Loading...
Agenda 05/23/2017 Item #16A 605/23/2017 EXECUTIVE SUMMARY Recommendation to approve final acceptance of the potable water and sewer facilities for Signature Club Circle Phases 1-2, PL20140002527, accept unconditional conveyance of a portion of the potable water facilities, and authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $33,387.33 to the Project Engineer or the Developer’s designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance of the potable water and sewer facilities, accept unconditional conveyance of a portion of the potable water facilities, and to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $33,387.33, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Signature Club Circle Phases 1-2, has constructed the potable water and sewer facilities within dedicated easements to serve this private development. A portion of the potable water facilities will be conveyed to the County, as described in Official Records (O.R.) Book 5226, Page (PG) 226. The remaining potable water facilities and all sewer facilities will be private. 2) Preliminary acceptance of these utility facilities was approved by the Development Review staff on August 24, 2015. At that time, the value of these potable water utility facilities (assets) was $88,896.00. 3) Staff recorded all preliminary acceptance documents associated with the potable water facilities conveyed to the County in the public records of Collier County, which were reviewed and approved by the County Attorney’s office as to form and legality. The County acquired its interest in a portion of the potable water facilities by Utilities Facilities Warranty Deed and Bill of Sale recorded in Official Records Book 5226, at page 226 of the Public Records of Collier County, Florida. 4) The potable water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period, following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by staff on January 23, 2017, in coordination with Public Utilities. These facilities have been found to be satisfactory and acceptable. 6) The on-site potable water and sewer utilities, less the potable water utilities described in O.R. Book 5226, PG 226, are owned and maintained by the developer. 7) Staff recommends final acceptance of the subject utility facilities and release the Utility Performance Security (UPS) and Final Obligation Bond in the total amount of $33,387.33. 8) This final acceptance is in accordance with Collier County, Ordinance No. 2004-31, as amended. 9) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. 16.A.6 Packet Pg. 238 05/23/2017 FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. However, approval of this Executive Summary will result in the Collier County Water -Sewer District receiving unconditional title to a portion of the potable water utility facilities, which at the time of preliminary acceptance, had a total gross value of $88,896.00 (no depreciation applied). GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this action. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval -SAS RECOMMENDATION: To approve final acceptance of the potable water and sewer facilities for Signature Club Circle Phases 1-2, PL20140002527, accept unconditional conveyance of a portion of the potable water facilities, and authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $33,387.33 to the Project Engineer or the Developer’s designated agent. Prepared by: Melissa Alvarez, Operations Coordinator, Development Review Division ATTACHMENT(S) 1. Location Map - Signature Club Circle Phases 1 and 2 (PDF) 2. Asset Sheet - Signature Club Circle Phases 1 and 2 (PDF) 3. Exhibit A - Signature Club Circle Phases 1 and 2(PDF) 16.A.6 Packet Pg. 239 05/23/2017 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.6 Doc ID: 3051 Item Summary: Recommendation to approve final acceptance of the potable water and sewer facilities for Signature Club Circle Phases 1-2, PL20140002527, accept unconditional conveyance of a portion of the potable water facilities, and authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $33,387.33 to the Project Engineer or the Developer’s designated agent. Meeting Date: 05/23/2017 Prepared by: Title: Operations Coordinator – Growth Management Development Review Name: Melissa Alvarez 04/12/2017 11:39 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 04/12/2017 11:39 AM Approved By: Review: Water Pamela Libby Additional Reviewer Completed 04/12/2017 11:43 AM Water Steve Messner Additional Reviewer Completed 04/12/2017 2:09 PM Engineering & Natural Resources Jack McKenna Additional Reviewer Completed 04/12/2017 3:12 PM Growth Management Department Jeanne Marcella Level 1 Division Reviewer Completed 04/12/2017 3:54 PM Growth Management Operations & Regulatory Management Stephanie Amann Additional Reviewer Completed 04/13/2017 4:54 PM Growth Management Department Matthew McLean Additional Reviewer Completed 04/14/2017 10:17 AM Growth Management Department Melissa Alvarez Level 2 Division Administrator Skipped 04/12/2017 12:54 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 04/18/2017 3:05 PM Growth Management Department James French Additional Reviewer Completed 04/26/2017 10:59 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 04/27/2017 8:43 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 05/01/2017 9:58 AM Budget and Management Office Mark Isackson Additional Reviewer Completed 05/10/2017 11:44 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 05/14/2017 10:20 PM Board of County Commissioners MaryJo Brock Meeting Pending 05/23/2017 9:00 AM 16.A.6 Packet Pg. 240 16.A.6.a Packet Pg. 241 Attachment: Location Map - Signature Club Circle Phases 1 and 2 (3051 : Final Utilities TOTAL PROJECT NAME: LOCATION: CERTIFICATION OF CONTRTBUTORY ASSETS' COUNTY SION,'ITURE CLUB PHA9EA I & 2 SEctroN 27, TowNgHlP 5() S, R^NoE 26 E coLUER cOUXTY' FLo8lDA STOCK DEVELOPMET{T' LLC 2647 PioFEBBloraaL ctF. srE t 2() I NAFLEB, FL 3{I T 9 NAITIE & ADORESS OF Or,vNER: TYPE OF UTILITY SY!;TEM: POTABLE WATER (MATERIALS ONLY) ITEM DE5CRIPTION CIUArtiITY 2" oouar-E WatEi sElvlcE'COMPTE E It t7 34 1,556 68 30 a 5 2 a I UNIT ljxrr PilcE 4" pVC W^rEi MAtr{ (c:gOO Cr.A3a 'l5(l) 4,' pVC WarER M^rN (CgOO Cr-^83 2OO) 8" pvc w^ati MatN (cgoo cr-Aaa l5o) 8" Pvc Wattl MarN (cgoo cu.8 2oo) I6tr PVC clartNo (cgoo cL 6. r50) 8" GarE valvE AIIIOI{ATTC FLJJSHINO DEVICE FIRE HYDEAN'I CoNNEcrlo E{dnNo WarER MalN THE FoEEool NEo ^.,.aO ^cKrtaowrEDcE' BEF.AE ,"E tH '," 1Qo^' ot -E/2', IA PEE'<'N.AI.LY I{NOW'N IO i'E AIIIO YYHO DID NO-r TAXE AN $a40.oo 36.OO $9.OO $ I A.OO t22.OO $49.OO s520.oo 3A6(,.OO 35,5AO.OO 33.26().OO 35OO.OO 39.24O.OO $376.OO 93()6.OO 329.604.OO $r.496,()() $1.470.OO rt4, t 6().()0 $4,3()0,oo 3' r, t 60.()0 $26,OAO.OO 35()().oo lE,oHEFIBYcEinFYiHATlHEc|UANTmEooFI\{.A.TEiIALoEscBIBEoAEovEAFEAtRUEANoAccURAYEEEPIEBENIAioNoFIHEBY'lElrl "t^o "o*,4*o to CoLuEtl CoulttY U.nunEa' lNc' CERTIFYI la 5 CH R. MTTCHET.L, P'E FL LrcEx.E a 5674(, OF: MITCHELL ENGINEERING GROUP. LLC 9! 28 sTl^o^ Pr'^cE, sulrE lo2OO N^PLEa' FLoRloa 341()8 IDO HEREEY CETNTYTHATTHE QUAl{llnE OF MATERIAL DEgCiIBED ABG,YE AEE A TiUE AND ACCURA'E iEFRE'EltI^rlON OF THE BYB'ET{ "a^o "o*",rtao to coLuaR couNrY l'rrl-rnEa' INC' CERTIFYING: oavlo c scaFlol, vP MTTCHELL & STARK CONSTRUCTION 6()()l SHIRLEV stREEt NaPLEs, FLoilDA 34109 STATE OF FLORIOA ) ) ss: COUNTY ()F COLLIER ) 3AA,696.OOTOTAL C 20/l-0-l I i{Bltl u l, Etar wa3 SEAL: G@PV EA LF LF LF LF LF EA EA EA EA EA 162074IF 2019EXPIRES: 16.A.6.b Packet Pg. 242 Attachment: Asset Sheet - Signature Club Circle Phases 1 and 2 (3051 : Final Utilities Acceptance - Signature Club Circle Phases 1 and 2 Exhibit A Utilities Performance Security (UPS) and Final Obligation Bond fhe 70% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-3L Attachments: 1. Verification of Final Cost 2. Receipt of Payment Amount Receipt Number 10% UPS Eond S29,387.33 2015235686 Fina I Obligation Eond S4,ooo.oo 2075234082 Total Amount S33,387.33 16.A.6.c Packet Pg. 243 Attachment: Exhibit A - Signature Club Circle Phases 1 and 2 (3051 : Final Utilities Acceptance - Signature Club Circle Phases 1 and 2 *-*'a,cot'o* oF F,NAL cosr - cou urF Signature Club Phases 1 & 2PROJECT NAME: LOCATION: TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS & LABOR) ITEM OESCRIPTION Quantity UNIT Unit P.ico TOTAL Ssction 27, Township 50 S, Rango 26 E Collier Count}/, Florida Stock Oev.lopmont, LLC 2647 Prof.ssional Ci.. Ste l20l Naple3, FL 34119 NAME E ADORESS OF OWNER 4- PVC Water Main (C900 Class 150) 4" PVC Water Main (C900 Class 200) 8" PVC Water Main (C900 Class 't50) 8" PVC Water Main (C900 Class 200) 16'PVC Casing (C900 Class 150) 4' Gate Valve I' Gate Valve Automatic Flushing Device Fire Hydrant Connect to Existing Water Main Temporary Sample Point R. Mitchell. P.E FL Licsnse # 56740 2 5c,q 47 34 1,656 68 30 8 5 2 E I 3 LF LF LF LF LF EA EA EA EA EA EA $18.00 s19.00 $28.00 s32.00 $s9.00 s920.00 $1,360.00 $6,580.00 14,260.00 14,030.00 3190.00 s846.00 s646.00 $46,368.00 $2.176.00 $1.770.00 $7,360.00 $6.800.00 $'t3,'160.00 934.080.00 $4.930.00 $570.00 CERTIFYING I do hereby certify that the es of material described above are a true and accurate representation of the as-installed system CERTIFYING: / David C Scafidi, VP MITCHELL & STARK CONSTRUCTION 6001 Shirley Stre€t Naples, Flodda 34109 STATE OF FLORIOA ) ) ss: couNTY oF coLLrER ) OF: MITCHELL ENGINEERING GROUP. LLC 9128 Strada Place, Suite '10200 Naples, Florida 34'108 oing instrum and acknowlodged belore me ttris { da V * Fp/n , z-/,*r who is personally known to me and who did nol take an oath h-zr-"--..-EElJilDA &mo8,qcllEB MY Co#rllsslot{ I FF 162074 EXPIRES: January 22, 2019 Eoln d Irru ihEy Putlic Und. ri- E@ z i":y. D o[ ^.]ltl I do hereby certity that the quantities of material described above are a tn/e and accurate representation of the as-installed system. $'t33,,146.00 The SEAL: t' 16.A.6.c Packet Pg. 244 Attachment: Exhibit A - Signature Club Circle Phases 1 and 2 (3051 : Final Utilities Acceptance - Signature Club Circle Phases 1 and 2 VERIFiCATIoN oF FINAL CosT - cou NTY- SIGN^IURE CLUB PHASES I & 2PROJECT NAME: LOCATION: NAME A ADDRESS OF OWNER: SECTTON 27, TOWI.SH|P 50 3, RAXOE 26 E COLLIER COUNIY! FLORTDA stocr( DEYEktPxExf , LLc 26{7 PRoFE3alortaat- Cri. sTE I 2Ol N.'Pa-E3, FL 34 I t 0 TYPE OF UTILITY SYSTEM: SANITARYSE\I!/ER (MATERIALS & LABOR) ITEM OESCRIPTION QuANrrtY UNIT UNtt PRICE TOTAL $750.OO $a I o.oo 517.94 $23.44 $2a.94 ii33.94 3rl,7E6,OO tE.79Z.OO t6,2! 3.OO s'7,646.OO i2,OOO.@ $4.OO $2O.OO $1.520.oo $4.A5O.OO $4,O72.9A 9t 2,7O4.4A $t 9.33 r .92 $4,2 t 3..I€l $ I 4,25a.OO tl r ,5a4,oo $r a,639.OO $22.93a,OO $2,OOO.OO $5,7t 6.00 $33,5AO.OO 2 Ct 227 2 €6A 212 3 2 3 3 I I,679 |,erg EA EA LF LF LF LF EA E-A EA EA EA LF LF CERTIFYIN Z c ER R. MIYCHELL, P.E. OF: MITCHELL ENGINEERING GROUP. LLC 9128 STRADA PTACE. SUrrE I O2CIO NAPLES. FLoRIDA 34I CX} I .'O HERESY CEKAFYTHAT THE OUANTITIEE OF ITIATERI,AL OEIBCRIBED AEOYE ARE A TiUE AND ACCUiAIE REPRESENTAIION OF THE A9 IT{gT LLED 3YSTEM. CERTIFYING: MITCHELL & STARK CONSTRUCNON 600 I SHIRLEY STREET NAPLES. FLORIDA 34I 09 STATE OFFLORIDA ) ) ss: COUNTY OF COLLIER ) sroi.ED AND A.KNo'r!.EDGTED BEFoRE raE TH o lo^, oa (a ,THE L, IYHO 13 PEi3OXALI-Y KNOWN TO I'E AND WHO DID NOI tAKE AN OATH. TOTAL COIIT EEI'IE5) 2Ct_ BY xGt SEAL: D oircrrydl 6" StracLE Pvc sEwER SERV|CE tv./ CLEANO(rI 6,.DOUaL.E PVC SEIYER SERVIcE w/ CI-EANoUT 8" PVC S^NrraRySEWER SDR,26 (0'6'Cur) 8" PVC SANFAiYSEWER SDR.26 (6,€'Cur) 8'PvC SaN]r^Ry 9EWER SDR-26 (8'-1C!'Cur) 8" PVC S^NrraRy SEWER SDR-26 fi O'-t Z,Cua) MANHoLE 4I DAMETER (o.€,} (IETCoATING) MANHoLE 4' DIAMETER (6,€) (IET coA'INc) MANHOLE 4t OAMETER (ATlO) (IETCOATINC) MANHoLE 4' O|AMETER (t OLt 2') (ET Co^Trxo) CoNNEcT To B(IsnNc MANHoLE TELEvt6toN tNipEc-rtoN RocK ExcavatroN - BLAsar 6 oR MEcHANtcaL FL LTCENSE T 56740 DAYID C SCAFIOI. VP I DO IIERESY CEETIFY THAT THE QUAITII'IEA OF MATER]AL DESCRIBED AEOVE AiE ATRIJE AND ACCURATE REPREgEN'AYION OF THEAg INgTALLED IYSTEM. FF 16n74 2,2019 16.A.6.c Packet Pg. 245 Attachment: Exhibit A - Signature Club Circle Phases 1 and 2 (3051 : Final Utilities Acceptance - Signature Club Circle Phases 1 and 2 Collier County Growth Management Division 2800 Horseshoe Drive N, Naples, FL i4lo4 239-252-2400 RECEIPT OF PAYMENT Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Paid: Change / Overage: Contact: FEE DETAILS: Ee-Pssslrli@ Refundable Bonds Cashier Name: Batch Number: Entered By: 2015235686 20 15 - 0161 54 03/30/20t5 $29,387.33 Pavment Method Check Amount Paid $33,387.33 check Number 22292 $33,387.33 $4,000.00 STOCK DEVELOPMENT LLC 2647 PROFESSIONAL CIR STE 1201NAPLES , FL 34TI9 Oriqinal Fee $29,3A7 .33 AmandaBayoumi 4356 melissaalvarez Reference Number P120140002527 Amount GlSgggttEl Paid $29,387.33 670-000000-220113 l,ot 16.A.6.c Packet Pg. 246 Attachment: Exhibit A - Signature Club Circle Phases 1 and 2 (3051 : Final Utilities Acceptance - Signature Club Circle Phases 1 and 2 a]-,rtt 'J-lo RECEIPT OF PAYMENT Receipt Number: Transaction Number: Date Paid: Amount Due: Payment Details: Amount Pa id: Change / Overage: Contact: FEE DETAILS: Fee Descriotion Refu nda ble Bonds Cashier Name: Batch Number: Entered By: 2015234082 2015-014550 03/23/207s $4,000.00 Pavment Method Check Reference Number PL20t40002527 Lea Derence 4338 melissaalva rez Amount Paid $4,000.00 Check Number 22224 GL Account 670-000000-220113 $4,000,00 $0.00 Stock Development, LLC 2647 PROFESSIONAL CIRCLE, STE 1201 Naples, FL 34119 Orioinal Fee $4,0 00.00 Amount Paid $4,00 0.00 Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 \lpc 16.A.6.c Packet Pg. 247 Attachment: Exhibit A - Signature Club Circle Phases 1 and 2 (3051 : Final Utilities Acceptance - Signature Club Circle Phases 1 and 2