Loading...
EAC Agenda 03/02/1994 COLLIER COUNTY ENVIRONMENTAL ADVISORY BOARD AGENDA March 2, 1994; 9 : 00 a.m. COMMISSION BOARDROOM, THIRD FLOOR--BUILDING "F" I. ROLL CALL II . APPROVAL OF MINUTES--January 5, 1994 III . ADDENDA IV. CONSENT/ADMINISTRATIVE APPROVAL AGENDA All matters listed under this item are considered to be routine and action will be taken by one motion without separate discussion of each item. If discussion is desired by a member of the Board, that item(s) will be removed from the Consent Agenda and considered separately. V. REGULAR AGENDA A. Conditional Use Petition No. CU-94-2 and Commercial Excavation Permit No. 59 . 499 "APAC - Earthmining Section 20" Sections 17 , 20 and 29 , Township 49 South, Range 27 East Collier County, Florida VI . OLD BUSINESS VII. NEW BUSINESS A. Welcome new EAB member, Blair Foley. B. Recommendation for Land Development Code Amendment, Section 2 . 2 . 24 . 8 . VIII. ADJOURNMENT IX. WORKSHOP *********************************************************************** NOTES: A. [Board Members] : Notify PROJECT PLAN REVIEW (643-8470) no later than 5 P.M. on Monday, February 28, 1994, if you cannot attend this meeting or if you have conflict and thus will abstain from voting on a particular petition. B. [General Public] : Any person who decides to appeal a decision of this board will need a record of the proceedings pertaining thereto; and therefore may need to insure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. *********************************************************************** MINUTES OF THE ENVIRONMENTAL ADVISORY BOARD DATE: January 5, 1994 TIME: 9 : 00 A.M. PLACE: 3rd Floor Boardroom, Building "F" , Collier County Government Center, Naples, Florida EAB STAFF PRESENT Hermanson X Adarmes Hinchcliff X Burgeson Neale X Keene X Saadeh X Lenberger X Straton X Madajewski Turrell X Reischl X Wilkison X Seal Prynoski X MINUTES BY: Fred Reischl, Environmental Specialist II CALLED TO ORDER AT: 9 : 05 a.m. ADJOURNED AT: 10 : 00 a.m. PRESIDING: Michel Saadeh, Chairman ADDENDA TO THE AGENDA: NONE APPROVAL OF MINUTES: Unanimous approval of minutes for December 1, 1993 . Page 1 ENVIRONMENTAL ADVISORY BOARD January 5 , 1994 ****** PETITION NO: ST-93-14 "Brady Single Family Residence" FILED BY/FOR: Debi Kay Lee, agent for George and Michael Brady REQUESTING: The petitioner proposes to replace an existing mobile home with a modular home, repair and expand an existing septic system, drill a new well and place gravel to extend the present driveway, with alterations limited to 4% of the site. REPRESENTED BY: Debi Kay Lee COMMENTS: For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F" , Collier County, Government Complex. MOTION: Made by Ms. Straton, seconded by Mr. Neale and carried 7/0, to approve Petition No. ST-93-14 with Staff' s stipulations. STIPULATIONS: Environmental: 1. Permits or letters of exemption from the Department of Environmental Protection (DEP) , South Florida Water Management District (SFWMD) , U. S. Army Corps of Engineers (ACOE) and the Big Cypress National Preserve, shall be presented prior to issuance of County Building Permit. 2 . Minor changes may be administratively approved by the Site Development Review Director or his/her designee. 3 . Upon issuance, the building permit is subject to a forty-five (45) day appeal period by the Florida Department of Community Affairs. ****** MOTION: Made by Mr. Neale, seconded by Mr. Turrell and carried 7/0, to approve; to direct Staff to prepare an amendment to the Land Development Code to require that petitions for renovations to single family residences or mobile home replacements with an ST zoning overlay be placed on the EAB Consent Agenda. If the site is within the Big Cypress National Preserve, the preserve manager's approval shall be obtained prior to being placed on the consent agenda. Page 2 ENVIRONMENTAL ADVISORY BOARD January 5, 1994 PETITION NO: ST-93-15/CU-93-18 "Gator Airboat Tours" FILED BY/FOR: Timothy L. Hancock, Wilson, Miller, Barton & Peek, Inc. , agent for Robert L. Weeks REQUESTING: The applicant is proposing an airboat tour/exhibit facility. REPRESENTED BY: Timothy L. Hancock, Wilson, Miller, Barton & Peek, Inc. COMMENTS: For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F" , Collier County, Government Complex. MOTION: Made by Mr. Hermanson, seconded by Mr. Neale and carried 7/0, to approve Petition ST-93-15/CU-93-18 with modified stipulations. STIPULATIONS: Water Management: 1. A copy of the South Florida Water Management District Permit shall be provided prior to Final Site Development Plan approval. Environmental: 1. Permits or letters of exemption from the U.S. Army Corps of Engineers and Florida Department of Environmental Protection shall be presented for the boat dock prior to the issuance of a building permit. 2 . Minor changes may be administratively approved by the Site Development Review Director or his/her designee. 3 . Prior to a Certificate of Occupancy all exotic vegetation as defined by the County Land Development Code shall be removed from the approved final site development plan (FSDP) development footprint. All developed areas shall be maintained exotics free (Collier County Land Development Code Section 2 .2 .24 . 7 . 4 . 18) . Page 3 ENVIRONMENTAL ADVISORY BOARD January 5, 1994 4 . Upon issuance, the building permit is subject to a forty-five (45) day appeal period by the Florida Department of Community Affairs. ****** PETITION NO: Development Excavation Permit No. 59 . 496 "Naples Landfill" FILED BY/FOR: Office of Capital Projects Management for Board of County Commissioners REQUESTING: The petitioner proposes to perform excavation work which is incidental to and part of drainage improvements necessary to bring the existing landfill site into compliance with the recently issued South Florida Water Management District permit. The petitioner has requested substitutions to the construction requirements set forth by Section 3 . 5 . 7 of the Land Development Code. REPRESENTED BY: Karl Boyer, P. E. - Office of Capital Projects Management COMMENTS: For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F" , Collier County, Government Complex. MOTION: Made by Mr. Hermanson, seconded by Mr. Wilkison and carried 7/0, to approve Petition Development Excavation Permit No. 59 . 496 with Staff's stipulations. STIPULATIONS: Water Management: 1. Where groundwater is proposed to be pumped during the excavating operation, a Dewatering Permit shall be obtained from the South Florida Water Management District, and a copy provided to Project Plan Review for approval prior to the commencement of any dewatering activity on the site. 2 . The littoral zone shall be created and planted as indicted on the Plan of Record and the 81 " x 11" sketch which can be found in the excavation file. 3 . All provisions of Collier County Ordinance No. 92-73, Division 3 . 5 shall be adhered to, with the exception of the substitution requested. Page 4 ENVIRONMENTAL ADVISORY BOARD January 5, 1994 4 . No blasting will be permitted unless issued a separate permit by Collier County Project Plan Review. Environmental: 1. A Collier County Vegetation Removal Permit shall be issued prior to any site clearing. ****** There being no further business, the meeting was adjourned by order of the Chair. Environmental Advisory Board Michel Saadeh, Chairman WORKSHOP: Critical Wildlife Area - Sand Dollar Island Presented by Fran Stallings, PhD, Natural Resources Director MOTION: Made by Ms. Straton, seconded by Mr. Hinchcliff and failed 2/5, to forward to the Board of County Commissioners the same recommendations as EPTAB. MOTION: Made by Mr. Neale, seconded by Mr. Hermanson and carried 5/2 , to forward to the Board of County Commissioners, the following recommendations: 1 . EAB supports the critical wildlife areas on Sand Dollar Island, as limited and defined by original legal description in Florida Game and Fresh Water Fish Commission (FGFWFC) order and supports the remainder of the beach to be for recreational use. 2 . EAB requests that County Staff investigate feasibility of a movable, expandable boardwalk to enhance beach access. 3 . EAB requests that County Staff amend Marco Beach raking permit to permit raking to occur in areas which became vegetated as a result of being a critical wildlife area and which have ceased being critical wildlife areas. 4 . EAB recommends, in concurrence with EPTAB that the County conduct an educational seminar in the Marco Island area on coastal barrier systems and their functions and values. 5 . EAB recommends in concurrence with EPTAB that the County investigate an environmental interpretive program at Tigertail . ****** Page 5 Project Plan Review Community Development Division/Collier County Government 2800 North Horseshoe Drive/ Naples, FL 33942-6917 Phone:813/643-8400 February 22 , 1994 Property Owner RE: Conditional Use Petition No. CU-94-2 and Commercial Excavation Permit No. 59 . 499 "APAC - Earthmining Section 20" Sections 17 , 20 and 29 , Township 49 South, Range 27 East Collier County, Florida Dear Property Owner: In accordance with the provisions of Section 3 . 5 . 5. 3 of Ordinance No. 91-102 , which regulates excavations within Collier County, we are required to serve notice to all adjacent property owners that the Environmental Advisory Board will consider a request to perform an excavation described at the location on the attached Staff Report. The Public Hearing to consider this item and other matters will begin at 9 : 00 a.m. on Wednesday, March 2, 1994 at the Collier County Government Complex, Building "F" , Third Floor, Commissioners Board Room. While your presence is not required at this meeting, all interested parties are invited to attend and be heard. In addition to those parties wishing to speak at the meeting, any written comments may be submitted to this office prior to the meeting for consideration by the Environmental Advisory Board. Should you have any further questions regarding the above, please feel free to contact this office at (813) 643-8471 . Sincerely, /A:e C';"" Ag4i.(' Beau E. Keene, P. E. Senior Engineer BEK/ew/doc: 7040 Attachments (2) cc: CU-94-2 Files and Comm. Exc. 59 . 499 File Chrono File c \ DUN't Item V. I. ENVIRONMENTAL ADVISORY BOARD STAFF REPORT MEETING OF MARCH 2 , 1994 I. NAME OF PETITIONER/PROJECT: Petition No. : Conditional Use No. CU-94-2 and Commercial Excavation Permit No. 59. 499 Petition Name: "APAC - Earthmining Section 20" Applicant/Developer: APAC - Florida, Inc. Engineering Consultant: Stephen A. Means, P. E. , Wilson, Miller, Barton and Peek, Inc. Environmental Consultant: Kevin L. Erwin, Kevin L. Erwin Consulting Ecologist, Inc. II . LOCATION: Approximately three miles east of C.R. 951, just south of 16th Avenue S. W. and just east of 17th Street S. W. , generally bounded on the north and west by property zoned Estates, on the south by undeveloped property zoned Agricultural, and on the east by land zoned Agricultural and PUD; located in Sections 17 , 20 and 29, Township 49 South, Range 27 East, Collier County, Florida. III . PROJECT DESCRIPTION: The subject property is a six hundred seventy-six (676) acre tract zoned Agricultural with an adjacent four acre tract zoned Estates. The proposed use is for the expansion of an existing earthmining operation (Warren Brothers PUD) . Approximately five hundred sixty-two (562) acres of the site are proposed as the envelope for excavation activities. The remaining one hundred eighteen (118) acres will be in conservation/mitigation areas (91. 7 acres) , buffer and setbacks (17 . 3 acres) and adjoining parcels zoned estates (3 . 7 acres) and agricultural (5. 3 acres) . Plan of Record: Water Management: "APAC Earthmining - Section 20" , prepared by Wilson, Miller, Barton & Peek, Inc. dated January 1994 , one (1) revision. (WMBP File No. EW-285 , 3 sheets) . "APAC Earthmining - Section 20" , prepared by Wilson, Miller, Barton & Peek, Inc. dated January 1994 , one (1) revision. (WMBP File No. RZ-221, 1 sheet) . Environmental: Environmental Impact Statement for APAC - Florida, Inc. , dated January, 1994 prepared by Kevin L. Erwin Consulting Ecologist, Inc. EAB Meeting 3/2/1994 CU-94-2/Comm. Ex. 59 . 499 Page 2 IV. STAFF COMMENTS: Water Management: The proposed earthmining operation will be located solely within Section 20 with ingress/egress through a four (4) acre Golden Gate Estates tract owned by the petitioner. This four acre tract will facilitate a haul route from the proposed excavation site to an existing material processing area within the Warren Brothers PUD (also owned by the petitioner) . The petitioner proposes to perform the excavation with no dewatering, but due to existing claimed wetlands on site, a South Florida Water Management District (SFWMD) Surface Water Permit will be required. The petitioner proposes to provide water quality for the haul road only since dewatering (and impoundment) will not occur. The maximum permitted depth per the Land Development Code is twenty feet (20' ) unless greater depths are supported by the "fetch formula" or comparative water quality studies. Since the "fetch formula" for this excavation yields an effective depth of sixty-five feet (65' ) and the adjacent Warren Brothers PUD was previously permitted to fifty feet (50' ) maximum depth or top of confining layer, whichever is more restrictive, the petitioner proposes to follow suit with the existing Warren Brothers PUD permitted depths. In summary, the petitioner requests a maximum depth of fifty feet (50' ) or the top of the confining layer, whichever is encountered first. Project Plan Review has contacted Dr. Gail Gibson of the County Pollution Control Department for technical assistance in the determination of the depth to the confining layer based on the soil boring logs provided. Pursuant to a meeting with the petitioner, Dr. Gibson, and Project Plan Review, it was agreed that prior to the Board of County Commissioners (BCC) hearing an additional boring to fifty-one foot (51' ) depth would be performed with samples (either cores or cuttings) to be provided to Dr. Gibson for his review. Dr. Gibson will ultimately make a recommendation to Project Plan Review for the maximum permitted depth which will be presented to the BCC. Environmental: Vegetatively the site consists of the following plant communities; pine flatwoods (271 . 9 acres) , cropland/pastureland (237 . 0 acres) , cypress forest (47 . 6 acres) , palmetto prairie (40 . 0 acres) , freshwater marsh (35 . 1 acres) , cabbage palm thicket (24 . 3 acres) , disturbed (cleared) land (14 . 0 acres) , wet prairie (4 . 8 acres) , live oak hammock (3 . 5 acres) and Brazilian pepper stands (1. 4 acres) . 71 . 8 acres of Collier county jurisdictional wetlands occur on the property. EAB Meeting 3/2/1994 CU-94-2/Comm. Ex. 59 . 499 Page 3 Approximately 9 . 1 acres of disturbed isolated on-site wetlands will be impacted by the proposed excavation activities. To mitigate for these impacts, 12 . 9 acres of herbaceous marsh will be constructed contiguous to the northern end of the southeast wetland system on the site. The 58 . 4 acre wetland in the southeast corner of the property is the least hydrologically disturbed system on site and is part of a contiguous wetland system that extends onto adjacent properties. The smaller isolated wetlands provide limited wetland function due to past hydrologic alterations and exotic plant infestation. Listed wildlife species on site include gopher tortoise, big cypress fox squirrel and little blue heron. A pair of red-cockaded woodpeckers were also observed foraging two hundred feet (200' ) off-site near the southwest corner of the property. An approximately 3 . 0 acre upland preserve located adjacent to the southeastern wetland preserve will be utilized as a recipient site for gopher tortoises. The habitat consists of palmetto prairie surrounded by pine flatwoods. One individual big cypress fox squirrel was observed in a pine flatwood area located in the southwest corner of the property. This area also contained four squirrel nests (species unconfirmed) built in large melaleuca trees. Squirrel activity was not observed on or near these nests. This parcel of land is presently zoned agricultural and is not within the proposed envelope for excavation. A letter dated November 15 , 1993 to Andy Woodruff, Kevin Erwin Consulting Ecologists, Inc. , from Marion F. Smith, Jr. , Supervisor, Florida Site File, State of Florida, Division of Historical Resources indicates no archaeological sites or historical standing structures to be recorded within the project location. The letter also indicates the possibility of unrecorded archaeological sites on the property. V. RECOMMENDATIONS: Staff recommends approval of Conditional Use Petition No. CU-94-2 and Commercial Excavation Permit No. 59 . 499 , "APAC - Earthmining Section 20" with the following stipulations: Water Management: 1. A copy of South Florida Water Management District Permit or Early Work Permit (with staff report) is required prior to excavation permit issuance. EAB Meeting 3/2/1994 CU-94-2/Comm. Ex. 59 . 499 Page 4 2 . An additional soil boring to fifty-one feet (51' ) below existing grade with a geotechnical engineer's classification and core samples shall be provided to the County Pollution Control Department prior to the Board of County Commissioner's hearing for maximum permitted depth determination. 3 . The lake littoral zone shall be created and planted as indicated on the Plan of Record. No vegetation other than that approved for planting shall be used in the littoral zone. 4 . All provisions of Collier County Ordinance No. 92-73 , Division 3 . 5 shall be adhered to. 5. Where groundwater is proposed to be pumped during the excavating operation, a Dewatering Permit shall be obtained from the South Florida Water Management District, and a copy provided to Project Plan Review for approval prior to the commencement of any dewatering activity on the site. 6. No blasting will be permitted unless issued a separate permit by Collier County Project Plan Review. 7 . Off-site removal of material shall be subject to "Standard Conditions" imposed by the Transportation Services Division in document dated 5/24/88 (attached) . 8 . No Excavation Permit shall be issued until the road impact fees have been paid. 9 . Prior to the excavation permit issuance, a cost estimate of the installed cost of the littoral plantings shall be provided in accordance with Section 3 . 5 . 7 . 2 . 5 of the Land Development Code. Environmental: 1. Permits or letters of exemption from the U. S. Army Corps of Engineers, Florida Department of Environmental Protection, South Florida Water Management District and Florida Game and Fresh Water Fish Commission shall be submitted prior to issuance of excavation permit. 2 . All conservation/mitigation areas shall be designated as conservation/preservation tracts or easements on all construction plans and shall be recorded on the plat with protective covenants per or similar to Section 704 . 06 of the Florida Statutes. EAB Meeting 3/2/1994 CU-94-2/Comm. Ex. 59 . 499 Page 5 In the event the project does not require platting, all conservation/mitigation areas shall be recorded as conservation/preservation tracts or easements dedicated to an approved entity or to Collier County with no responsibility for maintenance and subject to the uses and limitations similar to or as per Section 704 . 06 of the Florida Statues. The tracts or easements shall be indicated on all future site plans noting Official Record Book and Page of the public records. 3 . Buffer zones which extend at least fifteen (15) feet landward from the edge of wetland preserves in all places and average twenty-five (25) feet from the landward edge of wetland preserves shall be required. 4 . Prior to issuance of excavation permit, the petitioner shall submit a mitigation plan to Project Plan Review Environmental Staff for review and approval . The plan shall include, at minimum, mitigation ratios, areas to be re-vegetated, methods of re-vegetation and timetables for evaluation of success criteria. 5. An exotic vegetation removal, monitoring and maintenance (exotic free) plan for the site, with emphasis on the preservation areas, shall be submitted to Project Plan Review Environmental Staff for review and approval prior to issuance of excavation permit. 6. If during the course of site clearing, excavation, or other construction activities, an archaeological or historic site, artifact, or other indicator is found, all development within the minimum area necessary to protect the discovery shall be immediately stopped and subject to the procedures in Section 2 . 2 . 25, Collier County Land Development Code. 7 . An agricultural clearing permit for the site shall be issued pursuant to Division 3 . 9 Collier County Land Development Code. PREPARE BY: -el ?... / e,... -z..< 2/0V Beau E. Keene, P. E. Dat Senior Engineer J ; 27/0 g Step en Lenberger Date Environmental Specialist II REVIEWED BY: July C. Adarmes, P. E. Date Technical Services Supervisor COLLIER COUNTY TRANSPORTATION SERVICES "STANDARD CONDITIONS" EXCAVATION PERMIT APPLICATIONS INVOLVING OFF-SITE REMOVAL OF MATERIAL The intent of these "Standard Conditions" are to provide excavation permit applicants a summary of conditions which may affect their projects and which should be taken into consideration during all stages of project development: 1. Haul routes between an excavation site and an arterial road shall be private with property owner(s) approval or be a public collector road built to standards applicable to handle the resulting truck traffic. Where residential areas front collector roads, appropriate turn lanes, buffer and bikepath shall be required as minimal site improvements and if recommended for approval, shall be so with the condition that the Transportation Services Administration reserves the right to suspend or prohibit off-site removal of excavated material should such removal create a hazardous road condition or substantially deteriorate a road condition; such action by the Transportation Services Administration shall be subject to appeal before the Board of County Commissioners. 2 . Haul routes utilizing public roads shall be subject to road maintenance and road repair or an appropriate fair share by the permittee in accordance with Excavation Ordinance No. 92-73 and Right-of-Way Ordinance No. 82-91. 3 . Off-site removal of excavated material shall be subject to Ordinance No. 92-22 (Road Impact Ordinance) . A traffic and road impact analysis shall be made by the County to determine the effects that off-site removal of excavated material will have on the road system within the excavation project's zone of influence. If appropriate, road impact fees in accordance with Ordinance No. 92-22 shall be paid prior to the issuance of an excavation permit. 4 . The Transportation Services Administration reserves the right to establish emergency weight limits on public roadways affected by the off-site removal of excavated material; the procedure for establishment of weight limits shall be the presentation of an applicable resolution before the Board of County Commissioners. Should weight limits be instituted, the permittee shall be responsible to implement measure to assure that all heavy truck loadings leaving the permit's property conform to the applicable weight restriction. 5. The Excavation Performance Guarantee shall apply to excavation operations and also the maintenance/repair of public roads in accordance with current ordinances and applicable permit stipulations. 6. Based on soil boring information per Ordinance No. 92-73 , a blasting permit may be appropriate. Should a blasting permit application be submitted and should residential areas exist within one mile of the excavation site, the County reserves the right to deny a blasting permit based on concerns for off•-site impacts from blasting at an excavation site. Should a blasting permit be considered and approved, the minimum conditions of approval in addition to conditions per Ordinance No. 92-73 are as follows: A. Structure inventory/monitoring and applicable property owner release as required by the Development Services Director. B. Security bond applicable to private property damage acceptable to the County. C. Control of size/depth/number of charges per blast by the Development Services Director. D. The right of the County to suspend and/or revoke blasting permit authority should be determined that blasting activities are creating unacceptable off-site conditions either in terms of private property damage and/or related physical effects of blasting operations. 7 . No excavation permit shall be issued until receipt of a release from the Transportation Services Administration applicable to proper mitigation of off-site impacts, meeting of applicable provisions of Ordinance No. 82-91, Ordinance No. 92-22 , and Ordinance No. 92-73 . Reference to letter of 5/24/88 Revised 12/92 EAB Side Sheet 2/16/94 LDC Page 2-87 Delete stricken language, add underlined language: 2 . 2 . 24 . 8 Exceptions. Where land has an "ST" designation and the proposed alteration or development area contains twenty (20) acres or less in gross area, and where no transfer of development rights are involved, the Development Services Director may approve a Site Alteration Plan or a Site Development Plan. Prior to such approval, the Development Services Director shall make a finding that the following conditions exist: 1. The proposed site alteration or site development plan will not require any modification, with the exception of exotic vegetation removal, of the topography, drainage, flora, or fauna on the site. 2 . Single family principal structure where the proposed site alteration or site development plan will not require any significant modification of topography, drainage, flora, or fauna on the site, or where the alteration involves the renovation or replacement of a single family structure. Significant modification shall mean greater than ten (10) percent of the site. 3 . No pollutants will be discharged from the area that will degrade the air, water or soil below the levels existing at the time of application. All other site alteration or site development plan approvals of any size shall be as required in Sec. 2 . 2 . 24 . 4 , 2 . 2 . 24 . 5 and 2 . 2 . 24 . 6 . ew/doc: 7034 COMMUNITY DEVELOPMENT SERVICES DIVISION PROJECT PLAN REVIEW SECTION MEMORANDUM TO: July C. Adarmes, P.E. Technical Services Supervisor FROM: Earlene M. Weber-, : 771, Secretary II DATE: February 14 , 1994 RE: March EAB Meeting In order for petitions to be placed on the March EAB meeting, the staff report needs to be complete with signatures and all back up materials by February 18 , 1994 . Remember we will be off February 21, 1994 for President's Day. The packets will be mailed out February 22 , 1994 . Please let me know if you have a project that you expect to place on this agenda. cc: EAB Engineer Reviewers EAB Environmental Reviewers Chrono File COMMUNITY DEVELOPMENT SERVICES DIVISION PROJECT PLAN REVIEW SECTION MEMORANDUM TO: EAB Members FROM: Earlene M. Weber Secretary II DATE: January 25, 1994 RE: FEBRUARY EAB MEETING The February meeting of the Environmental Advisory Board (EAB) is being canceled. No petitions currently received for review are ready to be placed on the February agenda. The next scheduled EAB meeting will be March 2 , 1994 . If you have any questions, please contact this office at 643-8470. ew/doc: 6956 cc: Project Plan Review Environmental & Engineer Staff John F. Madajewski, Project Plan Review Manager Bob Mulhere, Acting Manager, Current Planning Louise Chesonis, Clerk to the Board Barbara Pedone, Executive Secretary to County Manager Chrono File fl1/R9/1994 17:89 Al 3F14214R7 IIIiFRA,TNn PAF R1 Dolt 4 Co3.4 cu 1 f:qui pm•tn FXKUOY. i 74Y..H2 ti > a?1 iC,41 I Fax Transmittal Sheet / DATE: 6-J8N-1994 ! ° + —71D5M4 ga=lena Weber 643-947° COLLIER COUNTY GOVERNMENT pat Neale FAX*: (813)774-8826 COMPANY! pEONE#: (813)774-8999 NO. OF PAGES 2 (including this cover sheet) SUBJECT: Please review draft language fox motions concerning Sand Dollar Island and recommendations to BCC. [°a4. 1 , cco: 11,t.,v.. - • . 01/09/1994 12:03 8136421487 LUCERA,INC PAGE 02 LJA1.A $ (;onrrot ttquij'Jtc:lat. }il}( 3OX 7760t+26 , 111 .3ei4216Fy7 1/5/94 MOTION: Made by Ms. Straton, ageOnded by Mr. Ilinchclilf and failed 2/5, to forward to the Board Of County Commissioners the same recommendations as EPTAB. MOTION: Made by Mr. Neale, seconded by Mr. Sermanson and carried 5/Z, to forward to the Board of County Commissioners , the following recommendations: I. EAB supports the critical wildlife area} on Sand Dollar Island, as limited and defined by original legal description in Florida Game and Fresh Water Fish Commission (FGFWFC) order and supports the remainder of the beach to be for recreational use. ae 2. EAR requ4-ts that County Staff investigate feasibility of movable, expandable boardwalk to enhance beach access . 3. EAB requests that County Staff amend Marco Beach raking permit to permit raking to occur in areas which vegetated as a result of being a critical wildlife area and which have ceased being critical wildlife areas. G-c-c� �i 4. EAB recommends , in concurrence with EPTAB that t County conduct an educational seminar in the Marco Island area on coastal barrier systems and their functions and values . 5. EAR recommends in concurrence with EPTAB that th County investigate an environmental interpretive program at Tigertail. ew/doc:6856 / V0/1/ )1/40../ (17/10\L l 1 t { /1)(70/ % COMMUNITY DEVELOPMENT SERVICES DIVISION PROJECT PLAN REVIEW SECTION MEMORANDUM TO: EAB Members FROM: Earlene M. Weber Secretary II , DATE: January 5, 1994 RE: February EAB Meeting - Location Please be advised the location of the February 5, 1994 EAB meeting has been changed. The meeting will be held in Conference Room "E" of the Development Services Building, 2800 Horseshoe Drive North. The Boardroom is being used for an Intangible Tax Seminar by the State of Florida, necessitating the change. ew/doc: 6842 cc: Chrono File EAB Binder INTEROFFICE MEMORANDUM Date: 17-Dec-1993 01: 05pm ES From: Sue Buck BUCK_S Dept: County Manager's Offic Tel No: 774-8383 TO: Earlene Weber ( WEBERE ) Subject: EAB Earlene - As I was preparing my Board Room calendar for 1994 , I ran into a "snag" . The EAB always meets on the first Wednesday of each month at 9 : 00 . In February the State is having an Intangible Tax Seminar - which they have every year - at the same time as your meeting. Is there some way (because it is still early enought) that we could reschedule your meeting? Please advise. Sue Buck j ; t Jjl ,/ / 11 {L � ',i') (e t'