DSAC Agenda 03/01/2017DSA C Meeting March 1, 2017 3:00 PM 280D N. Horseshoe Drive Growth Management Department DEVELOPMENT SERVICES ADVISORY COMMITTEE AGENDA March 1, 2017 3:00 p.m. Conference Room 610 NOTICE: Persons wishing to speak on any Agenda item will receive up to three (3) minutes unless the Chairman adjusts the time. Speakers are required to fill out a "Speaker Request Form," list the topic they wish to address, and hand it to the Staff member seated at the table before the meeting begins. Please wait to be recognized by the Chairman, and speak into a microphone. State your name and affiliation before commenting. During discussion, Committee Members may direct questions to the speaker. Please silence cell phones and digital devices. There may not be a break in this meeting. Please leave the room to conduct any personal business. All parties participating in the public meeting are to observe Roberts Rules of Order, and wait to be recognized by the Chairman. Please speak one at a time and into the microphone so the Hearing Reporter can record all statements being made. Call to Order — Chairman Approval of Agenda III. Approval of Minutes from January 4, 2017 and February 1, 2017 IV. Public Speakers V. Staff Announcements/Updates A. Code Enforcement Division update — [Mike Ossorio] B. Public Utilities Department update — [Tom Chmelik or designee] C. Growth Management Department Transportation Engineering Division & Planning Division updates — [Jay Ahmad or designee] D. Collier County Fire Review update — [Shawn Hanson and/or Shar Hingson] E. North Collier Fire Review update — [Dale Fey] F. Operations & Regulatory Mgmt. Division update — [Ken Kovensky] G. Development Review Division update — [Matt McLean] VI. New Business Note: These items have been continued from the 211/2017 DSAC meeting: A. School and Parks Impact Fees Indexing [Amy Patterson] B. Water and Wastewater Impact Fee Update Study [Amy Patterson] VII. Old Business VIII. Committee Member Comments IX. Adjourn Next Meeting Dates: April 5, 2017 GMD Conference Room 610 — 3:00 pm May 3, 2017 GMD Conference Room 610 — 3:00 pm June 7, 2017 GMD Conference Room 610 — 3:00 pm July 5, 2017 GMD Conference Room 610 — 3:00 pm August 2, 2017 GMD Conference Room 610 — 3:00 pm Page 1 of 1 February 1, 2017 MINUTES OF THE MEETING OF THE COLLIER COUNTY DEVELOPMENT SERVICES ADVISORY COMMITTEE Naples, Florida, February 1, 2017 LET IT BE REMEMBERED, the Collier County Development Services Advisory Committee in and for the County of Collier, having conducted business herein, met on this date at 3:00 P.M. in REGULAR SESSION at the Collier County Growth Management Department Building, Conference Room #609/610, 2800 N. Horseshoe Drive, Naples, Florida, with the following members present: Chairman: William J. Varian Vice Chairman: Blair Foley David Dunnavant James E. Boughton (Absent) Clay Brooker (Excused) Brad Schiffer Chris Mitchell Robert Mulhere (Excused) Mario Valle (Excused) Stan Chrzanowski (Excused) Norman Gentry Marco Espinar (Absent) Ron Waldrop (Excused) Laura Spurgeon DeJohn (Excused) Jeremy Sterk ALSO PRESENT: Judy Puig, Operations Analyst, Staff Liaison Lorraine Lantz, Transportation Planning Eric Fey, Sr. Project Manager, Public Utilities Mike Ossorio, Director, Code Enforcement Division Matt McLean, Director, Development Review Rich Long, Plan Review and Inspection Manager Claudine Auclair, Manager, Business Center Ken Kovensky, Director, Operations and Regulatory Management Amy Patterson, Director Impact Fee Administration February 1, 2017 Any persons in need of the verbatim record of the meeting may request a copy of the audio recording from the Collier County Growth Management Department — Contact Mr. Evy Ybaceta at 239-252-2400. I. Call to Order - Chairman Chairman Varian called the meeting to order at 3:00pm. A quorum could not be established so the meeting was held as an informational forum with no formal actions to be taken by the Committee. II. Approval of Agenda None III. Approval of Minutes from January 4, 2017 Meeting None IV. Public Speakers None V. Staff Announcements/Updates A. Code Enforcement Division update — [Mike Ossorio] Mr. Ossorio provided the report "Code Enforcement Division Monthly Report" for information purposes. He noted: Half of the Division Staff has completed the requirements of the Florida Association of Code Enforcement (F.A.C.E.) Phase IV training. A "door knocker card" program has been established whereby officers will be leaving thank you notifications for complying with County Codes. The Division Staff will be donning new uniform shirts. B. Public Utilities Division update — [Tom Chmelik or designee] Mr. Fey reported Staff met on January 19, 2017 to initiate changes to the Division's conveyance and acceptance process for small projects. The Ordinances under review include 134-58 (Construction approval and document submissions); 134-59 (Construction observation and inspection) and 134-60 (Utilities conveyance policies and procedures). The Amendments are anticipated to be completed within a year. C. Growth Management Department/Transportation Engineering and/or Planning — [Jay Ahmad or designee] Ms. Lantz provided an update on transportation projects noting an intersection and corridor study for Pine Ridge Road from I75 to Livingston Road is underway. The Committee requested Staff review the timing of the traffic lights on 1111 Ave to determine any changes that may be made to improve traffic flow in tine area during the work associated with the Vanderbilt Drive bridge replacement project. D. County Fire Review update — [Shar Hingson and/or Shawn Hanson] Ms. Hingson reported: 0 Plan reviews are at a 4 day turn around and inspections are at a 3 day turnaround. February 1, 2017 • Educational classes will be held by the International Firestop Council in Estero on February 21, 2017. • The Lee County Fire Department will be holding a poker run fund raiser. • On February 4th and 5th education classes on fire codes will be held by the Department at Harley Davidson and designed for general contractors, fire alarm contractors, etc. E. North Naples Fire Review update — [Dale Fey] Mr. Fey reported building plan reviews at a 7 day turn around, Site Development Plan reviews are at a 4 day turn around and Inspections are at a 1 — 2 day turn around. F. Operations & Regulatory Mgmt. Division update [Ken Kovensky] Mr. Kovensky submitted the "Collier County January 2017 Monthly Statistics" which outlined the building plan and land development review activities. The following was noted during his report: • Permit applications are up 9 percent year over year in January 2017. • Permits issued in January decreased year over year, however issuance of commercial permits tripled. • 17,000 inspections were completed in January 2017, an increase of 11 percent year over year. Fee Study Mr. Kovensky reported: • The consultant was on site from January 31 thru February 2 and reviewed the length of time for specific tasks and Staff provided the costs, including the "overhead" associated with the endeavors. • The data may be input to a model which analyzes the costs of the process. • The first draft of the report is anticipated to be delivered over the next several weeks and will be presented to the DSAC prior to it being heard by the BCC. Conflict of Interest Forms for Applicants Mr. Kovensky reported: • The County Attorney's Office is considering requiring applicants to submit a "conflict of interest" form identifying any relationships they may have with a Staff Member, Committee/Board Member, etc. • The requirement would apply to building and land use applications and is in the "discussion" stages with no time frame for implementation. The Committee noted the procedure may not be necessary given Committee Members and Staff are currently subject to County ethics standards. G. Development Review Division update [Matt McLean] Mr. McLean reported • Plats recorded in January 2017 numbered 700 with only 2,000 in total being filed in 2016. • Staff is reviewing the requirement of mylar sheets being provided at a fee of $17 each given technological advances allow the information to be accessed online through the Collier County Clerk's office. VI. New Business February 1, 2017 A. Permitting Processes [Claudine Auclair] Ms. Auclair provided an overview of the process for applicants who file for permits via walking into the lobby at the Growth Management Department building. She noted: • Applicants are required to check in at the information desk where a cursory review of their application is completed and they are given a number and requested to "sit and wait" while the application is processed. • The process time is generally 10 to 15 minutes until the "payment slip" is executed for the applicant. • The goal is for the process to take less than 15 minutes and data analysis indicates within the last 6 months, of 15,000 applications, the average wait time is 12 minutes 53 seconds. Eighty percent of the applications were processed within the 15 minute time frame. • In order to ensure all processes (walk in, electronic, etc.) is as efficient as possible, Staff is: • Reviewing the process to determine any changes that may be made to improve the process including training of Staff, identifying any areas where the required access to CityView is impeded, etc. • Reviewing changes which may be made to the electronic filing of applications such as the reviewers' ability to access certain documents. • Meeting with the major users of electronic plan filing platform at their place of business to provide training on the use of the system. • Scheduling educational classes for those professionals interested in electronic plan filing. They will notify Mr. Schiffer on the schedule so he may notify any interested members of the local AIA. The Committee recommended a `ticket number" display screen be installed so those waiting in the lobby are aware of where they are in queue. B. School and Parks Impact Fees Indexing [Amy Patterson] Ms. Patterson presented the documents "Parks and Schools Impact Fee Indexing and Water Wastewater Impact Fee Study Update " and "Collier County 2016 Indexing Calculations for Parks and Recreation Facilities and School Impact Fees Draft Report" for information purposes. Continued —See Item C. C. Water and Wastewater Impact Fee Update Study [Amy Patterson] Ms. Patterson presented the documents "Appendix B Existing Water and Waste Water Impact Fee Ordinance" for information purposes. Chairman Varian reported no quorum was present for a recommendation. Ms. Patterson reported she would present the items at the next meeting as she needs a recommendation from the Committee. Continuation of the items will not disrupt the schedule for the items. VII. Old Business None VIII. Committee Member Comments None 19 February 1, 2017 IX. Adjourn Next Meeting Dates March 1, 2017 GMD Conference Room 610 — 3:00 pm April 5, 2017 GMD Conference Room 610 — 3:00 pm May 3, 2017 GMD Conference Room 610 — 3:00 pm There being no further business for the good of the County, the meeting was adjourned by the order of the Chair at 4:45PM. COLLIER COUNTY DEVELOPMENT SERVICES ADVISORY COMMITTEE Chairman, William Varian These Minutes were approved by the Board/Chairman on as presented or as amended Code Enforcement Division Monthly Report January 22 — February 21, 2017 Highlights • Cases opened: 660 0 Cases closed due to voluntary compliance: 403 • Property inspections: 2478 0 Lien searches requested: 995 Trends Cases Opened Per Month 1200_- 1000 M- 400 200 0 y6 y6 ti� ti6 y� tiCO 0 0 This report reflects monthly data from: January 22 — February 21, 2017 9000 8000 7000 6000 5000 4000 3000 2000 1000 0 Total Code Cases Opened Annually 2015 2016 2017 This report reflects monthly data from: January 22 — February 21, 2017 Code Inspections per Month 3500 3000 N ry N N w m u N a 2500 M N N � N 2000 a 1500 1000 500 0 ti� ti� tie tib tib ti(0 ti� tib tib ti� ti^ ti^ �0 9000 8000 7000 6000 5000 4000 3000 2000 1000 0 Total Code Cases Opened Annually 2015 2016 2017 This report reflects monthly data from: January 22 — February 21, 2017 December 2016 Code Cases by Category Snipe signs omitted Vehicles 20% Arreccnrvllse mguu Right ot'M-V....�............. rarrcmg ouuIceniem 3% 5% 9% 2% Abatement 26% Case Type Common issues associated with Case Type Accessory Use — Fence permits, fence maintenance, canopies, shades, guesthouse renting etc. Animals — Prohibited animals, too many animals, etc. Commercial Shopping carts Land Use — Prohibited land use, roadside stands, outdoor storage, synthetic drugs, zoning issues, etc. Noise Construction, early morning landscaping, bar or club, outdoor bands, etc. Nuisance Abatement — Litter, grass overgrowth, waste container pits, exotics, etc. Occupational Licensing — Home occupation violations, no business tax receipts, kenneling. etc. Parking Enforcement - Parking within public right-of-way, handicap parking, etc. Property Maintenance Unsanitary conditions, no running water, green pools, structure in disrepair, etc. Protected Species -Gopher Tortoise, sea turtles lighting, bald eagles, etc. Right of Way - Construction in the public right-of-way, damaged culverts, obstruction to public right-of-way, etc. Signs - No sign permits, illegal banners, illegal signs on private property, etc. Site Development -Building permits, building alterations, land alterations, etc. Temporary Land Use - Special events, garage sales, promotional events, sidewalk sales, etc. Vegetation Requirements—Tree maintenance, sight distance triangle, tree pruning, land clearing, landfill, preserves, etc. Vehicles - License plates invalid, inoperable vehicles, grass parking, RV parking, other vehicle parking etc. This IePC) 1,1 r`ef6>ri, monthly da:a'froin: January 22 — Fe 1)t uary 21, 2017 Vehicl 30% Temporar January 1-21, 2017 Code Cases by Category Snipe signs omitted Vegetation Requirements, Animals Arressory Use 117 Signs Right of Way Property Maintenance 1% 9% 7% ise jisance atement 19% _icensing Case Type Common issues associated with Case Type Accessory Use — Fence permits, fence maintenance, canopies, shades, guesthouse renting etc. Animals — Prohibited animals, too many animals, etc. Commercial Shopping carts Land Use — Prohibited land use, roadside stands, outdoor storage, synthetic drugs, zoning issues, etc. Noise Construction, early morning landscaping, bar or club, outdoor bands, etc. Nuisance Abatement — Litter, grass overgrowth, waste container pits, exotics, etc. Occupational Licensing — Home occupation violations, no business tax receipts, kenneling. etc. Parking Enforcement Parking within public right-of-way, handicap parking, etc. Property Maintenance Unsanitary conditions, no running water, green pools, structure in disrepair, etc. Protected Species - Gopher Tortoise, sea turtles lighting, bald eagles, etc. Right of Way Construction in the public right-of-way, damaged culverts, obstruction to public right-of-way, etc. Signs No sign permits, illegal banners, illegal signs on private property, etc. Site Development -Building permits, building alterations, land alterations, etc. Temporary Land Use - Special events, garage sales, promotional events, sidewalk sales, etc. Vegetation Requirements — Tree maintenance, sight distance triangle, tree pruning, land clearing, landfill, preserves, etc. Vehicles - License plates invalid, inoperable vehicles, grass parking, RV parking, other vehicle parking etc. This report reflects monthly data front: January 22 — February 21, 2017 January 22 - February 21 Code Cases by Category Snipe signs omitted Accessory Use Vegetation Vehicles 1% Requirements 19% 3% Vehicle for Hire 0% Temporary Land Use I 0% Site Development 14% Signs 8% Right of Way 4% Commercial Animals 0% 2% Land Use I ,-' 12% Noise 4% _Nuisance Abatement 21% occupational Licensing Parking Enforcement 1% 4% Property Maintenance 7% Case Type Common issues associated with Case Type Accessory Use — Fence permits, fence maintenance, canopies, shades, guesthouse renting etc. Animals — Prohibited animals, too many animals, etc. Commercial Shopping carts Land Use — Prohibited land use, roadside stands, outdoor storage, synthetic drugs, zoning issues, etc. Noise Construction, early morning landscaping, bar or club, outdoor bands, etc. Nuisance Abatement — Litter, grass overgrowth, waste container pits, exotics, etc. Occupational Licensing — Home occupation violations, no business tax receipts, kenneling. etc. Parking Enforcement - Parking within public right-of-way, handicap parking, etc. Property Maintenance Unsanitary conditions, no running water, green pools, structure in disrepair, etc. Protected Species Gopher Tortoise, sea turtles lighting, bald eagles, etc. Right of Way Construction in the public right-of-way, damaged culverts, obstruction to public right-of-way, etc. Signs No sign permits, illegal banners, illegal signs on private property, etc. Site Development -Building permits, building alterations, land alterations, etc. Temporary Land Use - Special events, garage sales, promotional events, sidewalk sales, etc. Vegetation Requirements —Tree maintenance, sight distance triangle, tree pruning, land clearing, landfill, preserves, etc. Vehicles - License plates invalid, inoperable vehicles, grass parking, RV parking, other vehicle parking etc. This report reflects monthly data from: January 22 — February 21, 2017 February 22, 2017 GMD Public Portal - E -Permitting Training Classes The Growth Management Department is pleased to announce the spring schedule for E -Permitting training classes. This year we are offering training for both permit applicants ready to begin using our E- PermittinglElectronic Plan Review process and applicants who need a refresher on some or all E -Permitting features of the GMD Public Portal. Training modules have been updated and cover specific topics such as portal registration, uploading documents, and resubmittalslcorrections. This modular approach will give us more flexibility in tailoring training sessions to meet customer needs. We expect to have sessions for Building Permit applicants new to E -Permitting, Planning Permit applicants new to E -Permitting, and refresher training for both. Every effort will be made to group attendees by the type of training requested. Because the training classes are hands-on, we are limited to 20 participants per session. The presentations will generally last 45 minutes, but staff will be available for assistance from 9:00-12:00 for the morning sessions and 1:00-4:00 in the afternoon. The training classes will be held: March 20, 22, 24, 28, 29 & 30, 2017 Morning Sessions will begin at 9:00 am Afternoon Sessions will begin at 1:00 pm Collier County Growth Management Division 2800 North Horseshoe Drive Naples, Florida 34104 Conference Room 610 Please RSVP by Wednesday, March 10, 2017 To RSVP, please contact our Training Coordinator, Danny Condomina, at DannvCondomina(a)colliergov.net or 239-252-6866. Please provide the type of training you are requesting and preferred dates along with a call back number. We are excited and look forward to seeing you at the training, but if you are unable to join us for a hands-on session we will also be posting the training documents and videos on the Colliergov.net website. ROAD, PARKS, JAIL AND SCHOOLS IMPACT FEE INDEXING AND WATER -WASTEWATER IMPACT FEE UPDATE STUDY SINGLE FAMILY DETACHED MULTI -FAMILY 2,000 Sq. Ft. Living Area IMPACT FEE CURRENT PROPOSED DIFFERENCE CURRENT PROPOSED DIFFERENCE Parks - Community (6.5%) $876.84 $933.83 $56.99 $427.42 $455.20 $27.78 Parks - Regional (10.6%) $2,436.09 $2,694.31 $258.22 $1,112.33 $1,230.23 $117.90 Library* $336.05 $336.05 $159.78 $159.78 School (3.2%) $7,470.66 $7,709.72 $239.06 $2,394.66 $2,471.29 $76.63 Road (2.3%) $7,276.63 $7,443.99 $167.36 $5,417.29 $5,441.89 $24.60 EMS` $142.07 $142.07 $67.50 $67.50 Jail (2.6%) $486.54 $499.19 $12.65 $223.11 $228.91 $5.80 Fire (North Collier) $598.26 $598.26 $304.38 $304.38 Government Buildings* $934.44 $934.44 $443.94 $443.94 Law Enforcement* $586.95 $586.95 $296.56 $296.56 Water -3/4" Meter $2,600.00 $2,562.00 -$38.00 $2,600.00 $2,562.00 -$38.00 Sewer - 3/4" Meter $2,515.00 $2,701.00 $186.00 $2,515.00$2,701.00$186.00 TOTAL $26,259.53 $27,141.81 $882.28 $15,961.97 $16,362.68 $400.71 Change 3.36% 2.51% OFFICE RETAIL GENERAL INDUSTRIAL 10,000 Sq. FT. 10,000 Sq. FT, 10,000 Sq. FT. IMPACT FEE CURRENT PROPOSED DIFFERENCE CURRENT PROPOSED DIFFERENCE CURRENT PROPOSED DIFFERENCE Road $100,184.60 $102,488.80 $2,304.20 $104,363.70 $106,764.00 $2,400.30 $55,718.00 $56,999.50 $1,281.50 EMS* $934.00 $934.00 $1,923.00 $1,923.00 $541.60 $541.60 Jail $3,198.90 $3,282.00 $83.10 $6,585.80 $6,757.10 $171.30 $1,854.80 $1,903.00 $48.20 Fire (North Collier) $4,171.00 $4,171.00 $8,622.30 $8,622.30 $2,418.50 $2,418.50 Government Buildings* $6,195.10 $6,195.10 $12,754.70 $12,754.70 $3,592.10 $3,592.10 Law Enforcement* $3,715.70 $3,715.70 $7,649.90 $7,649.90 $2,154.50 $2,154.50 Water -1"Meter $4,340.00 $4,278.00 -$62.00 $4,340.00 $4,278.00 -$62.00 $4,340.00 $4,278.00 -$62.00 Sewer -1 " Meter $4,200.00 4 510.003$ 10.00 $4,200.00$4,510.00$310.00 $4,200.00 $4,510.00 $310.00 TOTAL $126,939.30 $129,574.60 $2,635.30 $150,439.40 $153,259.00 $2,819.60 $74,819.50 $76,397.20 $1,577.70 Change 2.08% 1.87% 2.11% "Previously reviewed by DSAC -to be presented to BCC February 28, 2017. Recommendation was to accept studies but to not increase rates. 2/2/2017 Collier County 2017 Indexing Calculations for Parks and Recreation, Schools, Correctional Facilities, and Transportation Impact Fees DRAFT Report Prepared for: Collier County 2800 North Horseshoe Drive Naples, FL 34104 Ph. (239) 252-8192 January 25, 2017 Tindale Oliver 1000 Ashley Drive, Suite 400 Tampa, FL 33602 Ph. (813) 224-8862, fax (813) 226-2106 E-mail: nkamp@tindaleoliver.com DRAFT COLLIER COUNTY 2017 INDEXING CALCULATIONS Table of Contents I. Introduction................................................................................................ 1 II. Calculation of Indices.................................................................................. 2 III. Application.................................................................................................. 3 Tindale Oliver Collier County January 2017 Indexing Update DRAFT I. Introduction Collier County retained Tindale Oliver to calculate the updated indices for the following impact fee program areas: • Community Parks; • Regional Parks; • Schools; • Correctional Facilities; and • Transportation. The County recently completed the technical studies for government buildings, emergency medical services facilities, law enforcement facilities, and library facilities and is the process of adopting the updated studies. As such, indices for these program areas are not included in this report. This technical report provides a summary of the updated indices and the calculations of combined indices for the five service areas listed above. Tindale Oliver Collier County January 2017 1 Indexing Update DRAFT II. Calculation of Indices As part of the calculations, the following indices were updated: • Collier County Property Values; • Consumer Price Index (CPI); • Producer Price Index (PPI) (for equipment, vehicles, and highway construction separately); • Engineering News Record (ENR) Building Cost Index; • Turner Building Cost Index; • RS Means Building Cost Index; and • Florida Department of Transportation (FDOT) Average Roadway Construction Cost, based on data from District 7. Table 1 presents the updated individual indices that will be used in the calculation of the overall indices for each program area. Indices were calculated based on the most recent two years of data available, 2015 and 2016. Consistent with the adopted indexing methodology, the building cost index utilized ENR, RS Means, and Turner Building Cost indices. In the case of the equipment/vehicle cost index, CPI and PPI for equipment were used. The land index is based on data from the Collier County Property Appraiser. Finally, the roadway construction index utilizes a combination of PPI Highways and FOOT District 7 data for 2015 and 2016. In the case of roadway construction index, while the Florida data indicates an increase, the national data suggests a decrease in cost over the past two years. Combining these two indices results in a conservative index. Table 1 also provides a comparison to 2016 indices calculated in March 2016. Table 1 Index Calculations 1) Calculated based on the data from 2015 and 2016 2) Calculated using 2014 and 2015 data, as available 3) Difference between the 2017 index (Item 1) and the 2016 index (Item 2) Tindale Oliver Collier County January 2017 2 Indexing Update DRAFT III. Application Updated individual indices from Table 1 are used to calculate the combined indices for the five service areas, which are shown in Tables 2 and 3. The total applicable index represents the adjustment factor that should be applied to the related impact fee schedules. Table 2 Combined Indices (Community and Regional Parks and School Facilities) InventoryComponent Community Parks Distribution of Percent of [7017 (3) Combined Land $53,857,380 40.2% 12.1% 4.9% Site Improvements $5,033,400 3.8% 2.6% 0.1% Facilities/Equipment $75,162,659 56.0% 2.6% 1.5% Total Cost $134,053,439 100.0.0 Total Applicable Index(s) 6.59% Regional Parks Land $341,739,000 84.3%1 12.1% 10.2% Site Improvements $30,376,800 7.5% 2.6% 0.2% Facilities/Equipment $33,136,514 8.2% 2.6% 0.2% Total Cost 1 $405,252,314 100.0.0 Total Applicable Index(s) 10.6% School Facilities Land $105,394,124 5.7% 12.1% 0.7% Buildings $1,536,147,228 82.7% 2.6% 2.2% Buses/Vehicles/Equipment $215,804,974 11.6% 2.2% 0.3% Total Cost $1,857,346,326 100.0.0 Total Applicable Index(s) 3:2f 1) Source: Impact Fee Technical Studies 2) Distribution of each inventory component is calculated by dividing each component by the total inventoryvalue 3) Source: Table 1 4) Percent of the total cost (Item 2) multiplied by the 2017 index (Item 3) 5) Sum of indices of each component Tindale Oliver Collier County January 2017 3 Indexing Update DRAFT Table 3 Combined Indices (Correctional Facilities and Transportation) Inventorl component Correctional Facilities a • Land $319,000 0.3% 12.1%1 0.0% Buildings $90,542,188 92.7% 2.69/6 2.4% Equipment/Vehicles6835427 7.0% 2.2% 0.2% Total Cost $97,696,615 100.0% Total Applicable Index(s) 2.65.1 Transportation Construction, Design, CEI, Mitigation, Urban Overpass $3,704,000 81.1% 0.7% 0.6% ROW (Land) $647,250 14.2% 12.1% 1.796 ROW (Administrative) 5215,750 4.7% 0.7% 0.0% Total Cost $4,567,000 100.0.0 Total Applicable Index(s) 2.3% 1) Source: Impact Fee Technical Studies 2) Distribution of each inventory component is calculated by dividing each component by the total inventory value 3) Source: Table 1 4) Percent of the total cost (Item 2) multiplied by the 2017 index (Item 3) 5) Sum of indices of each component Tindale Oliver Collier County January 2017 4 Indexing Update. DRAFT Fiscal Year 2017 WATER AND WASTEWATER IMPACT FEE STUDY For COLLIER COUNTY WATER -SEWER DISTRICT December 21, 2016 Public Resources Management Group, Inc. Utility, Rate, Financia[, and Management Consultants DRAFT Public Resources Management Group, Inc. Utility, Rate, Financial, and Maavagement Consultants December 21, 2016 Honorable Chairman and Members of the Board of County Commissioners Collier County 3299 Tamiami Trail East, Suite 303 Naples, FL 34112-5746 Subject: Water and Wastewater Impact Fee Study Public Resources Management Group, Inc. ("PRMG") has completed our review of the water and wastewater impact fees for the Collier County (the "County") Water -Sewer District (the "District") water and wastewater system (the "System"), and has summarized the results of our analyses, assumptions, and conclusions in this report, which is submitted for your consideration. The purpose of our analysis was to review the existing impact fees and make recommendations as to the level of charges that should reasonably be in effect consistent with: i) the utility assets installed by the District; ii) the capital expenditure requirements identified in the District's multi- year capital improvement program ("CIP"); iii) industry guidelines and Florida Statutes; and iv) County management objectives. The methodology for the determination of the capital costs to be included in proposed impact fees (i.e., available to be recovered) was also reviewed by the County's outside legal counsel and the fees as documented in this report reflect all of the recommendations from said counsel. Based on our review, PRMG is recommending that the water system impact fee be decreased from $2,600 to $2,562 per Equivalent Residential Connection ("ERC"). For the wastewater system, we are recommending an increase in the impact fee from $2,515 to $2,701 per ERC. The combined water and wastewater fees with the proposed rate adjustments would be $5,263, an increase of $148 or 2.9% when compared with the existing combined fees of $5,115. The proposed impact fees, based on the analyses and assumptions as documented in this report, are summarized on Table ES -1 following this letter and in the County's format to be included in the amended Impact Fee Ordinance presented in Appendix C. The proposed Impact Fees were based on the recovery: i) of capital -related costs that have been incurred for utility plant that has been placed into service and financed by the District which are estimated to have available capacity to serve new development; as well as ii) certain capital costs anticipated to be incurred by the District during the projection period that are considered necessary to serve new development. Based on the information provided by the District and the assumptions and considerations outlined in this report, which should be read in its entirety, PRMG considers the proposed impact fees to be cost -based, reasonable, and based on local costs in accordance with the provisions of Florida Statutes, 163.31801 (referred to as the "Florida Impact Fee Act"). K 001125-43ut AW&W W Impact Fee Smdy 341 NORTH MAITLAND AVENUE — SUITE 300 — MAITLAND, FL :-32751 Tel: 407-628-2600 • Fax: 407-628-2610 • Email: PRMG a PRMGinc.com • Website: www.PRMGine.com DRAFT Honorable Chairman and Members of the Board of County Commissioners Collier County December 21, 2016 Page 2 In 2006, consistent with the practices of other utilities within the State of Florida, the County adopted Allowance for Funds Prudently Invested ("AFPI") fees per ERC (pursuant to Ordinance No. 2006-27) to recover the carrying cost incurred by the County for "holding" capacity until it is reserved by development; these costs are not included as in the development of the proposed impact fees. The collection of the AFPI fees had a sunset provision effective in 2012 and, consistent with County management direction, the AFPI fees were not reinstated after 2012. During the Fiscal Year 2008, the combined water and wastewater impact fees totaled $7,339 per ERC, while the maximum accrual on the combined AFPI fees totaled $1,693. Collectively, the water and wastewater impact fees and AFPI fees totaled $9,032 ($7,339 impact fees k $1,693 AFPI fees = $9,032). The proposed combined water and wastewater impact fees of $5,263 are $3,769 Iower per ERC when compared with the Fiscal Year 2008 combined impact fee and AFPI fee levels. We appreciate the opportunity to be of service to the County and would like to thank the County staff for their assistance and cooperation during the course of this study. Very truly yours, Public Resources Management Group, Inc. Robert J. Ori President Bryan A. Mantz, CMC, CGFM Supervising Consultant RJO/dlc Attachments Ki CA1125-43Vt AW&WW hipact Fa SNdy Line No. I 2 3 4 5 6 7 8 9 10 I1 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 DRAFT Table ES -1 Collier County Water -Sewer District Water and Wastewater Impact Fee Study Summary of Existine and Proposed Water and Wastewater System Impact Fees Level of Service (gallons per day Description per ERC) Amount Cost Per Gallon IMPACT FEES Water Impact Fee Existing Per ERC Treatment Component Transmission Component Total Proposed Per ERC Calculated Treatment Component Transmission Component Total Rounded Treatment Component Transmission Component Total Change (Total) Amount Percent Wastewater Impact Fee Existing Per ERC Treatment Component Transmission Component Total Proposed Per ERC Calculated Treatment Component Transmission Component Total Rounded Treatment Component Transmission Component Total Change (Total) Amount Percent Combined Impact Fee Existing Per ERC Treatment Component Transmission Component Total Proposed Per ERC (Rounded) Treatment Component Transmission Component Total Change (Total) Amount Percent 325 $2,045.00 $6,29 325 555.00 1.71 325 $2,600.00 $8.00 325 $2,056.70 $6.33 325 505.50 1,56 325 $2,562.20 $7.88 325 $2,057.00 $6.33 325 505.00 t.55 325 $2,562.00 $7.88 ($38.00) ($0.12) -1.5% -1.5% 225 $2,120.00 $9.42 225 395.00 1.76 225 $2,515.00 $11.18 225 $2,341.69 $10.41 225 359.81 1.60 225 $2,701.50 $12.01 225 $2,341.00 $10.40 225 360.00 1.60 225 $2,701.00 $12.00 $186.00 $0.83 7.4% 7.4% $4,165.00 950.00 $5,115.00 $4,398.00 865.00 $5,263.00 $148.00 2.9% COLLIER COUNTY WATER -SEWER DISTRICT WATER AND WASTEWATER IMPACT FEE STUDY TABLE OF CONTENTS Title DRAFT Page No. Letter of Transmittal Table ES -1: Summary of Existing and Proposed Water and Wastewater System Impact Fees Tableof Contents................................................................................................................... i List of Tables, Figures, and Appendices................................................................................ ii Introduction........................................................... Purpose of Water and Wastewater Impact Fees ... Existing Impact Fees ............................................. Level of Service Requirements ............................. Existing Plant -in -Service ...................................... Additional Capital Investment .............................. Design of Water Impact Fee ................................. Design of Wastewater Impact Fee ........................ Impact Fee Comparisons ....................................... Conclusions and Recommendations ..................... KADCV 125-43Rp1\W&W W ❑npact Fee Sndy -i- DRAFT COLLIER COUNTY WATER -SEWER DISTRICT WATER AND WASTEWATER IMPACT FEE STUDY LIST OF TABLES, FIGURES, AND APPENDICES Table No. Description Page No. ES -1 Summary of Existing and Proposed Water and Wastewater System [*] Impact Fees 1 Development of Existing Water Production / Treatment Facility 19 Capacity Available to Serve System Growth 2 Development of Existing Wastewater Treatment Facility Capacity 21 Available to Serve System Growth 3 Development of Water System Impact Fee 23 4 Development of Wastewater System Impact Fee 24 5 Comparison of Water and Wastewater Impact Fees Per ERC 25 Figure No. Description Page No. 1 Comparison of Water Impact Fees per ERC 15 2 Comparison of Wastewater Impact Fees per ERC 16 3 Comparison of Water and Wastewater Impact Fees per ERC 17 Appendix No. Description Page No. A Summary of Existing Utility System Assets 26 B Existing Water and Wastewater Impact Fee Ordinance 27 C Existing and Proposed Water and Wastewater System Impact Fee 51 Schedule in County Format F] Table ES -1 follows the letter of transmittal. KMC\1125-43 tpt\Wa WImpad Pee Smdy —11— DRAFT COLLIER COUNTY WATER -SEWER DISTRICT WATER AND WASTEWATER IMPACT FEE STUDY INTRODUCTION In 2003, the Legislature of the State of Florida pursuant to Section 189.429, Florida Statutes, adopted the Collier County Water -Sewer District Special Act (formally known as "House Bill 849") (the "Act") to create the Collier County Water -Sewer District (the "District") on behalf of Collier County (the "County"). The District is an independent special district and public corporation of the State with the Board of County Commissioners being the governing board of the District. The purpose of creating the District was to provide the District with the overall responsibility for the provision of water and wastewater services to a specified geographic service area of the County as defined in the Act due primarily to the extensive growth that was occurring and anticipated within the County and to meet the public health and water supply issues affecting such service area. The District owns and operates a water and wastewater utility system (the "System"), which during the Fiscal Year 2016, provided service to an estimated 59,739 water retail accounts (annual average) and 62,251 wastewater retail accounts. The District has constructed or plans to construct utility infrastructure to accommodate the future developments identified for the County that are expected to be served by the System. Historically, the District has utilized water and wastewater impact fees, which are referred to as "system development fees" in the District's authorizing bond resolution, to fund a portion of constructing the infrastructure requirements associated with new growth or increased development. For the purpose of this report, the terms "impact fees" and "system development fees" shall be used interchangeably. PURPOSE OF WATER AND WASTEWATER IMPACT FEES The purpose of impact fees is to recover the pro -rata share of allocated capital costs that are considered as growth -related from new customers connecting to the System or from existing customers that are requesting an increase in the reserved water and / or wastewater capacity associated with increased development on their property. To the extent that new population growth and associated development impose identifiable added capital costs to municipal services, capital funding practices to include the assignment of such costs to those residents or system users responsible for those costs rather than to the existing population base is reasonable and provides for the property match of initial capital investment to reserve capacity. Generally, this practice has been labeled as "growth paying its own way" without existing user cost burdens. The application of impact fees to finance capital infrastructure allocated to such new capacity requests is very common in Florida and the country and has been used as a source of contributed capital by the District for a number of years. On June 14, 2006, additional impact fee legislation became effective as Chapter 2006-218, Laws of Florida, and was later incorporated in Section 163.31801 of the Florida Statutes. The impact fee legislation, which has been designated as the "Florida Impact Fee Act," recognized that impact fees are an important source of revenue for a local government to use in funding the TC$C\112543 pM&WW Impact Pee SNdy —I— infrastructure necessitated by new growth. The act further states that an impact fee adopted by ordinance of a county or municipality, or by resolution of a special district, must at minimum: • Require that the calculation of the impact fee be based on the most recent and localized data; • Provide for accounting and reporting of impact fee collections and expenditures in a separate accounting fund; • Limit administrative charges for the collection of impact fees to actual costs; and • Require that notice be provided no less than 90 days before the effective date of an ordinance or resolution imposing a new or amended impact fee. However, a county or municipality is not required to wait 90 days to decrease, suspend, or eliminate an impact fee. On May 21, 2009, Florida House Bill 227 became law, and this legislation added the following language to the Florida Impact Fee Act: "In any action challenging an impact fee, the government has the burden of proving by a preponderance of the evidence that the imposition or amount of the fee meets the requirements of state legal precedent or this section. The court may not use a deferential standard." Based on Section 163.31801 of the Florida Statutes and existing Florida case law, certain conditions are required to develop a valid impact fee. Generally, it is our understanding that these conditions involve the following issues: The impact fee must meet the "dual rational nexus" test. First, impact fees are valid when a reasonable impact or rationale exists between the anticipated need for the capital facilities and the growth in population. Second, impact fees are valid when a reasonable association, or rational nexus, exists between the expenditure of the impact fee proceeds and the benefits accruing to the growth from the use of the proceeds. 2. The system of fees and charges should be set up so that there is not an intentional windfall to existing users. 3. The impact fee should only cover the capital cost of construction and related costs thereto (engineering, legal, financing, administrative, etc.) for capital expansions or other system - related capital requirements that have been or are anticipated to be constructed which are required or available to serve growth. Therefore, expenses due to rehabilitation or replacement of a facility that has been constructed (e.g., replacement of a capital asset) or an increase in the level of service should be borne by all users of the facility (i.e., existing and future users) to the extent that capacity in such facilities is available to serve the needs of new development. 4. The County should adopt an impact fee resolution or ordinance that explicitly restricts the use of impact fees collected. Therefore, impact fee revenue should be set aside in a separate KWAI85-43\RpM&ffi Impact Fee SNdy —2— i c: account, and separate accounting must be made for those funds to ensure that they are used only for the lawful purposes described above. The County should provide advanced notice of not less than ninety (90) days before the effective date of a resolution or ordinance amending the existing impact fees, unless the impact fees are decreasing. EXISTING IMPACT FEES Ordinance No. 2015-17, which was adopted by the Board of County Commissioners of Collier County ("BOCC") on February 10, 2015 (the "Impact Fee Ordinance"), established the District's current water and wastewater impact fees. The current impact fees for an equivalent single family residential connection ("ERC") served by the District System became effective on February 17, 2015 and are summarized as follows: Existing Rate per ERC ill Water System Impact Fee $2,600 Wastewater System Impact Fee 2,515 Combined $5,115 [1] Reflects fee for standard individually -metered residential unit (generally served through a 3/4 -inch meter service and is considered to equate to 1 ERC). A copy of the Impact Fee Ordinance is included as Appendix B to this report. LEVEL OF SERVICE REQUIREMENTS In the evaluation of the capital facility needs for providing water and wastewater utility services, it is important that a level of service ("LOS") standard be developed. Pursuant to Section 163.3164, Florida Statutes, the "level of service" means an indicator of the extent or degree of service provided by, or proposed to be provided by, a facility based on and related to the operational characteristics of the facility and shall indicate the capacity per unit of demand for each public facility or service. Essentially, the level of service standards are established in order to ensure that adequate capacity will be provided for future development and for purposes of issuing development orders or permits, pursuant to Section 163.3202(2)(g) of the Florida Statutes. As further stated in the Statutes, each local government shall establish a LOS standard for each public facility located within the boundary for which such local government has authority to issue development orders or permits. Such LOS standards are set for each individual facility or facility type or class and not on a system -wide basis. For water and wastewater service, the level of service that is commonly used in the industry is the amount of capacity (service) allocable to an ERC expressed as the amount of usage (gallons) allocated on an average daily basis. This allocation of capacity would generally represent the amount of daily dependable capacity allocable to an ERC, whether or not such capacity is actually used (commonly referred to as "readiness to serve"). As previously mentioned, an ERC is representative of the average capacity required to service a typical individually -metered or single-family residential account. This class of users represents the largest amount of customers served by a public utility such as the District and generally the lowest (and most common) level of usage requirements for a specifically metered account. IC 01125.43apV&a VImpact Fee Swdy —3— In the development of the level of service standards for the impact fee update, the following references were considered and reviewed: • 2016 Water and Wastewater Master Plan Updates (the "2016 Master Plan Updates") prepared by AECOM, the District's consulting engineers (the "Consulting Engineers"); • Collier County Growth Management Plan adopted on October 28, 1997, as amended and supplemented; • Florida Department of Environmental Protection ("FDEP") general design standards; • Florida Public Service Commission ("FPSC") capacity relationships for private utilities; • Actual water sales and billed wastewater flow data reported by the District for the residential and commercial customer classes over the past several years; and • Actual water production and wastewater flow data reported by the District over the past several years. The following table shows the level of service standards contained in some of the reference sources: Comparison of Water and Wastewater Level of Service (LOS) Standards Per Equivalent Residential Connection (ERC) Water ERC Wastewater ERC Description (gpd) (gpd) Level of Service Utilized for Impact Fee Calculations 325 225 Collier County Growth Management Plan [11 2.40 persons per household 339 241 2.50 persons per household 353 251 2.64 persons per household 373 261 2016 Master Plan Updates [2 2.40 persons per household 299 201 2.50 persons per household 311 209 2.64 persons per household 329 221 Level of Service Standards Recognized By State Government of Florida: Florida Public Service Commission ("FPSC") Capacity Relationships for Private Utilities [3] 350 280 Florida Department of Health Design Standards for Sewer Systems [4] N/A Single or Multiple Family per Dwelling Unit [5] 300 Other per Occupant [6] 132 Footnotes on following page (Remainder of page intentionally left blank) Kd C\1125-43Vpt\W&WW Impact Fee Study —4— DRAFT Footnotes: [1] LOS standards reflect gallons per capita per day (gpcd) in Collier County Growth Management Plan multiplied by number of persons per household. Gallons per capita per day derived as follows: Water Wastewater Total gpcd 170 120 Adjustment for Commercial Component per County Billing Records (29) (19) Estimated Residential -only gpcd 141 101 Per the 2000 US Census, the persons pet household in Collier County was 2.39, while the persons per household per the 2010 Census was 2.64. Changing customer dynamics may adjust this number overtime. [2] LOS standards reflect gallons per capita per day (gpcd) in 2016 Master Plan Updates multiplied by number of persons per household. Gallons per capita per day derived as follows: Water Wastewater Total gpcd 150 100 Adjustment for Commercial Component per County Billing Retards (25) (16) Estimated Residential -only gpcd 125 84 Per the 2000 US Census, the persons per household in Collier County was 2.39, while the persons per household per the 2010 Census was 2.64. Changing customer dynamics may adjust this number over time. [3] Rule 25-30.515(8), Florida Administrative Code. A wastewater ERC level of service is assumed to be 80% of the water ERC level of service (350 gpd x 80%= 280 gpd). [4] Amounts derived based on information as published in the Florida Administrative Code (FAC), Rule 64E-6.008 {5] As stated in FAC Rule 64E-6.008, design standard (estimated sewage flows expressed on a gallons per day basis) for 3 -bedroom house with 1,201 - 2,250 square feet of building area and was assumed to be representative of a typical or standard residence. [6] As stated in FAC Rule 64E-6.008, design standard (estimated sewage flows expressed on a gallons per day basis) expressed on a "per occupant' basis of 50 gallons per day multiplied by an average household size of 2.64 based on reported 2010 US Census statistics for Collier County. Estimated flows for residential systems assumes a maximum occupancy of two persons per bedroom. Where residential care facilities will house more than two persons in any bedroom, estimated flows shall be increased by 50 gallons per each additional occupant It is our understanding that this additional capacity value would generally be added to the standard residential unit based on occupancy but this was presented to illustrate the minimum capacity based on average occupancy that may result (although the residential dwelling unit could demand a higher capacity requirement due to seasonality and higher occupancy characteristics). Recognizing: i) the current trends in water use per single family residential ERC; ii) the current capacity planning ERC service levels assumed in the most recent utility Master Plan Updates used in the evaluation of and planning for water and wastewater treatment capacity needs; iii) single family residential and commercial water use relationships based on detailed utility billing information as provided by the District; iv) the most recent U.S. Census data regarding persons per household for the County; and v) discussions with the District staff, the LOS standards recognized for the evaluation of the fees as expressed on a "gallons per day ("gpd") per ERC" basis are recommended to remain at the current service levels which are: i) 325 gpd for a water system ERC and ii) 225 gpd for a wastewater system ERC. The primary differences in the LOS standards between the two utilities are considered to be: i) the recognition of outdoor irrigation demands for potable water service which reflect water usage not returned to the wastewater system; ii) differences in unaccounted for water (finished water leaving the water treatment plant compared with water metered at the customer premise) and wastewater inflow and infiltration (groundwater and stormwater entering the wastewater collection system which are treated at the wastewater treatment plants) relationships; and iii) other factors. As previously mentioned, these LOS standards are consistent with those utilized in the last water and wastewater impact fee study completed in early 2015. K9DCU I2543TPAW&W W ]"pact Fee Srvdy —5— DRAFT EXISTING PLANT -IN-SERVICE In the determination of the impact fee associated with the servicing of future customers, any constructed capacity in the existing treatment and transmission utility system that is available to serve such growth was considered. Since this capacity was constructed and is available to serve the near-term incremental growth of the utility system, it is appropriate to recognize the capacity availability of such facilities. In order to evaluate the availability of the existing utility plant -in- service to meet or provide for near-term future capacity needs, it was necessary to functionalize the existing utility plant by specific function or purpose (treatment, conveyance, etc.). The "functionalization" of the existing utility plant is necessary to: i) identify those assets that should be considered or included in the determination of the impact fees; and ii) match existing plant type to the capital improvements to meet future service needs. The functional cost categories are based on the purpose of the assets and the service that such assets served. The following is a summary of the functional cost categories for the utility Alant- in -service identified in this report. Functional Plant Categories Water Service Wastewater Service Other Plant Supply Treatment General Plant (Equipment, Vehicles, etc.) Treatment Effluent/ Irrigation Quality Water Transmission Transmission Distribution Collection (Includes Local Lift Stations, Manholes, and Laterals) Fire Hydrants Meters and Services It was necessary to functionalize the utility plant into these cost categories so that system improvement costs can be identified such that a proper fee could be developed. System improvement costs relate to those costs incurred to provide capacity needed to serve new growth and development and do not include site improvements and facilities that are planned and designed to provide service for a particular development project and that are necessary for the use and convenience of the occupants or users of the project or routine and periodic maintenance expenditures, personnel training, and other operating costs. Therefore, the costs of on-site facilities which serve a specific development or customer are not considered as a "System" cost which is proportionately allocable to all users and include onsite (fronting the premise) water distribution and wastewater collection lines, meters and services, local lift stations, and fire hydrants are usually: i) donated by a developer as part of the District's utility extension program (a contribution of the plant); ii) recovered from the individual properties through an assessment program based on those properties which receive special benefit from such facilities or from the application of a main line extension fee to recover the specific cost of such facilities; or iii) funded from the customer directly (e.g., by a "front -foot" charge where the on-site lines were initially financed by the utility and then paid by the customer or an installation charge to recover the cost of a new service line and / or the potable water meter). Such utility plant should not be a capital cost included in the impact fee calculation. Additionally, assets or utility plant with short service lives that are replaced on a recurring basis should also not be included since these assets are considered attributable to the existing customers of the System. An example of this utility K MC\1125-43 ftM&W WTupact Fee Study —6— DRAFT plant would be assets commonly referred to as "general plant" and would include vehicles, equipment, furniture, and other related assets. The County provided PRMG with reported utility plant asset information through September 30, 2016 (the most recently completed fiscal year at the time of this analysis) that served as the basis of the functionalization of the existing utility plant -in-service. Appendix A at the end of this report provides a summary of the functionalization analysis of the existing utility plant -in-service for the System. The functionalized existing utility plant -in-service as shown in Appendix A represents the original installed cost of such assets (gross book value) when placed into service and represents all assets in service as of September 30, 2016 that were provided by the County and detailed in the utility asset records. This information represents the most current information available relative to the plant -in-service to serve the existing and near-term future customer base of each utility system. The assets represent "installed costs" and have not been restated to account for any fair market value adjustments which would reflect current costs (would essentially assume that assets were replaced with identical materials). If an asset had been replaced by the County as of September 30, 2016 and is now in service, such assets were considered since they are physically in-service and represent the capital cost actually being incurred by the County to provide service to future development (this also recognized that the asset that was replaced is retired and no longer in service and was assumed to not be included in the fixed asset register provided to PRMG). A summary of the functionalization of the existing utility plant -in-service in Appendix A is shown as follows: Summary of Water and Wastewater Utility System Existing Assets (Gross Utility Plant) Water System [1] Wastewater System [1] Totals Function Amount Percent Amount Percent Amount Percent Supply $90,226,735 16.1% $0 0.0% $90,226,735 7.4% Treatment 185,125,663 33.0% 267,181,658 40.7% 452,307,321 37.1% Transmission / Storage / Master Pumping 78,607,590 14.0% 63,860,903 9.7% 142,468,493 11.7% Distribution / Collection 118,986,279 21.2% 172,735,503 263% 291,721,782 24.0% Effluent/Reclaimed 0 0.0% 59,376,428 9.0% 59,376,428 4.9% Meters / Services / Hydrants 7,909,452 1.4% 0 0.0% 7,909,452 0.6% General Plant [2] 10,835,651 1.9% 12,690,180 1.9% 23,525,831 1.9% Other [3] 41,696,068 7.4% 46,351,697 7.1% 88,047,765 7.2% Construction Work -in -Progress [4] 27,662,107 4.9% 34,390,088 5.2% 62,052,194 5.1% Total Gross Utility Plant In Service $561,049,545 100.0% $656,586,457 100.0% $1,217,636,002 100.0% [1] Amounts shown derived from utility asset records as of September 30, 2016 that were provided by the District as shown in Appendix A. [2] General Plant represents equipment, vehicles, and assets with short service lives, and was allocated to the water and wastewater system in proportion to all other functionalized utility plant. [3] Reflects reported assets that: i) represent capitalized costs (e.g., studies) that did not directly link to an existing constructed asset, and ill certain asset costs considered to benefit only existing users; such amounts were not included as a capital cost for the determination of the impact fees. [4] Construction work -in -progress was not recognized since the projects have not yet been completed and placed into service by the District and the corresponding existing assets, if any, that would be retired or improved were not removed train to fixed asset register. In order to determine the amount of existing water supply / treatment and wastewater treatment / disposal plant assets available to meet future growth, it is necessary to identify the amount of unused capacity in such facilities. Table 1 at the end of this report provides an estimate of the unused capacity and the allocated water supply and treatment plant costs available to meet future needs. A similar analysis is shown on Table 2 at the end of this report for the wastewater system. K. Co 125-4vRpt\W&WW Impact Fc Sndy -7- DRAFT This estimate for water and wastewater capacity and the allocation of existing plant to future growth was based on: i) the permitted design capacity of the respective utility plant facilities; ii) the recognition of adjustments to present the facility capacity on an average daily demand / flow basis to be consistent with the assumed level of service requirements (dependable daily capacity); and iii) actual use of such facilities as experienced by the System service area through the Fiscal Year 2016. Based on this analysis, it was estimated that the existing water supply and treatment, wastewater treatment, and effluent disposal plant facilities had the following remaining and available capacity to meet future needs: Total Permitted Design Capacity (M?VDD / MMADF - MGD) Peaking Factor [3] Plant Capacity Expressed on Average Daily Demand / Flow Basis Less Existing Plant Utilization (ADF) Net Available to Meet Future Service Area Needs Estimated Percent of Total System Capacity MMDD = Maximum Month Daily Demand MMADF =Maximum Month Average Daily Flow MGD — Million Gallons Per Day ADF = Average Daily Flow Plant Capacity (MGD) Water Wastewater Plant [1] Plant [2] 52.000 40.100 1.200 1.200 43.333 33.417 26.776 17.818 16.557 15.599 38.21% 46.68% [I] Amounts derived from Table I. [2] Amounts derived from Table 2. [3] The utilized peaking factors are based on a review of historical peaking relationships experienced by the System. As shown above, it has been estimated that approximately 38.21% in existing water production and treatment utility assets is allocable to serve future development. With respect to the wastewater system, it is estimated that approximately 46.68% of the combined treatment and disposal utility assets is allocable to serve new customer growth. Recognizing the amount of the availability of the existing installed capacity to serve new development or growth, no future capacity additions have been recognized in the analysis; the water production / treatment and wastewater treatment / disposal capacity costs in the impact fee calculations represent the average installed costs of such capacity ("buy -in"). ADDITIONAL CAPITAL INVESTMENT The District staff and its Consulting Engineers recently prepared a capital improvement program ("CIP") which outlines a number of capital improvements for the water and wastewater system over the next ten years. The ten-year planning period was considered by the County to adequately address the immediate needs of the District service area demand requirements and represents projects that will be initiated in the next few years to meet and provide the necessary capacity to meet the respective demands in such planning horizon. This is also supported by the fact that the County currently has available capacity in its existing assets to serve growth, at least through the ten-year planning period. The improvements in the CIP are primarily for: i) upgrades to existing assets which benefit both current and future users of the System (e.g., replacement and upgrade of water and wastewater transmission mains); and ii) replacement of assets or conducting capital programs which generally only benefit current users of the System K\DCu 12543\ pt\W&WW Impact Fee Study —8— DRAFT (e.g., existing plant renewal and replacement, certain reliability projects). For the purposes of developing the impact fees to be charged to new growth, PRMG recognized the following capital projects in the impact fee calculations: Water System Project: Potable Water Storage Tank Cost Over Next Ten Years: $6,020,000 Project Description: Provide additional 3 million gallons of storage to accommodate increased potable water demand and fire flow need for the increasing population (assumed to be served from the existing constructed plant capacity) to be online in 2027, based on the Ten States Standards and / or FDEP Standards. Irrigation Quality ("IQ") Water System Project: IQ Expansion / Business Plan Cost Over Next Ten Years: $15,000,000 Project Description: Design and construct expanded distribution of IQ water given the additional capacity afforded by the Aquifer Storage Recovery facility being fully online and additional supplemental well capacity to accommodate demand to utilize IQ water that is produced and will be available from the existing wastewater treatment facilities during the 10 -year planning period. The County does not currently have enough IQ water to meet demand. DESIGN OF WATER IMPACT FEE As shown on Table 3 at the end of this report, the calculated impact fee for the water system is $2,562 per ERC. This represents a decrease of $38 or 1.5% when compared with the current fee of $2,600 per ERC. In the development of the proposed water impact fees, several assumptions were utilized or incorporated. The major assumptions utilized in the design of the calculated impact fees are: The existing water supply and treatment facilities have an estimated available capacity margin to serve new growth of approximately 38.21% of the average daily capacity of the facilities based on: i) the firm design capacity of the existing water treatment plant facilities; and ii) actual maximum month daily demand to annual average daily demand relationships recently experienced by the water system, including a review of the actual demand requirements for the fifteen fiscal year period ended 2016. The analysis is included on Table 1 at the end of this report. No water system capacity additions are projected to come online over the next ten years. 2. Per the directions of the County's outside legal counsel and discussions with County staff, only capital costs pertaining to the Potable Water Storage Tank were recognized in the water impact fee calculations. 3. The level of service for a water ERC was assumed to be 325 gpd expressed on an average daily flow basis. This level of service is consistent with what was assumed in the previous K[ C\1125-43ftt\W&WW Impact Fee Smdy —9— DRAFT impact fee study. The level of service assumption was predicated on the level of service requirements as contained in the 2016 Master Plan Updates; the County's Growth Management Plan (potable water sub -element); FDEP general design standards for water use analysis; FPSC capacity relationships for private utilities (Florida Administrative Code Rule 25-30.020); and discussions with the District staff. 4. Since the transmission function capacity is difficult to ascertain except at build -out conditions, the total existing (original cost and not on a replacement or current cost basis) costs to serve the total capacity of the water system over the next ten years was recognized, thus calculating a new users per -ERC average "buy -in" cost for this functional utility plant component of the Water System. 5. Because: i) the utility system is operated as an enterprise fund; ii) all financial resources received by the District stay within the fund for the benefit of such system; iii) the costs reflected in the fee are at original cost and not adjusted for any fair market value to reflect current cost conditions; iv)there is no interest -expense carry in the impact fee associated with the financing of the capital investment to serve new development; and v) there are no other revenues received by the District from new development for the capital costs / utility plant reflected in the impact fee (e.g., ad valorem taxes on the property), no credit for the future payment of debt service allocable to the properties has been recognized. All impact fee funds remain in the enterprise system and the long-term capital financing costs for infrastructure constructed and available to serve new growth are mitigated by using the impact fees for ongoing expansion -related capital project financing or for the direct payment of the annual expansion -related debt service payments. 6. The approach used to determine the estimated impact fee was the "System Buy -in" method which is based on the identification and allocation of the installed cost of the gross plant investment (expressed on an original cost basis — that is when the asset was originally placed into service) that is available (in-service) to serve new growth. Under this approach, the applicant paying the impact fee is essentially reimbursing the system for only the applicant's proportionate share of the constructed facilities that are currently in-service as of September 30, 2016 and that are available to meet the requests for Water System capacity from new development. This method also recognizes that as improvements are made to the Water System, the available capacity to meet the future demands of the new development that would be served from the current constructed gross plant investment is being maintained and therefore the most recent installed cost of the gross plant investment is considered as being reasonable for the determination of the impact fee. As of September 30, 2016, the District has several -capital projects that are underway and considered as construction -work -in -progress ("CWIP"). When the capital projects that are included in the CWIP are completed, the cost of the completed projects will be placed into service with a corresponding adjustment, if any, to the fixed assets records to remove any assets that may subsequently be retired and excluded from the fixed assets for financial reporting purposes. Because these capital projects have not yet been completed as of the end of Fiscal Year 2016 (which served as the Test Year for the asset evaluation) and it is unknown at this time what the total cost for such assets currently under construction may be as well as the amount of any assets that may be removed from service directly related to K.MC\112543\ p[\W@WWL poet Pee SNdy —10— FOX. the placement of these projects into service, the construction -work -progress capital expenditures incurred as of September 30, 2016 were not recognized in the fee calculations. The following table summarizes the amount of capital investment that has been recognized as being available to serve new growth based on the amount of capacity available to the water system and the amount being used by the existing customers of the water system: Summary of Constructed Utility Plant Costs Allocated to New Development - Water System Description Amount Total Constructed Assets — Gross Plant -in -Service [1] $533,387,438 Less Constructed Assets Directly Assigned to Existing Customers [2] (179,427,450) Less Adjustments for Contributed Assets and Assets Funded from External Sources [3] (18,369,432) Net Constructed Assets $335,590,556 Net Amount Allocated to Existing Customers: Percent 61.79% Amount $207,361,405 Net Amount Allocated to Future Customers $128,229,151 Percent of Total Constructed Assets [4] 24.04% Percent of Net Constructed Assets [5] 38.21% [i] Amounts shown derived from Table 3; amounts do not include construction -work -in -progress of $27,662,107. [2] Represents utility plant that is assumed to specifically benefit the property served as opposed to a System cost and includes water distribution facilities, meters, hydrants, services and general utility plant; in most instances these assets were contributed by the developer to the District. [3] Includes other assets that would generally be classified as a System improvement cost and represent contributed assets, grant -funded assets, or funded from transportation impact fees. [4] Represents percent of total constructed Gross Plant -in -Service (i.e, $533,387,438). [5] Represents percent of net constructed assets (i.e., $335,590,556). As shown on Table 3 at the end of this report, the calculated water impact fee is $2,562 per ERC, which represents a decrease of $38 or 1.5% when compared with the current fee of $2,600 per ERC. This fee would be applied to a standard individually -metered residential customer. Based on the capital facilities associated with the determination of the fee, the functional breakdown of the components of the rate is as follows: Calculated Cost Per ERC Proposed Fee Water Supply / Treatment $2,056.70 $2,057 Water Transmission 505.50 505 Total $2,562.20 $2,562 DESIGN OF WASTEWATER IMPACT FEE As shown on Table 4 at the end of this report, the calculated impact fee for the wastewater system is $2,701 per ERC. This represents an increase of $186 or 7.4% when compared with the current fee of $2,515 per ERC. In the development of the proposed wastewater impact fees, several assumptions were utilized or incorporated in the analysis. The major assumptions utilized in the design of the proposed wastewater impact fees are: rcaucn 125-43vcprWweww rmpaarr�e study -11- DRAFT 1. The existing wastewater treatment and effluent disposal facilities have an estimated available capacity margin to serve new growth of approximately 46.68% of the average daily capacity of the facilities based on: i) the firm design capacity of the existing wastewater treatment plant facilities; and ii) actual maximum month average daily flow to annual average daily flow relationships recently experienced by the wastewater system, including a review of the actual flow requirements for the fifteen fiscal year period ended 2016. The analysis is included on Table 2 at the end of this report. No wastewater system capacity additions are projected to come online over the next ten years. 2. Based on discussions with the County, the cost of treatment and effluent disposal includes the direct system -related cost of expanding the irrigation quality water system. The IQ water system is considered by the County to be a component of the wastewater system. 3. Per the directions of the County's outside legal counsel and discussions with County staff, only capital costs pertaining to the IQ Expansion / Business Plan were recognized in the wastewater impact fee calculations. 4. The level of service for a wastewater ERC was assumed to be 225 gpd expressed on an average daily flow basis. This level of service is consistent with what was assumed in the previous impact fee study. The level of service assumption was predicated on information contained in the 2016 Master Plan Updates regarding wastewater capacity; the level of service requirements as contained in the County's Growth Management Plan (sanitary sewer sub -element); FDEP flow standards as reported in FAC Rule 64E-6.008; FPSC capacity relationships for private utilities (FAC Rule 25-30.020); and discussions with District staff. 5. Since the transmission function capacity is difficult to ascertain except at build -out conditions, the total existing (original cost and not on a replacement or current cost basis) costs to serve the total capacity of the wastewater system over the next ten years was recognized, thus calculating a new users per -ERC average "buy -in" cost for this functional utility plant component of the Wastewater System. 6. Because: i) the utility system is operated as an enterprise fund; ii) all financial resources received by the District stay within the fund for the benefit of such system; iii) the costs reflected in the fee are at original cost and not adjusted for any fair market value to reflect current cost conditions; iv) there is no interest -expense carry in the impact fee associated with the financing of the capital investment to serve new development; and v) there are no other revenues received by the District from new development for the capital costs / utility plant reflected in the impact fee (e.g., ad valorem taxes on the property), no credit for the future payment of debt service allocable to the properties has been recognized. All impact fee funds remain in the enterprise system and the long-term capital financing costs for infrastructure constructed and available to serve new growth are mitigated by using the impact fees for ongoing expansion -related capital project financing or for the direct payment of the annual expansion -related debt service payments. K:\ C\112543\Rpt\W&WW Impact Fee Smdy —12— DRAFT 7. The approach used to determine the estimated impact fee was the "System Buy -in" method which is based on the identification and allocation of the installed cost of the gross plant investment (expressed on an original cost basis — that is when the asset was originally placed into service) that is available (in-service) to serve new growth. Under this approach, the applicant paying the impact fee is essentially reimbursing the system for only the applicant's proportionate share of the constructed facilities that are currently in-service as of September 30, 2016 and that are available to meet the requests for Wastewater System capacity from new development. This method also recognizes that as improvements are made to the Wastewater System, the available capacity to meet the future demands of the new development that would be served from the current constructed gross plant investment is being maintained and therefore the most recent installed cost of the gross plant investment is considered as being reasonable for the determination of the impact fee. As of September 30, 2016, the District has several capital projects that are underway and considered as construction -work -in -progress ("CWIP"). When the capital projects that are included in the CWIP are completed, the cost of the completed projects will be placed into service with a corresponding adjustment, if any, to the fixed assets records to remove any assets that may subsequently be retired and excluded from the fixed assets for financial reporting purposes. Because these capital projects have not yet been completed as of the end of Fiscal Year 2016 (which served as the Test Year for the asset evaluation) and it is unknown at this time what the total cost for such assets currently under construction may be as well as the amount of any assets that may be removed from service directly related to the placement of these projects into service, the construction -work -progress capital expenditures incurred as of September 30, 2016 were not recognized in the fee calculations. The following table summarizes the amount of capital investment that has been recognized as being available to serve new growth based on the amount of capacity available to the wastewater system and the amount being used by the existing customers of the wastewater system; (Remainder of page intentionally left blank) KADOI 12543%pt\W&W W Impact Fee Study —13- of Constructed Utilitt Plant Costs Allocated to New Development - Wastewater S DRAFT Description Amount Total Constructed Assets — Gross Plant -in -Service [1] $622,196,369 Less Constructed Assets Directly Assigned to Existing Customers [2] (231,777,380) Less Adjustments for Contributed Assets and Assets Funded from External Sources [3] (15,347,523) Net Constructed Assets Net Amount Allocated to Existing Customers: Percent Amount Net Amount Allocated to Future Customers Percent of Total Constructed Assets [4] Percent of Net Constructed Assets [5] $375,071,466 51.98% $194,980,694 $180,090,772 28.94% 48.02% [1] Amounts shown derived from Table 4; amounts do not include construction -work -in -progress of $34,390,088. [2] Represents utility plant that is assumed to specifically benefit the property served as opposed to a System cost and includes wastewater collection facilities and general utility plant; in most instances these assets were contributed by the developer to the District. [3] Includes other assets that would generally be classified as a System improvement cost and represent contributed assets, grant -funded assets and assets funded from transportation impact fees, [4] Represents percent of total constructed Gross Plant -in -Service (i.e., $622,196,369). [5] Represents percent of net constructed assets (i.e., $375,071,466). As shown on Table 4 at the end of this report, the calculated wastewater impact fee is $2,701 per ERC, which represents an increase of $186 or 7.4% when compared with the current fee of $2,515 per ERC. This fee would be applied to a standard individually -metered residential customer. Based on the capital facilities associated with the determination of the fee, the functional breakdown of the components of the rate is as follows: Calculated Cost Per ERC Proposed Fee Wastewater Treatment/Disposal $2,341.69 $2,341 Wastewater Transmission 359.81 360 Total $2,701.50 $2,701 IMPACT FEE COMPARISONS In order to provide additional information to the County regarding the existing and calculated impact fees, a comparison of the existing and calculated fees for the District with other Florida jurisdictions was prepared. This comparison is summarized on Table 5 at the end of this report and provides a comparison of the existing and proposed District impact fees for single-family residential connections (i.e., one ERC) relative to the impact fees or comparable charges currently imposed by other municipal / governmental water and wastewater systems located primarily in the southwest Florida region. It is important to note that the reader must view the comparison with caution as no in-depth analysis has been performed to determine the methods used in the development of the water and wastewater impact fees imposed by others, nor has any analysis been made to determine whether 100% of the cost of new facilities is recovered from system capacity charges, or some percentage less than 100% with the balance recovered through the user charges. Additionally, no analysis was conducted as to the rate of capital facilities currently in service or planned for the utility. For example, the costs of wastewater effluent disposal utilizing a deep injection well system generally has a higher capital cost per unit of capacity than percolation ponds. K:1DGi1125- tm1,9w&ww In eadFee study -14- DRAFT The following is a summary of the survey results regarding the impact fee comparison of the District's fees with those of the surveyed utilities: $4,000 $3,500 $3,000 $2,500 $2,000 $1,500 $1,000 $600 $0 dFoocgmo✓~ oJ00mUk UJ{�oO �'fk ��oS�oQ� 0A JULa�Qe UAa Uom°'oU ve No o�oUg�Oo`o yco�oa � ca S, Figure 1: Comparison of Water System Impact Fees per ERC Reflects rates effective in November 2016 iWater —Other Utilities' Average ($2,004) 52,562 52,600 I I I I I I I — 1111 � _U il U `ro O U 3o UU UY` U� r'$+ 111 am oa ��Q v U OOP 4 (Remainder of page intentionally left blank) KM0112543\RpM&WW1m dPee SNdy -15- $6,000 $4,600 - $4,000 $3,600 - $3,000 $2,600 $2,000 $1,600 $1,000 $600 - $0 DRAFT Figure 2: Comparison of Wastewater System Impact Fees per ERC ReIIects rates effective in November 1016 O Wastewater —Other Utilities' Average (S2,659) 52,701 S2,515 ------------------- Vo ,�oJ mH Jc'd .mm Q°F 8m o`' Jd Jd• A' dp Jc'8 U°� u c\ o c\ Ja J o V° of OmC '; L° of of (7° v ci _' Q„m m v v m Qm 8 d v s u SOH 4 0 kir Jiim `oy`m �c� oti �F os'� d� QJJ �F mm �°�` ti m" JA yo m ° A ° Q� 'e 4 d gO ..'d im '. yO Q o J m at omOm V'`'� Oy8 ti 4C Ci JOYS G 9m .ted bVs v �P�¢ oL �m4yQ`JR° O 4 ° 4 4 i m m °° JP �J of 41 e (Remainder of page intentionally left blank) IC:MC\112543LLt AW&W W input Fee SNdy -16- DRAFT Figure 3: Comparison of Water and Wastewater System Impact Fees per ERC $9,000 $8,000 $7,000 $6,000 $6,000 $4,000 $7,000 $2,000 $1,000 Reflects rates effective in November 2016 m \` 4P Doc Ct =wastewater ®Nater —Other Utilities' Average ($4,663) Jp Q� 551115 $5,263 $0 ldty pd m \` 4P Doc Ct le o or je mmm m °0 ,a oo\F �i orm O 4 m4 &'f p O\F4 o m` o i\°4m p Cie ooa aim 44 4 cl \m3 v O ti �o Q v� yQC V m \` 4P Doc Ct Jp Q� Cie ooa aim 44 4 cl \m3 v O ti �o Q v� yQC V m \` 4P Doc Some reasons why impact fees differ among utilities: • Water quality and proximity to source of supply. • Type of treatment process and disposal requirements (e.g., brine from reverse osmosis process, effluent from wastewater process). • Availability of grant and other external sources (e.g., other General Fund revenues such as sales taxes) available to finance CIP. • Age of system / level of renewals and replacements. • Utility life cycle (e.g., growth -oriented vs. mature). • Level of service standards. • Administrative decision to maintain fees at a level below what could justifiably be charged. K:\ 0112543\ pt\W&WW Tmp=FeeS dy —17— DRAFT As shown on Table 5 at the end of this report, the average water and wastewater system impact fees for the nineteen (19) govermnental entities surveyed are $2,004 and $2,659 (Combined = $4,663), respectively, for a standard single-family residence (i.e., one ERC). Of the surveyed utilities, the City of Marco Island had the highest water and wastewater system impact fees of $3,740 and $4,610 respectively ($8,350 combined). Pinellas County had the lowest combined system capacity charges in the group with the water fee being $352 and the wastewater fee being $2,060 (Combined = $2,412). The calculated water system impact fee of $2,562 and the calculated wastewater system impact fee of $2,701 (Combined = $5,263) for the District are higher than the average of the surveyed utilities' impact fees. CONCLUSIONS AND RECOMMENDATIONS Based on our evaluation of the District water and wastewater system impact fees, PRMG offers the following conclusions and recommendations: 1. The proposed impact fees are considered by PRMG to support the rational nexus requirements as determined by case law whereby the benefits received by the applicant (new development) must be reasonably related to the capital cost of providing utility services. PRMG considers the proposed impact fees to be cost -based and reasonable. 2. Based on levels of service per ERC and the capital costs identified, the proposed impact fees for the water and wastewater systems, respectively, are as follows: Existing and Proposed Fiscal Year 2017 Calculated Water and Wastewater Impact Fees Per ERC Difference System LOS (gpd) Existing Proposed Amount Percent Water 325 $2,600.00 $2,562.00 ($38.00) (1.5%) Wastewater 225 $2,515.00 $2,701.00 $186.00 7.4% Total $5,115.00 $5,263.00 $148.00 2.9% ERC =Equivalent Residential Connection Consistent with our scope of services, PRMG only reviewed the water and wastewater impact fee levels and did not review the County's methodology for charging the impact fees as shown in the Impact Fee Ordinance in Appendix B. Appendix C reflects the proposed fees applied to the County's existing methodology. (Remainder of Page Left Blank Intentionally) K W\112543\R,,M&W W Impact Fee Sfidy —18- APPENDIX A SUMMARY OF EXISTING UTILITY SYSTEM ASSETS DRAFT Table 1 Collier County Water -Sewer District Water and Wastewater Impact Fee Study Development of Existing Water Production / Treatment Facility Capacity Available to Serve System Growth Line Water No. System 1 Existing Permitted Plant Capacity of System (NMIDD-MGD) (1) 52.000 Adjustment to Reflect Average Daily Demand 2 of Water Treatment System (MGD) (2) (8.667) 3 Dependable Treatment Plant Capacity (ADD) 43.333 4 Average Daily Demand - Existing System (3) 26.776 5 Remaining Capacity (ADD) at Existing Plant 16.557 6 Percent of Total Capacity Remaining 38.21% 7 Percent of Total Capacity Recognized 38.21% 8 Capacity Available to Service New Growth (ADD) 16.557 9 Capacity Available to Service New Growth (gallons) 16,556,912 10 Level of Service Standard Per ERC (gallons per day) (4) 325 11 Number of ERCs That Could Be Served By Existing Capacity [Line 9 / Line 10] 50,944 MGD = Million Gallons Per Day MMDD = Maximmn Month Daily Demand ADD = Average Daily Demand Footnotes on page 20. 19 Footnotes: (1) L%_ A Table 1 Collier County Water -Sewer District Water and Wastewater Impact Fee Study Development of Existing Water Production / Treatment Facility Capacity Available to Serve System Growtb Amounts reflect MMDD treatment capacity of facilities as provided by the District. The permitted capacities of the two individual regional facilities are 20.0 MMDD-MGD (North County Regional Water Treatment Plant) and 32.0 MMDD-MGD (South County Regional Water Treatment Plant). (2) With respect to the water facilities, the plant capacity is expressed on a maximum month daily demand basis. To be consistent with the level of service requirements for the water system, the plant capacity was adjusted to reflect an average daily demand basis. A maximmn month daily demand to annual average daily demand peaking factor of 1.20 was utilized as supported by finished water flaw data contained in the Monthly Operating Reports filed with the Florida Department ofEnviromnental Protection (FDEP) as shown below: Fifteen -Year Maximum 1,24 Fifteen -Year Average 1.16 Factor Utilized By PRMG For Impact Fee Determination Purposes 1.20 52.000 MMDD-MGD Capacity / 1.20 Peaking Factor = 43.333 ADD -MGD Capacity. 52.000 Less 43.333 = 8.667. (3) Reflects the highest reported average daily demand experienced by the District's water treatment facilities for the twelve Fiscal Year period ended 2013 as shown below: Water Maximum Period Reported ADD (*) 26.78 (*) Reference is made to Footnote 2 for applicable average daily demand data. (4) The level of service factor for an ERC reflects capacity requirements expressed on an average daily water demand basis. 20 Maximum Annual Month Daily Average Daily Demand Demand (MGD) (MGD) Peaking Factor Fiscal Year 2002 22.90 26.45 1.15 Fiscal Year 2003 22.69 26.74 1.18 Fiscal Year 2004 24.40 26.35 1.08 Fiscal Year 2005 25.83 28.57 1.11 Fiscal Year 2006 26.00 31.71 122 Fiscal Year 2007 2678 32.34 1.21 Fiscal Year 2008 23.1 I 26A4 1.13 Fiscal Year 2009 22.72 28.17 1.24 Fiscal Year 2010 2134 23.12 1.08 Fiscal Year 2011 22.58 26.20 1.16 Fiscal Year 2012 2235 26.15 1.17 Fiscal Year 2013 22.14 26.76 1,21 Fiscal Year 2014 23.86 27.35 1.15 Fiscal Year 2015 24.14 28.00 1.16 Fiscal Year 2016 24.28 28.61 1.18 Fifteen -Year Maximum 1,24 Fifteen -Year Average 1.16 Factor Utilized By PRMG For Impact Fee Determination Purposes 1.20 52.000 MMDD-MGD Capacity / 1.20 Peaking Factor = 43.333 ADD -MGD Capacity. 52.000 Less 43.333 = 8.667. (3) Reflects the highest reported average daily demand experienced by the District's water treatment facilities for the twelve Fiscal Year period ended 2013 as shown below: Water Maximum Period Reported ADD (*) 26.78 (*) Reference is made to Footnote 2 for applicable average daily demand data. (4) The level of service factor for an ERC reflects capacity requirements expressed on an average daily water demand basis. 20 DRAFT Table 2 Collier County Water -Sewer District Water and Wastewater Impact Fee Study Development of Existing Wastewater Treatment Facility Capacity Available to Serve System Growth Line Wastewater No. System 1 Existing Plant Capacity of System (MMADF-MGD) (1) 40.100 2 Adjustment to Reflect Capacity on Average Daily Flow Basis (2) (6.683) 3 Dependable Treatment Plant Capacity (ADF) 33.417 4 Average Daily Flow - Existing System (3) 17.818 5 Remaining Capacity (ADF) at Existing Plant 15.599 6 Percent of Total Capacity Remaining 46.68% 7 Percent of Total Capacity Recognized 46.68% 8 Capacity Available to Service New Growth (ADF) 15.599 9 Capacity Available to Service New Growth (gallons) 15,599,096 10 Level of Service Standard Per ERC (gallons per day) 225 11 Number of ERCs That Could Be Served By Existing Capacity [Line 9 / Line 10] 69,329 MGD = Million Gallons Per Day MMADF = Ma immn Month Average Daily Flow ADA = Annual Average Daily Flow Footnotes on page 22. 21 Table 2 Collier County Water -Sewer District Water and Wastewater Impact Fee Study Development of Existing Wastewater Treatment Facility Capacity Available to Serve System Growth Footnotes: DRAFT (1) Amounts reflect permitted MMADF wastewater treatment plant capacity of facilities. The pencilled capacities of the individual regional facilities are 24.1 MMADF-MGD (North County Water Reclamation Facility) and 16.0 MMADF-MGD (South County Water Reclamation Facility). (2) With respect to the existing wastewater facilities, the plant capacity is expressed on a maximum month average daily flow basis. To be consistent with the level of service requirements for the wastewater system, the plant capacity was adjusted to reflect an average daily flow basis using a peaking factor of 1.20. A summary of the twelve fiscal year actual wastewater flows is summarized below. As can be seen based on the actual reported flow data, the capacity adjustment factor averaged 1.16. Fifteen -Year Maximum 1.30 Fifteen -Year Average 1.16 Factor Utilized by PRMG for Impact Fee Determination Purposes 1.20 40.100 MMDD-MGD Capacity/ 1.20 Peaking Factor= 33.417 AADD-MGD Capacity. 40.100 Less 33.417=6.683. (3) Reflects the highest reported average daily flow experienced by the District's wastewater treatment facilities for the twelve Fiscal Year period ended 2013 as shown below: Wastewater Maximum Period Reported AADF (*) 17.818 (*) Reference is made to Footnote 2 For applicable average dairy flow data. (4) The level of service factor for an ERC reflects capacity requirements expressed on an average daily wastewater flow basis; the factor was based on the County's capacity planning assumptions and other sources available to PRMG. 22 Annual Maximum Month Average Daily Average Daily Flow (MGD) Flow (MGD) Peaking Factor Fiscal Year 2002 15.528 20-160 1.30 Fiscal Year 2003 15.600 17.279 1.11 Fiscal Year 2004 15.921 18.899 1.19 Fiscal Year 2005 16.323 19.306 1.18 Fiscal Year 2006 17.372 19.890 1.14 Fiscal Year 2007 15.633 18.391 1.18 Fiscal Year 2008 15.601 18.290 1.17 Fiscal Year 2009 13.837 15.920 L15 Fiscal Year 2010 14291 15.747 ll0 Fiscal Year 2011 14.728 16.791 1.14 Fiscal Year 2012 15.834 18.122 1.14 Fiscal Year 2013 16.952 18.669 1.10 Fiscal Year2014 16.200 19.464 1.20 Fiscal Year 2015 17.231 19.537 1.13 Fiscal Year2016 17.818 21.311 1.20 Fifteen -Year Maximum 1.30 Fifteen -Year Average 1.16 Factor Utilized by PRMG for Impact Fee Determination Purposes 1.20 40.100 MMDD-MGD Capacity/ 1.20 Peaking Factor= 33.417 AADD-MGD Capacity. 40.100 Less 33.417=6.683. (3) Reflects the highest reported average daily flow experienced by the District's wastewater treatment facilities for the twelve Fiscal Year period ended 2013 as shown below: Wastewater Maximum Period Reported AADF (*) 17.818 (*) Reference is made to Footnote 2 For applicable average dairy flow data. (4) The level of service factor for an ERC reflects capacity requirements expressed on an average daily wastewater flow basis; the factor was based on the County's capacity planning assumptions and other sources available to PRMG. 22 DRAFT Table 3 Collier County Water -Sewer District Water and Wastewater Impact Fee Study Development of Water System Impact Fee 6 Percent Available to Serve New Growth [3] 7 Costs of Installed Assets Allocable to Serve New Growth 8 Estimated New Growth ERCs Available to be Served from Installed Assets [5] 9 Estimated Cost Per ERC Water System Capital Improvement Program 10 Potable Water Storage Tank (Online 2027) 11 Percent Available to Serve New Growth [3] 12 Costs of Additional Capital Improvement Projects Allocable to New Growth 13 Estimated New Growth ERCs [4] 14 Estimated Cost Per ERC 15 Total Impact Fee Per ERC - Calculated [Line 9 +Line 141 16 Total Impact Fee Per ERC - Rounded 17 Treatment Component (Rounded) 18 Transmission Component(Rouaded) 19 Total 38.21% 38.21% 38.21% 38.21% Water System 70,366,240 $ 23,451,989 S 128,229,151 50,944 50,944 50,944 50,944 Distribution / 1,381.24 $ 460.35 $ 2,517.04 50,944 50,944 Fire Hydrants / $ - $ Line 45 $ 45 Transmission/ Meters/ 505.50 No. Description Supply Treatment Storage General / Oth TOTAL Installed Water System Assets with Capacity Available to Serve New Growth I Total Installed Costs- Allocated Water Assets [1] $ 90,226,735 $ 185,125,663 S 78,607590 $ 179,427,450 $ 533,387,438 2 Less Amounts Classified as Contributed Capital [I] (169,361) (969,055) (2,381,741 (87,118,870) (90,639,027) 3 Less Estimated Assets Funded from Transportation Impact Fees [2] - - (14,849,276) - (14,849,276) 4 Less Plant Not Recognized In Fee Determination - (92,308580) (92,308,580) 5 Adjusted Installed Cost of Water Assets $ 90,057,374 $ 184 156 608 $ 61 376 574 $ $ 335 590 556 6 Percent Available to Serve New Growth [3] 7 Costs of Installed Assets Allocable to Serve New Growth 8 Estimated New Growth ERCs Available to be Served from Installed Assets [5] 9 Estimated Cost Per ERC Water System Capital Improvement Program 10 Potable Water Storage Tank (Online 2027) 11 Percent Available to Serve New Growth [3] 12 Costs of Additional Capital Improvement Projects Allocable to New Growth 13 Estimated New Growth ERCs [4] 14 Estimated Cost Per ERC 15 Total Impact Fee Per ERC - Calculated [Line 9 +Line 141 16 Total Impact Fee Per ERC - Rounded 17 Treatment Component (Rounded) 18 Transmission Component(Rouaded) 19 Total 38.21% 38.21% 38.21% 38.21% $ 34,410,923 $ 70,366,240 $ 23,451,989 S 128,229,151 50,944 50,944 50,944 50,944 $ 675.46 $ 1,381.24 $ 460.35 $ 2,517.04 $ - $ - $ 6,020,000 $ 6,020,000 38.21% 38.21% 38.21% 38.21% $ - $ - $ 2,300,242 $ 2,300,242 50,944 50,944 50,944 50,944 $ - $ - $ 45 $ 45 $ 675.46 $ 1,38L24 $ 505.50 $ 2,562.20 S 2,562.00 $ 2,057.00 505.00 $ 2,562.00 Footnotes: [1] Amounts derived from Appendix A. [2] Amount based on information provided by the County regarding transportation impact fees used for funding utility line relocations. [3] Amounts derived from Table 1, Line 7. [4] Amount's derived from Table 1, Line 11. 23 Line Table 4 Collier County Water -Sewer District Water and Wastewater Impact Fee Study Development of Wastewater System Impact Fee Installed Wastewater System Assets with Capacity Available to Serve New Growth 1 Total Installed Costs- Allocated Wastewater Assets [11 2 Less Amounts Classified as Contributed Capital [1] 3 Less Estimated Assets Funded from Transportation Impact Fees [2] 4 Less Plant Not Recognized In Fee Determination 5 Adjusted Installed Cost of Wastewater Assets 6 Percent Available to Serve New Growth [3] 7 Costs of Installed Assets Available to Serve New Growth 8 Estimated New Growth ERCs Available to be Served from Installed Assets [4] 9 Estimated Cost Per ERC Wastewater System Capital Improvement Program 10 IQ Expansion / Business Plan 11 Percent Available to Serve New Growth [3] 12 Costs of Additional Capital Improvement Projects Allocable to New Growth 13 Estimated New Growth ERCs [4] 14 Estimated Cost Per ERC 15 Total Impact Pee Per ERC- Calculated [Line 9+Line 14] 16 Total Impact Fee Per ERC - Rounded 17 Treatment Component (Rounded) 18 Transmission Component (Rounded) 19 Total EfFluent/ Treatment DRAFT Collection / Direct Reclaimed / Transmission General/Other TOTAL $ 267,181,658 $ 59,376,428 $ 63,860,903 S 231,777,380 $ 622,196,369 (462,578) (2,977,640) (67957546) (112,191,053) (122,588,817) - - (4,949,759) - (4,949,759) (119,586,327) (119,586,327) $ 266,719,080 $ 56,398,788 $ 51,953,598 $ - $ 375,071,466 48.02% 48.02% 48.02% 48.02% $ 128,065,314 $ 27,079,909 $ 24,945,549 $ 180,090,772 69,329 69,329 69,329 69,329 $ 1,847.20 $ 390.60 S 359.81 $ 2,597.61 $ - $ 15,000,000 $ - $ 15,000,000 48.02% 48.02% 48.02% 48.02% $ - $ 7,202,258 $ - $7,202,258 69,329 69,329 69,329 69,329 $ - $ 103.88 $ - $ 103.88 $1,847.20 $494.48 $359.81 $ 2,701.50 $ 2,701.00 $ 2,341.00 360.00 $ 2,701.00 Footnotes: [ 1] Amounts derived from Appendix A. [2] Amount based on information provided by the County regarding transportation impact fees used for funding utility line relocations. [3] Amounts derived from Table 2, Line 7. [4] Amounts derived from Table 2, Line 11. 24 Table 5 Collier County Water -Sewer District Water and Wastewater Impact Fee Study Comparison of Water and Wastewater System Impact Fees Per ERC f Il Line No. Description Collier County Water -Sewer District 1 Existing Impact Fees 2 Proposed Impact Fees Surveyed Florida Utilities: 3 Bonita Springs Utilities, Inc. 4 City of Bradenton 5 Charlotte County 6 DeSoto County 7 Englewood Water District 8 FGUA - Golden Gate (Collier County) 9 FGUA - Lehigh Acres System (Lee County) 10 City of Fort Myers 11 Hillsborough County 12 Lee County 13 Manatee County 14 City of Marco Island 15 City of Naples 16 City of North Port 17 Pasco County 18 Pinellas County 19 City of Punta Gorda 20 City of Sarasota 21 Sarasota County 22 Other Florida Utilities' Average Footnotes: DRAFT Residential 5/8" x 3/4" Meter Water Wastewater Combined $2,600 $2,515 $5,115 2,562 2,701 5,263 $2,600 $3,925 $6,525 1,183 1,545 2,728 2,407 2,251 4,658 1,910 4,140 6,050 2,074 2,850 4,924 1,950 1,525 3,475 2,696 2,839 5,535 2,023 1,966 3,989 1,750 1,800 3,550 2,440 2,660 5,100 1,970 3,027 4,997 3,740 4,610 8,350 1,416 2,324 3,740 1,735 2,388 4,123 1,561 2,730 4,291 352 2,060 2,412 2,646 2,677 5,323 900 2,577 3,477 2,720 2,627 5,347 $2,004 $2,659 $4,663 [1] Unless otherwise noted, amounts shown reflect fees chargedto a standard residential connection (one ERC) in effect November 2016 and are exclusive of taxes or franchise fees, if any, and reflect rates charged for inside the city service. All rates are as reported by the respective utility. This comparison is intended to show comparable charges for similar service for comparison purposes only and is not intended to be a complete listing of all rates and charges offered by each listed utility. 25 DRAFT APPENDIX A SUMMARY OF EXISTING UTILITY SYSTEM ASSETS DRAFT Appendix A Collier County Water -Sewer District Water and Wastewater Impact Fee Study Summary of Esistine Utility System Assets 111 11 Total Combined Utility System Assets Summary of Contributed Capital Summary of Reported Gross Plant-ILi-Service as of September 30 2016 Line Water Water System Wastewater System System No. Description Amount Percent Amount Percent Contributed Capital for Included Assets 12 Water Supply 1 Water Supply $90,226,735 16.08% --- --- 2 Treatment 185,125,663 33.00% $267,181,658 40.69% 3 Transmission 78,607,590 14.0100/ 63,860,903 9.73% 4 Effluent/Reclaimed --- --- 59,376,428 9.04% 87,070,870 Excluded Assets 16 Meters/Services/Hydrants 48,000 --- 5 Distribution/Collection 118,986,279 21.21% 172,735,503 26.31% 6 Meters/Services/Hydrams 7,909,452 1.41% --- --- 7 General Plant [21 10,835,651 1.93% 12,690,180 1.93% 8 Other [3] 41,696,068 7.43% 46,351,697 7.06% 9 Construction Work -in -Progress [4] 27.662.107 4.93% 34,390.088 5.24% 10 Totals $561.049545 ]QQ,QQ°/ 65MS6.457 JQQQQ°/ 11 Total Combined Utility System Assets 87217 636.002 Footnotes: [1] Amounts shown based on the functionalization of approximately 6,500 utility assets. [2] General Plant represents equipment, vehicles and assets with short service lives, and was allocated to the water and wastewater system in proportion to all other functionalized utility plant. [3] Reflects reported assets that: i) represent capitalized costs (e.g., studies) that did not directly link to an existing constructed asset; and ii) certain asset costs considered to benefit only existing users; such amounts were not included as a capital cost for the determination of the impact fees. [4] Consti action work -in -progress was not recognized since the projects have not yet been completed and placed into service. 26 Summary of Contributed Capital Water Wastewater Description System System Contributed Capital for Included Assets 12 Water Supply $169,361 --- 13 Treatment 969,055 $462,578 14 Transmission 2,381,741 6,957,546 Effluent/Reclaimed --- 2,977,640 Contributed Capital for Excluded Assets 15 Distribution/Collection 87,070,870 112,191,053 16 Meters/Services/Hydrants 48,000 --- 17 General Plant L326 128 1,553.096 18 Total $91965.155 $124141914 19 Total Combined Utility System Assets $2] 6.107.069 87217 636.002 Footnotes: [1] Amounts shown based on the functionalization of approximately 6,500 utility assets. [2] General Plant represents equipment, vehicles and assets with short service lives, and was allocated to the water and wastewater system in proportion to all other functionalized utility plant. [3] Reflects reported assets that: i) represent capitalized costs (e.g., studies) that did not directly link to an existing constructed asset; and ii) certain asset costs considered to benefit only existing users; such amounts were not included as a capital cost for the determination of the impact fees. [4] Consti action work -in -progress was not recognized since the projects have not yet been completed and placed into service. 26 DRAFT APPENDIX B EXISTING WATER AND WASTEWATER IMPACT FEE ORDINANCE DRAFT ORDINANCE NO. 2015- 17 AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, AMENDING CHAPTER 74 OF THE COLLIER COUNTY CODE OF LAWS AND ORDINANCES, THAT ORDINANCE BEING THE COLLIER COUNTY CONSOLIDATED IMPACT FEE ORDINANCE, NO. 2001-13, AS AMENDED, PROVIDING FOR THE INCORPORATION, BY REFERENCE, OF THE IMPACT FEE STUDY ENTITLED "COLLIER COUNTY TRANSPORTATION IMPACT FEE UPDATE. STUDY," THE IMPACT FEE STUDY ENTITLED "WATER AND WASTEWATER IMPACT FEE STUDY FOR COLLIER COUNTY WATER -SEWER DISTRICT" AND THE IMPACT FEE STUDY ENTITLED "COLLIER COUNTY CORRECTIONAL FACILITIES IMPACT FEE UPDATE STUDY'; AMENDING THE ROAD IMPACT FEE RATE SCHEDULE, WHICH IS SCHEDULE ONE OF APPENDIX A, AS SET FORTH IN TIIE IMPACT FEE UPDATE STUDY; AMENDING THE WATER AND WASTEWATER IMPACT FEE RATE SCHEDULE, WHICH IS SCHEDULE TWO OF APPENDIX A, AS SET FORTH IN THE IMPACT FEE UPDATE STUDY; AMENDING THE CORRECTIONAL FACILITIES IMPACT FEE RATE SCHEDULE, WHICH IS SCHEDULE FOUR OF APPENDIX A, AS SET FORTH IN THE IMPACT FEE STUDY; UPDATING THE GENERAL DEFINITIONS SECTION; PROVIDING THAT IMPACT FEES ARE ASSESSED USING THE RATES IN EFFECT (1) WHEN THE BUILDING PERMIT APPLICATION IS SUBMITTED, OR (2) AT THE TIME OF THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY OR CERTIFICATE OF COMPLETION FOR THE DEVELOPMENT, WHICHEVER IS LESS; PROVIDING FOR A CORRECTION IN THE DATE USED FOR TERMS OF DEFERRALS; PROVIDING FOR UPDATES TO THE SPECIAL REQUIREMENTS FOR WATER IMPACT FEE AVD/OR SEWER IMPACT FEE SECTION, IN ACCORDANCE WITH THE STUDY AND PRESCRIBED METHODOLOGY; PROVIDING FOR CONFLICT AND SEVERABILITY; PROVIDING FOR INCLUSION IN THE CODE OF LAWS AND ORDINANCES; AND PROVIDING FOR AN EFFECTIVE DATE OF FEBRUARY 17, 2015 FOR ALL FEE DECREASES, ANDA DELAYED EFFECTIVE DATE OF MAY 11, 2015 FOR ALL FEE INCREASES, IN ACCORDANCE WITH THE 90 -DAY NOTICE REQUIREMENTS SET FORTH IN SECTION 163.31801(3)(d), FLORIDA STATUTES. WHEREAS, Collier County has used impact fees as a funding source for growth -related capital improvements for transportation since 1985; and WHEREAS, on March 13, 2001, the Board of County Commissioners (Board) adopted Ordinance No, 2001-13, the Collier County Consolidated Impact Fee Ordinance, repealing and superseding all of the County's then existing impact fee regulations, and consolidating all of the County's impact fee regulations into that one Ordinance, codified in Chapter 74 of the Collier County Code of Laws and Ordinances (the "Code"); and Underlined text is added; Sct+.teN-s6reaglt text is deleted 27 DRAFT WHEREAS, on May 12, 2009, the Board adopted Ordinance No. 2009-24, thereby amending Schedule Four of Appendix A of Chapter 74 of the Code, and establishing the County's then current Correctional Facilities Impact Fee rates; and WHEREAS, on February 22, 2011, the Board adopted Ordinance No. 2011-05, thereby amending Schedule One of Appendix A of Chapter 74 of the Code, and establishing the County's then current Road Impact Fee rates; and WHEREAS, on February 22, 2011 the Board also adopted Resolution 2011-4 1, thereby amending Schedule Two of Appendix A of Chapter 74 of the Code, and establishing the County's current Water and Wastewater Impact Fee rates; and WHEREAS, on December 13, 2011, the Board adopted Ordinance No. 2011-44 through which Road Impact Fees and Correctional Facilities Impact Fees were indexed in accordance with the prescribed methodology, thereby establishing the rates that are currently in effect; and WHEREAS, as Section 74-502 of the Code states that impact fee studies should be reviewed at least every three years, the County retained Tindale -Oliver and Associates, Incorporated (TOA) and Public Resources Management Group, Inc. (PRMG) ( collectively the "Consultants"), to review the existing Road, Correctional Facilities, Water and Wastewater Impact Fees and recommend changes to the fees where appropriate; and WHEREAS, TOA has prepared impact fee studies entitled the "Collier County Transportation Impact Fee Update Study," dated January 13, 2015 and the "Collier County Correctional Facilities Impact Fee Update Study," dated January 13, 2015; and WHEREAS, PRMG has prepared an impact fee study entitled the "Water and Wastewater Impact Fee Study for Collier County Water -Sewer District," dated September 15, 2014; and WHEREAS, Collier County uses impact fees to supplement the funding of necessary capital improvements required to provide public facilities to serve new population and related development that is necessitated by growth in Collier County; and WHEREAS, the studies recommend changes to the Road Impact Fee rate schedule, as set forth in Schedule One of Appendix "A," changes to the Water and Wastewater Impact Fee rate schedule, as set forth in Schedule Two of Appendix "A," and changes to the Correctional Facilities Impact Fee rate schedule, as set forth in Schedule Four of Appendix "A" of Chapter 74 of the Collier County Code of Laws and Ordinances; and Underlined text is added{ &F elt i400gh ICU is deleted Page 2 of 24 28 DRAFT WHEREAS, the studies also recommend establishing the proposed impact fee rates in order to equitably distribute the costs of acquiring and constructing public facilities based upon a rational nexus relating costs incurred by fee payers to infrastructure impacts created by commercial and residential land uses; and WHEREAS, this Ordinance also updates the general definitions provided for in Section 74-108 of Chapter 74 of the Collier County Code of Laws and Ordinances for consistency with the updated studies and rate schedules; provides that impact fees are assessed using the rates in effect (1) when the building permit application is submitted, or (2) at the time of the issuance of a certificate of occupancy or certificate of completion for the development, whichever is less, corrects a date used for terms of deferrals and amends provisions related to the imposition of Water and Wastewater Impact Fees to comply with the study and methodology updates; and WHEREAS, the Consultants have reviewed and updated the fee calculation methodologies that will be imposed in an equitable and non-discriminatory manner; and WHEREAS, Section 163.31801, Florida Statutes, which is the Florida Impact Fee Act, requires the most recent and localized data be used in impact fee calculations and these studies comply with that requirement; and WHEREAS, the study methodologies have been reviewed and approved by Collier County's outside legal counsel, Nabors, Giblin and Nickerson, P.A.; and WHEREAS, staff has thoroughly reviewed the calculations and findings, concurs with the recommended changes to the Road, Correctional Facilities and Water and Wastewater Impact Fee rate schedules, and recommends that the Board of County Commissioners adopt this Ordinance to implement the recommended changes -in accordance with the notice requirements of Section 163.31801(3)(d), Florida Statutes. NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF COLLIER COUNTY, FLORIDA, that: SECTION ONE. Article 1, General, Section 74-106, Adoption of impact fee studies, of the Collier County Code of Laws and Ordinances is hereby amended to read as follows: Section 74-106. Adoption of impact fee studies. 1n' dint uet is added; gi�aek-'.h.-sugh ten is deleted Page 3 of 24 29 DRAFT (1) Tronsporialion facilities: "Collier County Transportation Impact Fee Update Study," prepared by Tindale -Oliver and Associates, Incorporated (February 19-, 2009) and Gollief County Trip 0-haraeteristies Study Mine Land Use (Septembe 2 2009) as ended by the "Collier Ce ., y Transportation Impact Cee Gest and Credit Update Study" (Septembe_ 9 201_ ,...d the Tfansportatioa linpast Fee Uses" (Mareeh 223 2011 January 13,201j5; U te„ . .ed H. Camp, Dre.,e. P. McKee 1..e (dated April 10 2006). TI. Water and wastewater facilities: "CollierGeenE), Water and fhe Wastewater Impact Fee Study for Collier County Water -Sewer District (dated June 6, 2006 September 15, 2014) prepared,by Public Resources Management Group, Inc."; (7) Correctional facilities: `_Collier County Correctional Facilities Impact Fee Update Study," prepared by Tindale -Oliver & Associates, Inc. (April 21 2009 January 13, 20151; SECTION TWO. Article I, General, Section 74-108, General definitions, of the Collier County Code of Laws and Ordinances is hereby amended to read as follows: Section 74-108. General definitions. When used in this chapter, the following terms shall have the following meanings, unless the context clearly indicates otherwise. Terms contained in article III or the rate schedules supercede these general definitions to the extent of any conflict(s). Undgdincd text is added; Strtxkitlraegh test is deleted Page 4 of 24 30 DRAFT Bundled Golf shall mean golf courses built as part of a residential development where the membership to and use of the golf course is open only to the residents Guests can use the golf course only when playing with a member, who is a resident Impact fee rate shall mean the formula or calculation that when applied to the respective development determines the applicable impact fee that results because of the impacts deemed by this chapter to be applicable to the respective public facility caused by particular development. Impact fees are assessed using the rates in effect u when the building permit application is submitted, or (2) at the time of the issuance of a certificate of occupancy or certificate of completion for the development, whichever is less ffftlE3 qtiffteFS, hot T arsittt iar sH adg' . Public utilities administrator shall mean the individual appointed by the board or the comity manager to supervise the administration, operations and/or acquisitions of the county's regional sewer system and/or regional water system, the former Goodland Water System, the Collier County Water -Sewer District, and/or any other similar utility system owned by the county and which now or in the future assesses any utility impact fee. Regional server .sysiems shall mean the wastewater or sewer utility system directly connected to treatment facilities operated by the Collier County Water -Sewer District, or Undttl_ned tez[ is added, & u&L, 4fa text is deleted Page 5 of 24 31 DRAFT the county, or both, For the purposes of this chapter the term sewer and wastewater are interchangeable and have the same meaning. Restaurant (rluaU y lots -turnover) shall mean a land use consisting of eating establishments of high quality and with turnover rates usually of at least one hour or longer. Generally, quality restaurants do not serve breakfast; some do not serve lunch; all serve dinner. Often the restaurants in this land use are not a chain and reservations are required. SECTION THREE. Article 11, Impact Fees, Section 74-201, Imposition o%impact fees, of the Collier County Code of Laws and Ordinances is hereby amended to read as follows: Section 74-201. Imposition of impact fees. (f) Fund reimbursement. Every county approved deferral of a water or sewer impact fee requires complete reimbursement and deposit of the entire amount deferred into the applicable water or sewer trust fund(s) within 30 days of the deferral or waiver agreement being signed on behalf of the county, except for deferrals of less than seven ten years for multi -family affordable housing rental units. However, deferrals of less than ses,ea ten years for multi -family affordable housing rental units must not adversely impact the cash flow or liquidity of the water and/or sewer impact fee trust fund accounts and thereby frustrate or interfere with the then planned or then ongoing growth -necessitated capital improvements and additions to such water and/or sewer systems. Such an adverse impact may be determined by the public utilities division administrator whenever either of the two trust fund's individual reserve balances is in jeopardy of approaching (or actually has reached) less than a total of $600,000.00 of unappropriated and unencumbered funds. If the public utilities division administrator determines that the unappropriated and unencumbered funds in either of these accounts is then in jeopardy of approaching a level of less than $600,000.00, then the total number of such multi -family affordable housing rental units that may be approved in any such fiscal year (including the fiscal year when the public utilities division J ndc, ined tcxt is added; 8"ek-threngh Icsl is deletcd Page 6 of 24 32 DRAFT administrator makes such a "funds in jeopardy" determination) for deferrals (i.e., for les, -s, -than; -seven ten years) shall not exceed 225 units. This unit number limitation will continue so long as a determination of "jeopardy' exists, except that any of the 225 units not approved by an agreement in any fiscal year where funds are in "jeopardy" may be accumulated and rolled -over from one fiscal year to the next fiscal year until such time as the "jeopardy' determination ends. The number of multi -family rental deferrals granted in a fiscal year where funds are in "jeopardy" may exceed 225 units, but only if an alternate funding source for the deferral is secured. SECTION FOUR. Article 111, Special requirements for specific Types of impact fees, Section 74-303, Special requirements for water impact fee and/or sewer impact fee, of the Collier County Code of Laws and Ordinances is hereby amended to read as follows: Section 74-303. Special requirements for water impact fee and/or sewer impact fee. (c) Limitation on Applicability. Notwithstanding the general applicability provisions set forth in this chapter, water and sewer impact fees shall be limited as follows: (1) The imposition of water and sewer impact fees shall include only development on lands within the county water sewer district. The imposition and collection of water and sewer impact fees on geographic areas within the county water sewer district shall not take place until such time when connection to the regional water and/or sewer system is made. Lands required to connect or request connection to the regional water and/or sewer system, or which otherwise create a growth necessitated demand upon the regional water and/or sewer system shall be subject to the imposition of impact fees in accordance with this chapter. The following areas are provided exclusion from water and/or sewer impact fees since they are not served by the existing treatment capabilities of the regional water and/or regional sewer system: a. Those areas lying within the boundaries of the former Goodland Water District. Exclusion of those areas within the boundaries of the former Goodland Water District recognizes that this area is not J:ndedined tact is added; gh ;en is deleted Page 7 of 24 33 DRAFT presently planned to be served by the treatment capabilities of the regional water and/or regional sewer systems. b. Those areas lying within the Macro Shores, Unit 1, Sections 26 and 27, Township 52 South, Range 26 East, and recorded in Plat Book 14, Page 34 of the Public Records of Collier County, Florida. Exclusion of the Marco Shores, Unit I, recognizes that this area is not presently planned to be served by treatment capabilities of the regional water and/or regional sewer systems. C. Those areas lying within the Key Marco Community Development District. ExelusiaH of the K • nr,ree r,,......,...•,. Development Distriet reeagnizes that this Brea -is aatside-'-the-f6tnity „eir seawtria�-not planned to be served by treatment capabilities of the regional water and/or revional sewers std. (d) Payment. (3) Subject to availability of funds, the county may enter into agreements to extend payment (offer installment payments) of water and/or sewer systems impact fees and associated costs over a period not to exceed seven years with owners of then existing buildings, structures or applicable improvements which are mandated to connect to the regional water and/or regional sewer systems. Prior to the county entering into any agreements to extend payments, and from time -to -time thereafter, the board shall identify a specific source of funds to be used relative to providing extended payment and the cost of such funds, including all expenses and costs incidental to obtaining or providing same, including interest at the interest rate that the board or the public utilities administrator will employ in offering extended payment with interest, and a reasonable estimation of the administrative costs of expenses associated with administering the extended payment alternative to the respective land(s). Undcrlined test is added', St.alk tseB;. Em is deleted Page 8 of 24 34 DRAFT Underlmed teat is added; &twlk4hhwgh text k deleted Page 9 of 24 35 11 41r SECTION FIVE. CONFLICT AND SEVERABILITY. In the event this Ordinance conflicts with any other Ordinance of Collier County or other applicable law, the more restrictive shall apply. If any phrase or portion of this Ordinance is held invalid or unconstitutional by any court of competent jurisdiction, such portion shalt be deemed a separate, distinct, and independent provision and such holding shall not affect the validity of the remaining portions. SECTION SIX. INCLUSION IN CODE OF LAWS AND ORDINANCES. The provisions of this Ordinance shall be made a part of the Code of Laws and Ordinances of Collier County, Florida. The sections of the Ordinance may be renumbered or re - lettered and internal cross-references amended throughout to accomplish such, and the word "ordinance" may be changed to "section," "article," or any other appropriate word. SECTION SEVEN. EFFECTIVE DATE. This Ordinance shall be considered adopted upon the date written below; however, the effective date of the Phase I Road Impact Fee rate Schedule, the Phase 1 Correctional Facilities Impact Fee rate schedule, and the Water and Wastewater Impact Fee rate schedule (decreases) shall become effective February 17, 2015, subject to filing with the Florida Department of State, and the Phase 2 Road Impact Fee rate schedule and the Phase 2 Correctional Facilities Impact Fee rate schedule shall be delayed to May 11, 201`5. rlincd text is added, StaaekaFaaagb text is deleted Page 10 of 24 36 DRAFT PASSED AND DULY ADOPTED by the Board of County Commissioners of Collier k r-uo County, Florida this lo�clay of , 201 ATTEST BOARD OF COUNTY COMMISSIONERS DwighcE, Broc15�Cleek OF COLLIER COUNTY, FLORIDA Deputy Clerk Jeffrey lity: County Attorney TIM NANCE, Chairman U.dgr1mcd ten is added; &wakiH ,gk Ica is deleted Page I I of 24 37 This ordinance Sacmtcry of'e. 1�&y cnd acknowled-'r—'M i` u fill glcaivea �� of i,.ar1�-a4t C,Zv.,.o rVir, way APPENDIX -SCHEDULE ONE ROAD IMPACT FEE RATE SCHEDULE Phase I -Effective Deeeex4er-3Bs-30}i-February 17, 2015 Impact Fee Land Use Category Rate Residential Assisted Living Facility (ALF) $844-g? $759.00 Per Dwelling Unit Condo/Townhouse (1-2 Stories) $4,255.70 Per Dwelling Unit High -Rise Condominium (3+ Stories) $3,087.89 Per Dwelling Unit Mobile Home $2,394.71 Per Dwelling Unit Multi-Family(Apartments) 1-10 Stories $4,313.86 Per Dwelling Unit Multi -Family (Apartments) >10 Stories $2,741.77 Per Dwelling Unit Retirement Community $2,125.50 Per Dwelling Unit Singe Family Detached House Less than 1,500 sq. ft. $4,230.38 Per Dwelling Unit 1,500 to 2,499 sq. ft. 55,752.75 Per Dwelling Unit 2,500 sq. ft. or larger $6,504.09 Per Dwelling Unit Non -Residential Auto Sales - Luxury $8,323.81 Per 1,000 sq. R Auto Sales-New/Used $13,555.03 Per 1,000 sq. ft. Bank/Savings: Drive -In 521,953,89 Per 1,000 sq. ft. Bank/Savings: Walk-In"'-�,�`0 99 $20.774.00 Per 1,000 sq. ft. Business Park $7,801.34 Per 1,000 sq. ft. Car Wash -Automatic $21,257.89 Per 1,000 sq. ft, Car Wash - Self -Service 91�,-722.322.389 7$ . 99,00 Per Scrvice Bay Church $317.98 Per Sent College/University (Private) Q,501 Students $1,325.39 Per Student >7,500 Students $1,000.84 Per Student Convenience Store (24 hours) $52,648.06 Per 1,000 sq. ft. Uadcri.ned text is added; BHaokAavugh tent is deleted Page 12 of 24 Impact Fee Land Use Category No -Residential (Cont'd) Convenience Store w/Gas Pumps 4 or less Fuel Positions $20,198.89 5 - 6 Fuel Positions $16,375.60 7 - 8 Fuel Positions $13,964.00 9 - 10 Fuel Positions $11,879.77 11 - 12 Fuel Positions $10,795,44 13 or more Fuel Positions $9,822,73 Dance Studios/Gymnastics $6,295.85 Day Care $802.92 Furniture Store 52,053.28 Gasol ine/Service Station 54,376.70 General Light Industrial $4,332.62 Golf Course s4z"2'." Golf Course - Bundled Home Improvement Store 55,486 36 Hospital 391394,07 Hotel 31;672-2-7 I lotel - All Suites 52,204.30 Manufacturing 52,394.71 Marina $1,967.92 Mine/Commercial Excavation $5.62 Mini -Warehouse $882.65 Mord S2,347.81 Movie Theater $25,202.18 Nursing Home $692.24 Office 6 000 fi or less Office 6 001-50,000 sq. ft. es4ess $9,290.89 0Mce 50,001-100,000 sq. ft. 57,919,53 Office 100,001200,000 sq, ft. $6,758.29 Office 200,001-400,000 sq. ft. $5,761.19 Office Greater than 400,000 sq. 11 $5,249.04 Office- Medical Greater than 10,000sq, ft. $22,301,88 Office - Medical 10,000 sq, ftor less $14,78096 Rate $193,492.0 $58.054.00 1212200 $3,54400 Vnder' a text is added; 89uek-threugh text is deleted Page 13 of 24 39 4 00 Per Fuel Position Per Fuel Position Per Fuel Position Per Fuel Position Per Fuel Position Per Fuel Position Per 1,000 sq. ft. Per Student Per 1,000 sq. ft. Per Fuel Position Per 1,000 sq. ft. Per 18 Holes Per Is Holes Per 1,000 sq. ft. Per 1,000 sq. ft. Per Room Per Room Per 1,000 sq. ft. Per Berth (DryRVet) Per 1,000 cubic yards Per 1,000 sq. ft. Per Room Per Screen Per Bed Per 1,000 sq. ft. Per 1,000 sq. ft. Per 1000 sq. ft. Per 1000 sq. ft. Per 1,000 sq. ft. Per 1,000 sq. ft. Per 1,000 sq, ft. Per 1,000 sq. ft, DRAFT DRAFT Impact Fee Land Use Category Rate Non -Residential (Cont'd) Pharmacy/Drug Store $7,678,46 Per 1,000 sq. A. Quick Lube $7,920.47 Per Servuce Bay Restaurant - Drive4r, $74,793.30 Per 1,000 sq, R. Restaurant - High Turnover $1,346.03 Per Seat Restaurant - Quality Low Turnover $847.95 Per Seat Retail 6,000 so ti, or less5$ .370.00 Per 1,000 sq. ft. Rchul 6.001-25 000 se, 0. $t0,06Per 1,000 sq. ft. Retail 25 001-50,000 Sq. Ft. or -Less $10,838.59 Per 1,000 sq. ft. Retail 50,001-100,000 Sq. Ft. $10,980.22 Per 1,000 sq. ft Retail 100,001-150,000 Sq. Ft. $10,246.71 Per 1,000 sq. ft. Retail 150,001-200,000 Sq. Ft. $9,816.17 Per 1,000 sq. ft. Retail 200,001400,000 Sq. Ft. $9,294.64 Per 1,000 sq. ft. Retail 400,001-600,000 Sq. Ft. $9,282.44 Per 1,000 sq. ft. Retail 600,001.1,000,000 Sq. Ft. $10,074.12 Per 1,000 sq. ft. Retail >1,000,000 Sq. Ft. 510,595.64 Per 1,000 sq. ft. Retail - Specialty $14,752,86 Per 1,000 sq. ft. RV Park e'er -278,49 U-1 50'00 Per Site School - Elementary (Private) $58437 Per Student School- Middle (Private) $816.06 Per Student School - High School (Private) $862.96 Per Student Supermarket $14,507,10 Per 1,000 sq. fL Tire Store 56,056.66 Per Service Bay Warehouse $2,206.17 Per 1,000 sq. ft. Underlined text is added; Straek-dr�jgh text is deleted Page 14 of 24 EEO DRAFT APPENDIX A -SCHEDULE ONE ROAD IMPACT FEE RATE SCHEDULE Phase 42 - Effective-€ebraery--4-7 - 045 May 11, 2015 Impact Fee Land Use Category Rate Residential Assisted Living Facility (ALF) $759.00 Per Dwelling Unit Condo/Townhouse (1-2 Stories) £4233;79 $4.567.00 Per Dwelling Unit High -Rise Condominium (3+ Stories) &3,087-49$3,309.00 Per Dwelling Unit Mobile Home $2,394.71 52.966.00 Per Dwelling Unit Multi-Family(Apartments) 1-10 Stories 9i'3E3.958,224.00 Per Dwelling Unit Multi -Family (Apartments)>10 Stories $274-1.7-7 $3J29.00 Per Dwelling Unit Retirement Community Pj2j.5265,28.00 Per Dwelling Unit Single Family Detached House Less than 4,490 -sq: 4,000 sq, ft. $4,23938 $7,017.00 017.00 Per Dwelling Unit -1y" to 2'999 sq r��oc�oc o�,-o... ^Ijng-lini — 2,500sq. A, O,arger 4,000 sq, fl. or larger $600409 $8,445.00 Per Dwelling Unit Non -Residential Auto Sales - Luxury u;393-8+ $10.319.00 Per 1,000 sq. ft. Auto Sales - New/Used $15,910.00 Per 1,000 sq. A. BarddSavings: Drive -In &21,933:89 $27 300 DO Per 1,000 sq. ft. Bank/Savings: Walk -In $20,774.00 Per 1,000 sq. fl, Business Park .S ,&GI -34 X16_00 Per 1,000 sq. fl. Car Wash -Automatic $2] 2, 49 131 482_00 Per 1,000 sq. it. Car Wash - Self -Service $9,799,00 Per Service Bay Church $347,48 $328.0 Per Seat Collegerllniversity (Private) X7,501 Students $1;323,39 $1,648.00 Per Student >7,500 Students &1 ,000.81 $1236_00 Per Student Convenience Store (24 hours) &R, 486 $65,7000 Per 1,000 sq. fl. 1�pderlined tcxt is added; Struck ihrsegkh text is delctcd Page 15 of 24 41 DRAFT Impact Fee Land Use Category Rate Non -Residential (Cont'd) Convenience Store w/Gas Pumps 4 or less Fuel Positions $20-1198:99 $24,428.00 Per Fuel Position 5 - 6 Fuel Positions $16;375:68 15 9.809.00 Per Fuel Position 7 - 8 Fuel Positions S13,961.00$16,826,0 0 Per Fuel Position 9 - 10 Fuel Positions $11,$79.77 $14,379.00 Per Fuel Position I I - 12 Fuel Positions $40;79544 $11054.00 Per Fuel Position 13 or more Fuel Positions $9,822.73$11,891.0o Per Fuel Position Dance Studios/Gymnastics 96;295-" - 7 733.00 Per 1,000 sq. R. Day Care $802.92 5967.00 Per Student Furniture Store $2,033.28 $2,551.00 Per 1,000 sq. ft. Gasoline/Service Station $4,376.-70 $5,12LOO Per Fuel Position General Light Industrial $4332.62 $5,373.00 Per 1,000 sq. ft. Golf Course .8193,492.00 Per IS Holes Golf Course - Bundled $58,054.00 Per 18 Holes Home Improvement Store $$,48636 $7,054.00 Per 1,000 sq. ft. I lospital $9,322.00 Per 1,000 sq, ft. Hotel $3,544.00 Per Room Hotel -All Suites $ZW4-30 11234.00 Per Room Manufacturing $27394.71 $2.943.00 Per 1,000 sq. it. Marina $1,967.92 $2,444.00 Per Berth (Dry/Wet) Mine/Commercial Excavation $3..62 $8.00 Per 1,000 cubic yards Mini -Warehouse SR82-.65 $942.00 Per 1,000 sq. t Motel S2,34?.81 S2,909.0 Per Room ff, ic,Th r $33 42-17 $31.3€3.,00 Per Serten Nursing Home S692-.24$972.00 Per Bed Office 6,000 sq. R. or less $8,114.00 Per 1,000 sq. ft. Office 6,001-30;000100_000 sq. ft $9;290,89 $7 919-13 59.661.00 Per 1,000 sq. ft. Pur i,000 Office 39,001-100 000sq--13- Office 100,001-200,000 sq. ft $6,75&2 $8,191.00 sq. Per 1,000 sq. ft. Office 200,001-400,000 sq. ft. P°,gii1-1'6$ ,923.00 Per 1,000 sq. ft. Office Greater than 400,000 sq. ft. $3,249.04 $6,283,00 Per 1,000 sq. ft. Office - Medical Greater than 10,000 sq. ft. $22,301.48 $26,689.00 Per 1,000 sq. ti Office - Medical 10,000 sq. ft, or less $-1-4;99&.06 $18,328.00 Per 1,000 sq. fl. Underlined text is added; Slruek Ihrengh text is deleted Page 16 of 24 42 DRAFT Impact Fee Land Use Category Rate Non -Residential (Cont'd) Pharmacy/Drug Store $7,1 446 $9,582.00 Per 1,000 sq. ft. Quick Lube x7,920.47 $10.083.00 Per Servuce Bay Restaurant - Fast Food w/Drive-[n 574;793.30 591,028.00 Per 1,000 sq, ft. Restaurant - High Turnover &4,346:03 $1,657.00 Per Seat Restaurant - Low Tumover $8471}5 �,06�00 Per Seat Retail 6,000 sq. ft, or less $5,370.00 Per 1,000 sq. ft. Retail 6,001-25,000 sq. ft. $10,064.00 Per 1,000 sq. ft, Retail 25,001-50,000 Sq. Ft. £40;83$-59 $13,496.00 Per 1,000 sq, ft. Retail 50,001-100,000 Sq. Ft. $}&984-22 D4_540.00 Per 1,000 sq. ft. Retail 100,001-150,000 Sq. Ft. $3&,-246;7-1 $13,531.00 Per 1,000 sq. ft. Retail 150,001-200,000 Sq. Ft. $9,8!6A7 $12,955.00 Per 1,000 sq. ft. Retail 200,001-400,000 Sq, Ft. &9;29464 312.244_00 Per 1,000 sq, ft. Retail 400,001-600,000 Sq. Ft. $4382;44 $12.068.00 Per 1,000 sq. ft. Retail 600,001-1,000,000 Sq, Ft. 530;0444-2 X12586.00 Per 1,000 sq. ft, Retail >1,000,000 Sq. Ft. $10395:64 $12.818.00 Per 1,000 sq. ft. Retail - Specialty $}4,732;86 118,131_00 Per 1,000 sq, ft. RV Park $1,156.00 Per Site School- Elementary(Private) &594,37 $687.00 Per Student School - Middle (Private) $816.06$969,00 Per Student School - High School (Private) $862:96 . I 0 23.00 Per Student Supermarket 514,507.0 318.064,00 Per 1,000 sq. ft. Tire Store $6;056-66 $_1709.0 Per Service Day Warehouse 32-206.17 52.73700 Per 1,000 sq. R. Underlined text is added; Fmjok-through text is deleted Page 17 of 24 43 DRAFT APPENDix co IAnnrn_�o IE4D W 4TER-Ai�7 PFFECTWE 14 NIT♦RV 1 gnna yl(�. X "M } ?^(t 111 /IAIA�tYI�R`G/\ ✓` 14F i ,.. y''�fj$'�:t t i ;, i { 'YfY' 1 - } / N' �r,,,IIt}€.i Y'% JA7RA�FF�S - ea a x t iib 1 314 $3;614:48 $g,722.3 e. Rest 047 RAF I In $2;423-14 $:483.85 AA6-I-359 ({ilia-ValUoERG/1/ $37-22.39 88;' 1 sL4-B3 $3,G16:48 b3:722.38 mac... (founded t F€& €9R $3,44649 falAlmem-valae F/ ERGysic (iAlA-Value .-86ltai s leafy(min 1"MyAll-le (rounded a yl(�. X "M } ?^(t 111 /IAIA�tYI�R`G/\ ✓` 14F i ,.. y''�fj$'�:t t i ;, i { 'YfY' 1 - } / N' �r,,,IIt}€.i Y'% )W K;� - ea x t iib 4:33 RAF t lflit $-1a-91',3@ $1,22994 Rest 047 RAF I In $2;423-14 $:483.85 88;' 1 ReFb'ai1 $3,G16:48 b3:722.38 y'1 (iAlA-Value car Ilnm.. $3`74 (rounded a to4he 9oCl✓ LUEx _NGnaearesl 5 tan $3;72v'�78 (min mum value ABF-- .. Aver'age-BaiiY-FlawsfieFgwyesed-uveas-grevided-lay-€OR• .: .,. ESR— €a9inaar-e�Racad#ar-{�rajest ERG-- Undtdip text added; Stfu* }.;aa-,fi text is deleted. Page 18 of24 DRAFT Nt}A}-R6-S}96A3'FFA-6 WATE MA TER SIZE 9R 9GW3B EQ4J -ALENT ERG RANGE 1N4 R9 E^,F69. . M4PF 1�111X A41P} A4A� $3,sisnn -14 24 3 5 08 8338:08 34&7-N 8178&100 26 6 8;$74,09 i�87-8:000-139:DA-755 3 &.} 8A X7.00 W-132040'�,- G 3 0n 99 3 &.4tl &4.9 27,662.00 447-484,00 28 47.2 n9 442,974 4 55 4284 18-8250n nnn�o�on0 3-43,33_5:00 4-&3,-044-.N 6 42-9 35,7.9 440,535.00 ' "' "n.90 453,439.00 47239,414:99 8 338 68022 ��n,N 2,049,0090 n,'54 7)4W 21-0440 Underllne text added; 3uack;k.ceygp text Is deleted. Page 19 of 24 45 DRAFT APPENDIX A SCHEDULE TWO - EFFECTIVE February 17, 2015 WATER & WASTEWATER IMPACT FEE RATE SCHEDULE ERC=_E,quivalenl Res ttnllat Connection ADP = Averaae Daly Flow MULTI=EAWLI. MAg7ER -INDIVI ..OA�LY.AAETEREO ;' yry 5 -".RESIDENTIAL Basis of Fae ERG Factor ,�";'- „s'wt WaatevTatar 17m ae-fe". All Non -Residential Impact fees a re delermined expansionsor replacements ;Feer 4 0 TO 750 Livm'p Space lSO.FT) ERG Factor'Bass of Fae: 030 '.. 751 TO 1 500 �0 Pye7 TO 4.999 1Per ERC $2800 $2515 L fAND NO MORE THAN 4 T IQ fM (fixed at 1 ERC) Mete, si,, dt,to,mire�l by the total fixture no [he cugent eoltlpn of the Florida PlumUlng Code R fgrgnce the Meter 61-I FOm 5.000 OR MORE Varies Im'nlmum Per ERC 2 6001 15.00 Vanes (Reference value f t I ittmd on ADF (minimum value Meter Size Notal IQR MORE TR 4 TM=_ial $2.515 6 inch 66.87 FOrm la)2 600 $167,675 8 Inch M"eter57za Meta, size determiny [h 1 f re value n ed f me eter an a I n a II able r vl n ur _ e iti of h I nda PI mbin e. Ref r he Meer n Neta; ERC wtlh ADF dr'ihUla - When ADF Is 10 Gallonsr P n use the fpmfpmvla fA a /3 t MULTI=EAWLI. MAg7ER METERED5 " Llvfno Spade (Sq:FT I(Sq:FTP Basis of Fae ERG Factor W4t' hr pkat WaatevTatar 17m ae-fe". All Non -Residential Impact fees a re delermined expansionsor replacements ;Feer 4 0 TO 750 Per un i 0 3 $@6.Q 030 '.. 751 TO 1 500 EgrU i Pye7 $1.740 805 1 501 OR MORS Pet U ' jS $2.600 ..;in Mete, si,, dt,to,mire�l by the total fixture no [he cugent eoltlpn of the Florida PlumUlng Code R fgrgnce the Meter 61-I FOm w 15.00 derlined le,l s added; &nro AWvgb texl is deleted ♦ u.,, 70 Of 74 46 NON-RESIOEIVTPAL . r; , ., easla prF� for All Non -Residential Impact fees a re delermined expansionsor replacements by meter size Waterand/orwasl 1 r impact fees alterations are imposed only Ifjhg meter size Is Increased as a res II of the it l'o expansion, or ne lacern M. `Meter. Vie`. ;"'-" .ERC Factor, f.',] °-Wat`e'r•!m act F66p!", 4 4 ; �.". Wasfewter lm`xet F66.'Y�` 3/4 Inch 1.00 $2,600 $2.515 1 inch 1.87 $4,340 $4,200 t-tainch 133o-eff W. 37�' 2 inch 5.33 $13,860 13 405 3 inch 15.00 $39.000 $37,725 4 inch 33.33 86.660 $83.825 6 inch 66.87 173.340 $167,675 8 Inch 116,67 303 340 $293,425 Meter Size Note Meier size determined in the curtenteditionf ey the total nKtv,e value cenrected to the netor thp Fjoddo Plumbing Code. 8Dfitrono and avolying anpik�ablglr vl tbe_Mql2r aizirg F nn. w 15.00 derlined le,l s added; &nro AWvgb texl is deleted ♦ u.,, 70 Of 74 46 DRAFT APPENDIX A -SCHEDULE FOUR CORRECTIONAL FACILITIES (JAIL) IMPACT FEE RATE SCHEDULE Phase I - Effective Peeeosbee-20,4014 February 17, 2015 Impact Fee Land Use Category Rate Residential Assisted Living Facility $209.03 Per Dwelling Unit Condo/Townhouee (1.2 S;pn9ll 32453 Por Dwelling Unit Wgh-R' C d 1Bium(3+St0ried $245,32 Per Dw1 ne Unit Mobile H.mORV tie -down $372.18 Per Dwelling Unit/Site Muili-Family x528 21661 Per Dwelling Unit Multi -Family- More thanlO tit ores2$ I6.6I ELL wdlin Unit Single Family Less than 1,500 sq, A, $443.23 Per Dwelling Unit 1,500 to 2,499 sq, ft. $488.30 Per Dwelling Unit 2,500 sq. ft, or larger $535.89 Per Dwelling Unit Non-Realdenthd Aum Sales fLuxurvl2S 68 81 Per 1,000 sq. R Auto Sales (New/Used) $43546 $383.64 Per 1,000 sq. ft. Bmk/Sevings: Drive -In $694.}3 $595,Q3 Per 1,000 sq. ft. BanklSavings: Walk -In 9635.13 S551199 Per 1,000 sq. ft Business Park 5232.37 250.54 Per 1,000 sq. ft. Cer Wash - Sclf-Servic. 5155.50 Per Service Bay Car Wash - Automated $410.42 Per 1,000 sq. R. Church $145.30 Per 1,000 sq. ft. Coll egNUniversily (Private) 4,501 525.49 Per Student >7,500 117.84 Per Student Co .vet e€ Slur- (24.he el V,19243 Pca 1,160 sq. ft. Convenience Storc ed6as Pumps g},4-86.29 PeFFual-Pesitien 4 or less Fuel Positions $1,13526 Per Fuel Position .5-6 Fuel P.sdtiooa $96563 Per Fjiej egsilto 7 - 8 Fuel Position} 5953.62 Em Fud .,ilio^ 9 - 10 Fuel Portions7S 67.28 Per Fuel Position I I - 12 Fuel Positions 121770 Per Fuef Emilio 13 or more Fuel Po tion3 675.94 Pcr Fuel P is n 12¢nce Stucho/Girm S57938 Per 10W s. R Day Care SI2.75 Per Student Furniture Store $61.17 Per 1,000 sq. R OasolineScmce Station $304.75 149847 Per Fuel Position UnrlincQtcxl is added; Stwek through text is deleted Page21 of24 47 DRAFT Impact Fee Land Use Category Rate Non-Resldenfial(ConPd) Golf Course $4,955.70 Per 18 Holes Golf Course -Bundled $1"521.51 Per 18 Holes Home Improvement Store $453.76 Per 1,000 sq. ft. Hospital 542042 $357,54 Per 1,000 sq, ft, Hotel 5201.39 Per Roam Industrial- General Light $175.90 Per 1,000 sq, ft. 6eaaq-huteSeks $282:96 Per 1,000 sq, .MgridfafluLng $1324Q Per 1,000 sq. ft Marina $48.43 Per Berth Mini -Warehouse $1.7-84 jn�g Per 1,000 sq. ft, Muni $191,19 Per Room Movie Theater $1,524.44 Per Screen Nursing Home $183.54 Per Bed Office 6,000 30;008 sq. ft. or less 5361,98 $240 98 Per 1,000 sq. ft. Office 6 001 50rWt -100,000 sq. ft. $358-85 310:57 Per 1,000 sq. ft. Office 100,001-200,000 sq. ft, 5280-31 $263.59 Per 1,000 sq. ft. Otlice 200,001400,000 sq, ft. 523463 $221,83 Per 1,000 sq, ft. Office Greater than 400.000 sq, ft. &243-94$200,95 Per 1,000 sq. ft. Office - Medical greater then 10 000 so, Ft $439,46 $433 22 Per 1,000 sq" ft. Office -Medial 10 000 soft or les 8 $297.52 Per 1,000 so. ft. Pharmacy0rug Store $492.00 Per 1,000 sq. ft. Quick Lube $295,71 Per Service Bay RV Park $137-65 $131-42 Per Site Restaurant Fact Food w/Drive-In $2,296.85 Per 1,000 sq. ft. Restaurant - High Turnover $68"82 Per seat Restaurant -Que ly Low Tumover $56,08 Per seat Retail 50,000 Sq. Ft. or Less $624.55 Per 1,000 sq. ft" Retail 50,001-100,000 Sq. Ft, 5670.44 $642 01 Per 1,000 sq. ft. Reil 10,0-01-I90SID45q Ft. $596.51 CSF`W21- Per t,BBQ S*It Retwl 150,001-200,000 Sq" FL 572632 5,717,70 Per 1,000 sq. ft. Rcuul 200,001-400,000 Sq. Ft. %637-30 5610.69 Per 1,000 sq. ft. Retail 400,001-600,000 Sq. FL 5650853$ 3 7,Q Per 1,000 sq. ft. Retail 600,001-1,000,000 Sq. Ft. $63685 5431 57 Per 1,000 sq. ft. Retail >1,000,000 Sq. Ft. $S32.781545.45 Per 1,000 sq, ft Retail -Specialty $430,82 Per 1,000 sq. ft. School- Elementary(Private) $15.29 Per Student School- Middle (Private) $17.84 Per Student School- High School (Private) 520.39 Per Student Supermarket $522,59 Per 1,000 sq. ft. 'Fire Store $341.59 Per Service Bay Warehouse 73.07 Per 1000 sq, ft ( nd t I ineAlaxt is added; &ruek4reugh text is deleted Page 22 of 24 ER i�M APPENDIX A - SCHEDULE FOUR CORRECTIONAL FACILITIES (JAIL) IMPACT FEE RATE SCHEDULE Phase 2.. Effective Feb s� May Il, 2015 Impact Fee Land Use Category Rate Residential Assisted Living Facility ;26443 $219.22 Per Dvcllmg Unit Condom.,,ahouse (1-2 Stones) $245 32 Per Dwelling Unit High -Rise Condominium(3+Stories) $245.32 Per Dwelling Unit Mobile Hom,/RV tie -down ;332-.}g $375.81 Per Dtvvllmg Unit/Siic Multi -Family $216,61 Per Dwelling Unit Multi -Family - More than 10 Stories $216.61 Per Dwc '-A—un-11 Retirement Community ,229.66 Per Dwelling Unit Single Family Less than 4,5C04,000 sq. ft, $443.23 47237 Per Dwelling Unit —F,5&'3Fe-b,494xt-R. 54&3-30 Per Dw Rmll-umo -2;500 4,000 sq. ft or larger $535,189 54023 Per Dwelling Unit Non -Residential Auto Sales (Luxury) $268,81 Per 1,000 sq. a. Auto Sales (New/Uscd) $383.64 Per 1,000 sq. ft. Bank/Saviags', Drive -In $595.03 Per 1,000 sq. 0, Bank/Savings; Walk -In $581.99 Per 1,000 sq, ft, Business Park $25054 Per 1,000 sq, A. Car Wash -Self-Service &ISS -5O 227.05 Per Service Bay Car Wash - Automated $419.42 $459.32 Per ],GOO sq. ft. Church $1-45.3 7.83 Per 4 -,s}00 -,q -R: Lest College/University (Private) <7,501 $25.49$26.10 Per Student ,7,500 SP441$ 827 Per Student Convenience Stare (24 hours) SI- ,394,43 11.4275 Per 1,000 sq, ft. Convenience Store _'Guopumpir .�v Per Fu3-Position- 4 or less Fuel Positions $1,135.26 Per Fuel Position 5-6 Fuel Positions 5965.63 Per Fuel Position 7 - 9 Fuel Positions 5858.62 Per Fucl Position 9 - 10 Fuel Positions $76728 Per Fuel Position I I - 12 Fuel Positions $717.70 Per Fucl Position 13 or more Fucl Positions 5675.94 Per Fuel Position Dame Studio/Gyms $579.38 Per 1,000 sq. ft. Day Care S43.7-5$130.5 Per Student Furniture Store 5f447 $62.64 Per 1,000 sq. ft. Gasoline smice Station 5498.47 Per Fuel Position r derima, text is added, gtrm,e ough text is deleted Page 23 or 24 DRAFT Impact Fee Land Use Category Rate Noo.Realdeatial (Cont'd) Golf Course $4;933.70 $5 073.45 Per I& Holes GulfCourse- Bundled $1,521.51 Per lB Holes Home Improvement Store £43176 $472.37 Per 1,000 sq.1 Hospital 5357.54 Per 1,000 sq. ft. Hotel $201,39 $20.77 Per Room industrial - General Light $17590 $180.08 Per 1,000 sq. ft, Manufacturing $130.49 Per 1,000 sq, R. Marina W..434S M Per Barth Mini -Warehouse $15.66 Per 1,000 sq. ft. Motcl 5191:19 ,51213.24 Per Room Movie Theater $ 524.-04 $i_„5,6AM Per Scrcen Nursing Home $+83:54 $2L4.L8 Per Bed Office 6,000 sq. ft. or Ins 5260.98 Per 1,000 sq, R. Office 6,001 -100,000 sq. ft. $310.57 Per 1,000 sq. A. Office 100,001-200,000 sq. ft. $263.59 Per 1,000 sq, ft, Office 200,001-400,000 sq, ft. $221.83 Per 1,000 sq. A, Office Greater than 400,000 sq. ft. $200.95 Per 1,000 sq. ft. OtFce- Medical greater than 10,000 sq. ft. $433.23 Per 1,000 sq. ft Office - Medical 10,000 sq. ft. or less $297.52 Per 1,000 sq, ft. PharmacyfDrug Stare $492.0 $.511 52 Per 1,000 sq. A. Quick Lube 9295:71 $302.74 Per Service Bay RV Park $130.49 Per Site Restaurant- Fast Food w(Drivc-in $2,296:65 L2.322.7 Per 1,000 sq. ft. Restaurant - High Turnover $68$2 120A Par seal Restaurant - Low Turnover $56.08 $67,_,42 Per scat Retail 50;000 6 000 Sq. Ft. or Less $621.53 $§39.40 Per 1,000 sq. ft. Retail 6.001-25 000 Sq, Ft. $629,4 Per 1,000q Fl Retail 25.00 1-50QQ $639.40 Per 1,000 so. A. Retail 50,00 6100,000 Sq. Ft. $642.01 Per 1,000 sq. A. Retail 100-,,001-t50,000 Sq. Ft. $587.21 Per 1,000 sq. ft Retail 150,001-200,000 Sq. Ft. $717.70 Per 1,000 sq. ft Retail 200,001400,000 Sq. Ft. $610.69 Per 1,000 sq. A. Retail 400,001-600,000 Sq. Ft, $636.79 Per 1,000 sq. ft. Retail 600,001-1,000,000 Sq. F4 $63157 Per 1,000 sq. ft. Rcmd >1,000,000 Sq. Ft $545,45 Par 1,000 sq. ft. Retail - Specialty $430,825441.06 Per 1,000 sq. A. School- Elementary(Private) 34329 $1566 Per Student School- Middle (Private) W.84$1827 Per Student School- High School (Private) $2439 $20.88 Per Student Supermarket $52139 5525 01 Per 1,000 sq. ft. Tire Store $341,39 $349,71 Per Scrvica Bay Warchooc 73.07 Per 1,000 sq, ft. Undr` lined tcm is added; &ruck-Ehteu3h text is delated Page 24 of 24 DRAFT APPENDIX C EXISTING AND PROPOSED WATER AND WASTEWATER IMPACT FEE SCHEDULE IN COUNTY FORMAT DRAFT Appendix C Cugies Cmmtywnlerscecz District Water mawesteeater Tmpacc Fee study d PrammedW l WastewaterS' S a Connote Farmnt RESIDENTIAL INDIVIDUALLY METERED IJNNGSPACE(SO.FTJ ERCFador lawman BASIS OFFEE METER SIZE WATERIMPACTFEE WATERIMPACTFEE WASTEWATER WASTEWATER 30 Selweuacoos.rnsa ALLOCATION 50 1.6] 1-112" IMPACTFEE IMPACTFEE 21 EpSTING PROPOSED EMITTING PROPOSED OT04,9" 1,W For ERG tneetlet l ERCT 3I<" ser. 5?56] Y¢S15 S27m turanO.mr and Tacerl 116.67 50000RMORE Per ERC(Lasedan POF Vabee(flelererie Meter ERC-V41LEai3,¢W� ERG VALUE Z S;552 so L, 52]ot 1Ruonemerveml.r Vann minlmumvelued lj Pormula) gee Noes) (mRdwnrYaai2404) partlmum value 63, 562) Meter also demented by ureteral term. value connected b me meter and sodium, app11mbla provision in me cement edition of the Flenda Norman, Code. Referenne the Meter Merer Six No. swi ng Form. ERC eiIh ADF Formula Man AOF b in Gallons Per Minute (GPM) Men uae Ne formula ((AUF8010N+1 RESIDENTIAL MASTER METERED LIVING SPACE(SO.FTJ ERC Cmrvr�hnr RC BASIS OF FEE METER SIZE WATERIMPACTFEE WASTEWATERIMPACTFEE R een W ALLOCATION EXISTING PROPOSED EXISTING PROPOSED OTO]W 0.33 PER UNIT Per GPMor Englnaervf egg $645 iMN 5691 Rewrd TSi TO LWO Set PER UNIT Per GPMor Enynaeror Wyg $1,716 IN M. 51,609 Record 1,5010R MORE 1.W PER UNIT Fer GPMorrdalnaerd ypppg $ZMM 52515 $2701 Retard Mera d.d.tarmmoul by the Wal brute valu mmuclad to Me meter e@tl applying applicahle pmvialon in to. rumem edit.nol Me Fl0nd0 Plumbing Code. Reference the Meter M"Nustze Na(e Ginn, Fern. NON-RESIDENTIAL CUSTOMER TYPE ERC ISwx.ImRea'eemA RASISOFFEE MEIERSIZE(1f WATERIMPACTFEE WASTEVIATER IMPACT FEE cse ed.N.01 ALLOCATION EXISTING PROPOSED EXISTING PROPOSED NcnRnidentlel 1.0o PER METUN.MU 1. -a. $2,563 52,515 S?701 NemRexidential 1.6] PER METER D- 1" "Isl IN.Va 51.2W St510 Mov, 'Mntii 333 PHt METHi&ZE t-1iC 5MA5G 58.531'. IiIWL SOM", Ne, Reald.mal 5.33 PERMETER.]. T W,B89 $13,655 5W.406 $14,396 NonRealdentiel Is'. PERMEUR51ZE 3" 53B,Nan 536,430 557,, Saudis Nor-Rsedenfial 13.33 PER MENER SIZE 4, i56.CG0 $65,391 551,525 5900N Non-Raltlarmal N&S, PERMETERSIZE T 5151544 $17OSO6 5167&15 5180,075 Non-Rmltlential 11667 PERM...[ZE B' I'mI0 E2ma.. asul e5 $315,125 Meteraae determined by Me total picture value compred to Me melerentl epplYing@PPbaeble provlelon In the mmm( edition el Me Florida Plumbing Cede. Rebrum eMe Meter Merer Slza NON STsm, Form. Im [t] Based on the rated capacities per technical e,vorkaeons of meters used by Me County. [2] Reflects rated hydraulic capsdty of meta, deoldad by 30 gallons per minute based on Me mted capadty ofsurallest meter also. ERC Factors by Meter Size for Non Residential Customers Rated Capedty ERC Meter Slze (gallons Per minurl IF Facto, 121 314" 30 1.00 1" 50 1.6] 1-112" 100 3.33 21 160 5,33 3" 450 15.00 4" 1,000 33.33 6" 2,000 66.67 6" 3,500 116.67 [t] Based on the rated capacities per technical e,vorkaeons of meters used by Me County. [2] Reflects rated hydraulic capsdty of meta, deoldad by 30 gallons per minute based on Me mted capadty ofsurallest meter also.