Backup Documents 09/27/2016 Item #16A 9 ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO 16 A 9
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNATURE
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
**NEW**ROUTING SLIP
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the Coun Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3. County Attorney Office County Attorney Office ,a71
' '
Ql
4. BCC Office Board of County —b71r->—\ c t\\l,
Commissioners v(- J
5. Minutes and Records Clerk of Court's Office
10 101 3'c()n
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above,may need to contact staff for additional or missing information.
Name of Primary Staff Robert Wiley ,rr Phone Number 252-2322
Contact/ Department Stormwater anagement /
Agenda Date Item was 9-27-16 Agenda Item Number 16.A.9
Approved by the BCC
Type of Document Original Interlocal Agreement Number of Original ca documenPconsisting
Attached Documents Attached of 9 pages���
PO number or account Recorded only after approved by City
number if document is Council and signed by City Mayor
to be recorded 325-172940-60142
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? j ` --Att .1 7\j'.�
2. Does the document need to be sent to another agency for additional signatures? Dyes, g C� e-
provide the Contact Information(Name;Agency;Address;Phone)on an attached sheet. ` r-,\p
3. Original document has been signed/initialed for legal sufficiency. (All documents to be te_h
signed by the Chairman,with the exception of most letters,must be reviewed and signed /ems
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/j
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain v
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on 9-27-16 (enter date)and all
changes made during the meeting have been incorporated in the attached document.
The County Attorney's Office has reviewed the changes,if applicable.
9. Initials of attorney verifying that the attached document is the version approved by the
BCC,all changes directed by the BCC have been made,and the document is ready fort s`"tete J
Chairman's signature.
1:Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revise .2 . ;Revised 11/30/12
1 6 A
9
MEMORANDUM
Date: October 17, 2016
To: Robert Wiley, Principal Project Manager
Engineering & Environmental Services
From: Teresa Cannon, Deputy Clerk
Board Minutes & Records Department
Re: Interlocal Agreement w/the City of Naples for West Goodlette-
Frank Road Area Joint Stormwater and Sewer Improvements
Attached are two (2) originals of the agreement referenced above, (Item #16A9)
adopted by the Board of County Commissioners on September 27, 2016.
Please forward to the City of Naples for additional signatures and return on fully
executed original back to our office for recording.
If you have any questions, please contact me at 252-8411.
Thank you.
Attachment
INSTR 5333522 OR 5332 PG 3607
RECORDED 11/10/205:1
16 321 PM PAGES 9
DWIGHT E. ROCK, CLERK OF THE CIRCUIT COURT
COLLIER COUNTY FLORIDA
REC$78.00
INTERLOCAL AGREEMENT
PROJECT: West Goodlette-Frank Road Area Joint Stormwater and Sanitary Sewer Improvements 1
6A 9
THIS INTERLOCAL AGREEMENT, made and entered into this,41 day o{_��rm� 016, by
and between Collier County a political subdivision of the State of Florida, (the "COUNTY") the City
of Naples, Florida, a Florida municipal corporation(the"CITY").
WITNESSETH
WHEREAS, the COUNTY has identified a need to undertake the design and construction of
roadside stormwater improvements on various streets located south of Pine Ridge Road between
Goodlette-Frank Road and US-41, hereinafter referred to as"AREA", to address recurring street and yard
flooding, and
WHEREAS, the CITY in 2006 developed a"Master Sewer Plan for the City's Unsewered Service
Areas", hereinafter referred to as"MSP", and
WHEREAS, the various streets within the AREA and identified as needing roadside stormwater
improvements are within the boundaries of the CITY's MSP, and
WHEREAS, the CITY owns certain potable water and wastewater utility systems (Utility) within,
adjacent to, and in the vicinity of the road easements and/or rights-of-way of the streets identified as
needing stormwater improvements, and
WHEREAS, the COUNTY and CITY are both aware of septic system problems experienced by
local residents during periods of intense or extended rainfall that resulted in temporary street and yard
flooding within the AREA, and
WHEREAS, the COUNTY and CITY have determined and mutually agree that it is economically
advantageous and in the best interest of the public to enter into this Agreement to undertake a joint project
(PROJECT) to construct roadside stormwater improvements and public wastewater collection system
facilities, and
WHEREAS, the COUNTY and CITY are both in agreement that the COUNTY will manage the
Project's design, permitting and construction phases, and
WHEREAS, the COUNTY and CITY are both in agreement that the COUNTY will be responsible
for funding the stormwater improvement cost portions of the Project and the CITY will be responsible for
funding the utility cost portions of the Project.
NOW, THEREFORE, in consideration of the above premises, and the mutual covenants, terms,
and provisions contained herein,the COUNTY and CITY agree as follows:
SECTION I: COUNTY'S RESPONSIBILITIES
1.0 The COUNTY will serve as project manager for the design, permitting and construction phases of
the PROJECT. The COUNTY's assigned staff project manager shall be under the supervision of
the COUNTY's contract manager as identified in Section 3.4 below.
16A9
1.1 The COUNTY shall maintain open communication with the CITY's assigned project manager and
provide periodic progress reports and documentation about the PROJECT as requested by the
CITY.
1.2 The COUNTY shall provide and perform comprehensive Utility-related design, construction and
construction administrative services to the CITY for the Utility portions of the PROJECT,rendered
jointly and concurrently with the COUNTY's design, construction and construction administrative
services for the stormwater portions of the PROJECT.
1.3 The following specific services, duties and responsibilities will be the obligation of the COUNTY
regarding the design coordination, construction, and contract administration of the Utility work on
behalf of the CITY.
A. The COUNTY's and CITY's assigned project managers shall maintain open communication
with eachother and provide periodic progress reports and documentation about the PROJECT
as requested by the COUNTY and CITY. Throughout the design, permitting and
construction phases of the PROJECT, both project managers shall mutually schedule periodic
progress meetings as deemed necessary.
B. The COUNTY shall prepare and release a Request for Proposal(RFP)for design engineering
services, in accordance with the COUNTY purchasing policies, that complies with the
Consultant's Competitive Negotiation Act (CCNA) as required by Section 287.055, Florida
Statutes. Preparation of the scope of work for the RFP will be a joint effort between
COUNTY and CITY wherein the main focus of the COUNTY's contribution will address the
stormwater and roadway design issues, and the main focus of the CITY's contribution will
address the Utility design issues. Upon review of all proposals received from interested
consulting engineering firms, the COUNTY shall present the recommendations of the RFP
Selection Committee(described in Section 3.5 below)to the Board of County Commissioners
(BCC) for ranking approval and authorization to enter into negotiations with the top ranked
firm. Upon successful contract scope and cost negotiation with an engineering consulting
firm, the BCC will vote whether to enter into design contract for the PROJECT. Before such
vote the City may determine whether it wishes to proceed further with the PROJECT. If not,
it shall notify the COUNTY, in which case the CITY will be responsible only for its portion
of cost to that point.
D. During the design portion of the PROJECT the COUNTY is responsible for providing
requested information to the consultant and timely reviews of draft plan sets. The
COUNTY's review will focus on the design of the stormwater and roadway portions of the
PROJECT, with only cursory review (primarily dealing with conflicts) provided for the
Utility portions of the PROJECT. The COUNTY will rely upon the CITY to provide the
COUNTY with timely detailed reviews and comments for the Utility portions of the
PROJECT.
E. The COUNTY will be responsible for conducting the public bid and award the construction
contract. Before such vote the City may determine whether it wishes to proceed further with
the PROJECT. If not, it shall notify the COUNTY, in which case the CITY will be
responsible only for its portion of cost to that point.
F. Funding for the construction of the stormwater and roadway portions of the designed and
permitted PROJECT will be provided by the COUNTY.
•
et. i /
G. The COUNTY is responsible to acquire all land rights (road rights-of-way and drainage
easements) needed to successfully construct the stormwater and roadway portions of the
PROJECT. These land rights shall be obtained prior to issuance of a Notice to Proceed letter
to the construction contractor(s).
H. Payments to contracted firms for completed and accepted work, including design and
permitting,will follow the procedures identified in the COUNTY's contract documents. The
CITY will make payments directly to the Utility contractor for the Utility portion of the
construction.
I. The COUNTY shall conduct a formal preconstruction conference prior to commencing with
the PROJECT. The COUNTY will provide the CITY notice of the preconstruction
conference at least five (5) working days prior to the conference. The CITY's assigned
project manager will attend this conference, and other CITY representatives may attend at the
CITY's discretion. A copy of the minutes of said conference shall be submitted to the
CITY's project manager.
J. The Utility work shall be coordinated with the CITY's project manager with respect to
keeping the CITY advised of technical, cost, and schedule impacts upon the Utility work.
K. The COUNTY shall confer with the CITY's project manager as deemed necessary by the
COUNTY in order to coordinate work stages between the Utility, stormwater, and roadway
improvements from a public interest view point.
L. Periodic Utility field measurements and quantity calculations shall be made by the COUNTY
of Utility work accomplished on an as-needed basis for processing of monthly progress
payments to the COUNTY's contractor. The CITY's project manager shall verify and
approve these measurements and calculations in writing prior to the COUNTY's issuance of
monthly progress payments to the contractor.
M. The COUNTY shall administer design changes, clarifications, supplements and other contract
amendments that may be necessary during the design and construction of the Utility
improvements. These contract directives to the consultant and contractor may be in the form
of plans, memoranda, reports, change orders, and supplemental agreements and shall be
subject to written approval by the CITY's project manager and/or contract authority.
The above notwithstanding, upon notification to CITY, the CITY herein authorizes the
COUNTY to prepare, execute, and implement minor change orders for contract amendments
necessitated by actual field conditions at the Utility project site so as not to delay the
contractor's performance and so as to meet the intent of the approved design for the Utility
improvements. Said change orders shall be issued by the COUNTY in compliance with
current County Purchasing Policy and Administrative procedures, either using existing
contract unit prices or negotiated unit prices for work adjustments within the physical limit of
the Utility work as shown in the construction plans. In no event shall the value of the total
change orders exceed the Utility allowance to be included in the BID approved by both the 1
COUNTY and CITY. Additional or extra work which exceeds the above change order
authority by COUNTY shall be submitted for prior review, approval and execution by the
CITY.
N. Upon completion of all Utility work, including work authorized under change orders and
supplemental agreements, the CITY and COUNTY shall conduct a joint final inspection of
6 11
the Utility work with the CITY's and COUNTY's project managers and/or inspectors and/or
record engineer prior to COUNTY's issuing final payment to the contractor.
O. COUNTY shall submit a final Certificate of Completion letter to the CITY along with an
appropriate number of plans detailing the Utility as constructed by the COUNTY's contractor
("As-built record drawings"); and, one-year warranty for utility work completed. The final
Certification of Completion shall be submitted by the COUNTY's engineer of record to the
FDEP and other local and state agencies that govern the Utility improvements.
P. All contracts entered into by the COUNTY for the design and/or construction of the Utility
facilities shall require the party contracting with the COUNTY to hold harmless, indemnify
and defend the CITY and COUNTY and its consultants, agents, officers and employees from
any and all claims, losses, penalties, fees,or any expense, damage, or liability incurred by any
of them, whether for personal injury, property damage, direct or consequential damages, or
economic loss arising directly or indirectly on account of or in connection with the work done
by the COUNTY's consultant or contractor pertaining to the design and construction of the
Utility, stormwater and/or roadway or by any person, firm or corporation to whom any
portion of the Utility, stormwater or roadway work is subcontracted by the COUNTY's
consultant or contractor.
Q. COUNTY shall take ownership and properly dispose of all removed materials.
SECTION II: CITY'S RESPONSIBILITY
2.0 The CITY shall provide and perform project support duties as defined below to ensure that
COUNTY is able to furnish design, construction and contract administration services to the mutual
satisfaction of the CITY and COUNTY, and other governing agencies that have jurisdictional
control over the Utility improvements.
2.1 The specific project support duties and responsibilities enumerated below shall be the obligation of
the CITY.
A. The CITY's Utilities Department Director will serve as the CITY's assigned contract
authority to be the point of contact for the COUNTY's contract manager as identified in
Section 3.4 below. The CITY's Utility Department Director shall designate in writing an
assigned CITY project manager to work with the COUNTY's assigned project manager in
typical day to day coordination of PROJECT design, permitting and construction. The
CITY's Utility Department Director shall assign in writing a Utility project coordinator (if
that person is someone different from the assigned project manager) for the purpose of
coordinating, resolving, and communicating construction issues at the field level with
COUNTY's project manager. The CITY's project manager and/or project coordinator shall
attend periodic construction progress meetings with and between the COUNTY and
contractor, subcontractors and utility companies with direct or indirect interest in the
provisions of the Interlocal Agreement.
B. The COUNTY's and CITY's assigned project managers shall maintain open communication
with each other and provide periodic progress reports and documentation about the
PROJECT as requested by the COUNTY and CITY. Throughout the design, permitting and
construction phases of the PROJECT, both project managers shall mutually schedule periodic
progress meetings as deemed necessary. The COUNTY shall provide the CITY written
Od
notice of all regularly scheduled progress meetings at least five (5) working days prior to the
meeting.
C. The CITY shall provide COUNTY with the specific Utility-related detailed information
needed for inclusion in preparation of the scope of services for the Request for Proposals I
(RFP)for the PROJECT design phase consultant selection process as identified in Section 3.5
below.
D. The CITY shall obtain all necessary land rights (rights-of-way, utility easements, temporary
construction easements, etc.) required for the construction, operation and maintenance of the
Utility facilities portion of the PROJECT. The land rights shall be obtained, recorded, and
made available to the COUNTY prior to the COUNTY's release of the construction bid
request.
E. Funding for the design and permitting of the Utility portions of the PROJECT shall be
provided by the CITY to the COUNTY. Reimbursement of COUNTY-incurred costs for the
design and permitting of Utility portions of the PROJECT will be made by the CITY to the
COUNTY within thirty (30) days of the Notice to Proceed letter to the construction
contractor. If for some reason the PROJECT is terminated and does not proceed through 1
completion of design, or permitting, or does not enter into construction, the CITY will
provide the reimbursement to the COUNTY within ninety (90) days of the date of
termination.
F. At the time of construction contract bid preparation, those Utility items identified for which
the CITY is financially responsible shall be subject to the CITY's review and approval by the
CITY's assigned project manager. The COUNTY will include the Utility work in the
PROJECT bid to arrive at the price for the CITY's actual construction Utility work. Prior to
the COUNTY's issuance of the Notice to Proceed letter to the construction contractor the
CITY shall provide a Purchase Order to the successful contractor for the CITY's portion of
the construction of the Utility improvements. Funding for additional approved cost increases
for Utility construction work (e.g. quantity changes, change orders, etc.) will be provided by
the CITY.
G. The CITY shall review the design documents, approve the Utility design, inspect the work as
necessary, and review and approve the "As-built record drawings" which will represent and
depict the Utility as constructed by the COUNTY's contractor.
H. During the design portion of the PROJECT the CITY is responsible for providing requested
information to the consultant and timely reviews of draft plan sets. The CITY's review will
focus on the design of the Utility portions of the PROJECT, with only cursory review
(primarily dealing with conflicts) provided for the stormwater and roadway portions of the
PROJECT. The CITY will provide the COUNTY with timely detailed reviews and
comments for the Utility portions of the PROJECT, so that the COUNTY can submit the
CITY's comments to the design consultant.
I The CITY is responsible for the development and implementation of a public relations
program for the PROJECT to address needed public support for the PROJECT. The CITY
will coordinate with the COUNTY the scheduling of any public meetings, workshops,
information distribution, etc. deemed viable and necessary to inform the affected public about
the planned stormwater and sewer facilities and the expectations they can have regarding
fiscal, physical, and timing impacts related to the PROJECT. The CITY shall provide the
0
1 6 A 9
COUNTY written notice of all public relations public meetings, workshops and information
distribution efforts at least five (5) working days prior to the meetings, workshops, or
information distribution.
J Monthly Utility field measurements and quantity calculations shall be made by the engineer
of record of Utility work accomplished for processing of monthly progress payments to the
COUNTY's contractor. The CITY's project manager shall verify and approve these
measurements and calculations in writing prior to the CITY's issuance of monthly progress
payments to the contractor.
K Upon completion of all Utility work, including work authorized under change orders and
supplemental agreements, the CITY and COUNTY shall conduct a joint final inspection of
the Utility work with the CITY's and COUNTY's project managers and/or inspectors and/or
engineer of record prior to CITY's issuing final payment to the contractor.
SECTION III: MUTUAL COVENANTS
3.0 The location of the PROJECT is within Area 4 and Area 5 of the "City of Naples Master Sewer
Plan for the City's Unsewered Service Areas" prepared by Johnson Engineering in September
2006. The specific streets under consideration for the PROJECT may include some or all of the
following streets:
• Hollygate Lane
• Frank Whiteman Blvd.
• Cooper Drive
• Illinois Drive
• Wisconsin Drive
• 10th Street North
• 12th Street North
• 14th Street North
• Ohio Drive
• High Point Circle
• Ridge Street
• Rosemary Lane
• Rosemary Court
3.1 The CITY shall not be responsible for construction means, methods, techniques, skills, sequences
or procedures of construction relating to Roadway or Stormwater improvements. The above
responsibilities during construction shall remain with the COUNTY'S contractor and/or the
contractor's subcontractors subject to the conditions and responsibilities set forth in this Interlocal
Agreement.
3.2 The CITY shall be responsible for providing review services and guidance to the COUNTY to
ensure that design and construction of the Utility components of the PROJECT comply with or
exceed the CITY's Utility design and construction minimum standards.
3.3 The CITY shall not be responsible to the COUNTY should the COUNTY fail to comply with the
Occupational Safety and Health Administration (OSHA) Safety and Health Standards (29 C.F.R.
1926) as authorized by the U.S. Department of Labor, OSHA; said responsibilities to be that of the
COUNTY's contractor and/or the contractor's subcontractor.
A93.4 The COUNTY's Capital Project, Impact Fees and Program Management Division Director, either
directly with the CITY's Utilities Department Director or through a duly authorized project
manager assigned to the PROJECT, shall act as the COUNTY's contract manager under this
Interlocal Agreement. As the COUNTY's contract manager under this Interlocal Agreement, the
Capital Project, Impact Fees and Program Management Division Director shall also have the
authority with prior written approval of the CITY to extend the limits and/or scope of Utility
construction work; subject to the COUNTY's Purchasing Policy and approval as required by the
Collier County Board of Commissioners.
3.5 The COUNTY and CITY agree that this is a joint project that will follow the Request for Proposal
(RFP) process for selecting the design consultant, and the public bidding process for selecting the
construction contractor(s). As such, the COUNTY will provide two (2) staff members with
stormwater design/construction experience and one (1) staff member with utility
design/construction experience to serve on an RFP selection committee and a bid review
committee. The CITY will provide one (1) staff member with stormwater design/construction
experience and two (2) staff members with utility design/construction experience to serve on an
RFP selection committee and a bid review committee.
3.6 During the construction phase of the PROJECT, construction engineering inspection services will
be provided by a CITY staff, COUNTY staff, consultant firm, and/or any combination thereof.
Periodic on-site inspections and construction reviews will be conducted by the COUNTY or its
designee or the CITY to assess the contractor's compliance with the construction plans and contract
documents.
3.7 The COUNTY shall provide the CITY with four (4) sets of the approved construction plans and
contract documents for the PROJECT prior to commencement of construction activities by the
COUNTY's contractor.
SECTION IV: AGREEMENT TERMS
4.0 This Interlocal Agreement shall remain in full force and effect from the date first above written and
shall terminate upon the completion of all services and responsibilities mutually performed by the
COUNTY and by the CITY to the written satisfaction of each to the other. It is understood that the
actual termination date herein may occur on or about the date of final approval and acceptance of
all Roadway, Stormwater and Utility improvements by the COUNTY and subject to construction
contract warranty provisions. This date is contemplated to be subsequent to the actual date of final
approval and acceptance of the Utility improvements by the CITY and following payment by the
CITY to the COUNTY.
4.1 Within the COUNTY public easements and/or rights-of-way of the AREA impacted by this Project,
the Roadway and Stormwater improvements shall be maintained by the COUNTY or its assigns,
and the Utilities improvements shall be maintained by the CITY or its assigns.
4.2 The COUNTY or the CITY may terminate this Interlocal Agreement prior to the completion of the
Utility work upon thirty (30) days prior written notice each to the other. In the event of such
termination by either party, the COUNTY shall be entitled to receive due compensation for the
value of services rendered, construction performed, and termination costs as actually incurred.
SECTION V: INSURANCE
5.0 The COUNTY and the CITY shall maintain insurance in at least the minimum amounts and types
as required by Florida Statutes.
5.1 The COUNTY and the CITY agree that both parties are partially self-insured. Each shall provide to
the other evidence of insurance in excess of the self-insured retention.
5.2 Nothing in this Interlocal Agreement shall operate as a waiver of the sovereign immunity afforded
to the parties as provided in Section 768.28, Florida Statutes
SECTION VI: MISCELLANEOUS
6.0 This Interlocal Agreement shall be governed by and construed under the laws of the State of
Florida. In the event any litigation is instituted by way of construction or enforcement of this
Interlocal Agreement, the party prevailing in said litigation shall be entitled to collect and recover
from the opposite party all court costs and other expenses excluding attorney's fees. Venue is in
Collier County,Florida.
6.1 It is understood that this Interlocal Agreement must be executed by both parties prior to the
COUNTY and the CITY commencing with the work, services, duties, and responsibilities described
heretofore.
6.2 This Agreement shall be modified or amended only by written agreement of both the COUNTY and
the CITY through authorized representatives.
6.3 The County shall record this Agreement at is sole cost in the Public Records of Collier County.
SECTION VII: DISPUTE RESOLUTION
7.1 The parties recognize that they are entities subject to dispute resolution procedures set out in
Chapter 164,Florida Statutes.
7.2 In the event of a dispute between the parties concerning this Interlocal Agreement, the COUNTY
and the CITY agree to attempt to resolve the dispute as expeditiously and inexpensively as feasible.
Specifically, their respective staffs will meet within ten (10) days of provision of notice of the
dispute and attempt in good faith to resolve the dispute. They may jointly agree to a mediator to
expedite and effectuate a resolution. If they are unable to agree upon a mediator, within ten (10)
days thereafter, they shall jointly request the Chief Judge of the 20"' Judicial Circuit to appoint a
mediator qualified in construction law to mediate the dispute in accordance with the court's pre-suit
mediation procedures. The mediation shall occur within ten (10) days after the mediator is
appointed. If the dispute cannot be resolved at this level, the Chapter 164 remedies shall be
available. Each party shall pay equally in the cost of the mediation.
IN WITNESS WHEREOF, the parties hereto have caused this Interlocal Agreement to be
executed by their appropriate officials, as of the date first above written.
'
AS TO THE COUNTY:
ATTEST:.
DWIGHT E.BROCK, CLERK COLLIER COUNTY, FLORIDA
By: ja4.4.0
AitS't as to Chair111anQ)eputy Clerk Do a Fiala, Chairman
signature only.
Approved as to form
and legality:
n( \, `P
``
Jennifer . Belpedio • �„'��j Z
Assistant County Attorne �J � �'
AS TO THE CITY QF NAPLES:
ATTEST: 2•'• �� ° CITY OF • 'LES, F C '. i •�
By: i C •. .r'• . By �� •�
Pat iciaU. '' imbosk,C ty Clerk Car ett, Mayor
rfi•j�'t if��' ,
Approved as to form
and legal sufficiency:
t"` ""I .r--)• 2,14r
Robert Pritt
City Attorney