Agenda 09/27/2016 Item #16D11 16.D.11
09/27/2016
EXECUTIVE SUMMARY
Recommendation to approve the expenditure of Category "A" Beach Park Facility Tourist Tax
Funds, award Invitation to Bid (ITB) #16-6673R for South Marco Parking Lot and Beach Access
improvements in the total amount of$263,309.91, approve the necessary budget amendment, and
make a finding that these expenditures promote tourism.
OBJECTIVE: To obtain a contractor for parking lot and beach access landscape improvements at South
Marco Beach in the City of Marco Island.
CONSIDERATIONS: On April 27, 2015, the Tourist Development Council (TDC) approved the budget
for these two projects for $200,000 and the actual expenditure (September 2016) is $277,809.91. Project
80336, Parking Lot Improvements, and Project 80337, Beach Access Enhancement and Boardwalk
Repairs. McGee and Associates completed the design of these landscape projects in May 2016.
Project 80336, Parking Lot Improvements, includes replacing some rooted trees and shrubs, repairing the
irrigation system, and replacing pavement and thermoplastic.
Project 80337, Beach Access Enhancement and Boardwalk Repairs, includes replacing some shrubs,
mulching, and repairing the irrigation system at the beach access.
Repairs to the boardwalk, under Project 80337, were solicited under a separate request for quotation to
five contractors and will be presented to the TDC and Board for separate approval.
Invitation to Bid No. 16-6673R, South Marco Parking Lot and Beach Access improvements, was posted
by the Procurement Services Division on July 18, 2016. Notices were sent to 2,744 vendors, with 61 of
those downloading the ITB package. Two (2) bid responses were received as of the August 10, 2016
deadline, from Heritage Builders and Coastal Concrete.
Contractor Project 80336 Project 80336 Project 80337 Total Cost
Base Bid Alternates Base Bid
Heritage Builders $91,076.68 $143,409.20 $28,824.03 $263,309.91
Coastal Concrete $297,540.50 $287,615.00 $103,910.00 $689,065.50
Staff reviewed the bids received and recommends award to Heritage Builders the amount of$263,309.91
as the lowest, qualified and responsive bidder. The total project cost is 6.5% lower than the architect's
opinion of cost.
FISCAL IMPACT: The subject ITB award involves two TDC Beach Park Facilities Capital Fund(183)
projects, South Marco Island Parking Lot Improvement,Project(80336),and Beach Access Enhancement
and Boardwalk Repairs, Project (80337). On April 27, 2015, the Tourist Development Council (TDC)
approved a combined budget of $200,000 for the two projects. The current combined project cost
estimate is $286,700. A budget amendment redistributing funding between the two projects as well as
appropriating S86,700 from reserves is required.
GROWTH MANAGEMENT IMPACT: There are no Growth Management Impacts associated with
this action.
ADVISORY BOARD RECOMMENDATION: The Parks and Recreation Advisory Board
(PARAB)previously approved this project with a 5-0 vote on April 15, 2015.
I Packet Pa. 1028
16.D.11
09/27/2016
TDC RECOMMENDATION: The Tourist Development Council will review the ITB award to Heritage
Builders for South Marco Parking Lot and Beach Access improvements at its regularly scheduled meeting
on September 26, 2016.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality and requires
majority vote for approval. -CMG
RECOMMENDATION: That the Board of County Commissioners approves the expenditure of
Category "A" Beach Park Facility Tourist Tax funds for the ITB No. 16-6673R to Heritage Builders for
South Marco Parking Lot and Beach Access improvements in the total amount of $263,309.91,
approves the necessary budget amendments, and makes a finding that these project expenditures promote
tourism.
Prepared by: Vicky Ahmad, Project Manager, Facilities Management Division
ATTACHMENT(S)
1. 16-6673R Bid Tabulation (PDF)
2. [linked] 16-6673 South Marco Beach Access and Parking Lot (PDF)
I Packet Pg. 1029
16.D.11
09/27/2016
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.D.11
Item Summary: Recommendation to approve the expenditure of Category "A" Beach Park
Facility Tourist Tax Funds, award Invitation to Bid (ITB) #16-6673R for South Marco Parking Lot and
Beach Access improvements in the total amount of $263,309.91, approve the necessary budget
amendment, and make a finding that these expenditures promote tourism.
Meeting Date: 09/27/2016
Prepared by:
Title: Project Manager—Facilities Management
Name: Vicky Ahmad
09/09/2016 8:39 AM
Submitted by:
Title: Division Director -Parks &Recreation—Parks & Recreation
Name: Barry Williams
09/09/2016 8:39 AM
Approved By:
Review:
Public Services Department Amanda O.Townsend Level 1 Sim.Reviewer 1-8 Completed 09/09/2016 9:23 AM
Facilities Management Dennis Linguidi Level 1 Sim. Reviewer 1-8 Completed 09/09/2016 12:32 PM
Parks&Recreation Ilonka Washburn Level 1 Sim.Reviewer 1-8 Completed 09/09/2016 12:52 PM
Parks&Recreation Ilonka Washburn Level 1 Sim. Reviewer 1-8 Completed 09/09/2016 12:52 PM
Facilities Management Margaret Bishop Level 1 Sim. Reviewer 1-8 Completed 09/09/2016 2:54 PM
Public Services Department Hailey Margarita Alonso Level 1 Division Reviewer Completed 09/12/2016 3:26 PM
Procurement Services Allison Kearns Level 1 Purchasing Gatekeeper Completed 09/12/2016 3:28 PM
Public Services Department Steve Carnell Level 2 Division Administrator Review Completed 09/13/2016 10:25 AM
County Attorneys Office Colleen Greene Level 2 Attorney Review Completed 09/13/2016 3:16 PM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 09/13/2016 4:52 PM
County Attorneys Office Jeffrey A.Klatzkow Level 3 County Attorneys Office Review Completed 09/14/2016 2:17 PM
Budget and Management Office Ed Finn Level 3 OMB 1st Reviewer 1-4 Completed 09/14/2016 5:09 PM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/18/2016 9:51 PM
Board of County Commissioners MaryJo Brock Meeting Pending 09/27/2016 9:00 AM
Packet Pg. 1030
Project Manager: Vicky Ahmad
Procurement: Matt Catoe 16-6673R South Marco Beach Access and Parking Lot Vendors Who Subscribe to Solicitation Commodities: 2744
Vendors Who Downloaded Specs: 61
Vendors Who Submitted Bids: 2
Item
Number Key Item Description Unit Qty.Installed
Unit Cost
Quantity
Total Unit Qty.Installed
Unit Cost
Quantity
Total
I - SITE WORK - PREPARATION AND DEMOLITION
P-1 PERMITTING
a. City of Marco Island SDPI Ea.1 3,000.00$ 3,000.00$ Ea.1 6,500.00$ 6,500.00$
SW-1 EXISTING IRRIGATION SYSTEM (MAPPING)L.S.1 625.00$ 625.00$ L.S.1 6,500.00$ 6,500.00$
SW-2 CLEARING & GRUBBING (Existing vegetation & soil)
a. Vegetation removal (shrubs & ground covers)S.F.1400 2.00$ 2,800.00$ S.F.1400 3.50$ 4,900.00$
b. Turf and Soil removal (top 4 inches) on -site S.F.9,486 1.00$ 9,486.00$ S.F.9,486 1.25$ 11,857.50$
c. Turf removal in the Right-of-way only S.F.0 0.50$ -$ S.F.0 0.50$ -$
SW-3 REMOVALS: TREES Ea.10 312.50$ 3,125.00$ Ea.10 750.00$ 7,500.00$
SW-4 REMOVALS: STUMP & ROOT SYSTEMS BY GRINDING Ea.9 175.00$ 1,575.00$ Ea.9 750.00$ 6,750.00$
SW-5 REMOVALS: STUMP & ROOT SYSTEM BY EXCAVATION Ea.2 175.00$ 350.00$ Ea.2 1,100.00$ 2,200.00$
SW-6 REMOVALS: EXISTING ROOT CONTAMINATED BASE MATERIAL S.Y.151 6.25$ 943.75$ S.Y.151 22.00$ 3,322.00$
SW-7 REMOVALS: EXISTING ASPHALT PAVEMENT (AVG. 2" DEPTH)S.Y.167 10.00$ 1,670.00$ S.Y.167 25.00$ 4,175.00$
SW-8 REWORKING EXISTING LIMEROCK BASE FOR NEW ASPHALT PAVEMENT (AVG. 3" DEPTH)S.Y.167 18.75$ 3,131.25$ S.Y.167 95.00$ 15,865.00$
SW-9 DESILTING PIPES & BOX CULVERTS
1. Culvert piping 12" dia.L.F.40 12.50$ 500.00$ L.F.40 45.00$ 1,800.00$
2. Box culverts/Catch Basins Ea.1 250.00$ 250.00$ Ea.1 1,900.00$ 1,900.00$
SW-10 REMOVALS: REMOVE AND STORE ON-SITE EXISTING CONCRETE CAR WHEELSTOPS/BUMPER GUARDS Ea.11 6.25$ 68.75$ Ea.11 60.00$ 660.00$
Sub-total I 27,524.75$ Sub-total I 73,269.50$
II - SITE IMPROVEMENTS
SI-1 CONCRETE CURBING (FDOT TYPE"D")L.F.138 25.00$ 3,450.00$ L.F.138 65.00$ 8,970.00$
SI-2 NEW LIMEROCK MATERIAL FOR REWORKING BASE AT TREE REMOVAL LOCATIONS (6" DEPTH)S.Y.133 37.50$ 4,987.50$ S.Y.133 155.00$ 20,615.00$
SI-3 NEW LIMEROCK MATERIAL FOR REWORKING BASE FOR NEW ASPHALT PAVEMENT (AVG. 3" DEPTH)S.Y.25 18.75$ 468.75$ S.Y.25 95.00$ 2,375.00$
SI-4 ASPHALT PAVEMENT 1.5"-2" TYPE S-3 ASPHALT (ONE LIFT)S.Y.167 25.00$ 4,175.00$ S.Y.167 250.00$ 41,750.00$
SI-5 CULVERT PIPE WITH CONCRETE MITERED ENDS (12" HDPE ADS N-12 ST)Ea.1 2,300.00$ 2,300.00$ Ea.1 5,500.00$ 5,500.00$
SI-6 IRRIGATION SYSTEM (COMPLETE)L.S.1 2,500.00$ 2,500.00$ L.S.1 14,500.00$ 14,500.00$
SI-7 LANDSCAPE (COMPLETE)L.S.1 19,593.00$ 19,593.00$ L.S.1 55,000.00$ 55,000.00$
SI-8 PERFORMANCE TURF - SOD (BAHIA)S.Y.1,200 2.81$ 3,372.00$ S.Y.1,200 6.50$ 7,800.00$
SI-9 MULCH (RICE ROCK - 3/8" PEA GRAVEL AVG. 3" DEPTH)TON 117 39.00$ 4,563.00$ TON 117 85.00$ 9,945.00$
SI-10 FILTER FABRIC FOR MULCH GRAVEL IN RETENTION AREAS S.F.3,000 0.31$ 930.00$ S.F.3,000 2.00$ 6,000.00$
SI-11 PAINTED PAVEMENT MARKINGS, STANDARD
a. 6" Line white solid L.F.198 1.44$ 285.12$ L.F.198 35.00$ 6,930.00$
b. 6" Line yellow solid L.F.0 3.00$ -$ L.F.0 3.00$ -$
c. 6" Line blue solid L.F.0 3.00$ -$ L.F.0 3.00$ -$
d. 8" Line white solid L.F.0 4.50$ -$ L.F.0 4.50$ -$
e. 12" Line white solid L.F.0 6.00$ -$ L.F.0 6.00$ -$
f. A.D.A. wheelchair symbol white solid Ea.0 50.00$ -$ Ea.0 50.00$ -$
g. Directional arrows white solid Ea.0 35.00$ -$ Ea.0 35.00$ -$
SI-12 REINSTALL: EXISTING STORED CONCRETE CAR WHEELSTOPS / BUMPER GUARDS Ea.11 6.25$ 68.75$ Ea.11 120.00$ 1,320.00$
Sub-total II 46,693.12$ Sub-total II 180,705.00$
Sub-total I-II 74,217.87$ Sub-total I-II 253,974.50$
Coastal ConcretePROJECT "B"
Project "B" Page 1 of 3
Heritage Builders
Project Manager: Vicky Ahmad
Procurement: Matt Catoe 16-6673R South Marco Beach Access and Parking Lot Vendors Who Subscribe to Solicitation Commodities: 2744
Vendors Who Downloaded Specs: 61
Vendors Who Submitted Bids: 2
COLLIER COUNTY SOUTH MARCO BEACH ACCESS PARKING TABULATION OF SITE, LANDSCAPE & IRRIGATION MATERIAL QUANTITIES
Item
Number Key Botanical Name Unit Qty.Installed Unit
Cost
Quantity
Total Unit Qty.Installed Unit
Cost
Quantity
Total
III. - LANDSCAPE MATERIALS
TREES
LM-1.Conocarpus erectus 'Sericeus'Ea.13 $ 510.87 $ 6,641.31 Ea.13 $ 15.00 $ 195.00
SHRUBS
LM-2.Clusia guttifera Ea.62 80.00$ 4,960.00$ Ea.62 12.00$ 744.00$
LM-3.Schefflera arboricola `Trinette`Ea.39 9.75$ 380.25$ Ea.39 18.00$ 702.00$
LM-4.Chrysobalanus icaco 'Horizontalis'Ea.37 9.75$ 360.75$ Ea.37 25.00$ 925.00$
Sub-total III 12,342.31$ Sub-total III 1,446.00$
SHRUBS AREAS
LM-5.Chrysobalanus icaco 'Horizontalis'Ea.60 9.75$ 585.00$ Ea.60 25.00$ 1,500.00$
LM-6. Hymenocallis latifolia Ea.198 9.75$ 1,930.50$ Ea.198 40.00$ 7,920.00$
Sub-total III 2,515.50$ Sub-total III 7,920.00$
Landscape
Sub-total III 14,857.81$
Landscape
Sub-total III 9,366.00$
COLLIER COUNTY SOUTH MARCO BEACH ACCESS PARKING TABULATION OF SITE, LANDSCAPE & IRRIGATION MATERIAL QUANTITIES
Item
Number Key Item Description: Remarks, Sizes and/or Specification Unit Qty.Installed Unit
Cost
Quantity
Total Unit Qty.Installed Unit
Cost
Quantity
Total
IV - IRRIGATON MATERIALS
IR-1.
ALW.
Supply & Install: Install new and/or remove & replace existing sprinklers with Hunter Pro-Spray Series, 6" & 12" high pop-up spray head
body with fixed and/or adjustable spray nozzles. To include lateral piping where needed. Nozzles: Adjustable arc, 5', 12' and 15' radius, Ea.50 8.00$ 400.00$ Ea.50 300.00$ 15,000.00$
IR-2.
ALW.Supply & Install: 24 volt 6 plex 18 ga. pvc jacketed valve wire in 1.25 " dia. conduit L.F.600 2.25$ 1,350.00$ L.F.600 18.00$ 10,800.00$
IR-3.
ALW.
Supply & Install: Hunter IVC -101G, 1" valve in rectangular valve box, valve wiring, piping and all components necessary to connect to
main line.Ea.1 225.00$ 225.00$ Ea.1 4,500.00$ 4,500.00$
IR-4. Supply & Install: Irritrol 533 adjustable flood bubbler (2) per tree) at each tree location per plans, notes and specifications.Ea.13 2.00$ 26.00$ Ea.13 300.00$ 3,900.00$
Irrigation
Sub-total IV 2,001.00$
Irrigation
Sub-total IV 34,200.00$
Project "B" Total Base Bid:91,076.68$ Project "B" Total Base Bid:297,540.50$
Project "B" Page 2 of 3
Heritage Builders Coastal Concrete
Heritage Builders Coastal Concrete
Project Manager: Vicky Ahmad
Procurement: Matt Catoe 16-6673R South Marco Beach Access and Parking Lot Vendors Who Subscribe to Solicitation Commodities: 2744
Vendors Who Downloaded Specs: 61
Vendors Who Submitted Bids: 2
COLLIER COUNTY SOUTH MARCO BEACH ACCESS PARKING TABULATION OF SITE, LANDSCAPE & IRRIGATION MATERIAL QUANTITIES
SITE, LANDSCAPE & IRRIGATION MATERIALS & LABOR BID SCHEDULE
Item
Number Key Item Description Unit Qty.Installed
Unit Cost
Quantity
Total Unit Qty.Installed
Unit Cost
Quantity
Total
SW-2 CLEARING & GRUBBING (Existing vegetation & soil)
a. Vegetation removal (shrubs & ground covers)S.F.0 2.00$ -$ S.F.0 2.00$ -$
b. Turf and Soil removal (top 4 inches) on -site S.F.0 0.75$ -$ S.F.0 0.75$ -$
c. Turf removal in the Right-of-way only S.F.2,500 1.00$ 2,500.00$ S.F.2,500 3.00$ 7,500.00$
SW-7
ALT.REMOVALS: EXISTING ASPHALT PAVEMENT (AVG. 2" DEPTH)S.Y.2,722 6.25$ 17,012.50$ S.Y.2,722 2.50$ 6,805.00$
SW-8
ALT.REWORKING EXISTING LIMEROCK BASE FOR NEW ASPHALT PAVEMENT (AVG. 3" DEPTH)S.Y.2,722 18.75$ 51,037.50$ S.Y.2,722 40.00$ 108,880.00$
Alternate Sub-
total 70,550.00$
Alternate Sub-
total 123,185.00$
(ALERNATES) II - SITE IMPROVEMENTS
SI-3
ALT.NEW LIMEROCK MATERIAL FOR REWORKING BASE FOR NEW ASPHALT PAVEMENT (AVG. 3" DEPTH)S.Y.126 43.00$ 5,418.00$ S.Y.126 95.00$ 11,970.00$
SI-4
ALT.ASPHALT PAVEMENT 1.5"-2" TYPE S-3 ASPHALT (ONE LIFT)S.Y.2,722 20.00$ 54,440.00$ S.Y.2,722 45.00$ 122,490.00$
SI-13
ALT.THERMOPLASTIC PAVEMENT MARKINGS, STANDARD
a. 6" Line white solid L.F.1,102 0.35$ 385.70$ L.F.1,102 10.00$ 11,020.00$
b. 6" Line yellow solid L.F.78 0.35$ 27.30$ L.F.78 10.00$ 780.00$
c. 6" Line blue solid L.F.108 0.35$ 37.80$ L.F.108 10.00$ 1,080.00$
d. 8" Line white solid L.F.64 0.60$ 38.40$ L.F.64 10.00$ 640.00$
e. 12" Line white solid L.F.12 2.00$ 24.00$ L.F.12 10.00$ 120.00$
f. A.D.A. wheelchair symbol white solid Ea.3 250.00$ 750.00$ Ea.3 10.00$ 30.00$
g. Directional arrows white solid Ea.6 135.00$ 810.00$ Ea.6 10.00$ 60.00$
SI-14
ALT.SUPPLY & INSTALL CONCRETE CAR WHEELSTOPS / BUMPER GUARDS (6" W X 4" H X 6' L)Ea.70 75.00$ 5,250.00$ Ea.70 100.00$ 7,000.00$
Alternate Sub-
total 67,181.20$
Alternate Sub-
total 155,190.00$
(ALTERNATES) IV - IRRIGATON MATERIALS
IR-5.
ALT.Supply & Install: 4" dia. Sch. 40 PVC sleeve at each location per plans, notes and specifications. L.F.370 15.00$ 5,550.00$ L.F.370 12.00$ 4,440.00$
IR-6.
ALW.
Supply & Install: Install new and/or remove & replace existing sprinklers with Hunter Pro-Spray Series, 6" high pop-up spray head body
with fixed and/or adjustable spray nozzles. To include lateral piping where needed. Nozzles: Adjustable arc, AND 360, 10' and 15' radius Ea.16 8.00$ 128.00$ Ea.16 300.00$ 4,800.00$
Alternate Sub-
total 5,678.00$
Alternate Sub-
total 9,240.00$
Alternates
Total 143,409.20$
Alternates
Total 287,615.00$
ALT.INDICATES BID ITEMS THAT ARE CONSIDERED ALTERNATES AND WILL SUBJECT TO DELETION OR ADDITION TO THE PROJECT.
ALW.INDICATES BID ITEMS THAT ARE CONSIDERED ALLOWANCES WITH QUANTITIES THAT ARE SUBJECT TO INCREASE AND
Project "B" Total with Alternates:234,485.88$ Project "B" Total with Alternates:585,155.50$
Opened by: Swain Hall 08/10/2016 3:00pm Witnessed by: Camille Shim-Marinos
Project "B" Page 3 of 3
(ALTERNATES) I - SITE WORK - PREPARATION AND DEMOLITION
INSTRUCTION TO BIDDER NOTES:
Heritage Builders
X
X
X
X
X
Heritage Builders Coastal Concrete
X
X
X
X
X
Coastal Concrete
X
X
X
X
X
X
X
X
X
X
Project Manager: Vicky Ahmad
Procurement: Matt Catoe 16-6673R South Marco Beach Access and Parking Lot Vendors Who Subscribe to Solicitation Commodities: 2744
Vendors Who Downloaded Specs: 61
Vendors Who Submitted Bids: 2
Item
Number Remarks, Sizes and/or Specification Unit Qty.Installed
Unit Cost
Quantity
Total Unit Qty.Installed
Unit Cost
Quantity
Total
I.SITE PREPARATION AND DEMOLITION
P-1 PERMITTING
a. City of Marco Island SDPI Allowance Ea.1.00 3,000.00$ 3,000.00$ Ea.1.00 6,500.00$ 6,500.00$
SW-1 EXISTING IRRIGATION SYSTEM (MAPPING)Per Plans, Notes & Specifications L.S.1 350.00$ 350.00$ L.S.1 6,500.00$ 6,500.00$
SW-2 a. Vegetation removal (Shrubs and Ground Covers)Per Plans, Notes & Specifications S.F.5,700 0.63$ 3,591.00$ S.F.5,700 3.50$ 19,950.00$
SW-3 b. Tree Pruning Per Plans, Notes & Specifications
1. Prune existing trees leaning against and over
hanging the north side fence L.S.1.00 625.00$ 625.00$ L.S.1.00 7,500.00$ 7,500.00$
SW-4 c. Soil removal (top 4 inches)Per Plans, Notes & Specifications
1. After vegetaion removal remove top 4 inches of
existing mulch & soil and finish grade.S.F.6,100 0.69$ 4,209.00$ S.F.6,100 1.25$ 7,625.00$
Sub-total I 11,775.00$ Sub-total I 48,075.00$
II.SITE MATERIALS
SI-1 GRAVEL MULCH (Rice Rock/Pea gravel 3/8")Per Plans, Notes & Specifications Ton 66 39.38$ 2,599.08$ Ton 66 85.00$ 5,610.00$
Sub-total II 2,599.08$ Sub-total II 5,610.00$
Item
Number Unit Qty.Installed Unit
Cost
Quantity
Total Unit Qty.Installed Unit
Cost
Quantity
Total
III.IRRIGATON MATERIALS
SI-2 Supply & Install: Install new or remove & replace existing
sprinklers with
Hunter Pro-Spray Series, 6" high pop-up
spray head body with fixed and/or
adjustable spray nozzles. To include lateral
piping where needed. Nozzles: Adjustable Ea.82 8.00$ 656.00$ Ea.82 175.00$ 14,350.00$
Sub-total III 656.00$ Sub-total III 14,350.00$
Item
Number Remarks, Sizes and/or Specification Unit Qty.Installed
Unit Cost
Quantity
Total Unit Qty.Installed
Unit Cost
Quantity
Total
IV.LANDSCAPE MATERIALS
S1-3 SHRUBS, GROUND COVERS & ACCENT PLANTS
1.Aechmea blanchetiana `Raspberry`Raspbery Bromeliad 10" pot Ea.19 27.64$ 525.16$ Ea.19 50.00$ 950.00$
2.Clusia guttifera Small-Leaf Clusia 15 gal., 5'-6' ht., Full Ea.135 80.00$ 10,800.00$ Ea.135 125.00$ 16,875.00$
3.Neoregelia x `Zoe``Zoe` Fireball Bromeliad 6" pot Ea.18 27.64$ 497.52$ Ea.18 50.00$ 900.00$
4.Schefflera arboricola `Trinette`Schefflera `Trinette`7 gal. 30"x30" ht./spr.Ea.13 9.75$ 126.75$ Ea.13 50.00$ 650.00$
5.Neoregelia x `Candy Apple``Candy Apple' Bromeliad 8" pot Ea.18 27.64$ 497.52$ Ea.18 50.00$ 900.00$
6.Vriesea x Phillipo-Coburgii Variegated Phillipo-Coburgii Bromeliad 10" pot Ea.6 27.64$ 165.84$ Ea.6 50.00$ 300.00$
7.Vriesea x `Guberii`Guberii Bromeliad 8" Pot Ea.19 27.64$ 525.16$ Ea.19 50.00$ 950.00$
Sub-total IV 13,137.95$ Sub-total IV 21,525.00$
Sections I, II, III & IV:28,168.03$ Sections I, II, III & IV:89,560.00$
Project "C" Total Base Bid:28,824.03$ Project "C" Total Base Bid:103,910.00$
Opened by: Swain Hall 08/10/2016 3:00pm Witnessed by: Camille Shim-Marinos Vendor Required Documents
Material Manufacture
List of Major Sub Contractors
Statement of Experience
Trench Safety Act
Immigration Law Affidavit
E-Verify
Bid Bond
Bidders Checklist
Division Corporation
Insurance and Bonding
Project "C" Page 1 of 1
Coastal Concrete
Item Description
CLEARING & GRUBBING (Existing trees, turf, shrubs, ground covers & soil)
Item Description: Remarks, Sizes and/or Specification
PROJECT "C"
Item Description
Heritage Builders
Heritage Builders Coastal Concrete
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X