Loading...
EAC Minutes 04/02/1997 MINUTES OF THE ENVIRONMENTAL ADVISORY BOARD DATE: April 2, 1997 TIME: 9:00 A.M. PLACE: 3rd Floor Boardroom, Administration Building, Collier County Government Center, Naples, Florida EAB STAFF PRESENT Foley X Chrzanowski X Hermanson excused absence Kuck X Hinchcliff X Lenberger X Lamoureux X Mulhere X Saadeh excused absence Seal X Straton X Wilkison X ^ MINUTES BY: Stephen Lenberger, Environmental Specialist II CALLED TO ORDER AT: 9:08 a.m. ADJOURNED AT: 10:42 a.m. PRESIDING: David S. Wilkison, Chairman ADDENDA TO THE AGENDA: None APPROVAL OF MINUTES: Motion made by Mr. Foley, seconded by Mr. Lamoureux and carried 5/0, to approve minutes of March 5, 1997. ITEM: Regular Agenda PETITION NO: Commercial Excavation Permit No. 59.600 "Islandwalk PUD/DRI" REQUESTING: The petitioner proposes to excavate 168 acres of lakes within Islandwalk, a 705 acre residential community with 2,100 residential dwelling units planned. REPRESENTED BY: Stephen Means, Wilson, Miller, Barton&Peek, Inc. Environmental Advisory Board Minutes April 4, 1997 Page 2 PUBLIC SPEAKER: Cathy Graves COMMENTS: For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F", Collier County, Government Complex. MOTION: Made by Mr. Foley, seconded by Mr.Lamoureux and carried 4/1, to approve Petition No. Ex. 59.600 with Staffs stipulations. STIPULATIONS: Water Management: 1. The excavation shall be limited to a bottom elevation of -10.0 ft. NGVD. All disturbed areas proposed for lake excavation shall be excavated to a minimum elevation of+2.0 ft. NGVD. 2. Off-site removal of material shall be subject to "Standard Conditions" imposed by the Transportation Services Division in document dated 5/24/88 (copy attached). 3. The lake littoral zone shall be created and planted as indicated on the Plan of Record. 4. In order to ensure a minimum eighty percent (80%) coverage of littoral zone planting areas, a performance guarantee, based on a cost estimate to replace the original installed littoral zone plants, will be required upon completion and acceptance of the excavation(Land Development Code 3.5.7.2.5). 5. All provisions of Collier County Ordinance No. 91-102, as amended, Division 3.5 shall be adhered to. 6. Where groundwater is proposed to be pumped during the excavating operation, a Dewatering Permit shall be obtained from the South Florida Water Management District, and a copy provided to Engineering Review Services for approval prior to the commencement of any dewatering activity on the site. 7. No blasting will be permitted unless issued a separate permit by Collier County Engineering Review Services. Environmental Advisory Board Minutes April 4, 1997 Page 3 r1 8. If trees are to be removed as a result of the excavating operation, a Vegetation Removal Permit, required by land Development Code, Division 3.9 shall be obtained from Collier County Planning& Technical Services before work shall commence. 9. A 20 ft. maintenance easement shall be provided around the perimeter of the lake and a 20 ft. access easement to it shall be provided from a right-of-way. The easement shall be accessible to all maintenance vehicles. 10. No excavation permit shall be issued until road impact fees have been paid. ******************** PETITION NO: Conditional Use No. CU-96-21 and Commercial Excavation Permit No. 59.583 "Maretee Road Commercial Excavation" REQUESTING: The petitioner proposes an earthmining operation over the 16.5 acre site with the offsite removal of an estimated 491,000 C.Y. of excavated material. REPRESENTED BY: Geoffrey G. Purse, P.E., Purse Associates, Inc. COMMENTS: For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F", Collier County, Government Complex. MOTION: Made by Mr. Lamoureux, seconded by Mr. Foley and carried 5/0, to approve Petition No. CU-96-21/Ex. 59.583 with added stipulations. ****** STIPULATIONS: Water Management: 1. The excavation shall be limited to a bottom elevation of -13.6 ft. NGVD. All disturbed areas proposed for lake excavation shall be excavated to a minimum elevation of-4.0 ft. NGVD. 2. Off-site removal of material shall be subject to "Standard Conditions" imposed by the Transportation Services Division in document dated 5/24/88 (copy attached). 3. In order to ensure a minimum eighty percent (80%) coverage of littoral zone planting areas, a performance guarantee, based on a cost estimate to replace the Environmental Advisory Board Minutes April 4, 1997 Page 4 original installed littoral zone plants, will be required upon completion and acceptance of the excavation (Land Development Code 3.5.7.2.5). No Certificates of Occupancy will be issued until this performance guarantee is submitted. 4. All provisions of Collier County Ordinance No. 91-102, Division 3.5 shall be adhered to. 5. Where groundwater is proposed to be pumped during the excavation operation, a Dewatering Permit shall be obtained from the South Florida Water Management District, and a copy provided to Engineering Review Services for approval prior to the commencement of any dewatering activity on the site. 6. No blasting will be permitted unless issued a separate permit by Collier County Engineering Review Services. 7. If trees are to be removed as a result of the excavating operation, a Vegetation Removal Permit, required by Land Development Code, Division 3.9 shall be obtained from Collier County Planning and Technical Services before work shall commence. 8. A 20 ft. maintenance easement shall be provided around the perimeter of the lake and a 20 ft. access easement to it shall be provided from a right-of-way. The easement shall be accessible to all maintenance vehicles. 9. No offsite hauling of material shall commence prior to issuance of a Collier County R/W permit. The following shall be a part of the R/W permit: a) Maretee Road shall be constructed pursuant to the excavation permit plan of record. b.) Maretee Road sub-base shall be stabilized. c) The intersection of Greenway Road and Maretee Road shall be paved to at least County minimum standards to the eastern right-of-way line of Greenway Road. d) During the earthmining operation, Greenway Road shall be maintained by the petitioner to the satisfaction of the Collier County Transportation Services and Development Services Divisions. e) Upon completion of the earthmining operation, Greenway Road shall be restored to present condition by the petitioner. Environmental Advisory Board Minutes April 4, 1997 Page 5 10. A water quality monitoring program shall be implemented in accordance with the approved program. 11. No blue trucks will be allowed on the project site. *********************** PETITION NO: Site Development Plan No. SDP-97-17 "Hawksridge Villas" REQUESTING: "Hawksridge Villas" is a 90 dwelling unit cluster home project within the Hawksridge PUD. REPRESENTED BY: Mark Minor, Grady Minor& Associates, P.A.. COMMENTS: For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor, Building "F", Collier County, Government Complex. MOTION: Made by Ms.Straton, seconded by Mr. Hinchcliff and carried 4/1, to place Petition No. SDP-97-17 on hold until the May 7, 1997 EAB meeting. The Environmental Advisory Board has requested the following information be submitted: 1. A landscape plan for the project. 2. More detailed inventory of existing vegetation. 3. Protected species survey information, including a list of the species which were surveyed for. ****** There being no further business, the meeting was adjourned by order of the Chair. Environmental Advisory Board David S. Wilkison, Chairman gdl✓f:EABMinutes/4.2.97Minutes /•"\