Agenda 09/27/2016 Item #16A 3 16.A.3
09/27/2016
EXECUTIVE SUMMARY
Recommendation to grant final approval of the private roadway and drainage improvements for
the final plat of Saturnia Falls - Phase One, Application Number AR-6124 with the roadway and
drainage improvements being privately maintained, authorizing the release of the maintenance
security and accepting the plat dedications.
OBJECTIVE: To have the Board of County Commissioners (Board) grant final approval of the
improvements associated with the Saturnia Falls - Phase One plat, accept the plat dedications, and release
the maintenance security.
CONSIDERATIONS:
1) On April 11, 2012, the Development Review Division granted preliminary acceptance of the
roadway and drainage improvements in Saturnia Falls - Phase One.
2) The roadway and drainage improvements will be maintained by the project's homeowners
association.
3) The required improvements have been constructed in accordance with the
Land Development Code (LDC). Staff has inspected the improvements and is recommending
final acceptance.
4) A resolution for final acceptance has been prepared and approved by the County Attorney's
Office. The resolution is a requirement of Section 10.02.05, C.3 of the LDC. A copy of the
document is attached.
5) This project is within the Terafina PUD, Ord. 04-15, as amended which has been found to be in
substantial compliance.
FISCAL IMPACT: The roadway and drainage improvements will be maintained by the project's
homeowners association. The existing security in the amount of$549,511.95 will be released upon Board
approval. The original security in the amount of $4,446,477 has been reduced to the current amount
based on the previous work performed and completed and pursuant to the terms of the Construction and
Maintenance Agreement dated September 13, 2011.
GROWTH MANAGEMENT IMPACT: There is no growth management impact associated with this
Executive Summary.
LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a
majority vote for Board approval. -SAS
RECOMMENDATION: To grant final acceptance of the roadway and drainage improvements in
Saturnia Falls -Phase One, Application Number AR-6124, and authorize;
1. The Chairman to execute the attached resolution authorizing final acceptance of the
improvements.
2. The Clerk of Courts to release the maintenance security.
I Packet Pq.409
16.A.3
09/27/2016
Prepared By: John Houldsworth, Senior Site Plans Reviewer, Development Review Division, Growth
Management Department
ATTACHMENT(S)
1.Location Map (PDF)
2. Construction and Maintenance Agreement (PDF)
3. Resolution (PDF)
I Packet Pa.410
16.A.3
09/27/2016
COLLIER COUNTY
Board of County Commissioners
Item Number: 16.A.3
Item Summary: Recommendation to grant final approval of the private roadway and drainage
improvements for the final plat of Saturnia Falls — Phase One, Application Number AR-6124 with the
roadway and drainage improvements being privately maintained, authorizing the release of the
maintenance security and accepting the plat dedications.
Meeting Date: 09/27/2016
Prepared by:
Title: Site Plans Reviewer, Senior—Growth Management Development Review
Name: John Houldsworth
08/17/2016 5:42 AM
Submitted by:
Title: Project Manager, Principal—Growth Management Department
Name: Matthew McLean
08/17/2016 5:42 AM
Approved By:
Review:
Growth Management Department Judy Puig Level 1 Division Reviewer Completed 08/17/2016 8:42 AM
Growth Management Department Matthew McLean Level 1 Add Division Reviewer Completed 08/23/2016 10:19 AM
Growth Management Department James French Level 2 Add Division Reviewer Completed 08/23/2016 4:30 PM
Growth Management Department Jeanne Marcella Level 2 Division Administrator Completed 09/06/2016 12:46 PM
County Attorneys Office Scott Stone Level 2 Attorney Review Completed 09/07/2016 8:45 AM
Office of Management and Budget Valerie Fleming Level 3 OMB Gatekeeper Review Completed 09/07/2016 9:00 AM
County Attorneys Office Jeffrey A.Klatzkow Level 3 County Attorneys Office Review Completed 09/07/2016 11:23 AM
Budget and Management Office Mark Isackson Level 3 OMB 1st Reviewer 1-4 Completed 09/13/2016 2:52 PM
County Manager's Office Nick Casalanguida Level 4 County Manager Review Completed 09/18/2016 8:00 PM
Board of County Commissioners MaryJo Brock Meeting Pending 09/27/2016 9:00 AM
I Packet Pg.411
16.A.3.a
V
fill
LEE COUNTY t'
COLLI:R coir \
!SITE LOCATION
'c� ass`, 70:71/ _
O
ea
a.
O N
R.T.S
a ic IMMO<ALEE ROAD +.R. 846 Ilih OXALE€ -I F U
rac
m g I 951 3
15., i.
Ii.
0 1, —tm
C
al0.
I N .\ \
Q
Gulf b . I
(.,
, .
u
0
.-
Q}I ,
Mexico
k .
PINE RIDGE ROAD C
ten,. _ �,.
N
co
LOCATION MAP
•ire rube. eorn,r.n a nn... 0-
CO fO
C
O
4-.
ca
U
O
J
,:..;
C
d
E
L
U
to
Y
W
Q
1
I Packet Pa.412
16.A.3.b
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS
THIS CONSTRUCTION AND MAINTENANCE AGREEMENT FOR
SUBDIVISION IMPROVEMENTS entered into this 3IIIday of St? . , 2011
between G.L. Homes of Naples•e 6pk sAssociates II, Ltd., a Florida limited liability
company, hereinafter referred to as "Developer," and the Board of County
Commissioners of Collier County, Florida, hereinafter referred to as the "Board".
N
RECITALS: cti
LL
A. Developer has, simultaneously with the delivery of this Agreement, z
applied for the approval by the board of a certain plat of a subdivision to be known as: CD
to
Saturnia Fall Phase One plat.
CO
B. Chapters 4 and 10 of the Collier County Land Development code requires
the Developer to post appropriate guarantees for the construction of the improvements
required by saidsubdivision regulations, said guarantees to be incorporated in a bonded
agreement for the construction of the required improvements. F,
NOW, THEREFORE, in consideration of the foregoing premises and mutual
covenants hereinafter set forth, Developer and the Board do hereby covenant and
agree as follows:
L
1. Developer will cause to be constructed: within 12 months from the date of approval
said subdivision plat, said improvements hereinafter referred to as the required
improvements.
a)
E
2. Developer herewith tenders its subdivision performance security (attached hereto as
Exhibit "A" and by reference made a part hereof) in the amount of$4,446,477.00 which
amount represents 10% of the total contract cost to complete construction plus 100% of a)
the estimate cost of to complete the required improvements at the date of this Agreement.
m
3. In the event of default by the Developer or failure of the Developer to complete such
improvements within the time required by the Land Development Code, Collier County
may call upon the subdivision performance security to insure satisfactory completion of c
the required improvements.
0
4. The required improvements shall not be considered complete until a statement of
substantial completion by Developer's engineer along with the final project records have
been furnished to be reviewed and approved by the County Manager or his designee for
compliance with the Collier County Land Development Code.
•
•
•
tC
Packet Pg.413 I
I6.A.3.b
5. The County Manager or his designee shall, within sixty (60) days of receipt of the
statement of substantial completion, either: a) notify the Developer in writing of his
preliminary approval of the improvements; or b) notify the Developer in writing of his
refusal to approve improvements, therewith specifying those conditions which the
Developer must fulfill in order to obtain the County Manager's approval of the
improvements. However, in no event. shall the County Manager or his designee refuse
preliminary approval of the improvements if they are in fact constructed and submitted
for approval in accordance with the requirements of this Agreement. a.
6. The Developer shall maintain all required improvements for a minimum period of one LL
year after preliminary approval by the County Manager or his designee. After the one
year maintenance period by the Developer has terminated, the Developer shall petition w
the County Manager or his designee to inspect the required improvements. The County cn
Manager or his designee shall inspect the required improvements and, if found to be still
in compliance with the Collier County Land Development Code as reflected by final
approval by the Board, the Board shall release the remaining 10% of the subdivision d
performance security. The Developer's responsibility for maintenance of the required
improvements shall continue unless or until the Board accepts maintenance responsibility
for and by the County. .y
7. Six (6) months after the execution of this Agreement and once within every six (6)
months thereafter the Developer may request the County Manager or his designee to
reduce the dollar amount of the subdivision performance security on the basis of work
complete. Each request for a reduction in the dollar amount of the subdivision
performance security shall be accompanied by a statement of substantial completion by
the Developer's engineer together with the project records necessary for review by the
County Manager or his designee. The County Manager or his designee may grant the
request for a reduction in the amount of the subdivision performance security for the
improvements completed as of the date of the request.
8. In the event the Developer shall fail or neglect to fulfill its obligations under this Q
Agreement, upon certification of such failure, the County Manager or his designee may
call upon the subdivision performance security to secure satisfactory completion, repair
and maintenance of the required improvements. The Board shall have the right to
construct and maintain, or cause to be constructed or maintained, pursuant to public 2
advertisement and receipt and acceptance of bids, the improvements required herein. The
Developer, as principal under the subdivision performance security, shall be liable to pay
and to indemnify the Board, upon completion of such construction, the final total cost to
the Board thereof, including, but not limited to, engineering, legal and contingent costs, L
together with any damages, either direct or consequential, which the Board may sustain
on account of the failure of the Developer to fulfill all of the provisions of this V
Agreement.
a>
9. All of the terms, covenants and conditions herein contained are and shall be binding
upon the Developer and the respective successors and assigns of the Developer.
I
Packet Pa.414
9I6.A.3.b
IN WITNESS WHEREOF, the Board and the Developer have caused this
Agreement to be executed by their duly authorized representatives this 13"4 day of
6 , 2011.
as
G.L. HOMES OF NAPLES ASSOCIATES II,
SIGNE THE PRE NCE OF: a)
LTD.
iVt Y N
7,3
Printed name: G L ,.1 ,�k Name: William M. Fenno LC
Title: Dir. of Land Development
Printed name: ..,U)44 I4o otekla g:t We a)
ATTES.':,.. .-
BOARD OF COUNTY COMMISSIONERS o
DWIG6T E`BROCI CcF.RK 'y
OF COLL R OUNTY, FLORIDA
By:t .-
■1� y�1i� By: tA) („,3Ak.
Deputy Clerkvre 0,314;• Chairmanti
y
Approved as to form and legal
s fficienc ..
oo
Assistant County Attorney
_
as
c.)
ca
ca
3
L
c
a
Packet Pg.415
•
I6.A.3.b
CERTIFIED COPY OF PARTNERSHIP RESOLUTION
I, PAUL CORBAN, Secretary of G.L. Homes of Naples II Corporation, a Florida corporation, the
general partner of G.L. HOMES OF NAPLES ASSOCIATES II, LTD., a Florida limited partnership, do
hereby certify that the following is a true and correct copy of a Resolution adopted by the general partner: O
"BE IT RESOLVED,that G.L. HOMES OF NAPLES ASSOCIATES II, LTD.,a Florida limited
partnership (the "Partnership"), is developing that certain residential community located in -_
Collier County, Florida commonly known as "Saturnia Falls", a/k/a "Terafina" (the y
"Community");and ea
u.
BE IT FURTHER RESOLVED, that G.L. Homes of Naples II Corporation, a Florida .03
corporation (the "General Partner"), as the general partner of the Partnership, intends to L.
execute, on behalf of the Partnership,various permit applications for and in connection with
the development of the Community(collectively, the"Land Development Documents"), and
thereafter, deliver such Land Development Documents to the applicable governmental and
quasi-governmental bodies, authorities and agencies (individually a "Governmental w
Authority"and collectively the"Governmental Authorities");and 0.
BE IT FURTHER RESOLVED,that General Partner hereby designates William Fenno as an
"Authorized Signatory" of the Partnership for the sole and limited purpose of executing and
delivering to the applicable Governmental Authorities, for and on behalf of General Partner, 'y
as the general partner of the Partnership, all of the Land Development Documents
necessary for the development of the Community;andcn
`a
BE IT FURTHER RESOLVED, that General Partner hereby designates William Fenno as an
Authorized Signatory of General Partner for the sole and limited purpose of executing and =
delivering to the applicable Governmental Authorities, on behalf of the Partnership, any and u0'
all of the Land Development Documents necessary for the development of the Community;
and cv
BE IT FURTHER RESOLVED, that William Fenno, as an Authorized Signatory of General
Partner, be and is hereby authorized to execute and deliver to the applicable Governmental
Authorities, for and on behalf of the Partnership, any and all of the Land Development m
Documents necessary for the development of the Community; and
a)
BE IT FURTHER RESOLVED, that any and all action previously taken by William Fenno in
connection with the execution and delivery of Land Development Documents by General
Partner, as general partner of and on behalf of the Partnership, consistent with the authority
granted herein Is, in all respects, ratified, approved and confirmed."
I FURTHER CERTIFY that the above Resolutions are in full force and effect and have not been
altered,modified or rescinded. 'a
iv
EXECUTED as of the 1st day of September,2010.
Paul Corban, as Secretary of G.L. Homes of
Naples Associates II Corporation, a Florida
corj3oration, the General Partner of G.L. HOMES
OF NAPLES ASSOCIATES II, LTD., a Florida E
limited partnership
(PackPq.41 416 .I
2011 LIMITED PARTNERSHIP ANNUAL REPORT FILED 16.A3.b
Apr 19, 201
DOCUMENT#A02000000415 Secretary of St1
ate
Entity Name: G.L. HOMES OF NAPLES ASSOCIATES II, LTD.
.n-rent Principal Place of Business: New Principal Place of Business:
1600 SAWGRASS CORP PKWY,SUITE 400
SUNRISE, FL 33323
0
Current Mailing Address: New Mailing Address:
ca
1600 SAWGRASS CORP PKWY,SUITE 400
SUNRISE,FL 33323 a
FEI Number:57-1139851 FEI Number Applied For( ) FEI Number Not Applicable( ) Certificate of Status Desired(X) u_
Name and Address of Current Registered Agent: Name and Address of New Registered Agent:
G.L. HOMES OF NAPLES II CORPORATION in
1600 SAWGRASS CORP PKWY, SUITE 400
SUNRISE,FL 33323 US
The above named entity submits this statement for the purpose of changing its registered office or registered agent,or both,
in the State of Florida. Q
SIGNATURE:
Electronic Signature of Registered Agent Date 'y
GENERAL PARTNER INFORMATION: ADDRESS CHANGES ONLY: CD
Document S: P02000030560
ame: G.L.HOMES OF NAPLES II CORPORATON u-
lress: 1600 SAWGRASS CORP PKWY,SUITE 400 Address:
j-St-Zip: SUNRISE,FL 33323 City-St-Zip:
coC
d
co
(5 • STP1/47. S
C
73
:r
V
To
C.)
.F�
I hereby certify that the information indicated on this report is true and accurate and that my electronic signature shall have E
the same legal effect as if made under oath;that I am a General Partner of the limited partnership or the receiver or trustee
empowered to execute this report as required by Chapter 620, Florida Statutes. �?
NATURE: RICHARD M. NORWALK V 04/19/2011
Electronic Signature of Signing General Partner Date
I Packet Pg.417 ,
Saturnia Falls Plat One 6A.3.b
Bond Estimate
9-19-11
Category Cost
Water $314,527.04
W
t0
.
Sewer $597,218.00
LL
Paving $ 1 ,021 ,243.30
U)
Drainage $660, 189.30
C
ea
g.
Off-Site Outfall
$972,498.09
V
C
Landscape/Irrigation $428,576.00 y
Lighting .)
Entrance Li
9 g $48,000.00 rn
C
Total $4,042,251 .73 "
N
co
Bond Amount = $4,042,251 .73 x 1.1
= $4,446,477.00
iv
coL
V
C
C
C
C
0
V
2
L
y
C
0
U
C
G1
o
`�
4T.h3y
Packet Pg.418
16.A.3.b
DESCRIPTION OF WORK
DESCRIPTION
VING UNIT UNIT PLAT 1 PLAT 1 PLAT 1
PRICE QUANTITY INSTALLED REMAINING PLAT 1 BOND
PE S-3 ASPHALT- 1"FIRST LIFT SY $3.59 43222 0 43,222 155,059
TYPE S-3 ASPHALT-3/4"FINAL LIFT SY $2.92 43222 0 43,222 $126,262.27
6"LIMEROCK BASE SY $4.70 47968 0 47,968 $225,449.60
12"STABILIZED SUBGRADE SY $1.25 57855 0 57,855 $72,318.75 d
TYPE"A"CURB LF $9.15 1174 0 1,174 $10,742.10 0
TYPE"RA"CURB LF $13.25 290 0 290 $3,842.50 N
TYPE"E"CURB LF , $8.73 998 0 998 $8,715.53 2
2'VALLEY GUTTER LF $5.60 16910 0 16,910 $94,636.82 0-
3'
3'VALLEY GUTTER p HANDICAPPED LF $16.99 420 0 420 $7,137.69 u)
TYPE"F"CURB&GUTTER LF $6.69 15553 0 15,553 $104,100.12 ti
12"CONCRETE BAND LF $14.11 384 0 384 $5,419.87 ca
CONCRETE SIDEWALK SF $1.89 84464 084,464 $159,299.10 6.
STOP SIGN/STREET NAME SIGNS(R1-1 EA $333.13 14 0 14 $4,663.75 w
SPEED LIMIT(R2-1) EA $179.38 1 0 1 $179.38 Cl)
NINE DOT BARRICADE SIGN (0M4-1) EA $117.88 12 0 12 $1,414.50
PED X-ING (W11-2 w/W16-7p) EA $189.63 26 0 26 $4,930.25 (73
PED X-ING(W11-2 w/W16-2a) EA $189.63 19 0 19 $3,602.88 0.
cu
YEILD SIGNS(R1-2) EA $179.38 3 0 3 $538.13
BIKE LANE SIGNS(R3-17) EA $153.75 23 0 23 $3,536.25 Q
BIKE LANE AHEAD(R3-17 w/R3-7a) EA $179.38 2 0 2 $358.75 c
BIKE LANE ENDS(R3-17 w/R3-17b) EA $179.38 2 0 2 $358.75 'n
TRAFFIC CIRCLE SIGN (W2-6 w/W16-12p) EA $199.88 3 0 3 $599.63 .?
24"STOP BAR,WHITE(PAINT) LF $2.31 240 0 240 $553.50 .0
24"STOP BAR,WHITE(THERMOPLASTIC) LF $4.36 240 0 240 $1,045.50 N
12"CROSSWALK STRIPING,WHITE LF $1.13 4111 0 4,111 $4,635.15
12"CROSSWALK STRIPING,WHITE LF $1.13 4111 0 4,111 $4,635.15 E
it
i'-1;'CROSSWALK STRIPING, WHITE LF $2.31 4111 0 4,111 $9,480.99
SOLID WHITE STRIPING(PAINT-FIRST LF $0.26 7575 0 7,575 $1,941.09
P"SOLID WHITE STRIPING(PAINT-FINAL LF $0.26 7575 0 7,575 $1,941.09 co
6"SOLID YELLOW STRIPING(PAINT- LF $0.26 385 0 385 $98.66
6"SOLID YELLOW STRIPING(PAINT- LF $0.26 385 0 385 $98.66 0,
18"GORE STRIPING,WHITE(PAINT- LF $1.79 74 0 74 $132.74 E
18"GORE STRIPING, WHITE (PAINT- LF $1.79 74 0 74 $132.74 0)
6"SOLID DOUBLE YELLOW(PAINT- LF $0.51 850 0 850 $435.63 Lal
6"SOLID DOUBLE YELLOW(PAINT- LF $0.51 850 0 850 $435.63 `t
BIKE SYMBOL,WHITE (PAINT-FIRST EA $25.63 49 0 49 $1,255.63 c
BIKE SYMBOL, WHITE (PAINT-FINAL EA $25.63 49 0 49 $1,255.63 ca
PAVING TOTAL $1,021,243.30 ,
C
Fs
2
.a
c
cv
c
0
oE
V')
c
0
U
C
m
E
12
Q
I Packet Pg.419 )
,16.A.3.b
DESCRIPTION OF WORK UNIT UNIT PLAT 1 PLAT 1 PLAT 1 I
PRICE QUANTITY INSTALLED REMAINING PLAT 1 BOI`
DRAINAGE
12"x 18" ERCP LF $20.00 24 0 24 $480.00
15" RCP LF $18.98 ' 1540 440 1,100 $20,878.0C
18"RCP LF $23.79 1771 1,190 581 $13,821.9c
24" RCP LF _ $30.02 1986 227 1,759 $52,805.1E --
30"RCP LF $42.47 961 0 961 $40,813.67 c
36" RCP LF $54.04 419 0 419 $22,642.7E O
42" RCP LF $66.64 117 0 117 $7,796.88 u,
48"RCP LF $81.36 2187 914 1,273 $103,571.21 s
60" RCP LF $111.98 1373 0 1,373 $153,748.5, N
JUNCTION BOX 18" RCP EA $1,423.00 1 1 0 $0.00 �a
JUNCTION BOX 24"RCP EA $1,523.00 1 1 0 $0.00 LL
JUNCTION BOX 36" RCP EA $2,656.00 1 0 1 $2,656.00 `°
JUNCTION BOX 48"RCP EA $3,200.00 1 0 1 $3,200.00
JUNCTION BOX 60"RCP EA $4,952.00 4 0 4 $19,808.00 A
FLARED END 15" EA $664.00 4 2 2 $1,328.00 0
FLARED END 18" EA $723.00 6 6 0 $0.00 c
FLARED END 24" EA $819.00 6 2 4 $3,276.00 g
FLARED END 36" EA $1,284.00 3 0 3 $3,852.00 n.
FLARED END 42" EA $1,500.00 1 0 1 $1,500.00 cti
FLARED END 48" EA $1,807.00 10 6 4 $7,228.00 ,
FLARED END 60" EA $3,091.00 4 0 4 $12,364.00 c
"F"CURB INLET EA $2,867.00 29 9 20 $57,340.00 o
VALLEY GUTTER INLET EA $2,668.00 43 15 28 $74,704.00 >
3'x 6' BOX CULVERT(CRITTER LF $415.00 274 137 137 $56,855.00 `a
WATER CONTROL STRUCTURE WCS-1 EA $16,000.00 1 1 0 $0.00 =
WATER CONTROL STRUCTURE WCS-2 EA $40,100.00 1 1 0 $0.00 co
WATER CONTROL STRUCTURE CB-166 EA $1,988.00 1 1 0 $0.00 c
DRAINAGE TOTAL $660,189.3( LZ/'\
N
Co
r.+
C
G7
E
d
ED.
a)
Q
d
0
C
co
C
d
C
2
.a
C
mi
C
O
7
L
N
C
O
U
w
C
m
E
a
to
w
Qin
Packet Pa.420
16.A.3.b
DESCRIPTION OF WORK UNIT UNIT PLAT 1 PLAT 1
PRICE QUANTITY INSTALLED
,,OTABLE WATER
PVC w/FITTINGS LF $14.49 4740 1,388
8" PVC w/FITTINGS (C-900, CL 200) LF $16.07 230 125
10" PVC w/FITTINGS LF $17.13 9905 4,488
10" PVC w/FITTINGS (C-900, CL 200) LF $20.00 1180 338
8"GATE VALVE EA $1,100.00 14 2 p
10"GATE VALVE EA $1,510.00 30 16
TEMP BACT. SAMPLE POINT EA $100.00 22 0 co
PERMANENT BACT. SAMPLE POINT EA $870.00 14 4 a.
BLOW OFF ASSEMBLY EA $760.00 6 0
FIRE HYDRANT ASSEMBLY w/6"GATE EA $2,290.00 38 16
AIR RELEASE VALVE EA $1,410.00 5 1 ca
SINGLE SERVICE CONNECTION (LONG) EA $444.00 23 19 E
SINGLE SERVICE CONNECTION(SHORT) EA $394.00 45 15
DOUBLE SERVICE CONNECTION (LONG) EA $620.00 24 10 Cl)
DOUBLE SERVICE CONNECTION (SHORT) EA $570.00 52 25
SERVICE TO LIFT STATION EA $1,430.00 2 1
BACKFLOW FOR TEMP. FIRE EA $6,000.00 1 1
CONNECT TO EXISTING 10" STUB EA , $2,430.00 6 2
WATER TOTAL Q
3
ca
_
LL
r
N
CO
r
,r.
_
d
D1
a)
a)
cc
to
L
N
_
ca
Pankof Pn d71
(°16.A.3.b 1
DESCRIPTION OF WORK UNIT UNIT PLAT 1
WASTEWATER PRICE QUANTITY PLAT 1 INSTALLED
8"PVC GRAVITY(0'-6' CUT) LF $12.45 3409.00 1,020
8"PVC GRAVITY(6'-8'CUT) LF $16.70 2572.00 711
8" PVC GRAVITY(8'-10'CUT) LF $18.95 1738.00
8"PVC GRAVITY(10'12'CUT) LF 949 c
$23.45 1951.00 776 °'
7
8"PVC GRAVITY(121-14'CUT) LFas
c
8"PVC GRAVITY(14'-16'CUT) LF $29.95 1025.00 475 O
$52.45 729.00
8"PVC GRAVITY(16'-18'CUT 427 y
LF $73.45 267.00 60
.c
SINGLE SERVICES EA $540.00 32.00 a.
DOUBLE SERVICES 15 N
T V. INSPECTION A $650.00 95.00 45 LL
MANHOLE(0'-6' DEEP) LF $2.00 11691.00 0 ca
EA $3,910.00 14.00 3 E
MANHOLE(6'-8'DEEP) EA $4,470.00 9.00 0
MANHOLE (8'-10'DEEP) 3 y
A $5,190.00 6.00 3
MANHOLE(I0'-12' DEEP) EA $6,080.00 8.00
MANHOLE (12'-14'DEEP) 3 o
EA $7,110.00 5.00 3 w
MANHOLE(14'-16' DEEP) EA $8,020.00 5.00 a
MANHOLE(16'-18' DEEP) 1
OUTSIDE DROP CONNECTION EA EA $ ,300.00 3.00 2 o
PLUG/BLOWOFF ASSEMBLY $2,300.00 3.00 13 c
$600.00 °
2 1/2"PVC w/FITTINGS(C-900, CL 200) LF $6.18 0.2.00 1 :o
80.00 80 "'
4"PVC w/FITTINGS LF $10.25 1370.00
4" PVC w/FITTINGS (C-900, CL 200) LF 905
6"PVC w/FITTINGS $10.77 420.00 285 N
6"PVC w/FITTINGS (C-900, CL 200) LF $111.$10.72LE .78 230.00 860.00 0 =
8"PVC w/FITTINGS 0 ii
TIE INTO EXISTING FORCEMAIN STUB LF $13.63 1350.00 1,350
$1,820.00 3.00
1
2 1/2"PLUG VALVE
4"PLUG VALVE EA EA
$730.00 2.00 1
6"PLUG VALVE $740.00 4.00 1
EA 8"PLUG VALVE $1.270.00 3.00 1 1)
EA $1,630.00 1.00 1
L.
AIR RELEASE VALVE EA $8,650.00 7.00 o)
PUMP STATION#1 3 Q
EA $142,000.00 1.00 1 m co
PUMP STATION#2
EA $142,000.00 0.00 c
PUMP STATION#3 0 �°
GRINDER STATION EA $141,000.00 1.00 0 aci
EA $25,000.00 1.00 p 5 c
WASTEWATER TOTAL
C
R
C
0
V)
C
O
(.)
C
d
E
V
co
w
a
Packet Pg.422.
16.A.3.b
DESCRIPTION OF WORK UNIT PLAT 1 PLAT 1
UNIT PRICE QUANTITY INSTALLED
OFF-SITE(LOGAN BOULEVARD OUTFALL)
SILT FENCE LF $0.70 6500 6500
48"RCP LF $89.00 6484 0
JUNCTION BOX EA $2,837.0020 0
48"FLARED END EA $2,780.00 r 2 0
DREDGE CANAL BOTTOM @ OUTFALL SY $4.00 980 0 0
RIP-RAP IN BOTTOM OF CANAL A CANAL SY
$22.00 315 0
DOUBLE CUT TRENCHING LF $20.00 4930 0 a.
DEMO & HAUL OFF EXIST. CURB LF $2.00 5375 0 w
DEMO ASPHALT TO CL OF LOGAN LF $2.007167 0 ii
RESTORATION 0
- VALLEY GUTTER LF $5.60 5375 0
- 12"STABILIZED SUBGRADE SY $2.00 8958 0
- 10" LIMEROCK SY $7.30 7167 0 ca
-2 1/2"S-1 AC SY $8.71 7167 0
-TYPE S-III SURFACE COURSE SY $4.20 7167 0
CONFLICT BOX EA $4,210.00 1 0 a
TURBIDITY BARRIER LF $15.00 100
OFF-SITE TOTAL 0
Q
0
N
7
N
co
•d
E
d
d
I-
0)
d
Ci
to
d
C
.a
C
C
0
c.)
L
N
C
0
C.)
r
C
d
E
.0
C)
ev
w..
�� Q
116.A.3.b; ,
DESCRIPTION OF WORK UNIT PLAT 1
LANDSCAPE& IRRIGATION UNIT PRICE QUANTITY �.
RED MAPLE EA $100.00 5
EAST PALATKA HOLLY EA $175.00 66
SLASH PINE
LIVE OAK EA $150.00 75
PALMS: EA $200.00 427 O
CABBAGE PALM w
EA $1 137 .
EA $8.00 879
SIMPSON STOPPER To
DWARF FAKAHATCHEE GRASS EA $8.00 7005
EA $8.00 440
RRIGATION SY $0.35 83800$8.00 413
m
I
SOUTH PROPERTY WALL
83800
LF $0.25
LANDSCAPE& IRRIGATION TOTALSY $60.00 3100
°
_ a
$2,000.00 24
STREET LIGHTING TOTAL °
.O
To
cor
N
O
E
G1
a,
I)
d
V
C
C
d
C
C,
2
C
C,
C
O
V
L
.F+
H
C
O
U
w
C
m
E
v
R
16.A.3.b
COLLIER COUNTY LAND DEVELOPMENT CODE
PERFORMANCE BOND
Bond No. 929536572
KNOW ALL PERSONS BY THESE PRESENTS: that
G.L Homes of Naples Associates II,Ltd.
1600 Sawgrass Corporate Parkway,4`" Floor O=
Sunrise, FL 33323ca
w
eo
s
(hereinafter referred to as"Owner")and o.
THE CONTINENTAL INSURANCE COMPANY ti
9800 NW 41'Street,Suite 300
Miami, FL 33178Cis
=
(hereinafter referred to as "Surety") are held and firmly bound unto Collier County, Florida, (hereinafter referred to as
"County") in the total aggregate sum of Four Million Four Hundred Forty Six Thousand Four Hundred Seventy cu
Seven and no/100 Dollars ($4,446,477.00) in lawful money of the United States, for the payment of which sum wellea
and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and
severally, firmly by these presents. Owner and Surety are used for singular or plural,as the context requires.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Owner has submitted for approval by the Board a
certain subdivision plat named Saturnia Falls Plat One and that certain subdivision shall include specific 'rn
improvements which are required by Collier County Ordinances and Resolutions (hereinafter "Land Development >_
Regulations"). This obligation of the Surety shall commence on the date this Bond is executed and shall continue until E
the date of final acceptance by the Board of County Commissioners of the specific improvements described in the Land to
Development Regulations(hereinafter the"Guaranty Period")
�'----
LL
NOW, THEREFORE, if the Owner shall well, truly and faithfully perform its obligations and duties in accordance with ••
the Land Development Regulations during the guaranty period established by the County,and the Owner shall satisfy all N
claims and demands incurred and shall fully indemnify and save harmless the County from and against all costs and 00
damages which it may suffer by reason of Owner's failure to do so, and shall reimburse and repay the County all outlay
and expense which the County may incur in making good any default, then this obligation shall be void, otherwise to E
remain in full force and effect.
L
PROVIDED FURTHER, that it is expressly agreed that the Bond shall be deemed amended automatically and Q
immediately, without formal and separate amendments hereto, so as to bind the Owner and the Surety to the full and aj
faithful performance in accordance with the Land Development Regulations. The term "Amendment," wherever used in
this Bond, and whether referring to this Bond, or other documents shall include any alteration, addition or modification m
of any character whatsoever.
cc
IN WITNESS WHEREOF, the parties hereto have caused this PERFORMANCE BOND to be executed this 4th day ofco
October.201 I.
0
.45N
C
O
U
r
C
am
E
c)
I. Packet Pg.425
16.A.3.b..
Owner
Attest: '�`
G.L. Homes of Naples Associates fl, Ltd. By
G.L. H f Naples II Corporation, its General Partner
� ( orporate Seal)
5
l/l m
By:/ / �'tC/ c
Pau Corban,Corporate Secretary N Maria enendez, ce President O
m
v,
ca
.c
State of Florida a
w
County of Broward
Ts
u_
cc
I HEREBY CERTIFY that on this day, before me,an officer duly authorized to take acknowledgements, L
personally appeared N. Maria Menendez, Vice President of G.L. Homes of Naples 11 Corporation,to me known to be
described in and who executed the foregoing instrument and acknowledged to and before me that they executed the fn
same.
d
V
c
Witness my hand and official seal in the county and state last aforesaid this 4th da o ctober,2011. 12
a
a)
o
n
---).%---1--/---- Q
Notary Public, State of Florida c
0
N
.5
'a
My commission expires 4tAeL4c-j.71313 ,
c1",- EVFLYN DUFNAS W
( =r° ` `t= Notary Public-State of Florida
•% ••° My Comm.Expires Aug 8, 2013 i Y�
1 ':•,'; -%` P' Commission#DD 904052 f
'''°.f,� Bonded Through National Notary Assn.
SuretyCIV
r"
e-
4
Attest: The Continental Insurance Company m
1 (Corporate Seal)
As Per Attached Power of Attorney B : a.
let ft �i �� _ az
D.A. :ells,Attorney-In-Fact and Florida Resident Agent d
c
as
c
a)
State of Florida _c
County of Miami-Dade c°
2
Before me this day personally appeared D.A. Belis, Attorney-In-Fact for The Continental Insurance Company, c
cc
who,being duly sworn,executed the foregoing instrument and acknowledged to and before me,the truthfulness ando
accuracy of the statements in the foregoing instrument.
a
Witness my hand and official seal in the county and state last aforesaid this 4th day of October,201 I.
g
c
V3 1 1"--)1 /a/(1)(4"‘ c
co
Notary Public, State of Florida c
t
s_\#Z" N. Efif Aslan al
_ :COMMiSSiON 1 EE 126431
My commission expires "s+y : EXPIRES:AUG.30,2015 Q^
,,,,,c,„• WWN.AARON 0TARY.aem
ID.,i,.4 D.. AHO I
-
` POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT 16.A.3.b
Know All Men By These Presents,That The Continental Insurance Company,a Pennsylvania insurance company,is a duly organized and existing
insurance company having its principal office in the City of Chicago,and State of Illinois,and that it does by virtue of the signature and seal herein
affixed hereby make,constitute and appoint
D A Belis,Individually
I;
c
0
m
h
of Miami,FL,its true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign,seal and execute for and on its behalf bon( a
undertakings and other obligatory instruments of similar nature
v,
-In Unlimited Amounts- ti
CO
and to bind them thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the insurance company and a
the acts of said Attorney,pursuant to the authority hereby given is hereby ratified and confirmed.
to
This Power of Attorney is made and executed pursuant to and by authority of the By-Law and Resolutions,printed on the reverse hereof,duly a
adopted,as indicated,by the Board of Directors of the insurance company. c
c
a
In Witness Whereof,The Continental Insurance Company has caused these presents to be signed by its Senior Vice President and its corporate se 0
to be hereto affixed on this 14th day of September,2009. Q
c
o
.....;' ...,• The Continental Insurance Company •-
At 5i % 'i5
z $: Cl)'
'NJ....aro Jacqu ; e M. elcastro Senior Vice President
N
co
State of Illinois,County of Cook,ss:
On this 14th day of September,2009,before me personally came Jacquelyne M.Belcastro to me known,who,being by me duly sworn,did depose
and say: that she resides in the City of Chicago,State of Illinois;that she is a Senior Vice President of The Continental Insurance Company,a y
Pennsylvania insurance company,described in and which executed the above instrument;that she knows the seal of said insurance company;that the se E
affixed to the said instrument is such corporate seal;that it was so affixed pursuant to authority given by the Board of Directors of said insurance y
company and that she signed her name thereto pursuant to like authority,and acknowledges same to be the act and deed of said insurance company. en
a
a)
WI 8?AIONMrCE ( 34 c
natstrntNttc.m►aar .13;t,uaas
OMPIi11C•SM11MARflq , i
i
My Commission Expires September 17,2013 Eliza ce Notary Public .ivi
E
c
tv
CERTIFICATE c
w
I,Mary A.Ribikawskis,Assistant Secretary of The Continental Insurance Company,a Pennsylvania insurance company,do hereby certify that the 1
Power of Attorney herein above set forth is still in force,and further certify that the By-Law and Resolution of the Board of Directors of the insurance w
company printed on the reverseh r f is still in force. test' ony whereof I have hereunto�-y�, subscribed my name and affixed the seal of the said c
insurance company this day of �G J I ` . V
.••'""••. The Continental Insurance Company ilm
* .
:z .1`, � ,,. : r
g :sit: s(2- C a
-e74124AJ24z=.
•~'••Z•'•'�• Mary A. ika is Assistant Secretary
Form F6850-5/2009
1
Packet Pg.427`°
16A.3.c"
RESOLUTION NO. 16-
A
RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS OF COLLIER COUNTY,
FLORIDA AUTHORIZING FINAL
ACCEPTANCE OF CERTAIN ROADWAY AND
DRAINAGE IMPROVEMENTS IN SATURNIA
FALLS PHASE ONE, ACCORDING TO THE
PLAT THEREOF RECORDED IN PLAT BOOK
51, PAGES 1 THROUGH 26; RELEASE OF THE
MAINTENANCE SECURITY; AND
d
ACCEPTANCE OF THE PLAT DEDICATIONS .c
a
WHEREAS, the Board of County Commissioners of Collier County, Florida, on 172.
September 13,2011, approved the plat of Saturnia Falls-Phase One for recording;and
WHEREAS, the Developer has constructed and maintained the roadway and
drainage improvements in accordance with the approved plans and specifications as 2D,
required by the Land Development Code (Collier County Ordinance No. 04-41, as ca
amended); and a
d
Q
WHEREAS, the Developer is requesting final acceptance of the roadway and
drainage improvements and release of his maintenance security; and •
WHEREAS, the Development Review Division has inspected the roadway and c
drainage improvements, and is recommending acceptance of said facilities. y
71-3NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY
t",..`,1
COMMISSIONERS OF CQLLIER COUNTY, FLORIDA, that final acceptance is hereby
granted for those roadway and drainage improvements in Saturnia Falls — Phase One,
pursuant to the plat thereof recorded in Plat Book 51,pages 1 through 26, and the Clerk is
c
hereby authorized to release the maintenance security.'
0
BE IT FURTHER RESOLVED AND" ORDERED that the roadway and drainage Ce
improvements within Saturnia Falls — Phase One will be maintained privately in the c
future and will not be the responsibility of Collier County. E
E
Ova
I6.A.3.c.
This Resolution adopted after motion, second and majority vote favoring same,
this day of , 2016.
DATE: BOARD OF COUNTY COMMISSIONERS
ATTEST: COLLIER COUNTY, FLORIDA
DWIGHT E. BROCK, CLERK
By: a
Deputy Clerk DONNA FIALA, CHAIRMAN
d
U,
0.
Approved as to form and legality: N
u.
CD
41/1)X1//
Scott A. Stone '4
Assistant County Attorney cn
d
c
a
CD
•u.
N
00
0
0
CO)
d
r
CD
I
Packet Pa 429