EAC Minutes 07/02/1997 .
MINUTES OF THE ENVIRONMENTAL ADVISORY BOARD
DATE: July 2, 1997
TIME: 9:00 A.M.
PLACE: 3RD Floor Boardroom,Administration Building, Collier County Government
Center,Naples,Florida
EAB STAFF PRESENT
Foley X Chrzanowski X
Hermanson X Gibson X
Hinchcliff X Kuck X
Saadeh X Lenberger X
Straton X Mulhere X
Wilkison X Seal X
MINUTES BY; Stephen Lenberger, Environmental Specialist II
CALLED TO ORDER AT: 9:05 a.m. ADJOURNED AT: 10:30 a.m.
PRESIDING: David S. Wilkison, Chairman •
ADDENDA TO THE AGENDA: None
APPROVAL OF MINUTES:
Motion made by Mr. Foley, seconded by Mr. Hermanson and carried 6/0,to approve minutes of
June 4 , 1997.
ITEM: Regular Agenda-Item V.A.
PETITION NO: Planned Unit Development No. PUD-97-6
U.S. 41/Wiggins Pass Road PUD
WITHDRAWN
a ,
._
Environmental AdvisoryBoard Minutes 2 1997
July
Page 2
ITEM: Regular Agenda-Item V.B.
PETITION NO: Conditional Use No. CU-97-16
Modification to Ex. 59.206
Willow Run Quarry
REQUESTING: The expansion to an existing quarry.
REPRESENTED BY: Dorothea Zysko, Wilson,Miller,Barton&Peek, Inc.
Joe Bonness III, Southern Sand and Stone
PUBLIC SPEAKERS: John Bowen
MOTION: Made by Mr. Hermanson, seconded by Mr. Saadeh and carried 6/0,to approve
conditional Use Petition NO. CU-97-16/Mod. To Ex. 59.206 with amended
stipulations.
Water Management:
1. Prior to issuance of the Excavation Permit, applicant shall submit Geological
Report with borings :showing depth of confining layer, if layer exists.
Conclusions in the report will be verified by County staff. Lake depth will be
limited to 50' or confining layer,whichever is shallower.
2. Petitioner will obtain necessary permits from the Army Corps of Engineers and
the South Florida Water Management District and the Florida Department of
Environmental Protection.
3. Prior to issuance of Excavation permit, or by September 1, 1997, whichever
comes first, applicant shall submit water quality monitoring plan for salinity.
Plan shall be in effect until it has been decided by County staff that no adverse
impacts are occurring.
Environmental:
1. The petitioner shall retain fifteen percent of the existing native vegetation on site
pursuant to section 3.9.5.5.4.CCLDC. The proposed site plan exceeds this
requirement by preserving 45 percent of the existing native vegetation on site.
Environmental Advisory Board Minutes July 2 , 1997
Page 3
2. Environmental permitting shall be in accordance with the state of Florida
Environmental Resource Permit rules and be subject to review and approval by
Current Planning Environmental Review Staff. Removal of exotic vegetation
shall not be counted towards mitigation for impacts to Collier County
jurisdictional wetlands.
3. Buffers shall be provided around wetlands, extending at least fifteen(15) feet
landward from the edge of wetland preserves in all places and averaging twenty-
five (25) feet from the landward edge of wetlands. Where natural buffers are not
possible, structural buffers shall be provided in accordance with the State of
Florida Environmental Resource Permit Rules and be subject to review and
approval by Current Planning Environmental Staff.
4. An exotic vegetation removal,monitoring, and maintenance(exotic free)plan
for the site,with emphasis on the areas of preservation, shall be submitted to
Current Planning environmental staff for review and approval prior to issuance
of an agricultural clearing permit.
5. Petitioner shall comply with the guidelines and recommendations of the U.S.
Fish and Wildlife Service(USFWS) and Florida Game and Fresh Water Fish
Commission(FGFWFC)regarding potential impacts to protected wildlife
species. Where protected species are observed on site, a Habitat Management
Plan for those protected species shall be submitted to Current Planning
Environmental staff for review and approval prior to issuance of an agricultural
clearing permit.
ITEM: Regular Agenda-Item V.C.
PETITION NO: Preliminary Subdivision Plat No.PSP-96-14
Sawgrass Subdivision
REQUESTING: A single family subdivision with 29 single family lots,water
management lake and preserve areas.
REPRESENTED BY: Gary Butler,Butler Engineering
Cindy Prine Butler,Prine Environmental
Environmental Advisory Board Minutes July 2 , 1997
Page 4
MOTION: Made by Mr. Saadeh, seconded by Mr. Foley and carried 6/0,to approve
Preliminary Subdivision Plat No. PSP-96-14 with amended stipulations.
Water Management:
1. The top of lake bank shall be no closer than 50 feet from a property line. This
requirement may be reduced if the lake is fenced or an equivalent is approved by
staff i.e. berm or heavy landscaping.
2. The south lake shall not encroach into the existing drainage easement unless
approved by the Stormwater Management Director.
3. An Excavation Permit will be required for the proposed lake in accordance with
Division 3.5 of Collier County Ordinance No. 92-73 and SFWMD rules.
Environmental:
1. An appropriate portion of native vegetation shall be retained on site as required
in section 3.9.5.5.4.CCLDC. These areas shall be designated on the final plat
/construction plans as separate easements for native vegetation retention
pursuant to section 3.9.5.5.4 CCLDC.
2. An exotic vegetation removal,monitoring, and maintenance(exotic free)plan
for the site,with emphasis on areas of retained native vegetation, shall be
submitted to Current Planning environmental staff for review and approval prior
to final site plan/construction plan approval.
ITEM: Regular agenda-Item V.D.
PETITION NO: Preliminary Site Plan(No petition number)
Livingston Park Subdivision
REQUESTING: Preliminary approval for a proposed industrial park.
REPRESENTED BY: Gary Butler,Butler Engineering
Cindy Prine Butler,Prine Environmental
•
Environmental Advisory Board Minutes July 2 , 1997
Page 5
MOTION: Made by Mr. Saadeh, seconded by Mr. Foley and carried 6/0,to approve
Livingston Park Subdivision Preliminary Site Plan with staffs stipulations.
Water Management:
1. Should wetland areas be determined jurisdictional, a copy of the SFWMD
Surface Water Permit will be required prior to final SDP approval.
2. An Excavation Permit will be required for the proposed lake in accordance with
Division 3.5 of Collier County Ordinance No. 92-73 and SFWMD rules.
Environmental:
1. An appropriate portion of native vegetation shall be retained on site as required
in section 3.9.5.5.4.CCLDC. These areas shall be designated on the final site
plan/construction plan as native vegetation retention pursuant to section
3.9.5.5.4 CCLDC.
2. Environmental permitting shall be in accordance with the state of Florida
Environmental Resource Permit rules and be subject to review and approval by
Current Planning Environmental Review Staff. Removal of exotic vegetation
shall not be counted towards mitigation for impacts to Collier County
jurisdictional wetlands.
3. Buffers shall be provided around wetlands, extending at least fifteen(15) feet
landward from the edge of wetland preserves in all places and averaging twenty-
five(25) feet from the landward edge of wetlands. Where natural buffers are not
possible, structural buffers shall be provided in accordance with the State of
Florida Environmental Resource Permit Rules and be subject to review and
approval by Current Planning Environmental Staff.
4. An exotic vegetation removal,monitoring, and maintenance(exotic free)plan
for the site,with emphasis on areas of retained native vegetation, shall be
submitted to Current Planning environmental staff for review and approval prior
to final site plan/construction plan approval.
5. Petitioner shall comply with the guidelines and recommendations of the U.S.
Fish and Wildlife Service (USFWS) and Florida Game and Fresh Water Fish
Commission(FGFWFC)regarding potential impacts to protected wildlife
-
Environmental Advisory Board Minutes July 2 , 1997
Page 6
species. Where protected species are observed on site, a Habitat Management
Plan for those protected species shall be submitted to Current Planning
Environmental staff for review and approval prior to final site plan/construction
plan approval.
OLD BUSINESS:
Discussion on Airboat Conditional use stipulations and monitoring reports.
PUBLIC SPEAKERS:
Mitchell House
Teresa House
MOTION: Made by Mr. Saadeh, seconded by Mr. Foley and carried 6/0, to direct staff to:
1. Look at Airboat use within the Big Cypress Area of Critical State Concern.
2. Propose an amendment to Conditional Use Petition No. CU-92-16, "Mitchell&
Teresa House, Everglades Private Airboat Tours"requesting that the Wildlife
Monitoring Report stipulation be deleted as a requirement of the existing
Conditional Use Resolution.
NEW BUSINESS:
Discussion on E.A.B. Absenteeism.
*******
COMMENTS: For a complete record of the proceedings reader is directed to the tape
recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor,Building
"F", Collier County, Government Complex.
There being no further business, the meeting was adjourned by order of the Chair.
Environmental Advisory Board
David S. Wilkison, Chairman
7/2/97 EAB MINUTES/md