Loading...
Agenda 03/14/2017 Item #16A 803/14/2017 EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Gaspar Station Phase 3, (Application Number PL20160001055) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. _____________________________________________________________________________________ OBJECTIVE: To have the Board of County Commissioners (Board) approve for recording the final plat of Gaspar Station Phase 3, a subdivision of lands located in Section 30, Township 48 South, Range 26 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of Gaspar Station Phase 3. These documents are in compliance with the County Land Development Code (LDC) and Chapter 177, Florida Statutes. This project is within the Gaspar Station CPUD, Ord. 07 -75, as amended. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney’s office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the LDC. Staff recommends that the final plat of Gaspar Station Phase 3 be approved for recording. FISCAL IMPACT: The project cost is $134,654.95 (estimated) to be borne by the developer. The cost breakdown is as follows: a) Water & Sewer $ 28,200.00 b) Drainage, Paving, Grading $ 106,454.95 The Security amount, equal to 110% of the project cost, is $148,120.45 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327 -- Land Development Services Revenue generated by this project: Total: $5,060.65 16.A.8 Packet Pg. 397 03/14/2017 The Fees are based on a construction estimate of $134,654.95 and were paid in September, 2016. The breakdown is as follows: a) Plat Review Fee ($1,000.00 + $5./ac) $ 1,021.00 b) Construction Drawing Review Fee Water & Sewer (.75% const. est.) $ 211.50 c) Drainage, Paving, Grading (.75% const. est.) $ 798.41 d) Construction Inspection Fee Water & Sewer (2.25% const. est.) $ 634.50 e) Drainage, Paving, Grading (2.25% const. est.) $ 2,395.24 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation , except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. - SAS RECOMMENDATION: To endorse staff’s recommendation to approve the final plat of Gaspar Station Phase 3, (Application Number PL20160001055) for recording with the following stipulations: 1. To approve the amount of $148,120.45 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 2. To approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney’s office and the Board or the County Manager or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the LDC. Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division ATTACHMENT(S) 1. Location Map (PDF) 2. Opinion of Probable Cost (PDF) 3. Plat Map (PDF) 16.A.8 Packet Pg. 398 03/14/2017 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.8 Doc ID: 2670 Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Gaspar Station Phase 3, (Application Nu mber PL20160001055) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 03/14/2017 Prepared by: Title: Site Plans Reviewer, Senior – Growth Management Development Review Name: John Houldsworth 01/31/2017 7:07 AM Submitted by: Title: Project Manager, Principal – Growth Management Department Name: Matthew McLean 01/31/2017 7:07 AM Approved By: Review: Growth Management Department Judy Puig Level 1 Division Reviewer Completed 01/31/2017 3:27 PM Growth Management Development Review Brett Rosenblum Additional Reviewer Completed 02/07/2017 8:58 AM Growth Management Development Review Chris Scott Additional Reviewer Completed 02/10/2017 8:36 AM Growth Management Department Matthew McLean Additional Reviewer Completed 02/13/2017 5:39 PM Growth Management Department Jeanne Marcella Level 2 Division Administrator Completed 02/14/2017 4:33 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 02/15/2017 8:22 AM Growth Management Department James French Additional Reviewer Completed 02/16/2017 7:58 PM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 02/17/2017 7:57 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 02/27/2017 1:27 PM Budget and Management Office Mark Isackson Additional Reviewer Completed 02/28/2017 4:36 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 03/05/2017 10:01 AM Board of County Commissioners MaryJo Brock Meeting Pending 03/14/2017 9:00 AM 16.A.8 Packet Pg. 399 16.A.8.a Packet Pg. 400 Attachment: Location Map (2670 : Final Plat Garpar Station Phase 3) Gaspar Self-Storage ENGINEER'S COST ESTIMATE REV02 - December 30, 2016 Paving DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 1.5" Asphalt SY 897 $7.25 $6,503.25 8" Limerock Base (compact & prime) SY 897 $9.00 $8,073.00 12" Stablized Subgrade SY 1,026 $1.95 $2,000.70 6" Concrete SY 25 $13.00 $325.00 6" Concrete Sidewalk SY 181 $26.00 $4,706.00 Type "F" Curb LF 450 $11.00 $4,950.00 3' Valley Gutter Crossing LF 147 $10.00 $1,470.00 SUBTOTAL $28,027.95 Misc. Site Work DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE Silt Fence & Inlet protection LS 1 $4,000.00 $4,000.00 Signage and Striping LS 1 $750.00 $750.00 Light Poles EA 2 $1,500.00 $3,000.00 SUBTOTAL $7,750.00 Drainage DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 18" RCP LF 639 $28.00 $17,892.00 24" RCP LF 226 $35.00 $7,910.00 36" RCP LF 393 $47.00 $18,471.00 Junction Box EA 6 $2,000.00 $12,000.00 Type '6' Inlet with 'C' Bottom EA 1 $2,000.00 $2,000.00 Type '6' Inlet with 'E' Bottom EA 1 $3,500.00 $3,500.00 Type '5' Inlet with 'E' Bottom EA 1 $3,500.00 $3,500.00 36" MES EA 1 $1,480.00 $1,480.00 Remove Existing Drainage Pipe LF 44 $21.00 $924.00 Connect to Existing RCP EA 2 $750.00 $1,500.00 Modify Existing Drainage Box EA 2 $750.00 $1,500.00 TOTAL $70,677.00 Potable Water System DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 8" C-900-CL-200 Water Main LF 190 $21.50 $4,085.00 8" C-900-CL-150 Water Main LF 230 $19.50 $4,485.00 Tie into Existing EA 1 $1,300.00 $1,300.00 Fire Hydrant Assembly Complete EA 1 $2,360.00 $2,360.00 Automatic Flushing Device EA 1 $3,500.00 $3,500.00 Permanent Sample Point EA 1 $1,000.00 $1,000.00 8" Gate Valve EA 3 $500.00 $1,500.00 TOTAL $18,230.00 Wastewater System DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE 8" Gravity Main LF 98 $20.00 $1,960.00 Manhole EA 1 $2,000.00 $2,000.00 Automatic Flushing Device EA 1 $1,250.00 $1,250.00 Connect to Existing Manhole EA 1 $760.00 $760.00 Lateral Service Complete EA 2 $2,000.00 $4,000.00 TOTAL $9,970.00 = $106,454.95 = $28,200.00 =$134,654.95 = $103,454.95 = $21,518.00 =$124,972.95 = $3,000.00 = $6,682.00 =$9,682.00 PREVIOUS- TOTAL DIFFERENCE- Site Construction Costs DIFFERENCE- Subtotal Water and Wastewater Costs DIFFERENCE- TOTAL Site Construction Costs Subtotal Water and Wastewater Costs TOTAL PREVIOUS- Site Construction Costs PREVIOUS- Subtotal Water and Wastewater Costs ________________________ Kristina M. Johnson, P.E. FL License No. 73793 16.A.8.b Packet Pg. 401 Attachment: Opinion of Probable Cost (2670 : Final Plat Garpar Station Phase 3) 16.A.8.c Packet Pg. 402 Attachment: Plat Map (2670 : Final Plat Garpar Station Phase 3) 16.A.8.c Packet Pg. 403 Attachment: Plat Map (2670 : Final Plat Garpar Station Phase 3)