Agenda 03/28/2017 Item #16D1103/28/2017
EXECUTIVE SUMMARY
Recommendation to approve an expenditure of Tourist Development Tax for Category “A” Beach
Park Facilities to Bridging Solutions, LLC, using Contract Number 13-6164, “Professional Services
for Engineers and Architects”, for a boardwalk inspection at Clam Pass Park, for $10,468, and
make a finding that this expenditure promotes tourism.
OBJECTIVE: To obtain an inspection report for the Clam Pass Park boardwalk decking and handrail
system.
CONSIDERATIONS: The Clam Pass Beach Park boardwalk has been in existence since 1985. On
January 26, 2015, the Tourist Development Council (TDC) approved a work order to Coastal Engineering
Consultants, Inc. for the inspection of the Clam Pass Boardwalk. The inspection included
recommendations for a full restoration of the substructure of the boardwalk. On October 26, 2015, the
TDC approved the Invitation to Bid, No. 15-6510, to Custom Built Marine Construction, Inc., for the
repairs to the Clam Pass Park boardwalk. The construction repairs included the full substructure
restoration and was limited to some handrail replacements at locations of critical concern.
Although missing or critically damaged handrail and handrail posts were replaced (Oct. 2015), the
handrail system and decking continues to deteriorate. To maintain the longevity of the decking and
handrail system, its maintenance needs to be addressed. A second inspection is needed for the handrail
system and decking to obtain a recommendation report to determine the life expectancy, prepare for
future year budgeting and prioritize needed repairs and maintenance. Handrail and cap maintenance was
specifically included in the April 27, 2015, grant application. This inspection will also include the
decking as the entire boardwalk system needs attention. This is the first expenditure of the $100,000
budget in the grant application for the Clam Pass Boardwalk.
ADVISORY BOARD RECOMMENDATION: On April 27, 2015, the Tourist Development Council
approved a grant application for $1,189,230 for a Category “A” Grant Application for Beach Park
Facilities, with $100,000 approved for the replacement of caps and top rails on the boardwalk at Clam
Pass Beach Park, with a vote 9-0.
On February 27, 2017, the Tourist Development Council approved this work order to Bridging Solutions,
LLC for a boardwalk inspection at Clam Pass Park for $10,468, with a vote 9-0.
FISCAL IMPACT: Sufficient funding for the award is provided in TDC Beach Park Facilities Fund
(183) within Clam Pass Boardwalk Repair Project 80333.
GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to
this action.
LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote
for approval. - CMG
RECOMMENDATION: To approve an expenditure of Tourist Development Tax for Category “A”
Beach Park Facilities to Bridging Solutions, LLC, under Contract Number 13-6164, “Professional
Services for Engineers and Architects”, for a boardwalk inspection at Clam Pass Park, Project No. 80333,
in the amount of $10,468, and make a finding that this project expenditure promotes tourism.
Prepared by: Felicia Kirby, Associate Project Manager, Facilities Management Division
03/28/2017
ATTACHMENT(S)
1. Work Order (PDF)
2. Proposal (PDF)
3. Grant Application (PDF)
03/28/2017
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.D.11
Doc ID: 2471
Item Summary: Recommendation to approve an expenditure of Tourist Development Tax for
Category “A” Beach Park Facilities to Bridging Solutions, LLC, using Contract Number 13 -6164,
“Professional Services for Engineers and Architects”, for a boardwalk inspection at Clam Pass Park, for
$10,468, and make a finding that this expenditure promotes tourism.
Meeting Date: 03/28/2017
Prepared by:
Title: – Facilities Management
Name: Felicia Kirby
01/30/2017 1:29 PM
Submitted by:
Title: Division Director - Facilities Mgmt – Facilities Management
Name: Dennis Linguidi
01/30/2017 1:29 PM
Approved By:
Review:
Procurement Services Lissett DeLaRosa Level 1 Purchasing Gatekeeper Completed 01/30/2017 1:40 PM
Facilities Management Dennis Linguidi Additional Reviewer Completed 01/30/2017 2:19 PM
Parks & Recreation Barry Williams Additional Reviewer Completed 01/30/2017 2:35 PM
Facilities Management Hank Jones Additional Reviewer Completed 01/30/2017 4:56 PM
Facilities Management Margaret Bishop Additional Reviewer Completed 01/30/2017 5:53 PM
Procurement Services Rhonda Burns Additional Reviewer Completed 01/31/2017 10:55 AM
Procurement Services Brenda Brilhart Additional Reviewer Completed 02/01/2017 11:25 AM
Procurement Services Ted Coyman Additional Reviewer Completed 02/22/2017 5:49 PM
Public Services Department Hailey Margarita Alonso Level 1 Division Reviewer Completed 02/27/2017 11:26 AM
Public Services Department Steve Carnell Level 2 Division Administrator Review Completed 02/28/2017 8:27 AM
County Attorney's Office Colleen Greene Level 2 Attorney Review Completed 03/02/2017 8:26 AM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/02/2017 10:27 AM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 03/03/2017 8:43 AM
Budget and Management Office Ed Finn Additional Reviewer Completed 03/07/2017 2:45 PM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 03/20/2017 9:31 PM
Board of County Commissioners MaryJo Brock Meeting Pending 03/28/2017 9:00 AM
WORK ORDER/PURCHASE ORDER
Contract | 3'6 | 64 "Professional Services for Engineers and Architects - ST"'
Contract Expiration Date: March 8.2019
This work order is fior professional engineering services lor work known as:
Project Name: Clam Pass Park Boardwalk lnspection
Projcct No: 80333
The work is specified in the proposal dated December 5.2016 which is attached hereto and made a
part of this Work Order. ln accordance with Terms and Conditions of the Agreement referenced
above. this work order/Purchase order is assigned to: Bridging solutions, LLc.
Scope of Work: As detailed in rhe attached proposal and the following:
* Task I Inspection and Field Reporrt Task ll Evaluation Study Report
Schedule of Work: Complete n'ork rvithin 60 days from the dare of the Norice to proceed which is
accompanying this Work Order. The Consultant a-qrees that any Work Order that extends beyond the
expiration date of Agreement No. l3-6t6.1 will survive and remain subject to the terms and
conditions of that Agreement until the completion or termination of this Work Order.
Compensation: In accordance with the Agreement referenced above. the County will compensate rhe
Firm in accordance rvith following method(s): filNegotiated Lump Sum (NLS) fLump Sum plus
Reimbursable Costs (LS+p61 ['fime & Material (T&M) (established hourly rar; Sch;dule A) f]
Cost Plus Fixed Fee (CPFF), as provided in the attached proposal.
Task I s 6.580.00 LS
Task ll $ 3.888.00 LS
TOTAL FEE $t0,468.00
PREPARED BY:
REVIEWED BY:/)-7-/L
Date
6licia Kirby. Associate Project Manager
Facilities Management Division
A. Bishop, P.E.. Sr/Project Manager
Facilities Management Division
Project No. 80333 Contract No. l3-616.{Page l of2
.E., Principal Project Manager
REVIEWED BY:W
APPROVED BY:
Barry W Division Director
By the signature below, the Firm (including employees, oflicers and/or agents) certifies. and hereby
discloses, that, to the best of their knowledge and beliel all relevant facts conceming past, present. or
curently planned interest or activity (financial, contractual. organizational. or otherwise) which
relates to the proposed work; and bear on whether the Firm has a potential conflict have bccn fully
disclosed.
Additionally, the Firm agrees to notify the Procurement Director, in writing r,rithin 48 hours of
leaming of any actual or potential conflict of interest that arises during the Work Order and/or project
duration.
ACCEPTED BY: Bridging Solutions. LLC
e*1"**-December 7,2019
Ralph Verrastro, P.E., Principal Date
(Remainder of page intentionally left blank)
Parks & Recrcation Division
Public Services Department
Date
Project No. 80333 Contract No. l3{164 Page 2 of2
We design bridges to fit your site and budget.
Bridging Solutions, LLC
15863 Secoya Reserve Circle
Naples, FL 34110
Tel. (239) 216-1370
ralph@bridging-solutions.com
www.bridging-solutions.com
December 5, 2016
Margaret A. Bishop, P.E.
Senior Project Manager
Facilities Management Department
Collier County Government
3299 Tamiami Trail East
Naples, FL 34112
RE: Proposal to Provide Professional Engineering Services for:
Clam Pass Park, Collier County, FL
Boardwalk Inspection & Evaluation Report
Dear Ms. Bishop:
Bridging Solutions, LLC appreciates the opportunity to submit this proposal to provide engineering
services based on your e-mail request.
1. BACKGROUND
The Collier County Facilities Management Department selected Bridging Solutions, LLC (BSLLC) to
perform engineering services for an inspection and the preparation of an evaluation report for the
boardwalk at Clam Pass Park under Collier County Contract Number 13-6164-ST. The inspection will be
limited to the boardwalk decking and railing system between the tram station and the concession area. We
understand the substructure and stringers were recently repaired by a contractor. The findings of the
inspection will be documented in a report that will include recommendations to maintain the longevity of
the boardwalk.
2. SCOPE OF SERVICES
2.1. Inspection and Field Report – Perform an inspection of all visible decking and railing system
elements on the boardwalk. Document the inspection findings including significant defects
including checks, cracks, rotting, spalls, corrosion, impact damage, etc. using field notes and
digital photographs.
2.2. Evaluation Study Report – Perform a study that considers the existing conditions and probable
future maintenance requirements including the probable life expectancy of the boardwalk decking
and railing system. Prepare a report that provides a summary of the inspection findings and
include recommendations to maintain the longevity of the boardwalk decking and railing system.
Prepare an opinion of probable cost for the eventual replacement of the decking and railing system
elements. Conduct a meeting with the County staff to review the report and recommendations.
2
We design bridges to fit your site and budget.
3. TIME SCHEDULE
We anticipate completion of the above described services in 60 days from receipt of a Notice to Proceed.
If the services covered by this proposal have not been completed within this time, through no fault of
Bridging Solutions, a time extension to complete our services may be renegotiated.
4. COMPENSATION
Bridging Solutions proposes to provide the above described services for lump sum fees according to the
following breakdown. The attached proposal back-up form provides the estimated hours, staffing titles
and rates that form a basis for the lump sum fees.
Task 2.1 – Inspection and Field Report $6,580
Task 2.2 – Evaluation Study Report 3,888
Total Fee $10,468
Thank you for your consideration of this proposal. Please contact me at 239-216-1370 if you have any
questions or comments.
Respectfully,
BRIDGING SOLUTIONS, LLC
Ralph Verrastro, PE
Principal
EXECUTIVE SUMMARY
Approve Twelve (12) Collier County Tourist Development Council Category “A” Grant
Applications for Beach Park Facilities for Fiscal Year 2015/2016 in the Total Amount of
$1,189,230.00 and make a finding that the expenditure promotes tourism.
OBJECTIVE: To obtain Collier County Tourist Development Council grant funding.
CONSIDERATIONS: The following Collier County Tourist Development Council Category “A” grant
applications were reviewed by the Parks and Recreation Advisory Board (PARAB) on April 15, 2015.
Their recommendations for improved beach park facilities are as follows:
PROJECT AMOUNT
REQUESTED
PREVIOUSLY
REQUESTED
Barefoot Beach Access Enhancements:
Boardwalk Replacement and Picnic Tables for 5
Pavilions
$200,000.00 0
Beach Wheel Chairs:
1 each @ Clam Pass, Tigertail, Barefoot, and
Vanderbilt Beach
$12,000.00 $6,000.00 FY14
Bluebill Beach Access
Restroom and Parking Area Security Cameras
$22,862.00 0
Clam Pass Beach Park:
Restroom Expansion
$300,000.00 0
Clam Pass Beach Park:
Replace Caps and Top Rails on Boardwalk
$100,000.00 0
Clam Pass Beach Park:
Mangrove Trimming along boardwalk
$50,000.00 0
Clam Pass Beach Park
Entrance Booth and Parking Lot Security
Cameras
$69,368.00 0
Sea Gate Beach Access Enhancements $40,000.00 0
South Marco Beach Access Parking Lot
Enhancements:
Design, Permitting, Installation
$90,000.00 0
South Marco Beach Access Enhancements:
Replace boardwalk and landscaping
$110,000.00 0
Tigertail Beach Park:
Entrance Enhancements and Interpretive
Signage Installation
$50,000.00 0
Vanderbilt Beach Park:
Exotic Vegetation Removal
$5,000.00 0
Vanderbilt Beach Parking Garage
Enhancements:
Restripe/Thermoplasty Parking Garage
$80,000.00 0
Wildlife Proof Trash Receptacles for Beach
Parks
$60,000.00 $30,000.00 FY14
TOTAL $1,189,230.00 $36,000.00
April 27, 2015
New Business 7-i
1 of 34
PROJECT DETAILS:
Barefoot Beach Access Enhancements: $200,000.00
Boardwalk Replacement and Picnic Tables for 5 Pavilions
• Ipe Boardwalk-Design $ 5,000
• Ipe Boardwalk Construction $ 155,000.00
• 4 picnic tables each at 5 pavilions $ 40,000.00
Beach Wheel Chairs: $12,000.00
1 each @ Clam Pass, Tigertail, Barefoot, and Vanderbilt Beach
• 4 Beach Wheel Chairs @ $3,000.00 each $12,000.00
Bluebill Beach Access
Installation of Building and Parking Lot Security Cameras: $22,862.00
• Add CenturyLink
• Add network equipment
• Install restroom and parking lot cameras
Clam Pass Beach Park: $300,000.00
Restroom Expansion: Design/Permitting/Construction
• Design $25,000.00
• Permitting $20,000.00
• Utilities $20,000.00
• Construction $235,000.00
Clam Pass Beach Park Boardwalk: $100,000.00
Redo Caps and Top Rails
• Materials/Construction $100,000.00
Clam Pass Beach Park Boardwalk $50,000.00
Mangrove Permitting and Trimming
• Field Inspection $2,000.00
• Permitting $3,000.00
• Mangrove Trimming $45,000.00
Clam Pass Beach Park
Entrance Booth and Parking Lot Security
Cameras $69,368.00
• Extend fiber from US 41 and Pine Ridge Road to Clam Pass
• Add network equipment
• Install toll booth and parking lot cameras
Sea Gate (North Gulf Shore) Beach Access $40,000.00
Access Enhancements
• Landscape Design $ 5,000.00
• Seating and bike rakes $ 10,000.00
April 27, 2015
New Business 7-i
2 of 34
• Plantings $ 25,000.00
South Marco Beach Access Parking Lot Enhancements: $90,000.00
Design, Permitting and Installation
• Design (landscaping) $ 5,000
• Installation Landscaping $25,000
• Thermoplasty Installation $60,000
South Marco Beach Access: $110,000.00
Boardwalk and Landscaping Enhancements
• Design $5,000
• Permitting $7,000
• Construction including landscape $98,000
Tigertail Beach Park: $50,000.00
Entrance Enhancements and Interpretive Signage Fabrication
• Fabrication of new entrance sign $30,000.00
• 10 2’ x 3’ Interpretive signs $20,000.00
Exotic Vegetation Removal: $5,000.00
Vanderbilt Beach Park
• Exotic Vegetation Removal $5,000.00
Vanderbilt Beach Parking Garage: $80,000.00
Restripe/Thermoplasty Parking Garage Spaces
• Thermoplasty Product and Labor $80,000.00
Wildlife Proof Trash Receptacles: $60,000.00
Tigertail Beach, Barefoot Beach, Barefoot Beach Access, South Marco Beach Access, Vanderbilt
Beach, and Clam Pass Beach Park
• 30 Wildlife Proof Trash Receptacles @ $2,000.00 each $60,000.00
The cost of these projects will come from the TDC Category “A” Funding.
FISCAL IMPACT: Funds in the amount of $1,189,230.00 are available for appropriation from
Category “A” Tourist Taxes Fund 183.
GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to
this action.
LEGAL CONSIDERATIONS:
ADVISORY BOARD RECOMMENDATION: At the April 15, 2015, Parks and Recreation Advisory
Board (PARAB) meeting, these grants applications were recommended for approval (approved 5 to 0).
April 27, 2015
New Business 7-i
3 of 34
RECOMMENDATION: That the Collier County Tourist Development Council approve the above-
referenced Category “A” grant applications in the amount of $1,189,230.00 and make a finding that the
expenditure promotes tourism.
Prepared by: Nancy Olson, Manager Parks and Recreation
April 27, 2015
New Business 7-i
4 of 34
COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL
CATEGORY "A" GRANT APPLICATION
Clam Pass Beach Park Boardwalk
Redo Caps and Top Rails
1. Name and Address of Project Sponsor Organization:
Collier County Parks and Recreation Department
North Collier Regional Park
15000 Livingston Road
Naples, Florida 34109
2. Contact Person, Title and Phone Number:
Name: Barry Williams, Director
Address: 15000 Livingston Road
City: Naples; ST: FL; ZIP 34109
Phone: 239-252-4035 FAX: 252-530-6538
Other: 239-280-7035
3. Organization's Chief Official and Title:
Barry Williams, Director
Collier County Parks and Recreation Department
4. Details of Project-Description and Location:
The Clam Pass Boardwalk Beach Park facility has been in existence since 1985. The
beach consists of 35 acres of coastal habitat, white sandy beach, a tidal bay that serves as
a breeding ground and nursery for marine life and shorebirds. A% mile boardwalk to the
beach takes visitors through a mangrove forest of red, white, and black mangroves.
Annually, over 200,000 visitors walk or take advantage of a tram service to get to the
beach. Collier County Parks and Recreation would like to redo the caps and top rails of
the% mile boardwalk.
5. Estimated project start date: October 2015
6. Estimated project duration: (see below for milestones).
7. Total TDC Tax Funds Requested: $100,000.00
8. If the full amount requested cannot be awarded, can the program/project be
restructured to accommodate a smaller award? Yes ( ) No (X)
April 27, 2015
New Business 7-i
33 of 34
Collier County Tourist Development Council
Category "A" Grant Application Page 2
Clam Pass Beach Park Boardwalk
Redo Caps and Top Rails
PROJECT BUDGET
PROJECT ELEMENT AMOUNT
TDC Funds Requested
City/Taxing District Share
State of Florida Share
Federal Share
TOTAL
PROJECT EXPENSES:
Construction
TOTAL
Milestones:
Solicit proposals for scope
Proposals due
Approve Work Order
Issue NTP
$100,000.00
$ N/A
$ N/A
$ N/A
$100,000.00
30 days after scope is defined
30 days after solicitation
30 days after quotes received
2 weeks after PO issued
I have read the Tourist Development Category "A" Beach Funding Policy covering beach
renourishment and pass maintenance and agree that my organization will comply with all
guiflelines and critrria.s and crlteria.4u
of Sponsor Organization's Chief Official
April 27, 2015
New Business 7-i