#16-6607 (Change #3 Hannula Landscapng) ProcuremelS icA 2 0 Co 1e 1' Count Change Order—Form ® Contract Modification El Work Order Modification ❑Amendment Contract#: 16-6607 Change#: 3 Purchase Order#: 4500170607 ,' Project#: 60149 Contractor/Firm Name: Hannula Landscaping and Irrigation Contract/Project: Collier Blvd. Highway Beautification Project Manager Name: Pamela Lulich Division Name: GMD Road&Bridge Division Landscape Section Original Contract/Work Order Amount $ 152,247.78 7/12/16 16A.15 (Original BCC Approval Date; Agenda Item # Current BCC ApproN,ed Amount $ 183,194.76V1/24/17 16A.5 Last BCC Approval Date; Agenda Item # Current Contract/Work Order Amount $ 183,194.76 3/7/2017 SAP Contract Expiration Date (Master) Dollar Amount of this Change $ 12,550.83 7 28.57% Total Change from Original Amount Revised Contract/Work Order Total $ 195,745.59 6.85% Change from Current BCC Approved Amount Cumulative Changes $ 43,497.81 6.85% Change from Current Amount Completion Date, Description of the Task(s)Change,and Rationale for the Change Notice to Proceed 9/8/2016 Original 3/7/2017 ' Last Approved 5/1/2017 vised Date 6/30/2017 Date Completion Date Date es this change) #of Days Added 60 Select Tasks ®Add new task(s) ❑ Delete task(s) ® Change task(s) ❑ Other(see below) Provide a response to the following: 1.) detailed and specific explanation/rationale of the requested change(s)to the task(s) and/ or the additional days added (if requested); 2.) why this change was not included in the original contract; and, 3.) describe the impact if this change is not processed. Attach additional information from the Design Professional and/or Contractor if needed. This change order is required to revise the bid specifications.The recommended changes are as follows: • Add Line items 1 through 9:Adding wire sizes 10-1 gauge, 12-1 gauge,and 14-1 gauge($22,325.28) (1)The change being requested is to add 10, 12, and 14 gauge wire that will connect to an existing Motorola AC controller located at Fiddler's Creek and will provide connection to the farthest valve south. The cost includes trenching and installation of the additional wires. (2)The various sized wires were not included in the contract because the irrigation was originally designed with the new Motorola DC controllers that required less wire. (3) If the change is not made,the irrigation system will not operate or communicate with the existing Motorola AC controller at Fiddler's Creek. • Add Line items 10 through 12: Add a 3"SDR 11 Directional Bore to encase the wires($3,208.50) (1)The change being requested to add the 3"directional bore between medians. The 3" conduit is needed to accommodate the additional larger size wire bundle. (2)The 3" SDR 11 directional bore was not included because in the original design because less wire was required. (3) If the change is not made,the additional wire will not fit in the existing conduit. • Add Line items 13 through 15:Add connection and mapping of irrigation wires to the existing Motorola AC controller ($958.45) / (1)The change being requested is for the connection and mapping of wires to the existing Motorola AC controller at Fiddler's Creek. (2)The additional work was not included since the Motorola DC controller requires less wires and does not require additional connections and mapping. (3) If the change is not made,the wires will not be properly mapped and connected to the existing Motorola AC controller. • Delete Line item 67: Delete the proposed Motorola DC power, 2-Station Piccolo Controller(-$1,675.00) ''"' (1)The change being requested is to delete the proposed Motorola DC power 2—Station Piccolo Controller. (2) Due to recent product standardizations, the Motorola DC Piccolo controller is no longer being used. (3) If the change is not made,this roadway would need to be converted to a Motorola AC controller(M unit)to meet the new standard at a later date incurring more cost. • Delete Line item 68: Delete the proposed Motorola DC power 4-Station Piccolo Controller(-$7,560.00) (1)The change being requested is to delete the Motorola DC power 4—Station Piccolo Controller. (2) Due to recent product standardizations,the Motorola DC Piccolo controller is no longer being used. (3) If the change is not made,this roadway would need to be converted to a Motorola AC controller(M unit)to meet the new standard at a later date incurring more cost. Revised: 10/28/2014 (Divisions who may require additional signatures may include on separate sheet.) PROCUREMENT USE ONLY Admin Rpf BCC ES 16A2Q r • Delete Line items 69,70,71,and 72 Primary and Spare Control Wires AWG 14-1 Solid Wire(9805 LF x$0.48= -$4,706.40) '„ o Delete Line item :69: Primary Control Wire AWG 14 solid copper insulated wire suitable for direct burial applications. Soild white primary ground applications. ■ (2325 LF x$.048=$1,116.00) o Delete Line item :70: Spare Control Wire AWG 14 solid copper insulated wire suitable for direct burial applications. Soild white/color stripe for spare ground applications. • (2325 LF x$.048=$1,116.00) o Delete Line item :71: Primary Control Wire AWG 14 solid copper insulated wire suitable for direct burial applications. Solid red for common/hot applications. • (2830 LF x$.048=$1,358.40) o Delete Line item :72: Spare Control Wire AWG 14 solid copper insulated wire suitable for direct burial applications. Solid blue for spare#1 common/hot applications. ■ (2325 LF x$.048=$1,116.00) (1)The change being requested is to delete the primary and spare control solid wires because the new design utilizes an existing Motorola AC controller requiring additional wires of multiple sizes. (2)The different sized wires were not included in the original bid schedule because the project was designed for a Motorola DC controller which requires less wire to operate the irrigation system. (3)If the change is not made,there will not be enough wires to properly operate the existing Motorola AC controller and the irrigation system will not meet the new standard. a, ,1 �: 4 Prepared by: 'X") Date:° `/ Pamela Lulich, PLA, Landscape Operations Manager, GMD Road&Bridge Maintenance �/� Acceptance of this Change Order shall constitute a modification to contract/work order identified above and will be subject to all the same terms and conditions as contained in the contract/work order indicated above,as fully as if the same were stated in this acceptance. The adjustment, if any, to the Contract shall constitute a full and final settlement of any and all claims of the Contractor/Vendor/Consultant/ Design Professional . ' ing out of•r related to the change set forth herein, including claims for impact and delay costs. 4141 • .iLAccepted by: ,11Date: al 13/)7 Dale Hannu t'resident, Hannula Landscaping& Irrigation, Inc. .�v 4 Approved by: .,.arliie�I Date: 2/13/17 Sc.tt Windham, Landscape Architect, indham Studios, Inc. Approved by: —"• — \ Date' Travis,D.Gossar•,/P , G D Road Maintenance Division Director Approv•, . . r x Dater` J1 //7 )4.4. David .Wilkison, GMD Depar. ent Head Z_ '( Approved by: _—j____gC4-‘-`41-1 Date: Brepda Brilhart, Procurement trategist BOARD OF CO ►M COMMISSIONERS ATTEST RK COLLIER 40, FLORIDA 4 , , , , _.: /� Attest . di Chairman's TA Ari •, CHAI• 1Chairman'sltel"# mnature ani Agenda t,�., fpro - legality Date ` �� as • o and Date j'1L117-1 Revised: - r uire ai d•.Raa si. atures may inclu,e on separate sheet.) PROCUREMENT USE ONLY ����f ea put �,°timS"'1�ttatr"� /.' ( Admin Rp BCC ES 46,472;,Apt Deputyra gik 1 6 A20 Change Order Number Three 16-6607 Collier Boulevard Highway Beautification Projct Date: February 8, 2017 Item Qty Add/Delete Description Spec Unit Cost Total 1 12 Add Wire 10-1 White 2500 Ft. Rolls Rolls $ ✓444.03 $ 5,328.36_✓ 2 8 Add Wire 12-1 White 2500 Ft. Rolls Rolls $ ;277.92 $ 2,223.36 3 12 Add Wire 14-1 Red 2500 Ft. Rolls _ Roils $ ,,//175.69 $ 2,108.28 / 4 45 Add Equipment Trencher Hrs. $ 65.00 $ 2,925.00 5 25 Add Skid Steer Loader Hrs. $ 55.00 $ 1,375.00 ✓ 6 160 Add Direct Labor Hrs. $ 26.50 $ 4,240.00 / 7 1 Add Labor Burden 37% $ 1,568.80 $ 1,568.80 " 8 1 Add Overhead And Profit 10% $ 1,976.88 $ 1,976.88 ✓ 9 1 Add Tax Ona Wire 6% $ ✓579.60 $ 21579.60 ✓ Total= _ $ 22,325.28 ✓ Directional Bore SDR 11 3" For Wire 10 155 Add From Median to Median L.Ft. `$18.00 $ 2,790.00 ✓ 11 1 Add Subcontractor Overhead And Profit 10% $279.00 $ 279.00 / 12 1 Add Contractor Overhead And Profit 5% $139.50 $ 139.50 / Total = , $ 3,208.50 Connect And Map Irrigation Wires To 13 24 Add AC Controller Hrs. $ 26.50 $ 636.00 '� 14 1 Add Labor Burden 37% $ 235.32^$ 235.32 f 15 1 Add Overhead And Profit 10% $ 87.13 $ 87.13 $ - Total= $ 958.45 ✓ Line 67 Delete Motorola DC Power 2- 16 1 Delete Station Piccolo controller Ea. $(1,675.00) $ (1,675.00) ✓ Line 68 Delete Motorola DC Power 4- 17 4 Delete Station Piccolo Controller Ea. _ $ (1,890.00) $ (7,560.00) Line Items 69,70,71, &72 Primary And Spare Control Wires AWG 14-1 Solid 18 9,805 Delete Wire L.Ft. $ (0.48) $ (4,706.40) Total Additions= _ $ 26,492.23 s/ Total Deletions = $ 13,941.40 / Net Change= $ 1Z550.83 1 6 A2 0 CHANGE ORDER NUMBER THREE Date: January 27, 2017 Item Qty Add/Delete Description Spec Unit Cost Total $ 1 12 Add Wire 10-1 White 2500 Ft. Rolls Rolls $ 444.03 $ 5,328.36 2 8 Add Wire 12-1 White 2500 Ft. Rolls Rolls $ 277.92 $ 2,223.36 3 12 Add Wire 14-1 Red 2500 Ft. Rolls Rolls $ 175.69 $ 2,108.28 4 45 Add Equipment Trencher Hrs. $ 65.00 $ 2,925.00 5 25 Add Equipment Skid Steer Loader Hrs. $ 55.00 $ 1,375.00 6 100 Add Direct Labor Hrs. $ 26.50 , $ 2,650.00 7 1 Add Labor Burden L.S. $ 3,151.80 . $ 3,151.80 8 1 Add Overhead& Profit 10% I $ 1,976.18 $ 1,976.18 - $ Subtotal= $ 21,737.98 9 1 Add Tax On Wire 6% $ 579.60 $ 579.60 $ Total = $ 22,317.58 10 155 Add Directional Bore SDR 11 3" For Wire L.Ft. $ 18.00 $ 2,790.00 From Median to Median 11 1 Add 'Subcontractor Overhead And Profit 10% $ 279.00 $ 279.00 12 1 Add Contractor Overhead And Profit 5% $ 139.50 $ 139.50_ Total = $ 3,208.50 13 28 Add Connect And Map lrrigatin Wires To Hrs. $ 26.50 $ 742.00 AC Controller _$ 14 1 Add Labor Burden L.S. $ 133.56 $ 133.56 1 15 1 Add Overhead And Profit 10% $ 87.56 $ 87.56 $ Total= $ 963.12 Line 67 Delete Motorola DC Power 2- 16 1 Delete Station Piccolo Controller Ea. $ (1,675.00) $ (1,675.00) Line 68 Delete Motorola DC Power 4- 17 4 Delete Station Piccolo Controller Ea. $(1,890.00) $ (7,560.00) Line Items 69,70,71,&72 Primary And Spare Control Wires AWG 14-1 Solid 18 9,805 Delete Wire L.Ft. $ (0.48), $ (4,706.40) Total Additions = $ 26,489.20 Total Deletions= $ 13,941.40 Net Change= $ 12,547.80 16A29 300 Central Park Dr. QUOTE Sanford,FL 32771 Q (407)995-9095 Fax:(407)995-9793 www.fisoutdoor.com/info@fisoutdoor.com __. ___.. ____ _ QUOTE DAIL I_TAKEN MY QUOTE MO 01123/17 —tj5 i~3961394-40 _ uaANot ui Ph u , 5670 L._ .135 FIS Outdoor._Naplesw. 1 r,:; ro Service Account Only 7050 Pennsylvania St Ft Myers. FL 33912 SHPP1NGaRANCH 135 FIS Outdoor Naples 239.594.0904 5565 Shirley St. Hannula IrrigationIncNaples, F1 34109 't'UI (239)594.0904 1 7050 Pennsylvania St Ft Myers, FL 33912 —. .._• :Ski NAME (407)995.9095 _.. ___ - ECi.� WE r .roIr..1 _ tEItlA: _. 22 10th Irt29 _, I `UNE P `�.__ ..—._ otiennil' Q7Y QUANTITY OTY UST — INT AMOUNT Na , MD DESCRIPTION ORDERED SHIPPED MO. UN PRICE PRICE thin 1 WIRE10.16HITE2500 12 ROLL 788.462 444.03D u 5329.36 10-1 White Wire 2500 2 WIRE12.10{I1E2500 8 ROLL 546.841 277.920 2223.36 Wire 12-1 White 2500; 3 WIRE14.1RE02500 12 ROLL 342.564 175.690 2108.28 _ 14-1 Rest Wire 2500'; 4 80340 1 EACH -' 68.000 44.140 Di Repair Coup - i 5 60-100-03 1 EACH 37.000 •.1''i 24.02 3' Knuckle Restraint" 6 F619654-3-SON EACH -• ,.r4 194.730 194.73 3" Flanged Gate Vlv, Sq. 7 854-030 2 • - 54.140 12,600 25.20 Sch 80 Van Stone FlangeB B SKIT 2 a 13.890 6.500 13.00 3" Flange Kit - Gasket. 9 VP10A 1 EACH . •• 11.060 11.06 10° Ametek Round Valve B 9 Lines Total SubTotal ' '(.15 Taxes $598. Quote To;Al $10,570.48 The enclosed quote is our best estimated(materials by Florida irrigation Supply,inc.The naterial quote is a service we provide to our customers.it is intended to be used as a check point Par the customer's own take-)ff of materials.Our customers are respo table for their own take-offs,estimates and for their bids to their own customers.To avoid billing confusion when ordering a job that has been quoted, ploape mention the quote when ordering The unit prices are guararteed for 15 days from .he date of the g1lote,with the exception of pipe •**Due to the volatile conditions in the PVC pipe market pipe pnces quoted on thifs form are reference only Actual pricea are determined et the time of delivery of product.We appiog¢e for any hardship this may create'.AU copper and other ware prices are good for 10 days from date of quote.By accepting this quote you are acrcepting the waiver and stipulations as mentioned above.Thank you. Last Pa eTERMS AND CONDITIONS 6y awlpting revery d the goodi anduWest,tprrg a oy mat,buyer spree.tet 1.AA prod.fated have been received Wess mixt by customer.2.O.ln., 0 hadcat beer M.r.oI on the upeld nen a thir nU 01 1 112%Dan month 9.Ck4nt baxd upas dant eve a draped xods rat De made o iUdn leo days+dor dalery.4.Mrd+mWao may rot by slimed widrM pace apprw.i My retarwdr pRWpe9 ire f fi Wgt Z btlw>C dtrpn ba+•d 041.udt morcimndt.betty N reaWTle cccoP oy and Dery xnat10 to ho aApYW saucer. 5 tt an W Den k amn41(ced to Rvo'0o Mroon..all.r ihel be eI ,UI r LJ!1/ 11:J toMOWeaornelliN.and it.t%„tidLW A1,¢dam.v... SERVING ALL OF YOUR GREEN INDUSTRY N DS 1 6 A 0 ,,,, , , gr 7- ;-: Ut,4...' 11-•'•' ilt`r4!it:1 "f !Ti • r.1 t;,.; t_ I 1.*;•*1 :.:..-•':*:-:',:°--1,.* 14 4,111,-ttlf.,t .14..,:•*‘..t?',, *',., k'41.:i.Pe- 1. lAciArif*5-1.-- ..:. •,.,-- '• - -' .--4-.‘,,1 e-,I.,:ler...,,1"..)p.ittit:4:1 4.4. .1-.• 1 4'f ; ,i.h..`c, -t.•;4:' hi:..•it!..41!!".",a. 1, . 1;,,..?l'-`,":• .1.14.,'-'.:f ..,..;!..,..:,4:4:;40,.,.,1, "... ' rAbc;at :...9k4;;::A•..1 crfitg, lei.;t".,g1,,. 7 • ..V, ..• i• pW,,,,qj....' :?:1 er.A it;r.g'-'4; J ::;.;.:-.•,,'•!'''!'t'e''.'•. .gq:',',:i.,''k A.-.•.t.;'•ii.A44', e• .,, 1" .rAJ1 W.t4114444.-4"tkitlL*1:1•••fi:tie Ne. : ' •• RM ., '• vnaikl,,,N•r:/*:IF :. .er:.4*. .. . i •' 1 ! •11Pli,,J, ,1•!ktd.;,::- ' if 4.4;1'.f.h... --:,•:., offor7 ,,. 11..,...#4,,,,,400,:....,.., ,:,..(t,,,A.10:,_,:,..•:.;;;....••., • 4 Fait;( :1 -x • .!-Ii:,,,,..19t....i7.ieS,.Y.7-.:*-?:7,2(!•,, ••.•• 4 .; ',*i.,:: •6,-,,,,Kt...ii.311•L' t'r:,"!•:,.• - , .,, , ••-•.; ! ',''.a' 1,•.' •!;.,,,,•-•r•.•••4;•••:,."1„;:-;:ti4.; To: ., :4 cciii,,,';•••••••114:163. ,-i,‘,4414141%;,(0...... ,„ Hun k ,Ilx . 1-:,. 1/27/2017 t::,.:).X., • .:.; . . L0:14,fi ii-:. t;IAIE. • 1 .i,itir,:tiriAr 0 . 4, ,.%,lii:Irrigation1:41.;•,0•;e.ifi.1•41:. ,..C„i:rff7r,',4,-.,,••Litc•c; .,..„• 2fIL31 Quails Nest ill . .. t,4. ,,,,i.:14.1.,.. ...•!...!-,iir.!: ...i4.p.is ,i:.'1•*' . 801 ..a • ,•:. 1 `f ".1:1410,S . l'i; AN---.1lic 1 i,r:1-: '• g."' 1ibl Springs, Fla 34135 , it-11.1: 1,:tg.g•L't• 'Aitlit...,...1,... .4 . . • ...,.i..,:o.e 4:.-i.-,..i.r. -,7, if417,--....,.!,.!..,...-,.,• Attention: Dale :, - -I.;0.4•:-.*4.till.ilim.•,!--1.'4,*.,•••••••••.: ; •.•••,.-..- ..•- 41,:••• . ./ -!.j•-! •.i•; • .„_. • t.. • •• •••..P •• .f•;;:i.,-: -....;.,4,... - 4,, , P••' •rf l!' 1'4•••''..•-i'44,;.40 Iri'•:...,%iii..i...;.,.,'' rc)posai>1-. liwto...)-1::-,...... • • • . -: .i ) , .,,,:.).,." p;.,...••,- , -• . _______, :-1 .;• .!Tv 4 iv, •.„r g.g. . COST DESCRIPTION , ", '.:f fl -,1 't. 11 , 1)*! g 951 — ..--, . I ,.., '!: •••!'•!!..g.:;.•': : $g • ; , ' . ',1 ;...0,'.,: ''.,, •!-- 1 , . -......! •!-7,..•• " i ,-• South ci Rddiers Creek v ,• :..• i.,,••,‘ ,•:. , •. ..,::-... ..-,.2,1; •,,..... ,„,...1 .......j,..•,f,!. • • Naples,Fla • ••••i'..j!h:,,:e):.,,..,1,,x,, . I. !.. i-; $11;:r.1.,pp,.i....., , 1 2.790.00 a • • t.:; 4 4-4 rt. 'Ft 1 3"Directional Bore approx, 155ft , $18.00ft ,. :.• ,i.1.....,•i,.',•...•;.';..;;:*.,•:,'%••'•j'..,,i.':.1..!„'..%s...tC:1;:,1.*.r.y?rt.,e*,; .sR,h!1,',,••!I-:1IlIl-e : ...:.•e;.i;1:i.-.l.4".e„,:,;,f i2'!1i•,.i1i•.,s.,:KiLe ,I Prce ncxes 3" SDR 11 HOPE Pipe " .;!!I"4f ;gpi1,.,.i.'i.,;:,:.,:(.i.::-}:;1•.,•::?;.,:i!:t.•:,::,,:;4,.-i.l.,,:y.:6,l,-„:,e: i,,.,•:.. 1 i .. .• ,• 1'. :i..:::;-$4',3-1'•V!'1;/.;::.'42...!•1•,11;g if!.. g,i;$::,•ti.i.,4! 1.1:: ;'• ... ',. •• ig' 4;; • •:'.'°;..:11:4:1T-ii:;•11A 1 , :f,.. A• ,:•;•:. - f..ii.-4::•.11`:11tit:;••,1if•::•,••-:•-•:%• • re. 4 , ....• . . ,-.1::!..!i:•,,i.,-‘,i412;j::•. i.i.c'e;:i. ...•, •,. - ..; :•'...••ii:.;,-ti •.?L r.5!• 4.:j ” :"•. . t •• ' "4,1 ' ..•,..t, ,,,, . It . ..................-.......- • , - . •.. $ $ 411 4- g•,, gg.. $ •. •, ,'.T;'-' ...•...1...1'I', I. I• • •TOTAL - • . • .... - - $2.790.a. • • . • -!h.4":3=... ...k..2:=..::. . . . . i..i. ,. .. r_ i • wtien quote Is*rod- lab wil be called In for locates anri.-PLF 9.4 FfgroP,I _, _haws of reit...011i. . , • date ilOrY and fax/email PockA1114ove riFflurr.'?"(gr 45 To acceft,Please dee, . • • : ',...e.;;;•;'rettil•.•• .,•,t,..;,!•&'-i•.::,'i• ' . .. , I • . ., I '.. Date: • '.. • . ...:. .,.„...1 , .,..•. . •• ••,,.,...,;?,:...;;;,,-jiir;.);*;-.,,,,,,..,. i.11.,..,...•.... -.: .. • .„ Mi 1 ie.', 101011 f I Irif •- ''77: 1 6 A 2 0 yam - e di 47i, et, Irrigation Consulting, Site Observation, System Auditing & Management 671 100th Avenue N.;Naples,Florida 34108 Office Telephone(239)304—8451; Cellular(239)692—2966 E-mail: James_C_Abney@yahoo.com Proposed Irrigation Control System Change DATE: January 12,2017 TO: Mr. Scott Windham,RLA—Windham Studio. FROM: James C.Abney,JCA-IC. PROJECT: Collier Boulevard(S.R. 951)—Collier County,Florida SUBJECT: Proposed Irrigation Control System Change Review/Study As a result of recently considering connecting the proposed irrigation design zones to an existing controller located near the northern end of the north median, study to evaluate the feasibility of connecting to the existing controller has been prepared.Below are the subject related observations. OBJECTIVE Primary Objective: The primary will be to eliminate the use of the Motorola Piccolo units proposed in the design, and study the economic feasibility to connect to an existing controller located nearby. CHALLENGES Existing Landscape: To get to the existing controller the proposed zones+hydrometer control wires will have to be installed trenching through existing landscape. The existing landscape has been in the ground for several years, approximately 10+/-years. Planting bedlines of ornamental grasses primarily meander throughout the median. The plantings are mature, slightly beyond their prime; some showing signs of decay,but most are in satisfactory condition. There are sections of turf grass that meander throughout the median.The turf grass is in fair to poor condition due to irrigation coverage interference by the plantings, also more than likely insufficient irrigation coverage applications (primarily due to surface runoff losses), and also very likely due to existing soil conditions(highly alkaline with poor percolation/drainage). Distance: The approximate distance in a straight line measure from the existing controller location to the project's limit of work line(north limits line) is approximately 1600+/-L.F. Trenching in a straight line from the existing controller location to the project's north limits line is not physically and feasibly possible due to large diameter palms(Royal Palms)as well as mature trees occurring along the straight line(s)possible path(s). • Existing Planting Bedlines Trenching; Trenching through the existing planting bedlines will create a highly visible disturbance to the existing plant communities. The trenching through the planting bedlines communities will present a significantly high cost that will not make the likely cost feasible for the project.Planting bedline disturbance restoration will cost around$40,000.00+/-,depending on the width of the path(assume 5' width). 1 16A20 • Directional Bore Installation; Having a Directional Bore conduit installed will require at least a 3"DB conduit, with a cost between$42,000.00 to 45,000.00,excluding the cost of the control wires. • Turf Grass Trenching: Trenching through the turf grass will present the lowest existing landscape restoration cost because it will present the least disturbance if done with a small trenching unit(set for an 18"+/-trench depth,but it will present an increase in distance(control wire quantities)due to the turf grass meandering throughout the median from side to side.A 15%+(250+/-L.F.)should be added to the 1600+/-L.F. distance. The existing controller to project's north limits line distance to consider should be 1,850+/-L.F. Control Wire Sizes: The length of the control wire required to reach from the existing controller location to the farthest valve(at the south end,near the project's south limits line)will be around 4750+/-L.F. Such length will require the use of a solid copper 10 Gauge ground wire and a solid copper 10 gauge active and spare wires.As the distance decreases the size(gauge)of the active control wires can decrease.Note,as a wire diameter decreases,the nominal label size increases. For example,a 10 gauge wire has a significantly larger diameter than a 14 gauge wire. Below is a table of recommended control wires,and approximate lengths. Estimated Control Wire Quantities Item Number Description 10 Gauge 12 Gauge 14 Gauge Main Ground Wire(Solid White) 4,750+/-L.F. Spare Ground Wire(White w/Red Stripe) 4,750+/-L.F. South Median Farthest Active Wire(Solid Blue at Valve D-5) 4,750+/-L.F. North Median Farthest Active Wire(Solid Green at Valve B-3) 3,000+/-L.F. Hydrometer Ground Wire(Solid White) 2,900+/-L.F. Hydrometer Active Wire(Solid black) 2,900+/-L.F. Hydrometer Ground Spare Wire(Solid White w/Black Stripe) 2,900+/-L.F Hydrometer Active Spare Wire(Solid w/stripe) 2,900+/-L.F. Valve A-1 Active(Solid Red) 2,100+/-L.F. Valve A-2 Active(Solid Red) 2,450+/-L.F. Valve A-3 Active(Solid Red) 2,600+/-L.F. Valve B-1 Active(Solid Red) 2,800+/-L.F. Valve B-2 Active(Solid Red) 3,000+/-L.F. Valve B-3 Active(Solid Red) 3,000+/-L.F. Valve C-1 Active(Solid Red) 3,400+/-L.F. Valve C-2 Active(Solid Red) 3,400+/-L.F. Valve C-3 Active(Solid Red) 3,700+/-L.F. Valve D-1 Active(Solid Red) 4,100+/-L.F. Valve D-2 Active(Solid Red) 4,100+/-L.F. Valve D-3 Active(Solid Red) 4,400+/-L.F. Valve D-4 Active(Solid Red) 4,400+/-L.F. Valve D-5 Active(Solid Red) 4,750+/-L.F. 27,800+/-L.F. 19,800+/-L.F. 29,450+/-L.F. ✓ 2 1 6 A2 0 Estimated Control Wires Approximate Estimated Cost Description Estimated Unit Total L.F. Estimated Unit Cost Estimated Unit Total 14 Gauge 29,450+/-L.F. $0.10 L.F. $2,945.00 12 Gauge 19,800+/-L.F. $0.15 L.F. $2,970.00 10 Gauge 27,800+/-L.F. $0.20 L.F. $5,560.00 Subtotal $11,475.00 Contingency 10% $1,147.50 ESTIMATED TOTAL $12,622.50 EXISTING CONTROLLER LOCATION AND LANDSCAPE IMAGES f. 1 . All v , -mow ®L191l801T It:4 1 Above Images: The existing controller is located near the north end of the median located south of the Fiddler's Creek development entrance.The controller's electric service is provided by a single phase transformer located on a power pole located on the west side of the Right of Way,parallel to the controller. r ..--40r , t , , ,,,,, „. . .., . , Above Images: The planting areas in the median(left image)have a consistent planting density for most of the planting area's length;but at some locations within the median's landscape area,where turf grass occurs(middle of the right image)it is possible to install the control wire using a small walk-behind trencher. s `5x 1- 4ALiis.. _11 Above Images: Throughout the median the turf grass meanders and has different forms of different widths. The turf grass paths present the most viable alternative for the control wire trenching. 3 I 6 A2 iu. Above Images: Left Image,Near the south end of the existing landscape area the turf grass path ends before a planting area mass that covers the entire width of the median, for about a 50' length.Right Image,At the end(south end) of the existing landscape,where the new project begins,the existing landscape is sparse. If you have any questions,feel free to contact me at your convenience. Sincerely yours, JAMES C.ABNEY-IRRIGATION CONSULTANT jai'ues C. A-bwee James C.Abney, I.A., C.I.T. State of Texas Licensed Irrigator 005636 Irrigation Association Certified Landscape Irrigation Auditor 018448 4