Loading...
EAC Agenda 12/06/1995 COLLIER COUNTY ENVIRONMENTAL ADVISORY BOARD AGENDA DECEMBER 6, 1995; 9: 00 a.m. COMMISSION BOARDROOM, THIRD FLOOR--ADMINISTRATION BUILDING I. ROLL CALL II. APPROVAL OF MINUTES--November 1, 1995 III. ADDENDA IV. CONSENT/ADMINISTRATIVE APPROVAL AGENDA V. REGULAR AGENDA VI. OLD BUSINESS A. Water Management Plan Submittal Requirements B. Ongoing Environmental Monitoring Requirements VII. NEW BUSINESS VIII. ADJOURNMENT IX. WORKSHOP *********************************************************************** NOTES: A. [Board Members] : Notify the PLANNING SERVICES DEPARTMENT (643-8400) no later than 5 P.M. on Monday December 4, 1995, if you cannot attend this meeting or if you have conflict and thus will abstain from voting on a particular petition. B. [General Public] : Any person who decides to appeal a decision of this board will need a record of the proceedings pertaining thereto; and therefore may need to insure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. *********************************************************************** COMMUNITY DEVELOPMENT & ENVIRONMENTAL SERVICES DIVISION PLANNING SERVICES DEPARTMENT MEMORANDUM TO: Environmental Advisory Board Members FROM: Thomas E. Kuck, P.E.;;� ,, Engineering Review Manager RE: Water Management Review DATE: November 27 , 1995 This is in response to your recent request that Staff provide you with a written recommendation indicating what information, at a minimum should be submitted for conditional uses, preliminary plats and so on. Attached for your review is a list of various items related to conceptual water management review and detailed water management review. We have marked the items that we feel are necessary for submittal for our conceptual review and review by the EAB. We request that you provide direction on whether or not you want any of the other items included in the EAB Staff Reports and/or review packages. If you have any questions, please do not hesitate to call. TEK/ew/doc: 10114 Attachment cc: EAB Binder Reading File WATER MANAGEMENT REVIEWS EAB Req. Staff Rec. Minimum Requirements: Conceptual Water Management Plan: signed & sealed by a licensed P. E. , showing at a minimum: YES 1. Location map showing County drainage basins and receiving water (nearest main canal, creek, or river) YES 2. Project boundary showing internal sub-basins YES 3. Scale, North Arrow, Date, Title YES 4. Topography, inflows, discharge point, W.S.W.T. YES 5. Berm cross-sections YES 6. Lake cross-section if different from U.L.D.C. YES 7. Size and location of lakes, swales, and wet/dry retention/detention areas YES 8. Conservation Areas NO 9. Roads and parking areas NO 10. Structures NO 11. Discharge structure plan, elevation, and cross-section YES 12. Downstream receiving facilities, (cross-sections) YES 13. Anything else the engineer thinks we should know about. Detailed Water Management Calculations: YES 1. W.S.W.T/control elevations; allowable discharge; inflows YES 2. Control elevations of nearest SFWMD permitted projects to north, south, east, and west. NO 3. Impervious areas - roofs, parking, roads YES 4. Water management areas; lakes, retention/detention areas NO 5. Pervious areas and conservation areas; soil storage NO 6. Water quality computations NO 7. Stage/storage computations NO 8. Stage/Discharge computations and discharge weir geometry NO 9. Minimum road and building slab elevations YES 10. Tailwater elevation at peak of 25 year, 3 day storm YES 11. Adequate capacity and legal availability of downstream receiving water. NO 12. Copy of SFWMD Permit Application (in lieu of) YES 13. Anything else the engineer thinks we should know about. EAB/ew/doc:10113 MINUTES OF THE ENVIRONMENTAL ADVISORY BOARD DATE: December 6, 1995 TIME: 9 : 00 A.M. PLACE: 3rd Floor Boardroom, Administration Building, Collier County Government Center, Naples, Florida EAB STAFF PRESENT Hermanson X Arrived 9 : 02 Burgeson Hinchcliff X Chrzanowski X Foley X Kuck X Gore X Lenberger X Saadeh Excused Absence Mulhere X Straton X Seal X Wilkison X Ashton X MINUTES BY: Stephen Lenberger, Environmental Specialist II CALLED TO ORDER AT: 9 : 00 a.m. ADJOURNED AT: 10: 05 a.m. PRESIDING: Blair A. Foley, Chairman ADDENDA TO THE AGENDA: none APPROVAL OF MINUTES: Motion made by Ms. Straton, seconded by Dr. Gore and carried 5/0, to approve minutes of November 1, 1995 . Page 1 ENVIRONMENTAL ADVISORY BOARD DECEMBER 1, 1995 OLD BUSINESS: ITEM: Water Management Plan Submittal Requirements PUBLIC SPEAKERS: Steve Means of Wilson, Miller, Barton & Peek, Inc. COMMENTS: Staff was directed to prepare a revised Water Management Plan Submittal Requirement "Check Off" List for the next EAB meeting. For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F" , Collier County, Government Complex. ****** ITEM: Ongoing Environmental Monitoring Requirements COMMENTS: Staff was directed to evaluate the wildlife monitoring reports for Conditional Use Petition No. CU-92-26 (Everglades Private Airboat Tours) and to prepare a report for EAB members to review. For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F" , Collier County, Government Complex. ****** There being no further business, the meeting was adjourned by order of the Chair. Environmental Advisory Board Blair A. Foley, Chairman Page 2 CHECKLIST FOR SUBMITTAL OF WATER MANAGEMENT REVIEWS TO THE ENVIRONMENTAL ADVISORY BOARD Minimum Requirements A. Conceptual Water Management Plan (any size up to 24"x36", but must be legible) 1. Signed and sealed by Florida licensed P. E. 2 . Location map showing County drainage basin boundaries. 3 . Discharge point and description of downstream receiving facilities to nearest main canal, creek, river, or bay. (analysis and cross-section if required) . 4 . Existing ground elevation. 5. Offsite inflows and how they will be routed internally. 6. Water management berm cross-sections. 7 . Internal sub-basins. 8 . Scale, north arrow, date, title and project boundary. 9 . Lake cross-sections (if different from Collier County Land Development Code. 10. Size and location of lakes, swales, and wet/dry retention/detention areas. 11. Conservation areas. 12 . Miscellaneous pertinent data. B. Detailed Water Management Calculations 1. Wet season water table, dry season water table, control elevation, allowable discharge, inflows. 2 . Control elevation of nearest South Florida Water Management District (SFWMD) permitted project to N, E, W, and S. 3 . Water management areas - lakes and retention/detention areas. 4 . Tailwater elevations (offsite at peak of 25 year, 3 day storm. 5. Adequate hydraulic capacity and legal availability of downstream receiving water. 6. Miscellaneous pertinent data. 12/95 ew/doc. 10165