit the rental of units on the property in perpetuity as well as the necessity for a 24-hour controlled access gate. Per policy direction from the Board of County Commissioners, we are requesting removal of the affordable housing contribution previously included with this project. Per discussions with staff and in keeping with the previous transportation commitment, the developer will construct a 5x8 concrete pad at the western end of the sidewalk to be constructed along Radio Lane in conjunction with the adjacent MAC PUD to be used as a bus stop by Collier County Transportation. COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 Application for a Public Hearing for PUD Rezone, Amendment to PUD or PUD to PUD Rezone PETITION NO PROJECT NAME DATE PROCESSED PUD Rezone (PUDZ): LDC subsection 10.02.13 A.-F., Ch. 3 G. 1 of the Administrative Code Amendment to PUD (PUDA): LDC subsection 10.02.13 E. and Ch. 3 G. 2 of the Administrative Code PUD to PUD Rezone (PUDR): LDC subsection 10.02.13 A.-F. APPLICANT CONTACT INFORMATION Name of Applicant(s): ___________________________________________________________ Address: _____________________________ City: ___________ State: ________ ZIP: _______ Telephone: ___________________ Cell: ____________________ Fax: ____________________ E-Mail Address: ________________________________________________________________ Name of Agent: ________________________________________________________________ Firm: _________________________________________________________________________ Address: _____________________________ City: ___________ State: ________ ZIP: _______ Telephone: __________________ Cell: _____________________ Fax: ____________________ E-Mail Address: ________________________________________________________________ Be aware that Collier County has lobbyist regulations. Guide yourself accordingly and ensure that you are in compliance with these regulations. To be completed by staff 4/15/2015 Page 1 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 DISCLOSURE OF INTEREST INFORMATION Please complete the following information, if space is inadequate use additional sheets and attach to the completed application packet. a. If the property is owned fee simple by an INDIVIDUAL, tenancy by the entirety, tenancy in common, or joint tenancy, list all parties with an ownership interest as well as the percentage of such interest: Name and Address % of Ownership b. If the property is owned by a CORPORATION, list the officers and stockholders and the percentage of stock owned by each: Name and Address % of Ownership c. If the property is in the name of a TRUSTEE, list the beneficiaries of the trust with the percentage of interest: Name and Address % of Ownership d. If the property is in the name of a GENERAL or LIMITED PARTNERSHIP, list the name of the general and/or limited partners: Name and Address % of Ownership 4/15/2015 Page 2 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 e. If there is a CONTRACT FOR PURCHASE, with an individual or individuals, a Corporation, Trustee, or a Partnership, list the names of the contract purchasers below, including the officers, stockholders, beneficiaries, or partners: Name and Address % of Ownership Date of Contract: f. If any contingency clause or contract terms involve additional parties, list all individuals or officers, if a corporation, partnership, or trust: Name and Address g. Date subject property acquired _______________ Leased: Term of lease ____________ years /months If, Petitioner has option to buy, indicate the following: Date of option: _________________________ Date option terminates: __________________, or Anticipated closing date: _________________ h. Should any changes of ownership or changes in contracts for purchase occur subsequent to the date of application, but prior to the date of the final public hearing, it is the responsibility of the applicant, or agent on his behalf, to submit a supplemental disclosure of interest form. 4/15/2015 Page 3 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 REZONE REQUEST This application is requesting a rezone from: _________________________ Zoning district(s) to the ________________________________ zoning district(s). Present Use of the Property: _________________________________________________________ Proposed Use (or range of uses) of the property: _________________________________________ Original PUD Name: ________________________________________________________________ Ordinance No.: ____________________________________________________________________ PROPERTY INFORMATION On a separate sheet attached to the application, provide a detailed legal description of the property covered by the application: • If the request involves changes to more than one zoning district, the applicant shall include a separate legal description for property involved in each district; • The applicant shall submit 4 copies of a recent survey (completed within the last six months, maximum 1" to 400' scale), if required to do so at the pre-application meeting; and • The applicant is responsible for supplying the correct legal description. If questions arise concerning the legal description, an engineer's certification or sealed survey may be required. Section/Township/Range: / / Lot: Block: Subdivision: ___________________________________________________ Metes & Bounds Description: _________________________________________________________ Plat Book: Page #: Property I.D. Number: ____________________________________ Size of Property: _______ ft. x _______ ft. = ________ Total Sq. Ft. Acres: _________ Address/ General Location of Subject Property: __________________________________________ __________________________________________________________________________________ PUD District (refer to LDC subsection 2.03.06 C): Commercial Residential Community Facilities Industrial Mixed Use Other: ________________ 4/15/2015 Page 4 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 ADJACENT ZONING AND LAND USE Zoning Land Use N S E W If the owner of the subject property owns contiguous property please provide a detailed legal description of the entire contiguous property on a separate sheet attached to the application. Section/Township/Range: / / Lot: Block: Subdivision: ___________________________________________________ Plat Book: Page #: Property I.D. Number: ____________________________________ Metes & Bounds Description: _________________________________________________________ ASSOCIATIONS Complete the following for all registered Association(s) that could be affected by this petition. Provide additional sheets if necessary. Information can be found on the Board of County Commissioner’s website at http://www.colliergov.net/Index.aspx?page=774. Name of Homeowner Association: _________________________________________________ Mailing Address: ____________________________ City: _________ State: ______ ZIP: ______ Name of Homeowner Association: _________________________________________________ Mailing Address: ____________________________ City: _________ State: ______ ZIP: ______ Name of Homeowner Association: _________________________________________________ Mailing Address: ____________________________ City: _________ State: ______ ZIP: ______ Name of Homeowner Association: _________________________________________________ Mailing Address: ____________________________ City: _________ State: ______ ZIP: ______ Name of Homeowner Association: _________________________________________________ Mailing Address: ____________________________ City: _________ State: ______ ZIP: ______ 4/15/2015 Page 5 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 EVALUATION CRITERIA Pursuant to LDC subsections 10.02.13 B, 10.02.08 F and Chapter 3 G. of the Administrative Code, staff’s analysis and recommendation to the Planning Commission, and the Planning Commission’s recommendation to the Board of County Commissioners shall be based upon consideration of the applicable criteria. On a separate sheet attached to the application, provide a narrative statement describing the rezone request with specific reference to the criteria below. Include any backup materials and documentation in support of the request. a. The suitability of the area for the type and pattern of development proposed in relation to physical characteristics of the land, surrounding areas, traffic and access, drainage, sewer, water, and other utilities. b. Adequacy of evidence of unified control and suitability of any proposed agreements, contract, or other instruments, or for amendments in those proposed, particularly as they may relate to arrangements or provisions to be made for the continuing operation and maintenance of such areas and facilities that are not to be provided or maintained at public expense. Findings and recommendations of this type shall be made only after consultation with the county attorney. c. Conformity of the proposed PUD with the goals, objectives and policies of the Growth Management Plan. (This is to include identifying what Sub-district, policy or other provision allows the requested uses/density, and fully explaining/addressing all criteria or conditions of that Sub-district, policy or other provision.) d. The internal and external compatibility of proposed uses, which conditions may include restrictions on location of improvements, restrictions on design, and buffering and screening requirements. e. The adequacy of usable open space areas in existence and as proposed to serve the development. f. The timing or sequence of development for the purpose of assuring the adequacy of available improvements and facilities, both public and private. g. The ability of the subject property and of surrounding areas to accommodate expansion. h. Conformity with PUD regulations, or as to desirable modifications of such regulations in the particular case, based on determination that such modifications of justified as meeting public purposes to a degree at least equivalent to literal application of such regulations. Deed Restrictions: The County is legally precluded from enforcing deed restrictions; however, many communities have adopted such restrictions. You may wish to contact the civic or property owners association in the area for which this use is being requested in order to ascertain whether or not the request is affected by existing deed restrictions. 4/15/2015 Page 6 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 Previous land use petitions on the subject property: To your knowledge, has a public hearing been held on this property within the last year? If so, what was the nature of that hearing? __________________________________________________________________________________ __________________________________________________________________________________ Official Interpretations or Zoning Verifications: To your knowledge, has there been an official interpretation or zoning verification rendered on this property within the last year? Yes No if so please provide copies. PUBLIC NOTICE REQUIREMENTS This land use petition requires a Neighborhood Information Meeting (NIM), pursuant to Chapter 3 E. of the Administrative Code and LDC section 10.03.06. Following the NIM, the applicant will submit a written summary and any commitments that have been made at the meeting. Refer to Chapter 8 B. of the Administrative Code for the NIM procedural requirements. Chapter 8 of the Administrative Code requires that the applicant must remove their public hearing advertising sign(s) after final action is taken by the Board of County Commissioners. Based on the Board's final action on this item, please remove all public hearing advertising sign(s) immediately. RECORDING OF DEVELOPER COMMITMENTS Within 30 days of adoption of the Ordinance, the owner or developer (specify name) at their expense shall record in the Public Records of Collier County a Memorandum of Understanding of Developer Commitments or Notice of Developer Commitments that contains the legal description of the property that is the subject of the land use petition and contains each and every commitment of the owner or developer specified in the Ordinance. The Memorandum or Notice shall be in form acceptable to the County and shall comply with the recording requirements of Chapter 695, FS. A recorded copy of the Memorandum or Notice shall be provided to the Collier County Planned Unit Development Monitoring staff within 15 days of recording of said Memorandum or Notice. LDC subsection 10.02.08 D This application will be considered “open” when the determination of “sufficiency” has been made and the application is assigned a petition processing number. The application will be considered “closed” when the petitioner withdraws the application through written notice or ceases to supply necessary information to continue processing or otherwise actively pursue the rezoning, amendment or change, for a period of 6 months. An application deemed “closed” will not receive further processing and an application “closed” through inactivity shall be deemed withdrawn. An application deemed “closed” may be re-opened by submission of a new application, repayment of all application fees and the grant of a determination of “sufficiency”. Further review of the request will be subject to the then current code. 4/15/2015 Page 7 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 STATEMENT OF UTILITY PROVISIONS FOR PUD REZONE REQUEST APPLICANT CONTACT INFORMATION Name of Applicant(s): _______________________________________________________________ Address: _________________________________ City: ___________ State: ________ ZIP: _______ Telephone: ____________________ Cell: _____________________ Fax: ______________________ E-Mail Address: ____________________________________________________________________ Address of Subject Property (If available): ______________________________________________ City: _________________ State: ________ ZIP: _________ PROPERTY INFORMATION Section/Township/Range: / / Lot: Block: Subdivision: ___________________________________________________ Metes & Bounds Description: _________________________________________________________ Plat Book: Page #: Property I.D. Number: ____________________________________ TYPE OF SEWAGE DISPOSAL TO BE PROVIDED Check applicable system: a. County Utility System b. City Utility System c. Franchised Utility System Provide Name: __________________________ d. Package Treatment Plant (GPD Capacity): _________________________ e. Septic System TYPE OF WATER SERVICE TO BE PROVIDED Check applicable system: a. County Utility System b. City Utility System c. Franchised Utility System Provide Name: __________________________ d. Private System (Well) Total Population to be Served: ________________________________________________________ Peak and Average Daily Demands: A. Water-Peak: _________ Average Daily: __________ B. Sewer-Peak: _________ Average Daily: __________ If proposing to be connected to Collier County Regional Water System, please provide the date service is expected to be required: ____________________________________________________ 4/15/2015 Page 8 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 Narrative statement: Provide a brief and concise narrative statement and schematic drawing of sewage treatment process to be used as well as a specific statement regarding the method of affluent and sludge disposal. If percolation ponds are to be used, then percolation data and soil involved shall be provided from tests prepared and certified by a professional engineer. __________________________________________________________________________________ __________________________________________________________________________________ __________________________________________________________________________________ Collier County Utility Dedication Statement: If the project is located within the service boundaries of Collier County’s utility service system, a notarized statement shall be provided agreeing to dedicate the water distribution and sewage collection facilities within the project area to the Collier County Utilities. This shall occur upon completion of the construction of these facilities in accordance with all applicable County ordinances in effect at that time. This statement shall also include an agreement that the applicable system development charges and connection fees will be paid to the County Utilities Division prior to the issuance of building permits by the County. If applicable, the statement shall contain an agreement to dedicate the appropriate utility easements for serving the water and sewer systems. __________________________________________________________________________________ __________________________________________________________________________________ __________________________________________________________________________________ Statement of Availability Capacity from other Providers: Unless waived or otherwise provided for at the pre-application meeting, if the project is to receive sewer or potable water services from any provider other than the County, a statement from that provider indicating adequate capacity to serve the project shall be provided. 4/15/2015 Page 9 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 Pre-Application Meeting and Final Submittal Requirement Checklist for: PUD Rezone- Ch. 3 G. 1 of the Administrative Code Amendment to PUD- Ch. 3 G. 2 of the Administrative Code PUD to PUD Rezone- Ch. 3 G. 1 of the Administrative Code The following Submittal Requirement checklist is to be utilized during the Pre-Application Meeting and at time of application submittal. At final submittal, the checklist is to be completed and submitted with the application packet. Please provide the submittal items in the exact order listed below, with cover sheets attached to each section. Incomplete submittals will not be accepted. REQUIREMENTS # OF COPIES REQUIRED NOT REQUIRED Cover Letter with Narrative Statement including a detailed description of why amendment is necessary Completed Application with required attachments Pre-application meeting notes Affidavit of Authorization, signed and notarized 2 Notarized and completed Covenant of Unified Control 2 Completed Addressing Checklist 2 Warranty Deed(s) 3 List Identifying Owner and all parties of corporation 2 Signed and sealed Boundary Survey 4 Architectural Rendering of proposed structures 4 Current Aerial Photographs (available from Property Appraiser) with project boundary and, if vegetated, FLUCFCS Codes with legend included on aerial. 5 Statement of Utility Provisions 4 Environmental Data Requirements pursuant to LDC section 3.08.00 4 Environmental Data Requirements collated into a single Environmental Impact Statement (EIS) packet at time of public hearings. Coordinate with project planner at time of public hearings. Listed or Protected Species survey, less than 12 months old. Include copies of previous surveys. 4 Traffic Impact Study 7 Historical Survey 4 School Impact Analysis Application, if applicable 2 Electronic copy of all required documents 2 Completed Exhibits A-F (see below for additional information)+ List of requested deviations from the LDC with justification for each (this document is separate from Exhibit E) Revised Conceptual Master Site Plan 24” x 36”and One 8 ½” x 11” copy Original PUD document/ordinance, and Master Plan 24” x 36” – Only if Amending the PUD Checklist continued onto next page… 4/15/2015 Page 11 of 16 COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 Revised PUD document with changes crossed thru & underlined Copy of Official Interpretation and/or Zoning Verification 1 *If located in Immokalee or seeking affordable housing, include an additional set of each submittal requirement +The following exhibits are to be completed on a separate document and attached to the application packet: Exhibit C: Master Plan- See Chapter 3 E. 1. of the Administrative Code Exhibit D: Legal Description Exhibit E: List of Requested LDC Deviations and justification for each Exhibit F: List of Development Commitments If located in RFMU (Rural Fringe Mixed Use) Receiving Land Areas Pursuant to LDC subsection 2.03.08.A.2.a.2.(b.)i.c., the applicant must contact the Florida Forest Service at 239-690-3500 for information regarding “Wildfire Mitigation & Prevention Plan.” PLANNERS – INDICATE IF THE PETITION NEEDS TO BE ROUTED TO THE FOLLOWING REVIEWERS: School District (Residential Components): Amy Lockheart Conservancy of SWFL: Nichole Ryan Utilities Engineering: Kris VanLengen Parks and Recreation: Vicky Ahmad Emergency Management: Dan Summers Immokalee Water/Sewer District: City of Naples: Robin Singer, Planning Director Other: FEE REQUIREMENTS Pre-Application Meeting: $500.00 PUD Rezone: $10,000.00* plus $25.00 an acre or fraction of an acre PUD to PUD Rezone: $8,000.00* plus $25.00 an acre or fraction of an acre PUD Amendment: $6,000.00* plus $25.00 an acre or fraction of an acre Comprehensive Planning Consistency Review: $2,250.00 Environmental Data Requirements-EIS Packet (submittal determined at pre-application meeting): $2,500.00 Listed or Protected Species Review (when an EIS is not required): $1,000.00 Transportation Review Fees: o Methodology Review: $500.00, to be paid directly to Transportation at the Methodology Meeting* *Additional fees to be determined at Methodology Meeting. o Minor Study Review: $750.00 o Major Study Review $1,500.00 Legal Advertising Fees: o CCPC: $925.00 o BCC: $500.00 School Concurrency Fee, if applicable: 4/15/2015 Page 12 of 16 x (11x$25=$275) x x x x x Fire Review Fee: $125.00x x (Paid at Pre-app) X XX X COLLIER COUNTY GOVERNMENT 2800 NORTH HORSESHOE DRIVE GROWTH MANAGEMENT DEPARTMENT NAPLES, FLORIDA 34104 www.colliergov.net (239) 252-2400 FAX: (239) 252-6358 o Mitigation Fees, if application, to be determined by the School District in coordination with the County *Additional fee for the 5th and subsequent re-submittal will be accessed at 20% of the original fee. All checks may be made payable to: Board of County Commissioners 4/15/2015 Page 13 of 16 x Page 1 of 5 11/3/2016 revision Triad PUDA Considerations RWA File 130019.02.00 PUDZ-PL2016-2564 ATTACHMENT A PUDA Considerations (LDC Section 10.02.13.B) 1. The suitability of the area for the type and pattern of development proposed in relation to physical characteristics of the land, surrounding areas, traffic and access, drainage, sewer, water, and other utilities. The Triad RPUD is located in the Urban Mixed Use-Urban Residential Land Use category. As per the original Ordinance 05-11 and FLUE the project was eligible for up to 16 units per acre, 172 dwelling units, as it converted previously zoned commercial property to residential. The original PUD requested, and was approved for 86 dwelling units at a density of 8 units per acre. This amendment requests a further reduction to 44 dwelling units at a density of 4.1 units per acre. The property is surrounded by existing and approved development, many of which include single family and multi-family residential projects such as Palm Springs Village to the north, the Saddlewood and Tuscan Isles Apartments to the east. The property is located at the corner of Radio Lane and Palm Springs Boulevard, near Radio Road and Davis Boulevard and will have direct access onto Palm Springs Boulevard. A traffic study has been submitted as part of this application. Public and community facilities and services are available in close proximity. The project will provide the required buffers along its boundaries. In the PUD’s original form, a 20’ landscape buffer was approved along both Radio Lane and Palm Springs Blvd. However, in keeping with current County codes this application will seek 15’ buffer along Radio Lane, and a 10’ buffer along Palm Springs Blvd. Due to the compatibility of single- family to single-family usage, configuration of the preserve at the northern side of the property, and due to the proposed reduction in density, this application will also seek removal of the previous requirement for a wall separating the property from the Palm Springs neighborhood to the north. The project will be served by County sewer and water services as well as other utility providers, which already have established infrastructure in the abutting roadway corridors. 2. Adequacy of evidence of unified control and suitability of any proposed agreements, contract, or other instruments, or for amendments in those proposed, particularly as they may relate to arrangements or provisions to be made for the continuing operation and maintenance of such areas and facilities that are not to be provided or maintained at public expense. Findings and recommendations of this type shall be made only after consultation with the county attorney. Page 2 of 5 11/3/2016 revision Triad PUDA Considerations RWA File 130019.02.00 PUDZ-PL2016-2564 DR Horton is the contract purchaser of the property and has demonstrated unified control through the various affidavits provided as part of this application. Operation and maintenance responsibility for private areas and facilities shall be assigned to the developer until conveyance to a property owners association. Further, the proposed RPUD documents make appropriate provisions for the continued operation and maintenance of common areas. 3. Conformity of the proposed PUD with the goals, objectives and policies of the growth management plan. The proposed residential development allows single family residential uses, ancillary recreational uses, water management lakes, preserves, open space and internal roadways with sidewalks. The proposed project is designed in compliance with the goals, objectives and policies set forth in the Collier County Growth Management Plan (GMP) as follows. 1. The subject property is located within the Urban Mixed Use-Urban Residential Subdistrict, as depicted on the Collier County Future Land Use Map (FLUM). According to the Growth Management Plan (GMP), the purpose of the Urban Mixed Use-Urban Residential Subdistrict is to provide for a variety of residential dwelling types. Based upon the original conversation of commercial to residential zoning, per the FLUE this project is eligible to request a maximum of 16 units per acre. The original PUD requested, and was approved for 86 dwelling units at a density of 8 units per acre. The Subdistrict permits a base density of 4 residential units per gross acre. The project is located adjacent to a mixed-use activity center subdistrict and is within a residential density band, therefore, 3 residential units per gross acre may be added according to the Growth Management Plans Density Rating System. A density of 4.1 dwelling units per gross acre for a total of 44 residential units is requested. This is consistent with the density rating system of the Growth Management Plan. 2. The subject property’s location in relation to existing or proposed community facilities and services constitutes an appropriate area for the development of residential land uses as intended in Objective 3 and Policy 5.5 of the Future Land Use Element (FLUE). The presence of schools, public facilities, medical facilities, office uses, and emergency services within a three-mile radius of the site, as well as water and wastewater treatment services, demonstrate that the proposed residential development will be appropriately served. Some of these facilities include: Collier Area Paratransit Station, Calusa Park Elementary School, East Naples Middle, Golden Gate High School, Lorenzo Walker Technical High, Walker Institute of Technology, Alternative Schools Summer School, East Naples Branch Library, South Regional Library, Physicians Page 3 of 5 11/3/2016 revision Triad PUDA Considerations RWA File 130019.02.00 PUDZ-PL2016-2564 Regional Medical Center, East Naples Fire Control District, Collier County Government offices, and Sugden Regional Park. 3. This proposed development addresses GMP objectives including Future Land Use Element (FLUE) Policies 5.3, 5.4, 5.5, 5.6, and 5.7 in that the site is located in an Urban Designated Area with available urban services and existing infrastructure, and it is a Planned Unit Development project that clusters residential development in a designated density band and thereby reduces development pressures in rural and environmentally sensitive areas. 4. As set for the in Objective #3, all improvements for the Triad PUD are planned to be compliant with land development regulations where applicable and as set forth in our PUD development standards and deviations. 5. The proposed residential development is compatible and complementary to existing and future surrounding land uses as required in Policy 5.4 of the FLUE through the proposed uses, internal arrangement of structures, the placement of land use buffers, and the proposed development standards contained herein. The proposed residential project will be consistent and compatible with existing and approved residential and commercial uses located adjacent and nearby. The proposed development standards will limit buildings to 2 stories and maximum height of 35 feet. The proposed height limit is less that then adjacent multi- family, multi-story, residential projects of Saddlebrook Village and Tuscan Isles apartments. A 15’ Type D buffer will separate the residential project from Radio Lane and a 10’ Type D buffer will be provided along Palm Springs Blvd. A 15’ Type A buffer located along the existing 8’ wall to the east of the property will be provided for the adjacent residential developments. Additionally, a water management lake and preserve significantly exceeding buffer requirements will provide separation and screening where the subject property abuts the Palm Springs neighborhood to the North. 6. The proposed development is consistent with Objective 7 of Future Land Use Element of the GMP and Policies regarding Smart Growth, in that it provides an internal network of sidewalks and provides pedestrian and bicycle interconnection to Palm Springs Blvd. and Radio Lane, and the County’s existing and planned pathway system. Moreover, the proposed development will be consistent with Policy 7.4 by developing a compact walkable community, and will be further enhanced with the inclusion bus stop improvements made as part of the adjacent MAC PUD. 7. The project’s compact infill nature, and the Planned Unit Development techniques of this project are consistent with the Urban Designation, Activity Page 4 of 5 11/3/2016 revision Triad PUDA Considerations RWA File 130019.02.00 PUDZ-PL2016-2564 Centers and Density Bands of the FLUE in that they promote infill development in the urban area, and promote efficient use of public facilities. 4. The internal and external compatibility of proposed uses, which conditions may include restrictions on location of improvements, restrictions on design, and buffering and screening requirements. The proposed development is compatible with existing and future surrounding land uses as required in Policy 5.4 of the Future Land Use Element. The surrounding land uses consist of Palm Springs Boulevard to the west, then the single-family MAC PUD and C-4 zoned Bowland Woodside bowling alley and associated parking. To the south is Radio Lane and then the Shell service station and Davis Blvd. To the west is Tuscan Isles, and Saddlebrook Village Apartments. To the north of the subject property is the single-family Palm Springs neighborhood. Moreover, the surrounding properties have the same Urban Mixed Use- Urban Residential Subdistrict Future Land Use designation as the subject property which allows the same broad category of uses, should any of those properties redevelop in the future. By virtue of the proposed single-family uses and densities, unified architectural theme, development standards, and preserves, this residential community is compatible with the surrounding area, especially when considering the separation from other residential uses created by two major roadways and on-site preserve area. The Triad PUD will be screened along property lines with buffers and preserves to ensure compatibility between proposed and existing or potential surrounding uses. 5. The adequacy of usable open space areas in existence and as proposed to serve the development. The proposed development will meet open space requirements of the Collier County LDC. Open space in the form of preserve, lake, pedestrian walkways, buffers, and private yards will provide over 3 acres of open space on the site. 6. The timing or sequence of development for the purpose of assuring the adequacy of available improvements and facilities, both public and private. Public and private improvements and facilities are available for the site. Water and sewer service is available. Roadway capacity is available. Drainage is adequate for the site. Waste management, cable, electric, and telephone services are available. Adequate schools, police, fire, bus, park, and health care facilities are within the proposed development’s service area. Payment of impact fees and timing of adequate public facilities certification are mechanisms to assure the development is appropriately serviced. 7. The ability of the subject property and of surrounding areas to accommodate expansion. Page 5 of 5 11/3/2016 revision Triad PUDA Considerations RWA File 130019.02.00 PUDZ-PL2016-2564 As explained in responses #3 and #6, the subject property and general area are appropriate for the proposed development. The proposed residential community is an ideal infill project that is compatible with surrounding uses and makes sense for the general area and the specific property. The property is served by adequate public facilities and will provide a quality residential project along Radio Road/Davis Boulevard corridor. Given that the projects development area is confined by 2 major roadways, preserve and existing development on adjacent properties, the future expansion of the proposed project in not feasible. 8. Conformity with PUD regulations, or as to desirable modifications of such regulations in the particular case, based on determination that such modifications of justified as meeting public purposes to a degree at least equivalent to literal application of such regulations. The proposed development conforms with the intent of the PUD regulations by establishing development regulations that are consistent with similar residential developments throughout Collier County and the requested deviations provide design flexibility that will help improve the overall project while not causing any adverse impact the public health, safety and welfare. K>>/ZKhEdz'KsZEDEd 'ZKtd,DE'DEd/s/^/KE ǁǁǁ͘ĐŽůůŝĞƌŐŽǀ͘ŶĞƚ ϮϴϬϬEKZd,,KZ^^,KZ/s EW>^͕&>KZ/ϯϰϭϬϰ ;ϮϯϵͿϮϱϮͲϮϰϬϬ&y ;ϮϯϵͿϮϱϮͲϱϳϮϰ ADDRESSING CHECKLIST 3OHDVH FRPSOHWH WKH IROORZLQJ DQG HPDLO WR*0'B$GGUHVVLQJ#FROOLHUJRYQHW RU ID[ WR WKH 2SHUDWLRQV 'HSDUWPHQWDWRUVXEPLWLQSHUVRQWRWKH$GGUHVVLQJ'HSDUWPHQWDWWKHDERYHDGGUHVV)RUPPXVW EHVLJQHGE\$GGUHVVLQJSHUVRQQHOSULRUWRSUHDSSOLFDWLRQPHHWLQJplease allow 3 days for processing. 1RW DOO LWHPV ZLOO DSSO\ WR HYHU\ SURMHFW ,WHPV LQbold type DUH UHTXLUHGFOLIO NUMBERS MUST BE PROVIDED.)RUPV ROGHU WKDQ  PRQWKV ZLOO UHTXLUH DGGLWLRQDO UHYLHZ DQG DSSURYDO E\ WKH $GGUHVVLQJ 'HSDUWPHQW PETITION TYPE (Indicate type below, complete a separate Addressing Checklist for each Petition type) %/ %ODVWLQJ3HUPLW  %' %RDW'RFN([WHQVLRQ  &DUQLYDO&LUFXV3HUPLW &8 &RQGLWLRQDO8VH  (;3 ([FDYDWLRQ3HUPLW  )3 )LQDO3ODW //$ /RW/LQH$GMXVWPHQW  31& 3URMHFW1DPH&KDQJH  33/ 3ODQV 3ODW5HYLHZ  363 3UHOLPLQDU\6XEGLYLVLRQ3ODW  38'5H]RQH 5= 6WDQGDUG5H]RQH  6'3 6LWH'HYHORSPHQW3ODQ  6'3$ 6'3$PHQGPHQW  6'3, ,QVXEVWDQWLDO&KDQJHWR6'3  6,3 6LWH,PSURYHPHQW3ODQ  6,3, ,QVXEVWDQWLDO&KDQJHWR6,3  615 6WUHHW1DPH&KDQJH  61& 6WUHHW1DPH&KDQJH±8QSODWWHG  7'5 7UDQVIHURI'HYHORSPHQW5LJKWV  9$ 9DULDQFH  953 9HJHWDWLRQ5HPRYDO3HUPLW  956)3 9HJHWDWLRQ5HPRYDO 6LWH)LOO3HUPLW  27+(5 LEGAL DESCRIPTION RIVXEMHFWSURSHUW\RUSURSHUWLHV(copy of lengthy description may be attached) FOLIO (Property ID) NUMBER(s)RIDERYH(attach to, or associate with, legal description if more than one) 675((7$''5(66RU$''5(66(6(as applicable, if already assigned) 352326('675((71$0(6(if applicable) 6,7('(9(/230(173/$1180%(5(for existing projects/sites only) 1 6859(< FRS\QHHGHGRQO\IRUXQSODWWHGSURSHUWLHV  LOCATION MAP PXVWEHDWWDFKHGVKRZLQJH[DFWORFDWLRQRISURMHFWVLWHLQUHODWLRQWRQHDUHVWSXEOLFURDGULJKW RIZD\ 352326('352-(&71$0((if applicable) 6'3RU$5RU3/ ■ See attached 65720320005 645 SARECINO CIR Pine Verde East K>>/ZKhEdz'KsZEDEd 'ZKtd,DE'DEd/s/^/KE ǁǁǁ͘ĐŽůůŝĞƌŐŽǀ͘ŶĞƚ ϮϴϬϬEKZd,,KZ^^,KZ/s EW>^͕&>KZ/ϯϰϭϬϰ ;ϮϯϵͿϮϱϮͲϮϰϬϬ&y ;ϮϯϵͿϮϱϮͲϱϳϮϰ 3OHDVH5HWXUQ$SSURYHG&KHFNOLVW%\(PDLO3HUVRQDOO\SLFNHGXS ASSOLFDQW1DPH 6LJQDWXUHRQ$GGUHVVLQJ&KHFNOLVWGRHVQRWFRQVWLWXWH3URMHFWDQGRU6WUHHW1DPH DSSURYDODQGLVVXEMHFWWRIXUWKHUUHYLHZE\WKH2SHUDWLRQV'HSDUWPHQW FOR STAFF USE ONLY FROLR Number Folio Number Folio Number Folio Number )ROLR1XPEHU )ROLR1XPEHU Approved by: Date: Updated by: Date: IF OLDER THAN 6 MONTHS, FORM MUST BE UPDATED OR NEW FORM SUBMITTED 2 )D[ (PDLO)D[3KRQH 3URMHFWRUGHYHORSPHQWQDPHVSURSRVHGIRURUDOUHDG\DSSHDULQJLQFRQGRPLQLXPGRFXPHQWV LIDSSOLFDWLRQ LQGLFDWHZKHWKHUSURSRVHGRUH[LVWLQJ  ■ Tiffany Bray / RWA, Inc. 239-597-0575 x. 236 tbray@consult-rwa.com / 239-597-0578 Collier County Property AppraiserProperty Detail Parcel No.65720320005 Site Adr.645 SARECINO CIR Name / Address SARECINO LLC % WXZ DEVELOPMENT 22720 FAIRVIEW DR #150 City FAIRVIEW PARK State OH Zip 44126 Permits Tax Yr Issuer Permit #CO Date Tmp CO Final Bldg Type Land  #Calc Code Units 10 PUD UNITS BUILDABLE 86  Building/Extra Features  #Year Built Description Area Adj Area TRIAD RPUD Rezoning Environmental Information (October 2016) The Triad RPUD project is 10.75± acres in size. Portions of the site, primarily along the perimeter of the property and an old paved east - west road (Calle Del Ray), have been significantly disturbed and are currently vegetated primarily by weedy and exotic species. The majority of the remainder of the site consists of historic hydric pine flatwoods that has been permanently drained by off-site development and drainage facilities. There is currently 9.37± acres of native vegetation (as defined by Collier County Land Development Code (LDC) Section 3.05.07.A.1) on the property. This consists of Florida Land Use, Cover and Forms Classification System Codes 419E1, 419E3, 624E2, and 643E as shown on the attached Vegetation Map. Please see the attached Protected Species Assessment for a discussion of current site conditions. The proposed native vegetation preserve is substantially consistent with the location of the preserve in the 2005 RPUD. According to soils information obtained from the Florida Geographic Data Library, the entire property consists of Pineda fine sand, limestone substratum. This soil type is considered to be hydric (wetland) soil by the Hydric Soils of Florida Handbook. Therefore, pursuant to Section 3.05.07.H.ii.d.ii of the LDC the discharge of treated stormwater into the preserve is allowed. Craig M. Smith of W. Dexter Bender & Associates, Inc. prepared the Protected Species Assessment. Mr. Smith has been employed as a full time environmental consultant in southwest Florida since 1987. A copy of his credentials is attached. Y:\DRHOR-185\County\County Zoning Info Triad.Docx TRIAD RPUD Section 34, Township 49 South, Range 26 East Collier County, Florida PROTECTED SPECIES ASSESSMENT October 2016 Prepared for: D.R. Horton Homes 10541 Ben C. Pratt Six Mile Cypress Pkwy., Suite 100 Fort Myers, FL 33966 Prepared by: W. Dexter Bender & Associates, Inc. 4470 Camino Real Way, Suite 101 Fort Myers, FL 33966 (239) 334-3680 1 INTRODUCTION This 10.75 acre project is located within a portion of Section 34, Township 49 South, Range 26 East, Collier County, Florida. The parcel is bordered to the east by the Tuscan Isles residential development, to the south by Radio Lane, to the west by Palm Springs Boulevard and undeveloped lands (the Mac RPUD parcel), and to the north by the Palm Springs Village residential subdivision. SITE CONDITIONS The property is bisected by an old paved road (Calle Del Ray) that has been blocked off. The remainder of the site consists mainly of historic hydric pine flatwoods that has been permanently drained by off-site development and drainage facilities. VEGETATIVE CLASSIFICATIONS The predominant vegetation associations were mapped in the field on 2016 digital 1” = 100’ scale aerial photography. The property boundary was obtained from RWA Consulting, Inc. and inserted into the digital aerial. The property boundary was not staked in the field at the time of our site inspection and was, therefore, estimated based on the overlay of the boundary on the aerial photography. Six vegetation associations were identified using the Florida Land Use, Cover and Forms Classification System (FLUCCS). Figure 1 depicts the approximate location and configuration of these vegetation associations and Table 1 summarizes the acreages by FLUCCS Code. A brief description of each FLUCCS Code is also provided below. Table 1. Acreage Summary by FLUCCS Code FLUCCS CODE DESCRIPTION ACREAGE 419E1 Other Pines Invaded by Exotics (10 – 25%) 6.38 419E3 Other Pines Invaded by Exotics (51 – 75%) 1.96 514 Swale 0.18 624E2 Cypress – Pine Invaded by Exotics (26 – 50%) 0.47 643E Wet Prairies Invaded by Exotics (5 – 9%) 0.56 740 Disturbed Land 1.20 Total 10.75 FLUCCS Code 419E1, Other Pines Invaded by Exotics (10 – 25%) This FLUCCS Code was used to delineate historic areas of hydric pine flatwoods that have been permanently altered by decades of over drainage. These areas contain an open canopy of slash pine (Pinus elliottii) with scattered earleaf acacia (Acacia auriculiformis) and java plum (Syzygium cumini). The midstory is vegetated by cabbage 3 palm (Sabal palmetto), myrsine (Rapanea punctata), Brazilian pepper (Schinus terebinthifolius), earleaf acacia, and buckthorn (Sideroxylon sp.). A variety of species are present in the ground cover including grape vine (Vitis sp.), broomsedge (Andropogon sp.), wedelia (Wedelia trilobata), penny royal (Piloblephis rigida), bracken fern (Pteridium aquilinum), little blue maidencane (Amphicarpum muhlenbergianum), poison ivy (Toxicodendron radicans), Bahia grass (Paspalum notatum), beggar tick (Bidens sp.), and scattered clumps of saw palmetto (Serenoa repens). FLUCCS Code 419E3, Other Pines Invaded by Exotics (51 – 75%) Portions of the property have significantly greater densities of exotics in the canopy (earleaf acacia and java plum) and in the midstory (Brazilian pepper and air potato (Dioscorea bulbifera)). The increased density of these exotics has also reduced the density and diversity of native species, particularly in the ground cover strata. FLUCCS Code 514, Swale A shallow swale is present along the east property line. The swale is primarily bare ground. FLUCCS Code 624E2, Cypress – Pine Invaded by Exotics (26 – 50%) A small remnant exotic invaded wetland is located in the northeastern portion of the site. The canopy contains slash pine and widely scattered pond cypress (Taxodium ascendens) as well as earleaf acacia, melaleuca (Melaleuca quinquenervia), and java plum. Cabbage palm, Brazilian pepper, and widely scattered pond cypress are present in the midstory. Ground cover consists of both wetland and upland species such as little blue maidencane, nut rush (Scleria sp.), spikerush (Eleocharis sp.), swamp fern (Blechnum serrulatum), foxtail grass (Setaria sp.), gulfdune paspalum (Paspalum monostachyum), whitehead broom (Spermacoce verticillata), grape vine, and rustweed (Polypremum procumbens). FLUCCS Code 643E1, Wet Prairies Invaded by Exotics (5 – 9%) A second remnant wetland is located in the southeastern portion of the site. The area contains very widely scattered slash pine, pond cypress, earleaf acacia, and Brazilian pepper. Ground cover consists of wetland species such as nut rush, bald rush (Psilocarya nitens), white-top sedge (Rhynchospora colorata), foxtail grass, spikerush, gulfdune paspalum, and marsh-pink (Sabatia sp.). FLUCCS Code 740, Disturbed Land Portions of the site, primarily along the perimeter of the property and the old east - west road, have been significantly disturbed and are currently vegetated primarily by weedy and exotic species. These include Bahia grass, grape vine, smutgrass (Sporobolus indicus), beggar tick, ragweed (Ambrosia artemisiifolia), Caesar weed (Urena lobata), wedelia, fingergrass (Eustachys petraea), Brazilian pepper, and whitehead broom. 4 SURVEY METHOD Based on the general habitat types (FLUCCS Codes) identified on-site there is a very low potential for a limited number of species listed as endangered, threatened, or species of special concern by the Florida Fish and Wildlife Conservation Commission (FWC) or the United States Fish and Wildlife Service (FWS) to potentially occur on the subject parcel. These species include gopher tortoise (Gopherus polyphemus), eastern indigo snake (Drymarchon corais couperi), red-cockaded woodpecker (RCW) (Picoides borealis), a variety of wading birds, Big Cypress fox squirrel (Sciurus niger avicennia), Florida bonneted-bat (Eumops floridanus), and Florida panther (Felis concolor coryi). The bald eagle (Haliaeetus leucocephalus), which has been delisted by the FWC and FWS, is still protected by other regulations and was therefore included in the survey. The Florida black bear (Ursus americanus floridanus), delisted in 2012, is still protected by the Florida Black Bear Management Plan and was therefore also included in the survey. Please see Table 2 for additional listed species included in the survey. In addition, per Collier County regulations three species of orchids (Cyrtopodium punctatum, Encyclia cochleata, and E. tampensis) and four species of wild pine (Tillandsia fasciculata, T. utriculata, T. balbisiana, and T. flexuosa) which could potentially occur on-site were included in the survey. In order to comply with FWC/FWS survey methodology guidelines, each habitat type was surveyed for the occurrence of the species listed above using meandering pedestrian belt transects. Observations for listed species were made during the protected species survey. The meandering pedestrian belt transects were spaced approximately 65 feet apart. The approximate location of direct sighting or sign (such as tracks, nests, and droppings) of a listed species, when observed, was denoted on the aerial photography. The 1" = 200’ scale aerial Protected Species Assessment Map (Figure 1) depicts the approximate location of the survey transects and the results of the survey. The listed species survey was conducted during the mid-day hours of October 6, 2016. The weather at the time of the survey was warm and overcast with a light breeze. Prior to conducting the protected species survey, a search of the FWC listed species database (updated June 2016) was conducted to determine the known occurrence of listed species in the project area. This search revealed no known protected species occurring on or immediately adjacent to the site. The database indicated that Florida black bear have been recorded in the vicinity of the property (Figure 2). The Florida black bear is listed as threatened by the FWC but is not listed by the FWS. RCW sightings are also shown in the general project area. The database does not contain information on the type of sighting (individual birds, cavity trees, etc.) or the date. In addition, the property is within a wood stork core foraging area but is not within Panther Priority 1 or 2 Zones. 5 Table 2. Listed Species That Could Potentially Occur On-site FLUCCS CODE Percent Survey Coverage Species Name Present Absent 419E1 419E3 80 Gopher Frog (Rana areolata) Eastern Indigo Snake (Drymarchon corais couperi) Gopher Tortoise (Gopherus polyphemus) Red-cockaded Woodpecker (Picoides borealis) Southeastern American Kestrel (Falco sparverius paulus) Big Cypress Fox Squirrel (Sciurus niger avicennia) Florida Black Bear (Ursus americanus floridanus) Florida Panther (Felis concolor coryi) √ √ √ √ √ √ √ √ 514 80 Limpkin (Aramus guarauna) Little Blue Heron (Egretta caerulea) Reddish Egret (Egretta rufescens) Roseate Spoonbill (Ajaia ajaja) Snowy Egret (Egretta thula) Tricolored Heron (Egretta tricolor) √ √ √ √ √ √ 624E2 80 Gopher Frog (Rana areolata) Arctic Peregrine Falcon (Falco peregrinus tundrius) Little Blue Heron (Egretta caerulea) Snowy Egret (Egretta thula) Tricolored Heron (Egretta tricolor) Big Cypress Fox Squirrel (Sciurus niger avicennia) Florida Black Bear (Ursus americanus floridanus) Florida Panther (Felis concolor coryi) √ √ √ √ √ √ √ √ 643E 80 Florida Sandhill Crane (Grus canadensis pratensis) Limpkin (Aramus guarauna) Little Blue Heron (Egretta caerulea) Reddish Egret (Egretta rufescens) Snail Kite (Rostrhamus sociabilis) Snowy Egret (Egretta thula) Tricolored Heron (Egretta tricolor) Wood Stork (Mycteria americana) √ √ √ √ √ √ √ √ 740 80 Gopher Tortoise (Gopherus polyphemus) √ 7 The Radio Road - Davis Boulevard area of Collier County historically contained several clusters of RCWs. Previous environmental surveys of this property and adjacent lands identified an inactive RCW cavity tree located off-site 420± feet west of Palm Springs Boulevard and 97± feet north of Calle Del Ray. This includes listed species surveys conducted in June and July 2000 (Boylan Environmental Consultants, Inc.), January 2002 (Boylan Environmental Consultants, Inc.), August 2003 (Hoover Planning & Development, Inc.), June, October, and November 2004 (Passarella & Associates, Inc.), August and September 2006 (EW Consultants, Inc.), and June 2009 (Passarella & Associates, Inc.). All of these studies determined that RCWs were not using the cavity nor were they present in the area. Red-bellied woodpeckers (Melanerpes crolinus) were documented nesting in the cavity. SURVEY RESULTS No species listed by either the FWS or the FWC or plants listed by Collier County were observed on the site during the protected species survey. This is consistent with the results of the listed species surveys previously conducted by other environmental consultants. The off-site historic RCW cavity tree was found. There is no evidence of fresh sap, a maintained face plate surrounding the ca vity entrance, or resin wells which are diagnostic of active RCW cavity trees. Widely scattered dead trees containing potential cavities entrances were observed. The vast majority of these trees consist of pine tree snags in advanced stages of decay. These potential cavity entrances are primarily less than approximately two inches in diameter. Many of the potential cavities are likely very shallow and do not penetrate the heartwood of the snag. No evidence of Florida bonneted bat utilization (bat vocalization/chatter from within the potential cavities or guano on or around the snags) was observed. No artificial structures were observed on-site. In addition to the site inspection, a search of the FWC s pecies database (updated June 2016) revealed no known protected species within or immediately adjacent to the project limits. Y:\DRHOR-185\County\PSA Triad.Docx Current Responsibilities Project Manager providing an array of environmental studies and services related to land development and property evaluation in south Florida. These activities, performed for private landowners and public entities, include vegetation mapping, binding and informal state and federal wetland jurisdictional determinations, wetland functional assessments using UMAM, WRAP, and MWRAP, habitat evaluations, establishing seasonal high water elevations for wetlands using biological indicators, threatened and endangered species surveys, and wetland (COE, DEP, and WMD) permit applications. Additional services include threatened and endangered species relocation and management plans, wetland mitigation (creation, restoration, enhancement, and preservation) plans, and the design and implementation of wetland monitoring plans. Experience Joined the firm in 2003 bringing over 16 years of experience as an environmental consultant in South Florida. More than 270,000 acres of land has been mapped and evaluated since 1987. Individual properties ranged in size from less than one acre to more than 5,000 acres located in Collier, Lee, Charlotte, Sarasota, Polk, Hardee, Brevard, Martin, and Dade Counties. Projects have included agricultural, residential, commercial, and industrial land uses, new and expanding roadways, and wetland restoration (wetland mitigation banking). Wetland permitting experience includes wetland delineation, preparation of state and federal permit applications and supporting documents, responding to agency questions and third party concerns, and negotiating mutually acceptable wetland mitigation plans. Surveys and management plans have been conducted and prepared for gopher tortoises, eastern indigo snake, bald eagle, red- cockaded woodpecker, Florida bonneted bat, and Big Cypress fox squirrel. Has authorization from the Florida Fish and Wildlife Conservation Commission to conduct surveys, prepare permit applications, and relocate gopher tortoises as an Authorized Gopher Tortoise Agent. Is qualified as an expert witness by the Lee County Hearing Examiner, Collier County Environmental Advisory Council, Collier County Planning Commission, and City of Bonita Springs Zoning Board on environmental issues. Recently completed and ongoing projects for the public and private sectors include monitoring of the Lely Area Stormwater Improvement Project’s (LASIP) Serenity Park, Craig M. Smith, Senior Ecologist wetland enhancement plan development, implementation, and monitoring for projects such as Barrington Cove, Marsilea, and Verona Pointe Estates, gopher tortoise permitting and relocation for several projects in Collier and Lee Counties, wetland permitting for Naples Heritage Golf and Country Club, and bald eagle management plan preparation for the Calusa Cay CPD on Pine Island. Education and Certification Master of Science, University of North Carolina at Wilmington, 1987. Bachelor of Science, Clarion University of Pennsylvania, 1984. Senior Ecologist, Ecological Society of America Professional Wetland Scientist (No. 238), Society of Wetland Scientists Certified Arborist (No. FL-6255A), International Society of Arboriculture Authorized Gopher Tortoise Agent (Permit No. GTA-09-00011D), Florida Fish and Wildlife Conservation Commission Qualified Bald Eagle Monitor, City of Cape Coral Provisionally Certified Wetland Delineator, U.S. Army Corps of Engineers Wetland Certification Program, 1993. Continuing Education Florida Master Naturalist Program – Freshwater Wetlands. University of Florida IFAS, 2012. Native Trees, Shrubs, and wildflowers for Central and South Florida: Zones 9-11. Florida Association of Native Nurseries. 2011. Unified Mitigation Assessment Method 201 Training. South Florida Water Management District. 2010. Florida Statewide (62-340 FAC) Wetland Delineation Training Program. Richard Chinn Environmental Training, Inc. 2007. Wetland Plant Identification Training Program. Richard Chinn Environmental Training, Inc. 2007. Unified Mitigation Assessment Method Training. U.S. Army Corps of Engineers. 2005. The Florida Master Wildlifer. University of Florida. Institute of Food and Agricultural Sciences. 2003. Basic Prescribed Fire Training. Hillsborough Community College. 1992. Florida Wetlands Successful Creation, Restoration, and Enhancement Training Course #1. Natural Resources Training and Certification, Inc. 1991. Florida Hydric Soils Workshop. Florida Association of Professional Soil Classifiers. 1991. Affiliations Ecological Society of America Society of Wetland Scientists Collier County Property AppraiserProperty Aerial Parcel No.65720320005 Site Adr.645 SARECINO CIR Open a GIS Window with More Features. EXHIBIT A List of Permitted Uses Triad Residential Planned Unit Development Page 1 of 9 5/19/2017 revision Triad PUDA RWA File 130019.02.00 PUDZ-PL20160002564 Regulations for development of the Triad Residential Planned Unit Development (RPUD) shall be in accordance with the contents of this RPUD Ordinance and applicable sections of the Land Development Code (LDC) and Growth Management Plan (GMP) in effect at the time of approval of site development plan or subdivision plat. Where this RPUD Ordinance does not provide development standards, then the provisions of the specific sections of the LDC that are otherwise applicable shall apply. MAXIMUM DENSITY: There shall be no more than 44 single-family residential dwelling units permitted on the ± 10.75 gross acres, resulting in a maximum density of 4.09 dwelling units per acre. PERMITTED USES: No building or structure, or part thereof, shall be erected, altered or used, or land used, in whole or in part, for other than the following: I. RESIDENTIAL A. Principal Uses: 1. Single-family, detached 2. Temporary Model homes 3. Any other principal use which is comparable in nature with the foregoing list of permitted principal uses, as determined by the Board of Zoning Appeals (“BZA”) or Hearing Examiner, as applicable. B. Accessory Uses: 1. Accessory uses and structures customarily associated with the permitted principal uses and structures, including, but not limited to swimming pools, spas, screen enclosures, private garages, and other recreational uses. 2. Gatehouses and other access control structures. 3. Project sales, construction and administrative offices that may occur in temporary model homes and/or temporary structures. 4. Walls, berms, and signs. 5. Mail Kiosks. EXHIBIT A List of Permitted Uses Triad Planned Unit Development Amendment Page 2 of 9 5/19/2017 revision Triad PUDA RWA File 130019.02.00 PUDZ-PL20160002564 6. Any other accessory use which is comparable in nature with the foregoing list of permitted accessory uses, as determined by the Board of Zoning Appeals (“BZA”) or Hearing Examiner, as applicable. II. PRESERVE AREA A. Permitted Uses: 1. Native preserves. EXHIBIT B Development Standards Triad Planned Unit Development Amendment Page 3 of 9 5/19/2017 revision Triad PUDA RWA File 130019.02.00 PUDZ-PL20160002564 Exhibit B sets forth the development standards for the land uses within the Triad PUD. Standards not specifically set forth herein shall be those specified in applicable sections of the LDC in effect as of the date of approval of the site development plan (SDP) or subdivision plat. 1. Guardhouses, gatehouses, access control structures, clock towers, columns, decorative hardscaping or architectural embellishments associated with the project’s entrance features are permitted within the “R” designated area abutting the project’s entrance or within the private roadway as depicted on the PUD Master Plan, and shall have no required setbacks; however, such structures cannot be located where they create vehicular stacking or sight distance issues for motorists and pedestrians, and cannot exceed 35 feet in actual height. Development Standards PRINCIPAL STRUCTURES SINGLE-FAMILY DETACHED MINIMUM LOT AREA 4,000 S.F. MIN. LOT WIDTH 40 FEET MIN. FLOOR AREA 1500 S.F. MIN. FRONT YARD1,2 15 FEET MIN. SIDE YARD 5 FEET MIN. REAR YARD 15 FEET MIN. PRESERVE SETBACK 25 FEET MIN. DISTANCE BETWEEN STRUCTURES 10 FEET MAX. ZONED BUILDING HEIGHT 35 FEET MAX. ACTUAL BUILDING HEIGHT 40 FEET ACCESSORY STRUCTURES MIN. FRONT YARD SPS MIN. SIDE YARD SPS MIN. REAR YARD3 0 FEET MIN. PRESERVE SETBACK 10 FEET MAX. ZONED BUILDING HEIGHT 35 FEET MAX. ACTUAL BUILDING HEIGHT 40 FEET S.P.S. = Same as Principal Structure BH = Building Height LME = Lake Maintenance Easement LBE = Landscape Buffer Easement EXHIBIT B Development Standards Triad Planned Unit Development Amendment Page 4 of 9 5/19/2017 revision Triad PUDA RWA File 130019.02.00 PUDZ-PL20160002564 Footnotes 1. For corner lots, only 1 front yard setback shall be required. The yard that does not contain the driveway vehicle access shall be considered a side yard and shall provide a minimum 5’ setback. 2. The minimum 15’ front yard setback may be reduced to 12’ where the unit has a recessed or side-entry garage. Front-loading garages shall be set back a minimum of 23 feet from edge of sidewalk. 3. Where the rear yard of a lot abuts the rear yard of another lot, the rear yard setback for the accessory structures shall be 5’. General Notes 1. All minimum yard setbacks will be measured from lot boundaries – LMEs and LBEs will be platted as separate tracts 2. For corner lots and lot abutting roadway terminus, see typical plan view detail in Exhibit C depicting lot with measurement and yard configurations. EXHIBIT D Legal Description Triad Planned Unit Development Amendment Page 7 of 9 5/19/2017 revision Triad PUDA RWA File 130019.02.00 PUDZ-PL20160002564 (AS TAKEN FROM TITLE COMMITMENT) ALL OF BLOCKS 2, 4 AND 6 AND THAT PART OF VACATED CALLE DEL REY LYING EAST OF PALM SPRINGS BOULEVARD, NORTH OF BLOCK 4 AND SOUTH OF BLOCK 6, PALM SPRINGS PLAZA, UNIT NO. 1, ACCORDING TO THE MAP OR PLAT THEREOF, AS RECORDED IN PLAT BOOK 8, PAGE 21, PUBLIC RECORDS OF COLLIER COUNTY, FLORIDA. EXHIBIT E List of Deviations Triad Planned Unit Development Amendment Page 8 of 9 5/19/2017 revision Triad PUDA RWA File 130019.02.00 PUDZ-PL20160002564 Deviation #1 seeks relief from LDC Section 6.06.01.N, “Street System Requirements,” which requires minimum local street right-of-way width of 60 feet, to allow for a 50-foot right-of-way minimum width for the private streets. Deviation #2 seeks relief from LDC Section 6.06.01.N, “Street System Requirements,” which requires that streets shall be classified by the cross-sections contained in Appendix B, to allow for an inverted roadway design, as depicted in Exhibit C. Deviation #3 seeks relief from LDC Section 5.04.06.A.3.e, which allows temporary signs on residentially zoned properties up to 4 square feet in area or 3 feet in height , to allow a temporary banner sign up to a maximum of 32 square feet in area and 8’height. The temporary banner signs shall be limited to a maximum of 90 days during season defined as January 1st to March 31th per calendar year. Deviation #4 seeks relief from LDC Section 4.06.02.C, Table 2.4, which requires a 15-foot wide Type B landscape buffer where Single-Family Residential Zoning abuts Multi-Family Residential Zoning along the eastern PUD boundary, to allow for a 15-foot wide Type A landscape buffer along the existing masonry wall. Deviation #5 seeks relief from LDC Section 6.06.02.A.1 which requires that sidewalks be constructed on both sides of public and private rights-of-way, to allow for sidewalks on one side of the ROW for roadway stubs where indicated on the Master Plan. Deviation #6 seeks relief from LDC Section 4.06.05.N.1.c which requires All bodies of water, including retention areas exceeding 20,000 square feet, and which are located adjacent to a public right-of-way, must incorporate into overall design of the project at least 2 of the following items: i. A walkway 5 feet wide and a minimum of 200 feet long, with trees of an average of 50 feet on center and with shaded benches, a minimum of 6 feet in length or picnic tables with one located every 150 feet. ii. Fountains. iii. Partially shaded plaza/courtyard, a minimum of 200 square feet in area, with benches and/or picnic tables abutting the water-body, or retention areas; to allow for only the installation of an aerator/fountain. EXHIBIT F PUD Commitments Triad Planned Unit Development Amendment Page 9 of 9 5/19/2017 revision Triad PUDA RWA File 130019.02.00 PUDZ-PL20160002564 PUD MONITORING: A. One entity (hereinafter the Managing Entity) shall be responsible for PUD monitoring until close-out of the PUD, and this entity shall also be responsible for satisfying all PUD commitments until close-out of the PUD. At the time of this PUD approval, the Managing Entity is DR Horton Inc., a Delaware corporation, or its assigns. Should the Managing Entity desire to transfer the monitoring and commitments to a successor entity, then it must provide a copy of a legally binding document that needs to be approved for legal sufficiency by the County Attorney. After such approval, the Managing Entity will be released of its obligations upon written approval of the transfer by County staff, and the successor entity shall become the Managing Entity. As Owner and Developer sell off tracts, the Managing Entity shall provide written notice to County that includes an acknowledgement of the commitments required by the PUD by the new owner and the new owner’s agreement to comply with the Commitments through the Managing Entity, but the Managing Entity shall not be relieved of its responsibility under this Section. When the PUD is closed-out, then the Managing Entity is no longer responsible for the monitoring and fulfillment of PUD commitments. TRANSPORTATION: A. The proposed development is limited to 50 unadjusted two-way PM weekday peak hour trips consistent with the TIS provided at the time of rezone. STORMWATER: A. <RESERVED> ENVIRONMENTAL: A. Per LDC Section 3.05.07 Preservation Standards, 15% of the subject property’s existing native vegetation, or 1.40 acres, will be preserved onsite as generally depicted on Exhibit C: RPUD Master Plan. Required preserve: ±1.40 ac (15% of ±9.37 ac of existing native vegetation). Preserve provided ±1.40 ac DEVIATION JUSTIFICATIONS Triad Planned Unit Development Amendment Page 1 of 3 LIST OF REQUESTED DEVIATIONS Deviation #1 seeks relief from LDC Section 6.06.01.N, “Street System Requirements,” which requires minimum local street right-of-way width of 60 feet, to allow for a 50-foot right-of-way minimum width for the private streets. Minimum right-of-way width of 50 feet is requested for local streets within the Triad RPUD. This deviation is justified because of the size and the small-scale neighborhood character of this project. A 50-foot right-of-way for a residential street can successfully facilitate movement of the vehicular, pedestrian and bike traffic while accommodating all utility and drainage needs. The 50-foot right-of-way accomplishes traffic calming to provide a safer transportation system within the neighborhood. This deviation is commonly approved and has been effectively implemented in numerous residential PUDs throughout the County. Deviation #2 seeks relief from LDC Section 6.06.01.N, “Street System Requirements,” which requires that streets shall be classified by the cross-sections contained in Appendix B, to allow for an inverted roadway design, as depicted in Exhibit C. The proposed inverted roadway design will not only allow for more efficient drainage of the neighborhood streets but will also provide immediate construction cost savings from not having to provide outside curbing. Moreover, this design requires fewer structures, connections, and drainage inlets that need ongoing maintenance, thus reducing long term costs for the HOA. A 3 foot wide concrete valley gutter will be utilized to increase revetment durability and reduce long term maintenance concerns. The design of the roadway will still maintain a low point above the 25 year flood elevation. The reduced construction costs associated with this roadway design will allow for greater housing affordability, as the cost savings will be reflected in home prices. Furthermore, the reduced maintenance cost will also provide affordability benefits to the residents. The inverted crown design has been and continues to be used in numerous communities throughout Florida, it is consistent with engineering best practices and does not pose any concern from a public health and safety standpoint. Deviation #3 seeks relief from LDC Section 5.04.06.A.3.e, which allows temporary signs on residentially zoned properties up to 4 square feet in area or 3 feet in height , to allow a temporary banner sign up to a maximum of 32 square feet in area and 8’height. The temporary banner signs shall be limited to a maximum of 90 days during season defined as January 1st to March 31th per calendar year. Due to the property’s location within the view of a busy arterial road and the high travel speeds along the roadway, the Applicant is seeking an increase to the allowable banner size to ensure visibility of this new community. DEVIATION JUSTIFICATIONS Triad Planned Unit Development Amendment Page 2 of 3 The proposed deviation will allow for a banner sign located along Radio Lane in order to advertise new homes available within the community. The 4 square foot banner sign permitted by the LDC provides minimal visibility and likely will not be seen by vehicles travelling along Davis Boulevard, a 50mph 4-lane divided roadway. Additionally, the applicant is requesting that the banner be allowed for up to 90 days per calendar year to allow display throughout the peak winter season for home sales. Deviation #4 seeks relief from LDC Section 4.06.02.C, Table 2.4, which requires a 15-foot wide Type B landscape buffer where Single-Family Residential Zoning abuts Multi-Family Residential Zoning along the eastern PUD boundary, to allow for a 15-foot wide Type A landscape buffer along the existing masonry wall. The eastern boundary of the property abuts an access road to the Tuscan Isles community rather than residential units. Additionally, a 6’ masonry wall and 10’ type D buffer exists on neighboring property along this boundary. The combination of a type A buffer and the abutting type D buffer with a masonry wall will meet or exceed the intent of the code by providing ample separation and screening. Deviation #5 seeks relief from LDC Section 6.06.02.A.1 which requires that sidewalks be constructed on both sides of public and private rights-of-way, to allow for sidewalks on one side of the ROW for roadway stubs where indicated on the Master Plan. The portions of roadway associated with this deviation and identified on the Master Plan abut the side yard of only one lot, whose front yard is serviced by the sidewalk along the intersecting roadway. The proposed sidewalk configuration meets the intent of the code by providing safe pedestrian access to all lots. Other than the identified stub-out locations, the proposed sidewalk network meets the requirement of providing sidewalks on both sides of the road and ensures that all homes are provided pedestrian access and fully interconnected to one another. The proposed deviation will not affect public health and safety, nor is it contrary to the intent behind the sidewalk requirements. Deviation #6 seeks relief from LDC Section 4.06.05.N.1.c which requires All bodies of water, including retention areas exceeding 20,000 square feet, and which are located adjacent to a public right-of-way, must incorporate into overall design of the project at least 2 of the following items: i. A walkway 5 feet wide and a minimum of 200 feet long, with trees of an average of 50 feet on center and with shaded benches, a minimum of 6 feet in length or picnic tables with one located every 150 feet. ii. Fountains. iii. Partially shaded plaza/courtyard, a minimum of 200 square feet in area, with benches and/or picnic tables abutting the water-body, or retention areas; to allow for only the installation of an aerator/fountain. The design and positioning of the water management structures on this property was done in a manner to provide maximum drainage functionality and buffering from the adjacent Palm Springs neighborhood to the north, rather than serve as an amenity to residents. Additionally, DEVIATION JUSTIFICATIONS Triad Planned Unit Development Amendment Page 3 of 3 such features as a walkway with benches and/or a plaza/courtyard would encourage activity along this buffered area, which the neighbors have made clear they would like kept to a minimum. DATEREVISION#DRAWN0RGE:TWP:SEC:DATE:TITLE:CLIENT:PROJECT:OFPROJECT NO.:SHEET NUMBER:DESIGNED:DRAWN:Florida Certificates of Authorization EB 7663 LB 69526610 Willow Park Drive, Suite 200 | Naples, FL 34109Office: 239.597.0575 Fax: (239) 597-0578www.consult-rwa.comTRIAD RPUD D.R. HORTON, INC.MASTER PLAN EXHIBIT C12130019.02.00OCT.,201615 51S 26EPVMDA20 40 80 MASTER PLAN NOTES1. THIS MASTER PLAN ISCONCEPTUAL IN NATUREAND SUBJECT TO CHANGESDUE TO AGENCY REVIEWAND SITE CONDITIONS.2. ACREAGE AND THE DESIGN,LOCATIONS ANDCONFIGURATIONS OF THELAND IMPROVEMENTS AREAPPROXIMATE ANDSUBJECT TO REFINEMENTAT THE TIME OF PLANS AND PLAT APPROVAL.3. INTERNAL ROADWAYDEPICTED ON MASTER PLANIS CONCEPTUAL, ROW FORSINGLE FAMILY.4. REQUIRED PRESERVE: ±1.40AC (15% OF ±9.37 AC OFEXISTING NATIVEVEGETATION). PRESERVEPROVIDED: ±1.40 AC.PRESERVES MAY BE USED TO SATISFYTHE LANDSCAPE BUFFER REQUIREMENTSAFTER EXOTIC VEGETATION REMOVAL INACCORDANCE WITH LDC SECTIONS4.06.02 AND 4.06.05.E.1. SUPPLEMENTALPLANTINGS WITH NATIVE PLANTMATERIALS SHALL BE IN ACCORDANCEWITH LDC SECTION 3.05.07.”SITE DATATOTAL SITE AREA: 10.75± ACRESMAXIMUM DWELLING UNITS:44 SINGLE-FAMILY RESIDENCESSCALE 1"=40' DATEREVISION#DRAWN0RGE:TWP:SEC:DATE:TITLE:CLIENT:PROJECT:OFPROJECT NO.:SHEET NUMBER:DESIGNED:DRAWN:Florida Certificates of Authorization EB 7663 LB 69526610 Willow Park Drive, Suite 200 | Naples, FL 34109Office: 239.597.0575 Fax: (239) 597-0578www.consult-rwa.comTRIAD RPUD D.R. HORTON, INC.MASTER PLAN EXHIBIT C22130019.02.00OCT.,201615 51S 26EPVMDA30 60 120DEVIATIONSSITE SUMMARYACREAGELAKE/ WATER MANAGEMENTACCESS DRIVE/ RIGHT OF WAYPRESERVE AREATOTALRESIDENTIALOTHER OPEN SPACEUSE±5.34±1.62±0.92±1.47±1.40±10.75DEVIATION #1 SEEKS RELIEF FROM LDC SECTION 6.06.01.N, “STREET SYSTEM REQUIREMENTS,” WHICHREQUIRES MINIMUM LOCAL STREET RIGHT-OF-WAY WIDTH OF 60 FEET, TO ALLOW FOR A 50-FOOTRIGHT-OF-WAY MINIMUM WIDTH FOR THE PRIVATE STREETS. DEVIATION #2 SEEKS RELIEF FROM LDC SECTION 6.06.01.N, “STREET SYSTEM REQUIREMENTS,” WHICHREQUIRES THAT STREETS SHALL BE CLASSIFIED BY THE CROSS-SECTIONS CONTAINED IN APPENDIX B, TOALLOW FOR AN INVERTED ROADWAY DESIGN, AS DEPICTED IN EXHIBIT C. DEVIATION #3 SEEKS RELIEF FROM LDC SECTION 5.04.06.A.3.E, WHICH ALLOWS TEMPORARY SIGNS ONRESIDENTIALLY ZONED PROPERTIES UP TO 4 SQUARE FEET IN AREA OR 3 FEET IN HEIGHT, TO ALLOW ATEMPORARY BANNER SIGN UP TO A MAXIMUM OF 32 SQUARE FEET IN AREA AND 8'HEIGHT. THETEMPORARY BANNER SIGNS SHALL BE LIMITED TO A MAXIMUM OF 90 DAYS DURING SEASON DEFINED ASJANUARY 1ST TO MARCH 31TH PER CALENDAR YEAR. DEVIATION #4 SEEKS RELIEF FROM LDC SECTION 4.06.02.C, TABLE 2.4, WHICH REQUIRES A 15-FOOT WIDETYPE B LANDSCAPE BUFFER WHERE SINGLE-FAMILY RESIDENTIAL ZONING ABUTS MULTI-FAMILYRESIDENTIAL ZONING ALONG THE EASTERN PUD BOUNDARY, TO ALLOW FOR A 15-FOOT WIDE TYPE ALANDSCAPE BUFFER ALONG THE EXISTING MASONRY WALL. DEVIATION #5 SEEKS RELIEF FROM LDC SECTION 6.06.02.A.1 WHICH REQUIRES THAT SIDEWALKS BECONSTRUCTED ON BOTH SIDES OF PUBLIC AND PRIVATE RIGHTS-OF-WAY, TO ALLOW FOR SIDEWALKS ONONE SIDE OF THE ROW FOR ROADWAY STUBS WHERE INDICATED ON THE MASTER PLAN. DEVIATION #6 SEEKS RELIEF FROM LDC SECTION 4.06.05.N.1.c WHICH REQUIRES ALL BODIES OF WATER,INCLUDING RETENTION AREAS EXCEEDING 20,000 SQUARE FEET, AND WHICH ARE LOCATED ADJACENT TO APUBLIC RIGHT-OF-WAY, MUST INCORPORATE INTO OVERALL DESIGN OF THE PROJECT AT LEAST 2 OF THEFOLLOWING ITEMS: I. A WALKWAY 5 FEET WIDE AND A MINIMUM OF 200 FEET LONG, WITH TREES OF ANAVERAGE OF 50 FEET ON CENTER AND WITH SHADED BENCHES, A MINIMUM OF 6 FEET IN LENGTH ORPICNIC TABLES WITH ONE LOCATED EVERY 150 FEET. II. FOUNTAINS. III. PARTIALLY SHADEDPLAZA/COURTYARD, A MINIMUM OF 200 SQUARE FEET IN AREA, WITH BENCHES AND/OR PICNIC TABLESABUTTING THE WATER-BODY, OR RETENTION AREAS; TO ALLOW FOR ONLY THE INSTALLATION OF ANAERATOR/FOUNTAIN. RADIO LN.PALM SPRING BLVD. BAROT DR.RGE:TWP:SEC:DATE:TITLE: CLIENT: PROJECT:OFPROJECT NO.:SHEET NUMBER:DESIGNED:DRAWN:Florida Certificates of Authorization EB 7663 LB 6952 6610 Willow Park Drive, Suite 200 | Naples, FL 34109 Office: 239.597.0575 Fax: (239) 597-0575 www.consult-rwa.com DATEREVISION#DRAWN 0May 10, 2017 4:08 PM K:\2013\130019.02.00 Hadley Place – PUD, ERP, PPL\004 RPUD Rezoning Application Support\1st Insufficiency\East - Triad\PUDA Submittal #2 Working Documents\5-10-17 1300190200X OPEN SPACE EAST.dwgPINE VERDE EAST D.R. HORTON, INC.   OPEN SPACE EXHIBIT EAST11130019.02.00MAY.,20173449S26EMCPDLP2550100OPEN SPACE - RESIDENTIALOPEN SPACE - R.O.W.OPEN SPACE - BUFFER / OTHERPOTENTIAL BUILDING FOOTPRINTLAKEROAD/CURB/WALKS1.58± AC.TOTAL SITENOTE:THIS SITE PLAN IS CONCEPTUAL IN NATURE ANDINTEDED FOR PLANNING PURPOSES ONLY. THEOVERALL CONFIGURATION, DENSITY AND/ORINTENSITY DEPICTED MAY CHANGESIGNIFICANTLY BASED UPON SURVEY,ENGINEERING, ENVIRONMENTAL, AND/ORREGULATORY REQUIREMENTS.0.14± AC.1.40± AC.2.99± AC.0.78± AC.1.06± AC.OPEN SPACE - RESIDENTIALOPEN SPACE - R.O.W.OPEN SPACE - OTHERLAKE2.35± AC.TOTAL PROVIDED0.45± AC.1.58± AC.0.78± AC.6.70 AC.TOTAL REQUIRED(60% OF TOTAL SITE)6.45 AC.10.75 AC.NOTE:BUILDING FOOTPRINTS ARE FOR CONCEPTUAL PURPOSES ONLY.OPEN SPACE - PRESERVEDETENTION / RETENTION2.35± AC.0.45± AC.DETENTION/RETENTION0.14± AC.OPEN SPACE - PRESERVE1.40± AC. COUNTY ROAD 856A.K.A. RADIO LANEPALM SPRINGS BOULEVARDCOUNTY ROAD 856A.K.A. RADIO LANETRIADMACEX. CONSERVATION EASEMENT(TO BE VACATED)PROP. PRESERVE AREAPROP. PRESERVE AREAPROPERTY BOUNDARYEASTPROPERTY BOUNDARYWESTOLD PRESERVEBOUNDARYPROPOSEDPRESERVEBOUNDARYRGE:TWP:SEC:DATE:TITLE: CLIENT: PROJECT:OFPROJECT NO.:SHEET NUMBER:DESIGNED:DRAWN:Florida Certificates of Authorization EB 7663 LB 6952 6610 Willow Park Drive, Suite 200 | Naples, FL 34109 Office: 239.597.0575 Fax: (239) 597-0575 www.consult-rwa.com DATEREVISION#DRAWN 0May 11, 2017 11:00 AM K:\2013\130019.02.00 Hadley Place – PUD, ERP, PPL\003 RPUD Rezoning Application Preparation\CAD Files\2017-05-10 02 1300190200P EX.dwgPINE VERDE   D.R. HORTON, INC.   EXISTING CONDITIONS W/AERIAL11130019.02.00MAY, 20173449S26EOSDLP2550100 Wall at East Property Boundary Eastern Side of Wall Western Side of Wall Published DailyNaples, FL 34110 Affi davit of PublicationState of FloridaCounties of Collier and Lee Before the undersigned they serve as the authority, personally appeared Daniel McDermott who on oath says that he serves as Inside Sales Manager of the Naples Daily News, a daily newspaper published at Naples, in Collier Coun-ty, Florida; distributed in Collier and Lee counties of Florida; that the attached copy of the advertising was published in said newspaper on dates listed. Affi ant further says that the said Naples Daily News is a newspaper published at Naples, in said Collier County, Florida, and that the said newspaper has heretofore been continuously published in said Collier County, Florida; distributed in Collier and Lee counties of Florida, each day and has been entered as second class mail matter at the post offi ce in Naples, in said Collier County, Florida, for a period of one year next pre-ceding the fi rst publication of the attached copy of advertisement; and affi ant further says that he has neither paid nor promised any person, or corporation any discount, rebate, commission or refund for the purpose of securing this advertisement for publication in the said newspaper.___________________________________________________________Customer Ad Number Copyline P.O.#_____________________________________________________________________________________ RWA, INC. 1532497 NIM Pub Dates March 22, 2017 _______________________________________ (Signature of affi ant) Sworn to and subscribed before me This March 24, 2017 _______________________________________ (Signature of affi ant) _______________________________________ (Signature of affi ant) Sworn to and subscribed before me This March 24, 2017 _______________________________________ (Signature of affi ant) +Naples Daily News Wednesday, March 22, 2017 19A Stem Cell Therapy for Joints www.NCHmd.org Naples Speaker:Leon Mead,MD Te lford Classroom 2, NCH Downtown Naples Hospital 350 7th St.N. To register,call 624-3978 Free Seminar March 29 3pmRadioUninterruptedisyourchancetosupport the station you love and avoid those frequent interruptions asking for your pledge.To help pay for your favorite public radio programs and avoid pledge interruptions in April,pledge your support by March 31.Supportthe station thatbrings you relevant,timely and fact-based news and revolutionize public radio pledge drives. Give to Radio Uninterrupted To day @wgcu.orgorcall 1.800.533.9428 Hear the Difference Listen to WGCU Pu blic Ra dio …NPR for Southwest Florida 90.1/91.7 FM When you pledge your support you will be entered to win greatprizes. Details areat wgcu.org. NEIGHBORHOOD INFORMATION MEETING The public is invited to attend a Neighborhood Information Meeting held DR Horton,represented by Patrick Va nasse of RWA,Inc.on: Thursday,April 6,2017 at 5:00 pm Collier County South Regional Library 8065 Lely Cultural Parkway,Naples,FL 34113 Subject properties:The MAC and Tr iad PUDs,comprised of 10.76 &10.75 acres respectively and located on the Northwest and Northeast corners of Palm Springs Boulevard and Radio Lane in Section 34,To wnship 49 South,Range 26 East,Collier County,Florida;and providing an effective date. Project:PL2016-0002564 &PL2016-0002565 -The property owners are petitioning Collier County,seeking approval to amend the Tr iad and MAC Residential Planned Unit Development (RPUD)identified on the map above. The primary intent of the amendments is to allow these PUDs to be developed as single-family communities,rather than multi-family as currently allowed, reducing the number of units from 86 to 44 for the MAC PUD,and from 86 to 44 for the Tr iad PUD.Minor changes to the Master Plan configuration,development standards and developer commitments,and deviations are requested.However, project boundaries,allowances for open space,as well as preserve location and acreages will remain from the original ordinances. In order to provide you an opportunity to become fully aware of our intention regarding the above described property and to give you an opportunity to provide input,we are holding a Neighborhood Information Meeting on Thursday, April 6th beginning at 5:00 PM,at the Collier County South Regional Library Meeting Room,8065 Lely Cultural Parkway,Naples,FL 34113. We value your input! Business and property owners,residents and visitors are welcome to attend the presentation and discuss the project with the owner’s representative and Collier County staff.If you are unable to attend this meeting,but have questions or comments,they can be directed by mail,phone,or e-mail to: Patrick Va nasse,AICP Director of Planning RWA Engineering 6610 Willow Park Drive,Suite 200 Naples,Florida 34109 239-597-0575 pvanasse@consult-rwa.com March 22,2017 ND-1532497 Martin McGuinness, an Irish Repub- lican Army commander turned peace- maker and former deputy leader of Northern Ireland, has died, his Sinn Fein party announced Tuesday. He was 66. Sinn Fein said he died after a short ill- ness. McGuinness was diagnosed with a rare heart disease in December. He was a senior IRA figure during 1972’s Bloody Sunday, when British sol- diers shot and killed 13 civilians during a peaceful civil rights march in London- derry. He became Sinn Fein’s chief nego- tiator during the Northern Ireland peace process after the 1998 Good Friday Agreement. McGuinness became Northern Ire- land’s deputy first minister in 2007 and stepped down in January in protest over a botched government-funded renew- able-energy plan, triggering an election earlier this month. “The world of politics and the people across this island will miss the leader- ship he gave, shown most clearly during the difficult times of the peace process, and his commitment to the values of gen- uine democracy that he demonstrated in the development of the institutions in Northern Ireland,” said Irish President Michael D. Higgins, in a statement. Sinn Fein President Gerry Adams said: “Throughout his life Martin showed great determination, dignity and humility and it was no different during his short illness. He was a passionate re- publican who worked tirelessly for peace and reconciliation and for the re- unification of his country.” The Troubles, a bloody 30-year-con- flict in Northern Ireland between mainly Catholic nationalists and republicans who wanted to become part of the Re- public of Ireland and predominantly Protestants who wished to remain part of the United Kingdom, ended in the late 1990s with the creation of a power-shar- ing government. Lingering animosities have some- times flared up as walls continue to di- vide Catholic and Protestant neighbor- hoods. The relatives of some victims of IRA bombings condemned McGuinness. Stephen Gault, whose father, Samuel, died in a bombing in Northern Ireland in 1987 that killed 10 others, said McGuin- ness was a terrorist who never showed “remorse or repentance.” PETER MORRISON/AP Martin McGuinness, an Irish Republican Army and Sinn Fein leader who became a minister of peacetime Northern Ireland, has died at 66. Former IRA leader McGuinness dies JANE ONYANGA-OMARA USA TODAY Page 1 6610 Willow Park Drive Suite 200 Naples, FL 34109 | (239) 597 -0575 | Fax (239) 597-0578 www.consult-rwa.com March 15, 2017 Subject: Neighborhood Information Meeting Triad & MAC RPUDs PL2016-0002564 PL2016-0002565 Dear Property Owner: Please be advised that the DR Horton has made a formal application to Collier County to amend Ordinance 05-11, the Triad Residential Planned Unit Development PUD, and Ordinance 05-50, the MAC Residential Planned Unit Development PUD Property Location Description: Triad RPUD is 10.75 acres located at the north east corner of the intersection of Radio Lane and Palm Springs Blvd in Section 34, Township 49 South, Range 26 East, Collier County, Florida. MAC RPUD is 10.76 acres and located at the northwest corner of the intersection of Radio Lane and Palm Springs Blvd in Section 34, Township 49 South, Range 26 East, Collier County, Florida. Petition Description: The property owners are petitioning Collier County, seeking approval to amend the Triad and MAC Residential Planned Unit Development (RPUD) identified on the map below. The primary intent of the amendments is to allow these PUDs to be developed as single-family communities, rather than multi-family as currently allowed, reducing the number of units from 86 to 44 for the MAC PUD, and from 86 to 44 for the Triad PUD. Minor changes to the Master Plan configuration, development standards and developer commitments and deviations are requested. However, project boundaries, allowances for open space, as well as preserve location and acreages will remain from the original ordinances. Page 2 6610 Willow Park Drive Suite 200 Naples, FL 34109 | (239) 597 -0575 | Fax (239) 597-0578 www.consult-rwa.com In order to provide you an opportunity to become fully aware of our intention regarding the above described property and to give you an opportunity to provide input, we are holding a Neighborhood Information Meeting on Thursday, April 6th beginning at 5:00 PM, at the Collier County South Regional Library Meeting Room, 8065 Lely Cultural Parkway, Naples, FL 34113. Should you have any questions, please feel free to contact me at 597-0575 ext. 259. Sincerely, RWA, Inc. Patrick Vanasse, AICP Director of Community Development MAC #1 MAC #2 Triad #1 Triad #2 Signage Placement