Backup Documents 06/13/2017 Item #11D ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 1 10
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATU
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1. Caroline Cilek Building Division, GMD rat 6/13/17
2.
3 County Attorney Office County Attorney Office
. (Djiiiti
4. BCC Office Board of County \'C
Commissioners
5. Minutes and Records Clerk of Court's Office req 119 iZ,�pm
PRIMARY CONTACT INFORMATION I
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the addressees
above,may need to contact staff for additional or issing information.
Name of Primary Staff Caroline Ci k Phone Number Ex.2485
Contact/ Department
Agenda Date Item was 6/13/17 Agenda Item Number 11.D
Approved by the BCC
Type of Document Resolution Number of Original 1
Attached Documents Attached
PO number or account N/A
number if document is
to be recorded OV f 1 — (0 1
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? CAC 5 A S
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name;Agency;Address; Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be CAC
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the CAC
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's CAC
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip CAC
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 6/13/17 and all changes made during the CAC
meeting have been incorporated in the attached document. The County Attorney's y9
Office has reviewed the changes,if applicable. ,/ 01,
9. Initials of attorney verifying that the attached document is the version approved by the
BCC, all changes directed by the BCC have been made,and the document is ready for the
Chairman's signature.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised' ' ;Revised 11/30/12
C'
110
Ann P. Jennejohn
From: Ann P.Jennejohn
Sent: Monday, June 19, 2017 4:54 PM
To: Cilek, Caroline
Subject: Resolution 2017-107 (Item #11D - June 13, 2017 BCC Meeting)
Attachments: Resolution 2017-107.pdf
Hi Caroline,
A copy of Resolution 2017-107, awiending GMD's
Developwtevtt Services Fee Schedule, adopted by the Board last
Tuesday, June 13, 2017 (Item #11D) is attached for your records.
Thank you.
Ann Jennejohn, Deputy Clerk
Clerk of the Circuit Court
Clerk to the Value Adjustment 13oard
Collier County Hoard Minutes & Records Dept.
239-252-8406 Fax 239-252-8408
1
110
RESOLUTION NO. 2017 - 1 07
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS
OF COLLIER COUNTY, FLORIDA, AMENDING THE COLLIER
COUNTY GROWTH MANAGEMENT DEPARTMENT/PLANNING
AND REGULATION FEE SCHEDULE.
WHEREAS, on September 13, 2016, the Board of County Commissioners (Board)
approved Resolution 2016-167, establishing a revised Collier County Growth Management
Department/Planning and Regulation Fee Schedule (Fee Schedule); and
WHEREAS, based on staff recommendation, the Board desires to revise the Fee
Schedule to modify the fees for residential AC change out permits, structural permits, building
permit inspections, solar permits, and irrigation permits; to eliminate convenience permit fees;
and to eliminate obsolete, duplicative or irrelevant fees;
NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that:
The Board of County Commissioners hereby amends Fee Schedule as set forth in the
attached Fee Schedule, which shall become effective on October 1, 2017.
BE IT FURTHER RESOLVED that the Board declares that these fees are all fair and
reasonable sums to be assessed to the Land Development Code and the County's
corresponding development review and permitting process.
BE IT FURTHER RESOLVED that Resolution 2016-167 is hereby superseded and
replaced in its entirety by this Resolution.
THIS RESOLUTION ADOPTED after motion, second and majority vote on this ii
day of Jo(sq. , 2017.
ATTEST: BOARD OF COUNTY COMMISSIONERS
DWIGHT E. BROC , Clerk COLLIER COUNTY, FLORIDA
By: kLAAA By: 73
A
j"Lw°
Attest at to Clerk PENNY T OR, CHA
Ai
Ap .g4Plt Ptrm and legality:
Item# l }-1---L—)
5/3i/ 7
Scott A. Stone Agenda �320
Assistant County Attorney Date
Date (.9-1 —{1
Rec'd
scputy ter 1
[17-IPR-00006/1341237/1]
•
cotr Coi.rnty
GROWTH MANAGEMENT DEPARTMENT
DEVELOPMENT SERVICES FEE SCHEDULE
BCC Approved version, March 28, 2017 June 13, 2017
Effective Date - July 1, 2017 October 1, 2017
Contents:
A)ADMINISTRATION 2
B)BLASTING PERMITS&INSPECTIONS 2
C)ENVIRONMENTAL/LANDSCAPING 2
D)EXCAVATION PERMITS 3
E)FIRE CODE REVIEW FEES 4
F)SITE DEVELOPMENT PLANS 4
G)SUBDIVISION 6
H)ENGINEERING INSPECTION FEES _ 6
I)TEMPORARY USE FEES 7
J)WELL PERMITS/INSPECTIONS 7
K)ZONING/LAND USE PETITIONS 7
L)MISCELLANEOUS 9
M)BUILDING PERMIT FEES 11
N)STRUCTURAL PERMIT REVIEW FEES 12
0)ELECTRICAL PERMIT REVIEW FEES 12
P)PLUMBING AND GAS PERMIT REVIEW FEES 13
Q)MECHANICAL PERMIT REVIEW FEES 13
R) SOLAR PERMIT REVIEW FEES 14
S) FIRE PREVENTION AND CONTROL PERMIT FEES 14
T)MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES 14
CHICKEES AND SIMILAR STRUCTURES 14
U)POOL OR SPA PERMIT FEES 14
V)FENCES 14
SCREEN ENCLOSURE PERMIT&PAN ROOF FEES 15
W)SIGN PERMIT FEES 15
CONVENIENCE PERMIT FEES 15
X)REVISION AND AS BUILT PLAN REVIEW FEES;CORRECTIONS TO PLANS 15
Y)PERMIT EXTENSION 15
Z)DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES 15
PRE MOVING INSPECTION FEES 15
AA)INSPECTION AND REINSPECTION FEES 15
REINSPECTION FEES 16
BB)FAILURE TO OBTAIN A PERMIT 16
CC)LICENSING 16
DD)DUPLICATE PERMIT CARDS 17
EE)CHANGE OF CONTRACTOR OR SUBCONTRACTORS 17
FF)PERMIT FEE REFUNDS 17
GG)RECORD RETRIEVAL 18
HH)COPY FEES 18
RESEARCH 18
18
RESERVED 18
PROPERTY INSPECTIONS 18
II)CERTIFICATE TO BOARD BUILDING 18
JJ)ADDITIONAL FEE REFUND PROVISIONS 19
KK)REFUND PROVISIONS 19
LL)ADDITIONAL FEE PROVISIONS 19
PUBLIC VEHICLE FOR HIRE FEES 19
MM)"PAYMENT IN LIEU OF"FEE FOR PATHWAYS(SIDEWALKS,AND BIKE LANES) 20
OPTIONAL EXPEDITED BUILDING PERMIT PLAN REVIEWS 20
FENCES 20
NN)OPTIONAL TEMPORARY CERTIFICATE OF OCCUPANCY 20
Fees are in bold
Words underlined are added;Wordsstruckare deleted.
Page 1
liD
FEES ARE ESTABLISHED BY THE COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS (BOARD)
RESOLUTION,AND CANNOT BE WAIVED OR SUSPENDED WITHOUT AN ACTION BY THE BOARD OF
COUNTY COMMISSIONERS.
ANY QUESTIONS CONCERNING THE APPLICABILITY OF FEES SHALL BE CONCLUSIVELY
DETERMINED BY THE DIRECTOR OF THE APPROPRIATE DEPARTMENT DIVISION,AS APPLICABLE.
WHERE AS PART OF A REZONING,PLAT OR SIMILAR APPLICATION TYPE,THE BOARD OF COUNTY
DIRECTS APPROVAL OF FUTURE DEVELOPMENT ORDERS DIFFERENT FROM THE
STANDARD TYPE OF APPROVAL PROCESSES REQUIRED,THE DIRECTOR OF THE APPROPRIATE
DEPARTMENT DIVISION SHALL DETERMINE THE FEES TO BE APPLIED TO THE PROCESS
NECESSARY TO MEET THE BOARDS REQUIREMENTS.THE APPLICABLE FEES SHALL BE THOSE
WHICH MOST CLOSELY RESEMBLE THOSE CHARGED FOR SIMILAR PROCESSES INCLUDING EXTRA
FEES FOR ADVERTISING AND THE LIKE.
A)ADMINISTRATION
1) Official Interpretation Request of Land Development Code(LDC),Growth Management Plan(GMP),or
Building Construction Administrative Code(Administrative Code). Based on staff hours:Less than 20 hours
$1,500.00,20 to 40 hours$3,000.00,more than 40 hours$5,000.00
N/A
2) Determination of Vested Rights $100.00(plus the County's out-of-pocket expenses associated with hearing
officer and hearings)
3) Appeal of Vested Rights Determination $100.00
4) Amendment to Land Development Code $3,000.00
5) Appeal of an Administrative Decision(as may be provided for in the Collier County Administrative Code or
the LDC)$1000.00(non-refundable)
' . ! fit tI -
B) BLASTING PERMITS&INSPECTION
1) 30 day permit fee,non-refundable payable upon application$250.00
2) 90 day permit fee,non-refundable payable upon application$600.00
3) Yearly permit fee,non-refundable payable upon application$1,500.00
4) Renewal permit fee,non-refundable payable upon application $200.00
5) After-the-fact fee,due to blasting without a permit$10,000.00
6) Fine fee,per detonated shot with after-the-fact permit$200.00
7) Blasting Inspection Fee$200.00(per inspection)
8) Inspection fees shall be paid upon issuance of a blasting permit based on the estimated number of blasts.
Upon completion,fees will be adjusted to reflect actual number of blasts.
C)ENVIRONMENTAL/LANDSCAPING
1) Site Clearing Permit,first acre or fraction of an acre$250.00 each additional acre or fraction of an acre
$50.00($3,000.00 maximum)
2) Agricultural Land Clearing
a. Land Clearing Notification$250.00
b. Land Clearing Permit$250.00 each additional acre or fraction of an acre$50.00($3,000.00
maximum)
Words underlined are added;Words t
sr•�, k-tnru are deleted.
Page 2 CLQ
3) Landscape Tree Removal Fee$250.00 1 10
4) Environmental Impact Statement(EIS)$2,500.00 for includes 1st submittal and 2'd submittal,if
applicable,3rd submittal$1,000.00,4th and subsequent submittals$500.00 each
. .. ' -- • .- - 2.. .! ! - . . :, ! !.!
5) Vehicle on the Beach Permit Application$250.00(Permit fee shall be waived for public and non-profit
organizations engaging in environmental activities for scientific,conservation or educational purposes).
Beach Nourishment Permits $400
6) Special Treatment Review
a. First five acres or less$400.00
b. Each additional acre,or fraction thereof$50.00($5,000.00 Maximum)
n/a
7) Coastal Construction Setback Line(CCSL)
a. CCSL Permits $400.00
b. Variance-Petition $1,000.00
8) Sea Turtle Permit
a. Sea Turtle Handling Permits$25.00
b. Sea Turtle Nesting Area Construction Permit$200.00
. . . - ! ! ! !
9) Vegetation Removal Permit
a. First acre or fraction of an acre less$250.00
b. Each additional acre,or fraction thereof$50.00($3,000.00Maximum)
10) After-the-fact Environmental or Landscape Permits
a. CCSL Variance Petition 2x normal fee
b. All other Environmental or Landscape Permits 4x normal fee
11) Informal Wetland Jurisdictional determination for single family parcels up to 5 acres $300.00
12) Conservation Easement review fee$300.00 application fee plus the following additional site fee:
$200.00 for CE acres less than 5 acres;$400.00 for CE area between 5 acres and 10 acres; $600.00
for CE area greater than 10 acres and less than 20 acres; $800.00 for CE areas between 20 and 50
acres;and an additional$200.00 for every 40 acres of CE area over 50 acres.
13) Listed or Protected Species review fee(when an EIS is not required) $1,000.00
D)EXCAVATION PERMITS
1) Application Renewal$300.00
2) Application(Private) $400.00
3) Application(Commercial) $2,000.00
4) Application(Development) $400.00
5) $200.00 per inspection paid in advance for 12 months
6) Reapplication: $300.00 plus$200.00 per month inspection fee
7) Cubic Yardage Review Fee: $200.00 first 5000cy,plus$10.00 per additional 1000cy with a max of
$20,000.00
8) Time Extension. $150.00 plus$200.00 per month inspection fee
9) After-the-fact Excavation Permit 4x application fee
10) Over excavation penalty fee per yard,plus Permit/Review$0.05 per cubic yard fee,unless maximum
have been paid.
Words underlined are added;Words strue#-thru are deleted.
Page 3 �'q
E) FIRE CODE REVIEW FEES
1) Please refer to the Fire Code Office regarding their Fire Code Review Fees.
Fire Code Review fees associated with each of the following processes:
a. SDP Site Development Plan $200.00
b. SDPA Site Development Plan,Amendment $150.00
c. SDPI Site Development Plan,Insubstantial $100.00
d. SIP Site Improvement Plan $150.00
e. SIPI Site Improvement Plan, Insubstantial $100.00
f. PSP Preliminary Subdivision Plans $150.00
g. PSPA Preliminary Subdivision Plans,Amendment $100.00
h. PPL Plans&Plat, Subdivision $100.00
i. FP Final Plat $100.00
j. CONSTR Construction Plans,Subdivision/Utilities $100.00
k. ICP Construction Plans,Insubstantial $100.00
1. DRI Development of Regional Impact $200.00
m. DOA Development Order,Amendment $150.00
n. PUDZ Planned Unit Development,Rezone $150.00
o. PUDA Planned Unit Development,Amendment $150.00
p. PDI Planned Unit Development,Insubstantial $100.00
q. RZ Rezone,Regular Zoning $100.00
r. CU Conditional Use $150.00
F) SITE DEVELOPMENT PLANS
1) Site Development Plan Review(SDP)$5,000.00
a. plus$40.00 per D/U
b. plus$100.00 per residential building structure
c. plus$0.10 per square foot for non-residential except that structures designed exclusively for
parking(parking garages) shall be calculated at$0.05 per square foot
d. plus$200.00 per building for non-residential
e. Additional fees for 3`d review$500.00,4th review$1,000.00,5th review$1,500.00,6th and subsequent
reviews$2,000.00
When a building consist of both residential and non-residential(commercial,retail,office)uses,the
following fees will apply.
a. $5,000.00 base fee plus$40.00 per D/U
b. $200.00 per building for non-residential
c. plus$0.10 per square foot of non-residential floor area
d. Additional fees for 3`d review$500.00,4th review$1,000.00,5th review$1,500.00,6th and subsequent
review$2,000.00
2) Pre-application fee$500.00(to be credited toward application fee submittal)
a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards
application fees
b. Second and subsequent pre-app meetings at staffs request will be held at no charge to the applicant
c. Applications submitted 9 months or more after the date of the last pre-app meeting shall not be credited
towards application fees and a new pre-application meeting will be required
3) Site Development Plan Insubstantial Change
a. Site Development Plan Insubstantial Change$400.00 for first sheet, $100.00 for each and every
additional sheet submitted
for the first sheet,$125.00 for each and every additional sheet.
Words underlined are added;Words strums are deleted.
Page 4
•
b. Additional fees for Preview$500.00,4th Review$1,000.00,5th and subsequent review $1,500.00
4) Site Development Plan Conceptual Review(CSP),Unified Development Plan(UDP),Neighborhood Park Site
(NPSP),Existing Conditions Site Improvement Plan$750.00
5) Site Improvement Plan Review(SIP)$1,000.00(plus Engineering review fees)
6) Utility Plan Review&Inspection Fees
a. Construction Document Review 0.75%of probable water and/or sewer construction costs
b. Construction Inspection 2.25%of probable water and/or sewer construction costs.All Inspection fees
will be due at the pre-construction meeting.If no pre-construction meeting is required,all Inspection fees
shall be due prior to the issuance of the permit.No construction shall take place until the fee is paid in
full.Fees are considered to be non-refundable after payment is received unless otherwise determined by
the Board .
-
! ! ! ! !
7) Engineering Site Plan Review Fee
a. Construction Documents Review Fee 0.75%of probable Paving,Grading,Drainage,Lighting,Code
Minimum Landscaping,and any other appurtenant cost of construction
b. Construction Inspection 2.25%of probable Paving,Grading,Drainage,Lighting,Code Minimum
Landscaping,and any other appurtenant cost of construction.All Inspection fees will be due at the pre-
construction meeting.If no pre-construction meeting is required,all Inspection fees shall be due prior to
the issuance of the permit.No construction shall take place until the fee is paid in full.Fees are
considered to be non-refundable after payment is received unless otherwise determined by the Board of
8) Site Development Plan Amendment(SDPA)$2,500.00
a. Plus$40.00 per D/U plus$100.00 per residential building structure
b. plus$0.10 per square foot
c. plus$200.00 per building for non-residential
d. Additional fees for 3rd review$500.00,4th Review$1,000.00, 5th and subsequent review$1,500.00
9) School Board Review(SBR)Fees
a. Pre-Acquisition Meeting$500.00(no refunds or credits)
b. Pre-application fee$500.00(to be credited toward application fee upon submittal)(all normal pre-
application provisions apply)
c. SBR Fee$5,000.00 with hourly reconciliation at project completion for hourly variation greater than
10%,final project charges at$100.00 per hour for all associated staff hours
10) Violation of the conditions of approval of the SDP/SIP or installation of improvements,clearing,or other
land alteration not depicted on,or otherwise authorized as a part of the approved SDP/SIP 4x the SIP/SDP
application fee.
11) Request for alternative architectural design$500.00,no separate or additional fee for appeals to,or requests
for assistance from,the Architectural Arbitration Board.
12) Site Development Plan Sheet change out(per Growth Management Department,Development Services policy
guidelines)$35.00 perpage.
- - ' ! ! ! ! - • - `review
' I !! ! !
13) SDP Extension$150.00
14) Post Take Site Plan:Base Fee$1,000.00,Resubmittal Fee$250.00 each submittal,$3,000.00 additional if
objection filed.
Words underlined are added;Words strut -ru are deleted.
Page 5
O
15) Site Plan with Deviations for Redevelopment(SDP/SDPA/SIP-DR). Application fee to request deviation(s)
for a redevelopment project$1,000.00.This fee is in addition to the fee for a SDP, SDPA or SIP applicatio
G) SUBDIVISION
1) Lot Line Adjustment(LLA)and Lot Split Review$250.00
2) Subdivision Review Fees(PPL),(PPLA)
a. Construction Documents Review Fee 0.75% of probable Paving,Grading,Drainage,Lighting,Code
Minimum Landscaping and any other appurtenant cost of construction
b. Subdivision Inspection Fee 2.25%of probable Paving,Grading,Drainage,Lighting,Code Minimum
Landscaping,and any other appurtenant cost of construction.All Inspection fees will be due at the pre-
construction meeting.If no pre-construction meeting is required,all Inspection fees shall be due prior to
the issuance of the permit.No construction shall take place until the fee is paid in full.Fees are
considered to be non-refundable after payment is received unless otherwise determined by the Board of
County Commissioners.
c. Construction Document Resubmission or Document Modification: submit as Insubstantial Change
$400.00 for first sheet,$100.00 for each additional sheet
d. Subdivisions: 3rd and subsequent additional reviews$500.00
3) Subdivision,Preliminary Plat(PSP)
a. Petition Application$1,000.00 plus$5.00 per acre(or fraction thereof)for residential,plus$10.00 per
acre(or fraction thereof)for non-residential; (mixed use is residential)
4) Subdivision Final Plat(FP)$1,000.00 plus$5.00 per acre(or fraction thereof)for residential, $1,000.00 plus
$10.00 per acre(or fraction thereof)for nonresidential; (mixed use is residential)
5) Additional review of construction plans for phased construction of subdivision improvements$1,000.00 per
phase
6) Two-year Extension$150.00
7) Water and Sewer Facilities Construction Document Review 0.75%of probable water and/or sewer
construction costs
8) Construction Document Resubmission or Document Modification 0.25%of probable water and/or sewer
construction costs
a. 3rd and subsequent re-submittals$500.00
b. Water and Sewer Facilities Construction Inspection Fee 2.25%of probable water and/or sewer
construction costs. All Inspection fees will be due at the pre-construction meeting.If no pre-construction
meeting is required,all Inspection fees shall be due prior to the issuance of the permit.No construction
shall take place until the fee is paid in full.Fees are considered to be non-refundable after payment is
received unless otherwise determined by the Board.
9) Violation of the conditions of approval of approved construction plans or installation of improvements,
clearing,or other land alteration not depicted on,or otherwise authorized as a part of the approved
construction plans or permit 4x the PPL,PPLA,PSP,CNSTR or Final Plat Review Fee(FP).
H)ENGINEERING INSPECTION FEES
1) Engineering Inspection Fee$150.00 per set of required engineering inspections charged at time of building
permit issuance
2) Re-inspection Fees: l're-inspection$65.00,2nd re-inspection$65.00,3`d and thereafter re-inspection$65.00
Words underlined are added;Words are deleted.
Page 6 (�
I)TEMPORARY USE PERMITS 1 1
1) Beach Events Permits:
a. Individual Permit $100.00
b. Block of 25 calendar days $2,250.00
c. Block of 50 calendar days $4,500.00
d. Block of 75 calendar days $6,750.00
e. Block of 100 calendar days $9,000.00
f. Block of 125 calendar days $11,250.00
g. Block of 150 calendar days $13,500.00
2) Temporary Use Permit Special Sales&Events$200.00
3) Model Homes and Sales Centers$500.00
4) Construction and Development,Mobile home,Agricultural Zoning,and Temporary use for"Coming Soon"
sign $125.00
5) Residential and Non-Profit Garage and Yard Sale Permits No Charge
6) Temporary Use Amendment$100.00
7) Renewals or extensions requested after the expiration date$200.00
8) Temporary Use Permit for Special Events requiring BCC approval,including Circus and Carnival Permits.
$275.00
9) Political Signs(Bulk Temporary Permit)$5.00
10) Fees for Temporary Use permits issued After the Fact,ATF: 2x normal fee
J)WELL PERMITS/INSPECTIONS
1) Hydraulic elevator shaft permit$300.00
2) Test hole permit(including 1st six holes)$300.00,each additional hole$20.00
3) Well permit(abandonment)$50.00
4) Well permit(construction,repair,or combined construction and abandonment at one site)$300.00
5) Well permit(monitoring) $150.00
6) Well Permit(modification of monitor/test well to a production well)$75.00
7) Well Reinspections
a. First Reinspection $65.00
b. Second Reinspection $65.00
c. Third Reinspection $65.00
8) After the fact well permits 4x normal fee per violation
NOTE: Multiple wells may be allowed on one permit,but each well must be accounted for and the appropriate fee
shall be charged for each well in accordance with the above listed schedule.
K) ZONING/LAND USE PETITIONS
1) Pre-application meeting fee$500.00(to be credited toward application fee upon submittal)
a. Second and subsequent pre-app meetings at the applicant's request shall not be credited towards
application fees.
b. Second and subsequent pre-app meetings at staffs request will be held at no charge to the applicant.
c. Applications submitted 9 months or more after the date of the last pre-app meeting shall not be credited
towards application fees and a new pre-application meeting will be required.
2) Alcoholic Beverage or Service Station Separation Requirement Waiver$1,000.00
3) Boat Dock Extension Petition$1,500.00 Boat Lift Canopy Administrative Review$500.00
Words underlined are added;Words fru are deleted.
Page 7 1 .
110
4) Conditional Use Permit$4,000.00 when filled with Rezone Petition($1,500.00),additional fee for 5th and
subsequent reviews: 20%of original fee.
! ! !
5) Conditional Use Extension $3,000.00
6) DRI Review(in addition to cost of rezone)$10,000.00 plus$25.00 an acre(or fraction thereof).Additional fee
for 5th and subsequent reviews: 20% of original fee Amendments deemed to be minor in nature,that is requiring
minor strike thru and underline text amendments of no more than 10 different lines of text changes in the DRI will
be capped at$13,000.00.Any amendment which includes a map and text change will be assessed the full fee(no
cap).
7) DRI/DO Amendment$6,000.00 plus$25.00 per acre(or fraction thereof). The acreage charge does not apply for
amendments which only change the build-out date of the DO for a time period of less than five years. Additional
fee for 5th and subsequent reviews: 20%of original fee.
a. DRI Extension$100.00
8) DRI Abandonment(DRIABN) $1,500.00
9) Flood Variance Petition$1,000.00
10) Interim Agriculture Use Petition$350.00
11) Non-Conforming Use Change/Alteration$1,500.00
12) Parking Exemption$1,500.00;additional fee for 5th and subsequent reviews: 20%of original fee
13) Parking Reduction(Administrative)$500.00
14) Rezone Petition(PUD to PUD)$8,000.00 plus$25.00 an acre(or fraction thereof); (requires a submittal of a
new PUD document),additional fee for 5th and subsequent reviews: 20%of original fee(excludes minor
revisions as required by staff).
15) Property owner notifications$1.50 non-certified mail,$3.00 certified return receipt mail(Petitioner to pay this
amount prior to advertisement of petition)
16) Planned Unit Development Amendments(PUD)$6,000.00 plus$25.00 an acre or fraction of an acre. Substantial
changes to the text and Master Plan; additional fee for 5`h and subsequent reviews:20% of original fee. Text
changes that do not impact the Master Plan$6,000.00(the$25.00 an acre fee will not apply). Amendments
deemed to be minor in nature that is requiring minor strike thru and underline amendments of no more than 10
different lines of text changes in the PUD will be capped at$9,000.00.Any amendment which includes a map and
text change will be assessed the full fee(no cap).
17) Planned Unit Development Amendment:Insubstantial(PDI)$1,500.00 requires a hearing by the CCPC only for a
minor change to the PUD Master Plan,PUD Minor Change(PMC) $1,000.00(Administrative Review for minor
change to the Master Plan).
18) Rezone Petition(Regular)$6,000.00 plus$25.00 an acre(or fraction thereof),additional fee for 5th and subsequent
reviews: 20%of original fee.
19) Rezone Petition(to PUD)$10,000.00 plus$25.00 an acre(or fraction thereof), additional fee for 5th and
subsequent reviews: 20%of original fee.
20) Street Name Change(Platted)$500.00 plus$1.50 for each property owner requiring notification of proposed street
name change.
Words underlined are added;Words are deleted.
Page 8
110
21) Un-platted street name or project name change$100.00 per application fee plus$50.00 per additional hour or partial
hour of research required to process application,not to exceed$500.00.
22) Variance petition$2,000.00 residential,$5,000.00 non-residential,additional fee for 5th and subsequent Reviews: 20%of
original fee.
23) Variance(Administrative)$1,000.00
24) Zoning Certificate: Residential$50.00,Commercial$125.00
. - ! ! ! ! !
25) Sign Variance Petition$2,000.00
26) Stewardship Receiving Area Petition(SRA) $7,000.00 per SRA plus$25.00 per acre for. Stewardship Sending Area
Petition(SSA)$9,500.00, Stewardship Receiving Alternative Deviation Design(SRDD)
$500.00. SRA Amendments deemed to be minor in nature,that is require minor strike thru and
underline text amendments of no more than 10 different lines of text changes in the SRA will be capped
at$10,000.00.
27) After-the-Fact Zoning/Land Use Petitions 2x the normal petition fee
28) Land Use Petition Continuances Including Appeal of an Administrative Decision and Appeal to Board of Zoning Appeals
a. Requested after petition has been advertised$500.00
b. Requested at the meeting$750.00
c. Resultant additional required advertising charged in addition to continuance fees
29) PUD and SRA Monitoring(one-time charge at time of building permit pick-up)
a. $100.00 per dwelling unit for residential construction within a PUD and SRA($3,000.00 maximum
fee per building permit application)
b. $0.12 per square foot for non-residential construction within a PUD and SRA($3,000.00 maximum fee per building
permit application)
30) Any legal advertising required during any Growth Management Department,Development Services activity or approval
process will be charged in addition to stated fees,at actual costs. The Growth Management Department reserves the
right to charge an estimated amount with the initially required project fees,and will reconcile and adjust such charges
against actual legal advertising recording billings at the completion of the project.
31) Mixed Use Project(MUP) $2,500.00
a. Mixed Use Project Deviation $1,000.00
32) Amplified Sound Permit$300.00
33) Planned Unit Development(PUD)closeout application and processing$2,500.00
34) Development of Regional Impact(DRI)closeout application and processing$10,000.00
35) Zoning Verification Letter: Planned Unit Development(PUD)Comparable Use Determination application fee
$1,000.00.Note:This application and fee is distinct from the Zoning Confirmation Letter found elsewhere in the Fee
Schedule.
36) Intent to Convert(ITC)application$2,000.00,additional fee for 5th and subsequent reviews:20%of original fee.
37) Compatibility Design Review(CDR)petition$3,000.00,additional fee for 5th and subsequent reviews:20%of original
fee.
L)MISCELLANEOUS
Resefved
Reserved
1) Official Zoning Atlas Map Sheet Publications,maps,and reports shall be copied at actual cost.
Words underlined are added;Words struck u are deleted.
Page 9
:11
2) The following fee shall be assessed for all Lien Search Requests and Payoff Requests: $25.00/per property
address.
3) The fee for researching records,ordinances,and codes shall be at no charge for the first hour,then at the base
salary hourly rate of the staff member conducting the service for time in excess of 1 hour.
4) The fee for creating and designing special computer generated reports that are not a part of regular standard
reports shall be at no charge for the first hour,then at the base salary hourly rate of the staff member
conducting the service for time in excess of 1 hour.
5) CD Burning: $5.00
Complete sets of Official Zoning Atlas Map Sheets$100.00 per set.
6) Staff shall charge the following fees for duplication of public records
a.$0.15 for each one sided photocopy of documents less than 11 x 17 inches
b.$0.20 for each two sided photocopy of documents less than 1 lx17 inches
c.$1.00 for each certified copy of a public record
7) Property Notification Address Listing
a.MS Excel spreadsheet on Disc$70.00
b.Print out on Paper$75.00+$0.05 for every record over 1500
c.Mailing Labels$80.00+$0.06 for every record over 1500
d.Print out on Paper+Mailing Labels$85.00+$0.11 for every record over 1500
8) Comprehensive Plan Consistency Review
a.CU's$300.00
b.Rezoning$750.00
c.PUD's or PUD Amendments$2,250.00
d.Letter of GMP consistency to outside agencies$250.00
e.SRA-Stewardship Receiving Area$2,250.00
f.DRI-Development of Regional Impact$2,250.00
g.FIAM—Fiscal Impact Analysis$4,000.00
9) Plan Review Fee(for planning review of all building permit applications)
a.Permit Application,complex(more than one trade): $75.00 per building permit application,2nd review
50%of fee,3rd and subsequent 25%of fee(2"d and subsequent review fees related to Zoning
approvals only)
b.Permit Application,basic(no trade or one trade): $50.00 per building permit application,2"d review
50%of fee,3rd and subsequent 25%of fee(2"d and subsequent review fees related to Zoning
approvals only)
10) Project Meetings: Active applications under review for the following project types will be afforded one inter-
departmental meeting at no charge:Planned Unit Development re-zonings and Site Development Plan
applications(except for conceptual site plan approval and insubstantial change approval).Meeting requests
for all other application types and additional meetings will be subject to the following fees:
a.Meetings with Departmental Project Approval Staff member per applicant request,reviews and petitions
in progress,$150.00 per one hour minimum,$75.00 per IA hour thereafter.Additional Department
staff attending meeting per applicant request$75.00 per'/2 hour per staffmember.
b.Inter-Departmental Project Meeting per applicant request,site plan reviews and land use petitions in
progress,$500.00 per one hour minimum,$250.00 per'/2 hour thereafter.
11) Adequate Public Facilities
a. Planning Applications requiring COA process review(such as FP's,PPL's&SIP's, SDPs) $200.00+
$25.00 per residential dwelling unit or+$25.00 per 1000 sq ft commercial($5000.00 maximum)
Words underlined are added;Words str-uelt-tkru are deleted.
Page 10
b. Building permit applications requiring COA process review not covered under 9.a above$100.00 per 1 1
building permit application.
12) Zoning Confirmation Letters
a. Standard Response$100.00(includes up to 1 hour research)
b. Extended Research$100.00 per hour (any response with research in excess of 1 hour)
N/A
13) CDD
a. Community Development District $15,000.00
b. Chapter 189 Special District,Independent or Dependent$15,000.00
14) GMP Amendment
a. Small Scale$9,000.00
b. General $16,700.00
c. Legal advertising in addition to sub-sections a. and b. fees,and subject to applicable fee
schedule provisions
d. Pre-application meetings for GMP consistency for development orders and zoning/land use petitions
$250.00
N/A
15) Application for issuance TDR$250.00(non-refundable);plus$25.00 per TDR issued and recorded(total
fees not to exceed$2,750.00)
16) Engineering Services
a. Vacation of Easements$2,000.00
17) Building Board of Adjustments and Appeals$250.00
18) Early Work Authorization(EWA)permit$500.00(does not include site clearing fee)
19) Legal Non-conforming Lot(LNC)$100.00
20) Vested Rights Determination(VRD)$1,500.00
21) Time Extension$150.00
includes 1 inspection)[Moved to Section P)4]
22) Notice of Commencement Administrative Fee$5.00.The Clerk of Courts Recording Fee(amount
as specified on the Collier Clerk of Courts website)will also be collected on the Clerk's behalf
M) BUILDING PERMIT FEES
1) The building permit fee shall be considered the addition of all individual trade plan review fees involved
in the process plus the inspection fees.
- ! !.! !,
2) Unless otherwise stated,estimated review application fees arc to be paid at the time of application,are non-
refundable,and will be a minimum of$50.00.Estimated review and inspections fees are to be paid at the time
of permit issuance. ae Inspection fees will be reconciled to the actual number of inspections
performed. Additional payment is required prior to the CO issuance if actual inspections exceed estimated.
Refunds issued if estimated inspections exceed actual.
Words underlined are added;Words struek—thfu are deleted.
Page 11
1 10
3) The balance of the total permit fee will be collected at the time of issuance of the permit and will include any
fee adjustments necessary. Exterior shell and interior construction are separate reviews for commercial
4) Phased or Early Work Authorization(EWA)permit$500.00
Exemptions for minor repairs residential. The following permit exemptions have been established for Collier
County based on Section 102.2.5 (3)of the Florida Building Code and Section 553.80(3)(c),Florida Statutes.
Permit exemption is for owners of single family detached residences performing work on single family
properties. All work performed shall comply with the standards of the Florida Building Code Residential.
Electrical: Repair work performed by a licensed electrical contractor that does not exceed$1,500.00
in value of materials and labor.
$1,500.00 in value of materials and labor.
Mechanical:Repair work performed by licensed mechanical contractors that does not exceed$1,500.00
in cost for parts and labor.
does not change the occupancy,does not affect life safety and value of which does not exceed$1,500.00 in
labor and materials.
•- . ..• . .. - - .I II '- • . ... - •.
exceeding two roofing squares(200 sq. ft.)in extent.
N) STRUCTURAL PERMIT REVIEW FEES
1) The fee for a structural permit shall be computed as follows: Such fees shall be either based on the contractor's
valuations of construction cost or based on square footage. Minimal accepted calculated costs of construction
are set forth on the attached Building Valuation Data Table-ICC Building Valuation Data Table,produced
February,2007. Valuation of construction costs of less than$750.00 No permit or fee is required,but
Official or requested by the applicant,the appropriate fees shall be paid.
EXCEPTION:
regardless of construction cost, signs must secure permits as stated in Collier County Code of Laws and
Ordinances Chapter 22 Building and Building Regulations.
2) Valuation of construction costs up to$4,999.99,$50.00 plus applicable inspection fees as required
3) New construction review fee of$0.055 per square foot total area for valuation of construction costs
$5,000 or over,with a minimum of$100.00
4) All new construction four floors or over in height, $0.17 per square foot total area,plus applicable inspection
fees as required
valuation in excess of$50,000 plus applicable inspection fees as required.
0)ELECTRICAL PERMIT REVIEW FEES
1) Valuation of construction costs up to$4,999.99,$50.00 plus applicable inspection fees as required
2) New construction review fee of$0.055 per square foot total area,with a minimum of$100.00
3) All construction four floors or over in height: review fee of$0.09 per square foot total area
4) The minimum for any electrical permit review fee shall be$50.00 per unit or tenant space plus applicable
inspection fees as required
Words underlined are added;Words mat are deleted.
Page 12
1 10
When not a complete installation,all switch and circuit breakers ahead of panel boards shall be computed at$0.15
per ampere.
Permit fees for any change in electrical installation shall be computed at the above rates for that portion of new
and/or increased fees in existing electrical facilities.
The minimum for any electrical permit shall be$110.00 per unit or tenant space
Fifty percent(50%)in additional fee costs shall be added to all above fees for three phase installations.
P) PLUMBING AND GAS PERMIT REVIEW FEES
The following fee calculations shall be applied separately when the permit involves mixed occupancies.
! !
whichever is calculated to be the greatest fee:
Institutional facilities,hospitals, schools,restaurants and repairs in any occupancy classification shall be charged
at the rate of$1.00 per fixture unit or
1 ! 1
1) Valuation of construction costs up to$4,999.99,$50.00 plus applicable inspection fees as required
2) New construction review fee of$0.055 per square foot total area,with a minimum of$100.00
3) All construction four floors or over in height:review fee of$0.07 per square foot total area
4) Replacement of a like kind residential grade electric water heater within a residential dwelling unit that is
located within an attached and/or multi-unit structure shall be computed at$35.00(fee includes 1 inspection)
. _ - •_ ' - : . •.•. Lawn sprinkler system permit,no application fee and shall be
computed at$35.00 for initial inspection
6) Gas permit review fee shall be computed as follows:
a. Valuation of construction costs up to$4,999.99,$50.00 plus applicable inspection fees as required
b. The minimum for any gas permit review shall be$50.00 per unit or tenant space plus applicable
inspection fees as required.
7) Grease traps:additional fee of$50.00 shall be assessed for each grease trap
8) Retrofit piping shall be computed at the minimum fee of$50.00 per floor for each main riser
Q) MECHANICAL PERMIT REVIEW FEES
The following fee calculations shall be applied separately when the permit involves mixed occupancies.
thereof shall be$3.00 per ton.
Words underlined are added;Words fru are deleted.
Page 13
1 1 0
A permit for the change out of components shall be calculated at the above mechanical permit fee rate or the
minimum fee whichever is greater.
1) Valuation of construction costs up to$4,999.99,$50.00 plus applicable inspection fees as required
2) New construction review fee of$0.055 per square foot total area,with a minimum of$100.00
3) All new construction four floors or over in height,review fee of$0.07 per square foot total area
4) The minimum mechanical permit review fee shall be$448:00$50.00 per unit or tenant space plus
applicable inspection fees as required
5) The cost of retrofit piping shall be computed at the minimum fee of$50.00 per floor for each cooling tower
or$50.00 for the first 3 horsepower and$3.00 for each additional horsepower,whichever is greater
6) Residential Air Conditioning Change out permits,$15.00 processing fee plus$45.00 for initial inspection
R) SOLAR PERMIT REVIEW FEES
1. Pool and domestic water heater permits,$30.00 application fee plus$35.00 per inspection
2. Photovoltaic permits,application fee of$50.00 each trade plus$35.00 per inspection
S) FIRE PREVENTION AND CONTROL PERMIT FEES
1) Please refer to the Fire Code Office regarding their Fire Prevention and Control Permit Fees.
T) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES
a. The permit fee shall be$40.00 to set-up a single-wide trailer or mobile home on an approved site
plus electrical,plumbing,mechanical,inspection and fire protection fees as applicable.
b. The permit fee shall be$65.00 to set-up a double wide or larger mobile homes on an approved site
plus electrical,plumbing,mechanical,inspection and fire protection fees as applicable.
contractor's estimated cost of construction,whichever is greater.The fee will then be calculated in accordance
with Section N of this Resolution.Additional permit fees for electric,plumbing,mechanical inspections,fire,
etc.,will be charged when applicable.
U) POOL OR SPA PERMIT FEES
1) For construction of each public pool or spa the fee shall be:
a. Valuation of construction costs of up to $4,999.99$100.00
b. Valuation of construction costs of$5000.00 through$49,999.99 $80.00 plus$7.00 per thousand
dollars,or fraction thereof,of building valuation in excess of$2,000.00
c. Valuation of construction costs of$50,000.00 through$1,000,000.00 $333.00 plus$3.00 per
thousand dollars,or fraction thereof,of building valuation in excess of$50,000.00
d. Valuation of construction costs over$1,000,000.00 $3,474.00 plus$3.00 per thousand dollars,or
fraction thereof,of building valuation in excess of$1,000,000.00
2) For construction of each private pool or spa the fee shall be: $50.00 application plus applicable inspection
fees as required
3) Resurfacing pool permits shall be computed at a rate of$50.00 plus applicable inspection
4) Above ground pool permits,no review fee and shall be computed at$35.00 for initial inspection
V) FENCES
Words underlined are added;Words str-Hek—thr-u are deleted.
Page 14 •
1) $35.00 application fee plus$35.00 per inspection as required. [Relocated from section WW) 1] 1 1D
N/A
The screen enclosure or roof fee will then be calculated in accordance with Section N of this Resolution.
W)SIGN PERMIT FEES
1) Sign permit fees will be calculated in accordance with all applicable Building Permit Fees and Electrical
Permit Fees outlined in this document,the Collier County Development Services Fee Schedule.The minimum
building permit fee for sign shall be$100.00.
2) Multiple signs of the same type(i.e.,wall signs)and for a single project may be allowed per one permit,
however an appropriate fee shall be charged for each sign in accordance with the schedule set forth in the
above subsection 1 of Sign Permit Fees.
• . . . \
Convenience permits are issued in blocks of 10 each. Only licensed contractors are eligible to
purchase convenience permits are limited to the use specified on the permit. The fee for a book of 10
X) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS
1) PERMIT AND PLAN REVISIONS: the fee for each permit revision submitted after permit issuance shall
be calculated using fee schedules outlined in Sections N through R above.The minimum permit fee for
revisions to permitted projects shall be$50.00.
permit fee or$140.00,whichever is greater,but shall not exceed$500.00.The fee is intended to cover the
cost of reviewing amended building plans in the office to determine that change orders and various field
changes are in compliance with the minimum construction and fire codes of Collier County. The following
are required for as built drawings review:
An itemized list of all changes made after permit plan approval.
As built plans that have all changes made after permit plan approval"clouded".
As built plans and changes shall be signed and sealed by the engineer and/or architect of record.
2) CORRECTIONS TO PLANS
a. First Correction to Plans No charge
b.Second Correction to Plans$65.00
c. Third&subsequent correction to plans$90.00
Y) PERMIT EXTENSION
1) The filing fee for each permit extension shall be equal to 10% of the original building permit fee or$100.00,
whichever is greater,but shall not exceed$500.00.The filing fee is intended to cover the cost of reviewing
existing or amended building plans to determine and verify code compliance
Z) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES
1) The permit fee shall be$20.00 application for the demolition of any building or structure;plus applicable
inspection fees as required.
, . • • .
AA)INSPECTION AND REINSPECTION FEES
1) All required and partial inspections:$50.00$45.00 per inspection
2) Re-inspections for any type of building permit shall result in an additional fee of$65.00$60.00 per re-
inspection
3) An inspection user fee of$4000$90.00 shall be assessed for all inspections on a time specified basis
Words underlined are added; Words struck .ru are deleted.
Page 15
- - [Combine with Section AA]
-.. - '. :1.1 !
inspeetion-
BB)FAILURE TO OBTAIN A PERMIT
1) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where such action was cited by Code Enforcement or by Contractor Licensing and resulted in a finding of
violation from either the Code Enforcement Board,the Special Magistrate,or the Contractor Licensing Board,
the fees herein specified shall be 2x the regular fee,as defined in this fee schedule,unless otherwise directed
by the Collier County Board of County Commissioners.
2) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and
where a contractor or agent/provider where the building official or zoning official or his/her designee, (for
cases involving land use development) deems that the contractor/provider should have known that a permit
was required but voluntary seeks voluntary compliance by obtaining the necessary permits to abate the
violation,the fees herein specified shall be 2x the regular fee,as defined in this fee schedule.
3) Where work for which a permit is required is started or proceeded with prior to obtaining said permit,_and
where the unpermitted work may or may not have been completed by the property owner, and where the
current owner seeks voluntary compliance by obtaining said permit to assure compliance with all applicable
codes,the fees will be assessed at the regular rate as defined in this fee schedule.
4) The payment of such fee shall not relieve any person from fully complying with the requirements of any
applicable construction code or ordinance in the execution of the work,or from any penalty prescribed within
any construction code,law or ordinance of Collier County.
5) The fees within section EE shall not be applicable for the re-issuance of any missing permit, missing certificate
of occupancy,or missing certificate of completion that was presumed to be issued prior to April 1, 1997,upon
the verification of such items presented by the property owner,or his/her designee,to the building official,or
his/her designee; but shall be applicable for all reviews requiring inspection, review of plans, and all other
applicable fees associated with the issuance of said permit(s), certificate of occupancy, or certificate of
completion, as determined by the building official, or his/her designee, in addition to the zoning director, or
his/her designee(for cases involving land use development),as defined within this fee schedule.
CC)LICENSING
1) The fee for licensing items is as follows:
a. Letters of Reciprocity$55.00
b. Contractors Change of Status(active to dormant)$10.00
c. Voluntary Registration of State Certified Contractors$45.00
d. Fee for a 6 month temporary contractor's license$55.00
Pictures.$2.00
e. Certified copies of Experience letters$35.00
f. Duplicate or replacement(of Competency cards)$25.00
g. Second entity application fee$105.00
2) Certificate of Competency(Annual)
a. Contractor
Initial License Fee $230.00
Renewal Fee $145.00
b. Specialty Contractor
Initial License Fee $205.00
Renewal Fee $125.00
c. Journeyman
Initial License Fee $80.00
Renewal Fee $55.00
Words underlined are added;Words t
sr�,u -th-Fu are deletes,
Page 16 )
3) Dormant Certificates of Competency(Annual) IDa.Contractor $130.00
b.Specialty Contractor $130.00
c.Penalty fees after 9/30 $20.00 per month until 12/31
4) Reinstatement of Delinquent License
a. Contractor $230.00 plus back years
b. Specialty Contractor $205.00 plus back years
c. Journeyman $80.00 plus back years
d. Examination Administrative Fee $130.00 good for 6 months
DD)DUPLICATE PERMIT CARDS
1) The fee shall be$5.00 for the issuance of a duplicate permit card for whatever reason
EE)CHANGE OF CONTRACTOR OR SUBCONTRACTORS
1) To record a change of contractor or subcontractor,on a permit that has been issued,the fee shall be
$40.00.This fee includes the issuance of a new permit card.
FF)PERMIT FEE REFUNDS
A)Building Permit Review Standards apply to all internal Growth Management Department,Development
Services reviews for building permit applications with previously approved site plans, including all
required trade reviews,along with any required Zoning,Engineering and Impact Fee reviews.Reviews
external to Growth Management Department,Development Services,such as a Fire,are excluded.The
performance standard time frame begins upon submission of the application,and runs until either
issuance of a comment letter or at approval.Review standard guarantees require the submission of a
sufficient number of plan sets(to be determined by the Building Department)to accommodate parallel
trade reviews.
1) New Residential construction reviews will be completed within 5 business days(if longer than 5
business days 50%of review fee refunded).
2) New Commercial construction reviews will be completed within 15 business days(if longer than 15
business days 50%of review fee refunded).
3) Alterations,Additions and Minor Permits:
a. Residential permit application reviews will be completed within 5 business days(if
longer than 5 business days 50%of review fee refunded).
b. Commercial permit applications requiring only a single trade review and will be
completed within 5 business days(if longer than 5 business days 50%of review fee
refunded).
c. Commercial permit applications requiring 2 or 3 trade reviews will be completed within
10 business days(if longer than 10 business days 50%of review fee refunded).
B) Annual Fee Adjustments:
1) Proposed Annual Fee adjustments for Building Department fees shall equal the average personnel
cost change(COLA plus average merit)approved by the BCC as part of that fiscal year's budget,
adjusted for any change in staffing levels.
2) Annual fee adjustments will become effective on Jan 1 of each fiscal year if approved.
3) Annual fee adjustments require full review and recommendation to the BCC from the
Development Services Advisory Committee. Annual fee adjustments also require full BCC
approval.
4) Annual fee adjustments require Building Fund total reserves to be less than 6 months of the
Building Fund operating budget for that fiscal year.If reserves exceed six months of budgeted
operating expenses,no annual adjustment can be requested.
Words underlined are added;Words str-tteli-th-ru are deleted.
Page 17
C) Special Fee Adjustment: j 1 0
1) If Building Fund total reserves are projected to exceed six months of operating expenses in the
proposed budget of any upcoming fiscal year,fees will be lowered in sufficient amount to insure
Building Fund reserves remain under six months of budgeted expenses.
2) If Building Fund total reserves are projected to fall below three months of operating expenses in
the proposed budget of any upcoming fiscal year, a special fee increase in sufficient amount to
insure Building Fund total reserves remain over three months of budgeted expenses will be
proposed for full Development Services Advisory Committee review and BCC approval.
3) Six months following any fee adjustment,other than annual increases,a full review of resulting
revenue will be presented for the review of the Development Services Advisory Committee. The
committee can make a recommendation to the Board to lower fees if revenue exceeds either
revenue projections used in fee adjustment calculations or targeted reserve levels.
GG)RECORD RETRIEVAL
1)No charge for normal retrieving of records from inactive or remote storage including microfilmed documents
2)Next day expedited retrieval of records from inactive or remote storage$75.00
HH)COPY FEES
1) The fee for blueprint and miscellaneous copying shall be as follows:
a. Microfilm copies,of documents less than 11x17 inches: $0.15 other sizes at cost ofproduction.
b. Microfilm or Blueprint
copies: 18X24$1.25 per page
30 X 36$2.50 per page
30 X 42$3.25 per page
34 X 44$5.00 per page
c. Growth Management/Planning&Regulation self-service copier,public access and not related to
public record retrieval or public record copies: documents less than 14x8.5 inches$0.15 per page
inclusive of sales tax.
RESEARCH
The fee for researching records,ordinances,and codes shall be at no charge for the first hour,then at the base
The fee for creating and designing special computer generated reports that are not part of the regular standard
the service for time in excess of 1 hour.
year is from Oct. 1 through Sept. 30.
RESERVED
I . 1 e .
Property In ctio
Initial Registration Fee through 2009 rental registration period $30.00 perproperty.
_. - --- !.! ! .. . .. . .. . . . • . .:!.!! - - • !!.
r-ental-registr-atien-per-ied,
The term"property"means a parcel or contiguous parcels with any number of rentals located
II) CERTIFICATE TO BOARD BUILDING
1) Initial Boarding Certificate $150.00
2) Boarding Certificate Extension$150.00
Words underlined are added;Words strueli-thfu are deleted.
Page 18 ,`�
JJ)ADDITIONAL FEE REFUND PROVISIONS 1 1
1)Requests for fee waivers may only be approved by the Board.Waiver requests for development review and
building permit fees shall be submitted in writing directly to the appropriate Development Services Staff,
who will prepare an executive summary for consideration by the Board. Such requests shall include a
statement indicating the reason for the fee waiver request and,if applicable,the nature of the organization
requesting the fee waiver.
KK)REFUND PROVISIONS
1) PAYMENT OF FEES:Full payment of fees is required for a complete application.Department policy
requires full payment of fees at the time of application submittal.No work will begin on staff review of
the application until all fees are paid in full. If full payment of fees is not received within 14 calendar days
of application submittal,the application will be considered void.At this point,a new application and full
payment of fees will be required to proceed with a project.
2) There will be no refund of Building,Planning,Environmental,or Engineering related fees,except those
applications which have been deemed not sufficient for staff review or inspection and withdrawn by the
applicant.Either the applicant or payer may,within 4 years of the date of payment apply for a refund for
only those staff review or inspection services that were not performed.Failure to make timely application
for a refund shall waive any right to a refund.
The application for a refund shall be filed with the County Manager of his/her designee and shall contain
the following:
a. The name and address of the applicant
b.The location of the property upon which the development was proposed
c.The date the specified fee was paid
d.A copy of receipt of payment;and
e. Payment of a non-refundable"refund processing fee"equal to one percent(1%)of the refund requested,
except that the minimum processing fee shall be$25.00 and the maximum processing fee will not exceed
$250.00
Refund requests totaling$25,000.00 or more cannot be approved administratively and must be submitted
to the Board for approval.
3) In no cases will there be refunds for pre-application fees,data conversion fees,appeals of administrative
decisions,or appeals to the Board of Zoning Appeals or Building Board of Adjustment.
4) If staff error causes the inappropriate or unnecessary filing of an application and payment of fees, 100
percent of all inappropriate fees,shall be refunded upon written request and with the concurrence of
Department management.
LL)ADDITIONAL FEE PROVISIONS
1) In those cases where alternative methods or timing of payments for Growth Management Department
services and/or fees listed in this schedule associated with SBR reviews are deemed to best serve the public
good,the Growth Management Department,Department Head will have the authority to approve such
alternatives. Such alternatives must be in writing and signed by all principals involved.In no case shall final
C.O.or such certifications of project completeness be issued until payments due the Growth Management
Department are received in full.
2) All hourly fees are computed and charged from actual Divisional time tracking records.
3) All acreage totals used in fee calculations will be rounded up to the nearest whole acre.
4) When deemed essential for project review or approval,there will be no additional charge for any
meetings requested by Growth Management Department staff.
• - '
Words underlined are added;Words struck-t~R are deleted.
Page 19 -"\\
the actual cost of the search).
1 10
Initial Application fee(new Companies) $200
Initial Certificate to Operate(Feb 1 Jan 31) $325.00
AnnualAfinual-Ceftificate to Operate Renewal $325.00
Late Fee for CTO Renewal $200.00
• j• ! ! ! !
Sub Certificate $162.50
Annual Sub Certificate renewal $162.50
Vehicle Decal $50.00
Temporary Vehicle Decal $5.00 per vehicle/per day
Temporary Vehicle Decal(In case of inoperable decaled vehicle) $5.00/per vehicle
Driver Identification Card(Initial/Renewal) $75.00 per driver
2'4-Driver Identification Card $25.00
. • . !
On site Vehicle Permitting $15.00 per vehicle
MM)"PAYMENT IN LIEU OF"FEE FOR PATHWAYS(SIDEWALKS,AND BIKE LANES)
1) Calculated using the current Florida Department of Transportation(FDOT)construction costs or an
engineering estimate not to exceed twenty-five percent(25%)of the submitted application request's
total project cost.
on a first come first served basis.
requested by the applicant for the re review,and shall be calculated against re submission charges.
FENCES
1) ,! ! ... ' .• -- . . , .! ! . - . . [Moved to Section V]
NN) OPTIONAL TEMPORARY CERTIFICATE OF OCCUPANCY
1) $250.00 for commercial,over 30,000 sq. ft$500.00.
2) $100.00 for residential
This is the last page of the Growth Management Department, Development
Services Fee Schedule
Words underlined are added;Words strttek-t:ru are deleted. -
Page 20