Agenda 06/13/2017 Item #16 A306/13/2017
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the final plat of Fronterra Phase 1, (Application Number PL20150001982) approval of
the standard form Construction and Maintenance Agreement and approval of the amount of the
performance security.
_____________________________________________________________________________________
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat
of Fronterra Phase 1, a subdivision of lands located in Section 34, Township 49 South, Range 26 East,
Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to
Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction
documents for construction purposes and recording purposes concurrently.
CONSIDERATIONS: The Development Review Division of the Growth Management Department has
completed the review of the construction drawings, specifications, and final plat of Fronterra Phase 1.
These documents are in compliance with the County Land Development Code and Chapter 177, Flo rida
Statutes. This project is within the East Gateway PUD, Ord. 03-11, as amended. All fees have been paid.
Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any
remaining improvements, together with a Construction and Maintenance Agreement for Subdivision
Improvements, shall be provided and accepted by the County Manager or his designee and the County
Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Sec tion
10.02.04 F.2 of the Land Development Code.
The Development Review Division recommends that the final plat of Fronterra Phase 1 be approved for
recording.
FISCAL IMPACT: The project cost is $2,518,686.57 (estimated) to be borne by the developer.
The cost breakdown is as follows:
a) Water & Sewer $ 650,801.87
b) Drainage, Paving, Grading $1,867,884.70
The Security amount, equal to 110% of the
project cost, is $2,770,555.23
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $76,750.60
16.A.3
Packet Pg. 406
06/13/2017
The Fees are based on a construction estimate of $2,518,686.57 and were paid in July, 2016.
The breakdown is as follows:
a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,190.00
b) Construction Drawing Review Fee
Water & Sewer (.75% const. est.) $ 4,881.01
c) Drainage, Paving, Grading
(.75% const. est.) $ 14,009.14
d) Construction Inspection Fee
Water & Sewer (2.25% const. est.) $ 14,643.04
e) Drainage, Paving, Grading
(2.25% const. est.) $ 42,027.41
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public
Facilities (COA) prior to the issuance of the construction plan final approva l letter and plat recordation,
except when the applicant elects to delay obtaining a COA for non-residential developments that are
required to obtain approval of a site development plan prior to the issuance of a building permit.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval. - SAS
RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of Fronterra
Phase 1 (Application Number PL20150001982) for recording with the following stipulations:
1. Approve the amount of $2,770,555.23 as performance security for the required improvements; or
such lesser amount based on work completed, and as is approved by the Growth Management
Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the County
Manager or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction and
Maintenance Agreement is approved and accepted by the County Attorney’s office and the
Board of County Commissioners or the County Manager or his designee on behalf of the
Board pursuant to Section 10.02.04 F.2 of the Land Development Code.
Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division
ATTACHMENT(S)
1. Location Map (PDF)
2. Opinion of Cost (PDF)
3. Plat Map (PDF)
16.A.3
Packet Pg. 407
06/13/2017
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.3
Doc ID: 3099
Item Summary: This item requires that ex parte disclosure be provided by Commission members.
Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to
approve for recording the final plat of Fronterra Phase 1, (Application Number PL20150001982) approval
of the standard form Construction and Maintenance Agreement and approval of the amount of the
performance security.
Meeting Date: 06/13/2017
Prepared by:
Title: Site Plans Reviewer, Senior – Growth Management Development Review
Name: John Houldsworth
04/24/2017 11:07 AM
Submitted by:
Title: Project Manager, Principal – Growth Management Department
Name: Matthew McLean
04/24/2017 11:07 AM
Approved By:
Review:
Growth Management Department Judy Puig Level 1 Division Reviewer Completed 04/24/2017 2:40 PM
Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 05/04/2017 9:16 AM
Growth Management Development Review Chris Scott Additional Reviewer Completed 05/05/2017 8:54 AM
Growth Management Department Matthew McLean Additional Reviewer Completed 05/08/2017 12:00 PM
Growth Management Department John Houldsworth Level 2 Division Administrator Skipped 04/24/2017 10:55 AM
County Attorney's Office Scott Stone Level 2 Attorney Review Completed 05/09/2017 8:56 AM
Growth Management Department James French Additional Reviewer Completed 05/09/2017 2:10 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/11/2017 7:22 AM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/15/2017 9:12 AM
Budget and Management Office Mark Isackson Additional Reviewer Completed 05/31/2017 4:48 PM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 06/04/2017 10:53 AM
Board of County Commissioners MaryJo Brock Meeting Pending 06/13/2017 9:00 AM
16.A.3
Packet Pg. 408
06/13/2017
EXECUTIVE SUMMARY
This item requires that ex parte disclosure be provided by Commission members. Should a hearing
be held on this item, all participants are required to be sworn in. Recommendation to approve for
recording the final plat of Fronterra Phase 1, (Application Number PL20150001982) approval of
the standard form Construction and Maintenance Agreement and approval of the amount of the
performance security.
_____________________________________________________________________________________
OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat
of Fronterra Phase 1, a subdivision of lands located in Section 34, Township 49 South, Range 26 East,
Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to
Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction
documents for construction purposes and recording purposes concurrently.
CONSIDERATIONS: The Development Review Division of the Growth Management Department has
completed the review of the construction drawings, specifications, and final plat of Fronterra Phase 1.
These documents are in compliance with the County Land Development Code and Chapter 177, Flo rida
Statutes. This project is within the East Gateway PUD, Ord. 03-11, as amended. All fees have been paid.
Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any
remaining improvements, together with a Construction and Maintenance Agreement for Subdivision
Improvements, shall be provided and accepted by the County Manager or his designee and the County
Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Sec tion
10.02.04 F.2 of the Land Development Code.
The Development Review Division recommends that the final plat of Fronterra Phase 1 be approved for
recording.
FISCAL IMPACT: The project cost is $2,518,686.57 (estimated) to be borne by the developer.
The cost breakdown is as follows:
a) Water & Sewer $ 650,801.87
b) Drainage, Paving, Grading $1,867,884.70
The Security amount, equal to 110% of the
project cost, is $2,770,555.23
The County will realize revenues as follows:
Fund: Growth Management Fund 131
Agency: County Manager
Cost Center: 138327 -- Land Development Services
Revenue generated by this project: Total: $76,750.60
16.A.3
Packet Pg. 406
06/13/2017
The Fees are based on a construction estimate of $2,518,686.57 and were paid in July, 2016.
The breakdown is as follows:
a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,190.00
b) Construction Drawing Review Fee
Water & Sewer (.75% const. est.) $ 4,881.01
c) Drainage, Paving, Grading
(.75% const. est.) $ 14,009.14
d) Construction Inspection Fee
Water & Sewer (2.25% const. est.) $ 14,643.04
e) Drainage, Paving, Grading
(2.25% const. est.) $ 42,027.41
GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public
Facilities (COA) prior to the issuance of the construction plan final approva l letter and plat recordation,
except when the applicant elects to delay obtaining a COA for non-residential developments that are
required to obtain approval of a site development plan prior to the issuance of a building permit.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval. - SAS
RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of Fronterra
Phase 1 (Application Number PL20150001982) for recording with the following stipulations:
1. Approve the amount of $2,770,555.23 as performance security for the required improvements; or
such lesser amount based on work completed, and as is approved by the Growth Management
Department.
2. Approve the standard form Construction and Maintenance Agreement and direct the County
Manager or his designee:
a. To withhold Certificates of Occupancy until the required improvements have received
preliminary acceptance.
b. To delay recording of the plat until suitable security and an appropriate Construction and
Maintenance Agreement is approved and accepted by the County Attorney’s office and the
Board of County Commissioners or the County Manager or his designee on behalf of the
Board pursuant to Section 10.02.04 F.2 of the Land Development Code.
Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division
ATTACHMENT(S)
1. Location Map (PDF)
2. Opinion of Cost (PDF)
3. Plat Map (PDF)
16.A.3
Packet Pg. 407
06/13/2017
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.3
Doc ID: 3099
Item Summary: This item requires that ex parte disclosure be provided by Commission members.
Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to
approve for recording the final plat of Fronterra Phase 1, (Application Number PL20150001982) approval
of the standard form Construction and Maintenance Agreement and approval of the amount of the
performance security.
Meeting Date: 06/13/2017
Prepared by:
Title: Site Plans Reviewer, Senior – Growth Management Development Review
Name: John Houldsworth
04/24/2017 11:07 AM
Submitted by:
Title: Project Manager, Principal – Growth Management Department
Name: Matthew McLean
04/24/2017 11:07 AM
Approved By:
Review:
Growth Management Department Judy Puig Level 1 Division Reviewer Completed 04/24/2017 2:40 PM
Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 05/04/2017 9:16 AM
Growth Management Development Review Chris Scott Additional Reviewer Completed 05/05/2017 8:54 AM
Growth Management Department Matthew McLean Additional Reviewer Completed 05/08/2017 12:00 PM
Growth Management Department John Houldsworth Level 2 Division Administrator Skipped 04/24/2017 10:55 AM
County Attorney's Office Scott Stone Level 2 Attorney Review Completed 05/09/2017 8:56 AM
Growth Management Department James French Additional Reviewer Completed 05/09/2017 2:10 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/11/2017 7:22 AM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/15/2017 9:12 AM
Budget and Management Office Mark Isackson Additional Reviewer Completed 05/31/2017 4:48 PM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 06/04/2017 10:53 AM
Board of County Commissioners MaryJo Brock Meeting Pending 06/13/2017 9:00 AM
16.A.3
Packet Pg. 408
P"
tE::{a
7,
IJ
lm4
F<
U
(}
FI
I
aq*(I
(!
COLLIER EOULEVARD 951
F*(J
Lr,l
o0{
o-
I
i
3-I1d3S 0I (s
r"1
I
f
t
16.A.3.a
Packet Pg. 409 Attachment: Location Map (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx1 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
PHASE 1
PERCENT DOLLAR
EARTHWORK 893,148.10$ 5%44,657.41$
PAVING 331,817.70$ 5%16,590.89$
DRAINAGE 345,972.00$ 5%17,298.60$
POTABLE WATER 183,375.80$ 5%9,168.79$
SANITARY SEWER 436,435.50$ 5%21,821.78$
IRRIGATION 111,000.00$ 5%5,550.00$
LIGHTING 50,000.00$ 5%2,500.00$
LANDSCAPING 47,000.00$ 5%2,350.00$
Total Probable Construction Cost:2,398,749.10$ 5%119,937.46$
NOTES:
1)This Opinion of Probable Cost shall be used for Review Fee Calculations Purposes Only.
2)
3)
4)
5)
6)
7)
David J. Hurst, P.E.
FL Registration #60727
Peninsula Engineering
Certificate of Authorization #28275
Fronterra PPL - PH1
Engineer's OPC for Subdivision Fee Calculation (Rev02)
This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances, and construction costs in
effect on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost, and may require adjustments to
delete, decrease, or increase portions of this Opinion of Probable Cost.
This cost estimate assumes dry utilities (LCEC, cable, telephone) will be installed at no-cost to the developer.
49,350.00$
Calculation Summary SUB-TOTAL
CONTINGENCY
2,518,686.57$
TOTAL
100% Construction Cost:
937,805.51$
363,270.60$
116,550.00$
348,408.59$
52,500.00$
192,544.59$
458,257.28$
All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time
due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor.
This cost estimate does not include the cost of any building construction.
Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit.
Paving, Drainage and Site
Water and Sewer
100% Construction Cost:650,801.87$
Estimated 110% Bond Amount 2,770,555.23$
Due to the preliminary nature of the project, this cost estimate includes a 5% contingency in each section.
1,867,884.70$ THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND
SEALED BY DAVID J HURST, P.E. ON 03/27/17 USING A
SHA-1 AUTHENTICATION CODE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT
CONSIDERED SIGNED AND SEALED AND THE SHA-1
AUTHENTICATION CODE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
16.A.3.b
Packet Pg. 410 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx2 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
EARTHWORK
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
EW-1 SILT FENCE 8,948 LF 2.00$ 17,896.00$
EW-2 LAKE EXCAVATION (NOT INCLUDED FOR FEE CALC.)68,521 CY -$ -$
EW-3 EMBANKMENT - (ON SITE)68,521 CY 1.10$ 75,373.10$
EW-4 EMBANKMENT - (IMPORT FILL)65,984 CY 11.00$ 725,824.00$
EW-5 CLEARING 21.50 AC 3,000.00$ 64,500.00$
EW-6 PRESERVE EXOTIC REMOVAL 6.37 AC 1,500.00$ 9,555.00$
-$
-$
-$
-$
SUB-TOTAL EARTHWORK =893,148.10$
5% CONTINGENCY =44,657.41$
TOTAL EARTHWORK =937,805.51$
Fronterra PPL - PH1
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 411 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx3 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
PAVING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-III (FIRST LIFT)8,182 SY 4.95$ 40,500.90$
PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-III (SECOND LIF 8,182 SY 4.95$ 40,500.90$
PAV-3 8" LIMEROCK BASE 9,721 SY 6.50$ 63,186.50$
PAV-4 12" STABILIZED SUBGRADE 10,191 SY 1.55$ 15,796.05$
PAV-4 BRICK PAVERS 81 SY 9.00$ 729.00$
PAV-5 2' VALLEY GUTTER 4,838 LF 7.95$ 38,462.10$
PAV-6 TYPE "F" CURB 606 LF 12.50$ 7,575.00$
PAV-7 TYPE "D" CURB 148 LF 9.00$ 1,332.00$
PAV-8 TYPE "A" CURB 317 LF 13.00$ 4,121.00$
PAV-9 3' VALLEY GUTTER CROSSING 209 LF 19.50$ 4,075.50$
PAV-10 ADA CURB RAMP 6 EA 300.00$ 1,800.00$
PAV-11 CONCRETE SIDEWALK 28,025 SF 3.75$ 105,093.75$
PAV-12 STABILIZED LIMEROCK TURNAROUND 2 EA 1,500.00$ 3,000.00$
PAV-13 BLUE-BLUE REFLECTORS 10 EA 15.00$ 150.00$
PAV-14 WHEEL STOP 9 EA 55.00$ 495.00$
PAV-15 SIGNING AND STRIPING 1 1 LS 5,000.00$ 5,000.00$
Note:SUB-TOTAL PAVING =331817.7
5% CONTINGENCY =16590.885
TOTAL PAVING =348408.585
1) Includes littorals and preserve signs
Fronterra PPL - PH1
Engineer's OPC for Subdivision Fee Calculation (Rev02)
Offsite turn-lane improvement costs are not included
within this cost estimate, as those improvements are
reviewed and inspected by FDOT.
16.A.3.b
Packet Pg. 412 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-
FeeCalc_Ph1_Rev02.xlsx 4 of 9
Project:
Task:
Prepared ByLMB Date:3/23/2017
Checked By DJH Date:3/23/2017
DRAINAGE
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
DRA-1 8" PVC SECONDARY DRAINAGE LINES 919 LF 15.50$ 14,244.50$
DRA-2 10" PVC SECONDARY DRAINAGE LINES 1,150 LF 19.00$ 21,850.00$
DRA-3 12" PVC STORM PIPE 42 LF 20.00$ 840.00$
DRA-4 15" RCP STORM SEWER 1,055 LF 22.20$ 23,421.00$
DRA-5 18" RCP STORM SEWER 361 LF 25.80$ 9,313.80$
DRA-6 24" RCP STORM SEWER 353 LF 38.10$ 13,449.30$
DRA-7 30" RCP STORM SEWER 479 LF 55.10$ 26,392.90$
DRA-8 60" RCP STORM SEWER 307 LF 200.00$ 61,400.00$
DRA-9 YARD DRAIN 52 EA 1,030.00$ 53,560.00$
DRA-10 DITCH BOTTOM INLET (TYPE D)5 EA 2,750.00$ 13,750.00$
DRA-11 CURB INLET 2 EA 2,934.00$ 5,868.00$
DRA-12 VALLEY GUTTER INLET (DOUBLE)13 EA 3,546.00$ 46,098.00$
DRA-13 JUNCTION BOX 4 EA 2,330.00$ 9,320.00$
DRA-14 JUNCTION BOX (FOR 60" RCP)3 EA 7,500.00$ 22,500.00$
DRA-15 TYPE "H" DITCH BOTTOM INLET (FOR 60" RCP)1 EA 4,000.00$ 4,000.00$
DRA-16 CONTROL STRUCTURE 1 EA 4,000.00$ 4,000.00$
DRA-17 CONTROL STRUCTURE (TYPE H DITCH BOTTOM
INLET)1 EA 4,000.00$ 4,000.00$
DRA-18 18" FLARED END 1 EA 2,400.00$ 2,400.00$
DRA-19 24" FLARED END 2 EA 2,500.00$ 5,000.00$
DRA-20 REMOVE EX. CONTROL STRUCTURE (AND RESTORE
WITH DITCH BOTTOM INLET)1 LS 4,200.00$ 4,200.00$
DRA-21 RIP-RAP 162 SY 2.25$ 364.50$
SUB-TOTAL DRAINAGE =345,972.00$
5% CONTINGENCY =17,298.60$
TOTAL DRAINAGE =363,270.60$
Fronterra PPL - PH1
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 413 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx5 of 9
Project:
Task:
Prepared By LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
POTABLE WATER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
WAT-1 4" GATE VALVE 1 EA 950.00$ 950.00$
WAT-2 4" PVC WATER SERVICE (C900, DR-14)55 LF 12.00$ 660.00$
WAT-3 6" PVC WATER MAIN (C900, DR-14)271 LF 15.00$ 4,065.00$
WAT-4 6" PVC WATER MAIN (C900, DR-18)503 LF 13.00$ 6,539.00$
WAT-5 6" GATE VALVE 3 EA 1,000.00$ 3,000.00$
WAT-6 8" PVC WATER MAIN (C900, DR-14)304 LF 18.00$ 5,472.00$
WAT-7 8" PVC WATER MAIN (C900, DR-18)1,936 LF 15.80$ 30,588.80$
WAT-8 8" GATE VALVE 10 EA 1,286.00$ 12,860.00$
WAT-9 DIRECTIONAL DRILL 6" PVC DR14 WITH CASING 132 LF 130.00$ 17,160.00$
WAT-10 FIRE HYDRANT ASSEMBLY (COMPLETE)*10 EA 3,500.00$ 35,000.00$
WAT-11 1" SINGLE SERVICE (SHORT SIDE) (COMPLETE)6 EA 575.00$ 3,450.00$
WAT-12 1" SINGLE SERVICE (LONG SIDE) (COMPLETE)3 EA 799.00$ 2,397.00$
WAT-13 1-1/2" DOUBLE SERVICE (SHORT SIDE) (COMPLETE)13 EA 969.00$ 12,597.00$
WAT-14 1-1/2" DOUBLE SERVICE (LONG SIDE) (COMPLETE)20 EA 1,250.00$ 25,000.00$
WAT-15 AIR RELEASE VALVE 4 EA 1,674.00$ 6,696.00$
WAT-16 AUTOMATIC FLUSHING DEVICE 1 EA 2,500.00$ 2,500.00$
WAT-17 TEMPORARY BLOW-OFF 4 EA 3,000.00$ 12,000.00$
WAT-18 TEMPORARY BACTERIAL SAMPLE POINT 3 EA 175.00$ 525.00$
WAT-19 PERMANENT BACTERIAL SAMPLE POINT 1 EA 1,916.00$ 1,916.00$
SUB-TOTAL POTABLE WATER =183,375.80$
* Fire Hydrant Assembly (Complete) includes gate valve at hydrant.5% CONTINGENCY =9,168.79$
TOTAL POTABLE WATER =192,544.59$
Fronterra PPL - PH1
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 414 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx6 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
SANITARY SEWER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
SAN-2 8" PVC GRAVITY SEWER MAIN (6'-8' CUT)370 LF 35.00$ 12,950.00$
SAN-3 8" PVC GRAVITY SEWER MAIN (8'-10' CUT)503 LF 40.00$ 20,120.00$
SAN-4 8" PVC GRAVITY SEWER MAIN (10'-12' CUT)459 LF 45.00$ 20,655.00$
SAN-5 8" PVC GRAVITY SEWER MAIN (12'-14' CUT)917 LF 50.00$ 45,850.00$
SAN-6 8" PVC GRAVITY SEWER MAIN (14'-16' CUT)123 LF 83.00$ 10,209.00$
SAN-7 4' SANITARY SEWER MANHOLE (0'-8' CUT)1 EA 4,300.00$ 4,300.00$
SAN-8 4' SANITARY SEWER MANHOLE (8'-10' CUT)1 EA 5,500.00$ 5,500.00$
SAN-9 4' SANITARY SEWER MANHOLE (10'-12' CUT)2 EA 7,050.00$ 14,100.00$
SAN-10 4' SANITARY SEWER MANHOLE (12'-14' CUT)4 EA 9,000.00$ 36,000.00$
SAN-11 4' SANITARY SEWER MANHOLE (14'-16' CUT)2 EA 11,110.00$ 22,220.00$
SAN-12 6" SERVICE LATERAL (SINGLE)13 EA 824.00$ 10,712.00$
SAN-13 6" SERVICE LATERAL (DOUBLE)31 EA 908.00$ 28,148.00$
SAN-14 TELEVISION INSPECTION 2,372 LF 2.50$ 5,930.00$
SAN-15 4" PVC FORCE MAIN (C900 DR14)63 LF 22.50$ 1,417.50$
SAN-16 4" PVC FORCE MAIN (C900-DR18)787 LF 15.00$ 11,805.00$
SAN-17 4" PLUG VALVE 1 EA 838.00$ 838.00$
SAN-18 AIR RELEASE VALVE 3 EA 2,727.00$ 8,181.00$
SAN-19 CONNECT TO EXISTING FORCE MAIN 1 EA 1,000.00$ 1,000.00$
SAN-20 TESTING 1 LS 1,500.00$ 1,500.00$
SAN-21 PUMP STATION 1 EA 175,000.00$ 175,000.00$
SUB-TOTAL SANITARY SEWER =436,435.50$
5% CONTINGENCY =21,821.78$
TOTAL SANITARY SEWER =458,257.28$
Fronterra PPL - PH1
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 415 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx7 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
IRRIGATION
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
IRR-1 IRRIGATION (WELL & PUMP ALLOWANCE)1 EA 63,000.00$ 63,000.00$
IRR-2 IRRIGATION (PRIMARY ALLOWANCE)1 EA 30,000.00$ 30,000.00$
IRR-3 IRRIGATION (SECONDARY ALLOWANCE)1 EA 18,000.00$ 18,000.00$
-$
-$
-$
-$
-$
-$
-$
SUB-TOTAL IRRIGATION 111,000.00$
5% CONTINGENCY =5,550.00$
TOTAL IRRIGATION =116,550.00$
Fronterra PPL - PH1
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 416 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx8 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
LIGHTING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
LL-1 SITE LIGHTING (ALLOWANCE)1 LS 50,000.00$ 50,000.00$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
SUB-TOTAL LIGHTING =50,000.00$
5% CONTINGENCY =2,500.00$
TOTAL LIGHTING =52,500.00$
Fronterra PPL - PH1
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 417 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph1_Rev02.xlsx9 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
LANDSCAPING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
LA-1 LANDSCAPING (ALLOWANCE)1 LS 47,000.00$ 47,000.00$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
SUB-TOTAL LANDSCAPING =47,000.00$
5% CONTINGENCY =2,350.00$
TOTAL LANDSCAPING =49,350.00$
Fronterra PPL - PH1
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 418 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx1 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
PHASE 2
PERCENT DOLLAR
EARTHWORK 1,022,009.00$ 5%51,100.45$
PAVING 174,076.70$ 5%8,703.84$
DRAINAGE 131,412.30$ 5%6,570.62$
POTABLE WATER 92,967.00$ 5%4,648.35$
SANITARY SEWER 161,867.50$ 5%8,093.38$
IRRIGATION 48,000.00$ 5%2,400.00$
LIGHTING 50,000.00$ 5%2,500.00$
LANDSCAPING 20,500.00$ 5%1,025.00$
Total Probable Construction Cost:1,700,832.50$ 5%85,041.63$
NOTES:
1)This Opinion of Probable Cost shall be used for Review Fee Calculations Purposes Only.
2)
3)
4)
5)
6)
7)
David J. Hurst, P.E.
FL Registration #60727
Peninsula Engineering
Certificate of Authorization #28275
All costs provided in this OPC are based on recent contract prices, or the Engineers' latest known unit costs. These costs cannot be guaranteed at this time
due to unpredictable and uncontrollable increases in the cost of concrete, petroleum, or the availability of materials and labor.
This cost estimate does not include the cost of any building construction.
Review Fees for lake excavation provided in separate Review Fee, with the lake excavation permit.
Paving, Drainage and Site
Water and Sewer
100% Construction Cost:267,576.23$
Estimated 110% Bond Amount 1,964,461.55$
52,500.00$
97,615.35$
169,960.88$
21,525.00$
1,073,109.45$
137,982.92$
50,400.00$
182,780.54$
Fronterra PPL - PH2
Engineer's OPC for Subdivision Fee Calculation (Rev02)
This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules, regulations, ordinances, and construction costs in
effect on the date of this document. Interpretations of these construction costs may affect this Opinion of Probable Cost, and may require adjustments to
delete, decrease, or increase portions of this Opinion of Probable Cost.
This cost estimate assumes dry utilities (LCEC, cable, telephone) will be installed at no-cost to the developer.
Due to the preliminary nature of the project, this cost estimate includes a 5% contingency in each section.
Calculation Summary
1,518,297.91$
SUB-TOTAL
CONTINGENCY
1,785,874.14$
TOTAL
100% Construction Cost:
THIS ITEM HAS BEEN ELECTRONICALLY SIGNED AND
SEALED BY DAVID J HURST, P.E. ON 03/27/17
USING A SHA-1 AUTHENTICATION CODE.
PRINTED COPIES OF THIS DOCUMENT ARE NOT
CONSIDERED SIGNED AND SEALED AND THE SHA-1
AUTHENTICATION CODE MUST BE VERIFIED ON
ANY ELECTRONIC COPIES
16.A.3.b
Packet Pg. 419 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx2 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
EARTHWORK
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
EW-1 CLEARING 9.50 AC 3,000.00$ 28,500.00$
EW-2 EMBANKMENT - (IMPORT FILL)90,319 CY 11.00$ 993,509.00$
EW-3 SILT FENCE (ACCOUNTED FOR IN PHASE 1)0 LF 2.00$ -$
-$
-$
-$
-$
-$
-$
SUB-TOTAL EARTHWORK =1,022,009.00$
5% CONTINGENCY =51,100.45$
TOTAL EARTHWORK =1,073,109.45$
Fronterra PPL - PH2
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 420 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx3 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
PAVING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
PAV-1 3/4" ASPHALTIC CONCRETE TYPE S-III (FIRST LIFT)4,004 SY 4.95$ 19,819.80$
PAV-2 3/4" ASPHALTIC CONCRETE TYPE S-III (SECOND LIFT)4,004 SY 4.95$ 19,819.80$
PAV-3 8" LIMEROCK BASE 4,971 SY 6.50$ 32,311.50$
PAV-4 12" STABILIZED SUBGRADE 5,164 SY 1.55$ 8,004.20$
PAV-5 2' VALLEY GUTTER 3,517 LF 7.95$ 27,960.15$
PAV-6 CONCRETE SIDEWALK 17,067 SF 3.75$ 64,001.25$
PAV-7 BLUE-BLUE REFLECTORS 4 EA 15.00$ 60.00$
PAV-8 SIGNING AND STRIPING 1 LS 1,500.00$ 1,500.00$
PAV-9 ADA CURB RAMP 2 EA 300.00$ 600.00$
SUB-TOTAL PAVING =174,076.70$
5% CONTINGENCY =8,703.84$
TOTAL PAVING =182,780.54$
Fronterra PPL - PH2
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 421 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-
FeeCalc_Ph2_Rev02.xlsx 4 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
DRAINAGE
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
DRA-1 10" PVC SECONDARY DRAINAGE LINES 1,242 LF 19.00$ 23,598.00$
DRA-2 15" RCP STORM SEWER 264 LF 22.20$ 5,860.80$
DRA-3 24" RCP STORM SEWER 327 LF 38.10$ 12,458.70$
DRA-4 30" RCP STORM SEWER 108 LF 55.10$ 5,950.80$
DRA-5 36" RCP STORM SEWER 194 LF 82.00$ 15,908.00$
DRA-6 YARD DRAIN 32 EA 1,030.00$ 32,960.00$
DRA-7 DITCH BOTTOM INLET (TYPE D)2 EA 2,750.00$ 5,500.00$
DRA-8 VALLEY GUTTER INLET (DOUBLE)6 EA 3,546.00$ 21,276.00$
DRA-9 24" FLARED END 2 EA 2,500.00$ 5,000.00$
DRA-10 36" FLARED END 1 EA 2,900.00$ 2,900.00$
SUB-TOTAL DRAINAGE =131,412.30$
5% CONTINGENCY =6,570.62$
TOTAL DRAINAGE =137,982.92$
Fronterra PPL - PH2
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 422 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx5 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
POTABLE WATER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
WAT-1 6" PVC WATER MAIN (C900, DR-18)1,602 LF 13.00$ 20,826.00$
WAT-2 6" GATE VALVE 5 EA 1,000.00$ 5,000.00$
WAT-3 8" PVC WATER MAIN (C900, DR-14)54 LF 18.00$ 972.00$
WAT-4 8" PVC WATER MAIN (C900, DR-18)230 LF 15.80$ 3,634.00$
WAT-5 8" GATE VALVE 1 EA 1,286.00$ 1,286.00$
WAT-6 FIRE HYDRANT ASSEMBLY (COMPLETE)*4 EA 3,500.00$ 14,000.00$
WAT-7 1" SINGLE SERVICE (SHORT SIDE) (COMPLETE)7 EA 575.00$ 4,025.00$
WAT-8 1" SINGLE SERVICE (LONG SIDE) (COMPLETE)2 EA 799.00$ 1,598.00$
WAT-9 1-1/2" DOUBLE SERVICE (SHORT SIDE) (COMPLETE)15 EA 969.00$ 14,535.00$
WAT-10 1-1/2" DOUBLE SERVICE (LONG SIDE) (COMPLETE)20 EA 1,250.00$ 25,000.00$
WAT-11 TEMPORARY BACTERIAL SAMPLE POINT 1 EA 175.00$ 175.00$
WAT-12 PERMANENT BACTERIAL SAMPLE POINT 1 EA 1,916.00$ 1,916.00$
* Fire Hydrant Assembly (Complete) includes gate valve at hydrant.SUB-TOTAL POTABLE WATER =92,967.00$
5% CONTINGENCY =4,648.35$
TOTAL POTABLE WATER =97,615.35$
Fronterra PPL - PH2
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 423 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx6 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
SANITARY SEWER
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
SAN-1 8" PVC GRAVITY SEWER MAIN (6'-8' CUT)313 LF 35.00$ 10,955.00$
SAN-2 8" PVC GRAVITY SEWER MAIN (8'-10' CUT)680 LF 40.00$ 27,200.00$
SAN-3 8" PVC GRAVITY SEWER MAIN (10'-12' CUT)313 LF 45.00$ 14,085.00$
SAN-4 8" PVC GRAVITY SEWER MAIN (12'-14' CUT)353 LF 50.00$ 17,650.00$
SAN-5 4' SANITARY SEWER MANHOLE (8'-10' CUT)4 EA 5,500.00$ 22,000.00$
SAN-6 4' SANITARY SEWER MANHOLE (10'-12' CUT)1 EA 7,050.00$ 7,050.00$
SAN-7 4' SANITARY SEWER MANHOLE (12'-14' CUT)2 EA 9,000.00$ 18,000.00$
SAN-8 6" SERVICE LATERAL (SINGLE)8 EA 824.00$ 6,592.00$
SAN-9 6" SERVICE LATERAL (DOUBLE)36 EA 908.00$ 32,688.00$
SAN-10 TELEVISION INSPECTION 1,659 LF 2.50$ 4,147.50$
SAN-11 TESTING 1 LS 1,500.00$ 1,500.00$
SUB-TOTAL SANITARY SEWER =161,867.50$
5% CONTINGENCY 8,093.38$
TOTAL SANITARY SEWER =169,960.88$
Fronterra PPL - PH2
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 424 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx7 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
IRRIGATION
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
IRR-1 IRRIGATION (PRIMARY ALLOWANCE)1 EA 30,000.00$ 30,000.00$
IRR-2 IRRIGATION (SECONDARY ALLOWANCE)1 EA 18,000.00$ 18,000.00$
-$
-$
-$
-$
-$
-$
-$
48,000.00$
5% CONTINGENCY =2,400.00$
TOTAL IRRIGATION =50,400.00$
Fronterra PPL - PH2
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 425 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx8 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
LIGHTING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
LL-1 SITE LIGHTING (ALLOWANCE)1 LS 50,000.00$ 50,000.00$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
SUB-TOTAL LIGHTING =50,000.00$
5% CONTINGENCY =2,500.00$
TOTAL LIGHTING =52,500.00$
Fronterra PPL - PH2
Engineer's OPC for Subdivision Fee Calculation (Rev02
16.A.3.b
Packet Pg. 426 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
P:\Active_Projects\P-BCNI-002\002_EastGateway_PPL\Design_Permit\OPCs\2017-03-14-Rev02\Fronterra-FeeCalc_Ph2_Rev02.xlsx9 of 9
Project:
Task:
Prepared By:LMB Date:3/23/2017
Checked By:DJH Date:3/23/2017
LANDSCAPING
ID DESCRIPTION QTY UNIT TYPE UNIT PRICE TOTAL PRICE
LA-1 LANDSCAPING (ALLOWANCE)1 LS 20,500.00$ 20,500.00$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
-$
SUB-TOTAL LANDSCAPING =20,500.00$
5% CONTINGENCY =1,025.00$
TOTAL LANDSCAPING =21,525.00$
Fronterra PPL - PH2
Engineer's OPC for Subdivision Fee Calculation (Rev02)
16.A.3.b
Packet Pg. 427 Attachment: Opinion of Cost (3099 : Final Plat Frontera Phase 1)
16.A.3.c
Packet Pg. 428 Attachment: Plat Map (3099 : Final Plat Frontera Phase 1)
16.A.3.c
Packet Pg. 429 Attachment: Plat Map (3099 : Final Plat Frontera Phase 1)
16.A.3.c
Packet Pg. 430 Attachment: Plat Map (3099 : Final Plat Frontera Phase 1)