Loading...
Agenda 05/23/2017 Item #16C 205/23/2017 EXECUTIVE SUMMARY Recommendation to approve a $377,986 work order under Request for Quotation 14-6213-97 to Quality Enterprises USA, Inc., under Project Number 70172, “Gulf Shore Drive Asbestos Water Main Abandonment Phase 2;” and authorize the necessary budget amendment. OBJECTIVE: To abandon a section of asbestos concrete (AC) water main to provide a compliant and reliable potable water system to the Collier County Water -Sewer District customers in the Gulf Shore Drive community, located north of Vanderbilt Beach Road and south of Bluebill Avenue. CONSIDERATIONS: The proposed scope of work under Project No. 70172, “Gulf Shore Drive Asbestos Water Main Abandonment Phase 2,” is consistent with the Capital Improvement Program (CIP) contained in the 2014 Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water Master Plan/CIP Plan approved by the Board of County Commissioners (Board) on November 10, 2015, as Agenda Item 9C, as Appendix III of the 2015 AUIR/CIE. The proposed Gulf Shore Drive Water Main Abandonment-North Project is located on Gulf Shore Drive from Bluebill Avenue to Bayshores Condominiums (10475 Gulf Shore Drive). The Project will consist of abandoning approximately 2,070 linear feet (LF) of 8” AC water main and transferring its connections to the existing 16” ductile iron pipe (DIP) water main. The location of the 8” AC and 16” DIP water mains vary throughout the project. In the northern portion from Bluebill Avenue to 10701 Gulf Shore Drive, the 8” AC water main is located on the west side and the 16” DIP water main on the east side of Gulf Shore Drive. The middle portion, from 10701 Gulf Shore Drive to 10691 Gulf Shore Drive, the 16” water main crosses the road and both mains run along the west side of Gulf Shore Drive. T hroughout the southern portion from 10691 Gulf Shore Drive to 10475 Gulf Shore Drive, the 16” main continues along the west side of Gulf Shore and the 8” AC crosses the road and runs along the east side to the south end of the Project at 10482 Gulf Shore Drive. The condition of this asset is defined as “Red: Level 3 - Risked Compliance,” as reported to the Board at the October 1, 2013 Asset Assessment and Management Workshop. The asbestos concrete water main has reached the end of its useful life, and presents significant risk due to its materials, age, and condition. Small leaks and breaks can easily become large failures, as evidenced by past incidents along this street, affecting more residents for longer periods of time. There are a limited number of isolation valves in the area, hindering operational control during maintenance of the distribution system. This potable water main project will benefit the Gulf Shore Drive community by increasing reliability and improving water quality. Request for Quotation 14-6214-97, “Gulf Shore Drive Asbestos Water Main Abandonment Phase 2,” was posted on February 28, 2017, and distributed to all vendors of the Fixed -Term Underground Utilities Contract 14-6213 via the county’s electronic bid process. Of the six vendors notified, five submitted quotations by the deadline. The quotations received March 15, 2017, are summarized in the table below: VENDOR QUOTE Quality Enterprises USA, Inc. $377,986 Kyle Construction, Inc. $488,900 Mitchell & Stark Construction Company, Inc. $733,500 Haskins, Inc. $767,200 Douglas N. Higgins, Inc. $817,000 No quotes were received from Southwest Utility. 16.C.2 Packet Pg. 587 05/23/2017 The quote specifications informed the respondents there may be unforeseen conditions associated with the project. The quote amount incorporates an allowance of $40,000 for owner-directed allowance for work related to unforeseen conditions including, but not limited to, conflicts with existing facilities not reflected in record drawings and modifications or repairs resulting from unforeseen utility work associated with this project. The price for any needed additional work will be negotiated prior to commencement in accordance with the county’s Procurement Ordinance and the terms of the agreement. County staff determined the lowest bid to be fair and reasonable and recommends awarding the project to Quality Enterprises, Inc., the lowest responsive and qualified vendor. The bid received was 24 percent less than the engineer’s cost opinion. In its recommendation letter, dated M arch 27, 2017 (Attachment 4), the design professional, RWA, Inc., recommends awarding the project to Quality Enterprises USA, Inc., who has a satisfactory performance and warranty record on previous, similar, utility-related projects. FISCAL IMPACT: The source of funding is Water User Fees, Fund (412). A budget amendment is required to transfer funds from Project 70130 in the amount of $650,000. The budget amendment is necessary to cover the construction cost, construction administration cost, construction inspection cost and to purchase the construction materials. The project is expected to be completed in 2017. This is a replacement project; therefore, operating costs are not expected to change. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval. -SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities and to remain in compliance with all regulatory programs. RECOMMENDATION: Approve a $377,986 work order under Request for Quotation 14-6213-97 to Quality Enterprises USA, Inc., authorize the necessary budget amendment; and, authorize the Chair to sign the attached Work Order. Prepared By: Benjamin N. Bullert, P.E., Senior Project Manager, Engineering and Project Management ATTACHMENT(S) 1. Attachment No 1 - RFQ 14-6213-97 Quote Tabulation (PDF) 2. Attachment No 2 - RFQ 14-6213-97 Quote Analysis (PDF) 3. Attachment No 3 - RFQ 14-6213-97 Quality_RFQ Form (PDF) 4. Attachment No 4 - RFQ 14-6213-97 Recommendation Letter (PDF) 5. Attachment No 5 - RFQ 14-6213-97 Work Order (PDF) 16.C.2 Packet Pg. 588 05/23/2017 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.2 Doc ID: 3024 Item Summary: Recommendation to approve a $377,986 work order under Request for Quotation 14-6213-97 to Quality Enterprises USA, Inc., under Project Number 70172, “Gulf Shore Drive Asbestos Water Main Abandonment Phase 2;” and authorize the necessary budget amendment. Meeting Date: 05/23/2017 Prepared by: Title: – Public Utilities Planning and Project Management Name: Benjamin Bullert 04/19/2017 11:29 AM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 04/19/2017 11:29 AM Approved By: Review: Water Steve Messner Additional Reviewer Completed 04/19/2017 11:37 AM Public Utilities Department Margie Hapke Additional Reviewer Completed 04/19/2017 12:37 PM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 04/19/2017 1:01 PM Procurement Services Lissett DeLaRosa Level 1 Purchasing Gatekeeper Completed 04/19/2017 2:25 PM Water Pamela Libby Additional Reviewer Completed 04/19/2017 4:15 PM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 04/19/2017 4:29 PM Public Utilities Planning and Project Management Oscar Martinez Additional Reviewer Completed 04/19/2017 10:16 PM Procurement Services Kristofer Lopez Additional Reviewer Completed 04/21/2017 10:55 AM Procurement Services Swainson Hall Additional Reviewer Completed 04/21/2017 5:12 PM Procurement Services Ted Coyman Additional Reviewer Completed 04/25/2017 9:39 AM Public Utilities Department Heather Bustos Level 1 Division Reviewer Completed 04/26/2017 12:52 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 05/01/2017 12:18 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 05/01/2017 4:58 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 05/02/2017 7:59 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/02/2017 8:46 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 05/15/2017 10:50 AM 16.C.2 Packet Pg. 589 05/23/2017 County Manager's Office Leo E. Ochs Level 4 County Manager Review Completed 05/15/2017 3:12 PM Board of County Commissioners MaryJo Brock Meeting Pending 05/23/2017 9:00 AM 16.C.2 Packet Pg. 590 Quality Enterprises Kyle Construction Mitchell & Stark Haskins, Inc.DN Higgins Southwest Utility Lump Sum 7,014.00$ 24,000.00$ 7,750.00$ 30,000.00$ 8,000.00$ -$ Lump Sum 30,405.00$ 43,000.00$ 44,100.00$ 40,000.00$ 84,000.00$ -$ Lump Sum 32,121.00$ 44,000.00$ 51,000.00$ 60,000.00$ 84,000.00$ -$ Lump Sum 30,303.00$ 52,000.00$ 51,000.00$ 54,000.00$ 84,000.00$ -$ Lump Sum 5,130.00$ 5,500.00$ 8,900.00$ 14,000.00$ 6,000.00$ -$ Lump Sum 29,529.00$ 43,000.00$ 51,000.00$ 70,000.00$ 84,000.00$ -$ Lump Sum 17,307.00$ 14,000.00$ 51,000.00$ 31,000.00$ 15,000.00$ -$ Lump Sum 31,695.00$ 46,000.00$ 53,300.00$ 73,000.00$ 88,000.00$ -$ Lump Sum 20,430.00$ 14,000.00$ 97,000.00$ 14,000.00$ 28,000.00$ -$ Lump Sum 32,655.00$ 46,000.00$ 51,000.00$ 68,000.00$ 84,000.00$ -$ Lump Sum 34,545.00$ 41,000.00$ 51,000.00$ 89,000.00$ 86,000.00$ -$ Lump Sum 36,723.00$ 46,000.00$ 62,500.00$ 86,000.00$ 86,000.00$ -$ Lump Sum 5,745.00$ 5,400.00$ 11,200.00$ 7,200.00$ 7,000.00$ -$ Lump Sum 24,384.00$ 25,000.00$ 102,750.00$ 91,000.00$ 33,000.00$ -$ $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 -$ TOTAL 377,986.00$ 488,900.00$ 733,500.00$ 767,200.00$ 817,000.00$ No Quote Opened By: Swainson Hall, Procurement Strategist Witnessed By: Evelyn Colon, Procurement Strategist Interconnection at 10951 Gulf Shore Dr. (Detail "B") Bluebill Ave. and Gulf Shore Dr. (Detail "A") Crossing #1 (11125 Gulf Shore Dr.) Crossing #2 (11125 Gulf Shore Dr.) Crossing #3 (10951 Gulf Shore Dr.) RFQ 14-6213-97 Gulf Shore Drive North Water Main Abandonment Quote Tabulation Gulf Shore Dr. Abandonment Allowance Crossing #4 (10951 Gulf Shore Dr.) Crossing #5 (10701 Gulf Shore Dr.) 10482 Gulf Shore Dr. (Detail "F") Crossing #8 (10562 Gulf Shore Dr.) Water Main Connection at 10686 Gulf Shore Dr. (Detail "C") Crossing #6 (10620 Gulf Shore Dr.) North and South Fire Hydrants (10701 Gulf Shore Dr.)(Detail "D" and "E") Crossing #7 (10620 Gulf Shore Dr.) 16.C.2.a Packet Pg. 591 Attachment: Attachment No 1 - RFQ 14-6213-97 Quote Tabulation (3024 : Gulf Shore Drive Asbestos $200,000.00$300,000.00$400,000.00$500,000.00$600,000.00$700,000.00$800,000.00$900,000.00$1,000,000.00Eng Est QualityEnterprisesKyle Construction Mitchell & Stark Haskins DN HigginsResults for RFQ 14‐6213‐97Gulf Shore Drive North Water Main AbandonmentKEY:Dashed Green‐AVERAGE BIDDashed black‐+/‐ 1 std devof avg bid 16.C.2.b Packet Pg. 592 Attachment: Attachment No 2 - RFQ 14-6213-97 Quote Analysis (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - North) 16.C.2.c Packet Pg. 593 Attachment: Attachment No 3 - RFQ 14-6213-97 Quality_RFQ Form (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - 16.C.2.d Packet Pg. 594 Attachment: Attachment No 4 - RFQ 14-6213-97 Recommendation Letter (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - 16.C.2.e Packet Pg. 595 Attachment: Attachment No 5 - RFQ 14-6213-97 Work Order (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - North) 16.C.2.e Packet Pg. 596 Attachment: Attachment No 5 - RFQ 14-6213-97 Work Order (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - North) 16.C.2.e Packet Pg. 597 Attachment: Attachment No 5 - RFQ 14-6213-97 Work Order (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - North) 16.C.2.e Packet Pg. 598 Attachment: Attachment No 5 - RFQ 14-6213-97 Work Order (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - North) 16.C.2.e Packet Pg. 599 Attachment: Attachment No 5 - RFQ 14-6213-97 Work Order (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - North) 16.C.2.e Packet Pg. 600 Attachment: Attachment No 5 - RFQ 14-6213-97 Work Order (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - North) 16.C.2.e Packet Pg. 601 Attachment: Attachment No 5 - RFQ 14-6213-97 Work Order (3024 : Gulf Shore Drive Asbestos Water Main Abandonment Phase 2 - North)