Loading...
Agenda 03/28/2017 Item #16D1003/28/2017 EXECUTIVE SUMMARY Recommendation to approve an expenditure of Tourist Development Tax Category “A” Beach Park Facility funds to Q. Grady Minor and Associates, P.A., using Contract Number 13-6164, “Professional Services for Engineers and Architects,” for an engineering report for drainage improvements at Barefoot Beach Park, for $4,590, and make a finding that this expenditure promotes tourism. OBJECTIVE: To obtain an engineering report for drainage improvements at the Barefoot Beach North Access parking lot. CONSIDERATIONS: The Barefoot Beach North Access parking lot repeatedly experiences significant flooding during the rainy season. The storm water drainage system at the parking lot no longer provides proper drainage for the area. After rain events, storm water accumulates at the parking lot, filling the retention ponds and regularly overflowing over the parking lot, covering parking spaces, including a substantial amount of the parking lot access road. Regularly, ponding will remain on the parking lo t and will not properly drain, as it should after rain events, sometimes accumulating inches of storm water over the parking spaces and access road. The drainage issues were previously looked into informally (2013), however severity of drainage issues at the Barefoot Beach North Access parking lot has increased since then. In order to officially document any changes to grading and drainage patterns, evaluate possible solutions and provide recommendations to improve the drainage system, an engineering study is needed. With the recommendations provided, the Parks and Recreation Division can then move forward with improvements to the drainage system. ADVISORY BOARD RECOMMENDATION: On June 27, 2011, with a 5-2 vote the Tourist Development Council (TDC) approved a Category “A” Beach Park Facilities grant application that provided $130,000 for Barefoot Beach Drainage improvements. On April 28, 2014, with 7-0 vote the TDC approved a follow-on Category “A” Beach Park Facilities grant application that provided an additional $150,000 for Barefoot Beach Drainage improvements. On February 27, 2017, with a 9 -0 vote the Tourist Development Council approved the subject work order to Q. Grady Minor and Associates, P.A. for an engineering report at Barefoot Beach Park. FISCAL IMPACT: Sufficient funding for the award is provided in TDC Beach Park Facilities Fund (183) in Project No. 80194 (Barefoot Beach Park Drainage Improvements). GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. LEGAL CONSIDERATIONS: This item is approved as to form and legality and requires majority vote approval. - CMG RECOMMENDATION: To approve an expenditure of Tourist Development Tax Category “A” Beach Park Facility funds to Q. Grady Minor and Associates, P.A., under Contract Number 13-6164, “Professional Services for Engineers and Architects,” for an engineering report for drainage improvements at Barefoot Beach Park, for $4,590, and make a finding that this project expenditure promotes tourism. Prepared by: Felicia Kirby, Associate Project Manager, Facilities Management Division 03/28/2017 ATTACHMENT(S) 1. Work Order (PDF) 2. Proposal (PDF) 3. Grant Application - June 27 2011 (PDF) 4. Grant Application - April 28 2014 (PDF) 5. Photo_1 (JPG) 03/28/2017 COLLIER COUNTY Board of County Commissioners Item Number: 16.D.10 Doc ID: 2729 Item Summary: Recommendation to approve an expenditure of Tourist Development Tax Category “A” Beach Park Facility funds to Q. Grady Minor and Associates, P.A., using Contract Number 13-6164, “Professional Services for Engineers and Architects,” for an engineering report for drainage improvements at Barefoot Beach Park, for $4,590, and make a finding that this expenditure promotes tourism. Meeting Date: 03/28/2017 Prepared by: Title: – Facilities Management Name: Felicia Kirby 02/13/2017 4:04 PM Submitted by: Title: Division Director - Facilities Mgmt – Facilities Management Name: Dennis Linguidi 02/13/2017 4:04 PM Approved By: Review: Facilities Management Dennis Linguidi Additional Reviewer Completed 02/14/2017 1:25 PM Procurement Services Lissett DeLaRosa Level 1 Purchasing Gatekeeper Completed 02/14/2017 2:13 PM Procurement Services Matthew Catoe Additional Reviewer Completed 02/14/2017 4:18 PM Procurement Services Brenda Brilhart Additional Reviewer Completed 02/15/2017 10:20 AM Parks & Recreation Barry Williams Additional Reviewer Completed 02/15/2017 5:29 PM Procurement Services Ted Coyman Additional Reviewer Completed 02/22/2017 5:56 PM Facilities Management Margaret Bishop Additional Reviewer Completed 02/24/2017 11:40 AM Facilities Management Margaret Bishop Additional Reviewer Completed 02/24/2017 11:44 AM Public Services Department Hailey Margarita Alonso Level 1 Division Reviewer Completed 02/27/2017 11:34 AM Public Services Department Steve Carnell Level 2 Division Administrator Review Completed 02/28/2017 7:56 AM County Attorney's Office Colleen Greene Level 2 Attorney Review Completed 03/02/2017 8:30 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 03/02/2017 10:32 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 03/03/2017 8:50 AM Budget and Management Office Ed Finn Additional Reviewer Completed 03/07/2017 4:19 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 03/20/2017 9:32 PM 03/28/2017 Board of County Commissioners MaryJo Brock Meeting Pending 03/28/2017 9:00 AM WORK ORDER/PURCHASE ORDER Contract I 3-6164 "Professional Services for Engineers and Architects - SS" Contract Expiration Date: March 8,2019 This Work Order is for professional engineering services for work known as: Project Name: Barefoot Beach North Access Parking Lot Project No: 801 94 The work is specified in the proposal dated January 13,2017 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions olthe Agreement referenced above, this Work Order/Purchase Order is assigned to: Q. Grady Minor & Associates, P.A. Scooe of Work: As detailed in the attached proposal and the following: * Task I Review Plans+ Task II Surveyr Task III Assessment and Field Visit+ Task Mummary Report+ Task V Meetings Schedule of Work: Complete work within 90 days from the date of the Notice to Proceed which is accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the expiration date ofAgreement #13-6164 will survive and remain subject to the terms and conditions of that Agreement until the completion or termination of this Work Order. Compensation: In accordance with the Agreement referenced above, the County will compensate the Firm in accordance with following method(s): lNegotiated Lump Sum (NLS) El-ump Sum Plus Reimbursable Costs (LS+RC) ffitime & Material (T&M) (established hourly rate - Schedule A) [ Cost Plus Fixed Fee (CPFF), as provided in the attached proposal. Taskl $455.00 T&M Task II $1,787.00 T&M Task Ill S 507.00 T&M Task lV $ 897.00 T&M TaskV $944.00 T&M TOTAL FEE $4.590.00 PREPAREDBY, (il'V T,r/nfn DateFelicia Kirby, Associate Project Manager Facilities Management Division Page I of ?Contract l3{ 164 PN 80194 R!VIEWED BY: RLVIEWED BY: Facilities Managemenl Division t- /7-/7 AppRovED By: //r/h//A-- Parks & Recreation Division By the signature below, the Firm (including employees, officen and./or agents) certifies, and hereby discloses, that, to the best oftheir knowledge and belief. all relevant facts conceming past, present, or cwrently plarmed interest or activity (financial, contractual, organizational. or otherwise) which relates to the proposed work; and bear on whether the Firm has a potential conllict have been fully disclosed. Additionally, the Firm agrees to notiry the Proculement Director. in writing within 48 hours of leaming ofany actual or potential conflict of interest that arises during the Work Order and./or project duration. ACCEPTED BY: Q Grady Minor & Associates, P.A. /,il4Q-k ,l/.1 /,/l / Mike Delate. P.E.. Senior Vice President Date ipal Project Manager Page 2 of2 Contract l3-6164 PN EOI94 Margaret h. Bishop, P.E.,pal Project Manager Date a,hr/rt=_4ffi- Da{e @GradyMinor Civil Engineers o Land Surveyors o Planners o Landscape Architects January 13,2017 Ms. Felicia Kfuby, Project Manager Collier County DeparEnent of Facilities Management 3301 E. Tamiami Trail Naples, FL 34112 RE: Proposal for Professional Services Barefoot Beach Park North Parking Lot Drainage Issues Dear Ms. Kirby: Thank you for the opportunity to provide this Proposal for Professional Services related to the drainage iszues at the north parking lot at Barefoot Beach Park. The lot experiences regular flooding during heavier rain events. A preliminary cursoryreview of plans and the site indicate that there is not an effective outfall forthe stonnwater. We propose to research Collier County Growttr Management Division record drawings, SFWMD permitting and visit the site along with the adjacent condominium to detennine the cause of the flooding. We will docume,lrt the findings and provide recommendations in a summary report. We propose the following services: 1. Review available plans and record drawings. Review SFWMD files and permits. Review adjacent condominium grading and drainage plans (if they become available). 2. Visit site for preliminary engineering review. Based on that review, conduct limitd topographic engineering survey to confirm gading and drainage patterns. This may include some elevations shots within the Villas at Barefoot Beach condominium adjacart to the parking lot. 3. Review topographic survey and make field visit to detennine possible drainage solutions. 4. Prepare sunmary report of findings and make recommendations for drainage improveme,nts. 5. Meetings - Attend recommendation meeting to review findings to County staff. Prese,nt results to Villas at Bmefoot Beach. We propose to complete these services on a time and material basis for $4,590.00. Q. Grady Minor & Associates, P.A. 3800 Via Del Rey Bonita Springs, FL 34134 Ph. 239-947-1144 . F\: 239-947-0375 EB 0005151 . LB 0005151 . LC 26000266 rvwru.gradyminor.com Ms. Felicia Kirby Re: BarefootBcadr Part January 13,2017 Page2 Fee schedule: Task Fee Est 1. $4ss.00 2. $1,787.003. $s07.004. S897.005. $944.00 Total $4,590.00 We propose to complete these services on a time and material basis for $41590.00. This Proposal only includes those items specifically identifiod above. This Proposal is subject to the Standard Provision of the Collier County Fixed Term Engine€ring Services Contact (FT-13-6164). See attached fee schedule. ffis Proposal is void if no Task Authorization or Purchase ffier is issued within 90 days of this date. Very tuly yours, lTEQK Michael J. Delate, P.E. Sr. Vice President MJD\ \EDloc!1fl6\A&inrvtrrdioS\PRoP6AlKlcoli.I CqDty Frcieb Mgd\FK 701 I I Bi!&o. Bad Drsilt8p Isdoc Barefoot Beach Park Task / Title P ro.ject Manager Surveyor Engineer SurveyCrew-2Man Clerical/Administrative Senior Designer Total Estimate Task / Title Project M anager Surveyor Engineer SurveyCrew-2Man Clerical/Ad m inistrative Senior Designer Total Estimate Task / Title Project Manager Surveyor Engineer SurveyCrew-2Man Clerical/Administrative Senior Designer Total Estimate Task / Title Project Manager Surveyor Engineer SurveyCrew-2Man Clerical/Administrative Senior Designer Total Estimate Task / Title Project Manager Surveyor Engineer SurveyCrew-2Man Clerical/Administrative Senior Designer Total Estimate Hours Estimate by Task Hours Billing Rate 1 s 147.00 s o s 12o.oo s 2 s 123.00 s o s 13o.oo s 1 s 62.00 s o s 114.00 s s Hours Billing Rate 1 s !47.OO 2 s 12o.oo 2 s 123.00 8 s 13o.oo o S 62.00 1s 1r.4.00 Hours Billing Rate 1 s L47.OO 0 s 120.00 2 5 123.00 0 s 130.00 o s 62.00 1 s 114.00 Hours Billing Rate Total L47.OO 246.00 62.00 455.00 Total s 147.00 s 240.00 s 246.00 s 1,040.00 ) s 114.00 S 1,787.00 Total s 147.00 S 246.00 ( ( s 114.00 S so7.oo 3s 0s 0s o$ 0s 4s 147.00 s 120.00 s 123.00 $ 130.00 s 62.00 s 114.00 s s Total 441.00 456.00 897.00 Total 882.00 Hours Billing Rate 6 s 147.00 s 0 s 120.00 s o s 123.00 s o s 13o.oo s 1 s 62.00 s 0 S 114.00 S s 62.00 944.00 Hours Estimate by Task TOTAL s 4,590.00 EXECUTIVE SUMMARY For the TDC to recommend approval of the Category “A” Tourist Development Fund 183 Grant Applications for Beach Park Facilities for FY 2011/12 in the amount of $1,975,000. ______________________________________________________________________________ OBJECTIVE:To recommend approval of the TDC Category “A” Grant Applications from Fund 183 Beach Park Facilities in the amount of $1,975,000. CONSIDERATIONS: The following is a list of grant applications intended for Fiscal Year 11/2012 Funding in Beach Park Facilities Fund 183: PROJECT/DESCRIPTION:AMOUNT REQUESTED Barefoot Entrance Sign –80193 $ 20,000 Barefoot Toll Booth Replacement –80190 $ 150,000 Barefoot Toll Booth Chemical Toilet –80191 $ 40,000 Barefoot Engineering and Permit –80186 $ 25,000 Barefoot Tiki Roof Repair –80192 $ 20,000 Barefoot ADA Ramp Rework –80195 $ 20,000 Barefoot Beach Parking Improvement –80194 $ 150,000 Conner Park Shelter and Bathroom –80189 $ 50,000 New Clam Bay Facility Turnaround and Parking Lot Rework –80187 $ 500,000 Seagate Access Bathroom –80188 $ 50,000 Gulfshore Property Acquisition $ 950,000 TOTAL $ 1,975,000 ADVISORY COMMITTEE RECOMMENDATIONS: At the Parks & Recreation Advisory Board (PRAB) April 21, 2011 meeting this item was approved 6 to 0. FISCAL IMPACT: The Fiscal Year 2011/12 proposed Beach Park Facilities Fund 183 budget appropriates funding for these grant applications. The source of funds is Category “A” Tourist Development Tax dollars. GROWTH MANAGEMENT IMPACT:There is no impact to the Growth Management Plan related to this action. COUNTY ATTORNEY FINDING: this item has been reviewed and approved by the County Attorney’s Office and is legally sufficient for Board action. -JK RECOMMENDATION: To recommend approval of the Category “A” Tourist Development (Fund 183 Beach Park Facilities) Grant Applications for FY 2011/12 in the amount of $1,975,000. PREPARED BY: Gail Hambright, CZM Accountant June 27, 2011 New Business 7-c 1 of 22 Evaluation/Approval Guidelines for TDC Category A Yearly Grant Requests by the Coastal Advisory Committee Yearly grant requests to the Coastal Advisory Committee will be evaluated, prioritized and funded based on the following criteria. 1. Grants associated with the completion of a previously approved project that are required to complete that project. 2. Grants required to meet Permit Regulatory Compliance. Examples of these grants would be Physical and Biological monitoring, turtle monitoring, shorebird monitoring and tilling. 3. Safety related activities and projects, which are the responsibility of the CAC. 4. Commitments covered by inter-local agreement and /or projects previously approved/identified in the 10 year plan. Examples would be the dredging of Clam, Wiggins, Doctors, Caxambas and Capri Passes and the 10-year cycle of beach re-nourishment. 5. Projects or studies that improve or have a high probability of improving our beach efficiency, the preservation of CAC capital or save us money. These projects would have to have a undisputed payout. Items that would fall into this category would be engineering or studies that could lengthen times between dredge events or re-nourishments. 6. Grants associated with the maintenance and upkeep of our beaches. Examples of these activities that preserve the quality of the beach experience are beach cleaning, raking and grading. 7. Projects that outside funding or third party funding can be obtained on that offset the capital cost. Examples would be FDEP funding, FEMA funding or third party grants. 8. Necessary or required projects would be next. Examples of this type of projects would be Doctors Pass Rip-Rap replacement. 9. New projects not required by law or consent decree would follow. June 27, 2011 New Business 7-c 2 of 22 COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY “A” GRANT APPLICATION Beach Renourishment and Pass Maintenance Barefoot Beach Parking Improvement 1. Name and Address of Project Sponsor Organization: Coastal Zone Management Collier County Government 3299 Tamiami Trail East, Suite 103 Naples, Florida 34112 2. Contact Person, Title and Phone Number: Name: Gail Hambright, Accountant Address: Collier County Government 3299 Tamiami Trail East, Suite 103 City Naples ST FL ZIP 34112 Phone: 252-2966 FAX: 252-2950 3. Organization’s Chief Official and Title: Fred W. Coyle, Chairman Board of County Commissioners 4. Details of Project- Description and Location: Engineer, permit and provide parking lot drainage improvements at Barefoot Beach R-1. 5. Estimated project start date: October 1, 2011 6. Estimated project duration: 12 Months 7. Total TDC Tax Funds Requested: $150,000.00 8. If the full amount requested cannot be awarded, can the program/project be restructured to accommodate a smaller award? Yes (X ) No ( ) June 27, 2011 New Business 7-c 15 of 22 Collier County Tourist Development Council Category “A” Grant Application Page 2 Barefoot Beach Parking Improvement PROJECT BUDGET PROGRAM ELEMENT AMOUNT TDC Funds Requested $ _150,000.00____ City/Taxing District Share $ ______________ State of Florida Share $ ______________ Federal Share $ ______________ TOTAL $ _150,000.00____ PROJECT EXPENSES: (Engineering, Mobilization, Contractor, Monitoring etc) Engineering, permit and provide parking _ $_150,000.00_____ lot drainage improvements at Barefoot___ $_______________ Beach_____________________________ $_______________ __________________________________ $_______________ __________________________________ $_______________ TOTAL $ _150,000.00______ I have read the Tourist Development Category “A” Beach Funding Policy covering beach renourishment and pass maintenance and agree that my organization will comply with all guidelines and criteria. Signature of Sponsor Organization’s Chief Official Date June 27, 2011 New Business 7-c 16 of 22 EXECUTIVE SUⅣIMARY Approve Six(6)Collier cOunけ Tourist Development Council Categow “A" Grant Applications for Beach Park Facilities for Fiscal Year 2014/2015 in the Total Amount of $900,000 and lllake a rlnding that the expenditure promotes tourism. OBJECTIVE: To obtain Collier County Tourist Development Council grant funding. CONSIDERATIONS: The following Collier County Tourist Development Council Category "A" grant applications were reviewed by the Parks and Recreation Advisory Board (PARAB) on April 15.2014. Their recommendations for improved beach park facilities are as follows: PROJECT AP10UNT REOUESTED PREⅥOUSLY REOUESTED Tigertail Beach Sand Dollar Island Wildlife C)bservation Tower $200,0000 Seagate Bathroom Conceptual Design $50,0000 Clam Pass Boardwalk Piling Structural hrtegrity InsDection $100,0000 Tigertail Beach Bathroom $200,0000 Barefoot Beach Parking Enhancements S150.0000 Clam Pass Concession Area Deckins $200,0000 TOTAL S900,0000 PROJECT DETAILS: Tigertail Beach Sand Dollar Island Wildlife Observation Tower:$200,000 o Consl'uction $ 175,000 o ADA access to tower $ 10,000 o Mounted Viewing Scopes $ 10,000 o Bench and hrterpretive Panel $ 5,000 Seagate Bathroom Conceptual Design: $50,000.00o Design Alternates, permitting Requirements, utility and easement Issues, construction cost estimate Clam Pass Boardwalk Piling Inspection: $100,000.00. Field hspection $40,000. Design Report $15,000. Design Alternatives $ 10,000 . Design Recommendation $ 5,000 o Construction Repair Design Plans $25,000o Construction Cost Estimate $ 5,000 Tigertail Beach Bathroom: $200,000.00. Designo Permitting. Utilitieso Construction S25,000 $10,000 $15,000 S150,000 April 28, 2014 New Business 7-i 1 of 15 Barefoot Beach Parking Enhancements: $150,000.00 o Design $25,000 o Permitting $10,000 . Utility Connections $20,000 o Toll Booth Installation $75,000 e Parking Lot Improvements $ 10,000 o Roadway Improvements $10,000 Clam Pass Concession Area Decking: $200,000.00 o Consfi'uction $200,000 The cost of these projects will come frorn the TDC Category "A" Funding. FISCAL IMPACT: Funds in the amount of $900,000 are available for appropriation from Category "A" Tourist Taxes Fund 183. GROWTH MANAGEMENT IMPACT: There is no impact to the Growth Management Plan related to this action. LEGAL CONSIDERATIONS: The TDC recomrnendation must include a finding as to whether this expenditure promotes tourism. The Board of County Commissioners may accept this finding or make a different detennination. This item has been approved as to form and legality and requires rnajority vote for approval. - CMG ADVISORY BOARD RECOMMENDATION: At the April I 5,2014, Parks and Recreation Advisory Board (PARAB) meeting, these grants applications were recommended for approval (approved 5 to 0). RECOMMENDATION: That the Collier County Tourist Development Council approve the above- referenced Category "A" grant applications for beach park facility improvements in the amount of $900,000 and make a finding that the expenditure promotes tourism. Prepared by: Natali Betancur, Operations Analyst, Collier County Parks and Recreation April 28, 2014 New Business 7-i 2 of 15 COLLIER COUNTY TOURIST DEVELOPMENT COUNCIL CATEGORY 6(A'' GRANT APPLICATION Barefoot Beach Parking Enhancements Design, Permitting and Construction 1. Name and Address of Project Sponsor Organization: Collier County Parks and Recreation Department North Collier Regional Park 15000 Livingston Road Naples, FL 34109 2. Contact Person, Title and Phone Number: Name: Barry Williams, Director Address: 15000 Livingston Road City: Naples; ST: FL; ZIP 34109 Phone: (239)252-4035 FAX: (252) 530-6538 Other: (239) 280-7035 3. Organization's Chief Official and Title: Barry Williams, Director Collier County Parks and Recreation Department 4. Details of Project- Description and Location: Barefoot Beach Preserve Park was listed by Dr. Beach as one of the top 10 beaches in the country in 2013. The entrance to this nationally recognized beach needs to be improved. Barefoot Beach Preserve Park has an existing small wooden toll booth (built in 1985) located at the entrance to this beach park facility. The toll booth accommodates one beach parking attendant whose primary responsibility is to provide customer service to beach park visitors and collect the daily beach parking fee. This 29 year old structure is structurally unsound, unsafe, and is inadequate for the needs of this beach park. The current toll booth does not have restroom facilities for the beach park attendant so a port- o-let has been placed behind the entrance sign across from the toll booth for use by the attendant. The project includes the design, permitting, and installation of a prefabricated toll booth constructed of galvanized steel with factory installed doors, windows, and electrical system. The toll booth will include a restroom (not for use by the public), a secure transaction window, dutch doors for safety, money drawers, exterior lighting, alc, heat, and plumbing. The roadway enhancements will include re-curbing around the perimeter of the new toll booth, required safety striping at the entrance, and speed bumps. 5. Estimated project start date: October, 2014 6. Estimated project duration: (see below for milestones) 7. Total TDC Tax Funds Requested: $150,000 April 28, 2014 New Business 7-i 11 of 15 Collier County Tourist Development Council Category "A" Grant Application Page 2 8. If the full amount requested cannot be awarded, can the program/project be restructured to accommodate a smaller award? Yes ( ) No (x) Barefoot Beach Parking Enhancements PROJECT BUDGET PROGRAM ELEMENT TDC Funds Requested City/Taxing District Share State of lrlorida Share Federal Share TOTAL PROJECT EXPENSES: (Engineering,Ⅳlobilization,Contractor,) Design Pernlitting Utility Connections Toll Booth lnstallation Parking Lot lmprovements Entrance Roadway llllprovements TOTAL AⅣ10UNT S150,000 SN/A SN/A SN/A S150,000 $25,000 S10,000 S20,000 S75,000 S10,000 S10,000 S150,000 Milestones Solicit proposals for design 30 days after scope is defined Proposals due 30 days after solicitation Approve Work Order 30 days after quotes received Issue NTP 2 weeks after PO is issued Design and Permitting 6 months after NTP issued Construction Cost Estimate 6 months after NTP issued Solicit Quotes for Construction 30 days after construction drawings and permitting is complete 30 days after solicitation 30 days after quotes received 2 weeks after PO is issued 6 months after NTP issued Quotes due Approve Work Order Issue NTP Construction Completion April 28, 2014 New Business 7-i 12 of 15 I have read the Tourist Development Category "A" Beach Funding Policy covering beach renourishment and pass maintenance and agree that my organization will comply rvith all guidelines and criteria. Signature(of Sponsor Organization's Chief OIfi cial April 28, 2014 New Business 7-i 13 of 15 IL J4 I pf. -�• r V pr &L. 4-tir M Ire j7 kap 4�4 ed