Loading...
Ordinance 2017-19 ORDINANCE NO. 2017-1 9 AN ORDINANCE OF COLLIER COUNTY, FLORIDA, AMENDING ORDINANCE NO. 74-50, AS AMENDED, TO ADD MAXIMUM OFF-SITE DISCHARGE STANDARDS APPLICABLE TO THE HENDERSON CREEK-BELLE MEADE BASIN NORTH, HENDERSON CREEK-BELLE MEADE BASIN SOUTH, URBAN IMMOKALEE BASIN EAST, URBAN IMMOKALEE BASIN WEST, 951 CANAL NORTH BASIN, C-4 CANAL BASIN, CORKSCREW CANAL BASIN, CYPRESS CANAL BASIN, FAKA-UNION CANAL BASIN-N, GORDON RIVER EXTENSION BASIN, I-75 CANAL BASIN, IMPERIAL DRAINAGE OUTLET BASIN, LELY MANOR CANAL BASIN, MAIN GOLDEN GATE CANAL BASIN, PALM RIVER CANAL BASIN, AND PINE RIDGE CANAL BASIN; MODIFYING THE NAMES OF FIVE EXISTING CANAL BASINS; ALSO MODIFYING THE MAXIMUM OFF-SITE DISCHARGE STANDARD FOR HARVEY BASIN; PROVIDING FOR INCLUSION INTO THE CODE OF LAWS AND ORDINANCES; PROVIDING FOR CONFLICT AND SEVERABILITY; PROVIDING AN EFFECTIVE DATE. WHEREAS, Ordinance No. 74-50, as amended by Ordinance No. 90-10, contains "Local Design Criteria" that specifies Allowable Post- Development Discharge Formulas for Collier County Canals, which formulas limit the allowable maximum off-site discharge into canals; and WHEREAS, the Belle Meade Area Stormwater Master Plan study prepared by Parsons, Inc., dated September 2006, recommends that the off-site discharge within the Belle Meade Basin be divided into two watersheds separated by Sabal Palm Road and limited by formula; and WHEREAS, the Immokalee Area Stormwater Master Plan study prepared by H.W. Lochner, Inc., dated December 2004, recommends that the off-site discharge within the Immokalee Master Plan Area be divided into two watersheds separated by SR 29 and limited by formula; and WHEREAS, the Watershed Management Plan study prepared by Atkins North America, dated November 2011, recommends that the off-site discharge within the 951 Canal Basin, C-4 Canal Basin, Corkscrew Canal Basin, Cypress Canal Basin, Faka-Union Canal Basin-N, Gordon River Extension Basin, 1-75 Canal Basin, Imperial Drainage Outlet Basin, Lely Manor Canal Basin, Main Golden Gate Canal Basin, Palm River Canal Basin and Pine Ridge Canal Basin be limited by formula; and WHEREAS, the maximum off-site discharge limitation formulas as indicated by the above referenced studies have not been incorporated into Ordinance No. 74-50, as amended by Ordinance No. 90-10 and Ordinance No. 01-27; and [17-IMP-00181/1337714/1]76 Words struck-through are deleted;words underlined are added. 5/9/17 Page 1 of 5 WHEREAS, Staff has recommended that discharge limitations applicable to the Belle Meade Stormwater Master Plan Area, Immokalee Stormwater Master Plan Area, 951 Canal North Basin, C-4 Canal Basin, Corkscrew Canal Basin, Cypress Canal Basin, Faka-Union Canal Basin-N, Gordon River Extension Basin, I-75 Canal Basin, Imperial Drainage Outlet Basin, Lely Manor Canal Basin, Main Golden Gate Canal Basin, Palm River Canal Basin and Pine Ridge Canal Basin be incorporated into Ordinance No. 74- 50, as amended by Ordinance No. 90-10 and Ordinance 01-27; and WHEREAS, the Board concurs with Staffs recommendations. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that: SECTION ONE: Paragraph 7. A of Article II, Section 2.01 of Ordinance No. 74-50, as amended by Ordinance No. 90-10 and Ordinance No. 01-27, is hereby amended to read as follows: 7. In accordance with the provisions of Chapter 40E 4, Florida ^dmin;strative Code, Section 40E4.091(1)(a), F.A.C. and the "Basis of Review for Environmental Resource Permit Applications within the South Florida Water Management District's August 2000" Section 6.0. as Mese-two-documents it may be amended from time to time, the following local design criteria shall be used in Collier County for new development and redevelopment as defined in LDC Section 3.07.02.A.2: A. Section 63_2: Discharge Rate - Offsite discharge contributed by a development is limited to amounts which will not cause adverse off-site impacts. These amounts may be determined by: (most restrictive applies) a) Historic discharge rates; b) Rates determined in previous SFWMD permit actions; c) Rates specified in SFWMD criteria (Basis of v eview See Appendix ;A); d) Rates based on system capacity for selected County primary outfall canals, unless special engineering studies are provided by a Registered Professional Engineer, shall be as follows: [17-IMP-00181/1337714/1176 Words struck-through are deleted;words underlined are added. 5/9/17 Page 2 of 5 ALLOWABLE POST-DEVELOPMENT DISCHARGE FORMULAS FOR COLLIER COUNTY CANALS CANAL ALLOWABLE RUNOFF DESIGN FREQ./DUR. AIRPORT ROAD 25.6 CSM (0.04 cfs/acre) 25 year/ 3 day NORTH CANAL BASIN SUBBASIN (North of Vanderbilt Beach Rd.) AIRPORT ROAD 38.4 CSM (0.06 cfs/acre) 25 year/ 3 day SOUTH CANAL BASIN SUBBASIN (South of Vanderbilt Beach Rd.) COCOHATCHEE RIVER 25.6 CSM (0.04 cfs/acre) 25 year/ 3 day CANAL BASIN LELY CANAL BASIN 38.4 CSM (0.06 cfs/acre) 25 year/ 3 day HARVEY CANAL BASIN 35.2 38.4 CSM (0.065 cfs/acre) 25 year/ 3 day WIGGINS PASS BAY OUTLET BASIN 83.2 CSM (0.13 cfs/acre) 25 year/ 3 day HENDERSON CREEK- 38.4 CSM (0.06 cfs/acre) 25 year/ 3 day BELLE MEADE BASIN NORTH HENDERSON CREEK- 25.6 CSM (0.04 cfs/acre) 25 year/ 3 day BELLE MEADE BASIN SOUTH URBAN IMMOKALEE MASTER 32.0 CSM (0.05 cfs/acre) 25 year/ 3 day BASIN EAST URBAN IMMOKALEE MASTER 64.0 CSM (0.10 cfs/acre) 25 year/3 day BASIN WEST 951 NORTH CANAL 70.4 CSM (0.11 cfs/acre) 25 year/ 3 day NORTH BASIN • C-4 CANAL BASIN 70.4 CSM (0.11 cfs/acre) 25 year/3 day CORKSCREW 25.6 CSM (0.04 cfs/acre) 25 year/3 day CANAL BASIN CYPRESS CANAL 38.4 CSM (0.06 cfs/acre) 25 year/ 3 day BASIN FAKA-UNION 57.6 CSM (0.09 cfs/acre) 25 year/3 day CANAL BASIN-N [17-IMP-00181/1337714/1176 Words struck-through are deleted;words underlined are added. 5/9/17 Page 3 of 5 GORDON RIVER 57.6 CSM (0.09 cfs/acre) 25 year/3 day EXTENSION BASIN I-75 CANAL BASIN 38.4 CSM (0.06 cfs/acre) 25 year/ 3 day IMPERIAL DRAINAGE 76.8 CSM (0.12 cfs/acre) 25 year/ 3 day OUTLET BASIN LELY MANOR 38.4 CSM (0.06 cfs/acre) 25 year/3 day CANAL BASIN MAIN GOLDEN GATE 25.6 CSM (0.04 cfs/acre) 25 year/ 3 day CANAL BASIN PALM RIVER 83.2 CSM (0.13 cfs/acre) 25 year/ 3 day CANAL BASIN PINE RIDGE 83.2 CSM (0.13 cfs/acre) 25 year/3 day CANAL BASIN e. In all other areas of the County off-site discharge shall not be in excess of 0.15 cfs/acre. Variations to the above requirement may be allowed with County staff approval based upon special engineering studies prepared by a Registered Professional Engineer. Unless otherwise specified by previous SFWMD permits or SFWMD criteria, a stormwater event of a 3 day duration and 25 year return frequency shall be used in computing off-site discharges. Allowable discharges will be designated by SFWMD on a case by case basis upon request. SECTION TWO: CONFLICT AND SEVERABILITY. In the event this Ordinance conflicts with any other Ordinance of Collier County or other applicable law, the more restrictive shall apply. If any phrase or portion of this Ordinance is held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct and independent provision and such holding shall not affect the validity of the remaining portions. [17-IMP-00181/1337714/1]76 Words struck-through are deleted;words underlined are added. 5/9/17 Page 4 of 5 SECTION THREE: INCLUSION IN THE CODE OF LAWS AND ORDINANCES. This Ordinance shall be made a part of the Code of Laws and Ordinances of Collier County, Florida. The sections of the Ordinance may be renumbered or relettered to accomplish that result, and the word "Ordinance" may be changed to "Section", "Article", or any other appropriate word. SECTION FOUR: EFFECTIVE DATE. This Ordinance shall become effective upon filing with the Department of State and on the date that the Growth Management Plan Amendment in Ordinance No. 2017- :2.`-f [Ordinance for Petition PL20130002637/CPSP-2013-11] becomes effective. PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier County, Florida this I.3 ay of `J tk.' , 2017. ATTEST: '''•�'�. BOARD OF COUNTY COMMISSIONERS DWIGHT E , CLERK COLLIER OjpTY, FLORIDA 1, - ' ' ekI Rt A .7'as to Chat atfteputy CPENNY e' OR, C Iii' an S pp owl o as to form and le_�lity: eidi Ashton-Cicko Managing Assistant County Attorney This ordinance filed with the Secretory of State's Office the Zd'"day of Joie- , f_7_ and acknowledgement of that filing received this ms'µ day of ✓nv 2nl g - I�►L.�..7. Deput it [17-IMP-00181/1337714/1]76 Words struck-through are deleted;words underlined are added. 5/9/17 Page 5 of 5 fill 1,r.; -,, -,),--,Lvizte FLORIDA DEPARTMENT Of STATE RICK SCOTT KEN DETZNER Governor Secretary of State June 20, 2017 Honorable Dwight E. Brock Clerk of the Circuit Court Collier County Post Office Box 413044 Naples,Florida 34101-3044 Attention: Martha Vergara, Deputy Clerk Dear Mr. Brock: Pursuant to the provisions of Section 125.66, Florida Statutes,this will acknowledge receipt of your electronic copy of Collier County Ordinance No. 2017-19, which was filed in this office on June 20, 2017. Sincerely, Ernest L. Reddick Program Administrator ELR/lb R. A. Gray Building • 500 South Bronough Street • Tallahassee, Florida 32399-0250 Telephone: (850) 245-6270 www.dos.state.tl.us