Agenda 02/28/2017 Item #16C 302/28/2017 EXECUTIVE SUMMARY Recommendation to approve a $618,550 purchase order to Stantec Consulting Services, Inc., under Contract Number 14-6345 for Construction, Engineering, and Inspection Services for the 110th Avenue North Public Utility Renewal Project, Project Numbers 60139 and 70120. (This is a companion to Agenda item 11.F) OBJECTIVE: To obtain professional Construction, Engineering, and Inspection (CEI) services during construction of the Basin 101 integrated water, wastewater and stormwater project specific to 110th Avenue North. A companion executive summary is requesting Board of County Commissioners (Board) approval for the construction contract for the project. CONSIDERATIONS: The proposed scope of work under Project Number 60139, “Naples Park Stormwater Improvements,” is consistent with the Stormwater Five-year Work Program of the 2015 Stormwater Management AUIR/CIE approved by the Board November 10, 2015, and with the goals, objectives, and policies of the Conservation and Coastal Management Element and the Stormwater Management Sub-Element of the Growth Management Plan. The proposed scope of work under Project Number 70120, “Naples Park Area Basin Optimization,” is consistent with the Capital Improvement Program (CIP) contained in the 2014 Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water Master Plan/CIP Plan also approved by the Board November 10, 2015, as Agenda Item 9C, as Appendix III of the 2015 AUIR/CIE. On July 7, 2015, as Agenda Item 16C6, the Board awarded Contract No. 14-6345 for CEI Services for the Basin 101 Program to Stantec Consultant Services, Inc. The contract encompassed CEI services pertaining to substantially similar integrated wastewater collections, water distribution, and stormwater system construction projects within Basin 101. This project, 110th Avenue North Public Utility Renewal, is within Basin 101. On December 5, 2016, Stantec Consulting Services, Inc., provided a time and materials proposal for $618,550 to provide CEI services during construction of the 110th Avenue North Public Utility Renewal Project (Attachment 1). The scope of services proposal includes construction observation and documentation services, general management and oversight, and public outreach services. The cost of CEI-related services is 12 percent of the project construction cost. The project scope includes replacing and rehabilitating water, wastewater and stormwater assets in one coordinated project designed to minimize cost and neighborhood impact as opposed to multiple separate mobilizations. Staff shall not issue a notice to proceed for these CEI services unless the Board awards Bid Number 16 - 7020 (the construction contract) as contained in the regular agenda companion item 2689. FISCAL IMPACT: Funding is available in the Stormwater Capital Fund (325), Water User Fee Fund (412) and Wastewater User Fee Fund (414), allocated as shown below. The companion to this item provides the necessary budget amendment. FUNDING SOURCE AMOUNT BID % Stormwater Capital Fund (325) $136,081.00 22% Water Capital Fund (412) $148,452.00 24% Wastewater Capital Fund (414) $334,017.00 54% Total $618,550.00 100% LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority 16.C.3 Packet Pg. 749 02/28/2017 vote for Board approval.-SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, approves a $618,550.00 purchase order to Stantec Consulting Services, Inc., under Contract Number 14-6345 for CEI services for the 110th Avenue North Public Utility Renewal Project, with direction that staff shall not issue a notic e to proceed for these CEI services unless the Board awards Bid Number 16-7020 (the construction contract) as contained in the regular agenda companion item 2689. Prepared By: Diana Dueri, PMP, Project Manager, Public Utilities Planning and Project Management Division ATTACHMENT(S) 1. Attachment 1 - Stantec Proposal (PDF) 16.C.3 Packet Pg. 750 02/28/2017 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.3 Doc ID: 2693 Item Summary: Recommendation to approve a $618,550 purchase order to Stantec Consulting Services, Inc., under Contract Number 14-6345 for Construction, Engineering, and Inspection Services for the 110th Avenue North Public Utility Renewal Project, Project Numbers 60139 and 70120. (This is a companion to Agenda item 11.F) Meeting Date: 02/28/2017 Prepared by: Title: Project Manager – Public Utilities Planning and Project Management Name: Diana Dueri 02/02/2017 6:58 PM Submitted by: Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management Name: Tom Chmelik 02/02/2017 6:58 PM Approved By: Review: Water Steve Messner Additional Reviewer Completed 02/03/2017 8:57 AM Procurement Services Barbara Lance Level 1 Purchasing Gatekeeper Completed 02/03/2017 10:36 AM Public Utilities Department Margie Hapke Additional Reviewer Completed 02/03/2017 11:15 AM Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 02/03/2017 11:38 AM Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 02/06/2017 12:34 PM Growth Management Department Lisa Taylor Additional Reviewer Completed 02/06/2017 12:53 PM Wastewater Beth Johnssen Additional Reviewer Completed 02/06/2017 3:12 PM Capital Project Planning, Impact Fees, and Program Management Gerald Kurtz Additional Reviewer Completed 02/06/2017 4:16 PM Public Utilities Department Heather Bustos Level 1 Division Reviewer Completed 02/07/2017 8:30 AM Procurement Services Swainson Hall Additional Reviewer Completed 02/07/2017 10:41 AM Procurement Services Allison Kearns Additional Reviewer Completed 02/07/2017 1:43 PM Procurement Services Sandra Herrera Additional Reviewer Completed 02/07/2017 4:07 PM Growth Management Department Jeanne Marcella Additional Reviewer Completed 02/08/2017 9:35 AM Capital Project Planning, Impact Fees, and Program Management Amy Patterson Additional Reviewer Completed 02/08/2017 4:22 PM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 02/10/2017 12:23 PM County Attorney's Office Scott Teach Level 2 Attorney Review Completed 02/13/2017 4:04 PM 16.C.3 Packet Pg. 751 02/28/2017 Procurement Services Ted Coyman Additional Reviewer Completed 02/14/2017 9:57 AM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 02/14/2017 10:43 AM County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 02/15/2017 10:08 AM Office of Management and Budget Susan Usher Additional Reviewer Completed 02/18/2017 3:42 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 02/19/2017 11:08 AM Board of County Commissioners MaryJo Brock Meeting Pending 02/28/2017 9:00 AM 16.C.3 Packet Pg. 752 16.C.3.a Packet Pg. 753 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services 110th Avenue North Public Utilities 1 Design with community in mind SCHEDULE A – SCOPE OF SERVICES Collier County Contract 14-6345 Construction Engineering & Inspection (CEI) Services Work Authorization ____ 110th Avenue North Public Utility Renewal 1.0 BACKGROUND Collier County Public Utilities Department Planning and Project Management Division (PPMD) is implementing a series of utility improvement projects within Wastewater Basin 101, known as the Naples Park area, in an effort to optimize existing wastewater infrastructure and maximize wastewater treatment and conveyance system capacity. Naples Park is predominantly a residential community located west of Tamiami Trail North to the Gulf of Mexico and between Vanderbilt Beach Road and 111th Ave. North. This system ultimately conveys wastewater to the County’s North Water Reclamation Facility (NCWRF) located on Goodlette- Frank Road south of the intersection with Immokalee Road. 1.1 110th AVENUE NORTH – WASTEWATER SYSTEM IMPROVEMENT PROGRAM PPMD retained CDM Smith and Q Grady Minor & Associates as the Engineers of Record (EORs) to renew or replace the existing pump stations, force mains, water mains, and gravity sanitary sewers within Naples Park in an effort to revitalize the wastewater basin and implement improvements to meet PPMD’s standard level of service. CDM Smith identified several large scale improvement projects that will improve the general conveyance of wastewater flow. Growth Management Department (GMD) has also retained Q Grady Minor to design water and stormwater improvements within Naples Park due to aging infrastructure. PPMD has selected Stantec Consulting Services Inc. (Stantec) to provide construction, engineering, and inspection services throughout the duration of the preconstruction, construction, and commissioning of the Naples Park Basin 101 Program Improvements. The 110th Avenue North Public Utility Renewal Project consists on the repair and replacement of water, wastewater, and stormwater systems along the 110th Avenue North between Tamiami Trail and Vanderbilt Drive (see attached map). As part of the improvements, the Contractor may need to replace water and sewer service lines. Each clay sewer pipe lateral from the property will be replaced with new PVC pipe. The service line work may need to take place on private property, and permission from the owner will be necessary. Stormwater collection and treatment system rehabilitation work will take place in the right-of-way. This project also includes the construction of a new pressurized wastewater pipeline along 110th Avenue North. Construction will begin at the intersection of 110th Avenue North and Vanderbilt Drive and will connect a new master pump station at the corner of 110th Avenue North and 8th Street North. This project will improve the ability to move wastewater from Basin 101 to the treatment facility that is necessary to ensure a continued high level of utility service for the community. 2.0 PURPOSE The purpose of this scope of services is to provide professional construction coordination services for the 110th Avenue North Public Utility Renewal project. 16.C.3.a Packet Pg. 754 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services 110th Avenue North Public Utilities 2 Design with community in mind 3.0 SCOPE OF SERVICES The tasks for this project are presented below and include the following: Task 1.0 – Construction Observation and Documentation Task 2.0 – CEI Construction and Project Oversight Task 3.0 – Public Involvement TASK 1.0 CONSTRUCTION INSPECTION AND OBSERVATION Services to be provided as part of this task will include the following: 1.1 Construction/Testing Observation – Stantec will conduct on-site observations and inspections of construction/testing activities on the Project on a full time basis, unless directed otherwise by the County’s Project Manager, to assess whether work is completed in general conformance with the Contract Documents. Stantec will notify the Contractor of any issues related to conformance of the work with the Contract Documents and document these notifications on the Daily Work Report (DWR). All Stantec field personnel will communicate directly with Collier County Project Manager as necessary. Stantec will provide interpretation of plans and specifications and assist the Contractor in developing solutions to field issues/conflicts at the project level. If the issue/conflict cannot be resolved at the project level, Stantec will submit a Request for Information (RFI) to the Design Engineer/Engineer of Record (EOR) within one business day and provide a copy to the County’s Project Manager. The EOR will review the issue and provide a written response to Stantec so that written direction can be given to the Contractor. Stantec will maintain an RFI log to track the final disposition of all issues/ conflicts and keep the County’s Project Manager updated as the project progresses. 1.2 DWR and Construction Documentation – Stantec will prepare a Daily Work Report (DWR) with pictures recording activities and details related to the work on a form approved in advance by the County’s Project Manager. Information will be recorded in the DWR when at the Project Site. The DWR will record relevant aspects of the construction observed while on site including, but not limited to: construction crew (labor) details, equipment used, materials used, compliance testing and inspection performed, site conditions, trench conditions, backfill material used, dewatering methods, compaction methods, location of the work, and other details related to the Work. The DWR will reference the digital photographs and/or video taken with appropriate caption summarizing subject matter and location. In addition to the construction details, the DWR will contain information related to: time and hours on the job site, weather conditions, data pertaining to questions of quantities of materials used, extras or deductions, list of visiting officials and representatives of manufacturers, fabricators, suppliers and distributors, observations in general and specific observations in more detail as in observing test procedures, conformance inspection of materials and fittings, name plate data for equipment and material installed, customer service field log, and other information requested by the County’s Project Manager. DWRs will be provided to the County’s Project Manager by Stantec on a daily basis in an electronic file via E-mail, on a digital CD, if requested by the County’s Project Manager, and a printed copy to be maintained on the project site in the inspector’s trailer. All daily reports will be prepared in the field. All other construction documentation produced by Stantec will be provided upon request. 1.3 Photographic and Video Record – Stantec will provide a digital photographic record of construction activities related to the Project in the DWR along with a brief description of the photograph, and the date and time of the photograph. A photograph log and photographic record will be provided to the County at the end of the project’s construction phase. 16.C.3.a Packet Pg. 755 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services 110th Avenue North Public Utilities 3 Design with community in mind 1.4 General Coordination – Stantec will coordinate information related to the Project between the construction contractor, the EOR and the County’s Project Manager. Stantec will oversee substantial and final completion inspections, and prepare and maintain the punch list, including follow-up inspections to confirm whether punch list items are corrected and/or completed. Stantec will coordinate with the County Utilities Department for testing and construction of required connections to existing facilities. Stantec will communicate, as directed by the County’s Project Manager, with community members, business owners, and the general public through the Public Information Manager (PIM). 1.5 Construction Progress Meetings – Stantec will conduct bi-weekly progress meetings to review project status and identify issues that may affect the Project. Stantec will prepare a DRAFT Agenda at least two (2) business days in advance of the meeting and produce meeting minutes within two (2) days after the meeting for distribution to the County’s Project Manager, EOR, and the construction contractor. 1.6 Substantial Completion Inspections – Stantec will conduct Substantial Completion inspections when requested by the construction Contractor and the EOR recommends that the work is sufficiently complete to warrant a Substantial Completion inspection. During the Substantial Completion inspection, Stantec will prepare a punch list of items requiring completion or correction to the satisfaction of the EOR and the County’s Project Manager. Stantec will be responsible for maintaining the punch-list and issuing updates to the punch-list on a weekly basis. Stantec will coordinate and participate in the final walk-through to confirm whether the punch- list items are completed to the satisfaction of the EOR and the County’s Project Manager. All services related to the Substantial Completion Inspection will be provided in writing and pictures provided to the County’s Project Manager. 1.7 Final Completion Inspection - Upon the request of the construction Contractor and concurrence of the EOR and the County’s Project Manager, Stantec will conduct Final Completion inspections of portions of the project, as they are finished, to determine if construction has been completed in conformance with the Contract Documents and the construction Contractor has fulfilled all obligations therein. Based on the results of the Final Completion inspection, the EOR, County’s Project Manager, and Stantec will judge the work complete or not complete. If the work is judged complete, Stantec will issue a “notice of final acceptance and recommendation for final payment”. If the work is judged not complete, Stantec will issue written notification to the construction Contractor identifying the work judged not complete. Upon provision of the construction contractor’s evidence or assurance that the deficiencies noted above have been corrected or completed, a second Final Completion inspection will be scheduled to verify that the outstanding issues have been resolved and Stantec can issue a “notice of final acceptance and recommendation for final payment”. All services related to the Final Completion Inspection will be provided to the Project Manager. 1.8 Final Construction Certification – Upon issuance of a “notice of final acceptance and recommendation for final payment” Stantec will provide the County’s Project Manager a signed and sealed certification by a professional engineer stating that the “Project has been completed by the construction Contractor in reasonable conformance to the Contract Documents, and as amended by the Engineer of Record”. 16.C.3.a Packet Pg. 756 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services 110th Avenue North Public Utilities 4 Design with community in mind TASK 2.0 CONSTRUCTION ADMINISTRATION Services to be provided for this task will include the following: 2.1 General Management and Oversight – Stantec will provide support services customarily related to the construction observation and inspection of similar projects including, but not limited to the following: a. Participate in a pre-construction meeting with the County’s Project Manager, EOR, the construction contractor, and all other interested parties. b. Participate in other meetings as described or implied herein. c. Review and verify correctness of the construction contractor’s monthly applications for payment and accompanying data and recommend approval of payments due and payable to the construction contractor. Stantec’s recommendation of any payment requested in an application for payment will constitute a representation by Stantec to the County’s Project Manager as an experienced and qualified professional, that based on Stantec’s onsite observations and inspections of construction in progress, that the quantities of work completed in the applications for payment accurately reflect the progress of the work completed in conformance with the Contract Documents. Stantec will process pay requests in accordance with the Florida Prompt Payment Act. All incoming pay requests processed by the Stantec will be mechanically stamped with the date received. d. Stantec will review the monthly updates to the construction schedule prepared by the construction Contractor and provide written comments to the County’s Project Manager and EOR. e. Stantec will oversee such field testing and provide an opinion whether materials, equipment and supplies installed or utilized on the Project are in conformance with the Contract Documents and Shop Drawings approved by the EOR. f. Stantec will have access to, collate, file, and distribute required Project records, including but not limited to construction contractor’s progress schedules, DWRs, and testing reports. 2.2 Coordination of Shop Drawings, Contract Interpretations, and Clarifications – Stantec will coordinate with the design engineer (EOR) regarding the issuance of interpretations and clarifications of Contract Documents during construction. The EOR will be responsible for technical review and decisions regarding interpretation and clarification of Contract Documents. Stantec will communicate the EOR’s decisions and responses with the construction contractor. 2.3 Change Orders – Upon identification of an unforeseen condition or additional work, Stantec will analyze the extent of the change and compare it to the proposed change order cost submitted by the construction contractor. If necessary, Stantec will negotiate the cost of the Change Order, and assist the County in issuing a Work Directive and subsequent Change Order. 2.4 As Constructed Field Drawings – Stantec will maintain red pencil “mark-up” notations and sketches on full size construction plans that reflect the actual details of constructed facilities. These As Constructed Field Drawings will be used by Stantec to validate the “As Built” documentation provided by the construction contractor. 2.5 Start-up and Re-commissioning Support – Stantec will assist the County’s Project Manager, the EOR, and the construction Contractor during start-up of each segment, as designated for Beneficial Use by the EOR, and provide general coordination during these activities. 16.C.3.a Packet Pg. 757 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services 110th Avenue North Public Utilities 5 Design with community in mind TASK 3.0 PUBLIC INVOLVEMENT Collier County has emphasized that communicating project initiatives, plans, and progress with community members is a high priority during the completion of the Basin projects. For Naples Park projects, Stantec will provide a full time information team that will consist of a Public Information Manager (PIM), a Public Information Officer (PIO) and a Public Information Assistant (PIA) to support the County with the following: 3.1 Public Outreach Plan - Work with the County to develop the vision of the project which includes identifying why the project is needed, what work will be done, how the project will benefit customers, how the project fit into the community, and how the project fit into the broader County initiative plans. The vision, once defined will be provided to the public through various methods throughout the duration of this project. Develop a plan to educate, engage, and inform residents, business owners, local and seasonal visitors and, in general, the impacted community; to continue to build community trust, and to provide a solid messaging process to in-house departments and the media. This will include Grassroots communication efforts paired with the use of technology including social media, e- newsletters, etc. The plan will be prepared to assist the team with review, assess input, and will be updated quarterly. 3.2 24 Hour Project Hot Line – The PIM or PIO will be accessible through a dedicated phone line for activities associated with public information. A single number will be provided for this service and will be active 24 hours to receive calls or messages. Project representatives will receive community member complaints or concerns and will provide responses within a 24-hour period to prevent interruptions of Public Utility Department staff. The PIM will also be capable of communicating about the project vision, progress, goals, and objectives, as well as the specifics of day to day activities. All calls will be documented and databased. Periodic reports will be provided to the Stantec team. 3.3 Coordination with Collier County Communications & Customer Relations Department – The PIM will work in partnership (seamlessly) to serve the community. Our Public Outreach professional will provide Mike Sheffield with accurate, timely and useful information. Our approach mirrors that of the County and use a multi-media approach already in place to include access television, printed publications and media releases. 3.4 Report Information –The PIM or PIO will compile information to be included in regularly scheduled reports to provide quality feedback, reporting and materials to Collier County Government staff members such as County Manager. 3.5 Outreach and Meetings 3.5.1 Project Specific Community Outreach - Participate in community meetings before and after the project bid, as well as during construction progress of each project. Professional Communications Services during construction will be proactive to assist with minimizing disturbances and restoration efforts to residents, as well as to all project stakeholders 3.5.2 Project Progress – The PIM will provide ongoing messages to keep public and other stakeholders informed about the project including project schedule, traffic impacts, major milestones, etc. 16.C.3.a Packet Pg. 758 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services 110th Avenue North Public Utilities 6 Design with community in mind 3.5.3 Additional Outreach Efforts – These include the services listed below: a. Coordinate with community members and Contractor during construction to sequence construction as necessary to provide community members continuous, reasonable access to their property during construction. b. Provide coping information to residents and business that may have inconveniences caused by the project. This could include details regarding access, services, etc. and can be in the form of formal and informal communications as necessary. c. Provide community members with advance notice of scheduled service outages. d. Coordinate use of variable message boards (VMBs) to inform community members of when and where work activities will be occurring. e. Coordinate with Naples Park HOA. f. Develop informational material to provide to the community and stakeholders as directed by the County. Informational materials may include narratives identifying why the project is needed, what work will be done, how the project will benefit customers, how the project fits into the community, and how the project fits into the broader County initiative plans. Once defined, the materials will be provided to the public through various methods including letters, e-mails, special printings such as door hangers, and other forms of formal and informal communication, throughout the duration of this project, as directed by Collier County. The cost for all reimbursable materials will be invoiced to the project with supporting back-up information. 3.6 Graphic Design for Publications - Stantec will provide a graphic designer to assist the County and project staff in developing graphic content for the website, publications, and materials to be utilized to provide information to the public and project personnel. 4.0 FEE All work will be charged on a Time & Material basis in accordance with the Project Budget Form. Many facets that control the length of the project and necessary effort are outside the control of Stantec. Hours shown in this work assignment are only estimates. Any additional work that may be required, will be performed under a separate Work Assignment, or as an amendment to this one. Task Estimated Fee Fee Type Task 1 – Construction Inspection and Observation $299,425 T&M Task 2 – Construction Administration $216,575 T&M Task 3 - Public Involvement $102,550 T&M Total Fee $618,550 T&M 16.C.3.a Packet Pg. 759 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services 110th Avenue North Public Utilities 7 Design with community in mind 5.0 SCHEDULE Stantec will provide services throughout the duration of the project as directed by the County in accordance with the Project Schedule as defined by Contract #14-6345 “Construction Engineering and Inspection (CEI) Services for the Wastewater Basin Programs (MPS 101 Basin)” and its amendments. 16.C.3.a Packet Pg. 760 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services 110th Avenue North Public Utilities Sr. Project Manager (QA/QC) Senior Inspector Engineer Intern Clerical / Administrative PI Assistant PI Officer PI Manager Total Labor Survey Total Task 1 - Construction Inspection & Documentation 120 2380 289 $299,425.00 $299,425.00 Task 2 - Construction Administration 710 884 325 $216,575.00 $216,575.00 Task 3 - Public Involvement 270 250 250 250 $102,550.00 $102,550.00 TOTAL HOURS 830 2380 884 884 250 250 250 HOURLY RATE $157.00 $110.00 $95.00 $65.00 $105.00 $115.00 $120.00 DIRECT LABOR COST $130,310.00 $261,800.00 $83,980.00 $57,460.00 $26,250.00 $28,750.00 $30,000.00 Construction Cost 5,182,405.00$ Proposal Percentage 11.94% $618,550.00 Task $0.00 Project Personnel (Hrs) $618,550.00 WBS# Construction engineering & Inspection Services for 110th Avenue North Public Utility Renewal Wastewater Basin Program Collier County Contract 14-6345 16.C.3.a Packet Pg. 761 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services ! ! ! ! !!!! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! !! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !!!! ! ! !!!!7th ST8th ST110th AVE N 756B 760B 768B 772B 791B 787B737 733 731 703B 783 700 771 780 735 748 732 744 791A 804 767 728 723 719 736 716 792 739 712 755 784 724 751 800 752 743 775 707 708 711 806 776 779 740 788 720 795 727 763 CCPA, Stantec Stantec Consulting Services Inc.6900 Professional Parkway EastSarasota, FL 34240tel 941.907.6900fax 941.907.6911 110TH AVE NORTHADJACENT PARCEL LOCATION MAPJuly 2016\\US1226-F01\V:\1773\active\177310803\gis\mxd\N110thAve_20160621_v03_106492.mxd Revised: 2016-07-01 By: esturmDisclaimer: Stantec assumes no responsibility for datasupplied in electronic format. The recipient acceptsfull responsibility for verifying the accuracy andcompleteness of the data. The recipient releases Stantec, its officers, employees, consultants andagents, from any and all claims arising in any wayfrom the content or provision of the data.Prepared by:E.E.S. 06/30/16 Notes:1. Coordinate System: NAD 1983 StatePlane Florida East FIPS 0901 Feet2. Source data: COLLIER COUNTY GIS3. Imagery: CCPA 2016 !!! ! ! ! !!! ! ! ! ! ! !! ! ! !! !! ! ! ! ! ! ! ! ! ! ! ! !! ! !! !! ! ! !! !! ! !! !!!! 110th AVE N Vanderbilt DR6th ST586582 60410980542 541 526 574558 589557 530 581 578 525 56155311002 562554 598518 517 538 549 607 546 577 550 603 594 529 570 565509 600 545 569533537 566522 593513 590534 573 555 559 514A 514B514C514D CCPA, Stantec ! ! ! ! ! !! ! ! ! !!! ! ! ! !! !! ! ! ! !! !! ! ! ! ! !!! ! ! ! ! !! !! ! ! ! ! ! !! ! !! ! 110th AVE N 7th ST6th ST703A 700 703B 604 647 672640 627 695 636 589 671643 656 692 611 660 684 639 679 598 644 635615607 651 663 616 628 603 675 594 612 648 687 600 631 699A 608 664 667623 652 655 620 688 593 676 613 683 691 699B CCPA, Stantec ! !! !! !!!!!!!! ! ! ! ! ! ! !! !!! ! ! ! !!! ! ! ! !! !! ! !!! ! ! ! !! ! ! ! !!!!! !! !!!!!! ! ! !! ! ! ! 109th AVE N8th ST110th AVE N 109th AVE N Tamiami TRL N110th AVE N 870986068405 8605 772B 8869 8865 791B 787B 856 783 780 828 824 812 8703 8702791A 852 804 816 850 864 792 784 832 800 775 840 806 779 8409 808 820 788 795 10975 11075 840BLDG CCPA, Stantec 0 80 160Feet ($$¯ 0 70 140Feet ($$¯0 70 140Feet 0 65 130Feet ($$¯ ($$¯ 16.C.3.a Packet Pg. 762 Attachment: Attachment 1 - Stantec Proposal (2693 : Construction, Engineering, and Inspection Services 110th Avenue North Public Utilities Renewal)