Agenda 01/24/2017 Item #11A01/24/2017
EXECUTIVE SUMMARY
Recommendation to award bid number 16-6694, “Heritage Bay Master Pump Station,” to Douglas
N. Higgins, Inc., in the amount of $1,681,760 under Master Pump Station Technical Support
Project Number 70050.
OBJECTIVE: To maintain reliable and sustainable wastewater service by constructing Master Pump Station
(MPS) 167.00 in the Heritage Bay PUD.
CONSIDERATIONS: The proposed scope of work under Project Number 70050, “Master Pump Station
Technical Support,” is consistent with the Capital Improvement Program (CIP) contained in the 2014 Water,
Wastewater, Irrigation Quality Water, and Bulk Potable Water Master Plan/CIP Plan approved by the Board of
County Commissioners (Board) on November 10, 2015, as Agenda Item 9C, Appendix III of the 2015
AUIR/CIE. Funding is available in, and is consistent with, the FY2017 CIP Budget.
The Heritage Bay MPS was originally included in the 2008 Wastewater Master Plan. As growth decelerated
shortly thereafter, implementation was deferred until now. The project includes the construction of a new
wastewater master pump station near the intersection of Immokalee Road and CR‐951. The site is located
approximately 800 feet north of the intersection within a 7.7 acre tract of land owned by Collier County as
shown in Attachment 1. The site is adjacent to the newly constructed NCH Healthcare Northeast facility.
Coordination with NCH Healthcare was performed for the planning and design of the Heritage Bay MPS site.
This MPS will serve as a wastewater booster pump station for the Heritage Bay PUD, current and future
developments along CR-951, and from east of CR‐951 along Immokalee Road. The initial design for the MPS
will be to pump wastewater west to existing master pump stations then to the North County Water
Reclamation Facility. The Heritage Bay MPS will also provide the flexibility to pump wastewater to a future
water reclamation facility located in the northeast.
This project benefits approximately 14,000 current customers by increasing the capacity and reliability of the
wastewater pumping system. Future customers in the current and future service areas are also benefited by
development of the site and construction of the MPS.
PROCUREMENT ACTION: On September 27, 2016, the Procurement Services Division released notices
of Invitation to Bid No. 16-6694 to 1,669 vendors for the construction of Heritage Bay Master Pump Station.
Ninety-Six (96) solicitation packages were downloaded, and five (5) bids were received on November 2, 2016,
as shown below and on the attached Bid tabulation. The bids are summarized below.
VENDOR PROJECT COST
Douglas N. Higgins $1,681,760.00
Quality Enterprises $1,745,000.00
Mitchell & Stark $2,065,000.00
Jafer Construction $2,204,820.00
Haskins Inc. $2,216,425.00
Staff and the lead project design engineer, Stantec, determined that the lowest bid is fair and reasonable, and
recommend awarding the contract to Douglas N. Higgins, Inc. The bid is approximately 13 percent below the
design engineer’s $1,927,876 opinion of cost. The bid tabulation, analysis chart, engineer’s letter of
recommendation, and construction agreement are Attachments 2, 3, 4 and 5, respectively.
The bid specifications informed the bidders that there may be unforeseen conditions associated with the
project. The bid amount incorporates an allowance of $100,000 for owner-directed additional work including,
11.A
Packet Pg. 359
01/24/2017
but not limited to, unforeseen geologic conditions, and existing below ground utility conditions and locations.
The price for any additional work will be negotiated prior to commencement in accordance with the county’s
Procurement Ordinance and the terms of the agreement.
FISCAL IMPACT: Funding is available in, and is consistent with, the FY2017 Capital Budget approved by
the Board on September 22, 2016. The source of funding is the Wastewater User Fee Fund (414).
Using today’s dollars, the total cost to replace the equipment at the station is $1,681,760, with a life
expectancy of 20 years for a new pump station generating an approximate annualized capital cost of $84,000.
The operating budget impact of the completed project is reflected in the table below. The funding source will
be user fees.
Elements FY2017 FY2018* Cumulative
FY2018 - FY2038
Operating and Maintenance $24,800 $496,000
Capital Outlay $ 1,681,760
Total Operating Costs $24,800 $496,000
Cost Savings - -
Net Operating Effect $24,800 496,000
Operating costs reflect an estimate of the additional funds needed in the annual operating budget for each fiscal
year. The net result is a $24,800 estimated annual increase in operating costs.
LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for
Board approval.-SRT.
GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to
ensure the adequacy and availability of viable public facilities.
RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the
Collier County Water-Sewer District, awards bid number 16-6694 to Douglas N. Higgins, Inc., in the amount
of $1,681,760 for the “Heritage Bay Master Pump Station”; and, authorizes the Chair to sign the attached
agreement.
Prepared By: Wayne M. Karlovich, Senior Project Manager, Public Utilities Engineering and Project
Management Division
ATTACHMENT(S)
1. Attachment 1 - Site Location Map (PDF)
2. Attachment 2 - 16-6694 Bid Tabulation (PDF)
3. Attachment 3 - EPMD Bid Analysis (PDF)
4. Attachment 4 - Engineer's Recommendation Letter (PDF)
5. [Linked] Attachment 5 - 16-6694 Higgins_Contract CAO (PDF)
11.A
Packet Pg. 360
01/24/2017
COLLIER COUNTY
Board of County Commissioners
Item Number: 11.A
Item Summary: Recommendation to award bid number 16-6694, “Heritage Bay Master Pump
Station,” to Douglas N. Higgins, Inc., in the amount of $1,681,760 under Master Pump Station Technical
Support Project Number 70050. (George Yilmaz, Public Utilities Department Head)
Meeting Date: 01/24/2017
Prepared by:
Title: Project Manager, Senior – Public Utilities Planning and Project Management
Name: Wayne Karlovich
12/29/2016 1:14 PM
Submitted by:
Title: Division Director - Public Utilities Eng – Public Utilities Planning and Project Management
Name: Tom Chmelik
12/29/2016 1:14 PM
Approved By:
Review:
Wastewater Steve Nagy Additional Reviewer Completed 12/29/2016 9:43 PM
Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 12/30/2016 3:30 PM
Wastewater Beth Johnssen Additional Reviewer Completed 01/03/2017 12:57 PM
Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed 01/03/2017 3:16 PM
Public Utilities Planning and Project Management Craig Pajer Additional Reviewer Completed 01/03/2017 3:19 PM
Procurement Services Lissett DeLaRosa Level 1 Purchasing Gatekeeper Completed 01/04/2017 10:13 AM
Public Utilities Department Heather Bustos Level 1 Division Reviewer Completed 01/04/2017 3:40 PM
Procurement Services Sandra Herrera Additional Reviewer Completed 01/06/2017 5:06 PM
Procurement Services Swainson Hall Additional Reviewer Completed 01/09/2017 1:46 PM
Procurement Services Ted Coyman Additional Reviewer Completed 01/10/2017 8:24 AM
Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 01/11/2017 1:42 PM
County Attorney's Office Scott Teach Level 2 Attorney Review Completed 01/11/2017 2:10 PM
County Attorney's Office Jeffrey A. Klatzkow Level 3 County Attorney's Office Review Completed 01/11/2017 4:07 PM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 01/12/2017 4:00 PM
Office of Management and Budget Susan Usher Additional Reviewer Completed 01/13/2017 6:09 PM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 01/16/2017 9:57 AM
Board of County Commissioners MaryJo Brock Meeting Pending 01/24/2017 9:00 AM
11.A
Packet Pg. 361
Heritage Master
Pump StaƟon
Heritage Bay Commons
Tract G
AƩachment 1 ‐ LocaƟon Map
Heritage Bay Master Pump StaƟon
Public UƟliƟes Department
Engineering & Project Management Division
NCH Healthcare
11.A.1
Packet Pg. 362 Attachment: Attachment 1 - Site Location Map (2513 : Heritage Bay Master Pump Station Construction Contract)
Project Manager: Wayne Karlovich Notifications Sent: 1669
Procurement Strategist: Swainson Hall Downloaded: 96
Submittals: 5
BID
ITEM Basis of Payment
1 Lump Sum
2 Electrical Service Allowance T&M
3 T&M
4 T&M
E Verify
Florida Division of Corporations
Material Manufacturers
List of Major Subcontractors
Statement of Experience
Trench Safety Act
Substitute W-9
Bid Bond
Bidders Check List
Insurance Certificate
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Opened By: Swainson Hall, Procurement Strategist
Witnessed By: Kristofer Lopez, Procurement Strategist
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2,204,820.00$
Haskins Inc.
2,061,425.00$
15,000.00$
40,000.00$
100,000.00$
2,216,425.00$
Jafer Construction
Corp.
2,049,820.00$
15,000.00$
40,000.00$
100,000.00$
1,745,000.00$
Mitchell & Stark
Construction
1,910,000.00$
15,000.00$
40,000.00$
100,000.00$
2,065,000.00$
Quality Enterprises
USA, Inc.
1,590,000.00$
15,000.00$
40,000.00$
100,000.00$
Bid Tabulation
Collier County, Florida
16-6694 Heritage Bay Master Pump Station
Collier County Public Utilities Department PPMD Project # 70050.6
Access Management Allowance
TOTAL BID PRICE (TOTAL OF BID ITEMS 1, 2, 3 AND 4)
DESCRIPTION
Construct Heritage Bay Master Pumping Station
Owner Directed Allowance
1,681,760.00$
Douglas N.
Higgins, Inc.
1,526,760.00$
15,000.00$
40,000.00$
100,000.00$
11.A.2
Packet Pg. 363 Attachment: Attachment 2 - 16-6694 Bid Tabulation (2513 : Heritage Bay Master Pump Station
$0.00
$500,000.00
$1,000,000.00
$1,500,000.00
$2,000,000.00
$2,500,000.00
Eng Est D.N. Higgins Quality
Enterprises
Mitchell & Stark Jafer
Construction
Haskins
Bid Results of ITB 16-6694
(Heritage Bay Master Pump Station)
KEY:
Dashed Green-
AVERAGE BID
Dashed black-
+/-1 std dev
of avg bid
Dotted red-
+/-20% of eng
estimate for
horizontal
construction
11.A.3
Packet Pg. 364 Attachment: Attachment 3 - EPMD Bid Analysis [Revision 1] (2513 : Heritage Bay Master Pump Station
11.A.4
Packet Pg. 365 Attachment: Attachment 4 - Engineer's Recommendation Letter (2513 : Heritage Bay Master Pump Station Construction Contract)
1
Construction Services Agreement for Public Utilities: Revised 06132016
Heritage Bay Master Pump Station
COLLIER COUNTY BID NO. 16-6694
COLLIER COUNTY, FLORIDA
Swainson Hall, Procurement Strategist
Email: swainsonhall@colliergov.net
Telephone: (239) 252 - 8935
FAX: (239) 252 - 6334
Design Professional: Stantec
2
Construction Services Agreement for Public Utilities: Revised 06132016
TABLE OF CONTENTS
PUBLIC NOTICE ....................................................................................................................... 3
PART B - INSTRUCTIONS TO BIDDERS ................................................................................. 5
CONSTRUCTION BID ..............................................................................................................12
BID SCHEDULE .......................................................................................................................13
MATERIAL MANUFACTURERS ..............................................................................................14
LIST OF MAJOR SUBCONTRACTORS ..................................................................................15
STATEMENT OF EXPERIENCE OF BIDDER ..........................................................................16
TRENCH SAFETY ACT ............................................................................................................17
IMMIGRATION LAW AFFIDAVIT CERTIFICATION .................................................................18
COLLIER COUNTY SOLICITATIONS SUBSTITUTE W – 9 .....................................................19
BID BOND ................................................................................................................................23
BIDDERS CHECK LIST ...........................................................................................................25
CONSTRUCTION AGREEMENT..............................................................................................26
EXHIBIT A: PUBLIC PAYMENT BOND ...................................................................................33
EXHIBIT A: PUBLIC PERFORMANCE BOND .........................................................................36
EXHIBIT B: INSURANCE REQUIREMENTS............................................................................39
INSURANCE AND BONDING REQUIREMENTS .....................................................................41
EXHIBIT C:RELEASE AND AFFIDAVIT FORM .......................................................................43
EXHIBIT D: FORM OF CONTRACT APPLICATION FOR PAYMENT .....................................45
EXHIBIT E: CHANGE ORDER .................................................................................................46
EXHIBIT F: CERTIFICATE OF SUBSTANTIAL COMPLETION ...............................................47
EXHIBIT G: FINAL PAYMENT CHECKLIST ............................................................................49
EXHIBIT H: GENERAL TERMS AND CONDITIONS ................................................................51
EXHIBIT I: SUPPLEMENTAL TERMS AND CONDITIONS ......................................................80
EXHIBIT J: TECHNICAL SPECIFICATIONS ...........................................................................81
EXHIBIT K: PERMITS ..............................................................................................................82
EXHIBIT L: STANDARD DETAILS ..........................................................................................83
EXHIBIT M: PLANS AND SPECIFICATIONS ..........................................................................84
EXHIBIT N: CONTRACTOR’S KEY PERSONNEL ASSIGNED TO THE PROJECT ...............85
3
Construction Services Agreement for Public Utilities: Revised 06132016
PUBLIC NOTICE
INVITATION TO BID
COLLIER COUNTY, FLORIDA
Heritage Bay Master Pump Station
COUNTY BID NO. 16-6694
Separate sealed bids for the construction of Heritage Bay Master Pump Station, addressed to
Ms. Allison Kearns, Interim Director, Procurement Services Division, will be received at the
Collier County Government, Procurement Services Division, 3327 Tamiami Trail E, Naples, FL
34112, until 3:00 P.M. LOCAL TIME, on the 31st day of October 2016, at which time all bids will
be publicly opened and read aloud. Any bids received after the time and date specified will not
be accepted and shall be returned unopened to the Bidder.
A non-mandatory pre-bid conference shall be held at the Procurement Services Division,
Conference Room A, at 10 a.m. LOCAL TIME on the 12th day of October 2016, at which time
all prospective Bidders may have questions answered regarding the Bidding Documents for this
Project. All Bidders shall submit all questions via the OnLine Bidding System located at
colliergov.net\bid. All questions will be answered in the OnLine Bidding System. The Engineer’s
Estimate for this project is $1,900,000.00 Dollars.
Sealed envelopes containing bids shall be marked or endorsed, "Bid for Collier County
Government, Collier County, Heritage Bay Master Pump Station Bid No. 16-6694 and Bid Date
of October 31, 2016". No bid shall be considered unless it is made on an unaltered Bid form
which is included in the Bidding Documents. The Bid Schedule shall be removed from the
Bidding Documents prior to submittal.
One contract will be awarded for all Work. Bidding Documents may be examined on the Collier
County Procurement Services Division Online Bidding System website: www.colliergov.net/bid.
Copies of the Bidding Documents may be obtained only from the denoted website. Bidding
Documents obtained from sources other than the Collier County Procurement Services Division
website may not be accurate or current.
Each bid shall be accompanied by a certified or cashier’s check or a Bid Bond in an amount not
less than five percent (5%) of the total Bid to be retained as liquidated damages in the event the
Successful Bidder fails to execute the Agreement and file the required bonds and insurance
within ten (10) calendar days after the receipt of the Notice of Award. The Successful Bidder
acknowledges and agrees that it shall execute the Agreement in the form attached hereto and
incorporated herein.
The Successful Bidder shall be required to furnish the necessary Payment and Performance
Bonds, as prescribed in the General Conditions of the Contract Documents. All Bid Bonds,
Payment and Performance Bonds, Insurance Contracts and Certificates of Insurance shall be
either be executed by or countersigned by a licensed resident agent of the surety or insurance
company having its place of business in the State of Florida. Further, the said surety or
insurance company shall be duly licensed and qualified to do business in the State of Florida.
4
Construction Services Agreement for Public Utilities: Revised 06132016
Attorneys-in-fact that sign Bid Bonds or Payment and Performance Bonds must file with each
bond a certified and effective dated copy of their Power of Attorney.
In order to perform public work, the Successful Bidder shall, as applicable, hold or obtain such
contractor's and business licenses, certifications and registrations as required by State statutes
and County ordinances.
Before a contract will be awarded for the Work contemplated herein, the Owner shall conduct
such investigations as it deems necessary to determine the performance record and ability of
the apparent low Bidder to perform the size and type of work specified in the Bidding
Documents. Upon request, the Bidder shall submit such information as deemed necessary by
the Owner to evaluate the Bidder's qualifications.
The Successful Bidder shall be required to finally complete all Work within Three Hundred and
Sixty Five (365) calendar days from and after the Commencement Date specified in the Notice
to Proceed.
The Owner reserves the right to reject all Bids or any Bid not conforming to the intent and
purpose of the Bidding Documents, and to postpone the award of the contract for a period of
time which, however, shall not extend beyond one hundred twenty (120) days from the bid
opening date without the consent of the Successful Bidder.
Dated this 27th day of September 2016
BOARD OF COUNTY COMMISSIONERS
COLLIER COUNTY, FLORIDA
BY: /s/ Allison Kearns
Interim Director, Procurement Services Division
5
Construction Services Agreement for Public Utilities: Revised 06132016
PART B - INSTRUCTIONS TO BIDDERS
Section 1. Definitions
1.1 The term "Owner" used herein refers to the Board of County Commissioners, or its duly
authorized representative.
1.2 The term "Project Manager" used herein refers to the Owner's duly authorized
representative and shall mean the Division Administrator or Department Director, as applicable,
acting directly or through duly authorized representatives.
1.3 The term "Design Professional" refers to the licensed professional engineer or architect
who is in privity with the Owner for the purpose of designing and/or monitoring the construction
of the project. At the Owner’s discretion, any or all duties of the Design Professional referenced
in the Contract Documents may be assumed at any time by the Project Manager on behalf of
the Owner. Conversely, at the Owner’s discretion the Project Manager may formally assign any
of his/her duties specified in the Contract Documents to the Design Professional.
1.4 The term "Bidder" used herein means one who submits a bid directly to the Owner in
response to this solicitation.
1.5 The term "Successful Bidder" means the lowest qualified, responsible and responsive
Bidder who is awarded the contract by the Board of County Commissioners, on the basis of the
Owner's evaluation.
1.6 The term "Bidding Documents" includes the Legal Advertisement, these Instructions to
Bidders, the Bid Schedule and the Contract Documents as defined in the Agreement.
1.7 The term "Bid" shall mean a completed Bid Schedule, bound in the Bidding Documents,
properly signed, providing the Owner a proposed cost for providing the services required in the
Bidding Documents.
Section 2. Preparation of Bids
2.1 The Bids must be submitted on the standard form herein furnished by the Owner (pages
12 - 25 as bound in these Bidding Documents). By submitting a Bid, Bidder acknowledges and
agrees that it shall execute the Agreement in the form attached hereto and incorporated herein.
The Bidder shall complete the Bid in ink or by typewriter and shall sign the Bid correctly. Bid
Schedules submitted on disk/CD shall be accompanied by a hard copy of the completed Bid
Schedule which shall be signed and dated by the Bidder. The Bid may be rejected if it contains
any omission, alteration of form, conditional bid or irregularities of any kind. Bids must be
submitted in sealed envelopes, marked with the Bid Number, Project Name and Bid opening
Date and Time, and shall be addressed to the Collier County Government, Procurement
Services Division, 3327 Tamiami Trail E, Naples, FL 34112. If forwarded by mail, the sealed
envelope containing the Bid must be enclosed in another sealed envelope addressed as above.
Bids received at the location specified herein after the time specified for bid opening will be
returned to the bidder unopened and shall not be considered.
6
Construction Services Agreement for Public Utilities: Revised 06132016
Section 3. Bid Deposit Requirements
3.1 No Bid shall be considered or accepted unless at the time of Bid filing the same shall be
accompanied by a cashier’s check, a cash bond posted with the County Clerk, a certified check
payable to Owner on some bank or trust company located in the State of Florida insured by the
Federal Deposit Insurance Corporation, or Bid Bond, in an amount not less than 5% of the
bidder's maximum possible award (base bid plus all add alternates) (collectively referred to
herein as the "Bid Deposit"). The Bid Deposit shall be retained by Owner as liquidated damages
if the Successful Bidder fails to execute and deliver to Owner the unaltered Agreement, or fails
to deliver the required Performance and Payment Bonds or Certificates of Insurance, all within
ten (10) calendar days after receipt of the Notice of Award. Bid Bonds shall be executed by a
corporate surety licensed under the laws of the State of Florida to execute such bonds, with
conditions that the surety will, upon demand, forthwith make payment to Owner upon said bond.
Bid Deposits of the three (3) lowest Bidders shall be held until the Agreement has been
executed by the Successful Bidder and same has been delivered to Owner together with the
required bonds and insurance, after which all three (3) Bid Deposits shall be returned to the
respective Bidders. All other Bid Deposits shall be released within ten (10) working days of the
Bid Opening. No Bid including alternates, shall be withdrawn within one hundred and twenty
(120) days after the public opening thereof. If a Bid is not accepted within said time period it
shall be deemed rejected and the Bid Deposit shall be returned to Bidder. In the event that the
Owner awards the contract prior to the expiration of the one hundred and twenty (120) day
period without selecting any or all alternates, the Owner shall retain the right to subsequently
award to the Successful Bidder said alternates at a later time but no later than one hundred and
twenty (120) days from opening, unless otherwise agreed by the Procurement Director and the
Successful Bidder.
3.2 The Successful Bidder shall execute five (5) copies of the Agreement in the form
attached and deliver same to Owner within the time period noted above. The Owner shall
execute all copies and return one fully executed copy of the Agreement to Successful Bidder
within thirty (30) working days after receipt of the executed Agreement from Successful Bidder
unless any governmental agency having funding control over the Project requires additional
time, in which event the Owner shall have such additional time to execute the Agreement as
may be reasonably necessary.
Section 4. Right to Reject Bids
4.1 The Owner reserves the right to reject any and all Bids or to waive informalities and
negotiate with the apparent lowest, qualified Bidder to such extent as may be necessary for
budgetary reasons.
Section 5. Signing of Bids
5.1 Bids submitted by a corporation must be executed in the corporate name by the
president, a vice president, or duly authorized representative. The corporate address and state
of incorporation must be shown below the signature.
5.2 Bids by a partnership must be executed in the partnership name and signed by a
general partner whose title must appear under the signature and the official address of the
partnership must be shown below said signature.
7
Construction Services Agreement for Public Utilities: Revised 06132016
5.3 If Bidder is an individual, his or her signature shall be inscribed.
5.4 If signature is by an agent or other than an officer of corporation or general partner of
partnership, a properly notarized power of attorney must be submitted with the Bid.
5.5 All Bids shall have names typed or printed below all signatures.
5.6 All Bids shall state the Bidder's contractor license number.
5.7 Failure to follow the provisions of this section shall be grounds for rejecting the Bid as
irregular or unauthorized.
Section 6. Withdrawal of Bids
Any Bid may be withdrawn at any time prior to the hour fixed in the Legal Advertisement for the
opening of Bids, provided that the withdrawal is requested in writing, properly executed by the
Bidder and received by Owner prior to Bid Opening. The withdrawal of a Bid will not prejudice
the right of a Bidder to file a new Bid prior to the time specified for Bid opening.
Section 7. Late Bids
No Bid shall be accepted that fails to be submitted prior to the time specified in the Legal
Advertisement.
Section 8. Interpretation of Contract Documents
8.1 No interpretation of the meaning of the plans, specifications or other Bidding Documents
shall be made to a Bidder orally. Any such oral or other interpretations or clarifications shall be
without legal effect. All requests for interpretations or clarifications shall be in writing, addressed
to the Procurement Services Division, to be given consideration. All such requests for
interpretations or clarification must be received at least ten (10) calendar days prior to the Bid
opening date. Any and all such interpretations and supplemental instructions shall be in the
form of written addendum which, if issued, shall be sent by mail or fax to all known Bidders at
their respective addresses furnished for such purposes no later than three (3) working days
prior to the date fixed for the opening of Bids. Such written addenda shall be binding on Bidder
and shall become a part of the Bidding Documents.
8.2 It shall be the responsibility of each Bidder to ascertain, prior to submitting its Bid, that it
has received all addenda issued and it shall acknowledge same in its Bid.
8.3 As noted in the Legal Advertisement, attendance by all bidders at the Pre-Bid
Conference is non-mandatory. In instances where the Owner has deemed the pre-bid to be
mandatory, the Bidder's failure to attend the pre-bid conference shall result in the
rejection of his bid.
Section 9. Examination of Site and Contract Documents
9.1 By executing and submitting its Bid, each Bidder certifies that it has:
a. Examined all Bidding Documents thoroughly;
8
Construction Services Agreement for Public Utilities: Revised 06132016
b. Visited the site to become familiar with local conditions that may in any manner affect
performance of the Work;
c. Become familiar with all federal, state and local laws, ordinances, rules, and regulations
affecting performance of the Work; and
d. Correlated all of its observations with the requirements of Bidding documents.
No plea of ignorance of conditions or difficulties that may exist or conditions or difficulties that
may be encountered in the execution of the Work pursuant to these Bidding Documents as a
result of failure to make the necessary examinations and investigations shall be accepted as an
excuse for any failure or omission on the part of the Successful Bidder, nor shall they be
accepted as a basis for any claims whatsoever for extra compensation or for an extension of
time.
9.2 The Owner will make copies of surveys and reports performed in conjunction with this
Project available to any Bidder requesting them at cost; provided, however, the Owner does not
warrant or represent to any Bidder either the completeness or accuracy of any such surveys
and reports. Before submitting its Bid, each Bidder shall, at its own expense, make such
additional surveys and investigations as may be necessary to determine its Bid price for the
performance of the Work within the terms of the Bidding Documents. This provision shall be
subject to Section 2.3 of the General Conditions to the Agreement.
Section 10. Material Requirements
It is the intention of these Bidding Documents to identify standard materials. When space
is provided on the Bid Schedule, Bidders shall specify the materials which they propose to use
in the Project. The Owner may declare any Bid non-responsive or irregular if such materials are
not specifically named by Bidder.
Section 11. Bid Quantities
11.1 Quantities given in the Bid Schedule, while estimated from the best information
available, are approximate only. Payment for unit price items shall be based on the actual
number of units installed for the Work. Bids shall be compared on the basis of number of units
stated in the Bid Schedule as set forth in the Bidding Documents. Said unit prices shall be
multiplied by the bid quantities for the total Bid price. Any Bid not conforming to this requirement
may be rejected. Special attention to all Bidders is called to this provision, because if conditions
make it necessary or prudent to revise the unit quantities, the unit prices will be fixed for such
increased or decreased quantities. Compensation for such additive or subtractive changes in
the quantities shall be limited to the unit prices in the Bid. Subsequent to the issuance of a
notice to proceed, the Project Manager and the Successful Bidder shall have the discretion to
re-negotiate any unit price(s) where the actual quantity varies by more than 25% from the
estimate at the time of bid.
9
Construction Services Agreement for Public Utilities: Revised 06132016
11.2 Alternate Bid Pricing: In the event that alternate pricing is requested, it is an expressed
requirement of the bid invitation to provide pricing for all alternates as listed. The omission of a
response or a no-bid or lack of a submitted price may be the basis for the rejection of the
submitted bid response.
Section 12. Award of Contract
12.1 Any prospective bidder who desires to protest any aspect(s) or provision(s) of the bid
invitation (including the form of the bid documents or bid procedures) shall file their protest with
the Procurement Director prior to the time of the bid opening strictly in accordance with Owner’s
then current Procurement Ordinance.
12.2 Statement of Award: The Award of Contract shall be issued to the lowest, responsive
and qualified Bidder determined by the base bid, and any, or all, selected alternates, and the
Owner's investigations of the Bidder. In determining the lowest, responsive and qualified bidder,
the Owner shall consider the capability of the Bidder to perform the contract in a timely and
responsible manner. When the contract is awarded by Owner, such award shall be evidenced
by a written Notice of Award, signed by a procurement professional of the Owner’s Procurement
Services Division or his or her designee and delivered to the intended awardee or mailed to
awardee at the business address shown in the Bid.
12.3 Award recommendations will be posted outside the offices of the Procurement Services
Division generally on Wednesdays or Thursdays prior to the presentation to the Board of County
Commissioners. Award of Contract will be made by the Board of County Commissioners in
public session. Any actual or prospective bidder who desires to formally protest the
recommended contract award must file a notice of intent to protest with the Procurement
Director within two (2) calendar days (excluding weekends and holidays) of the date that the
recommended award is posted. Upon filing of said notice, the protesting party will have five (5)
days to file a formal protest, said protest to strictly comply with Owner’s then current
Procurement Ordinance. A copy of the Procurement Ordinance is available at
http://www.colliergov.net/Index.aspx?page=762.
12.4 For Bidders who may wish to receive copies of Bids after the Bid opening, The Owner
reserves the right to recover all costs associated with the printing and distribution of such
copies.
12.5 For Bidders who may wish to receive copies of Bids after the Bid opening, The Owner
reserves the right to recover all costs associated with the printing and distribution of such
copies.
12.6 Certificate of Authority to Conduct Business in the State of Florida
(Florida Statute 607.1501)
In order to be considered for award, firms must be registered with the Florida Department of
State Divisions of Corporations in accordance with the requirements of Florida Statute 607.1501
and provide a certificate of authority (www.sunbiz.org/search.html) prior to execution of a
contract. A copy of the document may be submitted with the solicitation response and the
document number shall be identified. Firms who do not provide the certificate of authority at the
time of response shall be required to provide same within five (5) days upon notification of
selection for award. If the firm cannot provide the document within the referenced timeframe, the
County reserves the right to award to another firm.
10
Construction Services Agreement for Public Utilities: Revised 06132016
Section 13. Sales Tax
13.1 The Successful Bidder acknowledges and agrees that Owner may utilize a sales tax
savings program and the Successful Bidder agrees to fully comply, at no additional cost to
Owner, with such sales tax savings program implemented by the Owner as set forth in the
Agreement and in accordance with Owner’s policies and procedures.
Section 14. Exclusion of County Permits in Bid Prices
14.1 To ensure compliance with Section 218.80, F.S., otherwise known as “The Public Bid
Disclosure Act”, Collier County will pay the Contractor for all Collier County permits and fees
applicable to the Project, including license fees, permit fees, impact fees or inspection fees
applicable to this Work through an internal budget transfer(s). Hence, bidders shall not include
these permit/fee amounts in their bid offer. However, the Successful Bidder shall retain the
responsibility to initiate and complete all necessary and appropriate actions to obtain the
required permits other than payment for the items identified in this section. Owner will not be
obligated to pay for any permits obtained by Subcontractors.
14.2 The Successful Bidder shall be responsible for procuring and paying for all necessary
permits not issued by Collier County pursuant to the prosecution of the work.
Section 15. Use of Subcontractors
15.1 To ensure the Work contemplated by the Contract Documents is performed in a
professional and timely manner, all Subcontractors performing any portion of the work on this
Project shall be “qualified” as defined in Collier County Ordinance 2013.69, meaning a person or
entity that has the capability in all respects to perform fully the Agreement requirements and has
the integrity and reliability to assure good faith performance. A Subcontractor’s disqualification
from bidding by the Owner, or other public contracting entity within the past twelve months shall
be considered by the Owner when determining whether the Subcontractors are “qualified.”
15.2 The Owner may consider the past performance and capability of a Subcontractor when
evaluating the ability, capacity and skill of the Bidder and its ability to perform the Agreement
within the time required. Owner reserves the right to disqualify a Bidder who includes
Subcontractors in its bid offer which are not “qualified” or who do not meet the legal
requirements applicable to and necessitated by this Agreement.
15.3 The Owner may reject all bids proposing the use of any subcontractors who have been
disqualified from submitting bids to the Owner, disqualified or de-certified for bidding purposes
by any public contracting entity, or who has exhibited an inability to perform through any other
means.
15.4 Notwithstanding anything in the Contract Documents to the contrary, the Bidders shall
identify the subcontractor(s) it intends to use for the categories of work as set forth in the List of
Subcontracts attached hereto, said list to be submitted with its bid. Bidders acknowledge and
agree that the subcontractors identified on the list is not a complete list of the subcontractors to
be used on the Project, but rather only the major subcontractors for each category of Work as
established by Owner. Bidders further acknowledge that once there is an Award of Contract,
11
Construction Services Agreement for Public Utilities: Revised 06132016
the Successful Bidder shall identify, subject to Owner’s review and approval, all the
subcontractors it intends to use on the Project. Once approved by Owner, no subcontractor
shall be removed or replaced without Owner’s prior written approval.
Section 16. Prohibition of Gifts
No organization or individual shall offer or give, either directly or indirectly, any favor, gift, loan,
fee, service or other item of value to any County employee, as set forth in Chapter 112, Part III,
Florida Statutes, Collier County Ethics Ordinance No. 2004-05, and County Administrative
Procedure 5311. Violation of this provision may result in one or more of the following
consequences: a. Prohibition by the individual, firm, and/or any employee of the firm from
contact with County staff for a specified period of time; b. Prohibition by the individual and/or
firm from doing business with the County for a specified period of time, including but not limited
to: submitting bids, RFP, and/or quotes; and, c. immediate termination of any contract held by
the individual and/or firm for cause.
Section 17. Lobbying
All firms are hereby placed on NOTICE that the Board of County Commissioners does
not wish to be lobbied, either individually or collectively about a project for which a firm
has submitted a response.
Firms and their agents are not to contact members of the County Commission for such
purposes as meeting or introduction, luncheons, dinners, etc. During the process, from
solicitation closing to final Board approval, no firm or their agent shall contact any other
employee of Collier County in reference to this solicitation, or the vendor’s response, with the
exception of the Procurement Director or his designee(s). Failure to abide by this provision may
serve as grounds for disqualification for award of this contract to the firm.
Section 18. Public Entity Crimes
By its submitting a Bid, Bidder acknowledges and agrees to and represents it is in compliance
with the terms of Section 287.133(2)(a) of the Florida Statutes which read as follows:
"A person or affiliate who has been placed on the convicted
vendor list following a conviction for a public entity crime may not
submit a bid, proposal, or reply on a contract to provide any goods
or services to a public entity; may not submit a bid, proposal, or
reply on a contract with a public entity for the construction or
repair of a public building or public work; may not submit bids,
proposals, or replies on leases of real property to a public entity’;
may not be awarded or perform work as a contractor, supplier,
subcontractor, or consultant under a contract with any public
entity; and may not transact business with any public entity in
excess of the threshold amount provided in s. 287.017 for
CATEGORY TWO for a period of 36 months from the date of
being placed on the convicted vendor list.”