Loading...
Agenda 09/13/2016 R Item #16A23 16.A.23 09/13/2016 EXECUTIVE SUMMARY Recommendation to approve final acceptance and unconditional conveyance of the water and sewer utility facilities for Talis Park Drive Extension, PL20140000987/PL20130002663, and to authorize the County Manager, or his designee,to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of $41,866.69 to the Project Engineer or the Developer's designated agent. OBJECTIVE: To have the Board of County Commissioners, as Ex-Officio Governing Board of the Collier County Water-Sewer District, approve final acceptance and unconditional conveyance of these water and sewer facilities and to release the Utilities Performance Security and Final Obligation Bond in the total amount of$41,866.69, in accordance with the Collier County Utility Standards and Procedures, Ordinance No. 2004-31. CONSIDERATIONS: 1) The Developer of Talis Park Drive Extension, has constructed the water and sewer facilities within dedicated easements to serve this development. 2) Preliminary acceptance of these utility facilities was approved by the Engineering and Natural Resources Division on July 8, 2014. At that time,the value of these water and sewer utility facilities (assets)was $29,569.66 and$183,917.98,respectively. 3) Staff recorded all preliminary utility conveyance acceptance documents in the public records of Collier County, which were reviewed and approved by the County Attorney's office as to form and legality. The County acquired its record interest by Utility Facilities Warranty Deed and Bill of Sale recorded in Official Records Book(OR) 5274, at Page(PG)2996,together with the Utility Facilities Warranty Deed and Bill of Sale recorded at OR 5065, PG 1473, and corrected by that certain Utility Facilities Quit Claim Deed and Bill of Sale recorded at OR 5262,PG 3734, all of the Public Records of Collier County,Florida. 4) The water and sewer utility facilities have been operated and maintained during the required one (1) year warranty period,following preliminary acceptance. 5) A final inspection to discover defects in materials and workmanship has been conducted by staff on March 18, 2016 in coordination with Public Utilities and these facilities have been found to be satisfactory and acceptable. 6) Staff recommends final acceptance of the subject utility facilities and to release the Utilities Performance Security and Final Obligation Bond in the total amount of$41,866.69. 7) This final acceptance is in accordance with Collier County Ordinance No.2004-31,as amended. 8) Staff is unaware of any issues that would serve to negate the recommendation to release the applicable security. FISCAL IMPACT: Approval of this Executive Summary will have no specific financial impact. Packet Pg. 637 16.A.23 09/13/2016 However, approval of this Executive Summary will result in the Collier County Water-Sewer District receiving unconditional title to the utility facilities, which at the time of preliminary acceptance, had a total gross value of$213,487.64(no depreciation applied). GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this Executive Summary. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval- SAS RECOMMENDATION: To approve final acceptance and unconditional conveyance of the water and sewer utility facilities for Talis Park Drive Extension,PL20140000987/PL20130002663, and to authorize the County Manager, or his designee, to release the Utilities Performance Security (UPS) and Final Obligation Bond in the total amount of$41,866.69 to the Project Engineer or the Developer's designated agent. Prepared by: Melissa Alvarez, Operations Coordinator, Engineering and Natural Resources Division,Growth Management Department ATTACHMENT(S) 1.Asset Sheets-Talis Park Drive Extension (PDF) 2. Location Map-Talis Park Drive Extension (PDF) 3. Exhibit A-Talis Park Drive Extension (PDF) Packet Pg. 638 16.A.23 09/13/2016 COLLIER COUNTY Board of County Commissioners Item Number: 16.A.23 Item Summary: Recommendation to approve final acceptance and unconditional conveyance of the water and sewer utility facilities for Talis Park Drive Extension, PL20140000987/PL20130002663, and to authorize the County Manager, or his designee,to release the Utilities Performance Security(UPS) and Final Obligation Bond in the total amount of$41,866.69 to the Project Engineer or the Developer's designated agent. Meeting Date: 09/13/2016 Prepared by: Title: Operations Coordinator—Growth Management Development Review Name: Melissa Alvarez 07/21/2016 9:21 AM Submitted by: Title: Department Head-Growth Management Dept—Growth Management Department Name: David Wilkison 07/21/2016 9:21 AM Approved By: Review: Wastewater Steve Nagy Level 1 Sim.Reviewer 1-8 Completed 07/21/2016 9:23 AM Water Steve Messner Level 1 Sim.Reviewer 1-8 Completed 07/21/2016 9:29 AM Water Pamela Libby Level 1 Sim.Reviewer 1-8 Completed 07/21/2016 10:24 AM Growth Management Department Judy Puig Level 1 Division Reviewer Completed 07/21/2016 11:18 AM Growth Management Operations&Regulatory Management Kenneth Kovensky Level 1 Sim.Reviewer 1-8Completed Wastewater Beth Johnssen Level 1 Sim.Reviewer 1-8 Completed 07/21/2016 3:54 PM Growth Management Department Matthew McLean Level 1 Sim.Reviewer 1-8 Completed 07/22/2016 2:41 PM Engineering&Natural Resources Jack McKenna Level 1 Sim.Reviewer 1-8 Completed 07/26/2016 1:07 PM Public Utilities Planning and Project Management Tom Chmelik Level 1 Sim.Reviewer 1-8Completed Growth Management Department Jeanne Marcella Level 2 Division Administrator Completed 08/02/2016 1:16 PM County Attorney's Office Scott Stone Level 2 Attorney Review Completed 08/15/2016 5:23 PM Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 08/16/2016 8:52 AM County Attorney's Office Jeffrey A.Klatzkow Level 3 County Attorney's Office Review Completed 08/16/2016 9:36 AM Budget and Management Office Mark Isackson Level 3 OMB 1st Reviewer 1-4 Completed 08/22/2016 10:57 AM County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 08/27/2016 10:03 AM Board of County Commissioners MaryJo Brock Meeting Pending 09/13/2016 9:00 AM Packet Pg. 639 CERTIFI' 'ION OF CONTRIBUTORY COSTS (WA' ""). 16.A.23.a PROJECT NAME: TALIS PARK DRIVE EXTENSION LOCATION: Section 7 Township 485 Range 26E Collier County, Florida N. 00 am NAME & ADDRESS OF OWNER: KE TALIS PARK PROPERTIES, LLC o 16990 LIVINGSTON RD co NAPLES, FL 34110 0 N J TYPE OF UTILITY SYSTEM: POTABLE WATER (MATERIALS ONLY) °- c 0 !Item Size Quantity Units .Cost Total. c N < Gate Valve 10" 5 EA $1.422.16 S7,110,80 w C900 DR14 Pipe 10" 680 LF $17.44 $11,859.20 d > C900 DR14 Pipe 8" 80 LF $10.16 $812.80 0 Gate Valve 8" 1 EA $921.00 $921.00 Y Gate Valve 6" 1 EA $572.77 $572.77 a Fire Hydrant 1 EA 52,837.00 $2.837.00 ` Water Service 1.5" 1 EA $993.73 $993.73 H Air Release Valve 1 EA $900.00 $900.00 w Permanent Sample Point 1 EA $836.36 S836.36 c Automatic Flushing Device 1 EA $2,726.00 $2,726.00 `wQ.° TOTAL COST $29,569.66 a) C.) Q I do hereby certify that the quantities of material described above are true and an accurate representation al of the as-installed system. :� CERTIF G:z ., 4,4,/, R ii NAME &TITLE OF ENGINEER CERTIFYING n L asv-i-oi v. W t'{�e wt'S! !:f_ m co OF: Waldrop Engineering 28100 Bonita Grande Dr#305 c 0 Bonita Springs, FL 34135 •N c d I do hereby certify that the quantities of material described above are true and an accurate representation W of the as-installed cost of the system. N CERTIFYING: /77- ,,% o ca a. Kevin Jensen, Pr '•ent 'Tri— i— .i-- OF: JENSEN UNDERGROUND UTILITIES, INC. u) 5585 Taylor Road d Naples, Florida 34109 UU) m STATE OF FLORIDA ) a ) SS: COUNTY OF COLLIER ) ai E The foregoing instrument was signed and acknowledged before me this 13th day of March , 2014 by o Kevi : nen ,w o is pers nally known to me and who did not take an oath. ,) _,.,, SEAL' ,,L. E D. •a L. Ventre , Notary Pu.lic .7'r �1, Ir -` of Flu ' K :I.:,=-7My Co,um Etr..Jun 1,231: ., • ` s' Packet Pg. 640 4 cs- -' . 1G�.23.a -- CERTIFICATION OF CONTRIBUTORY COSTS(SEWER) -CERT|F|CxT0NOFCOmTR|ounOnYCO5TS<SEm/ER> oo PROJECT NAME: TALIS PARK DRIVE EXTENSIONco co co LOCATION: Section 7 Township 48S Range 26E cnr o Collier County, Florida NAME&ADDRESS OF OWNER: KE TALIS PARK PROPERT|ES. LLC a' 16990 LIVINGSTON RD NAPLES, FL 34110 . TYPE OF UTILITY SYSTEM: SANITARY SEWER(MATERIALS ONLY) x m UCD !Item� � - - _ -'� e Quantity� Units�� ' �� Cost 'z-'' -Zo�<" "--- c� Pump Station 1 EA $99.748.68 �9,748.68 Manhole 14'-16' 1 EA S5,423.00 55.423.00 cti Manhole12*-14' 2 EA S5,040 20 S10.080.40 cn SDR 26 Pipe 10' 171 LF S11.30 $1.932.30 75 � 8" 646 LF � 7B $3,087.88 S�R3�P�e . C800DR18Pipe 8" 4,822 LF 39.77 $47,110.94 0900 DR14 Pipe 8" 210 LF $10.01 8210210 Plug Valve 8" 4 EA $1,476,57 S5.908.88 cis Air Release Valve 2 EA S4.26300 $8,526.00 TOTAL COST $183.917.98 � I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed = NAMEci TITLE OF ENGINE • CERTIFYING �. /��/ Lr)OF� / WaldropE"gineenog co u" � �� 2V10oBonduG�ndeD,#�e Bonita Springs, FL 34135o cri I do hereby certify that the quantities of material described above are true and an accurate representation of the as-installed costm CERTIFYING: tu `� y o Kevin Jenne'n2r | .Ne ro" OF: ,/ JENSEN UNDERGROUND UTILITIES, INC. 5585 Taylor Road Rii Naples, Florida ���4108 STATE OF FLORIDA ) > SS: = COUNTY OF COLLIER ) cniii The foregoing instrument was signed and acknowledgeduefothis 13tx day of March,2014 by "tt ke an oath. `�~ k` --- �L'~`_�~��__J SEAL: Donna L.Ventre , Notary Public Packet Pg. 641 -C2 anplo )ped snei-aoueldeoov seRffilll leu!A : S991.) uo!sualxj 0/UQ )ped snei-dew uoRepoi :luewnoe4IV c.i CNI et ot! CD CL . o co ' CL !.: ,• '. 'r. ' 1 n.... . z .7- 4 t. 4 T.,..) o v.'. 1 H s-it '7 t .A . 1-""' i CID r-1 1 .1 Ili v.2, -) '--- . • Z V' ........ ro 4.14 0 GO U 4-0'1'1 t r , 0 11 112"1 • ' I 1 •, . 1 /n ' I c,... 4toeimils 16.A.23.c Exhibit A 00 Utilities Performance Security (UPS) and Final Obligation Bond Amount Receipt Number CL 10% UPS Bond $37,866.69 j 2014175261 Final Obligation Bond $4,000.00 2014175261 f � Total Amount $41,866.69 uj The 10% UPS Bond, if applicable, is based on the total amount of the water and/or sewer utilities being installed for the whole project which includes material and labor. The contributory assets reflect the cost of materials, not labor and are based on the assets of a. which the county will be owning and maintaining. Final Obligation Bond, if applicable, in accordance with Utility Ordinance 2004-31 d U Attachments: 1. Receipt of Payment 2. Verification of Final Cost . C U- co C 0 N C a) a) 4. F 0 W G a) E U .3 I Packet Pg. 643 16.A.23.c Collier County Growth Management Division 2800 Horseshoe Drive N. Naples, FL 34104 239-252-2400 ti oo RECEIPT OF PAYMENT 0 Receipt Number: 2014175261 `V J Transaction Number: 2014-022380 Date Paid: 05/19/2014 Amount Due: $41,866.69 a, Payment Details: Payment Method Amount Paid Check Number w Check $37,866.69 74502422 > Check $4,000.00 74502421 Amount Paid: $41,866.69 Change / Overage: $0,00 a- Contact: KE TAUS PARK PROPERTIES LLC N 4500 PGA BLVD STE 400 PALM BCH GDNS , FL 33418 co v CIS FEE DETAILS: tu Fee Description Reference Number Original Amount Gt. Account N Fee Paid a) Refundable Bonds PL20130002663 $37,866.69 $37,866.69 670-000000-220113 w, Refundable Bonds PL20130002663 $4,000.00 $4,000.00 670-000000-220113 ii Cashier Name: melissaalvarez o ca Batch Number: 3766 Entered By: tamibuchan 0 U) a, w a> a N Tis .0 x W c E V ns c'( Packet Pg. 644 16.A.23.c V. !CATION OF FINAL COST PROJECT NAME: TALIS PARK DRIVE EXTENSION LOCATION: Section 7 Township 48S Range 26E Collier County,Florida r•-• NAME&ADDRESS OF OWNER: KE TALIS PARK PROPERTIES,LLC oo a) 16990 LIVINGSTON RD = c) NAPLES,FL 34110 cs cp -4. TYPE OF UTILITY SYSTEM: POTABLE WATER <NI -J 'Item Size Quantity Units Cast Toll c Gate Valve 10" 5 EA $1,546.00 57,730.002 .— C900 DR14 Pipe 10" 680 LF $24.60 $16,728.00 us c C900 DR14 Pipe 8" 80 LF $19.10 $1,528.00 2 Gate Valve 8" 1 EA $1,121.00 $1,121.00 x u.1 Gate Valve 6" EA $781.00 5781.00 0 Fire Hydrant 1 EA $5,279.00 $5,279.00 Water Service 1 5" 1 EA $1,493.73 $1,493.73 C:1 Air Release Valve 1 EA $1,400.00 $1,400.00 Permanent Sample Point 1 EA $1,557.00 $1,557.00 a. Automatic Flushing Device 1 EA $4.646.00 $4,646.00 (0) TOTAL COST $42,263.73 Ti I— I do hereby certify that the quantities of material and services described above are true and an accurate w c.) representation of the as-installed system. c CERTIFYIN ./ ., , 0 .. L.) Nam nd Title of Engineer Certifying < 1,4(14 , ' lei u, OF: Waldrop Engineering 47.- 28100 Bonita Grande Dr#305 47. Bonita Springs,FL 34135 Tv I do hereby certify that the quantities of material and services described above are true and an accurate iZ representation of the as-installed cost of the system. U) CERTIFYING. „ _"."../7 — c 0 c Kevin Jen ,Pr .ent a) Lu OF: JENSEN UNDERGROUND UTILITIES,INC. w 5565 Taylor Road > 'C. Naples,Florida 34109 p co a. STATE OF FLORIDA ) u) ) SS: ._ ii COUNTY OF COLLIER ) l— .4t The foregoing instrument was signed and acknowledged before me this 13th day of March,2014 by Kevin Jensen ,wh. ' personally known to me and who did not take an oath. 2-2 x C,,.i\,...1 D-It ifla_ __ 1 i r SEAL: ) w „, _ t; —Donna L.Ventre — , otary -ub ic a) E ..c U Dot=L.\ENTRE p I.. 2 4 : 4 „.<:•.„.., z-i (-:(:;';:;:::" .--,,, Notyy Put`,.: -State (:-. Fln,la il '.--,..., .j .:. ,,..,`L;;f tvly CV:•(11 iiY:,f,''S,i'M 1,2 31 5 ip Packet Pg. 645 16.A.23.c VERIFICATION OF FINAL COST PROJECT NAME: TALIS PARK DRIVE EXTENSION co 0 LOCATION: Section 7 Township 48S Range 26E 0 Collier County, Florida 0 N NAME &ADDRESS OF OWNER: KE TALIS PARK PROPERTIES, LLC a. 16990 LIVINGSTON RD o NAPLES, FL 34110 .N c a) TYPE OF UTILITY SYSTEM: SANITARY SEWER w a) 'ltem Size Quantity Units Cost Totall o Pump Station 1 EA $150,346.00 $150,346.00 Manhole 14'-16' 1 EA $7,730.00 $7,730.00 a Manhole 12'-14' 2 EA S6.897.00 $13,794.00 u, SDR 26 Pipe 10" 171 LF $78.60 $13,440.60 11 SDR 26 Pipe 8" 646 LF $74.46 $48,101.16 C900 DR18 Pipe 8" 4,822 LF 516.70 $80,527.40 .c) C900 DR14 Pipe 8" 210 LF $18.80 $3,948.00 Plug Valve 8" 5 EA $1,598.00 $7,990.00 °- a) Air Release Valve 2 EA $5,263.00 $10,526.00 U TOTAL COST $$336,403.16 `i) N a) I do hereby certify that the quantities of material and services described above are true and an accurate }, representation of the as-installed system. Ta CERT YING: //, c a- '"!f/PAXf co Name and Title of Engineer Certifying OF: Waldrop Engineering "" 28100 Bonita Grande Dr#305 0 Bonita Springs, FL 34135 c m x I do hereby certify that the suantities of material and services described above are true and an accurate a) representation of the a /. -d cost of the system. L CERTIFYING: 9, /' p / �r / a Kevin Jens-ne'Presi N OF: JENSEN UNDERGROUND UTILITIES, INC. if0 5585 Taylor Road a Naples, Florida 34109 STATE OF FLORIDA ) a ) SS: ill COUNTY OF COLLIER ) c m The.„0.0.... .oing instru fit was signed and acknowledged before me this 13th day of March, 2014 by en ,who r perso ally kn. . t. --an who did not take an oath. as IllikUlt SEAL: Q •..na entre `—,1/\1A-5114ary Public 1`�_ . -.-_,„,—,---4,----.\-,!.... .:. , -, 1 I t1 al T .. State of Ft. CI i Lx2orLS,! I._L15 I) u EE it ' Packet Pg. 646