Loading...
EAC Agenda 05/01/1996 COLLIER COUNTY ENVIRONMENTAL ADVISORY BOARD AGENDA MAY 1, 1996, 9: 00 a.m. COMMISSION BOARDROOM, THIRD FLOOR--ADMINISTRATION BUILDING I. ROLL CALL II. APPROVAL OF MINUTES--April 3 , 1996 III. ADDENDA IV. CONSENT/ADMINISTRATIVE APPROVAL AGENDA V. REGULAR AGENDA A. Rezone Petition No. R-96-4 "The Preserve" Section 8, Township 50 South, Range 26 East Collier County, Florida VI. OLD BUSINESS VII. NEW BUSINESS VIII. ADJOURNMENT IX. WORKSHOP *********************************************************************** NOTES: A. [Board Members] : Notify the PLANNING SERVICES DEPARTMENT (643-8400) no later than 5 P.M. on Monday April 29, 1996, if you cannot attend this meeting or if you have conflict and thus will abstain from voting on a particular petition. B. [General Public] : Any person who decides to appeal a decision of this board will need a record of the proceedings pertaining thereto; and therefore may need to insure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. *********************************************************************** MINUTES OF THE ENVIRONMENTAL ADVISORY BOARD DATE: April 3 , 1996 TIME: 9: 00 A.M. PLACE: 3rd Floor Boardroom, Administration Building, Collier County Government Center, Naples, Florida EAB STAFF PRESENT Hermanson Excused Absence Burgeson X Hinchcliff X Chrzanowski X Foley X Kuck X Gore X Lenberger X Saadeh X Mulhere X Straton X Seal Wilkison Absent Ashton X MINUTES BY: Barbara S. Burgeson, Environmental Specialist II CALLED TO ORDER AT: 9 : 00 a.m. ADJOURNED AT: 10: 00 a.m. PRESIDING: Blair A. Foley, Chairman ADDENDA TO THE AGENDA: Added brief presentation by Heidi Ashton, Assistant County Attorney, regarding EAB authority. APPROVAL OF MINUTES: March 6, 1996 Motion made by Mr. Hinchcliff, seconded by Mr. Saadeh and carried 5/0, to approve minutes of March 6, 1996. Page 1 ENVIRONMENTAL ADVISORY BOARD APRIL 3 , 1996 ****** PETITION NO: Planned Unit Development Petition No. PUD-96-7 "College Park PUD" FILED BY/FOR: July C. Adarmes, P. E. of Hole, Montes & Associates. Inc. /Kenneth D. Goodman, Trustee College Park Trust REQUESTING: The proposed project will consist of a maximum of two hundred and ten (210) multi-family housing units with on-site recreational facilities, water management lake and preserve areas. REPRESENTED BY: July C. Adarmes, P. E. of Hole, Montes & Associates. Inc. COMMENTS: For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F" , Collier County, Government Complex. MOTION: Made by Mr. Saadeh, seconded by Ms. Straton and carried 5/0, to approve Petition PUD-96-7 with amended stipulations. STIPULATIONS: Water Management: 1. A copy of the South Florida Water Management District (SFWMD) Permit or Early Work Authorization, with Staff Reports, is required prior to final site development plan approval. 2 . An offsite swale shall be constructed within the existing drainage easement from the south side of the property to the existing lake shown on the "Offsite Conveyance Swale Plan" for College Park. Environmental: 1. Amend section 4. 14 of the PUD document to read as follows by adding the underlined language. 4 . 14 NATIVE VEGETATION RETENTION REQUIREMENTS Pursuant to Policy 6.4.7 of the Conservation and Coastal Management Element of the Collier County Growth Management Plan, an appropriate portion of the viably functioning native habitat shall be retained in buffer areas, around the lake and within open space areas and preserves as depicted on the PUD master plan. Add the following stipulations to Section IX of the PUD document. 2 . Environmental permitting shall be in accordance with the state of Florida Environmental Resource Permit rules and be subject to review and approval Page 2 ENVIRONMENTAL ADVISORY BOARD APRIL 3 , 1996 by Current Planning Environmental Review Staff. Removal of exotic vegetation shall not be counted towards mitigation for impacts to Collier County jurisdictional wetlands. 3. All jurisdictional wetlands and/or mitigation areas shall be designated as conservation/preservation tracts or easements on all construction plans and shall be recorded on the plat,or by separate instrument, with protective covenants per or similar to Section 704. 06 of the Florida Statutes. 4. At the time of site development plan submittal, petitioner shall submit a letter from the U. S. Fish and Wildlife Service (USFWS) regarding red-cockaded woodpecker issues on site. ****** OLD BUSINESS: ITEM: EAB Authority COMMENTS: Heidi Ashton gave a legal opinion for concerning the EAB's authority in requiring or requesting additional information for water management. A memo was distributed. ****** WORKSHOP: ITEM Wetland Mitigation COMMENTS: Karen Johnson was present from South Florida Water Management District (SFWMD) to answer questions and discuss policies and procedures, both of SFWMD and other counties. The EAB and Staff discussed the concept of no net loss of wetlands, with a consensus or recommendation to Mr. Mulhere, that Staff prepare standard language regarding mitigation and consider several different alternatives including a Mitigation Fund, upland compensation around wetlands, and offsite mitigation when the proposed mitigation for the Environmental Resource Permit (ERP) causes a net loss of wetlands. Staff was also asked to clearly define what constitutes a net loss. ****** There being no further business, the meeting was adjourned by order of the Chair. Environmental Advisory Board Blair A. Foley, Chairman Page 3 Item V.A. ENVIRONMENTAL ADVISORY BOARD STAFF REPORT MEETING OF May 1, 1996 I. NAME OF PETITIONER/PROJECT: Petition No. : Rezone Petition No. R-96-4 Petition Name: "The Preserve" Applicant/Developer: Wallace R. Devlin Engineering Consultant: McAnly Engineering & Design, Inc. Environmental Consultant: McAnly Engineering & Design, Inc. II. LOCATION: The subject property is a fifty-eight acre parcel located at the southwest corner of Davis Boulevard and County Barn Road in Collier County, within Section 8, Township 50 South, Range 26 East. III. DESCRIPTION OF SURROUNDING PROPERTIES: The proposed rezone is located adjacent to the south side of Davis Boulevard and is on the west side of County Barn Road. The surrounding land uses are almost entirely single family with the exception of the church across County Barn road to the east of the property. ZONING DESCRIPTION N - PUD Embassy Woods PUD S - C-3 and A Vacant land in the commercial zoning and single family homes on the A zoned land E - E single family homes W - E single family homes IV. PROJECT DESCRIPTION: The total site area of The Preserve is 58 acres and is proposed to be developed with multi-family dwelling units. It is anticipated that the project will contain 232 units housed in 20 buildings, a clubhouse, pool house and pool. The surface water management system serving The Preserve will be designed to provide water quality treatment for the 36. 90 ± acres of developed area. The water management system will consist of two (2) lakes totaling 5. 10 acres providing water detention for runoff from the impervious areas. Surface water runoff will be collected from the roads, parking lots and landscaped areas by catch basins and pipe systems for conveyance to the proposed lakes. Water quality treatment will be accomplished by grassed EAB Meeting 5/1/1996 R-96-4, "The Preserve" Page 2 swales and landscaped islands which will receive most of the surface water runoff prior to entering the stormwater system. The balance of the property's preserve area will be isolated from the project's water management system through berming, and will be unaltered to act as a natural flow way to carry historic surface waters from the east through the property. A water control structure will be installed at the property line along County Barn road to provide detention of the surface water runoff. The control structure will be designed for the 25-year, 3-day storm event. This structure will be a modified Type "C" catch basin with orifice set at the control elevation, 9 . 5 feet NGVD. The allowable discharge of 0. 06 cfs/acres (2 . 21 cfs) will not be exceeded. Preliminary water management calculations will result in a minimum road center line elevation set at approximately 12 . 5 ft. NGVD. , and the finished floor elevation at approximately 14 ft. NGVD. Plan of Record: ENGINEERING: The Preserve "Conceptual Water Management Plan" prepared by McAnly Engineering & Design, Inc. , dated February 29, 1996, no revisions. Environmental: Collier County Environmental Impact Statement for Wallace R. Devlin, 58 acres located in S8 , T 50S, R 26E, Collier County Florida, dated February 1996. IV. STAFF COMMENTS: Water Management: Water management concerns will be reviewed at time of site development plan submittal. This project will be permitted for surface water management by the South Florida Water Management District (SFWMD) . Environmental: The subject property is a mix of pine flatwoods, saw palmetto islands and hydric pine to cypress wetlands. It is expected that approximately one half of the property will be determined to be jurisdictional to one or more of the agencies. Although some small areas on site have a great abundance of exotic vegetation, the vast majority of the site is nearly exotic free. EAB Meeting 5/1/1996 R-96-4, "The Preserve" Page 3 Strong evidence of wetland hydrology was seen on the parcel through such indicators as algal matting, water marks and drift lines (materials that has been transported and deposited by waterflows) . The recent heavy flooding of this property (starting with the 16+ inches of rain that the Naples area received in the '95 rainy season) may have contributed to some of these more obvious indicators. The upland areas are divided between pine flatwoods and diversly vegetated palmetto habitats. There was no evidence of gopher tortoise on site, nor were there any sitings on the property of any other protected wildlife with the exception of airplants (Tillandsia spp) and golden polypody ferns (Phlebodium aureum) . V. RECOMMENDATIONS: Staff recommends approval of Rezone Petition No. R-96-4, "The Preserve" with the following stipulations: Water Management: 1. An Excavation Permit will be required for the proposed lakes in accordance with division 3 . 5 of Collier County Ordinance No. 92-73 and South Florida Water Management District (SFWMD) . 2 . A copy of South Florida Water Management District (SFWMD) with staff report is required prior to site development plan approval. 3 . Developer shall coordinate the design of the project with Collier County Office of Capital Projects Management staff to ensure the interface with the 4-lane design of county Barn road which is in progress. Environmental: 1. All conservation areas shall be recorded on the plat or by separate instrument at the time of site development review with protective covenants per or similar to Section 704 . 06 of the Florida Statues. Conservation areas shall be dedicated on the plat to the project's homeowners association or like entity for ownership and maintenance responsibilities and to Collier County with no responsibility for maintenance. EAB Meeting 5/1/1996 R-96-4, "The Preserve" Page 4 2 . At the time of submittal of the first Site Development Plan the petitioner shall provide a management plan (per CCLDC Section 3 . 9 . 5. 3) for the entire preserve area on site and shall indicate a schedule for that plan to go into effect. PREPARED BY:(_„/ ,l 4 z- Stepp- /fal ) Date Senior Engineer ,fir y '_ Barbara S. Burges Date Environmental Specialist II REVIEWED BY: Thomas E. Kuck, P.E. Date Engineering Review Services Manager K- z, z -� Ro..ert J. Mulhere, AICP Date Current Planning Manager MINUTES OF THE ENVIRONMENTAL ADVISORY BOARD DATE: May 1, 1996 TIME: 9:00 A.M. PLACE: 3rd Floor Boardroom, Administration Building, Collier County Government Center, Naples, Florida EAB STAFF PRESENT Hinchcliff X Seal X Hermanson Excused Absence Burgeson X Foley X Kuck Gore X Lenberger Saadeh X Mulhere Straton Excused Absence Wilkison Absent MINUTES BY: Barbara Burgeson, Environmental Specialist II CALLED TO ORDER AT: 9:05 a.m. ADJOURNED AT: 9:40 a.m. PRESIDING: Blair A. Foley, Chairman ADDENDA TO THE AGENDA: None APPROVAL OF MINUTES: Motion made by Mr. Saadeh, seconded by Mr. Hinchcliff and carried 4/0, to approve minutes of April 3, 1996. Page 1 ENVIRONMENTAL ADVISORY BOARD MAY 1, 1996 ****** PETITION NO: Rezone petition No. R-96-4, "The Preserve" FILED BY/FOR: Dwight Nadeau of McAnly Engineering & Design, Inc. / Wallace R. Devlin REQUESTING: The total site area of The Preserve is 58 acres and is proposed to be developed with multi-family dwelling units. It is anticipated that the project will contain 232 units housed in 20 buildings, a clubhouse, pool house and a pool. REPRESENTED BY: Dwight Nadeau of McAnly Engineering& Design, Inc. COMMENTS: For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F", Collier County, Government Complex. MOTION: Made by Mr. Saadeh, seconded by Dr. Gore and carried 4/0, to approve Petition R-96-4 with amended stipulations. STIPULATIONS: Water Management: 1. An Excavation Permit will be required for the proposed lakes in accordance with Division 3.5 of Collier County Ordinance No. 92-73 and South Florida Water Management District (SFWMD). 2. A copy of South Florida Water Management District (SFWMD) Surface Water Management Permit with staff report is required prior to site development plan approval. 3. Developer shall coordinate the design of the project with Collier County Office of Capital Projects Management staff to ensure the interface with the 4-lane design of County Barn Road with is in progress. Environmental: 1. All conservation areas shall be recorded on the plat or by separate instrument at the time of site development review with protective convenants per or similar to Section 704.06 of the Florida Statues. Conservation areas shall be dedicated on the plat to the project's homeowners association or like entity for ownership and maintenance responsibilities and to Collier County with no responsibility for maintenance. Page 2 ENVIRONMENTAL ADVISORY BOARD MAY 1, 1996 2. At the time of submittal of the first Site Development Plan the petitioner shall provide a management plan (per CCLDC Section 3.9.5.3) for the entire preserve area on site and shall indicate a schedule for that plan to go into effect. OLD BUSINESS: ITEM: Wetland Mitigation COMMENTS: Working on wetland mitigation language and should have something for the EAB to look at in next two meetings. Landscape Committee working on proposed LDC changes and acceptable exotic vegetation list. There being no further business, the meeting was adjourned by order of the Chair. Environmental Advisory Board Blair A. Foley, Chairman Page 3