Agenda 09/13/2016 R Item #16C 3 16.C.3 09/13/2016 EXECUTIVE SUMMARY Recommendation to approve a $301,990 work order under Request for Quotation 14-6213-72 to Haskins Inc., to rehabilitate pump station 300.04 under Wastewater Pump Station Technical Support Project Number 70046. OBJECTIVE: To maintain reliable wastewater collection in compliance with Florida Department of Environmental Protection agency regulations. CONSIDERATIONS: The proposed scope of work under Project Number 70046, "Wastewater Pump Station Technical Support," is consistent with the Capital Improvement Program (CIP) contained in the 2014 Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water Master P1an/CIP Plan approved by the Board of County Commissioners (Board) November 10, 2015, as Agenda Item 9C, as Appendix III of the 2015 AUIR/CIE. Funding for Project Number 70046 is available in, and is consistent with,the FY2016 CIP Budget. Pump station 300.04 is located in the median of Lely Palm Drive in the Lely Palms subdivision. The pump station is 31 years old and at the end of its useful life. The primary issue compelling rehabilitation of the pump station involves the corrosion of components due to the hydrogen sulfide gases. The pump station's deficiencies include electrical equipment deterioration, and corrosion in the valve vault and wetwell piping. The scope of work includes new pumps and electrical panels. The confined space valve vault will be eliminated by moving piping and appurtenances above grade. The installation of high- density polyethylene pipe instead of ductile iron will eliminate pipe corrosion. Eliminating the underground valve vault will reduce valve corrosion, and will eliminate the confined space restraints for valve maintenance by Wastewater Division staff. This project will update the station to current utility standards in a coordinated manner that will not interrupt service. Pump station 300.04 serves 32 single family units, 28 multifamily units, and the Lely Palms assisted living facility that has 150 apartments and 13 two-bedroom villas. The HCR Manor Care skilled nursing facility currently has 117 beds. The surrounding area is fully built-out and no significant additional wastewater flow is expected in the future. Request for Quotation 14-6213-72, "PS300.04 Rehabilitation," was distributed July 6, 2016, to the six vendors under the Fixed-Term Underground Utilities Contract 14-6213. The four quotes received by the July 29,2016,deadline are summarized below. VENDOR QUOTE Haskins, Inc. $301,990.00 Douglas N. Higgins,Inc. $399,957.35 Quality Enterprises USA, Inc. $415,863.00 Mitchell& Stark,Const. Co., Inc. $554,990.00 The engineer's opinion of probable construction cost was $403,897.25. Staff reviewed the quotations and determined Haskins, Inc., to be the lowest qualified and responsive bidder at approximately 25 percent below the engineer's cost estimate. The quote tabulation and graph of the results are Attachments 1 and 2, respectively. The Procurement Services Division concluded that bidding was competitive and representative of market conditions. The project design professional, Agnoli Barber & Brundage, Inc., Packet Pg. 1090 16.C.3 09/13/2016 also recommends award of this work order to Haskins, Inc., as stated in the attached letter dated August 1, 2016 (Attachment 3). Haskins, Inc., has a satisfactory performance and warranty record on other similar county utility-related construction projects. The bid specifications informed the bidders there may be unforeseen conditions associated with the project. The project cost includes an allowance of $39,390.00 for owner-directed work due to unforeseen corrosive or geological conditions that include, but are not limited to,repairs due to structural deterioration, and/or replacement of defective mechanical equipment and deficient electrical components. The price for any additional work due to unforeseen conditions shall be negotiated prior to the start of any such work in accord with the county's Procurement Ordinance and the terms of the agreement. FISCAL IMPACT: Funding is available in, and is consistent with,the FY2016 Capital Budget approved by the Board on September 24, 2015. The source of funding is the Wastewater User Fee Fund (414). This is a replacement project; therefore, operating costs are not expected to change. LEGAL CONSIDERATIONS: This item has been reviewed by the County Attorney, is approved as to form and legality,and requires majority vote for approval. -JAK GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, approves a $301,990 work order to Haskins, Inc.,under Request for Quotation 14-6213-72 for the Pump Station 300.04 Project No. 70046; and, authorizes the Chair to sign and execute the work order. Prepared By: Zamira DelToro,Project Manager,Public Utilities PPMD Division. ATTACHMENT(S) 1.Attachment 1-Quote Tabulation (PDF) 2.Attachment 2-PPMD Quote Analysis (PDF) 3.Attachment 3-Recommendation Letter (PDF) 4.Attachment 4-WO (PDF) Packet Pg. 1091 1 6.C.3 09/13/2016 COLLIER COUNTY Board of County Commissioners Item Number: 16.C.3 Item Summary: Recommendation to approve a$301,990 work order under Request for Quotation 14-6213-72 to Haskins Inc., to rehabilitate pump station 300.04 under Wastewater Pump Station Technical Support Project Number 70046. Meeting Date: 09/13/2016 Prepared by: Title:Project Manager—Public Utilities Planning and Project Management Name: Zamira Deltoro 08/08/2016 4:58 PM Submitted by: Title: Division Director-Public Utilities Eng—Public Utilities Planning and Project Management Name: Tom Chmelik 08/08/2016 4:58 PM Approved By: Review: Procurement Services Lissett DeLaRosa Level 1 Purchasing Gatekeeper Completed 08/09/2016 8:18 AM Public Utilities Department Margie Hapke Level 1 Division Reviewer Completed 08/09/2016 9:45 AM Public Utilities Operations Support Joseph Bellone Level 1 Sim.Reviewer 1-8 Completed 08/09/2016 10:03 AM Public Utilities Planning and Project Management Tom Chmelik Level 1 Sim.Reviewer 1-8Completed Wastewater Beth Johnssen Level 1 Sim.Reviewer 1-8 Completed 08/10/2016 5:51 AM Procurement Services Swainson Hall Level 1 Purchasing Reviewer 1-4 Completed 08/10/2016 12:41 PM Public Utilities Planning and Project Management Craig Pajer Level 1 Sim.Reviewer 1-8Completed Procurement Services Scott Johnson Level 1 Purchasing Reviewer 1-4 Completed 08/12/2016 4:20 PM Procurement Services Allison Kearns Level 1 Purchasing Reviewer 1-4 Completed 08/13/2016 10:12 AM Public Utilities Department George Yilmaz Level 2 Division Administrator Review Completed 08/15/2016 2:28 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/15/2016 3:05 PM County Attorney's Office Jeffrey A.Klatzkow Level 3 County Attorney's Office Review Completed 08/15/2016 4:27 PM Office of Management and Budget Susan Usher Level 3 OMB 1st Reviewer 1-4 Completed 08/15/2016 5:58 PM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 08/28/2016 10:16 AM Board of County Commissioners MaryJo Brock Meeting Pending 09/13/2016 9:00 AM Packet Pg. 1092 m (uogeli�Egeyaa 40'00£Sd:Z6LI.) uoge�ngel along-E,luawyoelly:luawyoelly co (.i — m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U 0 0 0 0 0000 0 0 0 0 0 0 0 0 0 0 0 0 000000 000 0 `o •- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 O C1 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m 0 0 0 0 0 0 0 0 0 0 0 D) 0. _ Y 0 N 0 O VO 0 N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 6- 0 CO CO Of y @ .-r V (O .- M W I- O CO W V (0 N (O N W V co O W W CO (O V Q N N O 0 N 0 CO ,- CO V V N N- .- N V ,- (O V ^ (NO .,C cd F b3 be be be to b) 69 bf be be be be 69 (9 69 fA 69 69 be bi 69 69 b)69 be 69 bi be be 69 n.. T, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 o o o o o (Li u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ._ OO o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 .1 . 0 0000 000000 . . . . . . 0 0 0 0(D - - 0 N- .- , M W I- O N W V N (1) (0 N (D V W o W W M (O V C 1- N A- CO V .- V N N- .- CO V 6- CO @ J O be 69 be be be b3 be be bi be b) 09 09 bf bi E9 be be be be be 69 be be be be I- u 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co co CO U) a 0000 00) 00 O N M 0 0 0 O O O O N O 000000 O N V (D W 0) 0 0 N- O CO I. r W N CO N Q CO O) M I� (O O N o 0 CO N- W O W N 0 @ N- co CO NNN O) CO O V co I- CO O co co V 0) COCO N V N N W V N Y) CO CO N CO CO (O �O Z. F CO V - N be be 69 be 69 (A be bf bi be bf be be (9 (9 (9 (9 (A a 69 bi 69 be bi(9 (9 bi 69 (A @ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (0 O 0 O O O O 0 0 0 0 000000 0 0 0 0 0 0 0 0 0 0 0 0 0 o0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O (O O V) O N co 0 0 0 O O O O N O 0 0 0 0 (O O O@ A: N M W O Ns O CO N- r W N W N Q W O) M N N O (O O O W r W O O 0 0 M M N N CO O) CO 0 V O) N- M O W CO V M co co N V N N CO 17 G (0 r N CO .- N 1- .-- CO N (e a 0 O bi b) b) b) b( 69 bi b) VI b) (A bi b) (A b) bf (A N bi bi b) bi b)bf VI(A b)0 I- d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000 O O LO N U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000 00 M CO W M O 0 W W N N O M V W M U) (O M V N O .- O CO O O O O N O W- W W VM 1 M VN N P. M V h I:.r 0 W M M MV W IOM N- V M� (NO OV O O'- CO 1W�W T N a 6 N Q V (O N N W (O W .- I� .- M M V M M (()LU co N- N D) _C O N (O t- - co, .- N- CO V N D) M M 0) to b> (A 69 be b) be be 69 b) be 69 69 bf 69 69 69 be 69 be 69 b) b)bi 69 be 69 69 be H = 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O Z 0 0000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a WO) 0 (O W (O CO CO O CO V W6 (D CO V (D O O O 0 0 0 O CO N V W W V N- (O N 0 CO V ,- N- r U) CO M V (O I- V CO (D 0 0 0 a 0 CO CO CO M V N I,- O N r N 0 W N N M 0 CO I-- V ,- N V N ,- M 0 0 lt (nN Q Ni N N CO W W W .- I� .- .- CO M .- V CO CO V)(O to I- C ,_ CO (O ,_ ,_ ,_ CO ,_ N- CO @ D J O b) bi fA b) bi b) b) bi 0 b) bf 0 b) bi bi bi bl bi 0 b) b) 69 bi bl b)b) b(co I- 1 N 0 0 0 0 o O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 U 0000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000000 000 0 . 0 . O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O .?-3 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C)o M m O W Q O (O co O N O O 0 O O O O O N (O O O W N V O N N o CO CO O) = c .a .-COQ Q N ,_ W N N Q N N (O ,- N W V W N W N V r' N CO CO O O C O N CO 0 ~ bi bi bi IA 69 69 be 69 be 69 bi be be 69 be 69 bi bf 69 69 bi bi 69 b)b)C9 69 69 69 (9 X 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 7 = V O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Ta co a 00 '0O (I) W O N 000000 0 0 0 (00 0 0 (O N Q O N N 0 0 000000 0 0 L C C N .- Q Q 0: ,_ u) N N V (O N N ,_ N W V W I� W O Q 0 I- CC N .- r (O CO N11, e _ b) 0 be 0 be bi bi bi be be bi bi bi be be b> bi bi bi bi be bi (A EA be be be(0 I- C E __,____I0 0 0 01 U. 3C0000000 0000 000000 00) 10000 00000 0 N- = C J J J J J J J J J J J J J J J J J J J J J J J J J J O O 'c':3 co• a a i C .O a c ti o °' U _ N dE ._ ci S.t) O d TB 2 (n U co 3 il r U O oi ‘>' I) L. j @O N U 0 C L 0 0 0 0 E _c0 0 . 0 y '� N Ti• (0N N W >. @ M O` 0 N CO @ 0 G 0 J O _ C U U y O o a 'm 0 0 d 'u .= 3 m d m ` c) O 0 m 0 c a 2 C c E a@ E c N - a � o rp mii NNJ a U o a O) Oc ) C 0 Nc @ O = C y@O N 3 T: RI U) Od 'O O Q . n Ira @0 O . C to wQO N 3 N N cm ' 0 mQm L W c0 ' 0) C - • DL Nu c > Eo 5 , - , a) O -O c .0 O C W O NJ N @ O N N 0 NO aC C C 0 @ 2 .0 a C o .O _ C N0 III c C a0 Y a a E O O. 0a 00 0 0 0 d CW d E OC o@ a@ o n @ N d C N fyOC d N dO. J @ U @ C o 'a 7 C ') 0 0 - N M$ L L Ea 0 (`0- L 3 O m O N O r 2 O C ON .Ol O •J a U N N O ad @ C UN0 C @ U O Uc = N O L U C @ O O - 'O -,,,a ill w OT00 U o O .1 a a ' U ¢ Uo00O 'mo L Z o o u ac > mN N 6 LNEsa Lm . U0CfCUl N Uj3g c obv c .S m @ > c m ; V_ o 3 a ` o f .N Ei UoE a m o0 >- .❑ .4 `o o •:c7; `0 a m >@ .Ea U a o .N c a (0 c ,aaN 3o v 11,5) 0 0 0V O o XNm .CJ mD ,- O N N O) @ ` C00 F0- ` �.9C ` N U IL U ` aN O >. N N N C W p, a U ui ` N J mN C N OLY @ a@ LL. a QLL El o OaN N D@M.0 H0 O W >.O 9 22 C C C OJc N UL N ` . 0 r T. 22 n .S E E wEV o0a2Nc3 , 0 , n` 9 C 6 Z . McLCe6 3 Y N 0 5 QJ a 3 3 0 0 i! Z • M > N � = U 0 (O J U 0O Nw w U 0(J w ❑ 0 O 2 2 j E Z - N M V (D W N_ W U M O - N M V J (0 CO I"- CO M O V N M V N (o O co O N W W - - - - > v- - - .- 6- N J N N N N N N Q N M - C7 2 U w Q ..tt. c:, r. (uoge;!!!cieliaU 't70'00eSd : Z6LL) ci) st s!sAieuy aiont) OVIdd-Z luowq3e44v :luawitoell ci tif et. ..., (.i a) .Nc cci tap C) c) ._ = = ca 0- a) su _ > 0 , 8 co co a) .`t '6 w 4° < 7, 1-,.: 00 i ,' _C ,._, > 4-' CJ Pt,= C-- (1) (13 4' ' '''''' 0 7 0 411';$ 1.j (0 '•L '4- 21 '*4'''' ') _L-, U I I .. 1 062". c, ,..) -- , 1 I 1 . :II il 11 1 i I , i c •I ; I I . I 1 ° • : a a.) CU .iI ..., = ..1, : L.,..1 I .... I Z-- ...... .... ._ I:2 - 1 I r° R3 •1 1 1 cf= 1 ..0 1 .1 a) 1 ce I .zt I I o • 1 1 •::.11 o o I ._ m z o 1 '' 1 0 0_ 1 ...... :I 1 I esi N i i 1 m I :1 1 1 • u v-i 1 i I 1 c%1 1 . I lt3 , 1 Cr 1 t-1 1 a • • • a,... o 1 . • . , 4_, = I00 (J) I , a) ' cc 1 11 1 0 0 0 LU c cp 0 c c c cr.) c ci O Q o v-) Q O o o o C O d C 0 C 0 C 0 C" C 0 C"0 o' C o 6' C C ,--1 c)" o" 0 (+4 0 m •(/), Cr 0 Ln tn Lt) .Ln ir) in- 16.C.3.b Collier County Pump Station 300.04 Rehabilitation Engineer's Opinion of Probable Construction Cost(Lump Sum) Agnoli,Barber&Brundage,Inc ABB PN 15-0049 Collier County Project 70046 Item Description Quantity Unit Engineer's _ Opinion of Cost GENERAL 1 Mobilization,Demobilization,Bonding,Insurance 1 LS $ 10.000.00 2 Pre-construction Video and Post-construction Video 1 LS $ 1,500.00 3 Maintain record drawings/survey 1 LS $ 2,000.00 4 Maintenance of traffic 1 LS $ 5,000.00 DEMOLITION,RELOCATION AND TEMPORAY FACILITIES 5 _Demolition and disposal of drywell/vault piping,slab,antenna,electrical,etc. 1 LS $ 2,000.00 6 Demolish Existing,Conduit,Wire,and Control Panels. 1 LS $ 15,000.00 7 Sitework-clearing,tree removal,dewatering,fill,grading,limerock,pavement restoration,etc. 1 LS $ 10,000.00 8 Temporary Bypass Pumping System 1 LS $ 25,000.00 MECHANICAL 9 Wetwell piping,above ground&buried piping,fittings,adaptors,plug&check valves,wetwell misc.,etc. 1 LS $ 20,465.00 10 Air Release Valves,check valves,air piping,fittings,pressure gauges 1 LS $ 11,750.00 11 300 PSF Aluminum Acess Hatch&Frame W/316 SS Harare Installation 1 LS $ 6,500.00 12 Pipe support stanchions,misc.hangers,brackes,fasteners,seals,316 ss hardware,etc. 1 LS $ 8,650.00 13 Vent Piping,Collar,Cover and Meter Box 1 LS $ 1,850.00 14 Install 2 Flygt pumps,and equipment specified by Addendum 1. 1 LS $ 60,000.00 CIVIL 15 Misc.site restoration,sod,Prime&Paint above ground piping,etc. 1 LS $ 5,500.00 16 Silt fence/erosion control 1 LS $ 1,500.00 17 Concrete,slabs,stone,&all other miscellaneous items not specifically listed. 1 LS $ 10,500.00 18 Patch holes in wetwell,abrasive blast,pressure clean wetwell 1 LS $ 4,500.00 19 Sewpercoat application-entire wetwell 1 LS $ 20,000.00 0 20 Landscaping&Irrigiation 1 LS $ 8,500.00 ELECTRICAL = 21 Service entrance conductors 1 LS $ 45,000.00 16 s 22 Electrical Equipment&Installation(pedestal,conduit,wire,panel installation,float switches,etc.) 1 LS $ 35,000.00 m 23 Surge suppression systems 1 LS $ 2,500.00 24 Conduit and wire,misc 1 LS $ 15,000.00 25 Lightning Protection,bonding&grounding 1 LS $ 7,500.00 1 26 Subcontractor overhead and profit LS $ 6,000.00 ADD ALTERNATES 29 Data Flow Telemetry Enclosure installation and interconnecting wiring 1 . LS $ 10,000.00 rn 30 'Owner-Directed Work for Unforseen Conditions 15%(geological,corrosion,etc.) As Required $ 52,682.25 Total I$ 403,897.251 O • • 2 a N f6 m 1 of 1 Packet Pg.1095 16.C.3.c �GNOLIAgirt . F l,4a.IJARBER& � r :.BRUNDAGE, <:. Professional enzineeis,planners&land surveyors -400 Tamiami Trail North,Suite 200,Napl s,Florida 34i11fy-(239)c97-311) I AX (239)566-2203 August 1, 2016 Ms. Zamira Deltoro Collier County Public Utilities 3339 Tamiami Trail East, #303 Naples, FL 34112 g 15 Re: RFQ 14-6213-72 PS300.04 Rehabilitation, ABB PN 10-0109 Dear Ms. Deltoro: a We are in receipt of the bid tabulation prepared by Collier County Purchasing dated 8/1/16 in reference to the above specified construction project bid. The apparent low bidder as verified by Purchasing's spreadsheet was Haskins Inc with a low bid of$301,990.00. We have considerable experience with Haskins on utility projects where they constructed our designs and feel they are qualified to perform this work for Collier County Public Utilities. r Based on the information provided, we recommend the construction contract be awarded to 0 Haskins Inc. the bid amount. a) E Should there be any questions, please feel free to contact our office. m re Sincerely, AGNOLI, BARBER, & BRUNDAGE, INC. D • C:)/11,.0111 -4 4/)-7; c:, CD Dominick J. Amico, Jr, P.E. �? Project Engineer `t Packet Pg. 1096 16.C.3.d -"WORK ORDER/PURCHASE ORDER Contract 14-6213 "Underground Utility Contrag" Contract Expiration Date: July 7,2018. RFQ 14-6213-72 PS300.04 Rehabilitation ✓ This Work Order is for underground construction services for work known as: Project Name: PS300.04 Rehabilitation Project No: 70046.4.4.3. ✓ The work is specified in the proposal dated July 22, 2016 which is attached hereto and made a part of this Work Order. In accordance with Terms and Conditions sof the Agreement referenced above, this Work Order/Purchase Order is assigned to: Haskins, Inc. it E 0 Scope of Work: As detailed in the attached proposal and the following: * Task I Construction of Pump Station * Task II Owner-Directed Work for Unforeseen Conditions / o / c Schedule of Work: Complete work within 180 days from the date of the Notice to Proceed which is co accompanying this Work Order. The Consultant agrees that any Work Order that extends beyond the a_ expirationdate of Agreement# 14-6213 will survive and remain subject to the terms and conditions of N that Agreement until the completion or termination of this Work Order. ti Compensation: In accordance with the Agreement referenced above, the County will compensate the 3 Firm in accordance with following method(s): ®Negotiated Lump Sum (NLS) (Lump Sum Plus d• Reimbursable Costs (LS+RC) ®Time & Material (T&M) (established hourly rate— Schedule A) n Cost Plus Fixed Fee (CPFF), as provided in the attached proposal. Task I $262,600.00 (NLS) Task II $ 39,390.00 (T&M) ✓ n )(\ TOTAL FEE $301,990.00 U g 0 PREPARED BY: ✓•C --c � '—' caV3\ Zn). Zamira DelToro, PPMD Project Manager Date APPROVED BY: j 8 ?J Craig PajkigkE., PP f' Principal Project Manager Date Imp APPROVED BY: 7/9 •l `�- 37 /t!�ToChmelik, P.E., PPMD Director Date Page 1 of 3 Packet Pg. 1097 16.C.3.d APPROVED BY'. Y — (0/1//6. eth J. 7nssen U Wastewater Director Date APPROVED BY: 4,.:f .Ati �_ 74/4 Joseph B-) ne, P Operation Director Date 1 i f "S -f{{y APPROVED BY: �.: _. <.: -z� .4 -_.._ 1. . -.., ~'` George Yilmaz, Ph. D.,PU Dept. Administrator Date Y By the signature below, the Firm (including employees, officers and/or agents) certifies, and hereby discloses,that,to the best of their knowledge and belief, all relevant facts concerning past, present, or currently planned interest or activity(financial,contractual,organizational,or otherwise)which relatescn to the proposed work; and bear on whether the Firm has a potential conflict have been fully disclosed. Additionally,the Firm agrees to notify the Procurement Director, in writing within 48 hours of learning ti of any actual or potential conflict of interest that arises during the Work Order and/or project duration. 0 ACCEPTED BY: Haskins, Inc. - ll J�i cts Ryan Ma ce,Treasurer Date a) E 0 (Remainder of page intentionally left blank) Page 2 of 3 Packet Pg. 1098 16.C.3.d IN WITNESS WHEREOF, the parties hereto,have each, respectively, by an authorized person or agent, have executed this Work Order on the date and year first written below. ATTEST: BOARD OF COUNTY COMMISSIONERS Dwight E. Brock, Clerk of Courts COLLIER COUNTY, FLORIDA By: By: Donna Fiala, Chairman Dated: (SEAL) Haskins, Inc. 0 aS 1 '4/3 ,•//;#By: Ad Asirets First Withless ature v Ryan acPhee,Treasurer Mabel Lago TType/print signature and titleT TT �lype/print less nameT a Second • s 0 Sol Panpakdeediskul 4 TType/print witness nameT E C, Approved as to Form and Legality: Assistant County Attorney c r Print Name Page 3 of 3 Packet Pg. 1099 16.C.3.d REQUEST FOR QUOTATIONS FOR MULTIPLE PROJECTS UNDER CONTRACT #14-6213 "Annual Contract for Underground Utilities & General Contractors" Date: July 6, 2016 From: Swainson Hall, Procurement Strategist 239-252-8935, Telephone Number 239-252-6597, Fax Number sYt^moi;tt Sonh i! 'cpiliera 4.ii To: Potential Quoters c Subject: RFQ 14-6213-72 PS300.04 Rehabilitation 7.0 o As provided in the referenced contract, the Collier County Procurement Services Division is soliciting quotes for the referenced project. 2 m t � RFQ Due Date: Ju,,, 22 201E, 2: 22:C1 0 cn Pre-Quote Meeting: .27 72-21 E, Nack, 34.1:. n. Q&A Deadline: u. 5.00 Ply', N Number of Days to Final Completion: 230 Scope Provided ' 0 Plans and Specs: Liquidated Damages: S1.271..5 Payment& Performance Bonds l, ' 5200.000.00 Your quotation response for this project is due no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date. If your firm is unable to respond electronically, your quotation must be received in the office of the Purchasing Department at the above referenced address no later than the time and date specified. We look forward to your participation in this request for information/quotation process. c Haskins Inc. Firm's Complete Legal Na - 239-947-1846 /239-"47-3857 Teleph e Nu7- ,J :1Number Sign }�r-' Ti"�asurer Title Ryan MacPhee 7/22/16 Print Name Date C: Zamira Del Toro/ Project Manager 1 RFQ 14-6213-7' Packet Pg. 1100 16.C.3.d Collier County Pump Station 300.04 Rehabilitation Bid Tabulation Form Project Manager: Zamira Deltoro May 2016 Collier County Project 70046 Revised July 21,2016 Revised July 27,2016 Total Price Item Description Quantity Unit Unit Price GENERAL 1 Mobilization,Demobilization,Bonding,Insurance 1 LS $ 25,000.00 25,000.00 2 Pre-construction Video and Post-construction Video1 LS $ 1,600.00 $ 1,600.00 3 Maintain record drawings/survey 1 LS $ 4,400.00 $ 4,400.00 4 Maintenance of traffic1 LS $ 4,000.00 $ 4,000.00 5 Demolition and disposal of drywell/vault piping,slab,antenna,electrical,etc. 1 LS $ 7,500.00 $ 7,500.00 6 Demolish Existing,Conduit,Wire,and Control Panels. 1 LS $ 800.00 $ 800.00 7 _Sitework-clearing,tree removal,dewatering,fill,grading,limerock,pavement restoration,etc. 1 LS $ 17,000.00 $ 17,000.00 8 Temporary Bypass Pumping System 1 LS $ 5,200.00 $ 5,200.00 MECHANICAL 9 Wetwell piping,above ground&buried piping,fittings,adaptors,plug&check valves,wetwell misc.,etc. 1 LS $ 5,000.00 $ 5,000.00 10 Air Release Valves,check valves,air piping,fittings,pressure gauges 1 LS $ 2,000.00 $ 2,000.00 11 300 PSF Aluminum Acess Hatch&Frame W/316 SS Harware Installation 1 LS $ 4,500.00 $ 4,500.00 12 Pipe support stanchions,misc.hangers,brackes,fasteners,seals,316 ss hardware,etc. 1 LS $ 5,000.00 $ 5,000.00 13 Vent Piping,Collar,Cover and Meter Box 1 i LS $ 2,000.00 $ 2,000.00 14 Install 2 Flygt pumps,and equipment specified by Addendum 1 1 LS $ 15,000.00 $ 15,000.00 CIVIL 15 Misc.site restoration,sod,Prime&Paint above ground piping,etc. 1 LS $ 13,000.00 $ 13,000.00 16 Silt fence/erosion control 1 LS $ 2,000.00 $ 2,000.00 17 Concrete,slabs,stone,&all other miscellaneous items not specifically listed. 1 LS $ 6,500.00 $ 6,500.00 18 i Patch holes in wetwell,abrasive blast,pressure clean wetwell 1 LS $ 1,500.00 $ 1,500.00 19 Sewpercoat application-entire wetwell 1 LS $ 14,000.00 $ 14,000.00 20 Landscaping&Irrigiation 1 LS $ 6,000.00 $ 6,000.00 E ELECTRICAL .2 21 Service entrance conductors 1 LS $ 57,600.00 $ 57,600,00 2 22 Electrical Equipment&Installation(pedestal,conduit,wire,panel installation,float switches,etc.) 1 LS $ 16,200.00 $ 16,200.00 ;S 23 Surge suppression systems 1 LS $ 1,400.00 $ 1,400.00 r 24 Conduit and wire,misc 1 LS $ 20,000.00 $ 20,000.00 eiCC 25 Lightning Protection,bonding&grounding 1 LS $ 4,200,00 $ 4,200.00 cr o 26 Subcontractor overhead and profit 1 LS $ 1,200.00 $ 1,200.00 0 ADD ALTERNATES o co 29 'Data Flow Telemetry Enclosure installation and interconnecting wiring 1 1 f LS 1$ 20,000.00 $ 20,000.00 Lb Sub-Total $ 262,600.00 a 30 'Owner-Directed Work for Unforseen Conditions 15%(geological,corrosion,etc.) 1 15%of sub-total I $ 39,390.00 rn Total Bid $ 301,990.00 0 'NOTE: 15%-Owner reserves these funds for owner-directed work. There is no guarantee that the contractor will receive any portion of these 4 additional funds. dc ADDITIONAL NOTES: E (1) Contractor is responsible to purchase all job materials and equipments,for receiving,unloading,verifying condition,protecting and installing u these materials and equipment not including the materials listed in Addendum 1.The Contractor will be responsible for the warranty of the installation.All items shown in th eprevious detailed breakdown are to be provided unless purchased by County. Q (2) The Contractor is responsible for all required bypassing and shall provide power to lift station throughout construction.Contractor to submit m bypass pumping plan to County and Engineer for approval. E s (3) Weekly progress meetings will be held for the project.The Contractor shall have his Project Manager and lob Superintendent at all progress m meetings.The Contractor shall provide an update of all work in the past week and a two(2)week look ahead.The Contractor on a weekly basis Q shall provide an updated project schedule.The Contractor will need to supplement with additional crews as necessary to remain on schedule for timely completion. (4) All Contractor Personnel(including subcontractors)shall complete a Collier County Facilities Contractor background check.Only those personnel passing this security check shall be allowed on the Project Site.All personnel shall wear the issued badge at all times while on the project.The Contractor shall be responsible for all costs of obtaining the background checks and issued identification badge.Badges shall be reissued annually as required. (5) All excavation shall be unclassified with no additional payment to be made for rock,muck or other materials.Contractor will be responsible for all replacement fill material. Contractor shall obtain all necessary permits-tree removal permit,etc. 1 of 1 Packet Pg.1101 16.C.3.d C 7e" Coumy Email: SwainsonHall@colliergov.net Telephone: (239)252-8935 Administrative Services Division FAX: (239)252-6334 urchasing ADDENDUM #1 Memorandum Date: July 7, 2016 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum #1 — RFQ 14-6213-72 PS300.04 Rehabilitation o The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: a) CL CHANGE: Pre Quote Meeting Time Update Current Date and Time— Friday, July 7, 2016 at 10:00 AM N ti Updated Date and Time— Friday, July 7, 2016 at 9:30 AM 0 If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Zamira Del Toro, Project Manager c) RS Packet Pg. 1102 16.C.3.d ie?' Email: SwainsonHall@colliergov.net rt Telephone: (239)252-8935 1 dministcatve ServicesgDivision FAX: (239)252-6334 Purchasing ADDENDUM #2 Memorandum Date: July 11, 2016 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum #2— RFQ 14-6213-72 PS300.04 Rehabilitation o The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: a) CHANGE: v Pre Quote Meeting Time Update co) a Current Date and Time— Friday, July 15, 2016 at 10:00 AM 0) r-- Updated Updated Date and Time— Friday, July 15, 2016 at 9:30 AM 0 If you require additional information please post a question on the Online Bidding site or contact me c using the above contact information. W c: Zamira Del Toro, Project Manager a Y a) E U t4 w Packet Pg. 1103 16.C.3.d O Tom„ Comity Email: SwainsonHall@colliergov.net Telephone: (239)252-8935 Administrative Services Division FAX: (239)252-6334 Purchasing ADDENDUM #3 Memorandum Date: July 21, 2016 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum #3— RFQ 14-6213-72 PS300.04 Rehabilitation o The following clarifications are issued as an addendum identifying the following changes for the referenced solicitation: C0 a) CHANGE: c 1. Due Date Update Current Date and Time— Friday, July 22, 2016 at 3:00 PM N C, ti Updated Date and Time— Friday, July 29, 2016 at 3:00 PM 0 2. Updated Quote Schedule (See Attached) v 3. "The data flow telemetry control unit may be supplied in a separate enclosure in lieu of integral to E the pump control panel as shown on sheet E5. In addition CCUD may opt to mount the pump termination cabinet to the side of the pump control panel in lieu of below it as detailed on sheet E4. As an add alternate provide a cost for the following scope: 1. Increase size of equipment rack to allow for mounting of the Telemetry panel and the pump termination cabinet on the side of the pump control panel. Telemetry cabinet and pump termination cabinet may be stacked. 2. Include installation cost for owner supplied Telemetry Panel. 3. Provide interconnecting wiring between pump control panel and Telemetry panel including (3)#12 in 0.75"C for 120V power and (37) conductor#14 control cable in 2"C. Enclosed is the updated bid tab sheet with the Add Alternate item included. 4. The equipment and parts specified in the quote enclosed will be purchased by the County. The Contractor is responsible for its safe keeping and proper installation upon their taking possession of the materials. (See Attached) If you require additional information please post a question on the Online Bidding site or contact me using the above contact information. c: Zamira Del Toro, Project Manager Packet Pg. 1104 16.C.3.d y:yern. Xylem Water Solutions USA, Inc. 5771 Country Lakes Drive Fort Myers, Florida 33905 Phone: 239-693-5226 Fax: 239-693-1485 To: Bidding Contractors Date: June 16, 2016 Subject: Collier PS 300.04 Quote Number: 2016-FTM-0223 We are pleased to offer the following equipment: (2) CP3102.181 435 imp 5hp/230v/3ph Flygt Pump with 50' Cable, Prepared for Flush Valve (1) Valve, Flush (1) Duplex Control Panel 5hp/230v/1 ph Built to Collier Standards with VFD's for Phase Conversion (1) DFS Control Panel (2) 20'X1/4" Lift Chain 316SS O (2) 4"X4" Discharge Connection (2) Collier County Base Plate 24X24x1/4" 304SS (16) %"X 8 '/2"Threaded Rod 316SS to L (4) Adhesive Anchoring System (4) Nozzle, Adhesive d (4) 20'X2" Guide Rail 316SS (2) 2" Upper Guide Bar Bracket 316SS (1) Cable Holder 316SS n. (1) Wetwell APD Retrofit Hatch for 29"X47" Hole (1) Start Up Charge ti NOTE: FLOATS BY OTHERS 0 Price: $ 67,543.00, plus taxes if applicable, including freight, FCA Origin E We thank you for your interest in our equipment and look forward to being of service to you in the near future. 4- IN THE ABSENCE OF A FORMAL ISSUED PURCHASE ORDER, A SIGNED FACSIMILE COPY OF THIS PROPOSAL Q IS ACCEPTABLE AS A BINDING CONTRACT. c The Xylem Water Solutions USA, Inc. North American Terms &Conditions of Sale apply to this offer. f6 Xylem Water Solutions USA, Inc. Company Name: Accepted By: PO#: Print Name: Chris Stewart Date: \de Packet Pg. 1105 16.C.3.d O' lam!'" COUTIttY Email: SwainsonHall@colliergov.net Telephone: (239)252-8935 FAX: (239)252-6334 Administrative Services DMsicxn u'urchasing ADDENDUM #4 Memorandum Date: July 28, 2016 From: Swainson Hall, Procurement Strategist To: Potential Proposers Subject: Addendum #4— RFQ 14-6213-72 PS300.04 Rehabilitation o The following clarifications are issued as an addendum identifying the following changes for the = a referenced solicitation: fII a) ce CHANGE: c 0 1. Updated Quote Schedule (See Attached) Cl) n. N If you require additional information please post a question on the Online Bidding site or contact me an using the above contact information. 0 v c: Zamira Del Toro, Project Manager c a) E C.)2 w Zi. Q s.: a) E C) .. Ca Q Packet Pg. 1106 16.C.3.d Collier County Pump Station 300.04 Rehabilitation Bid Tabulation Form Project Manager: Zamira Deltoro May 2016 Collier County Project 70046 Revised July 21,2016 Revised July 27,2016 Item Description Quantity Unit Unit Price Total Price GENERAL 1 Mobilization,Demobilization,Bonding,Insurance 1 LS $ - 2 Pre-construction Video and Post-construction Video 1 LS $ - 3 Maintain record drawings/survey 1 LS $ - 4 Maintenance of traffic 1 LS $ - 5 Demolition and disposal of drywell/vault piping,slab,antenna,electrical,etc. 1 LS $ 6 Demolish Existing,Conduit,Wire,and Control Panels. 1 LS $ - 7 Sitework-clearing,tree removal,dewatering,fill,grading,limerock,pavement restoration,etc. 1 LS $ - 8 Temporary Bypass Pumping System 1 LS $ - MECHANICAL _9 Wetwell piping,above ground&buried piping,fittings,adaptors,plug&check valves,wetwell misc.,etc. 1 LS $ - 10 Air Release Valves,check valves,air piping,fittings,pressure gauges 1 LS $ - 11 300 PSF Aluminum Acess Hatch&Frame W/316 SS Harare Installation 1 LS $ - 12 Pipe support stanchions,misc.hangers,brackes,fasteners,seals,316 ss hardware,etc. 1 LS $ - 13 Vent Piping,Collar,Cover and Meter Box 1 LS $ - 14 Install 2 Flygt pumps,and equipment specified by Addendum 1 1 LS $ - CIVIL 15 Misc.site restoration,sod,Prime&Paint above ground piping,etc. 1 LS $ - 16 Silt fence/erosion control 1 LS $ - 17 Concrete,slabs,stone,&all other miscellaneous items not specifically listed. 1 LS $ - 18 Patch holes in wetwell,abrasive blast,pressure clean wetwell 1 LS $ - 19 Sewpercoat application-entire wetwell 1 LS $ - 20 Landscaping&Irrigiation 1 LS $ - —a- ELECTRICAL ELECTRICAL o 21 Service entrance conductors 1 LS $ - w 22 Electrical Equipment&Installation(pedestal,conduit,wire,panel installation,float switches,etc.) 1 LS $ - Fit 23 Surge suppression systems 1 LS $ - ,_ ckt 24 Conduit and wire,misc 1 LS $ - C 25 Lightning Protection,bonding&grounding 1 LS $ - sr 26 Subcontractor overhead and profit 1 LS $ - q 0 ADD ALTERNATES _ _ _ _ _ _ _ _ a 29 Data Flow Telemetry Enclosure installation and interconnecting wiring ( 1 1 LS J $ - d Sub-Total $ - 30 'Owner-Directed Work for Unforseen Conditions 15%(geological,corrosion,etc.) I 15%of sub-total I $ - N n Total Bid $ - " 0 •NOTE: 15%-Owner reserves these funds for owner-directed work. There is no guarantee that the contractor will receive any portion of these 4 additional funds. or or ADDITIONAL NOTES: E (1) Contractor is responsible to purchase all job materials and equipments,for receiving,unloading,verifying condition,protecting and installing o these materials and equipment not including the materials listed in Addendum 1.The Contractor will be responsible for the warranty of the installation.All items shown in th eprevious detailed breakdown are to be provided unless purchased by County. Q (2) The Contractor is responsible for all required bypassing and shall provide power to lift station throughout construction.Contractor to submit y bypass pumping plan to County and Engineer for approval. E t (3) Weekly progress meetings will be held for the project.The Contractor shall have his Project Manager and Job Superintendent at all progress m meetings.The Contractor shall provide an update of all work in the past week and a two(2)week look ahead.The Contractor on a weekly basis Q shall provide an updated project schedule.The Contractor will need to supplement with additional crews as necessary to remain on schedule for timely completion. (4) All Contractor Personnel(including subcontractors)shall complete a Collier County Facilities Contractor background check.Only those personnel passing this security check shall be allowed on the Project Site.All personnel shall wear the issued badge at all times while on the project.The Contractor shall be responsible for all costs of obtaining the background checks and issued identification badge.Badges shall be reissued annually as required. (5) All excavation shall be unclassified with no additional payment to be made for rock,muck or other materials.Contractor will be responsible for all replacement fill material. Contractor shall obtain all necessary permits-tree removal permit,etc. 1 of 1 Packet Pg.1107