Loading...
EAC Minutes 09/02/1998 MINUTES OF THE ENVIRONMENTAL ADVISORY BOARD DATE: September 2, 1998 TIME: 9:00 a.m. PLACE: 3RD Floor Boardroom, Administration Building, Collier County Government Center, Naples, Florida EAB STAFF PRESENT Dejong Absent Ashton Espinar X Burgeson Foley X Chrzanowski X Hermanson X Kuck Hill X Lenberger X Hinchcliff X Mulhere Saadeh Absent Seal X MINUTES BY: Stephen Lenberger, Environmental Specialist II CALLED TO ORDER AT: 9:05 a.m. ADJOURNED AT: 10:35 a.m. PRESIDING: Paul Hinchcliff, Chairman ADDENDA TO THE AGENDA: APPROVAL OF MINUTES: Motion made by Mr. Espinar, seconded by Mr. Hermanson and carried 5/0, to approve minutes of July 1, 1998. ITEM: Regular Agenda- Item V.A. PETITION NO: Commercial Excavation No. 59.654 "Jolly/Evers Excavation" REQUESTING: To excavate a 2.0 (+) acre lake on a 5 acre tract in Golden Gate Estates. , • Environmental Advisory Board Minutes September 2, 1998 Page 2 n MOTION: Made by Mr. Foley, seconded by Mr. Espinar and carried 5/0, to approve Commercial Excavation No. 59.654 "Jolly/Evers Excavation" with Staffs stipulations. • Water Management: 1. The excavation shall be limited to a bottom depth of 12' below control. All distributed areas proposed for lake excavation shall be excavated to a minimum depth of 6'below control. 2. Off-site removal of material shall be subject to "Standard Conditions" imposed by the Transportation Services Division in document dated 5/24/88 (copy attached). 3. The lake littoral zone shall be created and planted as indicated on the Plan of Record. 4. All provisions of Collier County Ordinance No. 91-102, Division 3.5 shall be adhered to. 5. Groundwater shall not be pumped during the excavating operation. 6. No blasting will be permitted unless issued a separate permit by Collier County Engineering Review Services. 7. Stockpile side slope shall be at a maximum of 4:1 unless fencing is installed around the entire perimeter of the stockpile area. 8. No excavation permit shall be issued until all impact fees have been paid. These fees will be determined by Transportation Services Division. ITEM: Regular Agenda- Item V.B. PETITION NO: Commercial Excavation No. 59.648 (Companion to C.U. 98-12) "Winchester Lake Fill Pit" REQUESTING: To excavate a 604.75 acre lake on 654.12 acres of agriculturally zoned property. REPRESENTED BY: Glenn Simpson,representing Southern Sand& Stone ` Environmental Advisory Board Minutes September 2, 1998 Page 3 n MOTION: Made by Mr. Foley, seconded by Mr. Hermanson and carried 5/0, to approve Commercial Excavation No. 59.648 "Winchester Lake Fill Pit" with Staffs stipulations. Environmental Staff recommends approval of Commercial Excavation Permit No. 59.642 "Winchester Lake Fill Pit" with the following stipulations: 1. The excavation shall be limited to a lowest possible bottom elevation of 25 feet below existing grade unless a permit modification is applied for through the EAB and the BCC and shall be no shallower than 10 feet below existing grade. 2. Offsite removal of material shall be subject to standard conditions imposed by the Transportation Department(attached). 3. No blasting will be permitted unless a Collier County approved Blasting Permit is obtained 4. A separate vegetation removal permit (per Collier County Land Development /'•\ Code, Division 3.9) shall be obtained from Collier County Community Development Environmental Services Division before commencing the proposed clearing. • 5. The site plan shall be revised to include the following note: "Exotic vegetation, as defined by the CCLDC Section 3.9.6.4.1, shall be removed from the site. Subsequent annual exotic removal (in perpetuity) shall be the responsibility of the property owner." 6. Prior to any site improvement proposed in relation to this excavation or clearing, the owner shall contact the USACOE and SFWMD to determine if wetland permitting is needed. If so, all agency permits shall be obtained, prior to the commencement of any site improvements. ITEM: Regular Agenda-Item V.C. PETITION NO: Planned Unit Development No. PUD-98-10 "Cambridge Square PUD" REQUESTING: A commercial PUD with office, adult living facilities and other transitional uses. Environmental Advisory Board Minutes September 2, 1998 Page 4 REPRESENTED BY: David Morin, Hole,Montes and Associates, Inc. MOTION: Made by Mr. Espinar, seconded by Mr. Hill and carried 4/0,to approve Planned Unit Development No. PUD-98-10 "Cambridge Square PUD" with Staffs stipulations. Mr. Hermanson abstained from the vote. Water Management: 1. A copy of the SFWMD permit is required prior to development plan approval. 2. For perimeter berm heights in excess of two feet, side slopes shall be at a maximum of 4:1. Environmental: • No additional stipulations. ITEM: Regular Agenda- Item V.D. PETITION NO: Planned Unit Development No. PUD-98-9 "Glen Eden on the Bay" REQUESTING: A multi-family subdivision. REPRESENTED BY: Mark Minor, Q. Grady Minor&Associates, P.A. Ken Passarella,Passarella&Associates, Inc. Michael Myers,Passarella&Associates, Inc. PUBLIC SPEAKERS: Karen Johnson, South Florida Water Management District Michael Simonik, The Conservancy of Southwest Florida THIS ITEM WAS CONTINUED BY THE PETITIONER ITEM: Regular Agenda- Item V.E. PETITION NO: Planned Unit Development No. PUD-98-11 "Tamiami Professional Center" REQUESTING: A PUD containing a mix of office, retail and assisted living facility. • Environmental Advisory Board Minutes September 2, 1998 Page 5 REPRESENTED BY: Robert Duane,Hole, Montes and Associates, Inc. Geza Wass de Czege, Southern Biomes EIS, Inc. MOTION: Made by Mr. Hill, seconded by Mr. Foley and carried,4/0 to approve Planned Unit Development No. PUD-98-11 "Tamiami Professional Center" with Staffs stipulations. Mr. Hermanson abstained from the vote. Water Management: The petitioner shall submit a copy of the SFWMD permit application to Collier County Development Services Engineering Staff for review and comment. Environmental: The followinglanguage shall be added to the PUD document, "A Conservation Easement shall be placed over the preserves and recorded on the plat(or by separate instrument if the parcel is not platted)with protective covenants per or similar to Section 704.06 of the Florida Statutes. Conservation areas shall be dedicated on the plat to the project's homeowners association or like entity for ownership and maintenance responsibility and to Collier County with no responsibility for maintenance." *************** COMMENTS: For a complete record of the proceedings reader is directed to the tape recording of this meeting, located in the Office of the Clerk to the Board, 5th Floor,Building "F", Collier County, Government Complex. There being no further business, the meeting was adjourned by order of the Chair. Environmental Advisory Board ti_ r Pau = , ci f, Chairman Min/h:\EAB Forms