Agenda 10/25/2016 Item #16A20 16.A20 10/25/2016 The Fees are based on a construction estimate of$882,932.05 and were paid in August,2016. The breakdown is as follows: a) Plat Review Fee($1,000.00+$5./ac) $ 1,102.00 b) Construction Drawing Review Fee Water& Sewer(.75%const. est.) $3,172.00 c) Drainage,Paving,Grading (.75%const. est.) $ 3,449.99 d) Construction Inspection Fee Water& Sewer(2.25%const. est.) $9,516.00 e) Drainage,Paving, Grading (2.25%const. est.) $10,349.97 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. -SAS RECOMMENDATION: To approve the final plat of Coral Harbor Phase II (Application Number PL20160001577) for recording with the following stipulations: 1. To approve the amount of$971,225.26 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 2. To approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney's office and the Board or the County Manager or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the LDC. Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division, Growth Management Department ATTACHMENT(S) 1.Location Map (PDF) 2.Plat Map (PDF) 3.Opinion of Cost(PDF) Packet Pg. 782 16.A.20 10/25/2016 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.20 Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Coral Harbor Phase II, (Application Number PL20160001577) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 10/25/2016 Prepared by: Title: Site Plans Reviewer, Senior—Growth Management Development Review Name: John Houldsworth 09/20/2016 2:19 PM Submitted by: Title: Project Manager,Principal—Growth Management Department Name: Matthew McLean 09/20/2016 2:19 PM Approved By: Review: Growth Management Department Judy Puig Level 1 Division Reviewer Completed 09/27/2016 2:28 PM Growth Management Department Matthew McLean Level 1 Add Division Reviewer Completed 09/28/2016 8:10 AM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 09/28/2016 11:46 AM Growth Management Department James French Level 2 Add Division Reviewer Completed 09/29/2016 2:06 PM Growth Management Department Jeanne Marcella Level 2 Division Administrator Completed 09/30/2016 1:08 PM County Attorney's Office Jeffrey A.Klatzkow Level 3 County Attorney's Office Review Completed 09/30/2016 5:05 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 10/03/2016 4:08 PM Budget and Management Office Mark Isackson Additional Reviewer Completed 10/03/2016 4:15 PM County Manager's Office Leo E.Ochs Level 4 County Manager Review Completed 10/14/2016 1:10 PM Board of County Commissioners MaryJo Brock Meeting Pending 10/25/2016 9:00 AM Packet Pg. 783 16.A.20.a 1 j .:!-IT-';'-'i 1 30-505-26E 111. 31-50S-27E'-'- 111414 PROJECT LOCATION -2 L 4!P26E ' 16E (Lel cz 651S27E i l o VZ Lg WI MEM ii: 141 0 WIN Cii I it {` 111 8 w11.1 O �.� 2-51S-26E= c I= 11-51 S-26E I .'`•'` j „® _ 1 _ v III IAII� L i��-ii.;zing!' U. mina♦ 7-515-2 E ,ai ,, Fill titi ■ w ,i •.tl CN U. _I� Jia L Ansa DR a + .r1�v � Jar� rt � —~. :•- . MIM/Ise■ r o -J LOCATION MAP c NOT TO SCALE E U ca Q 1 Packet Pg. 784 P d 3 v M a 0 _ - Qw �o <a LLa _= e o:Wigo a, O O I Nc 338 o CO o w- N a; _ o w - 0 =aw z o _ - _ a 1 zWLE1 _ &A;:' - Q rc� o - i s- _ bt w - D pw rcNa _ W. W. ozEa = z. -J 2a ]z po - to - B' ' s BE �' _ U5 � as LE - _ Wrc NW rc W. i us� _ s Es III zs z5� z I z < z _ z°'_3 atm p8_ pi pi I<3 Bi J� goa z Ov B.. BELE ELE BELELEc E; B 2< n_3 aLL _�.�m< �� ° U-1 J ® CD - - O - _ El: 2g gL LJ G.) ,-"8 -LL= ! _ - _ ;oio 0R .x QO O mss` p - _ - I " LE 3 2 ==w oaam O = ego - %wm 2-2 C O d� a S8W��`x S w LE -A N � �i f1• � o-a a - w 0,R, RP 235 -- 6,o - <�ow� fn J 50¢ - do 3 3 a ¢Po__n¢ PPR sa Yb .<<. dnS~S CW.7 U .� ryo a Ne w ® te''''a-- Q fl 1- IN Ki W C'Z 0( 1 1 r Z g d Z F=— o lwi nes { W - C . w N G - 11E / flY 2'U d. 'R I �, ,�,y fly 1/�� if Q f1' z 5 <2 p,,1.-tel�� /-ans Mgt.SIVA !.- ] , ,. 3 Fv�i1� t' f ' LAJ i Q O W j�\ 2A-22- ---- -:-_ c2- --- t S .. 'yy ./B Yi I Y j O \ � A le i ■ ft } R fn W V's , Esti,: w w N \._�7 T.-- ,R__,1 X71 , N Z IJJ r, 5- w _ w' LE - 6 _ a - z _. 'sgD ',7 ter, ° ` 'RRR, 20 2 Iw', RR p's N o-c _ _ �s C - _ Bio s, �� p ;sw�m•ULE o wa� 53 ,2m 3 ,;' ` .'a su2'' �o---s=nz y oz on yw< Jnn,Jo o p 3 0 E'RsRg g <=wo8' lm w� w LEl �s w E w _ __ ss z - -� �a� 3,4,4? z N o =, s 0�6 sLEw �W =o LE s 3 glia =<i "s Twp§o oa =_ zza n51" 0 3 € 3 € s89 r - € o 5,-- o0 `<0 w� w o wp o LEE- R 6hW4, O g LE - � LE -- - LE �� w � LE rw wto �� LL' ' � �woLEw z E-� 1 ' ''LL 'h g'll 6� 5 8i' 0, - bs-¢ N .,m LE Iw 3 A w � - 3 w _ _� S _ LE�ow Q3WWuo. �ry -ct 8 0_ o -5.'= o 'g• a= -21E Rom_ .a =° m"s=3 5 I Lo go Eads 5 a� aPw ao a aR:„� aE 'g as <asP.2 <orzou 5-3w.1 . 2 4 w o 2 2 cc o�'� « m LE w 1 d 1 „ ,.mom H2 P4 F a°1- . vxz od " zUm _ =k= .kaGow _ oW _ s Hp '6`_ 'off :"R8 Yo PnEgE �'''& '2° s-'a��'aq`n,r.3 3 �a O N Zz oe e " .4g _ _ "�s o•!k'�so rc Z'z g " • .. _ a` _oYS.,,, aw m W o w �a. ag " go " � m4. ssy § sx$o= "''=a2� _1 ' 0= W ;.4 :'0 1= 2=We2sosEg k'2 s ag,go, ,='sa=2-mai ok"5e : 8(8o ak.:;'tnoYaku'a�r u 5802 I=N!Y'k 164 Q ae28 "` u2 , 3<k2kF s ' , � .:WO ,2,s,22.--k2-to-,,s2,"212-§-e a, _ g -, E k 1 ' - - o' cg� �f =m_ . " - . . we u_ 7gap8Rg=ok = lm12§ _g., Pg-,41LL o ..',.- 5,'.,.-.•,,,,,,,.,a_k, gg a 'X?8 52.'00=8k` stm`g=o9• -g-Yoa44W<o _^ ^9 8 = 'a•^g=A1, 9',',gW` Ov 8 ( 9g-o oEarW ;; :k='tgg„8k= "P ar ;4„2.'-'='6 ask '2 ;$11, k, ,00.*S om W= -a W '::UE i 4'6 Wce km id-` ., k =ow€ g” 3a- g�"E'19j�;k8'� L7- mo Jo - Y -w_*t, , qytr, k R'`RtE" ss6k c _,L,24, `. ,_.,=kg baa` .4,,• ',,,,w, --.. ,,,--,.0 ',,,,,,,,,,,.„, _ $"w ," o en.,,§400 = og=e so-� awg� _ gmt�ok� 1,4kY e o `J g8g4▪9799 2888718= 8 88455_ sa ga. ==g8 FsTI 8,'om k g -g =m U wW 013: a o Q _2 o2 = z I8a8 88 fl 8 8 R ceo � x � s � tf k B F 5 R S @q, t C 7 S Rte. JI 4 € A W 4 q E u,si.,s t R. gr, snn La O ca a R ` F a m a . 4 n s e _ 0, C„ _kV/aC9'NI6-65,61005% Lto[KastOps( WW i 8 � 8 Z ^ k _ —.. . . I &E'R: qqqV 0Nu � aa mm n m u m n m m n •`� o m m n m m a n � . . . -. 111 mWC7 1--- Z Ld 10.1. 31 810 21311%3'003 CO Z I- 11111111111 W N w -® el 1,65,610% is O[4 6661006 • $7,1 u'17� Y �o saarR t. 8. VT, .,, a � R8� $ gl Q W r, a „� �} 6EV R' .o r:� 6u 7'r® �, ��' wane �R^ 52' F. N 880 m� r��� a s s -.a t y .E,o- oa �a" $s e " - w ry a < : MEN Oro _ U - " VI b to wise w ' X514611" in.._W W NZ $ r� Eth8 ; 1140 iaa3wvaeoa x 4 ili,,F4 iv a41 a2 z t1ry1{I' E2d p � � gill 11110 ✓ - 33N0 31939395N U _ ,r' ,84 -•R 1065i�w 1�n _ .L. q s l .{ \� / _ x;p 9 a. m a f 8• 88e a � - Si5 O s a ' " E 6 O i a i 4 m Z `o � , i i 11, ,, �" i Z al ZY 0 Oka.61U5 6-....00 «SCI 1« « CO0 « SC 008 00'8 008 00'8 K SCI I OS 00 09«t.•.'' IIID �869�) - (I, 8Z J�BJ '-_7 - � 0 F "�_ 3 tIU 440'47 yB r Q d f 8 8 j 8� 8 8 8 8 8 8 8 8 8 8 8 , --L 1.'-' R , R, R 9-, Si 52 R A R it 1 RI g St 9, R 8 cr P. 1 r F F o r c" F ... f F '. P.'n-1 PI r . t f _ 3 § SI • S ` 3 ` S ` S ' s ' § . Y §, . Y . 8 ., 8 F On SC r 00-K 00'8 00 K 00"K ossd- 1«'SC_ S9'«1- 993 n 'p`,08 F, I- W w 8 « 21 vs 10(.612031 �WK cot, 3 030 n x✓b \ nN _ U - 05 0.0`6:8\d B18 IDY8I \ ''' �s �8 O_ (n ,..`� - 219(5;SLb IDW - ' - �� 43 N,�� 5 SW 3132110 2131VM3003„ ` EYO2S Ire6Ifp31 3 ��' � aV'o . T _ . ry;«' I_ I5SSi 038 008 WK 008 038 i` _ «5�1«Si 008 90__ \ i� n 9.y In l� R R 0 c8 S a 8 8 8 8 8 8 8' 8 8 a \ \ 8e/ �1%* 8 8 lL SR 9 5 R R SR R ,1 AR , 5 8 j$ `" \ 0,,„, a¢ ., > „8lEr _I r _ r _ F F _ 5 - F _ f_e1 r _ rur ,g m • 17 S. S Y 7 3 S 3 § SI 3 4 ,7 ^ ip$ \g . o y O• k' a l 8 I I .4 ^ \ nm • 0: ' `9 \�t u\ 567j,3030 15 W r,our IOStt 00K OoK K 00,, 00 CO 0000 70S'« 008 90 / KJ :4' \''' \ 311559 r_ \u -_ - .. -Z'OLS 0.0051 WN� - - \ �t5� r.\ r,m O E; -0 _4g 8 eg,„ 1!,'I oq0 0)Y 13000 V c.• & '" = 7 8 9, a �1 S $ 8 A 3 $ 3 o R 8 8 8 a 8 8 R M;�11 p�� 00 ., a "^I R % s s a .. s Y - 00 3101'30624 1)0.00 O a w w w e w w w Y m W 5" W W F r F F T F F f r F F F F T F F _ 8 R P ^ °J a m ,5, R R a e - 8 8 R Y 8 y, 3 3 7 8 .� R R_ 1 a 1^ na a _ A a x B C{ R S n aR B R " R a Jl .. 9Ril p566%YI 1)101 U s aesseaaffiassnsn � saaasaaaaaP � = N8 LI sl 00 OVI 3,00 6100N a" _- q J l g a m , ., . ' ., � .n a r R Y . Y . s ,, Y . s . „ 2 Y " , V Y m ^ - ti ti ti w ti ti - w w ti w w w w A ti „ I, w F. ti n n i- w 00"«I;CZ 61'011 $ a - � 3 8 8 _ '• ir_ � .'t " W A 8 ji � � � '`,� 'P, Yi �"�E .. 8 8 aoa ;islnou a o g r; s R gE e I al Ix S, $ `8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 I 00'«I;Le bdtti 8 �" 5I 8 I Q oO 2555555555555555555555555555555555555 ag 82 ,1 ,21 8 2a81 OOOCl;aa6100N 1 ,2 • ,.1 .5551555555555555555555555555555 ,8, 22E ! Iw w waI �8 1at I O C> 8 ^ 811" 83 s s mon;czslm31 s 5 a s s 3 $ . Y 3 's 3 's ry a NA ixa NI N8. No = . 000c;MIXON I = O F f f m f f f T T F F m f„ w i 8 8 00O1;0.61(031 q1 B- ;3 ^ R 8 SR8s r 8 5 8 8 a 05 l a 1 " 00'«I;000 3 0 1 : Y Y 6 .a Y gY ; Y : B = a -.minas -o ' 00'001;02.610031 I o �Wv _ = a = 'z R _ • a x ' I I^ xI �a I 1 - - - m F- a • e _ 8 ,6100 11 1‘1.6'n 5 6.,E w 1 ; ; 9t ; ; ; ; ; ; ; ; ; Q a n g 2 2 Q 1'So /, a/l o BB 1314,x",.ma,a 15 1 $ �I& 1 ,p 8 8 8 8 - •, 'O ^ 00 & SAs6 / - / I 99«t;12919031 i ill s m ® ~ z sass _ / w n 92\6r \s w a �/ w'°rl a9l ro f r m - '° f • x __ - 6-- - _ X03 3q a Z 1-- '-- 113 913 6 c� Bt,� 8 ' 8 R �� / / / N O - IJ $ 8 R A �- - / \ 8q( , - I .83 FR /j/ N s a 8 s a l8 l R - = n' :s m / 3a, z /s !.'6, 7":1 rFf: _ R_ +m w �+ R r I. I g N 's f $ 4 0 / qxg, " / .,8� ▪ Nt� g 8 �w - _ -7'3,81_e":_______ __--e,, wv cox b �' m -z m '50-B50161.00. t Hm 1 I LLI Q -l 010 - -crx cry - - 0,,‘„, 4, Cs v /e,. = Y 8 5065x, ..14r n t!, / // llJ za 8 0x9 W 8 g- EDGE\IpiER CIRCLE _ °- 4, = y /43 900 / 1.yJ �*-- 8 y55'WT 165.E ' }130 11 V1 0 8 y,4, h- / w O. ,'of_ g- ,,,;7,7NP,, 'a a is N6J 97t :' t _ T a.:; 0. N 3100o5r 3FNe .f .... v5e�_, i, x__sHM�, W ® 9IJ600 _ $f R a R �' Zy - a 3° 'F1.'' 5 w w F °c,.: $ F, Zz 2u j 3 r 1 U __- _ `bg�-- _NAPLES ACSERVE CIRCLE _ § ' N i 2 -la] 1Fr!) o O z 5 u n o xa ▪ R I a $ a '. . T. r R $• f0, e3 t xS .0 8 e 8 0 - : R 2, 2 7 R 2 c 6 R 8 ^ - S A 3 $ 3, R 2, R 3, a, 2, a 8 Rm Rn ,T ^a O a waf F FF F w P w8H w F n F Y T w w w H w wR w wY f F f r w r w H F r r wY, w w W W Ww w 8 w H w w w w w P w w8 w 0' w 3 W Y w w8H w w Q - 2 - 28 .22 a 2 a 2aR a2 - aa r n a ' aa sar g8x a ` 8aa ^ aaa2 22 a 222222222 ' $ 'a 'a2 ' 2a2 � 2 ' sa 22 ' � � 2a a22G2 25 ' ai 1 O`` yy - ;•`:', a x n a R P a a a a e a s s. a s a s x. 5 ce n a m n e 8 a s. e g e s. n n s e - $ s 3 ^ R 1 R X r r R . . _ .. ' ., r R R r : ^ m a m g o a r ^ ,. __ : ; ry P m t R r ., .� ., ., ., r, ., _ 2 r ; r, P : ' ~ a = 3 - •a p - 8 Si • • • • si d • R r 00 '3 8 e § a •.4 m S • a $ • a 3 a S ¢ n 8 R ^ 8 8 8 ' a = = a a n R 3 8 a_ - e s h y r4 4 : - - . . � n b s e e a e b e _ c H ti R e e _ e a k $ p r F F. Fc. 2 ti F F F. n r n a R _ n CC s 8 8. 8 8 8 8 8 8. 8. 8 8 8 8 8. s 8. a 8 8 8 8 8 8 8 8 a 8. 8. 8. 88 8 8 8. 8 8 8 8 8 8 8 8 8. 8. 8. 8 8 8. 8 8. 8. 8 8 8 8. 8 8 8 8 8 8 8. 8. 8. 8 2e „ eae aai ? iaaaaaaaaYo _ Y5sas $ 55 geesssa9aaaaaaaaaaaaaao ^ , 000s8 a 1 _ 555 ' c55aaaaaaaaa : 55555555555555555599555555553595535595995500003000 00 a tt 8 g.. m a s a d ' C9,9,x.656199 [Y 8.99.6,0058.99.6,0056 ozs 6, 6' 0_ - - - - - -- 0106 9910 01L6 0019 908 BY Si 1 I co SC GM 009 00 ti. 00K 00 8' o ,•9' ^r 8 8 s 8 0 8 8 8 8 8 i 8 80:,68„ S R 8 57 R R IR S2 R R 52 R 1.R Od mr ` 8 A �g f T i.! _ T e� l� T _ f T T f ry t m &SY�. `� 9 �' _ r 8 ' S 3 ^ S ' 3 ' 3 S . q �R[§ w t 7r,a I I w � Q w C 99 -,e$ @ R 8 R ' w d '-<'$ 1C,0 LKC 9900 009 0115C 1 OS SCT)-U-99 OUK 00'8 00 911 9907 ;9'1: - / 1:'": �t`$¢' 7y ats0 �ete� 99 011 0.6'1.6,880 Lvm0 IS 01003 $_ `�/ ''� e c N -",-1t0k L Q / 99 - /q 6 - 99',8„656,003 - fl 05005 5CL.6l000 VI u ^� LL�(f �� ` / 9919 99191;6561003 06 e L 09069 3.C.60.01911 r„ '-i' 1..� 9 '035 J / 0101 __m9C OSTM 99R 008 00'9 K 0000 ./ N / // ff r r_r - . O = / �a'.4,, 5 / 8 a m� R R TR� Si R A R R R €.R 0 �' '@.qx /c:9 / / Y oa W -" f f e G _ t f _ f _ f f ? __R4T / 4' 3 -^ S ' S o 3 0- S o' S 3 S ' S S `t'S m o W %l 03 roil r rz / / / aR` 2$ " a W a s 0 0 � I I o � is I e U S/ K�M,6111l / '�p0111 ' 6140 99'99 156 01190 0006 9C"CL 00'9 009 OOK 99K C':` 7 V) / mm N / X50f9'19116G.6100N 1 LO[s 0.0,6,003— r '- -. __- __ _- - _- - -- -¢cc 8 °ia''':, �/ a rO 3/ arostnx 'i -< R 8 d'' .R�BA [. LI :/,...6-w::::;,!it, o:41=.145,:::‘:; v s / ° awxllx �!I, �//1 m .' ' /8 ,9/— mu,u°. 113 U ._ loll 99°nx.11x 3ps s , p O 8. ^>a,i 1: nQti31 ,, / m' / LL �" 0" I 0 ,3/1, oval 3.99 /4.x C<7'.1 of ccx1 3o..&.1 If W/?a R`l m fi.11x / e s i0 Z 9cn _ 03 I 13 8 '� _ O 'rx.LS,zBGy tw �-' O rocs 998 ..l a® mI r,a13A50�, /R 2 U 900±280otsox �/' W Fla a• n „,, CO = zz W5 3oo1>'YtIr 110.00 3 31 �,.W, x?a: Q U `9000019 I U I -I e I nig g'. d H � - 996. ^. (/j I .0001.95100 8R \. 1 5x (\Ki Q 903050ri 111100 V I ` 311 \� t.+ 1 W 'Igry' ' 1 m� Y N G r ^ ,\ y\ `pd' O �y tlo g SS'e '9r O 6..... x1'111 \ �8 A ,. - m m p R f R R R n '" x 8 8 w A w a ® e S S R e -. - "� 6 W 8 3 Q w \ \ ' - yy s a ; 1 1 a $ 5 s a 4 4 $ s ^ a s �. " N,ya�19'6 b 0\ m"1„p• fi R S : S Y 1 Y Y S S S Y R _ P. fj/j = m2%, W \�' \ _ Y .4 .8 R o SS '8 .8 •'" 1 '8 318 S '" e '8 x n W ZO 6�a1� bx ? b $ b " bbbbbbb " 31 9 \'� \ ,q\ ,. / .. 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 99 8 rY cv min s \�, z8msaa88ae88 a as co q e a ♦ o .6 Q i J �� \ 95 't' `?Si RR r R n R ^ ^ ., . .,= 1V8 °m° -08 b f T t t t t f f f f f T f i t f t f Y Y A S 3 A ; 3 6 6; ,.R A 8 8 ; � S w o a 99 fx a � npo � xsa $ C./1 .-- i4� P ,-,2--- ,,,,,,---_ 3ivmiDx $ q a E a S _ ea, " 0 8 / 1 --_ 03 g 1 m 1 g 1 n ; 3 r. 1 8 n 8 1 a .— p lg w z iry " 99 / --- __ 'ss ',, s - - a a - - a = e '* !".1 "y e y N W - 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 F- Z „2 ro / 0. 8 $ n 3 3 3 " 5R S uN \ 3 - ' B . n 8 ^ 998 8 " 4Y8054 4d Z QNJ \ ) _ ` °' t f f f ; R f t wR a w w wS SN ' w, T - 'i R r8 8 a 8 Yh 1 R/ . : � . '' t N N t t i N - :0/ O W +Y'ti}}„ fkP,,,,,_ g •+8 ^ 8 8 $ iN Fffi a 3 2 3 Y 3 Y $ Rn9 U 6i}b}aeF..'i _ 'l m 8 $ " n " 1N® H4fMal+ -- - geee ..eetimNm 'ma "'baw ^ eeee C'e f _ 1 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8, 8 8 8 8 '1@AIt Z 5 t A 4 S S 9, 22 2 8 i= 7O t 99 8 s F R £ ot o `_ n 1 S s Y 5 ; F . . a _ 39.9e3 3'82'13,S37d9V' 5 ; g 3 a t r ; t ; T ; T 5 5 w F 5 r T5 J 00 1--- 5 9' -i __ - -- 8 8 8 8 4 ^ 3 g 8 1 8 R F Y M $8 1 0 - Y 0 e 1 e ugo �__ _ m ry cc 5 8 8 8 8 8 , 8 8 8 8 8 5 8 8 8 8 8 i "a r P w P P , a a a "1 a 8 - 16.A.20.c bj R0 BAU &AS S O C IATE S NAPLES RESERVE — CORAL HARBOR PHASE 2 — REVO1 PRELIMINARY OPINION OF PROBABLE COST SUMMARY 0 GENERAL $ 17,500.00 Tc EARTHWORK $ 3,500.00 SANITARY SEWER $ 210,862.00 0. 0. POTABLE WATER&FIRE $ 212,071.50 o. STORM DRAINAGE $ 181,146.00 U- PAVING $ 221,852.55 c N LIGHTING $ 36,000.00 U 96 TOTAL $ 882,932.05 Contingency(110%) of TOTAL $ 971,225.26 UTILITY DOCUMENT REVIEW FEE 0.75%OF SEWER AND WATER ESTIMATE $ 3,172.00 UTILITY INSPECTION FEE 2.25%OF SEWER AND WATER ESTIMATE $ 9,516.00 UTILITY REVIEW FEES PAID $ 3,091.62 UTILITY REVIEW FEES DUE $ 80.38 CONSTRUCTION REVIEW FEE 0.75%OF ESTIMATE $ 3,449.99 CONSTRUCTION INSPECTION FEE 2.25%OF ESTIMATE $ 10,349.97 CONSTRUCTION REVIEW FEES PAID $ 3,449.99 CONSTRUCTION REVIEW FEES DUE $ (0.00) 8/26/2016 3:12 PM X:AShared\P\016-00-007 NR Parcel 5\007 CCFDEP Permit Sup\Phase II\RAI_I\OPC_Phase 2 Packet Pg. 789 16.A.20.c •i bar ROBAU &ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST NAPLES RESERVE-CORAL HARBOR PHASE 2 Estimated By:KAM Checked By:MWD GENERAL DESCRIPTION UNIT QUANTITY UNIT TOTAL 8- COST COST -2 is Mobilization(Large Projects,$10.0 to$20.0 Million) LS 0 $25,000.00 $ - 0 U Mobilization(Large Projects,$2.5 to$10.0 Million) LS 0 $ 10,000.00 $ - > 0 Mobilization(Small Projects,$500,000 to$2.5 Million) LS 1 $ 7,500.00 $ 7,500.00 E. Maintenance of Traffic(Varies,Depends on Type Project) LS 1 $ 2,500.00 $ 2,500.00 ii Staked Silt Fence LF 0 $ 1.25 $ - c N Turbidity Barrier(Floating) LF 0 $ 12.50 $ in 0 Clearing&Grubbing(Burn) AC 0 $ 2,500.00 $ - U 0 0 Clearing&Grubbing(Chip&Haul Off-Site) AC 0 $ 3,400.00 $ - c .Q 0 Bridges(Canals,30'Or Less Using Con-Span Type) EA 0 $ 475,000.00 $ - ai E Large Bridges(Based on SF of Deck @$160.00 Per SF) EA 0 $ 1,750,000.00 $ - Construction Staking Total Project LS 1 $7,500.00 $ 7,500.00 General Subtotal $ 17,500.00 Packet Pg. 790 16.A.20.c f 6 ROBAU & ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST NAPLES RESERVE-CORAL HARBOR PHASE 2 Estimated By:KAM Checked By:MWD EARTHWORK DESCRIPTION UNIT QUANTITY UNIT TOTAL o COST .Q ca I Regular Excavation CY 0 $ 2.00 $ - 0 U iTs Lake Excavation(Blasted Rock) CY 0 $ 2.80 $ - L Embankment(From Regular&Lake Excavation CY 0 $ 1.50 $ - Q Includes Spread,Compact&Fine Grading) ca E. 73 Excavate,Stockpile for Rock Bury CY 0 $ 1.50 $ - ii 0 Replace from Stockpile&Cover Rock Bury CY 0 $ 1.25 $ - N Import Fill(compacted in-place) CY 0 $ 9.75 $ - U 46 Berm Construction LF 0 $ 3.80 $ - 0 Swale Construction LF 0 $ 2.50 $ - 0 c Construction Entrance(FDOT Stone Bed) EA 1 $ 3,500.00 $ 3,500.00 E U as Rip-Rap(12")w/Fabric SY 0 $ 60.00 $ - Q Retaining Wall LF 0 $ 100.00 $ - Rock Blasting(Range$15,000/$75,000,Depends AC 0 $ 45,000.00 $ - on Thickness of Rock&Other Variables) Gabions(standard size 6'x3'x3'filled w/stone EA 0 $ 210.00 $ - and installed)(There are 10 different sizes) Sod @ Berms SY 0 $ 1.40 $ - Packet Pg. 791 16.A.20.c If ; ; ROBAU & ASSOCIATES NPDES Monitoring LS 0 $ 7,500.00 $ - Earthwork Subtotal $ 3,500.00 O To 0 V To O L 0. Q a LL d' 0 N a- N O U 0 0 .Q 0 0 E co Packet Pg.792 16.A.20.c 1:‘./.,40. ROBAU & ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST NAPLES RESERVE-CORAL HARBOR PHASE 2 Estimated By:KAM Checked By:MWD SANITARY SEWER DESCRIPTION UNIT QUANTITY UNIT TOTAL o COST 'E m 2 Tts 8"PVC Sanitary Sewer Main(0'-6'Depth) LF 1,396 $ 24.00 $ 33,504.00 0 U is 8"PVC Sanitary Sewer Main(6'-8'Depth) LF 785 $ 30.00 $ 23,550.00 0 2 Q Q 8"PVC Sanitary Sewer Main(8'-10'Depth) LF 401 $ 42.00 $ 16,842.00 Q r ro a. 8"PVC Sanitary Sewer Main(10'-12 Depth) LF 0 $ 56.00 $ - Tu c ii 8"PVC Sanitary Sewer Main(I2'-14'Depth) LF 0 $ 72.00 $ - .. Vr 0 N 8"PVC Sanitary Sewer Main(14'-16'Depth) LF 0 $ 86.00 $ - r rn 0 U 4'Diameter Manholes(0'-6'Depth) EA 7 $ 3,800.00 $ 26,600.00 0 c 0 4'Diameter Manholes(6'-8'Depth) EA 4 $ 4,600.00 $ 18,400.00 E Q 0 4'Diameter Manholes(8'-10'Depth) EA 2 $ 5,500.00 $ 11,000.00 c E 4'Diameter Manholes(10'-12'Depth) EA 0 $ 6,400.00 $ - cor r Q 4'Diameter Manholes(12'-I4'Depth) EA 0 $ 7,800.00 $ - 4'Diameter Manholes(14'-16'Depth) EA 0 $ 9,000.00 $ - Additional Cost,Drop Manhole for(8'-10'Depth) EA 0 $ 1,000.00 $ - Additional Cost,Drop Manhole for(10'-12'Depth) EA 0 $ 1,300.00 $ - Additional Cost,Drop Manhole for(12'-14') EA 0 $ 1,800.00 $ - Packet Pg. 793 16.A.20.c 4 0' ROBAU &A.SSOCLATE S Additional Cost,Drop Manhole for(14'-16') EA 0 $ 2,600.00 $ - 6"PVC Laterals LF 2,171 $ 21.00 $ 45,591.00 6"Single Clean-out EA 0 $ 225.00 $ - 6"Double Clean-out EA 75 $ 425.00 $ 31,875.00 Video Inspection LF 1 $ 3,500.00 $ 3,500.00 Lift Station Average,(See Listing Below) EA 0 $ 140,000.00 $ - o L as 4'PVC Force Main(C-900,CL200,DR-18) LF 0 $ 16.00 $ - �a O U 4'PVC Force Main(C-900,CL 200,DR-14) LF 0 $ 18.00 $ - > O 6'PVC Force Main(C-900,CL 200,DR-18) LF 0 $ 22.00 $ - Q- O_ Q I.; 6"PVC Force Main(C-900,CL 200,DR-14) LF 0 5 26.00 $ - p_ Tcsc 8"PVC Force Main(C-900,CL 200,DR-18) LF 0 $ 30.00 $ - "u. 0 d• 8"PVC Force Main(C-900,CL 200,DR-14) LF 0 $ 32.00 $ - o N+4 Air Release Valves EA 0 $ 1,200.00 $ - O U 48 O 8"Force Main Hot Tap EA 0 $ 3,500.00 $ - o c .Q 6"Force Main Hot Tap EA 0 $ 3,100.00 $ - 0 C E 4"Force Main Hot Tap EA 0 $ 2,500.00 $ - EE U +a Directional Bore 4"Force Main,(12"Casing) LF 0 $ 140.00 $ - Directional Bore 6"Force Main,(12"Casing) LF 0 $ 160.00 $ - Directional Bore 8"Force Main,(16"Casing) LF 0 $ 210.00 $ - 4"Plug Valve EA 0 $ 1,000.00 $ - 6"Plug Valve EA 0 $ 1,200.00 $ - 8"Plug Valve EA 0 $ 1,500.00 $ - Packet Pg. 794 16.A.20.c fir ROBAU &ASSOCIATES 10"Plug Valve EA 0 $ 2,000.00 $ - 12"Plug Valve EA 0 $ 2,600.00 $ - Sanitary Sewer Subtotal $ 210,862.00 0I.. L 0 U T 0 L 0. 0. a U- 0 N N 0 U 40 0 .E a O c E t 0 w Q Packet Pg. 795 I6.A.20.c j ROBAU &ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST NAPLES RESERVE-CORAL HARBOR PHASE 2 Estimated By:KAM Checked By:MWD POTABLE WATER&FIRE DESCRIPTION UNIT QUANTITY UNIT TOTAL o COST -E c4 I 12"PVC Water Main(C-900,CL-200,DR-14) LF 0 $ 32.00 $ - 0 U 12"PVC Water Main(C-900,CL-200,DR-18) LF 0 $ 30.00 $ - > 0 I- a CI 12"Gate Valve EA 0 $ 2,800.00 $ - Q E. 12"x 24"Hot Tap EA 0 $ 5,200.00 $ - Tts c ii 12"Backflow Preventer EA 0 $ 12,000.00 $ - o vt 0 N 12"Master Meter EA 0 $ 17,500.00 $ - `" w O U Directional Bore 12"PVC w/24"Casing) LF 0 $ 265.00 $ - 46 C 0 10"PVC Water Main(C-900,CL-200,DR-14) LF 0 $ 28.00 $ - c 0 0 10"PVC Water Main(C-900,CL-200,DR-18) LF 0 $ 26.00 $ - c a) c 10"Gate Valve EA 0 $ 2,300.00 $ - ci ca -. Q9 10"Backflow Preventer EA 0 $ 10,000.00 $ - 10"Master Meter EA 0 $ 15,500.00 $ - Directional Bore 10"PVC w/20"Casing) LF 0 $ 245.00 $ - 8"PVC Water Main(C-900,CL-200,DR-14) LF 0 $ 22.00 $ - 8"PVC Water Main(C-900,CL-200,DR-18) LF 2,919 $ 20.00 $ 58,380.00 Packet Pg. 796 16.A.20.c / , . ROBAU &ASSOCIATES 8"Gate Valve w/Box EA 3 $ 1,400.00 $ 4,200.00 8"x 12"Hot Tap EA 0 $ 3,500.00 $ - 8"Backflow Preventer EA 0 $ 8,000.00 $ - Fire Hydrant Assembly EA 8 $ 3,600.00 $ 28,800.00 Dead-End Hydrants EA 0 $ 3,800.00 $ - Blue RPM's EA 8 $ 12.50 $ 100.00 8 L as Perm.Bact.Sample Point EA 0 $ 1,200.00 $ - TO L 8 U Temporary Blow-off&Bact.Sample Points EA 0 $ 1,200.00 $ - 0 L Air Release Valve EA 0 $ 1,200.00 $ - n. Q Q is 6"Backflow Preventer EA 0 $ 6,000.00 $ - p_ Ttsc 6"Gate Valve w/Box EA 0 $ 1,200.00 $ - Lt. c)v 6"x 12"Hot Tap EA 0 $ 3,100.00 $ - N n 4"Gate Valve w/Box EA 0 $ 1,000.00 $ - O U 4— 4"PVC Utility Sleeves LF 1,816 $ 5.00 $ 9,080.00 c Z. 1"Water Service Line LF 2,963 $ 10.50 $ 31,111.50 0 c Double Meter EA 62 $ 950.00 $ 58,900.00 E co Single Meter EA 26 $ 550.00 $ 14,300.00 e( 1 1/2"Water Service Line LF 0 $ 8.50 $ - 1 1/2"Double Meter EA 0 $ 800.00 $ - 1 1/2"Single Meter EA 0 $ 400.00 $ - Temp.Gap Configuration EA 1 $ 2,500.00 $ 2,500.00 Temp.Backflow Preventer EA 0 $ 2,500.00 $ - Packet Pg. 797 16.A.20.c r<, } ROBAU &ASSOCIATES Automatic Flushing Device(RELOCATED) EA 1 $500.00 $ 500.00 Connect to Existing Water Main EA 2 $ 2,100.00 $ 4,200.00 Aerial Canal Crossing(3-Piers) EA 0 $ 45,000.00 $ - Potable Water&Fire Station Subtotal $ 212,071.50 0 T� i L 0 U Ta 0 0. U- 0 0 17; 0 U 4- 0 0 0 a> E U Packet Pg. 798 16.A.20.c ROBAU & .ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST NAPLES RESERVE-CORAL HARBOR PHASE 2 Estimated By:KAM Checked By:MWD STORM DRAINAGE DESCRIPTION UNIT QUANTITY UNIT TOTAL COST ca rt Single Barrel 4'x 6'Box Culvert,Pre-Cast LF 0 $ 430.00 $ - U Double Barrel 4'x 6'Box Culvert,Pre-Cast LF 0 $ 880.00 $ - 0 0. Q Triple Barrel 4'x 6'Box Culvert,Pre-Cast LF 0 $ 1,300.00 $ - Q 15"RCP LF 392 $ 22.00 $ 8,624.00 ii 18"RCP LF 756 $ 32.00 $ 24,192.00 0 N 24"RCP LF 780 $ 56.00 $ 43,680.00 in O 30"RCP LF 0 $ 68.00 $ - o 0 36"RCP LF 365 $ 80.00 $ 29,200.00 Q 0 42"RCP LF 0 $ 95.00 $ - a� E 48"RCP LF 0 $ 120.00 $ - C 54"RCP LF 0 $ 170.00 $ - 12"HDPE LF 0 $ 20.00 $ - 15"HDPE LF 0 $ 24.00 $ - 18"HDPE LF 0 $ 30.00 $ - 24"HDPE LF 0 $ 40.00 $ - Packet Pg.799 16.A.20.c / . xy ROBAU & ASSOCIATES 30"HDPE LF 0 $ 52.00 $ - Valley Gutter Inlets(4'x4') EA 14 $ 3,200.00 $ 44,800.00 0 Valley Gutter Inlet(5'X5') EA 0 $ 4,100.00 $ - Throat Inlets(Top) EA 0 $ 2,500.00 $ - Junction Box(4'x4') EA 5 $ 3,200.00 $ 16,000.00 Junction Box(5'x5') EA 0 $ 3,800.00 $ - LO L as Junction Box P-7(greater than 10') EA 0 $ 5,600.00 $ - Z is L O Junction Box J-7(less than 10') EA 0 $ 4,800.00 $ - U 76 0 L Junction Box J-7(greater than 10') EA 0 $ 6,600.00 $ - Q Q O Control Structure EA 0 $ 5,500.00 $ - a. To c Water Quality Structure EA 0 $ 6,500.00 $ - it 0 cir Bubbler Grate w/Rip-Rap EA 0 $ 3,500.00 $ - o 9- N Grate Inlet(4'x 4') EA 0 $ 2,800.00 $ - O U 40 Grate Inlet(5'x5') EA 0 $ 3,800.00 $ - c C 71. Curb Inlet(Base) EA 0 $ 1,800.00 $ - 0 w c E Grate Inlet,(FDOT)Type"C" EA 3 $ 2,200.00 $ 6,600.00 E U cu Grate Inlet,(FDOT)Type"D" EA 1 $ 2,800.00 $ 2,800.00 Q Grate Inlet,Type"E" EA 0 $ 2,400.00 $ - 12"Flared End Section EA 0 $ 250.00 $ - 15"Flared End Section EA 2 $ 350.00 $ 700.00 18"Flared End Section EA 1 $ 450.00 $ 450.00 24"Flared End Section EA 4 $ 650.00 $ 2,600.00 Packet Pg. 800 16.A.20.c A 1 ROBAU & A.SSOCIATES 30"Flared End Section EA 0 $ 1,000.00 $ - 36"Flared End Section EA 1 $ 1,500.00 $ 1,500.00 42"Flared End Section EA 0 $ 2,000.00 $ - 48"Flared End Section EA 0 $ 2,500.00 $ - 54"Flared End Section EA 0 $ 3,000.00 $ - L O .LZ 15"Mitered End Section EA 0 $ 1,500.00 $ - ct I Tu 18"Mitered End Section EA 0 $ 1,800.00 $ - O U 24"Mitered End Section EA 0 $ 2,400.00 $ - > O L Q Q 30"Mitered End Section EA 0 $ 3,000.00 $ - < ca EC 36"Mitered End Section EA 0 $ 3,600.00 $ - c ii 42"Mitered End Section EA 0 $ 4,200.00 $ - 0 0 N 48"Mitered End Section EA 0 $ 4,800.00 $ - N 0 U 54"Mitered Section EA 0 $ 5,400.00 $ - p c O Yard Drain EA 0 $ 1,200.00 $ - c Q 0 c Storni Drainage Subtotal $ 181,146.00 E 0 P.a.+ a� Q Packet Pg. 801 16.A.20.c ROBAU &ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST NAPLES RESERVE-CORAL HARBOR PHASE 2 Estimated By: KAM Checked By:MWD PAVING DESCRIPTION UNIT QUANTITY UNIT TOTAL p COST 'a m I To 12"Concrete Ribbon Curb LF 0 $ 24.00 $ - 0 U Ta 2'Valley Gutter LF 5,837 $ 8.50 $ 49,614.50 0 0 Q Type"A"Curb&Gutter LF 0 $ 12.50 $ - Q ca CT„. Type"E"Curb&Gutter LF 0 $ 12.50 $ c7 i - c LL Type"F"Curb&Gutter LF 0 $ 10.00 $ - o v 0 N Type"D"Curb LF 0 $ 8.50 $ - n 0 U 3/4"Type S-111 Asphalt(2nd Lift) SY 6,475 $ 4.10 $ 26,547.50 O c 0 3/4"Type S-111 Asphalt(1st Lift) SY 6,475 $ 3.80 $ 24,605.00 ._ Q 0 12"Stabilized Subgrade(LBR 40) SY 8,417 $ 1.40 $ 11,783.80 c m E 8"Limerock Base(LBR 100) SY 0 $ 5.35 $ - ci ca Q 6"Limerock Base(LBR 100) SY 6,475 $ 4.50 $ 29,137.50 4"Limerock Base(LBR 100) SY 0 $ 4.00 $ - Signage&Pavement Marking Per Mile LS 1 $ 5,000.00 $ 5,000.00 Fine Grading(This Could Be Priced By SY Also) DA 0 $ 1,000.00 $ - 4'Sod Strip Between Curb&Sidewalk SY 3,192 $ 1.50 $ 4,788.00 Packet Pg. 802 16.A.20.c R,O BAU &AS S O C IAC'E S ADA Ramps&Detectable Warnings SF 0 $ 24.00 $ - 6'Wide Sidewalk(4"Thick Concrete) LS 0 $ 5,000.00 $ - 5'Wide Sidewalk(4"Thick Concrete) LF 5,745 $ 12.25 $ 70,376.25 2"Sand Cushion SY 0 $ 0.54 $ - Paving Subtotal $221,852.55 L 0 L 0 U To 0 0. 0. 4- a To c LL 0 To. 0 N N 0 U 46 c 0 C a. 0 .. c m E 0 to a-� Packet Pg. 803 16.A.20.c (kv,4 ROBAU &. ASSOCIATES PRELIMINARY OPINION OF PROBABLE COST NAPLES RESERVE-CORAL HARBOR PHASE 2 Estimated By:KAM Checked By:MWD LANDSCAPING DESCRIPTION UNIT QUANTITY UNIT TOTAL COST -E ea L O Lighting-Refer to OPC by Trebilcock Solutions LS l $ 36,000.00 $ 36,000.00 0 cc O Landscape and Lighting Subtotal $36,000.00 0 rea a. R it 0 v 0 N O U 4- O C O .E 0 C a> E U Packet Pg. 804