EXECUTIVE SUMMARY
Recommendation to approve a$375,457.00 work order under Request For Quotation 14-6213-75 to
Douglas N. Higgins, Inc., for the "Sludge Thickener Refurbishing Project," under the South
County Regional Water Treatment Plant,Lime Softening Technical Support Project 70109.
OBJECTIVE: Maintain a reliable treatment process that meets potable water demand and maintains
compliance with all regulatory requirements at the South County Regional Water Treatment Plant
(SCRWTP), which serves customers throughout the Collier County water service area, by refurbishing
the Sludge Thickener mechanism.
CONSIDERATIONS: The proposed scope of work under Project 70109, "South County Regional
Water Treatment Plant Lime Softening Technical Support Project" is consistent with the Capital
Improvement Program (CIP) contained in the 2014 Water, Wastewater, Irrigation Quality Water, and
Bulk Potable Water Master Plan/CIP Plan approved by the Board of County Commissioners (Board) on
November 10,2015,Agenda Item 9C,as Appendix III of the 2015 AUIR/CIE. Funding for project 70109
is available in,and is consistent with,the FY2017 CIP Budget.
The SCRWTP,built in 1984,was designed to produce 12 million gallons per day(MGD) of potable water
utilizing a lime softening treatment process. The process includes a 40 foot diameter gravity sludge
thickener tank with a bridge supported rotating mechanism that was fabricated and installed in 1986. The
mechanism is approximately 30 years old and is in need of either refurbishing or replacement. The
thickener mechanism is experiencing structural and other failures related to the mechanical collector arms
and torque tube, and to a lesser extent the drive and a lift mechanism intended to raise the rotating parts
under conditions of heavy loading and high torque. The mechanical collector arms and torque tube are
being replaced under this work order. The drive and lift mechanism are being rebuilt at a factory
authorized service center for a complete refurbishing of these components.
The additional cost to procure and install a new thickener mechanism in lieu of a refurbished unit was
estimated as $125,000. The mechanism, designed for a long life span, is generally robust and can be
refurbished. The consultant reviewed the cost for a new drive and lift mechanism, determined that it was
more economical to refurbish these components to a near new condition, and made the recommendation
to refurbish the drive and lift mechanism. In addition to refurbishing the thickener mechanism, the
project also includes repainting the support bridge, and replacing electrical components, area lighting and
adding lightning protection. The mechanism was manufactured by Eimco, which was then purchased by
the Ovivo Corporation. The specifications require the contractor to return the drive and lift mechanism to
Ovivo's Tampa service center for factory authorized refurbishing. The existing drive is not obsolete and
the manufacturer anticipates that the refurbished unit will have a service life that is nearly as long as a
new drive. Ovivo provides a one year warranty on parts and workmanship, which is the same for a new or
refurbished drive.
Request for Quotation 14-6214-75, "SCRWTP Sludge Thickener Refurbishing Project," was posted
August 23, 2016, and distributed to the four vendors approved for treatment facilities under the Fixed-
Term Underground Utilities Contract 14-6214 via the county's electronic quote process. All four vendors
submitted quotations by the September 9,2016,deadline. The quotations are summarized below:
Packet Pg. 1059
16.C.3
12/13/2016
VENDOR QUOTE
Douglas N Higgins, Inc. $375,457.00
Quality Enterprises USA, Inc. $405,500.00
Haskins, Inc. $473,500.00
Mitchell& Stark Construction Co., Inc. $477,000.00
Staff and local engineering consultant, TKW Consulting Engineers, Inc., determined the lowest quote is
fair and reasonable, and recommend awarding the work order to Douglas N. Higgins, Inc. The Douglas
N. Higgins, Inc., quote is consistent with the project consultant's $375,000 opinion of probable cost. The
Procurement Services Division concluded the quote was competitive and representative of market
conditions. The quote summary, chart, engineer's letter of recommendation, and work order are
Attachments 1, 2, 3, and 4,respectively.
There may be unforeseen conditions associated with the project. The solicitation incorporated an
allowance of $20,000 that included, but was not limited to, additional repairs that were not identified
during the initial inspections, but may be discovered during construction. The price for any additional
work shall be negotiated prior to commencement in accordance with the county's Procurement Ordinance
and the terms of the agreement.
FISCAL IMPACT: Funding is available in, and is consistent with, the FY17 capital budget approved by
the Board on September 22, 2016. Funds are available in the Water User Fee Fund (412). The total
capital cost to implement this project is $375,457. This is a repair/replacement project; therefore,
operating costs are not expected to change.
GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan
standards to ensure the adequacy and availability of viable public facilities.
LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote
for Board approval. -SRT
RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of
the Collier County Water-Sewer District, approves a $375,457 work order under Request for Quotation
14-6213-75 to Douglas N. Higgins, Inc.; and authorizes the Chair to sign and execute the attached work
order.
Prepared By: Alicia Abbott,Project Manager,Public Utilities Engineering and Project Management
ATTACHMENT(S)
1. RFQ 14-6213-75 Quote Summary (PDF)
2. Chart (PDF)
3. Recommendation Letter(PDF)
4.Work Order(2) (PDF)
Packet Pg. 1060
16.C.3
12/13/2016
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.C.3
Item Summary: Recommendation to approve a $375,457.00 work order under Request For
Quotation 14-6213-75 to Douglas N. Higgins, Inc., for the "Sludge Thickener Refurbishing Project,"
under the South County Regional Water Treatment Plant, Lime Softening Technical Support Project
70109.
Meeting Date: 12/13/2016
Prepared by:
Title: Project Manager—Public Utilities Planning and Project Management
Name: Alicia Abbott
11/10/2016 5:13 PM
Submitted by:
Title: Division Director-Public Utilities Eng—Public Utilities Planning and Project Management
Name: Tom Chmelik
11/10/2016 5:13 PM
Approved By:
Review:
Procurement Services Lissett DeLaRosa Level 1 Purchasing Gatekeeper Completed 11/14/2016 9:00 AM
Public Utilities Planning and Project Management Tom Chmelik Additional Reviewer Completed
Procurement Services Ted Coyman Additional Reviewer Completed 11/14/2016 9:18 AM
Public Utilities Planning and Project Management Oscar Martinez Additional Reviewer Completed
Water Steve Messner Additional Reviewer Completed 11/14/2016 9:46 AM
Procurement Services Swainson Hall Additional Reviewer Completed 11/14/2016 9:56 AM
Public Utilities Operations Support Joseph Bellone Additional Reviewer Completed 11/14/2016 9:57 AM
Water Randy Lewis Additional Reviewer Completed 11/14/2016 10:38 AM
Procurement Services Brenda Brilhart Additional Reviewer Completed 11/14/2016 10:38 AM
Public Utilities Department Margie Hapke Additional Reviewer Completed 11/14/2016 11:00 AM
Public Utilities Department Heather Bustos Level 1 Division Reviewer Completed 11/14/2016 11:57 AM
Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 11/15/2016 4:40 PM
County Attorneys Office Scott Teach Level 2 Attorney Review Completed 11/16/2016 4:43 PM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 11/17/2016 9:46 AM
County Attorneys Office Jeffrey A.Klatzkow Level 3 County Attorney's Office Review Completed 11/17/2016 10:40 AM
Office of Management and Budget Susan Usher Additional Reviewer Completed 12/02/2016 10:20 AM
Packet Pg. 1061
16.C.3
12/13/2016
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 12/04/2016 12:27 PM
Board of County Commissioners MaryJo Brock Meeting Pending 12/13/2016 9:00 AM
Packet Pg.1062
ca )jaof 6uigsigan}aj aauacoiyi a6pniS d1Mt13S : LL£Z) AiewwnS a}onb 9L-£�Z9-tt6 ad2J :;uawyoe;;y c
el o
T
Co Co Co Co Co Co O O
CD O o 0 o O O o O 1:3).
T 1:5 a) Co Co co Co Co Co Co Co a
Co Co Co Co Co Co Co Co +",
-� Y c M L 6 W 6 t` 6 Y
Co N CoV
RI X EA ON E9 EA 69 E9 V- EA C
C4 w 69 o
o aCootS
Co0
O Coo CoO Co Co
o r`
s o O
;• . Co Co Co Co Co co Na
_ E Co Co Co Co Co Co 4.9-
0
0 0 0 o o o o
M Cl) Co wo
o o co
a 6s N E9 EA 699 EA
EA
oo Co Co Co Co Co Co
Co Co 0 Co 0 0 0 0
0 0 Co Co Co Co Co Co
a) Co Co Co co Co Co Co Co
a Co o Cl) Co Co Co Co co
C Co co Cl) I- O (`'i Co
w ^ ^ N N N Co N
CX. EA Ffl Efl EA V69 E9 0
W EA E9
Co
yo
C in
.1C Co Co Co Co Co Co M
y Co Co O O O O n
U) ..- co O O O O O
_ 'C co O O O O O W
0 Co Co Co O O O
Cl) Co Co I- O
`y M I- r N N N
0-. CA
6 69 EA EA 69
EA EA
Co Co Co Co Co Co Co Co
I- Co Co Co Co O O O O
Z Q - oO o o Co Co Co Co
N Co Co Co Co Co Co Co Co
J =.'O Co Co co Co ,c) Lc) Cn O
CO M M N (D CoCo
I- d K co Co 69 EA 69 P co 69 0
ZEn LL EA EA c
w 0c
E = :: Co Co o o o o ,ri
QCO c o 0 o O o 0 0
w w ...: Co Co Co Co Co Co et-
CC Co Co Co Co Co Coco
w
�- = C ��... (D M M N Co
w 0 �: N 69 CO 69 N
w w u' d C fA Efl ER Efl
F-
m
Q'
a
w--
Co Co Co Co Co Co Co Co
J Z co 0 0 0 0 o 0 0 0
o co Co N- Co
Y a) C.1 0 0 0) N N Co Co Co
Z
O C '6. CO N M M CO N Co
N 6 <t I- CD V (n O
3I a .E X E9 Co E9 EA 69 C) EA o
LU I- D)w EA 69
CC wa)
>- 0 _
▪ Q Co Co Co Co Co Co ICj
Z O O O O O O n
Z =
CoCo Co c9
O • ?Ln 0) N .- Nin EA
' Co N M M Co N
O 7. N O 'It I- 00 0 M O co N N EA
= Q.d E9 NEA EA E9 EA
1-
n n
O
CI) �.
H, : E,
3 d
Q 5
o 2co as a R
C1 I- ... (n
E
• cn co up Cl) Cl) Cl) 3 in E
p
Z - J - - - -I y
D C a) d
_ II II C E V
@ O -• a) J w .a d 0
> O O E L a) U Co m a)E '06 Co < 0 O 0 d
O c U a) N c c c, ` '@ Q c) O 0 M ca E N-
E a C a n o o U Co O - a s
o C O O O y
O ` c c a) w O Co O C m a) O C L C 0 Q Q O C4 J
F Y d E m o c n a CON /) U I-
O O- a) Cq C O a 0 U a) - J O C a) U =
- m o` c a o 0922c m e c O 2 O m a'
tx c - o o c � n y a y 3 ° a� a o ~ Z' 0 0 0
L7:' m E c 0 D a m m a) E c = EA y
co 0 E a) a c c 0 cn 6 o-0 3 = c a Z m w o U
0 c 3
Lis U m 0 m E a) E w° 0 u) E n ; U (�
0 a— E c a 0 `o _o m e y m m ti -up s v O c c >
-..• N co-) 6 Ei).a U C m C N U)O c C - C C T w O 0 Ca 3 O w m
w ,O m o o- m 0 0 a) y m -co 0 .a CO CC a) .- 0 U T.a
~ O • m ?� N N U > U 9 c o C (1.C. N U CO a) 6 0 an d
a) . C N "' O C N Q) m E _ a) U L O C U LT 'fl y
N O N r O a 0 a) � .`- 0 C E y 4) m N U O 0 c-76 y d-_ Cl)( Y c a,
0
a x v°�" Y y a - 0 - � c15 c
:fl0 n`) c 0 a U 0 n m .E c CO E m 2cca E o f N a) w
a o `) o > H .� CC m m aa) Li cca (a Li_ ti O E -00 Q S2 O 'S
W •
:O N CO V Co CO h-
1-
H Z
(aapao$aoM 6uiysigan}aN aaua�{olyl a6pnIS d1M2I3S : LL£Z) pago :;uawgoe;;y ,:t
0
U
cfl
,.-
0) 0....
v
fti
a )
GI ' 00
0 d 'O v O a.) +r-+ v
3 Q - 4 -O a N C c
.. of W C , 1 f> Y NN I_ .� N
.F+ C
Y ¢ +aCO o o + a 2
Y
co
�n
v
s
U
c
.c I I + v
N C
• H
I = I
I C
GJ I 2 ai
0 r0
M LA
0 t -
.. t -N; ,vim Oa
CZ 110
Qo
0
tea 4 � 0
H
U ! f f
t i i f i
Lrlt
i
M t
e--1
COI i t
LS) + N
Cr own
I
o 0 0 0 0 0 0 `n
0 o 0 0 0 0
t4 t4 t
I. 16.C.3.c
Ire
', November 1, 2016
Ffl*011e ,-V-
ti? Alicia Abbott
�� tukc
� Collier County Government
;,., �,rwti
� Public Utilities Planning &Project Management
• 3339 Tamiami Trail East, Suite 3037.
" � Naples, FL 34112 0
01,;:ii,-,I,'`,-,A1-4,,,.Y
RE: Award of RFQ 14-6213-75 SCRWTP Sludge Thickener Refurbishing
" ' ' '' '_, TKW Job No. 14904.05 u)
< :I-
X410.
� � Dear Ms. Abbott:
cu
• 'I"t'' « ' We have reviewed all four(4) quotations received for the SCRWTP Sludge Thickener
M . Refurbishing Project from the County's Fixed Term Underground Utilities Contractors. 0
Itstr
" car '--:''', Following is a list of the proposers and the total amount of each quotation:
OM7
• h; t .,1 , r Douglas N. Higgins, Inc. $375,457.00
4 '. Quality Enterprises USA... $405,500.00
Haskins, Inc. $473,500.00
Mitchell & Stark $477,000.00 et
en
- • The Engineer's Opinion of Probable Construction Cost for this project was $375,000. We have ti
' • reviewed Higgins quote tabulation and the amounts shown for each item appear reasonable and r)
in line with our expectations. On October 6, 2016 we did participate in a conference call with
'.. HiQ ins' representative and further confirmed their understanding of the scope of services 0"• "A 75
required. -'
a
4/11",= "tt, We believe Douglas N. Higgins, Inc. has the required experience and qualifications to perform
this work successfully. We recommend the SCRWTP Sludge Thickener Refurbishing Project
be awarded to Douglas N. Higgins, Inc.as the lowest responsive qualified bidder.
.'k:.;:6:r4fevft o
a
" tp
k x. Sincerely,
'' TKW CONSULTING ENGINEERS, INC. P
;,:. .-, al
al
.7'4
i d o•;tE q �
F,
Douglas H. Eckmann P.E., BCEE
"" Project Manager
�z
s,
A .,." Packet Pg. 1065
•# .,
16.C.3.d
WORK ORDER/PURCHASE ORDER
Contract 14-6213 "Underground Utility Contractors"
Contract Expiration Date: July 7,2018
This Work Order is for General Utility Contracting services for work known as:
Project Name: RFQ#14-6213-75 SCRWTP Sludge Thickener Refurbishing
Project No: 70109.1.2" a
L
0
The work is specified in the proposal dated September 9, 2016,which is attached hereto and made a `
part of this Work Order. In accordance with Terms and Conditions of the Agreement referenced °
above, Request for Quotation#14-6213-75,this Work Order/Purchase Order is assigned to: Douglas a,
N.Higgins,Inc. _
N
Scope of Work: As detailed in the attached proposal and the following: 6
m
ce
• Task I: Perform all Work as described in the Request for Quote (RFQ 14-6213-75), 6.
and as listed on the attached quote form. c
• Task II Allowance
:i=
Schedule of Work: Complete work within 180 days from the date of the Notice to Proceed which is a.)
accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the 73
expiration date of Agreement# 14-6213 will survive and remain subject to the terms and conditions c,/1
of that Agreement until the completion or termination of this Work Order. o_
Compensation: In accordance with the Agreement ref�erenced above,the County will compensate the v
Firm in accordance with following method(s): EgNegotiated Lump Sum (NLS) ELump Sum Plus
Reimbursable Costs (LS+RC) ®Tithe& Material (T&M) (established hourly rate-Schedule A)0
Cost Plus Fixed Fee (CPFF), (define which method will be used for which tasks) as provided in the N
attached proposal. `"
Task I: $355,457.00 LS" '- "'
Task II: $ 20,000:00 T&M -
Total $375,457.00 LS&T&M 02
PREPARED BY: 1\- \ - \(,_,
`o
Alicia Abbott,Project Manager Date u
Planning Project Management Department a
APPROVED BY: refr. " ii///6 y
Oscar Martinez,P.E., Pri' •.1 Project Manager Date
Planning&Project Mana_= ent Department
((# `1
\7
(E=1
v0.
Packet Pg. 1066
16.C.3.d
4
RFP#12135-6 7
APPROVED BY: Q ..e.J /(- /-Za IC,
Randy Lewis, CRWTP Manager Date
APPROVED BY: J 1 l i Irbil
eve essner, Water Director
APPROVED BY: (A ` ' 1 I( (tl!
Tom hmelik,P.E.,Director Date
Planning&Project Management Department
12
APPROVED BY: C---i dir lI I 46
Jo . J.ne,Uti ' les Operations Support Director Date °
/ /
a)APPROVED BY: dAft � f
�s a',,son Hall, Procurement Strategist ate
c
APPROVED BY: r _,._.�__._. 2 V....-----� iY-y/6 75
George Yilmaz,Public Utilities Administrator Date
a>
U
By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby
I--
discloses, that,to the best of their knowledge and belief, all relevant facts concerning past,present, or a
currently planned interest or activity (financial, contractual, organizational, or otherwise) which C3
relates to the proposed work; and bear on whether the Firm has a potential conflict have been fully
a
disclosed. 1-
ce
Additionally, the Firm agrees to notify the Procurement Director, in writing within 48 hours of N
learning of any actual or potential conflict of interest that arises during the Work Order and/or project r.-
duration.
duration. N
ACCEPTED BY: Douglas N.Higgins, Inc. F.
as
IIit '! ( , O
N me (Sign & Print Title o u ' cd-company Officer Date o
brew. bar- V
(Remainder of page inteitionally left blank)
U
asw
Q
Page 2 of 3
Packet Pg. 1067
16.C.3.d
RFP#14-6213-75
IN WITNESS WHEREOF,the parties hereto,have each,respectively,by an authorized person or
agent,have executed this Work Order on the date and year first written below.
A FTbST: BOARD OF COUNTY COMMISSIONERS a�
Dwight E.Brock, Clerk of Courts COLLIER COUNTY,FLORIDA o
O
By: By:
Donna Fiala,Chairman c'
Dated: n
(SEAL) .i2
cu
Name of Firm:Douglas N.Higgins,Inc. c
c
CD
-•— By711114*
• irs ++' ess S _nature --
o o as
1�V /iS lea TType/prin4.ignature and title v
TType/print witness namel c_O/!Y1 MA__ dicv-<:0,
U
4
Second Witness
N.
evUr LU.i u 1C r.M
TType/print witness name
N
65
Approved as to Form and Legality: o
Y
L
8
Assistant County Attorney
d
E
Print Name 5
Ot' i` ticlU
�v
Page 3 of 3
6fril
Packet Pg. 1068
16.C.3.d
Cor County
Administrative Services Department
Procurement Services Division
REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT
#14-6213"Annual Contract for Underground Utilities&General Contractors"
Date: August 23, 2016
From: Kristofer Lopez, Procurement Strategist
a)
239-252-8944,Telephone Number
239-252-6597, Fax Number 0
kristoferlopezna colliergov.net -
0
To: Potential Quoters o
Subject: RFQ 14-6213-75 SCRWTP Sludge Thickener Refurbishing N
As provided in the referenced contract, the Collier County Procurement Services Division is a
soliciting quotes for the referenced project.
L
d
RFQ Due Date: Wednesday,September 7, 2016 at 3:00 PM
August 29, 2016 2:00 PM
Pre-Quote Meeting: 3851 City Gate.Drive, Naples, FL 34117
Q&A Deadline: Monday,September 5,2016 at 5:00 PM m
( a)
Number of Days to Final Completion: 150 days to substantial +30 days final = 180 days total
Scope Provided Yesa.
Plans and Specs: Yes
Liquidated Damages: $900 per day
Payment&Performance Bonds If over$200,000.00 cn
I
Your quotation response for this project is due no later than the date and time specified above.We
will not accept any quotation responses later than the noted time and date. If your firm is unable to
respond electronically, your quotation must be received in the office of the Purchasing Department at
the above referenced address no later than the time and date specified. We look forward to your iv
participation in this request for information/quotation process. o
Douglas N. Higgins, Inc.
Firm's Complete Legal Name
239-774-3130/239-774-4266
Telephone Number/Fax Number a)
— c6
Vice President
Title
Brandy Bartolone ?/'
Print Name Date
C: Alicia Abbott/Project Manager
1
RFQ 14-6213-75
Packet Pg. 1069
16.C.3.d
COIL County Email: kristoferlopez@colliergov.net
Telephone: (239)252-8944
Administrative Services Division FAX:(239)252-2810
Purchasing
ADDENDUM#1
Memorandum
a)
Date: August 31, 2016 0
From: Kristofer Lopez, Procurement Strategist
as
To: Potential Proposers
N
Subject: Addendum#1 —RFQ 14-6213-75 SCRWTP Sludge Thickener Refurbishing
m
The following clarifications are issued as an addendum identifying the following changes for the
referenced solicitation:
U
Change 1:
Current Q/A Due Date-Monday, September 5, 2016 5:00 PM 3
Updated Q/A Due Date-Tuesday, September 6, 2016 5:00 PM r1
i—
Change 2:
U
rn
Current RFQ Due Date-Wednesday, September 7, 2016 3:00 PM
Updated RFQ Due Date—Friday, September 9, 2016 3:00 PM CNI
.0
I-
c: Alicia Abbott, Project Manager 0
1
Packet Pg. 1070
16.C.3.d
SOUTH COUNTY REGIONAL WATER TREATMENT PLANT
t1 SLUDGE THICKENER REFURBISHING
10/3/2016
Quote Tabulation
ITEMPRICE
NO ITEM DESCRIPTION UNITS QUANTITY per-Unit Extended
Mobilize on site, clean tank, remove
support bridge,demolition and removal of a)
1 existing equipment to be replaced,order LS 1 $32,654.00 $32,654.00
O
new long lead equipment items,transport
equipment to be refurbished to Vendor �S`o
Vendor replacement and refurbished a)
2 Thickener equipment in accordance with LS 1 $200,294.00 $200,294.00
Specification Section 055000, includingN
Vendor supplied control panel "
Repair access bridge, repaint,
3 reassemble grate decking and railing LS 1 $64,321.00 $64,321.00
system, install new fabricated equipment c
and refurbished equipment Y
Furnish and install new wiring conduit andc.)
1E
4 electrical equipment, including new area LS 1 $27,310.00 $27,310.00 f—
light fixtures a,
_a
Furnish and Install New Lightning
5 Protection System LS 1 $26,628.00 $26,628.00 F
Er
U
Clean-up, start-up and testing,
6 LS 1 $4,250.00 $4,250.00
manufacturer certification, demobilization
tV
SUBTOTAL= $355,457.00
N
7 Allowance for Owner directed work of T&M $20,000.00
Items 1-6
O
TOTAL QUOTE= $ 375,457.00
0
••
Q)
E
0
ti
Packet Pg. 1071
16.C.3.d
0 0 0 0 0 0 0 0
0 0 ❑ 0 0 0 0 0
o 0 0 o c o 0 0
.rm o 0 0o a o 0 0
0 0 0 0 0 0 0 0
0 0 0 0 m N .- U) N
.21 to NN 69 Vi 69 Ce -- 69 G
fq o
oO
O O O O O O
L 0 O 0 O O O t`A
et
V+ ~ O O O O O O N
O O O O O 0
t7 If) O 4) O
• m 609 N 69 V! N co co t9
,A
00 0 0 0 0 0 0
0 0 0 0 0 0 0 0
a o 0 o O o 0 o o L.
m o 0 0 0 0 0 0 o a)
v 0 o )D o 0 0 0 o
C O
v) - Ce N N N 0 N O 0
G Nf M IA M M C
C IA 69 M9
o Y
m o L
ca O
o O O O o o ti
m .. o 0 0 o O o a
T-c o ❑ o 0 0 o w
0 o U) 0 0 0 C
U) co" Or: o
W 0 h• N- N N N
4. to M 69 co co Ce N
, L.
O O
F O O O O O O O O 6.
Z N . 0 10 to O o O o O O to O O� to O
C. Ip O CDD m N a m N L
Z N W b9 •
69 6'f fA Vf fR co 69 G C
W = 0 a)
m )n Y
0 0 0 0 0 0 U
c 0 0 0 0 0 0
00 0 0 0 0 Ce L
In0 0 0 )Or) Ifo]CZ MH
_F c. co" co ni v CO a)
C wCeWw ' en C
0a
F
m
3 a .
J Z IW o 0 0 0 0 0 0 o CrV
Q UI c3 N m N O� N co I- O a
Z Y .� .='0 0 N c') 0 CO N a O F
O U 0 _ 'ryy N Oc7r V h• fDN a h O CL
{1) F N
a C,W 69 N 69 69 Ce 0 FA 0 ♦LLQ
X IV
,n .'- U)
Z O O O O O O n
O▪ CO ▪j 0CV C9 co co N N M
D oi cN) O co N N 69 N
'= Q 69 N 69 69 69
F 64
Cif
O i
W ti d
� - o "0
L-
Z .- LR 0
Oea
0- W w
a;, W I-
... m w
F, E m Z5 0
Jo E.
Z y Cl) Cr) Cl) Cl) N E
o m E C
u u c E E a)
> yi a Ti C -..- p) J W L m 0
m °m E L m 8 _ 'n = a' -2 C a 0 F- v 3
0 m m m w Woo E a , c a O o O o o n' U
c FL.
2, m a a s E a 1:5 - c -a o 5 co O a 0. y
O E ° o - W Loo c W d m c c) L 7 m -� - o .r
17. ,i0, . 2 .... N V O a C O) 'N f° Z F 0 m J '<
U m o° 5n c c° P E c-6 L 3 c 3 °: ° m 0 E c e m
C z C) $ E m aNC m C m ' a 7 a m O t C
H
+ am mEcoomm m ❑ YE j"C 3 U 2 mp avE Eaoone o- m 0 >aom 3mv m mymE N N Hrnc5 g- cmcolic c > m o q o Ym
— m W- amcmmO c8-5 -0cn w m E-° U i;13 j oa6 Em a, - W m ( L mv.N ° co ommmC cmEym OI W - =.E c3 _DC) m. C
NaWY mE cn Q
X m "° W mE • C G
c> " m CO ,...0, 2, 5c ` E m o f m N g.
2 uo o L ° j3 cc ma) m ti m mL a O E C < O
,..-
{{tt2FN Co v n Cl) ti
Packet Pg. 1072,