Loading...
Agenda 06/13/2017 Item #11D06/13/2017 EXECUTIVE SUMMARY Recommendation to approve a Resolution amending the Collier County Growth Management Department, Development Services Fee Schedule, with an effective date of October 1, 2017. ______________________________________________________________________________ OBJECTIVE: To implement a targeted fee reduction for several of the Building Plan Review and Inspection Division fees in the Collier County Growth Management Department Development Services Fee Schedule. CONSIDERATIONS: The Growth Management Department has continued to promote a business- friendly environment that focuses on best management practices and efficiencies. It is proposed that the following permits and or fees are amended as described below. Several of the fee changes are b ased on the results of the fee study prepared by MGT of America. Further, the savings to customer calculations are based on the year permit activity for 2016 and therefore it is assumed that future permit activity will be similar in nature. Elimination of convenience permit books and reduction of residential AC change out permit fee Change: It is proposed that residential AC change out convenience permit books, consisting of 10 permits at $62 each, are eliminated. As a replacement for convenience permits, customers will utilize regular residential AC change out permits. The cost of a regular AC change out permit will be reduced from $160 to $60 each. Justification: This change will not adversely impact customers as regular AC change out permits are easily assessable through our Electronic Plan Review process. Further, convenience permits take significant staff resources and eliminating them will allow staff to focus on other permits. Savings to customers: It is estimated that this change will result in a reduction of revenue of $437,318. Fee changes for structural review of buildings 4 stories and greater Change: It is proposed the current structural review fee for buildings four stories and greater is eliminated and the fee methodology is charged as follows: Buildings three stories and under will utilize the existing fee structure, a rate of $0.055 per square foot, and fees will be charged by trade. Buildings four stories and greater will be charged at the following rates: Structural $0.17, Electrical $0.09, Plumbing $0.07 and Mechanical $0.07 per square foot. Justification: The proposed changes simplify the fee structure. Buildings four stories or greater will be aligned with the Florida Building Code’s “threshold building” category which call for additional staff time to review the required engineering documentation. Further, this fee was determined by the third party consultant, MGT of America, to be extreme and arbitrary. Savings to customers: $9,759 and $126,155, respectively. Fee changes for building permit inspection Change: It is proposed the building permit inspection fee is reduced from $50 to $45. Justification: A reduction incentivizes permit holders to call for inspections and obtain a certificate of completion. Savings to customers: $1,005,000. Fee changes for solar permit Change: To reduce fees as follows: Domestic and Pool Water: reduce fee from $160 to $100 (to include inspections) Solar electric: reducing fee from $500 to $205 (to include inspections) Justification: To incentivize solar activities in the County. 11.D Packet Pg. 303 06/13/2017 Savings to customers: $31,200 Fee changes for irrigation permit Change: To reduce the fee from $100 to $35 (to include inspections). Justification: This permit is issued over the counter and there is no Building Plan Review and Inspection review. The permit requires one minimal field inspection. The reduction of the fee is closely aligned with the water heater permit model. Savings to customer: $84,500 Beyond the targeted fee reductions, certain other duplicative or no longer relevant fee types were removed. In addition to consumer cost savings and efficiency programs, Collier County received a 2017 National Association of Counties (NACo) Achievement Award and the NACo President‘s 100 Brilliant Ideas at Work Award, for implementing a digital inspection platform that provides inspection scheduling and notifications to our clients through different messaging platforms prior to inspector arrival. The department continues to create and explore industry best practices that will enhance online service offerings to residents and businesses. NACo posted an honor roll of the 100 Brilliant Ideas on their website the week of June 5th to announce award winners to the public. FISCAL IMPACT: The Fee Schedule changes will result in cost savings to the development industry as noted for each permit type above. The total savings is approximately $1.6m. Further, there will be savings in County staff time and resources with the elimination of convenience permits. GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality and requires a majority vote for Board approval. SAS RECOMMENDATION: To approve the resolution amending the Collier County Growth Management Department Development Services Fee Schedule to include the following changes: elimination of convenience permit books and reduction of fee for the residential AC change out permit; modification of the fee methodology for structural, electrical, plumbing and mechanical review of buildings four stories or greater; reduction of the fee for building permit inspection; reduction of the review and inspection fee for a solar permit; reduction of the review and inspection fee for an irrigation permit; and elimination of obsolete, duplicative and irrelevant fees. Prepared By: Caroline Cilek, Manager, Building Plan Review and Inspection Division ATTACHMENT(S) 1. Fee Schedule 10012017 strikethrough underline.pdf (PDF) 2. Fee Schedule 10012017 clean (PDF) 3. Resolution initialed by SAS - 053117(1) (002) (PDF) 4. 2017 NACo Achievement Award Inspections (PDF) 11.D Packet Pg. 304 06/13/2017 COLLIER COUNTY Board of County Commissioners Item Number: 11.D Doc ID: 3175 Item Summary: Recommendation to approve a Resolution amending the Collier County Growth Management Department, Development Services Fee Schedule, with an effective date of October 1, 2017. (James French, Deputy Department Head, Growth Management Department) Meeting Date: 06/13/2017 Prepared by: Title: Manager - LDC – Growth Management Development Review Name: Caroline Cilek 05/12/2017 2:49 PM Submitted by: Title: Director - Building Plans Review & Inspections – Building Plan Review & Inspections Name: Richard Long 05/12/2017 2:49 PM Approved By: Review: Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 05/24/2017 1:29 PM Growth Management Department Judy Puig Level 1 Division Reviewer Completed 05/24/2017 2:11 PM Building Plan Review & Inspections Richard Long Additional Reviewer Completed 05/30/2017 1:15 PM Growth Management Operations & Regulatory Management Kenneth Kovensky Additional Reviewer Completed 05/31/2017 12:12 PM Growth Management Department Caroline Cilek Level 2 Division Administrator Skipped 05/08/2017 4:58 PM Growth Management Department James French Additional Reviewer Completed 05/31/2017 4:47 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 06/02/2017 8:10 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 06/02/2017 8:25 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 06/02/2017 1:54 PM Budget and Management Office Mark Isackson Additional Reviewer Completed 06/02/2017 3:31 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 06/04/2017 11:04 AM Board of County Commissioners MaryJo Brock Meeting Pending 06/13/2017 9:00 AM 11.D Packet Pg. 305 Words underlined are added; Words struck-thru are deleted. Page 1 GROWTH MANAGEMENT DEPARTMENT DEVELOPMENT SERVICES FEE SCHEDULE BCC Approved version, March 28, 2017 June 13, 2017 Effective Date – July 1, 2017 October 1, 2017 Contents: A) ADMINISTRATION 2 B) BLASTING PERMITS & INSPECTIONS 2 C) ENVIRONMENTAL/LANDSCAPING 2 D) EXCAVATION PERMITS 3 E) FIRE CODE REVIEW FEES 4 F) SITE DEVELOPMENT PLANS 4 G) SUBDIVISION 6 H) ENGINEERING INSPECTION FEES 6 I) TEMPORARY USE FEES 7 J) WELL PERMITS/INSPECTIONS 7 K) ZONING/LAND USE PETITIONS 7 L) MISCELLANEOUS 9 M) BUILDING PERMIT FEES 11 N) STRUCTURAL PERMIT REVIEW FEES 12 O) ELECTRICAL PERMIT REVIEW FEES 12 P) PLUMBING AND GAS PERMIT REVIEW FEES 13 Q) MECHANICAL PERMIT REVIEW FEES 13 R) SOLAR PERMIT REVIEW FEES 14 S) FIRE PREVENTION AND CONTROL PERMIT FEES 14 T) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES 14 CHICKEES AND SIMILAR STRUCTURES 14 U) POOL OR SPA PERMIT FEES 14 V) FENCES 14 SCREEN ENCLOSURE PERMIT & PAN ROOF FEES 15 W) SIGN PERMIT FEES 15 CONVENIENCE PERMIT FEES 15 X) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS 15 Y) PERMIT EXTENSION 15 Z) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES 15 PRE-MOVING INSPECTION FEES 15 AA) INSPECTION AND REINSPECTION FEES 15 REINSPECTION FEES 16 BB) FAILURE TO OBTAIN A PERMIT 16 CC) LICENSING 16 DD) DUPLICATE PERMIT CARDS 17 EE) CHANGE OF CONTRACTOR OR SUBCONTRACTORS 17 FF) PERMIT FEE REFUNDS 17 GG) RECORD RETRIEVAL 18 HH) COPY FEES 18 RESEARCH 18 SUBSCRIPTION SERVICE 18 RESERVED 18 PROPERTY INSPECTIONS 18 II) CERTIFICATE TO BOARD BUILDING 18 JJ) ADDITIONAL FEE REFUND PROVISIONS 19 KK) REFUND PROVISIONS 19 LL) ADDITIONAL FEE PROVISIONS 19 PUBLIC VEHICLE FOR HIRE FEES 19 MM) “PAYMENT IN LIEU OF” FEE FOR PATHWAYS (SIDEWALKS, AND BIKE LANES) 20 OPTIONAL EXPEDITED BUILDING PERMIT PLAN REVIEWS 20 FENCES 20 NN) OPTIONAL TEMPORARY CERTIFICATE OF OCCUPANCY 20 Fees are in bold 11.D.1 Packet Pg. 306 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 2 FEES ARE ESTABLISHED BY THE COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS (BOARD) RESOLUTION, AND CANNOT BE WAIVED OR SUSPENDED WITHOUT AN ACTION BY THE BOARD OF COUNTY COMMISSIONERS. ANY QUESTIONS CONCERNING THE APPLICABILITY OF FEES SHALL BE CONCLUSIVELY DETERMINED BY THE DIRECTOR OF THE APPROPRIATE DEPARTMENT DIVISION, AS APPLICABLE. WHERE AS PART OF A REZONING, PLAT OR SIMILAR APPLICATION TYPE, THE BOARD OF COUNTY COMMISSIONERS DIRECTS APPROVAL OF FUTURE DEVELOPMENT ORDERS DIFFERENT FROM THE STANDARD TYPE OF APPROVAL PROCESSES REQUIRED, THE DIRECTOR OF THE APPROPRIATE DEPARTMENT DIVISION SHALL DETERMINE THE FEES TO BE APPLIED TO THE PROCESS NECESSARY TO MEET THE BOARDS REQUIREMENTS. THE APPLICABLE FEES SHALL BE THOSE WHICH MOST CLOSELY RESEMBLE THOSE CHARGED FOR SIMILAR PROCESSES INCLUDING EXTRA FEES FOR ADVERTISING AND THE LIKE. A) ADMINISTRATION 1) Official Interpretation Request of Land Development Code (LDC), Growth Management Plan (GMP), or Building Construction Administrative Code (Administrative Code). Based on staff hours: Less than 20 hours $1,500.00, 20 to 40 hours $3,000.00, more than 40 hours $5,000.00 N/A 2) Determination of Vested Rights $100.00 (plus the County's out-of-pocket expenses associated with hearing officer and hearings) 3) Appeal of Vested Rights Determination $100.00 4) Amendment to Land Development Code $3,000.00 5) Appeal of an Administrative Decision (as may be provided for in the Collier County Administrative Code or the LDC) $1000.00 (non-refundable) Appeal to Board of Zoning Appeals or Building Board of Adjustments and Appeals (as may be provided for in the Collier County Administrative Code or the LDC) $1,000.00 (non-refundable) B) BLASTING PERMITS & INSPECTION 1) 30 day permit fee, non-refundable payable upon application $250.00 2) 90 day permit fee, non-refundable payable upon application $600.00 3) Yearly permit fee, non-refundable payable upon application $1,500.00 4) Renewal permit fee, non-refundable payable upon application $200.00 5) After-the-fact fee, due to blasting without a permit $10,000.00 6) Fine fee, per detonated shot with after-the-fact permit $200.00 Handler fee, for handler who assists the user or blaster in the use of explosives. $100.00 7) Blasting Inspection Fee $200.00 (per inspection) 8) Inspection fees shall be paid upon issuance of a blasting permit based on the estimated number of blasts. Upon completion, fees will be adjusted to reflect actual number of blasts. C) ENVIRONMENTAL/LANDSCAPING 1) Site Clearing Permit, first acre or fraction of an acre $250.00 each additional acre or fraction of an acre $50.00 ($3,000.00 maximum) 2) Agricultural Land Clearing a. Land Clearing Notification $250.00 b. Land Clearing Permit $250.00 each additional acre or fraction of an acre $50.00 ($3,000.00 maximum) 11.D.1 Packet Pg. 307 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 3 3) Landscape Tree Removal Fee $250.00 4) Environmental Impact Statement (EIS) $2,500.00 for includes 1st submittal and 2nd submittal, if applicable, 3rd submittal $1,000.00, 4th and subsequent submittals $500.00 each Landscape Re-inspection 1st $50.00, 2nd $75.00, every inspection afterward $100.00 5) Vehicle on the Beach Permit Application $250.00 (Permit fee shall be waived for public and non-profit organizations engaging in environmental activities for scientific, conservation or educational purposes). Beach Nourishment Permits - $400 6) Special Treatment Review a. First five acres or less $400.00 b. Each additional acre, or fraction thereof $50.00 ($5,000.00 Maximum) n/a 7) Coastal Construction Setback Line (CCSL) a. CCSL Permits $400.00 b. Variance - Petition $1,000.00 8) Sea Turtle Permit a. Sea Turtle Handling Permits $25.00 b. Sea Turtle Nesting Area Construction Permit $200.00 Sea Turtle Nest Relocation $100.00 9) Vegetation Removal Permit a. First acre or fraction of an acre less $250.00 b. Each additional acre, or fraction thereof $50.00 ($3,000.00 Maximum) 10) After-the-fact Environmental or Landscape Permits a. CCSL Variance Petition 2x normal fee b. All other Environmental or Landscape Permits 4x normal fee 11) Informal Wetland Jurisdictional determination for single family parcels up to 5 acres $300.00 12) Conservation Easement review fee $300.00 application fee plus the following additional site fee: $200.00 for CE acres less than 5 acres; $400.00 for CE area between 5 acres and 10 acres; $600.00 for CE area greater than 10 acres and less than 20 acres; $800.00 for CE areas between 20 and 50 acres; and an additional $200.00 for every 40 acres of CE area over 50 acres. 13) Listed or Protected Species review fee (when an EIS is not required) $1,000.00 D) EXCAVATION PERMITS 1) Application Renewal $300.00 2) Application (Private) $400.00 3) Application (Commercial) $2,000.00 4) Application (Development) $400.00 5) $200.00 per inspection paid in advance for 12 months 6) Reapplication: $300.00 plus $200.00 per month inspection fee 7) Cubic Yardage Review Fee: $200.00 first 5000cy, plus $10.00 per additional 1000cy with a max of $20,000.00 8) Time Extension. $150.00 plus $200.00 per month inspection fee 9) After-the-fact Excavation Permit 4x application fee 10) Over excavation penalty fee per yard, plus Permit/Review $0.05 per cubic yard fee, unless maximum have been paid. 11.D.1 Packet Pg. 308 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 4 E) FIRE CODE REVIEW FEES 1) Please refer to the Fire Code Office regarding their Fire Code Review Fees. Fire Code Review fees associated with each of the following processes: a. SDP - Site Development Plan $200.00 b. SDPA - Site Development Plan, Amendment $150.00 c. SDPI - Site Development Plan, Insubstantial $100.00 d. SIP - Site Improvement Plan $150.00 e. SIPI - Site Improvement Plan, Insubstantial $100.00 f. PSP - Preliminary Subdivision Plans $150.00 g. PSPA - Preliminary Subdivision Plans, Amendment $100.00 h. PPL - Plans & Plat, Subdivision $100.00 i. FP - Final Plat $100.00 j. CONSTR - Construction Plans, Subdivision/Utilities $100.00 k. ICP - Construction Plans, Insubstantial $100.00 l. DRI - Development of Regional Impact $200.00 m. DOA - Development Order, Amendment $150.00 n. PUDZ - Planned Unit Development, Rezone $150.00 o. PUDA - Planned Unit Development, Amendment $150.00 p. PDI - Planned Unit Development, Insubstantial $100.00 q. RZ - Rezone, Regular Zoning $100.00 r. CU - Conditional Use $150.00 F) SITE DEVELOPMENT PLANS 1) Site Development Plan Review (SDP) $5,000.00 a. plus $40.00 per D/U b. plus $100.00 per residential building structure c. plus $0.10 per square foot for non-residential except that structures designed exclusively for parking (parking garages) shall be calculated at $0.05 per square foot d. plus $200.00 per building for non-residential e. Additional fees for 3rd review $500.00, 4th review $1,000.00, 5th review $1,500.00, 6th and subsequent reviews $2,000.00 When a building consist of both residential and non -residential (commercial, retail, office) uses, the following fees will apply. a. $5,000.00 base fee plus $40.00 per D/U b. $200.00 per building for non-residential c. plus $0.10 per square foot of non-residential floor area d. Additional fees for 3rd review $500.00, 4th review $1,000.00, 5th review $1,500.00, 6th and subsequent review $2,000.00 2) Pre-application fee $500.00 (to be credited toward application fee submittal) a. Second and subsequent pre-app meetings at the applicant’s request shall not be credited towards application fees b. Second and subsequent pre-app meetings at staff's request will be held at no charge to the applicant c. Applications submitted 9 months or more after the date of the last pre -app meeting shall not be credited towards application fees and a new pre-application meeting will be required Simultaneous Review Fee (planning review of simultaneous building permit applications) $100.00 per building permit application. 3) Site Development Plan Insubstantial Change a. Site Development Plan Insubstantial Change $400.00 for first sheet, $100.00 for each and every additional sheet submitted Site Development Plan Insubstantial Change for Public Utility System Accessory Uses. $500.00 for the first sheet, $125.00 for each and every additional sheet. 11.D.1 Packet Pg. 309 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 5 b. Additional fees for 3rd review $500.00, 4th Review $1,000.00, 5th and subsequent review $1,500.00 4) Site Development Plan Conceptual Review (CSP), Unified Development Plan (UDP), Neighborhood Park Site (NPSP), Existing Conditions Site Improvement Plan $750.00 5) Site Improvement Plan Review (SIP) $1,000.00 (plus Engineering review fees) 6) Utility Plan Review & Inspection Fees a. Construction Document Review 0.75% of probable water and/or sewer construction costs b. Construction Inspection 2.25% of probable water and/or sewer construction costs. All Inspection fees will be due at the pre-construction meeting. If no pre-construction meeting is required, all Inspection fees shall be due prior to the issuance of the permit. No construction shall take place until the fee is paid in full. Fees are considered to be non-refundable after payment is received unless otherwise determined by the Board of County Commissioners. Construction Document Resubmission or Document Modification, submit as insubstantial change. $150.00 for first sheet, $75.00 for each additional sheet 7) Engineering Site Plan Review Fee a. Construction Documents Review Fee 0.75% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping, and any other appurtenant cost of construction b. Construction Inspection 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping, and any other appurtenant cost of construction. All Inspection fees will be due at the pre - construction meeting. If no pre-construction meeting is required, all Inspection fees shall be due prior to the issuance of the permit. No construction shall take place until the fee is paid in full. Fees are considered to be non-refundable after payment is received unless otherwise determined by the Board of County Commissioners unless otherwise determined by the Board of County Commissioners. 8) Site Development Plan Amendment (SDPA) $2,500.00 a. Plus $40.00 per D/U plus $100.00 per residential building structure b. plus $0.10 per square foot c. plus $200.00 per building for non-residential d. Additional fees for 3rd review $500.00, 4th Review $1,000.00, 5th and subsequent review $1,500.00 9) School Board Review (SBR) Fees a. Pre-Acquisition Meeting $500.00 (no refunds or credits) b. Pre-application fee $500.00 (to be credited toward application fee upon submittal) (all normal pre - application provisions apply) c. SBR Fee $5,000.00 with hourly reconciliation at project completion for hourly variation greater than 10%, final project charges at $100.00 per hour for all associated staff hours 10) Violation of the conditions of approval of the SDP/SIP or installation of improvements , clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approved SDP/SIP 4x the SIP/SDP application fee. 11) Request for alternative architectural design $500.00, no separate or additional fee for appeals to, or requests for assistance from, the Architectural Arbitration Board. 12) Site Development Plan Sheet change out (per Growth Management Department, Development Services policy guidelines) $35.00 per page. Town Home Site Plan Review - $6,000.00 base fee, additional fees for 3rd review $500.00, 4th review $1,000.00, 5th review $1,500.00, 6th and subsequent review $2,000.00 13) SDP Extension $150.00 14) Post Take Site Plan: Base Fee $1,000.00, Resubmittal Fee $250.00 each submittal, $3,000.00 additional if objection filed. 11.D.1 Packet Pg. 310 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 6 15) Site Plan with Deviations for Redevelopment (SDP/SDPA/SIP -DR). Application fee to request deviation(s) for a redevelopment project $1,000.00. This fee is in addition to the fee for a SDP, SDPA or SIP application. G) SUBDIVISION 1) Lot Line Adjustment (LLA) and Lot Split Review $250.00 2) Subdivision Review Fees (PPL), (PPLA) a. Construction Documents Review Fee 0.75% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping and any other appurtenant cost of construction b. Subdivision Inspection Fee 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping, and any other appurtenant cost of construction. All Inspection fees will be due at the pre - construction meeting. If no pre-construction meeting is required, all Inspection fees shall be due prior to the issuance of the permit. No construction shall take place until the fee is paid in full. Fees are considered to be non-refundable after payment is received unless other wise determined by the Board of County Commissioners. c. Construction Document Resubmission or Document Modification: submit as Insubstantial Change $400.00 for first sheet, $100.00 for each additional sheet d. Subdivisions: 3rd and subsequent additional reviews $500.00 Subdivisions: Substantial deviations from approval construction documents $500.00 3) Subdivision, Preliminary Plat (PSP) a. Petition Application $1,000.00 plus $5.00 per acre (or fraction thereof) for residential, plus $10.00 per acre (or fraction thereof) for non-residential; (mixed use is residential) 4) Subdivision Final Plat (FP) $1,000.00 plus $5.00 per acre (or fraction thereof) for residential, $1,000.00 plus $10.00 per acre (or fraction thereof) for nonresidential; (mixed use is residential) 5) Additional review of construction plans for phased constructi on of subdivision improvements $1,000.00 per phase 6) Two-year Extension $150.00 7) Water and Sewer Facilities Construction Document Review 0.75% of probable water and/or sewer construction costs 8) Construction Document Resubmission or Document Modification 0.25% of probable water and/or sewer construction costs a. 3rd and subsequent re-submittals $500.00 b. Water and Sewer Facilities Construction Inspection Fee 2.25% of probable water and/or sewer construction costs. All Inspection fees will be due at the pre-construction meeting. If no pre-construction meeting is required, all Inspection fees shall be due prior to the issuance of the permit. No construction shall take place until the fee is paid in full. Fees are considered to be non-refundable after payment is received unless otherwise determined by the Board. 9) Violation of the conditions of approval of approved construction plans or installation of improvements , clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approve d construction plans or permit 4x the PPL, PPLA, PSP, CNSTR or Final Plat Review Fee (FP). Administrative Amendment $250.00 H) ENGINEERING INSPECTION FEES 1) Engineering Inspection Fee $150.00 per set of required engineering inspections charged at time of building permit issuance 2) Re-inspection Fees: 1st re-inspection $65.00, 2nd re-inspection $65.00, 3rd and thereafter re-inspection $65.00 11.D.1 Packet Pg. 311 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 7 I) TEMPORARY USE PERMITS 1) Beach Events Permits: a. Individual Permit $100.00 b. Block of 25 calendar days $2,250.00 c. Block of 50 calendar days $4,500.00 d. Block of 75 calendar days $6,750.00 e. Block of 100 calendar days $9,000.00 f. Block of 125 calendar days $11,250.00 g. Block of 150 calendar days $13,500.00 2) Temporary Use Permit Special Sales & Events $200.00 3) Model Homes and Sales Centers $500.00 4) Construction and Development, Mobile home, Agricultural Zoning, and Temporary use for "Coming Soon" sign $125.00 5) Residential and Non-Profit Garage and Yard Sale Permits No Charge 6) Temporary Use Amendment $100.00 7) Renewals or extensions requested after the expiration date $200.00 8) Temporary Use Permit for Special Events requiring BCC approval, including Circus and Carnival Permits. $275.00 9) Political Signs (Bulk Temporary Permit) $5.00 10) Fees for Temporary Use permits issued After the Fact, ATF: 2x normal fee J) WELL PERMITS/INSPECTIONS 1) Hydraulic elevator shaft permit $300.00 2) Test hole permit (including 1st six holes) $300.00, each additional hole $20.00 3) Well permit (abandonment) $50.00 4) Well permit (construction, repair, or combined construction and abandonment at one site) $300.00 5) Well permit (monitoring) $150.00 6) Well Permit (modification of monitor/test well to a production well) $75.00 7) Well Reinspections a. First Reinspection $65.00 b. Second Reinspection $65.00 c. Third Reinspection $65.00 8) After the fact well permits 4x normal fee per violation NOTE: Multiple wells may be allowed on one permit, but each well must be accounted for and the appropriate fee shall be charged for each well in accordance with the above listed schedule. K) ZONING/LAND USE PETITIONS 1) Pre-application meeting fee $500.00 (to be credited toward application fee upon submittal) a. Second and subsequent pre-app meetings at the applicant’s request shall not be credited towards application fees. b. Second and subsequent pre-app meetings at staff's request will be held at no charge to the applicant. c. Applications submitted 9 months or more after the date of the last pre -app meeting shall not be credited towards application fees and a new pre-application meeting will be required. 2) Alcoholic Beverage or Service Station Separation Requirement Waiver $1,000.00 3) Boat Dock Extension Petition $1,500.00 Boat Lift Canopy Administrative Review $500.00 11.D.1 Packet Pg. 312 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 8 4) Conditional Use Permit $4,000.00 when filled with Rezone Petition ($1,500.00), additional fee for 5th and subsequent reviews: 20% of original fee. Conditional Use Monitoring Review: $750.00 5) Conditional Use Extension $3,000.00 6) DRI Review (in addition to cost of rezone) $10,000.00 plus $25.00 an acre (or fraction thereof). Additional fee for 5th and subsequent reviews: 20% of original fee Amendments deemed to be minor in nature, that is requiring minor strike thru and underline text amendments of no more than 10 different lines of text changes in the DRI will be capped at $13,000.00. Any amendment which includes a map and text change will be assessed the full fee (no cap). 7) DRI/DO Amendment $6,000.00 plus $25.00 per acre (or fraction thereof). The acreage charge does not apply for amendments which only change the build-out date of the DO for a time period of less than five years. Additional fee for 5th and subsequent reviews: 20% of original fee. a. DRI Extension $100.00 8) DRI Abandonment (DRIABN) $1,500.00 9) Flood Variance Petition $1,000.00 10) Interim Agriculture Use Petition $350.00 11) Non-Conforming Use Change/Alteration $1,500.00 12) Parking Exemption $1,500.00; additional fee for 5th and subsequent reviews: 20% of original fee 13) Parking Reduction (Administrative) $500.00 14) Rezone Petition (PUD to PUD) $8,000.00 plus $25.00 an acre (or fraction thereof); (requires a submittal of a new PUD document), additional fee for 5th and subsequent reviews: 20% of original fee (excludes minor revisions as required by staff). 15) Property owner notifications $1.50 non-certified mail, $3.00 certified return receipt mail (Petitioner to pay this amount prior to advertisement of petition) 16) Planned Unit Development Amendments (PUD) $6,000.00 plus $25.00 an acre or fraction of an acre. Substantial changes to the text and Master Plan; additional fee for 5th and subsequent reviews: 20% of original fee. Text changes that do not impact the Master Plan $6,000.00 (the $25.00 an acre fee will not apply). Amendments deemed to be minor in nature that is requiring minor strike thru and underline amendments of no more than 10 different lines of text changes in the PUD will be capped at $9,000.00. Any amendment which includes a map and text change will be assessed the full fee (no cap). 17) Planned Unit Development Amendment: Insubstantial (PDI) $1,500.00 requires a hearing by the CCPC only for a minor change to the PUD Master Plan, PUD Minor Change (PMC) $1,000.00 (Administrative Review for minor change to the Master Plan). 18) Rezone Petition (Regular) $6,000.00 plus $25.00 an acre (or fraction thereof), additional fee for 5th and subsequent reviews: 20% of original fee. 19) Rezone Petition (to PUD) $10,000.00 plus $25.00 an acre (or fraction thereof), additional fee for 5th and subsequent reviews: 20% of original fee. 20) Street Name Change (Platted) $500.00 plus $1.50 for each property owner requiring notification of proposed street name change. 11.D.1 Packet Pg. 313 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 9 21) Un-platted street name or project name change $100.00 per application fee plus $50.00 per additional hour or partial hour of research required to process application, not to exceed $500.00. 22) Variance petition $2,000.00 residential, $5,000.00 non-residential, additional fee for 5th and subsequent Reviews: 20% of original fee. 23) Variance (Administrative) $1,000.00 24) Zoning Certificate: Residential $50.00, Commercial $125.00 PUD Extension – Sun Setting: $1000.00 25) Sign Variance Petition $2,000.00 26) Stewardship Receiving Area Petition (SRA) $7,000.00 per SRA plus $25.00 per acre for. Stewardship Sending Area Petition (SSA) $9,500.00, Stewardship Receiving Alternative Deviation Design (SRDD) $500.00. SRA Amendments deemed to be minor in nature, that is require minor strike thru and underline text amendments of no more than 10 different lines of text changes in the SRA will be capped at $10,000.00. 27) After-the-Fact Zoning/Land Use Petitions 2x the normal petition fee 28) Land Use Petition Continuances Including Appeal of an Administrative Decision and Appeal to Board of Zoning Appeals a. Requested after petition has been advertised $500.00 b. Requested at the meeting $750.00 c. Resultant additional required advertising charged in addition to continuance fees 29) PUD and SRA Monitoring (one-time charge at time of building permit pick-up) a. $100.00 per dwelling unit for residential construction within a PUD and SRA ($3,000.00 maximum fee per building permit application) b. $0.12 per square foot for non-residential construction within a PUD and SRA ($3,000.00 maximum fee per building permit application) 30) Any legal advertising required during any Growth Management Department, Develop ment Services activity or approval process will be charged in addition to stated fees, at actual costs. The Growth Management Department reserves the right to charge an estimated amount with the initially required project fees, and will reconcile and adjust such charges against actual legal advertising recording billings at the completion of the project. 31) Mixed Use Project (MUP) $2,500.00 a. Mixed Use Project Deviation $1,000.00 32) Amplified Sound Permit $300.00 33) Planned Unit Development (PUD) closeout application and processing $2,500.00 34) Development of Regional Impact (DRI) closeout application and processing $10,000.00 35) Zoning Verification Letter: Planned Unit Development (PUD) Comparable Use Determination application fee $1,000.00. Note: This application and fee is distinct from the Zoning Confirmation Letter found elsewhere in the Fee Schedule. 36) Intent to Convert (ITC) application $2,000.00, additional fee for 5th and subsequent reviews: 20% of original fee. 37) Compatibility Design Review (CDR) petition $3,000.00, additional fee for 5th and subsequent reviews: 20% of original fee. L) MISCELLANEOUS Reserved Reserved 1) Official Zoning Atlas Map Sheet Publications, maps, and reports shall be copied at actual cost. 11.D.1 Packet Pg. 314 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 10 2) The following fee shall be assessed for all Lien Search Requests and Payoff Requests: $25.00/per property address. 3) The fee for researching records, ordinances, and codes shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of 1 hour. 4) The fee for creating and designing special computer generated reports that are not a part of regular standard reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of 1 hour. 5) CD Burning: $5.00 Complete sets of Official Zoning Atlas Map Sheets $100.00 per set. 6) Staff shall charge the following fees for duplication of public records a. $0.15 for each one sided photocopy of documents less than 11x17 inches b. $0.20 for each two sided photocopy of documents less than 11x17 inches c. $1.00 for each certified copy of a public record 7) Property Notification Address Listing a. MS Excel spreadsheet on Disc $70.00 b. Print out on Paper $75.00 + $0.05 for every record over 1500 c. Mailing Labels $80.00 + $0.06 for every record over 1500 d. Print out on Paper + Mailing Labels $85.00 + $0.11 for every record over 1500 8) Comprehensive Plan Consistency Review a. CU’s $300.00 b. Rezoning $750.00 c. PUD’s or PUD Amendments $2,250.00 d. Letter of GMP consistency to outside agencies $250.00 e. SRA - Stewardship Receiving Area $2,250.00 f. DRI - Development of Regional Impact $2,250.00 g. FIAM – Fiscal Impact Analysis $4,000.00 9) Plan Review Fee (for planning review of all building permit applications) a. Permit Application, complex (more than one trade): $75.00 per building permit application, 2nd review 50% of fee, 3rd and subsequent 25% of fee (2nd and subsequent review fees related to Zoning approvals only) b. Permit Application, basic (no trade or one trade): $50.00 per building permit application, 2nd review 50% of fee, 3rd and subsequent 25% of fee (2nd and subsequent review fees related to Zoning approvals only) 10) Project Meetings: Active applications under review for the following project types will be afforded one inter - departmental meeting at no charge: Planned Unit Development re-zonings and Site Development Plan applications (except for conceptual site plan approval and insubstantial change approval). Meeting requests for all other application types and additional meetings will be subject to the following fees: a. Meetings with Departmental Project Approval Staff member per applicant request, reviews and petitions in progress, $150.00 per one hour minimum, $75.00 per ½ hour thereafter. Additional Department staff attending meeting per applicant request $75.00 per ½ hour per staff member. b. Inter-Departmental Project Meeting per applicant request, site plan reviews and land use petitions in progress, $500.00 per one hour minimum, $250.00 per ½ hour thereafter. 11) Adequate Public Facilities a. Planning Applications requiring COA process review (such as FP’s, PPL’s & SIP’s, SDPs) $200.00 + $25.00 per residential dwelling unit or + $25.00 per 1000 sq ft commercial ($5000.00 maximum) 11.D.1 Packet Pg. 315 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 11 b. Building permit applications requiring COA process review not covered under 9.a above $100.00 per building permit application. 12) Zoning Confirmation Letters a. Standard Response $100.00 (includes up to 1 hour research) b. Extended Research $100.00 per hour (any response with research in excess of 1 hour) N/A 13) CDD a. Community Development District $15,000.00 b. Chapter 189 Special District, Independent or Dependent $15,000.00 14) GMP Amendment a. Small Scale $9,000.00 b. General $16,700.00 c. Legal advertising in addition to sub-sections a. and b. fees, and subject to applicable fee schedule provisions d. Pre-application meetings for GMP consistency for development orders and zoning/land use petitions $250.00 N/A 15) Application for issuance TDR $250.00 (non-refundable); plus $25.00 per TDR issued and recorded (total fees not to exceed $2,750.00) 16) Engineering Services a. Vacation of Easements $2,000.00 17) Building Board of Adjustments and Appeals $250.00 18) Early Work Authorization (EWA) permit $500.00 (does not include site clearing fee) 19) Legal Non-conforming Lot (LNC) $100.00 20) Vested Rights Determination (VRD) $1,500.00 21) Time Extension $150.00 The following fee shall be assessed for replacement of a like kind residential grade electric water heater within a residential dwelling unit that is located within an attached and/or multi -unit structure $35.00 (fee includes 1 inspection) [Moved to Section P) 4] 22) Notice of Commencement Administrative Fee $5.00. The Clerk of Courts Recording Fee (amount as specified on the Collier Clerk of Courts website) will also be collected on the Clerk’s behalf. M) BUILDING PERMIT FEES 1) The building permit fee shall be considered the addition of all individual trade plan review fees involved in the process plus the inspection fees. Minimum fee of $100.00 for each of the following: plumbing, mechanical (A/C), electrical and structural. Minimum fee for all other applications - $100.00. 2) Unless otherwise stated, estimated review application fees are to be paid at the time of application, are non- refundable, and will be a minimum of $50.00. Estimated review and inspections fees are to be paid at the time of permit issuance. and will be Inspection fees will be reconciled to the actual number of inspections performed. Additional payment is required prior to the CO issuance if actual inspections exceed estimated. Refunds issued if estimated inspections exceed actual. 11.D.1 Packet Pg. 316 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 12 3) The balance of the total permit fee will be collected at the time of issuance of the permit and will include any fee adjustments necessary. Exterior shell and interior construction are separate reviews for commercial construction whether permitted simultaneously or under separate shell and build out permits. 4) Phased or Early Work Authorization (EWA) permit $500.00 Exemptions for minor repairs residential. The following permit exemptions have been established for Collier County based on Section 102.2.5 (3) of the Florida Building Code and Section 553.80(3)(c), Florida Statutes. Permit exemption is for owners of single family detached residences performing work on single family properties. All work performed shall comply with the standards of the Florida Building Code Residential. Electrical: Repair work performed by a licensed electrical contractor that does not exceed $1,500.00 in value of materials and labor. Plumbing: Repair/replace work performed by licensed plumbing contractors that does not exceed $1,500.00 in value of materials and labor. Mechanical: Repair work performed by licensed mechanical contractors that does not exceed $1,500.00 in cost for parts and labor. Building: Repair work performed by licensed contractors per Florida Statute 489 that is not structural in nature and does not change the occupancy, does not affect life safety and value of which does not exceed $1,500.00 in labor and materials. The repair of any roof covering not exceeding $1,500.00 in value of materials and labor or work not exceeding two roofing squares (200 sq. ft.) in extent. N) STRUCTURAL PERMIT REVIEW FEES 1) The fee for a structural permit shall be computed as follows: Such fees shall be either based on the contractor's valuations of construction cost or based on square footage. Minimal accepted calculated costs of construction are set forth on the attached Building Valuation Data Table - ICC Building Valuation Data Table, produced February, 2007. Valuation of construction costs of less than $750.00 - No permit or fee is required, but construction must comply with all County Codes and Ordinances. If inspections are required by the Building Official or requested by the applicant, the appropriate fees shall be paid. EXCEPTION: All work involving structural components and/or fire rated assemblies requiring permits and inspection regardless of construction cost, signs must secure permits as stated in Collier County Code of Laws and Ordinances – Chapter 22 Building and Building Regulations. 2) Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required 3) New construction review fee of $0.055 per square foot total area for valuation of construction costs $5,000 or over, with a minimum of $100.00 4) All new construction four floors or over in height, $0.17 per square foot total area, plus applicable inspection fees as required Alternative Minimum Review Fee: all construction under 500 square feet with valuation in excess of 100,000, and all construction three floors or over in height, $333.00 plus $3.00 per thousand dollars of building valuation in excess of $50,000 plus applicable inspection fees as required. O) ELECTRICAL PERMIT REVIEW FEES 1) Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required 2) New construction review fee of $0.055 per square foot total area, with a minimum of $100.00 3) All construction four floors or over in height: review fee of $0.09 per square foot total area 4) The minimum for any electrical permit review fee shall be $50.00 per unit or tenant space plus applicable inspection fees as required 11.D.1 Packet Pg. 317 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 13 Alternative Minimum Review Fee: $0.40 per ampere rating of all single-phase panel boards. $0.15 per ampere rating for switch or circuit whichever is greater, if item #1 above does not apply. When not a complete installation, all switch and circuit breakers ahead of panel boards shall be computed at $0.15 per ampere. Permit fees for any change in electrical installation shall be computed at the above rates for that portion of new and/or increased fees in existing electrical facilities. The minimum for any electrical permit shall be $110.00 per unit or tenant space Fifty percent (50%) in additional fee costs shall be added to all above fees for three phase installations. P) PLUMBING AND GAS PERMIT REVIEW FEES The following fee calculations shall be applied separately when the permit involves mixed occupancies. Residential occupancies: The fee for a plumbing permit shall be computed at the rate of $0.055 per square foot total area to be charged for each living unit with one to three bathrooms with at a minimum of $110.00. An additional fee of $10.00 will be assessed for each additional bathroom Nonresidential occupancies: The fee for a plumbing permit shall be computed by the following methods, whichever is calculated to be the greatest fee: The rate of $0.055 per square foot total area with a minimum of $110.00; or Institutional facilities, hospitals, schools, restaurants and repairs in any occupancy classification shall be charged at the rate of $1.00 per fixture unit or Minimum of $110.00 for each occupancy or tenant space. 1) Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required 2) New construction review fee of $0.055 per square foot total area, with a minimum of $100.00 3) All construction four floors or over in height: review fee of $0.07 per square foot total area 4) Replacement of a like kind residential grade electric water heater within a residential dwelling unit that is located within an attached and/or multi-unit structure shall be computed at $35.00 (fee includes 1 inspection) 5) The cost of a permit for lawn sprinkler systems shall be computed using the dollar valuation as shown under Section M of this Resolution. Lawn sprinkler system permit, no application fee and shall be computed at $35.00 for initial inspection 6) Gas permit review fee shall be computed as follows: a. Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required b. The minimum for any gas permit review shall be $50.00 per unit or tenant space plus applicable inspection fees as required. 7) Grease traps: additional fee of $50.00 shall be assessed for each grease trap 8) Retrofit piping shall be computed at the minimum fee of $50.00 per floor for each main riser Q) MECHANICAL PERMIT REVIEW FEES The following fee calculations shall be applied separately when the permit involves mixed occupancies. Residential occupancies: The mechanical permit fees shall be computed at the rate of $0.055 per square foot total area to be charged for each living unit up to three tons of air conditioning. Each additional ton or part thereof shall be $3.00 per ton. 11.D.1 Packet Pg. 318 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 14 Nonresidential occupancies: The mechanical permit fees shall be computed by one of the following methods, whichever is calculated to be the greatest fee: The rate of $0.055 per square foot total area to be charged for the first three tons or three horsepower of air conditioning or other mechanical systems per tenant space, each additional ton of air conditioning or horsepower shall be $3.00. A permit for the change out of components shall be calculated at the above mechanical permit fee rate or the minimum fee whichever is greater. 1) Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required 2) New construction review fee of $0.055 per square foot total area, with a minimum of $100.00 3) All new construction four floors or over in height, review fee of $0.07 per square foot total area 4) The minimum mechanical permit review fee shall be $110.00 $50.00 per unit or tenant space plus applicable inspection fees as required 5) The cost of retrofit piping shall be computed at the minimum fee of $50.00 per floor for each cooling tower or $50.00 for the first 3 horsepower and $3.00 for each additional horsepower, whichever is greater 6) Residential Air Conditioning Change out permits, $15.00 processing fee plus $45.00 for initial inspection R) SOLAR PERMIT REVIEW FEES 1. Pool and domestic water heater permits, $30.00 application fee plus $35.00 per inspection 2. Photovoltaic permits, application fee of $50.00 each trade plus $35.00 per inspection S) FIRE PREVENTION AND CONTROL PERMIT FEES 1) Please refer to the Fire Code Office regarding their Fire Prevention and Control Permit Fees. T) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES a. The permit fee shall be $40.00 to set-up a single-wide trailer or mobile home on an approved site plus electrical, plumbing, mechanical, inspection and fire protection fees as applicable. b. The permit fee shall be $65.00 to set-up a double wide or larger mobile homes on an approved site plus electrical, plumbing, mechanical, inspection and fire protection fees as applicable. CHICKEES AND SIMILAR STRUCTURES The permit fee will be based upon a calculated cost of construction of $4.00 per square foot under roof or the contractor's estimated cost of construction, whichever is greater. The fee will then be calculated in accordance with Section N of this Resolution. Additional permit fees for electric, plumbing, mechanical inspections, fire, etc., will be charged when applicable. U) POOL OR SPA PERMIT FEES 1) For construction of each public pool or spa the fee shall be: a. Valuation of construction costs of up to $4,999.99 $100.00 b. Valuation of construction costs of $5000.00 through $49,999.99 $80.00 plus $7.00 per thousand dollars, or fraction thereof, of building valuation in excess of $2,000.00 c. Valuation of construction costs of $50,000.00 through $1,000,000.00 $333.00 plus $3.00 per thousand dollars, or fraction thereof, of building valuatio n in excess of $50,000.00 d. Valuation of construction costs over $1,000,000.00 $3,474.00 plus $3.00 per thousand dollars, or fraction thereof, of building valuation in excess of $1,000,000.00 2) For construction of each private pool or spa the fee shall be: $50.00 application plus applicable inspection fees as required 3) Resurfacing pool permits shall be computed at a rate of $50.00 plus applicable inspection 4) Above ground pool permits, no review fee and shall be computed at $35.00 for initial inspection V) FENCES 11.D.1 Packet Pg. 319 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 15 1) $35.00 application fee plus $35.00 per inspection as required. [Relocated from section WW) 1] SCREEN ENCLOSURE PERMIT & PAN ROOF FEES N/A The screen enclosure or roof fee will then be calculated in accordance with Section N of this Resolution. W) SIGN PERMIT FEES 1) Sign permit fees will be calculated in accordance with all applicable Building Permit Fees and Electrical Permit Fees outlined in this document, the Collier County Development Services Fee Schedule. The minimum building permit fee for sign shall be $100.00. 2) Multiple signs of the same type (i.e., wall signs) and for a single project may be allowed per one permit, however an appropriate fee shall be charged for each sign in accordance with the schedule set forth in the above subsection 1 of Sign Permit Fees. CONVENIENCE PERMIT FEES Convenience permits are issued in blocks of 10 each. Only licensed contractors are eligible to purchase convenience permits are limited to the use specified on the permit. The fee for a book of 10 convenience permits is $620.00 (1 inspection only) X) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS 1) PERMIT AND PLAN REVISIONS: the fee for each permit revision submitted after permit issuance shall be calculated using fee schedules outlined in Sections N through R above. The minimum permit fee for revisions to permitted projects shall be $50.00. AS BUILT PLANS The fee for "As Built" plan review shall be ten (10%) percent of the original building permit fee or $140.00, whichever is greater, but shall not exceed $500.00. The fee is intended to cover the cost of reviewing amended building plans in the office to determine that change orders and various field changes are in compliance with the minimum construction and fire codes of Collier County. The following are required for as-built drawings review: An itemized list of all changes made after permit plan approval. As-built plans that have all changes made after permit plan approval "clouded". As-built plans and changes shall be signed and sealed by the engineer and/or architect of record. 2) CORRECTIONS TO PLANS a. First Correction to Plans No charge b. Second Correction to Plans $65.00 c. Third & subsequent correction to plans $90.00 Y) PERMIT EXTENSION 1) The filing fee for each permit extension shall be equal to 10% of the original building permit fee or $100.00, whichever is greater, but shall not exceed $500.00. The filing fee is intended to cover the cost of reviewing existing or amended building plans to determine and verify code compliance Z) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES 1) The permit fee shall be $20.00 application for the demolition of any building or structure; plus applicable inspection fees as required. PRE-MOVING INSPECTION FEES The fee shall be $140.00 for the pre-moving inspection of any building or structure AA) INSPECTION AND REINSPECTION FEES 1) All required and partial inspections: $50.00 $45.00 per inspection 2) Re-inspections for any type of building permit shall result in an additional fee of $65.00 $60.00 per re- inspection A charge of $50.00 per inspection shall be assessed for inspections for which a permit is not necessary 3) An inspection user fee of $100.00 $90.00 shall be assessed for all inspections on a time specified basis 11.D.1 Packet Pg. 320 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 16 REINSPECTION FEES [Combine with Section AA] Re-inspections for any type of building permit shall result in an additional fee of $65.00 $60.00 per re- inspection BB) FAILURE TO OBTAIN A PERMIT 1) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and where such action was cited by Code Enforcement or by Contractor Licensing and resulted in a finding of violation from either the Code Enforcement Board, the Special Magistrate, or the Contractor Licensing Board, the fees herein specified shall be 2x the regular fee, as defined in this fee schedule, unless otherwise directed by the Collier County Board of County Commissioners. 2) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and where a contractor or agent/provider where the building official or zoning official or his/her designee, (for cases involving land use development) deems that the contractor/provider should have known that a permit was required but voluntary seeks voluntary compliance by obtaining the necessary permits to abate the violation, the fees herein specified shall be 2x the regular fee, as defined in this fee schedule. 3) Where work for which a permit is required is started or proceeded with prior to obtaining said permit, and where the unpermitted work may or may not have been completed by the property owner, and where the current owner seeks voluntary compliance by obtaining said permit to assure compliance with all applicable codes, the fees will be assessed at the regular rate as defined in this fee schedule. 4) The payment of such fee shall not relieve any person from fully complying with the requirements of any applicable construction code or ordinance in the execution of the work, or from any penalty prescribed within any construction code, law or ordinance of Collier County. 5) The fees within section EE shall not be applicable for the re-issuance of any missing permit, missing certificate of occupancy, or missing certificate of completion that was presumed to be issued prior to April 1, 1997, upon the verification of such items presented by the property owner, or his/her designee, to the building official, o r his/her designee; but shall be applicable for all reviews requiring inspection, review of plans, and all other applicable fees associated with the issuance of said permit(s), certificate of occupancy, or certificate of completion, as determined by the building official, or his/her designee, in addition to the zoning director, or his/her designee (for cases involving land use development), as defined within this fee schedule. CC) LICENSING 1) The fee for licensing items is as follows: a. Letters of Reciprocity $55.00 b. Contractors Change of Status (active to dormant) $10.00 c. Voluntary Registration of State Certified Contractors $45.00 d. Fee for a 6 month temporary contractor’s license $55.00 Pictures. $2.00 Laminating $1.00 (per license) e. Certified copies of Experience letters $35.00 f. Duplicate or replacement (of Competency cards) $25.00 g. Second entity application fee $105.00 2) Certificate of Competency (Annual) a. Contractor Initial License Fee $230.00 Renewal Fee $145.00 b. Specialty Contractor Initial License Fee $205.00 Renewal Fee $125.00 c. Journeyman Initial License Fee $80.00 Renewal Fee $55.00 11.D.1 Packet Pg. 321 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 17 3) Dormant Certificates of Competency (Annual) a. Contractor $130.00 b. Specialty Contractor $130.00 c. Penalty fees after 9/30 $20.00 per month until 12/31 4) Reinstatement of Delinquent License a. Contractor $230.00 plus back years b. Specialty Contractor $205.00 plus back years c. Journeyman $80.00 plus back years d. Examination Administrative Fee $130.00 good for 6 months DD) DUPLICATE PERMIT CARDS 1) The fee shall be $5.00 for the issuance of a duplicate permit card for whatever reason EE) CHANGE OF CONTRACTOR OR SUBCONTRACTORS 1) To record a change of contractor or subcontractor, on a permit that has been issued, the fee shall be $40.00. This fee includes the issuance of a new permit card. FF) PERMIT FEE REFUNDS A) Building Permit Review Standards apply to all internal Growth Management Department, Development Services reviews for building permit applications with previously approved site plans, including all required trade reviews, along with any required Zoning, Engineering and Impact Fee reviews. Reviews external to Growth Management Department, Development Services, such as a Fire, are excluded. The performance standard time frame begins upon submission of the application, and runs until either issuance of a comment letter or at approval. Review standard guarantees require the submission of a sufficient number of plan sets (to be determined by the Building Department) to accommodate parallel trade reviews. 1) New Residential construction reviews will be completed within 5 business days (if longer than 5 business days 50% of review fee refunded). 2) New Commercial construction reviews will be completed within 15 business days (if longer than 15 business days 50% of review fee refunded). 3) Alterations, Additions and Minor Permits: a. Residential permit application reviews will be completed within 5 business days (if longer than 5 business days 50% of review fee refunded). b. Commercial permit applications requiring only a single trade review and will be completed within 5 business days (if longer than 5 business days 50% of review fee refunded). c. Commercial permit applications requiring 2 or 3 trade reviews will be completed within 10 business days (if longer than 10 business days 50% of review fee refunded). B) Annual Fee Adjustments: 1) Proposed Annual Fee adjustments for Building Department fees shall equal the average personnel cost change (COLA plus average merit) approved by the BCC as part of that fiscal year’s budget, adjusted for any change in staffing levels. 2) Annual fee adjustments will become effective on Jan 1 of each fiscal year if approved. 3) Annual fee adjustments require full review and recommendation to the BCC from the Development Services Advisory Committee. Annual fee adjustments also require full BCC approval. 4) Annual fee adjustments require Building Fund total reserves to be less than 6 months of the Building Fund operating budget for that fiscal year. If reserves exceed six months of budgeted operating expenses, no annual adjustment can be requested. 11.D.1 Packet Pg. 322 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 18 C) Special Fee Adjustment: 1) If Building Fund total reserves are projected to exceed six months of operating expenses in the proposed budget of any upcoming fiscal year, fees will be lowered in sufficient amount to insure Building Fund reserves remain under six months of budgeted expenses. 2) If Building Fund total reserves are projected to fall below three months of operating expenses in the proposed budget of any upcoming fiscal year, a special fee increase in sufficient amount to insure Building Fund total reserves remain over three months of budgeted expenses will be proposed for full Development Services Advisory Committee review and BCC approval. 3) Six months following any fee adjustment, other than annual increases, a full review of resulting revenue will be presented for the review of the Development Services Advisory Committee. The committee can make a recommendation to the Board to lower fees if revenue exceeds either revenue projections used in fee adjustment calculations or targeted reserve levels. GG) RECORD RETRIEVAL 1) No charge for normal retrieving of records from inactive or remote storage including microfilmed documents 2) Next day expedited retrieval of records from inactive or remote storage $75.00 HH) COPY FEES 1) The fee for blueprint and miscellaneous copying shall be as follows: a. Microfilm copies, of documents less than 11x17 inches: $0.15 other sizes at cost of production. b. Microfilm or Blueprint copies: 18X24 $1.25 per page 30 X 36 $2.50 per page 30 X 42 $3.25 per page 34 X 44 $5.00 per page c. Growth Management/Planning & Regulation self-service copier, public access and not related to public record retrieval or public record copies: documents less than 14x8.5 inches $0.15 per page inclusive of sales tax. RESEARCH The fee for researching records, ordinances, and codes shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of 1 hour The fee for creating and designing special computer generated reports that are not part of the regular standard reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of 1 hour. SUBSCRIPTION SERVICE The fee for one-year subscription service to be mailed quarterly shall be $15.00 per year. The subscription year is from Oct. 1 through Sept. 30. RESERVED PROPERTY INSPECTIONS Property Inspection Property Inspection - $200.00 per unit Re-inspection Fee - $50.00 per re-inspection per unit. Initial Registration Fee through 2009 rental registration period - $30.00 per property. Annual Renewal - $20.00/per property through 2009 rental registration period. Annual Late Fee - $10.00/ per day per property up to a maximum of $80.00 through 2009 rental registration period. The term “property” means a parcel or contiguous parcels with any number of rentals located thereupon under common ownership and/or management. II) CERTIFICATE TO BOARD BUILDING 1) Initial Boarding Certificate $150.00 2) Boarding Certificate Extension $150.00 11.D.1 Packet Pg. 323 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 19 JJ) ADDITIONAL FEE REFUND PROVISIONS 1) Requests for fee waivers may only be approved by the Board. Waiver requests for development review and building permit fees shall be submitted in writing directly to the appropriate Development Services Staff, who will prepare an executive summary for consideration by the Board. Such requests shall include a statement indicating the reason for the fee waiver request and, if applicable, the nature of the organization requesting the fee waiver. KK) REFUND PROVISIONS 1) PAYMENT OF FEES: Full payment of fees is required for a complete application. Department policy requires full payment of fees at the time of application submittal. No work will begin on staff review of the application until all fees are paid in full. If full payment of fees is not received within 14 calendar days of application submittal, the application will be considered void. At this point, a new application and full payment of fees will be required to proceed with a project. 2) There will be no refund of Building, Planning, Environmental, or Engineering related fees, except those applications which have been deemed not sufficient for staff review or inspection and withdrawn by the applicant. Either the applicant or payer may, within 4 years of the date of payment apply for a refund for only those staff review or inspection services that were not performed. Failure to make timely application for a refund shall waive any right to a refund. The application for a refund shall be filed with the County Manager of his/her designee and shall contain the following: a. The name and address of the applicant b. The location of the property upon which the development was proposed c. The date the specified fee was paid d. A copy of receipt of payment; and e. Payment of a non-refundable “refund processing fee” equal to one percent (1%) of the refund requested, except that the minimum processing fee shall be $25.00 and the maximum processing fee will not exceed $250.00 Refund requests totaling $25,000.00 or more cannot be approved administratively and must be submitted to the Board for approval. 3) In no cases will there be refunds for pre-application fees, data conversion fees, appeals of administrative decisions, or appeals to the Board of Zoning Appeals or Building Board of Adjustment. 4) If staff error causes the inappropriate or unnecessary filing of an application and payment of fees, 100 percent of all inappropriate fees, shall be refunded upon written request and with the concurrence of Department management. LL) ADDITIONAL FEE PROVISIONS 1) In those cases where alternative methods or timing of payments for Growth Management Department services and/or fees listed in this schedule associated with SBR reviews are deemed to best serve the public good, the Growth Management Department, Department Head will have the authority to approve such alternatives. Such alternatives must be in writing and signed by all principals involved. In no case shall final C.O. or such certifications of project completeness be issued until payments due the Growth Management Department are received in full. 2) All hourly fees are computed and charged from actual Divisional time tracking records. 3) All acreage totals used in fee calculations will be rounded up to the nearest whole acre. 4) When deemed essential for project review or approval, there will be no additional charge for any meetings requested by Growth Management Department staff. PUBLIC VEHICLE FOR HIRE FEES The following fees shall be assessed for the Public Vehicle for Hire Program: (In the event that the background check fee charged to the county exceeds the minimum fee established by the county, the applicant(s) shall be responsible for 11.D.1 Packet Pg. 324 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Words underlined are added; Words struck-thru are deleted. Page 20 the actual cost of the search). Initial Application fee (new Companies) - $200 Initial Certificate to Operate (Feb 1-Jan 31) - $325.00 Annual Certificate to Operate Renewal - $325.00 Late Fee for CTO Renewal - $200.00 Sub-Certificate Application Fee (New Companies) - $100.00 Sub-Certificate - $162.50 Annual Sub-Certificate renewal - $162.50 Late Fee for Sub-Certificate Renewal - $100.00 Vehicle Decal - $50.00 Temporary Vehicle Decal - $5.00 per vehicle/per day Temporary Vehicle Decal (In case of inoperable decaled vehicle) - $5.00/per vehicle Driver Identification Card (Initial/Renewal) - $75.00 per driver 2nd Driver Identification Card - $25.00 Replacement Driver ID - $10.00 On-site Vehicle Permitting - $15.00 per vehicle MM) “PAYMENT IN LIEU OF” FEE FOR PATHWAYS (SIDEWALKS, AND BIKE LANES) 1) Calculated using the current Florida Department of Transportation (FDOT) construction costs or an engineering estimate not to exceed twenty-five percent (25%) of the submitted application request’s total project cost. OPTIONAL EXPEDITED BUILDING PERMIT PLAN REVIEWS Optional expedited building permit plan review fee shall be 30% of the building permit fee (additional to full building permit fees) with a minimum fee of $50.00 Participation in the optional expedited review program is subject to limited availability, applications will be accepted on a first come first served basis. Review completion times are guaranteed to equal, or be less than, one half of the normal advertised completion timeframes. Should the expedited review exceed this guaranteed completion time, the 30% optional expedited building permit review fee will be refunded to the applicant, and all normal permit fees will apply. Such guarantee and refund provisions shall apply to reviews, and do not infer or relate to approvals. Optional expedited building permit review fees shall be due at the time of building permit application submission. Any required re-submissions of permit applications’ leading to re-reviews, when due to applicant insufficiencies, shall be subject to additional optional expedited building permit plan review fees if an additional expedited review is requested by the applicant for the re-review, and shall be calculated against re-submission charges. FENCES 1) $35.00 application fee plus $35.00 per inspection as required. [Moved to Section V] NN) OPTIONAL TEMPORARY CERTIFICATE OF OCCUPANCY 1) $250.00 for commercial, over 30,000 sq. ft $500.00. 2) $100.00 for residential This is the last page of the Growth Management Department, Development Services Fee Schedule 11.D.1 Packet Pg. 325 Attachment: Fee Schedule 10012017 strikethrough underline.pdf (3175 : Targeted Fee Schedule Reductions) Page 1 GROWTH MANAGEMENT DEPARTMENT DEVELOPMENT SERVICES FEE SCHEDULE BCC Approved version, June 13, 2017 Effective Date – October 1, 2017 Contents: A) ADMINISTRATION 2 B) BLASTING PERMITS & INSPECTIONS 2 C) ENVIRONMENTAL/LANDSCAPING 2 D) EXCAVATION PERMITS 3 E) FIRE CODE REVIEW FEES 3 F) SITE DEVELOPMENT PLANS 4 G) SUBDIVISION 5 H) ENGINEERING INSPECTION FEES 6 I) TEMPORARY USE FEES 6 J) WELL PERMITS/INSPECTIONS 6 K) ZONING/LAND USE PETITIONS 7 L) MISCELLANEOUS 9 M) BUILDING PERMIT FEES 10 N) STRUCTURAL PERMIT REVIEW FEES 11 O) ELECTRICAL PERMIT REVIEW FEES 11 P) PLUMBING AND GAS PERMIT REVIEW FEES 11 Q) MECHANICAL PERMIT REVIEW FEES 11 R) SOLAR PERMIT REVIEW FEES 12 S) FIRE PREVENTION AND CONTROL PERMIT FEES 12 T) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES 12 U) POOL OR SPA PERMIT FEES 12 V) FENCES 12 W) SIGN PERMIT FEES 12 X) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS 13 Y) PERMIT EXTENSION 13 Z) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES 13 AA) INSPECTION AND REINSPECTION FEES 13 BB) FAILURE TO OBTAIN A PERMIT 13 CC) LICENSING 14 DD) DUPLICATE PERMIT CARDS 14 EE) CHANGE OF CONTRACTOR OR SUBCONTRACTORS 14 FF) PERMIT FEE REFUNDS 14 GG) RECORD RETRIEVAL 15 HH) COPY FEES 15 II) CERTIFICATE TO BOARD BUILDING 15 JJ) ADDITIONAL FEE REFUND PROVISIONS 15 KK) REFUND PROVISIONS 16 LL) ADDITIONAL FEE PROVISIONS 16 MM) “PAYMENT IN LIEU OF” FEE FOR PATHWAYS (SIDEWALKS, AND BIKE LANES) 17 NN) OPTIONAL TEMPORARY CERTIFICATE OF OCCUPANCY 17 Fees are in bold 11.D.2 Packet Pg. 326 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 2 FEES ARE ESTABLISHED BY THE COLLIER COUNTY BOARD OF COUNTY COMMISSIONERS (BOARD) RESOLUTION, AND CANNOT BE WAIVED OR SUSPENDED WITHOUT AN ACTION BY THE BOARD. ANY QUESTIONS CONCERNING THE APPLICABILITY OF FEES SHALL BE CONCLUSIVELY DETERMINED BY THE DIRECTOR OF THE APPROPRIATE DIVISION, AS APPLICABLE. WHERE AS PART OF A REZONING, PLAT OR SIMILAR APPLICATION TYPE, THE BOARD DIRECTS APPROVAL OF FUTURE DEVELOPMENT ORDERS DIFFERENT FROM THE STANDARD T YPE OF APPROVAL PROCESSES REQUIRED, THE DIRECTOR OF THE APPROPRIATE DIVISION SHALL DETERMINE THE FEES TO BE APPLIED TO THE PROCESS NECESSARY TO MEET THE BOARDS REQUIREMENTS. THE APPLICABLE FEES SHALL BE THOSE WHICH MOST CLOSELY RESEMBLE THOSE CHARGED FOR SIMILAR PROCESSES INCLUDING EXTRA FEES FOR ADVERTISING AND THE LIKE. A) ADMINISTRATION 1) Official Interpretation Request of Land Development Code (LDC), Growth Management Plan (GMP), or Building Construction Administrative Code (Administrative Code). Based o n staff hours: Less than 20 hours $1,500.00, 20 to 40 hours $3,000.00, more than 40 hours $5,000.00 2) Determination of Vested Rights $100.00 (plus the County's out-of-pocket expenses associated with hearing officer and hearings) 3) Appeal of Vested Rights Determination $100.00 4) Amendment to Land Development Code $3,000.00 5) Appeal of an Administrative Decision (as may be provided for in the Collier County Administrative Code or the LDC) $1000.00 (non-refundable) B) BLASTING PERMITS & INSPECTION 1) 30 day permit fee, non-refundable payable upon application $250.00 2) 90 day permit fee, non-refundable payable upon application $600.00 3) Yearly permit fee, non-refundable payable upon application $1,500.00 4) Renewal permit fee, non-refundable payable upon application $200.00 5) After-the-fact fee, due to blasting without a permit $10,000.00 6) Fine fee, per detonated shot with after-the-fact permit $200.00 7) Blasting Inspection Fee $200.00 (per inspection) 8) Inspection fees shall be paid upon issuance of a blasting permit based on the estimated number of blasts. Upon completion, fees will be adjusted to reflect actual number of blasts. C) ENVIRONMENTAL/LANDSCAPING 1) Site Clearing Permit, first acre or fraction of an acre $250.00 each additional acre or fraction of an acre $50.00 ($3,000.00 maximum) 2) Agricultural Land Clearing a) Land Clearing Notification $250.00 b) Land Clearing Permit $250.00 each additional acre or fraction of an acre $50.00 ($3,000.00 maximum) 3) Landscape Tree Removal Fee $250.00 4) Environmental Impact Statement (EIS) $2,500.00 includes 1st submittal and 2nd submittal, if applicable, 3rd submittal $1,000.00, 4th and subsequent submittals $500.00 each 11.D.2 Packet Pg. 327 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 3 5) Vehicle on the Beach Permit Application $250.00 (Permit fee shall be waived for public and non-profit organizations engaging in environmental activities for scientific, conservation or educational purposes). 6) Special Treatment Review a) First five acres or less $400.00 b) Each additional acre, or fraction thereof $50.00 ($5,000.00 Maximum) 7) Coastal Construction Setback Line (CCSL) a) CCSL Permits $400.00 b) Variance - Petition $1,000.00 8) Sea Turtle Permit a) Sea Turtle Handling Permits $25.00 b) Sea Turtle Nesting Area Construction Permit $200.00 9) Vegetation Removal Permit a) First acre or fraction of an acre less $250.00 b) Each additional acre, or fraction thereof $50.00 ($3,000.00 Maximum) 10) After-the-fact Environmental or Landscape Permits a) CCSL Variance Petition 2x normal fee b) All other Environmental or Landscape Permits 4x normal fee 11) Informal Wetland Jurisdictional determination for single family parcels up to 5 acres $300.00 12) Conservation Easement review fee $300.00 application fee plus the following additional site fee: $200.00 for CE acres less than 5 acres; $400.00 for CE area between 5 acres and 10 acres; $600.00 for CE area greater than 10 acres and less than 20 acres; $800.00 for CE areas between 20 and 50 acres; and an additional $200.00 for every 40 acres of CE area over 50 acres. 13) Listed or Protected Species review fee (when an EIS is not required) $1,000.00 D) EXCAVATION PERMITS 1) Application Renewal $300.00 2) Application (Private) $400.00 3) Application (Commercial) $2,000.00 4) Application (Development) $400.00 5) $200.00 per inspection paid in advance for 12 months 6) Reapplication: $300.00 plus $200.00 per month inspection fee 7) Cubic Yardage Review Fee: $200.00 first 5000cy, plus $10.00 per additional 1000cy with a max of $20,000.00 8) Time Extension. $150.00 plus $200.00 per month inspection fee 9) After-the-fact Excavation Permit 4x application fee 10) Over excavation penalty fee per yard, plus Permit/Review $0.05 per cubic yard fee, unless maximum have been paid. E) FIRE CODE REVIEW FEES 1) Please refer to the Fire Code Office regarding their Fire Code Review Fees. 11.D.2 Packet Pg. 328 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 4 F) SITE DEVELOPMENT PLANS 1) Site Development Plan Review (SDP) $5,000.00 a) plus $40.00 per D/U b) plus $100.00 per residential building structure c) plus $0.10 per square foot for non-residential except that structures designed exclusively for parking (parking garages) shall be calculated at $0.05 per square foot d) plus $200.00 per building for non-residential e) Additional fees for 3rd review $500.00, 4th review $1,000.00, 5th review $1,500.00, 6th and subsequent reviews $2,000.00 When a building consist of both residential and non -residential (commercial, retail, office) uses, the following fees will apply. a) $5,000.00 base fee plus $40.00 per D/U b) $200.00 per building for non-residential c) plus $0.10 per square foot of non-residential floor area d) Additional fees for 3rd review $500.00, 4th review $1,000.00, 5th review $1,500.00, 6th and subsequent review $2,000.00 2) Pre-application fee $500.00 (to be credited toward application fee submittal) a) Second and subsequent pre-app meetings at the applicant’s request shall not be credited towards application fees b) Second and subsequent pre-app meetings at staff's request will be held at no charge to the applicant c) Applications submitted 9 months or more after the date of the last pre -app meeting shall not be credited towards application fees and a new pre-application meeting will be required 3) Site Development Plan Insubstantial Change a) Site Development Plan Insubstantial Change $400.00 for first sheet, $100.00 for each and every additional sheet submitted b) Additional fees for 3rd review $500.00, 4th Review $1,000.00, 5th and subsequent review $1,500.00 4) Site Development Plan Conceptual Review (CSP), Unified Development Plan (UDP), Neighborhood Park Site (NPSP), Existing Conditions Site Improvement Plan $750.00 5) Site Improvement Plan Review (SIP) $1,000.00 (plus Engineering review fees) 6) Utility Plan Review & Inspection Fees a) Construction Document Review 0.75% of probable water and/or sewer construction costs b) Construction Inspection 2.25% of probable water and/or sewer construction costs. All Inspection fees will be due at the pre-construction meeting. If no pre-construction meeting is required, all Inspection fees shall be due prior to the issuance of the permit. No construction shall take place until the fee is paid in full. Fees are considered to be non-refundable after payment is received unless otherwise determined by the Board. 7) Engineering Site Plan Review Fee a) Construction Documents Review Fee 0.75% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping, and any other appurtenant cost of construction b) Construction Inspection 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping, and any other appurtenant cost of construction. All Inspection fees will be due at the pre - construction meeting. If no pre-construction meeting is required, all Inspection fees shall be due prior to the issuance of the permit. No construction shall take place until the fee is paid in full. Fees are considered to be non-refundable after payment is received unless otherwise determined by the Board. 8) Site Development Plan Amendment (SDPA) $2,500.00 a) Plus $40.00 per D/U plus $100.00 per residential building structure b) plus $0.10 per square foot 11.D.2 Packet Pg. 329 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 5 c) plus $200.00 per building for non-residential d) Additional fees for 3rd review $500.00, 4th Review $1,000.00, 5th and subsequent review $1,500.00 9) School Board Review (SBR) Fees a) Pre-Acquisition Meeting $500.00 (no refunds or credits) b) Pre-application fee $500.00 (to be credited toward application fee upon submittal) (all normal pre - application provisions apply) c) SBR Fee $5,000.00 with hourly reconciliation at project completion for hourly variation greater than 10%, final project charges at $100.00 per hour for all associated staff hours 10) Violation of the conditions of approval of the SDP/SIP or installation of improvements, cleari ng, or other land alteration not depicted on, or otherwise authorized as a part of the approved SDP/SIP 4x the SIP/SDP application fee. 11) Request for alternative architectural design $500.00, no separate or additional fee for appeals to, or requests for assistance from, the Architectural Arbitration Board. 12) Site Development Plan Sheet change out (per Growth Management Department, Development Services policy guidelines) $35.00 per page. 13) SDP Extension $150.00 14) Post Take Site Plan: Base Fee $1,000.00, Resubmittal Fee $250.00 each submittal, $3,000.00 additional if objection filed. 15) Site Plan with Deviations for Redevelopment (SDP/SDPA/SIP -DR). Application fee to request deviation(s) for a redevelopment project $1,000.00. This fee is in addition to the fee for a SDP, SDPA or SIP application. G) SUBDIVISION 1) Lot Line Adjustment (LLA) and Lot Split Review $250.00 2) Subdivision Review Fees (PPL), (PPLA) a) Construction Documents Review Fee 0.75% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping and any other appurtenant cost of construction b) Subdivision Inspection Fee 2.25% of probable Paving, Grading, Drainage, Lighting, Code Minimum Landscaping, and any other appurtenant cost of construction. All Inspection fees will be due at the pr e- construction meeting. If no pre-construction meeting is required, all Inspection fees shall be due prior to the issuance of the permit. No construction shall take place until the fee is paid in full. Fees are considered to be non-refundable after payment is received unless otherwise determined by the Board. c) Construction Document Resubmission or Document Modification: submit as Insubstantial Change $400.00 for first sheet, $100.00 for each additional sheet d) Subdivisions: 3rd and subsequent additional reviews $500.00 3) Subdivision, Preliminary Plat (PSP) a) Petition Application $1,000.00 plus $5.00 per acre (or fraction thereof) for residential, plus $10.00 per acre (or fraction thereof) for non-residential; (mixed use is residential) 4) Subdivision Final Plat (FP) $1,000.00 plus $5.00 per acre (or fraction thereof) for residential, $1,000.00 plus $10.00 per acre (or fraction thereof) for nonresidential; (mixed use is residential) 5) Additional review of construction plans for phased construction of subdivision improvements $1,000.00 per phase 6) Two-year Extension $150.00 7) Water and Sewer Facilities Construction Document Review 0.75% of probable water and/or sewer construction costs 11.D.2 Packet Pg. 330 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 6 8) Construction Document Resubmission or Document Modification 0.25% of probable water and/or sewer construction costs a) 3rd and subsequent re-submittals $500.00 b) Water and Sewer Facilities Construction Inspection Fee 2.25% of probable water and/or sewer construction costs. All Inspection fees will be due at the pre-construction meeting. If no pre-construction meeting is required, all Inspection fees shall be due prior to the issuance of the permit. No construction shall take place until the fee is paid in full. Fees are considered to be non-refundable after payment is received unless otherwise determined by the Board. 9) Violation of the conditions of approval of approved construction plans or installation of improvements, clearing, or other land alteration not depicted on, or otherwise authorized as a part of the approved construction plans or permit 4x the PPL, PPLA, PSP, CNSTR or Final Plat Review Fee (FP). H) ENGINEERING INSPECTION FEES 1) Engineering Inspection Fee $150.00 per set of required engineering inspections charged at time of building permit issuance 2) Re-inspection Fees: 1st re-inspection $65.00, 2nd re-inspection $65.00, 3rd and thereafter re-inspection $65.00 I) TEMPORARY USE PERMITS 1) Beach Events Permits: a) Individual Permit $100.00 b) Block of 25 calendar days $2,250.00 c) Block of 50 calendar days $4,500.00 d) Block of 75 calendar days $6,750.00 e) Block of 100 calendar days $9,000.00 f) Block of 125 calendar days $11,250.00 g) Block of 150 calendar days $13,500.00 2) Temporary Use Permit Special Sales & Events $200.00 3) Model Homes and Sales Centers $500.00 4) Construction and Development, Mobile home, Agricultural Zoning, and Temporary use for "Coming Soon" sign $125.00 5) Residential and Non-Profit Garage and Yard Sale Permits No Charge 6) Temporary Use Amendment $100.00 7) Renewals or extensions requested after the expiration date $200.00 8) Temporary Use Permit for Special Events requiring BCC approval, including Circus and Carnival Permits. $275.00 9) Political Signs (Bulk Temporary Permit) $5.00 10) Fees for Temporary Use permits issued After the Fact, ATF: 2x normal fee J) WELL PERMITS/INSPECTIONS 1) Hydraulic elevator shaft permit $300.00 2) Test hole permit (including 1st six holes) $300.00, each additional hole $20.00 3) Well permit (abandonment) $50.00 4) Well permit (construction, repair, or combined construction and abandonment at one site) $300.00 5) Well permit (monitoring) $150.00 11.D.2 Packet Pg. 331 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 7 6) Well Permit (modification of monitor/test well to a production well) $75.00 7) Well Reinspections a) First Reinspection $65.00 b) Second Reinspection $65.00 c) Third Reinspection $65.00 8) After the fact well permits 4x normal fee per violation NOTE: Multiple wells may be allowed on one permit, but each well must be accounted for and the appropriate fee shall be charged for each well in accordance with the above listed schedule. K) ZONING/LAND USE PETITIONS 1) Pre-application meeting fee $500.00 (to be credited toward application fee upon submittal) a) Second and subsequent pre-app meetings at the applicant’s request shall not be credited towards application fees. b) Second and subsequent pre-app meetings at staff's request will be held at no charge to the applicant. c) Applications submitted 9 months or more after the date of the last pre -app meeting shall not be credited towards application fees and a new pre-application meeting will be required. 2) Alcoholic Beverage or Service Station Separation Requirement Waiver $1,000.00 3) Boat Dock Extension Petition $1,500.00 Boat Lift Canopy Administrative Review $500.00 4) Conditional Use Permit $4,000.00 when filled with Rezone Petition ($1,500.00), additional fee for 5th and subsequent reviews: 20% of original fee. 5) Conditional Use Extension $3,000.00 6) DRI Review (in addition to cost of rezone) $10,000.00 plus $25.00 an acre (or fraction thereof). Additional fee for 5th and subsequent reviews: 20% of original fee Amendments deemed to be minor in nature, that is requiring minor strike thru and underline text amendments of no more than 10 different lines of text changes in the DRI will be capped at $13,000.00. Any amendment which includes a map and text change will be assessed the full fee (no cap). 7) DRI/DO Amendment $6,000.00 plus $25.00 per acre (or fraction thereof). The acreage charge does not apply for amendments which only change the build-out date of the DO for a time period of less than five years. Additional fee for 5th and subsequent reviews: 20% of original fee. a. DRI Extension $100.00 8) DRI Abandonment (DRIABN) $1,500.00 9) Flood Variance Petition $1,000.00 10) Interim Agriculture Use Petition $350.00 11) Non-Conforming Use Change/Alteration $1,500.00 12) Parking Exemption $1,500.00; additional fee for 5th and subsequent reviews: 20% of original fee 13) Parking Reduction (Administrative) $500.00 14) Rezone Petition (PUD to PUD) $8,000.00 plus $25.00 an acre (or fraction thereof); (requires a submittal of a new PUD document), additional fee for 5th and subsequent reviews: 20% of original fee (excludes minor revisions as required by staff). 15) Property owner notifications $1.50 non-certified mail, $3.00 certified return receipt mail (Petitioner to pay this amount prior to advertisement of petition) 16) Planned Unit Development Amendments (PUD) $6,000.00 plus $25.00 an acre or fraction of an acre. Substantial changes to the text and Master Plan; additional fee for 5th and subsequent reviews: 20% of original fee. Text 11.D.2 Packet Pg. 332 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 8 changes that do not impact the Master Plan $6,000.00 (the $25.00 an acre fee will not apply). Amendments deemed to be minor in nature that is requiring minor strike thru and underline amendments of no more than 10 different lines of text changes in the PUD will be capped at $9,000.00. Any amendment which includes a map and text change will be assessed the full fee (no cap). 17) Planned Unit Development Amendment: Insubstantial (PDI) $1,500.00 requires a hearing by the CCPC only for a minor change to the PUD Master Plan, PUD Minor Change (PMC) $1,000.00 (Administrative Review for minor change to the Master Plan). 18) Rezone Petition (Regular) $6,000.00 plus $25.00 an acre (or fraction thereof), additional fee for 5th and subsequent reviews: 20% of original fee. 19) Rezone Petition (to PUD) $10,000.00 plus $25.00 an acre (or fraction thereof), additional fee for 5th and subsequent reviews: 20% of original fee. 20) Street Name Change (Platted) $500.00 plus $1.50 for each property owner requiring notification of proposed street name change. 21) Un-platted street name or project name change $100.00 per application fee plus $50.00 per additional hour or partial hour of research required to process application, not to exceed $500.00. 22) Variance petition $2,000.00 residential, $5,000.00 non-residential, additional fee for 5th and subsequent Reviews: 20% of original fee. 23) Variance (Administrative) $1,000.00 24) Zoning Certificate: Residential $50.00, Commercial $125.00 25) Sign Variance Petition $2,000.00 26) Stewardship Receiving Area Petition (SRA) $7,000.00 per SRA plus $25.00 per acre for. Stewardship Sending Area Petition (SSA) $9,500.00, Stewardship Receiving Alternative Deviation Design (SRDD) $500.00. SRA Amendments deemed to be minor in nature, that is require minor strike thru and underline text amendments of no more than 10 different lines of text changes in the SRA will be capped at $10,000.00. 27) After-the-Fact Zoning/Land Use Petitions 2x the normal petition fee 28) Land Use Petition Continuances Including Appeal of an Administrative Decision and Appeal to Board of Zoning Appeals a) Requested after petition has been advertised $500.00 b) Requested at the meeting $750.00 c) Resultant additional required advertising charged in addition to continuance fees 29) PUD and SRA Monitoring (one-time charge at time of building permit pick-up) a) $100.00 per dwelling unit for residential construction within a PUD and SRA ($3,000.00 maximum fee per building permit application) b) $0.12 per square foot for non-residential construction within a PUD and SRA ($3,000.00 maximum fee per building permit application) 30) Any legal advertising required during any Growth Management Department, Development Services activity or approval process will be charged in addition to stated fees, at actual costs. The Growth Management Department reserves the right to charge an estimated amount with the initially required project fees, and will reconcile and adjust such charges against actual legal advertising recording billings at the completion of the project. 31) Mixed Use Project (MUP) $2,500.00 a) Mixed Use Project Deviation $1,000.00 32) Amplified Sound Permit $300.00 11.D.2 Packet Pg. 333 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 9 33) Planned Unit Development (PUD) closeout application and processing $2,500.00 34) Development of Regional Impact (DRI) closeout application and processing $10,000.00 35) Zoning Verification Letter: Planned Unit Development (PUD) Comparable Use Determination application fee $1,000.00. Note: This application and fee is distinct from the Zoning Confirmation Letter found elsewhere in the Fee Schedule. 36) Intent to Convert (ITC) application $2,000.00, additional fee for 5th and subsequent reviews: 20% of original fee. 37) Compatibility Design Review (CDR) petition $3,000.00, additional fee for 5th and subsequent reviews: 20% of original fee. L) MISCELLANEOUS 1) Official Zoning Atlas Map Sheet Publications, maps, and reports shall be copied at actual cost . 2) The following fee shall be assessed for all Lien Search Requests and Payoff Requests: $25.00/per property address. 3) The fee for researching records, ordinances, and codes shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of 1 hour. 4) The fee for creating and designing special computer generated reports that are not a part of regular standard reports shall be at no charge for the first hour, then at the base salary hourly rate of the staff member conducting the service for time in excess of 1 hour. 5) CD Burning: $5.00 6) Staff shall charge the following fees for duplication of public records a. $0.15 for each one sided photocopy of documents less than 11x17 inches b. $0.20 for each two sided photocopy of documents less than 11x17 inches c. $1.00 for each certified copy of a public record 7) Property Notification Address Listing a. MS Excel spreadsheet on Disc $70.00 b. Print out on Paper $75.00 + $0.05 for every record over 1500 c. Mailing Labels $80.00 + $0.06 for every record over 1500 d. Print out on Paper + Mailing Labels $85.00 + $0.11 for every record over 1500 8) Comprehensive Plan Consistency Review a. CU’s $300.00 b. Rezoning $750.00 c. PUD’s or PUD Amendments $2,250.00 d. Letter of GMP consistency to outside agencies $250.00 e. SRA - Stewardship Receiving Area $2,250.00 f. DRI - Development of Regional Impact $2,250.00 g. FIAM – Fiscal Impact Analysis $4,000.00 9) Plan Review Fee (for planning review of all building permit applications) a. Permit Application, complex (more than one trade): $75.00 per building permit application, 2nd review 50% of fee, 3rd and subsequent 25% of fee (2nd and subsequent review fees related to Zoning approvals only) b. Permit Application, basic (no trade or one trade): $50.00 per building permit application, 2nd review 50% of fee, 3rd and subsequent 25% of fee (2nd and subsequent review fees related to Zoning approvals only) 10) Project Meetings: Active applications under review for the following project types will be afforded one inter - departmental meeting at no charge: Planned Unit Development re-zonings and Site Development Plan applications (except for conceptual site plan approval and insubstantial change approval). Meeting requests for all other application types and additional meetings will be subject to the following fees: a. Meetings with Departmental Project Approval Staff member per applicant request, reviews and petitions 11.D.2 Packet Pg. 334 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 10 in progress, $150.00 per one hour minimum, $75.00 per ½ hour thereafter. Additional Department staff attending meeting per applicant request $75.00 per ½ hour per staff member. b. Inter-Departmental Project Meeting per applicant request, site plan reviews and land use petitions in progress, $500.00 per one hour minimum, $250.00 per ½ hour thereafter. 11) Adequate Public Facilities a. Planning Applications requiring COA process review (such as FP’s, PPL’s & SIP’s, SDPs) $200.00 + $25.00 per residential dwelling unit or + $25.00 per 1000 sq ft commercial ($5000.00 maximum) b. Building permit applications requiring COA process review not covered under 9.a above $100.00 per building permit application. 12) Zoning Confirmation Letters a. Standard Response $100.00 (includes up to 1 hour research) b. Extended Research $100.00 per hour (any response with research in excess of 1 hour) 13) CDD a. Community Development District $15,000.00 b. Chapter 189 Special District, Independent or Dependent $15,000.00 14) GMP Amendment a. Small Scale $9,000.00 b. General $16,700.00 c. Legal advertising in addition to sub-sections a. and b. fees, and subject to applicable fee schedule provisions d. Pre-application meetings for GMP consistency for development orders and zoning/land use petitions $250.00 15) Application for issuance TDR $250.00 (non-refundable); plus $25.00 per TDR issued and recorded (total fees not to exceed $2,750.00) 16) Engineering Services a. Vacation of Easements $2,000.00 17) Building Board of Adjustments and Appeals $250.00 18) Early Work Authorization (EWA) permit $500.00 (does not include site clearing fee) 19) Legal Non-conforming Lot (LNC) $100.00 20) Vested Rights Determination (VRD) $1,500.00 21) Time Extension $150.00 22) Notice of Commencement Administrative Fee $5.00. The Clerk of Courts Recording Fee (amount as specified on the Collier Clerk of Courts website) will also be collected on the Clerk’s behalf. M) BUILDING PERMIT FEES 1) The building permit fee shall be considered the addition of all individual trade plan review fees involved in the process plus the inspection fees. 2) Unless otherwise stated, estimated application fees paid at the time of application, are non- refundable, and will be a minimum of $50.00. Estimated review and inspection fees are to be paid at the time of permit issuance. Inspection fees will be reconciled to the actual number of inspections performed. Additional payment is required prior to the CO issuance if actual inspections exceed estimated. Refunds issued if estimated inspections exceed actual. 3) The balance of the total permit fee will be collected at the time of issuance of the permit and will include any fee adjustments necessary. 11.D.2 Packet Pg. 335 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 11 4) Phased or Early Work Authorization (EWA) permit $500.00 N) STRUCTURAL PERMIT REVIEW FEES 1) The fee for a structural permit shall be computed as follows: Such fees shall be either based on the contractor's valuations of construction cost or based on square footage. Minimal accepted calculated costs of construction are set forth on the attached Building Valuation Data Table - ICC Building Valuation Data Table, produced February, 2007. 2) Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required 3) New construction review fee of $0.055 per square foot total area for valuation of construction costs $5,000 or over, with a minimum of $100.00 4) All new construction four floors or over in height, $0.17 per square foot total area, plus applicable inspection fees as required O) ELECTRICAL PERMIT REVIEW FEES 1) Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required 2) New construction review fee of $0.055 per square foot total area, with a minimum of $100.00 3) All construction four floors or over in height: review fee of $0.09 per square foot total area 4) The minimum for any electrical permit review fee shall be $50.00 per unit or tenant space plus applicable inspection fees as required P) PLUMBING AND GAS PERMIT REVIEW FEES 1) Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required 2) New construction review fee of $0.055 per square foot total area, with a minimum of $100.00 3) All construction four floors or over in height: review fee of $0.07 per square foot total area 4) Replacement of a like kind residential grade electric water heater within a residential dwelling unit that is located within an attached and/or multi-unit structure shall be computed at $35.00 (fee includes 1 inspection) 5) Lawn sprinkler system permit, no application fee and shall be computed at $35.00 for initial inspection 6) Gas permit review fee shall be computed as follows: a. Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required b. The minimum for any gas permit review shall be $50.00 per unit or tenant space plus applicable inspection fees as required. 7) Grease traps: additional fee of $50.00 shall be assessed for each grease trap 8) Retrofit piping shall be computed at the minimum fee of $50.00 per floor for each main riser Q) MECHANICAL PERMIT REVIEW FEES 1) Valuation of construction costs up to $4,999.99, $50.00 plus applicable inspection fees as required 2) New construction review fee of $0.055 per square foot total area, with a minimum of $100.00 3) All new construction four floors or over in height, review fee of $0.07 per square foot total area 11.D.2 Packet Pg. 336 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 12 4) The minimum mechanical permit review fee shall be $50.00 per unit or tenant space plus applicable inspection fees as required 5) The cost of retrofit piping shall be computed at the minimum fee of $50.00 per floor for each cooling tower 6) Residential Air Conditioning Change out permits, $15.00 processing fee plus $45.00 for initial inspection R) SOLAR PERMIT REVIEW FEES 1. Pool and domestic water heater permits, $30.00 application fee plus $35.00 per inspection 2. Photovoltaic permits, application fee of $50.00 each trade plus $35.00 per inspection S) FIRE PREVENTION AND CONTROL PERMIT FEES 1) Please refer to the Fire Code Office regarding their Fire Prevention and Control Permit Fees. T) MOBILE HOME/OFFICE TRAILER AND OTHER TRAILER PERMIT FEES a. The permit fee shall be $40.00 to set-up a single-wide trailer or mobile home on an approved site plus electrical, plumbing, mechanical, inspection and fire protection fees as applicable. b. The permit fee shall be $65.00 to set-up a double wide or larger mobile homes on an approved site plus electrical, plumbing, mechanical, inspection and fire protection fees as applicable. U) POOL OR SPA PERMIT FEES 1) For construction of each public pool or spa the fee shall be: a. Valuation of construction costs of up to $4,999.99 $100.00 b. Valuation of construction costs of $5000.00 through $49,999.99 $80.00 plus $7.00 per thousand dollars, or fraction thereof, of building valuation in excess of $2,000.00 c. Valuation of construction costs of $50,000.00 through $1,000,000.00 $333.00 plus $3.00 per thousand dollars, or fraction thereof, of building valuation in excess of $50,000.00 d. Valuation of construction costs over $1,000,000.00 $3,474.00 plus $3.00 per thousand dollars, or fraction thereof, of building valuation in excess of $1,000,000.00 2) For construction of each private pool or spa the fee shall be: $50.00 application plus applicable inspection fees as required 3) Resurfacing pool permits shall be computed at a rate of $50.00 plus applicable inspection 4) Above ground pool permits, no review fee and shall be computed at $35.00 for initial inspection V) FENCES 1) $35.00 application fee plus $35.00 per inspection as required W) SIGN PERMIT FEES 1) Sign permit fees will be calculated in accordance with all applicable Building Permit Fees and Electrical Permit Fees outlined in this document, the Collier County Development Services Fee Schedule. The minimum building permit fee for sign shall be $100.00. 2) Multiple signs of the same type (i.e., wall signs) and for a single project may be allowed per one permit, however an appropriate fee shall be charged for each sign in accordance with the schedule set forth in the above subsection 1 of Sign Permit Fees. 11.D.2 Packet Pg. 337 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 13 X) REVISION AND AS BUILT PLAN REVIEW FEES; CORRECTIONS TO PLANS 1) PERMIT AND PLAN REVISIONS: the fee for each permit revision submitted after permit issuance shall be calculated using fee schedules outlined in Sections N through R above. The minimum permit fee for revisions to permitted projects shall be $50.00. 2) CORRECTIONS TO PLANS a. First Correction to Plans No charge b. Second Correction to Plans $65.00 c. Third & subsequent correction to plans $90.00 Y) PERMIT EXTENSION 1) The filing fee for each permit extension shall be equal to 10% of the original building permit fee or $100.00, whichever is greater, but shall not exceed $500.00. The filing fee is intended to cover the cost of reviewing existing or amended building plans to determine and verify code compliance Z) DEMOLITION OF BUILDING OR STRUCTURE PERMIT FEES 1) The permit fee shall be $20.00 application for the demolition of any building or structure; plus applicable inspection fees as required. AA) INSPECTION AND REINSPECTION FEES 1) All required and partial inspections: $45.00 per inspection 2) Re-inspections for any type of building permit shall result in an additional fee of $60.00 per re-inspection 3) An inspection fee of $90.00 shall be assessed for all inspections on a time specified basis BB) FAILURE TO OBTAIN A PERMIT 1) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and where such action was cited by Code Enforcement or by Contractor Licensing and resulted in a finding of violation from either the Code Enforcement Board, the Special Magistrate, or the Contractor Licensing Board, the fees herein specified shall be 2x the regular fee, as defined in this fee schedule, unless otherwise directed by the Collier County Board of County Commissioners. 2) Where work for which a permit is required is started or proceeded with prior to obtaining said permit and where a contractor or agent/provider where the building official or zoning official or his/her designee, (for cases involving land use development) deems that the contractor/provider should have kn own that a permit was required but voluntary seeks voluntary compliance by obtaining the necessary permits to abate the violation, the fees herein specified shall be 2x the regular fee, as defined in this fee schedule. 3) Where work for which a permit is required is started or proceeded with prior to obtaining said permit, and where the unpermitted work may or may not have been completed by the property owner, and where the current owner seeks voluntary compliance by obtaining said permit to assure compliance with all applicable codes, the fees will be assessed at the regular rate as defined in this fee schedule. 4) The payment of such fee shall not relieve any person from fully complying with the requirements of any applicable construction code or ordinance in the execution of the work, or from any penalty prescribed within any construction code, law or ordinance of Collier County. 5) The fees within section EE shall not be applicable for the re-issuance of any missing permit, missing certificate of occupancy, or missing certificate of completion that was presumed to be issued prior to April 1, 1997, upon the verification of such items presented by the property owner, or his/her designee, to the building official, or his/her designee; but shall be applicable for all reviews requiring inspection, review of plans, and all other applicable fees associated with the issuance of said permit(s), certificate of occupancy, or certificate of completion, as determined by the building official, or his/her designee, in addition to the zoning director, or his/her designee (for cases involving land use development), as defined within this fee schedule. 11.D.2 Packet Pg. 338 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 14 CC) LICENSING 1) The fee for licensing items is as follows: a. Letters of Reciprocity $55.00 b. Contractors Change of Status (active to dormant) $10.00 c. Voluntary Registration of State Certified Contractors $45.00 d. Fee for a 6 month temporary contractor’s license $55.00 e. Certified copies of Experience letters $35.00 f. Duplicate or replacement (of Competency cards) $25.00 g. Second entity application fee $105.00 2) Certificate of Competency (Annual) a. Contractor Initial License Fee $230.00 Renewal Fee $145.00 b. Specialty Contractor Initial License Fee $205.00 Renewal Fee $125.00 c. Journeyman Initial License Fee $80.00 Renewal Fee $55.00 3) Dormant Certificates of Competency (Annual) a. Contractor $130.00 b. Specialty Contractor $130.00 c. Penalty fees after 9/30 $20.00 per month until 12/31 4) Reinstatement of Delinquent License a. Contractor $230.00 plus back years b. Specialty Contractor $205.00 plus back years c. Journeyman $80.00 plus back years d. Examination Administrative Fee $130.00 good for 6 months DD) DUPLICATE PERMIT CARDS 1) The fee shall be $5.00 for the issuance of a duplicate permit card for whatever reason EE) CHANGE OF CONTRACTOR OR SUBCONTRACTORS 1) To record a change of contractor or subcontractor, on a permit that has been issued, the fee shall be $40.00. This fee includes the issuance of a new permit card. FF) PERMIT FEE REFUNDS A) Building Permit Review Standards apply to all internal Growth Management Department, Development Services reviews for building permit applications with previously approved site plans, including all required trade reviews, along with any required Zoning, Engineering and Impact Fee reviews. Reviews external to Growth Management Department, Development Services, such as a Fire, are excluded. The performance standard time frame begins upon submission of the application, and runs until either issuance of a comment letter or at approval. Review standard guarantees require the submission of a sufficient number of plan sets (to be determined by the Building Department) to accommodate parallel trade reviews. 1) New Residential construction reviews will be completed wit hin 5 business days (if longer than 5 business days 50% of review fee refunded). 2) New Commercial construction reviews will be completed within 15 business days (if longer than 15 business days 50% of review fee refunded). 3) Alterations, Additions and Minor Permits: a. Residential permit application reviews will be completed within 5 business days (if longer than 5 business days 50% of review fee refunded). 11.D.2 Packet Pg. 339 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 15 b. Commercial permit applications requiring only a single trade review and will be completed within 5 business days (if longer than 5 business days 50% of review fee refunded). c. Commercial permit applications requiring 2 or 3 trade reviews will be completed within 10 business days (if longer than 10 business days 50% of review fee refunded). B) Annual Fee Adjustments: 1) Proposed Annual Fee adjustments for Building Department fees shall equal the average personnel cost change (COLA plus average merit) approved by the BCC as part of that fiscal year’s budget, adjusted for any change in staffing levels. 2) Annual fee adjustments will become effective on Jan 1 of each fiscal year if approved. 3) Annual fee adjustments require full review and recommendation to the BCC from the Development Services Advisory Committee. Annual fee adjustments also require full BCC approval. 4) Annual fee adjustments require Building Fund total reserves to be less than 6 months of the Building Fund operating budget for that fiscal year. If reserves exceed six months of budgeted operating expenses, no annual adjustment can be requested. C) Special Fee Adjustment: 1) If Building Fund total reserves are projected to exceed six months of operating expenses in the proposed budget of any upcoming fiscal year, fees will be lowered in sufficient amount to insure Building Fund reserves remain under six months of budgeted expenses. 2) If Building Fund total reserves are projected to fall below three months of operating expenses in the proposed budget of any upcoming fiscal year, a special fee increase in sufficient amount to insure Building Fund total reserves remain over three months of budgeted expenses will be proposed for full Development Services Advisory Committee review and BCC approval. 3) Six months following any fee adjustment, other than annual increases, a full review of resulting revenue will be presented for the review of the Development Services Advisory Committee. The committee can make a recommendation to the BCC to lower fees if revenue exceeds either revenue projections used in fee adjustment calculations or targeted reserve levels. GG) RECORD RETRIEVAL 1) No charge for normal retrieving of records from inactive or remote storage including microfilmed documents 2) Next day expedited retrieval of records from inactive or remote storage $75.00 HH) COPY FEES 1) The fee for blueprint and miscellaneous copying shall be as follows: a. Microfilm copies, of documents less than 11x17 inches: $0.15 other sizes at cost of production. b. Microfilm or Blueprint copies: 18X24 $1.25 per page 30 X 36 $2.50 per page 30 X 42 $3.25 per page 34 X 44 $5.00 per page c. Growth Management/Planning & Regulation self-service copier, public access and not related to public record retrieval or public record copies: documents less than 14x8.5 inches $0.15 per page inclusive of sales tax. II) CERTIFICATE TO BOARD BUILDING 1) Initial Boarding Certificate $150.00 2) Boarding Certificate Extension $150.00 JJ) ADDITIONAL FEE REFUND PROVISIONS 1) Requests for fee waivers may only be approved by the Board. Waiver requests for development review and building permit fees shall be submitted in writing directly to the appropriate Development Services Staff, who will prepare an executive summary for consideration by the Board. Such requests shall include a 11.D.2 Packet Pg. 340 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 16 statement indicating the reason for the fee waiver request and, if applicable, the nature of the organization requesting the fee waiver. KK) REFUND PROVISIONS 1) PAYMENT OF FEES: Full payment of fees is required for a complete application. Department policy requires full payment of fees at the time of application submittal. No work will begin on staff review of the application until all fees are paid in full. If full payment of fees is not received within 14 calendar days of application submittal, the application will be considered void. At this point, a new application and full payment of fees will be required to proceed with a project. 2) There will be no refund of Building, Planning, Environmental, or Engineering related fees, except those applications which have been deemed not sufficient for staff review or inspection and withdrawn by the applicant. Either the applicant or payer may, within 4 years of the date of payment apply for a refund for only those staff review or inspection services that were not performed. Failure to make timely application for a refund shall waive any right to a refund. The application for a refund shall be filed with the County Manager of his/her designee and shall contain the following: a. The name and address of the applicant b. The location of the property upon which the development was proposed c. The date the specified fee was paid d. A copy of receipt of payment; and e. Payment of a non-refundable “refund processing fee” equal to one percent (1%) of the refund requested, except that the minimum processing fee shall be $25.00 and the maximum processing fee will not exceed $250.00 Refund requests totaling $25,000.00 or more cannot be approved administratively and must be submitte d to the Board for approval. 3) In no cases will there be refunds for pre-application fees, data conversion fees, appeals of administrative decisions, or appeals to the Board of Zoning Appeals or Building Board of Adjustment. 4) If staff error causes the inappropriate or unnecessary filing of an application and payment of fees, 100 percent of all inappropriate fees, shall be refunded upon written request and with the concurrence of Department management. LL) ADDITIONAL FEE PROVISIONS 1) In those cases where alternative methods or timing of payments for Growth Management Department services and/or fees listed in this schedule associated with SBR reviews are deemed to best serve the public good, the Growth Management Department, Department Head will have the authority to approve such alternatives. Such alternatives must be in writing and signed by all principals involved. In no case shall final C.O. or such certifications of project completeness be issued until payments due the Growth Management Department are received in full. 2) All hourly fees are computed and charged from actual Divisional time tracking records. 3) All acreage totals used in fee calculations will be rounded up to the nearest whole acre. 4) When deemed essential for project review or approval, there will be no additional charge for any meetings requested by Growth Management Department staff. 11.D.2 Packet Pg. 341 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) Page 17 MM) “PAYMENT IN LIEU OF” FEE FOR PATHWAYS (SIDEWALKS, AND BIKE LANES) 1) Calculated using the current Florida Department of Transportation (FDOT) construction costs or an engineering estimate not to exceed twenty-five percent (25%) of the submitted application request’s total project cost. NN) OPTIONAL TEMPORARY CERTIFICATE OF OCCUPANCY 1) $250.00 for commercial, over 30,000 sq. ft $500.00 1) $100.00 for residential This is the last page of the Growth Management Department, Development Services Fee Schedule 11.D.2 Packet Pg. 342 Attachment: Fee Schedule 10012017 clean (3175 : Targeted Fee Schedule Reductions) 11.D.4 Packet Pg. 364 Attachment: 2017 NACo Achievement Award Inspections (3175 : Targeted Fee Schedule Reductions) 11.D.4 Packet Pg. 365 Attachment: 2017 NACo Achievement Award Inspections (3175 : Targeted Fee Schedule Reductions)