Add On Item IOB: Recommendation to accept a Multi-Way Stop Warrant Study and approve
the installation and operation of a 4-way stop control at the intersection of St. Andrews Boulevard
and Wildflower Way at an installation cost of approximately $300, with an annual maintenance
cost of approximately$100(Cost Center 163630). (Commissioner Fiala's request)
Move Item 16A8 to Item 11B: Recommendation to approve a
Resolution amending Ordinance No. 2004-66, as amended, that
created an administrative code for Collier County, to amend
Exhibit "B," Administrative Code for Land Development, by
amending Chapter Four, Administrative Procedures, more
specifically to add section M, Stormwater Plan; amending Chapter
Eight, Public Notice, more specifically to amend section F,
Stakeholder Outreach Meeting for Golf Course Conversion (SOM);
and providing an effective date. (This is a companion to Agenda
Item 9.B.) (Commissioner Solis' request)
Time Certain Items:
Item 13A to be heard at 10:00 a.m.
Item 10A to be heard at 1:00 p.m.
Item 12A to be heard immediately following Item 5B
4/13/201710:27 AM
ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP 1 I B
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW** ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1. Jeremy Frantz Zoning Division, GMD ttr 4/10/17
2.
3 County Attorney Office County Attorney Office
11/r'7
4. BCC Office Board of County
Commissioners
5. Minutes and Records Clerk of Court's Office
iA 11 3:3P4
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above,may need to contact staff for additional or missing information.
Name of Primary Staff Jeremy Frantz Phone Number Ex.2305
Contact/ Department
Agenda Date Item was 4/11/17 Agenda Item Number 16.A.8 }„ 11.
Approved by the BCC
Type of Document Resolution Number of Original 1
Attached TAO-16 Documents Attached
PO number or account N/A
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A"in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
I. Does the document require the chairman's original signature? -1RRP' AGS
2. Does the document need to be sent to another agency for additional signatures? If yes, N/A
provide the Contact Information(Name; Agency;Address;Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be JRF
signed by the Chairman,with the exception of most letters,must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JRF
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's JRF
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip JRF
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 4/11/17 and all changes made during the J 745,0
meeting have been incorporated in the attached document. The County Attorney's a t
Office has reviewed the changes, if applicable.
9. Initials of attorney verifying that the attached document is the version approved by the g
BCC,all changes directed by the BCC have been made, and the document is ready for the dgfigirla
Chairman's signature.
I:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
�-1—LIDS
118
RESOLUTION NO. 2017 -7 3
A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS
OF COLLIER COUNTY, FLORIDA AMENDING ORDINANCE NO.
2004-66, AS AMENDED, THAT CREATED AN ADMINISTRATIVE
CODE FOR COLLIER COUNTY, TO AMEND EXHIBIT "B,"
ADMINISTRATIVE CODE FOR LAND DEVELOPMENT, BY
AMENDING CHAPTER FOUR, ADMINISTRATIVE PROCEDURES,
MORE SPECIFICALLY TO AMEND SECTION M, STORMWATER
PLAN; AMENDING CHAPTER EIGHT, PUBLIC NOTICE, MORE
SPECIFICALLY TO ADD SECTION F, STAKEHOLDER OUTREACH
MEETING FOR GOLF COURSE CONVERSION (SOM); AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, the Board of County Commissioners ("Board") adopted Ordinance No.
2004-66 on October 12, 2004, which created an Administrative Code for Collier County; and
WHEREAS, the Board subsequently amended Ordinance No. 2004-66 through the
adoption of Ordinance No. 2013-57 on September 24, 2013; and
WHEREAS, Ordinance No. 2013-57 provides for the adoption of Exhibit "B,"
Administrative Code for Land Development; and
WHEREAS, Ordinance No. 2013-57 also provides that amendments required to maintain
the Administrative Code shall be made by resolution adopted by the Board; and
WHEREAS, the Board desires to revise Exhibit "B," Administrative Code for Land
Development, to amend procedures and public notice requirements for Stakeholder Outreach
Meetings relating to the conversion of constructed golf courses to non-golf course land uses in
accordance with Sections 5.05.15 and 10.03.06 of the Collier County Land Development Code;
and to add procedures relating to stormwater plans for single-family dwelling units, two-family
dwelling units, and duplexes in accordance with Section 6.05.03 of the Collier County Land
Development Code.
NOW, THEREFORE BE IT RESOLVED BY THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that Exhibit "B", Administrative
Code for Land Development, of Ordinance No. 2004-66, as amended, is hereby amended as
follows:
[17-LDS-00033/1329552/11 17-LDS-00033 3/28/17
116
SECTION ONE: AMENDMENT OF CHAPTER FOUR — ADMINISTRATIVE
PROCEDURES
Section M, entitled "Stormwater Plan", is hereby by added to Chapter Four,
Administrative Procedures, of Exhibit "B," Administrative Code for Land Development, as set
forth in Exhibit A, attached hereto and incorporated herein by reference.
SECTION TWO: AMENDMENT OF CHAPTER EIGHT—PUBLIC NOTICE
Section F, entitled "Stakeholder Outreach Meeting for Golf Course Conversion (SOM),"
of Chapter Eight, Public Notice, of Exhibit "B," Administrative Code for Land Development, is
hereby amended as set forth in Exhibit B, attached hereto and incorporated herein by reference.
SECTION THREE: EFFECTIVE DATE
This Resolution shall become effective on the date of adoption by the Board.
THIS RESOLUTION ADOPTED by majority vote this i day of Ptio , 2017.
ATTEST BOARD OF COUNTY COMMISSIONERS
DWIGHT E. BROCK,TCLERK COL I40$UNTY, FLORIDA
By. Ja, �
D uty.Clerl Q - - PENN tAYLOR, dr IRMAN
Attest as to Charman
signature only.
Approved as to form and legality:
Scott A. Stone
Assistant County Attorney
Attachments: Exhibit A—Chapter 4, Section M, "Stormwater Plan"
Exhibit B —Chapter 8, Section F, "Stakeholder Outreach Meeting for Golf Course
Conversion (SOM)"
[17-LDS-00033/1329552/1] 17-LDS-00033 3/28/17
Text underlined is new text to be added
Strikethrough text is current text to be deleted
Bold text indicates a defined term
Collier County Land Development Code I Administrative Procedures Manual
Chapter 4 I Administrative Procedures
M. Stormwater Plan
Reference LDC subsection 6.05.03.
Applicability This process applies to single-family dwellings,two-family dwellings, and duplexes that
meet the applicability criteria established in LDC section 6.05.03.
This process may also be used to demonstrate compliance with Collier County Code of
Laws and Ordinances section 90-41(f)(8)as described in LDC section 6.05.03 G.
Pre-application A pre-application meeting is not required.
Initiation The applicant submits a Type I or Type II Stormwater Plan as part of the Building Permit
application or when required by the Code Enforcement Board or Special Magistrate to
demonstrate compliance with Collier County Code of Laws and Ordinances section 90-
41(f)(8).
Application Submittal Credentials:A Type I Stormwater Plan, as described below,shall be prepared
Contents by a Florida registered design professional, licensed contractor, or owner
builder.A Type II Stormwater Plan,as described below,shall be prepared by a
professional engineer licensed in the state of Florida.The name and contact
information of the person who prepared the drainage plan shall be included on
the document.
Type I and Type II Stormwater Plan applications must include the following:
1. Applicant contact information.
2. Property information,including:
• Address of the subject property;
• Zoning of the subject property;and
• Description of the proposed activity.
3. The Stormwater Plan shall demonstrate the following:
• Property boundaries;
• Lot area;
• Finished floor elevation of the subject property,as needed;
• Elevation of adjacent properties at the property line and representative
elevations of the subject site throughout the impacted area,as needed;
• Location and area of all surfaces that prevent the percolation or absorption
of water into the ground on the site;
• Septic system location and dimensions, if applicable;
• Location of existing topographical features,such as,watercourses, drainage
ditches, lakes, marshes, if applicable;
• Proposed drainage directional arrows;
• Location and type of all drainage infrastructure, if applicable;
C:\Users\scottstone\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\6PV052E0\M Stormwater Plans
3-6-17(2).docx — - -- -
Exhibit A h
Text underlined is new text to be added I I B
Strikethrough text is current text to be deleted
Bold text indicates a defined term
Collier County Land Development Code I Administrative Procedures Manual
Chapter 4 I Administrative Procedures
• Square feet of retention or detention areas, if applicable;
• Depth of retention or detention areas in inches, if applicable;
• Cross-sections illustrating proposed grading and drainage infrastructure,
including but not limited to:berms,walls,swales, pipes,gutters and
downspouts, or other drainage facilities as needed to demonstrate
compliance with LDC section 6.05.03;and
• Elevation of the wet season water table in the impacted area if detention or
retention is proposed;
In addition to the application contents above,Type II Stormwater Plans must
include an engineer's analysis that demonstrates the following:
• Water quantity calculations required in LDC section 6.05.03 D.2;
• A matrix of all required separation distances between wells,drainfield
systems,and stormwater retention/detention areas.The matrix may be
included as a part of the site plan or on a separate engineer's report; and
• The wet season water table elevation.
4. Any additional information related to the subject site, impervious areas,or drainage
requested by the County Manager or designee.
Completeness and The Planning&Zoning Division will review the application for completeness.After
Processing submission of the completed application packet accompanied with the required fee,the
applicant will receive a mailed or electronic response notifying the applicant that the
petition is being processed.Accompanying that response will be a receipt for the
payment and the tracking number(i.e.,XX201200000)assigned to the petition.This
petition tracking number should be noted on all future correspondence regarding the
petition.
Notice No notice is required.
Public Hearing No public hearing required.
Decision maker The County Manager or designee.
Review Process The Stormwater Plan will be reviewed by the Planning&Zoning Division as a part of the
Building Permit application or a code enforcement case.
Updated
C:\Users\scottstone\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\6PVO52E0\M Stormwater Plans
3-6-17(2).docx
Ai
Text underlined is new text to be added
118
Bold text indicates a defined term
Collier County Land Development Code I Administrative Procedures Manual
Chapter 8 I Public Notice—Generally, Contents, Categories of Notice, and Notice Recipients
F. Stakeholder Outreach Meeting for Golf Course Conversions (SOM)
Reference LDC sections 5.05.15 and LDC Public Notice section 10.03.06.
q See Chapter 4.N for Intent to Convert Applications for the Application Contents
Required for Presentations at SOMs.
Purpose Stakeholder Outreach Meetings(SOMs)are intended to engage stakeholders early in the
design of a golf course conversion project and to encourage collaboration and consensus
between the applicant and the stakeholders on the proposed conversion.
Applicability This process applies to applicants seeking to convert a constructed golf course to a non-
golf course use.A minimum of two in-person meetings and one web-based visual survey
are required.This section shall be used in connection with LDC section 5.05.15.
Initiation The SOMs may be held after the "Intent to Convert"application has been received by the
County and deemed sufficient by staff to proceed. It is encouraged that SOMs take place
in a timely manner so as to support stakeholder involvement.
SOM Notice Each SOM shall be noticed as follows:
Requirements
1. Newspaper Advertisements:The legal advertisement shall be published at least 15
days before the SOM in a newspaper of general circulation.The advertisement shall
include at a minimum:
• Date,time,and location of the SOM;
• Petition name, number and applicant contact info;
• Notice of the intention to convert the golf course to a non-golf course use;
• Brief description of the proposed uses;and
• 2 in.x 3 in. map of the project location.
2. Mailed Notice: For the purposes of this mailed notice requirement,written notice
shall be sent to property owners located within 1,000 feet from the property line of
the golf course at least 15 days before the first SOM.The mailed notice shall include
the following:
• Date,time,and location of each SOM included in the mailed notice;
• Petition name, number and applicant contact info;
• Notice of the intention to convert the golf course to another use;
• A brief description of the proposed uses;
• A statement describing that the applicant is seeking input through a
stakeholder outreach process;
• The user-friendly web address where the meeting materials,such as the
Developers Alternatives Statement,can be accessed;
• A brief description of the visual survey and the user-friendly web address
where the survey can be accessed;and
• The dates that the web-based visual survey will be available online.
C:\Users\scottstone\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\6PV052E0\E Stakeholder Outreach
Meeting 3-28-17.docx
Exhibit B
11B
Text underlined is new text to be added
Bold text indicates a defined term
Collier County Land Development Code I Administrative Procedures Manual
Chapter 8 / Public Notice—Generally, Contents, Categories of Notice, and Notice Recipients
Location The applicant must arrange the location of the meeting.The location must be reasonably
convenient to the property owners who receive the required notice.The facilities must
be of sufficient size to accommodate expected attendance.
Timeframe SOMs must be held between November 15L and April 30th.
Conduct of SOMs A minimum of two SOMs shall be conducted in accordance with the following:
• An assigned County planner shall attend the SOMs and observe the process.
The planner shall note any commitment made by the applicant during the
meetings.
• Meeting Conduct:The applicant shall conduct the meetings as follows:
o Use at least one public outreach method during the in-person
meetings as described below;and
o The applicant shall facilitate dialogue and encourage input on the
conceptual development plan from the stakeholders regarding the
types of development the stakeholders consider compatible with
the neighborhood,and the types of land uses they would support
to be added to the neighborhood.
• Presentation: The applicant must provide the following at the SOM for
review and comment:
o The current LDC zoning district uses and development regulations;
o Information about the purpose of the meeting,including the goals
and objectives of the conversion project;
o A copy of the Developer's Alternatives Statement shall be made
available at the SOM,as described in LDC section 5.05.15 C.2;
o Visuals depicting the conceptual development plan(s)and the
greenway;and
o The list of deviations requested,as described in LDC section 5.05.15
C.4.a-b.
• Public Outreach Methods:The applicant shall use one or more of the
following at the Stakeholder Outreach Meetings to engage stakeholders:
o Charrette.This public outreach method is a collaborative design
and planning workshop that occurs over multiple days.Through a
charrette,the applicant designs the conceptual development plan
and greenway with stakeholders' input. During a charrette,
stakeholders are given the opportunity to identify values, needs,
and desired outcomes regarding the project.Through a series of
engagement activities the conceptual development plan and
greenway are designed and refined.Throughout the sessions,
stakeholders have an opportunity to analyze the project,address
and resolve issues,and comment on multiple iterations of the
project.
o Participatory Mapping.This public outreach method produces maps
C:\Users\scottstone\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\6PV052E0\E Stakeholder Outreach
Meeting 3-28-17.docx
Cq
118
Text underlined is new text to be added
Bold text indicates a defined term
Collier County Land Development Code I Administrative Procedures Manual
Chapter 8 / Public Notice—Generally, Contents, Categories of Notice, and Notice Recipients
using stakeholder knowledge and input.To start,the applicant
hosts a workshop and shares information about the project through
exhibits such as poster boards,written or electronic materials,etc.
Participants are then given sticky dots, markers,or other
tactile/visualization tools in conjunction with maps of the
conceptual development plan and greenway to identify options to
address compatibility,adverse impacts,or types of desirable usable
open space for the project. For example:stakeholders are asked to
place red dots on the map where there is a perceived pedestrian
hazard and place a green dot where they support additional tree
plantings in the greenway.
o Group Polling.This public outreach method polls participants at the
meeting and provides instant results.The poll can include a wide
range of topics about the project,such as density,greenway uses,
vehicle/pedestrian transportation networks,etc.The applicant
provides sticky dots or uses electronic devices to conduct the
polling.
o Visioning Exercise.This public outreach method invites
stakeholders to describe their core values and vision for their
community. In a workshop setting,the applicant presents a wide
variety of reports, maps, photos,and other information about the
project.The applicant then poses questions to the participants,
such as, but not limited to the following:
• "What do people want to preserve in the community?"
• "What do people want to create in the community?"
• "What do people want to change in the community?"
The applicant collects the responses and works with the
participants to create a vision statement for the project that
incorporates the goals,concerns,and values of the community.
Web-based Visual The web-based visual survey is intended to increase engagement with stakeholders.The
Survey survey should engage the stakeholders in the design of the project and assist in
Requirements determining what stakeholders find important to the neighborhood,what is considered
compatible with the neighborhood,and what types of land uses they support adding to
the neighborhood.
• The survey shall provide visual representations of the proposed
development, in particular the types of land uses proposed,streetscapes,
public spaces,design characteristics,and depictions of the greenway design;
• The survey questions shall be worded so as to elicit responses to the
stakeholders' preferences or support for the visual representations.
• The survey shall allow for additional comment(s)to be made by the
stakeholders.
SOM Report After the SOMs and the web-based survey are complete,the applicant will submit a
report of the SOM to the County, including the following information:
• A list of attendees,a description of the public outreach methods used,
C:\Users\scottstone\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\6PV052E0\E Stakeholder Outreach
Meeting 3-28-17.docx
•
1 1 B
Text underlined is new text to be added
Bold text indicates a defined term
Collier County Land Development Code I Administrative Procedures Manual
Chapter 8 I Public Notice—Generally, Contents, Categories of Notice, and Notice Recipients
photos from the meetings demonstrating the outreach process, results from
outreach methods described above;
• Copies of the materials used during the meeting, including any materials
created at the meeting,such as any participatory mapping or related
documents;
• A verbatim transcript of the meetings and an audio(mp3 or WAV format)or
video recording in a format accessible or viewable by the County;
• A point-counterpoint list,identifying the input from the stakeholders and
how and why it was or was not incorporated into the application. Input from
stakeholders may be categorized by topic and the applicant may provide a
single response to each topic in narrative format;and
• The report shall be organized such that the issues and ideas provided by the
stakeholders that are incorporated in the application are clearly labeled in
the point-counterpoint list and in the conversion application.
Meeting Follow-up After each SOM is completed and prior to the submittal of a conversion application,the
applicant will submit to the assigned planner a written summary of the SOM and any
commitment that has been made.Any commitment made during the meeting will:
• Become part of the record of the proceedings;
• Be included in the staff report for any subsequent conversion application;
and
• Be considered for inclusion into the conditions of approval of any
subsequent development order.
Updated
C:\Users\scottstone\AppOata\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\6PV052E0\E Stakeholder Outreach
Meeting 3-28-17.docx /�