Loading...
Agenda 07/12/2016 Item #16A12 7/12/2016 16.A.12. EXECUTIVE SUMMARY This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Anthem Parkway Phase One (Application Number PL20150001931) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. OBJECTIVE: To have the Board of County Commissioners(Board)approve for recording the final plat of Anthem Parkway Phase One, a subdivision of lands located in Sections 4, 8, and 9, Township 48 South, Range 29 East, Collier County, Florida, following the alternative procedure for approval of subdivision plats pursuant to Resolution 99-199. This procedure allows for the Board to approve the plat and associated construction documents for construction purposes and recording purposes concurrently. CONSIDERATIONS: The Development Review Division of the Growth Management Department has completed the review of the construction drawings, specifications, and final plat of Anthem Parkway Phase One. These documents are in compliance with the County Land Development Code and Chapter 177, Florida Statutes. This project is within the Ave Maria SRA. All fees have been paid. Security in the amount of 10% of the total cost of the required improvements, and 100% of the cost of any remaining improvements, together with a Construction and Maintenance Agreement for Subdivision Improvements, shall be provided and accepted by the County Manager or his designee and the County Attorney's office prior to the recording of the final plat. This procedure is in conformance with Section 10.02.04 F.2 of the Land Development Code. Staff recommends that the final plat of Anthem Parkway Phase One be approved for recording. FISCAL IMPACT: The project cost is $2,636,303.60 (estimated)to be borne by the developer. The cost breakdown is as follows: a) Water& Sewer $ 762,267.88 b) Drainage,Paving, Grading $1,874,035.72 The Security amount, equal to 110%of the project cost, is $2,899,933.96 The County will realize revenues as follows: Fund: Growth Management Fund 131 Agency: County Manager Cost Center: 138327--Land Development Services Revenue generated by this project: Total: $57,621.07 Packet Page-277- 7/12/2016 16.A.12. The Fees are based on a construction estimate of$1,874,035.72 (does not include Ave Maria Utilities) and were paid in February, 2016. The breakdown is as follows: a) Plat Review Fee($1,000.00+$5./ac) $ 1,400.00 b) Construction Drawing Review Fee Water&Sewer(.75%const. est.) n/a c) Drainage,Paving,Grading (.75%const. est.) $14,055.27 d) Construction Inspection Fee Water&Sewer(2.25% const. est.) n/a e) Drainage,Paving, Grading (2.25%const. est.) $42,165.80 GROWTH MANAGEMENT IMPACT: The developer must receive a Certificate of Adequate Public Facilities (COA) prior to the issuance of the construction plan final approval letter and plat recordation, except when the applicant elects to delay obtaining a COA for non-residential developments that are required to obtain approval of a site development plan prior to the issuance of a building permit. LEGAL CONSIDERATIONS: This item has been approved as to form and legality, and requires a majority vote for Board approval. -SAS RECOMMENDATION: To approve the final plat of Anthem Parkway Phase One (Application Number PL20150001931)for recording with the following stipulations: 1. To approve the amount of$2,899,933.96 as performance security for the required improvements; or such lesser amount based on work completed, and as is approved by the Growth Management Department. 2. To approve the standard form Construction and Maintenance Agreement and direct the County Manager or his designee: a. To withhold Certificates of Occupancy until the required improvements have received preliminary acceptance. b. To delay recording of the plat until suitable security and an appropriate Construction and Maintenance Agreement is approved and accepted by the County Attorney's office and the Board or the County Manager or his designee on behalf of the Board pursuant to Section 10.02.04 F.2 of the Land Development Code. Prepared by: John Houldsworth, Senior Site Plans Reviewer, Development Review Division, Growth Management Department Attachments: 1)Location Map 2)Plat Map 3) Opinion of Probable Cost Packet Page -278- 7/12/2016 16.A.12. COLLIER COUNTY Board of County Commissioners Item Number: 16.16.A.16.A.12. Item Summary: This item requires that ex parte disclosure be provided by Commission members. Should a hearing be held on this item, all participants are required to be sworn in. Recommendation to approve for recording the final plat of Anthem Parkway Phase One (Application Number PL20150001931) approval of the standard form Construction and Maintenance Agreement and approval of the amount of the performance security. Meeting Date: 7/12/2016 Prepared By Name: HouldsworthJohn Title: Site Plans Reviewer, Senior,Development Review 6/7/2016 6:56:18 AM Approved By Name: PuigJudy Title: Operations Analyst, Operations &Regulatory Management Date: 6/7/2016 2:31:56 PM Name: PuigJudy Title: Operations Analyst, Operations&Regulatory Management Date: 6/7/2016 2:41:09 PM Name: McLeanMatthew Title:Project Manager,Principal, Development Review Date: 6/9/2016 2:42:41 PM Name: MarcellaJeanne Title: Executive Secretary, Transportation Administration Date: 6/14/2016 5:02:18 PM Name: StoneScott Title:Assistant County Attorney, CAO Land Use/Transportation Date: 6/16/2016 1:15:50 PM Name: KlatzkowJeff Packet Page-279- 7/12/2016 16.A.12. Title: County Attorney, Date: 6/21/2016 3:34:48 PM Name: IsacksonMark Title: Division Director-Corp Fin&Mgmt Svc, Office of Management&Budget Date: 6/30/2016 5:07:47 PM Name: CasalanguidaNick Title:Deputy County Manager, County Managers Office Date: 7/1/2016 4:51:12 PM Packet Page-280- 7/12/2016 16.A.12. Imaimgeoriow • _r/ PROJECT LOCATION TOWN OF AVE MARIA IMMOKALEE ROAD Qi) •-"k' k:141-1 CC t 6 OR.WELL ROAD NMOKALEE ROAD 1 GOLDEN GATE BLVD k "1- ._ VICINITY MAP Packet Page -281- ='77:4"°174" °T'°Pu ANTHEM PARKWAY PHASE ONE K PLAT BOOK PAGE IOH N.N CIRCUMSTANCES RESUPPLANTED nV AUTHORITY Bl['� .`A°- a[ x ,=°"='ANY LOCATION MAP SHEET 1 OF 4 IILNGINE RING ,Da°oT ,,1„, L rp oatTNf,74.,,,ut A REPLAT OF A PORTION OF TRACTS F-11,F-12,AND TRACT R _----.------1------ -- J--- AVE MARIA UNIT TWO,PARK OF COMMERCE, 1 36 3 HemcenoN ANo pp6EpvAnorvs: Resr I ; I'3r err. PLAT BOOK 48,PAGES 22-28 ^ T�.wm..otl "5 T ANDA PORTION OF TRACT E, -� SITE I MAPLE RIDGE PHASE 3,PLAT BOOK 56,PAGES 41-49, 1 ala `` 1 s 1 I N2 R'It [. .z °[.n° +r° A PARCEL OF LAND LYING IN � £,a, �° SECTIONS 4,8,&9,TOWNSHIP 48 SOUTH,RANGE 29 EAST NI _ I �, - I 'Z W x+a ,�„x,TZ,;, wnK",a.= ,TZ,;,,, COLLIER COUNTY,FLORIDA \'\6t--- :L-- �= r,�.u.[,wTx a[zeoxzie cr.rn u.wrtx+xec amc,Tx[x[,u[-u°s<,r°[+s[u-xn°[n,,[,'xcee°x p\'EYORS CR.HTIFICwT \ x ccra.,r,-cOc i[a suxT,.,z ra+A-xr5[S MO iu C.,:r ria[CON.,°rzrai. _ _ y ° ` z 13.,,,,c.ru+a,u[ COMPANY�[ E^ -T•[ +`L^ °z,a.cIrz xu xu. MO RTOAOEE['CONSENi I. ''cc wa c vuL' "''''-''''''''.47.' oc.,w r x, .. c,c[ana nz r"' ""[-s[ ,' u c c[. -[ ,vc[,[n,. c Mc[uv'r°•Tn "[[Ms rnam,"n ena srac,.=s,—v °A.[, ro ,rnn.r..r e Fr''''' r„o cc.c.r c n[. u ''''r °r z,c z r- cc c,n: 1p J:7;x TT ns N[.ea[,, ,.` APPRO\'wL5 Lu oa N . [,OA z.Or. , ,c , [ .A �ox.a.aaFr,[, +.. „ ,- SII „,,,a,.,[„co Ma A.NA"A CO. ,sr.. ux c N5 u,.,rT Ar"AxA.2+,AA,s~,cwxx ,,,�r... .wx ,: A _ CONtiNNT .za_u�T c>'.�ATT max_. Tr vx°cru:r[°c.r.a s easssxTs .r,cer. I . . u c .,ri"' n��,[ r x.rcWru,i wry+ry �,101,4"[c[C. nc o max, °c r.,:i,i01c. ., "A.. -. c r_<c� ,r AnrzinrnIccco x,ocus ca nT ro. I O v,y r,+ ACKNOWLPOOMF.NT .r.[,,,_ .[,c a, ,[ .rc:v 0 fcar r xuf ox, u[ uA,rc°cv,cc _w °[unri AT.zx. vo c T r ,,,, [var.n cx nx v rrt u� V` x =',.'TPar ANTHEM PARKWAY PHASE ONE PLAT BOOK PAGE JOHNSON SHEET2OF4 �,���I!�!�,,aciel A REPLAT OF A PORTION OF TRACTS F-11,F-12,AND TRACT R w.E„G N .., AVE MARIA UNIT TWO,PARK OF COMMERCE, ,Po PLAT BOOK 48,PAGES 22-28 AND A PORTION OF TRACT E, MAPLE RIDGE PHASE 3,PLAT BOOK 56,PAGES 41-49, 5 e' a SH Era A PARCEL OF LAND LYING IN ""- --s SECTIONS 4,8,&9,TOWNSHIP 48 SOUTH,RANGE 29 EAST COLLIER COUNTY,FLORIDA <✓ SHEET 3', DESCRIPTION KNE m MSP E ,.< "% r. N RARnON... CE. .S.a o e.D o ,.,. x 90 MS.,mOST CORN.Cr TRACT L. E£Al AVE mMIA ACER 42.CF ME FII' PAUL RECORDS«COLLIER COMM FLORIDA,uENCE RCN x6611N ALD G NGRDERL,LINE a WAC,E.A DISTANCE e,.30 ,.n PONT OF 6ECANNxG 7- FEEL THOME 551195341.A DISTANCE OF 2.03.1 TO MC PONT Or W.A..OF n CDR.TO TM LEFT HALING A RADIOS OF 110.00 FEET,A CENTRAL IN.CF 63.431,A MORO BEARING OF N0,49.41‘.MP•CHORD DISTMCE.149.61 KET.FOR AN ARC DISTMCE DF 1134.33 FEET TO A PONT ON*N.-TANCENT Mg: MENCE 549131.561 ALONC SAIO N.-TAN.NT LNE.A DISTANCE CF 133.FEET: THENCE ON THE MC CF A 14.-MOICENT OA.TO ME LEFT HAHNE A RADIUS Of 130.00 FEM.A CENTRAL ANGLE OF novo,.A.ORD EtA.R.0,SIOMM.E.ATIO A CHORD DISTANCE OF 166.09 FEET.F.AT4 ARC DISTANCE Or 100.13 FEET 10 ME PONT CF REY..CORNAMRE, NOME.ME APO OF A REVERSE CIASE TO ME NWT MONO A RADIUS.2.396.MET.•CENTRAL ANGLE OF 00105,A CHORD )u LEGEND Apo oF A moN_TAN0ENT copur m mE Ncur s•L,Nc A LA.,.s•73..FEEL.•cs-sm•,.Aso.,.pr.',A 0.0 REANNAG.543,23,ARD A cmoRD :21ILLE Eis,71,74 EASEMENT I DISTANCE OF 166.0 FEET.FOR Aud ARC DISTANCE Of us.os urr TO A PONT.A NON-TANGENT LINE TIM.SOODS.42,AL..5.NON-TANDENT LINE A DISTANCE OF 0.62 FEET TO ME PONT OF OIRvAITURE OF A CYR.TO 111E LER HAW.•RADIOS OF 270.0C FEET.A CENTRAL AN.Cf 706153r.A CHORD BEARIN0 Cf coon T3EMNO 18j0 S1465537M.AND A OHM DSTANCE OF 312.33 FEET,FOR AN MC DISTANCE OF 33310 FEET TO TNE PONT Of RE.SE OURVATO. IND.CR TTIE ARC OF A REM.. COME TO THE F.FIT HA.,4 A RAMIS OF moo FEET.n CENTRAL ANGLE Or 2071'21..A.ORD EIMR940 OF SICl/M1,AHO A CHORD DISTANCE OF.93 OEM FOR AN r ,r,,za LASEuNI (..0 GINE.,SILMIS MC INSTANCE OF 41.14 FEET TO THE PON/OF TANGENCY OF 5.CUR.:THENCE SOCI,VOTE.A m.o.OF 125.00 FEET TO A PONT ON THE NORM LINE OF sEcnori 0, Rr X Ir IRON RODS 61M 2. D eEw PD) sow..40 SOITN,RAN.29 EAST:THENCE.9.45'53,AL.O 5/JD SEED.UNE,A DISTANCE Cf 377.10 FEET,MEI.DEPART,.SAID sEcnov.E.RON SISISOOM, x, tSUE CENTRAL AN.OF 0363,49,A..D BEARING OF sousrosro Aro A C.RD DISTANCE OF 137.07 FEET.FOR AN ARC DISTANCE OF 137.99 FEET TO TE POW OF . LANDSCAPE EASPIENT TANI.CT OF SAID COM MENCL 562.431,2,9,A DIMATICE Of 434..rat Nola S3710.S6,A DISTANCE or ssoo rut pious 562,311,A OISTANCE OF oo.ss TAON. MENUmENT FEET TO TINE PONT OF CuMoTuRE.A MAW M MI LEFT mv,NO A RADIUS OF 1.93301/FEET.A CENTRAL ANGLE OF 19.06.46..A CMORD BEARNO Or SS31.1"39M,AND NASD. NORM ATAILINCAN VERTICAL DAMTA OF 196.6 A CNO.DISTANCE OF 642.93 FEEt FOR AN ARC OSTANCE OF 645.94 FEM TO ME PONT OF MNO.CY OF SAID CURVE,MD.M31410.9.A DISTANCE OF MD 40 FMT moo 6 - R5DiP1 70 ne N ns c .ANDA NO. ROAMER {Nn)e M ANTIC.DAN.a 1929 CHOPO INSTANCE or 3196 Mt roR M ARC ENSTANCE Or 37.FEET TO A PONT ON roc EASTERLY RON1-0E-MY OF ATE AIMIA FICAILINARD.!TRACT VI'l;:rlitaNDS BO. 7. r..110,?'„-"-""`.°%"°TM'"'"''',0 RECORDED IN PUT BOOK 46.PA.5 10-3S.OF ME PUBLIC RECORDS OF CELLAR COUNTY,R.10.MEN.NM ON SAID R.T-OF-MY UNE ISE FOLL.NO COIRSE6 ON .0.,,,, LOYD SOE 1 LNFS.ARE CENTER ON 5.INES,uNLESS OTHERvISE 4O.E P149,OC UNITY EASEMENT T.ARC OF A.NON-TANGENT crow TO no LEr1 HALING A RAMS.1.325.00 FEET,A aorom.ANOLE Or 01.5916,A OK.BEAM.OF N42.59518M.AIM A OLORD MOLE OF 02'30.01..A CNORD BEARING Of N45,33.04.N.ANO A C.RD DISTANCE 0,77.90.1.FOR AN MC INSIAN.OF 77.91 FEET TO ME KANT OF TANGENCY OF SAID CuPsE,MENCE 1•46.33.44M.A INSTANCE OF 66,00„ET M A PoiNT.ME SOOTIEST PROPERTY BOoNDANY Or A.TRARIA uNT MO.PARR OF COumERCE.PLAT BOOK M.PACES 22-219,OF ME P..'RECORDS OF COLuER COuNry.FLOMDA,THENCE N43.34.161 ALO.5.SOUMERLT UNE A DIR..OF 12637 FM,MEN.ON INE ';4'/. TR=;"EIZE'N'CL'ATOTIA.EN I FEET.A CENTRAL ANGLE OF 43.27,0.,A.0.BEAR.OF osnsuro oro A CHORD OSTANCE Os 57.M MET,FOR AN ARC DISTANCE OF 59.17 MT TO ME PONT OF 1-;;L-,., 4-:',="g:FIECT4:71111X EASMIENT DRAINAGE...RENT bOA,TO ME LEFT HALING A RAMIS OF 65.rut A CONTRA.J.AN.Of 50.04.38,•[Non REARING or NOIMISIM.AND A OIORD DISTANCE OF M.04 FOR AN NIM �) DELTA AN02 . FEEL TH.CE 527-23530,A 05..OF 10766 FEET TO nu PONT OF CoRmToRE 0,A CUROF TO NC LEFT HAM.A RADOS Of 100.0.FEEL A CENTRAL ANGIE OFy 3.1.33.3,.A CHORD BEARING Of 35413.111.A.A CH0.60 OISTMCE OF 91,3 FEET.FOR M ARC DISTANCE Of 94.04 fEET TO PLE POINT Of REVERSE COM/ANNE. 1 ram.°A R.US OF 76.00 FEE,A CENTRAL ANGLE OF 4510.39-,A CHORD REAM.OF NB572'521,MD A.0.DISTANCE OF 6011.1,FCP AN ARC DISTANCE Of i 0171 FErr TO NE PONT or TANCOICA or sus ORA;OINCr 1032,3OSU.A MU.,OF.5.37 FEET ro tor ProoT or cooyAnus u A nou 10 MI LA,MAO. Ns., 30.30%.MD A CHORD DISTANCE OF 1.445.67 MEL TR AN ARC MS..Or f O A �S..NCE a,G.SS Fara:AR AR ,AR �,..E,m xE RNx,G.ffGNNNG .NDE aOF 0,40.20..A CHORD BEARNO Cr Azr000srt Ares A OURO DiSIANCE OF 115.39 FEET,!OR AN ARC 05TANCEOF 6,60,1632 --O ME"•-"'PONT Or a N,S,6COMPOMDs,..•-.t . 0) eCO.,NNND 6,247 S,,,ARE,EE,OR 90.60 ACRES NENE OR 5 1 PARCEL sue.,m MSENEN,s.RESDxCS.S.RESERVATIONS.AND/SCHTS-a-NA.a RECORD. Cr) > f N 1 Imo "'"weE"'"o°na°tteANTHEM PARKWAY PHASE ONE 101-INsoN IPLATBOOK PAGE SHEET 3OF4 m�LI ESR I N IU A REPLAT OF A PORTION OF TRACTS F-11,F-12,AND TRACT R ""°" "' AVE MARIA UNIT TWO,PARK OF COMMERCE, "4"• PLAT BOOK 48,PAGES 22-28 —--, - AND A PORTION OF TRACT E, / MAPLE RIDGE PHASE 3,PLAT BOOK 56,PAGES 41-49, Y ' } A PARCEL OF LAND LYING IN / ` b SECTIONS 4,8,&9,TOWNSHIP 48 SOUTH,RANGE 29 EAST PAGE LAYOUT COLLIER COUNTY,FLORIDA °"5 N w 5 SMOTE 51.00. LEGEND m T - el ACCE OEM 0 30 00 o .. .. ryal Pa(WEENIE, Y SCALE=.-cD) °" LE. LANOSCOr CARLOW M.. MONUMENT c .• .5rnu.°. „ C15 51. P.O.E. PONOC OP,'EASEMENT 7 u n.5 > _----- WA, _—— __— _c= (w EK oa gNWaYT PAWS REFERENCE NpwENT W/ MTN DJ iERA•555.—---- iw, ¢Ein anise ` (D °„ m co 500�. oo sar.55z x 5o„ .,,555E 55.5555.55r%4 m tag.„ '9'.7.'7/1 v '-k,';(55 CV 190•00'52,1517T 537.140, 1•211.00.1015, a�ff n 13.-..- x •. • ,n /, ONE OPECTION 5.111 C15 C15 MOO' 43.27.50. .5 �_,. .., a n•55.,5E 5.55 �. /. 5,53D,5E C21 75 CC' 5r n55,.5EE N. NJ 59,5•59xe,R . '/ 55„55.r ' a`,au°. O , - . . ..,.,°,.., /as ,, �..E 5,5> ,.,. a E.5 5 .---------- .1'..---'--' / (INTENDED D d7 ryj1. , ,. •..---- ----_i ,O. o. DISPLAY scut: sv) Q� X55 „D5.5D "." .75-.5".E 5..55 55 N zi-.1" x= ANTHEM PARKWAY PHASE ONE PLAT BOOK PAGE JOHN SCT' SHEET plot OF 4 LEILG RINGI A REPLAT OF A PORTION OF TRACTS F-11,F-12,AND TRACT R :7417...°,7°..=, AVE MARIA UNIT TWO,PARK OF COMMERCE, PLAT BOOK 48,PAGES 22-28 —--- - AND A PORTION OF TRACT E, // MAPLE RIDGE PHASE 3,PLAT BOOK 56,PAGES 41-49, y ,, Ij A PARCEL OF LAND LYING IN / ` SECTIONS 4,8,&9,TOWNSHIP 48 SOUTH,RANGE 29 EAST PAGE LAYOUT SC— COLLIER COUNTY,FLORIDA °'TO POINTOF BEGINNING POINT OF COMMENCEMENT EASTERLY MOST CORNER OF xwxE tmn TRACT E, MAPLE RIDGE AT LEGEND (1NTEnDEo DISr su.0 1-so') AVE MARIA PHASE 3, PLAT g x.w •3'z E GSEu,xT BOOK 56. PAGES 41-49. PUBLIC RECORD. COLLIER -5,s COUNTY.FLORIDA TA SEEsc x D+x udT Cz ° R«it ' ro we knxncEs[nncw DAMN Of 1929 IR/°E a a E 0 ea '' ��_— a cw .minx te.,, Ion) ry •rz - a III L(x ae x,z '' 1'u. n �V $ Nm=co nE.EnuCE xw,.xExt ;t V E , t,, / / cm At i� R.° JC�7 �� .DauxnuEnLEU M3CO .�.°A ,� ,;.% a 51 wk) yyI lo•)a CEitnnxelE EUExz m see '41,,,,i--- u xs»te 21tSo ,'T'•onz �` o.,e'Isis osTu.) IaarE1,� n RACT1 u°.E-1 s 2". 1 I tt t ,• . immcn a.nx D DETAIL 02 I 130 , , 0, IT (INTENDED DISPLAY SCALE.I,_z') C4 iy0 00 10.46• ss • . I. ,g rd t•'r Co CO z• ,• t ....X DIRECT,. LENGTH Ca 1414 17 3 6000 p 03- . •55 53119 041 20 03 Ni a ,x � x ,. .„oe. .a .s ,�w.°, . e, .o• O Cat 2374 OP 404'3,. 45048 te'x 1091, 140,0 @ � c3, ,°w.o' new xe:31.5. w„ w,r '�ti-,,1„, I 39P c3• sesrow' xszxx'ce' •.w T,. ECC tees w'221”.. xzrzrx xxt a't cw tens w' 37x x°' xw,e'33Y t.0 q J conk Tn. CD �",46 '13,. ,.,,I s,em2,x mlWE '27,,jsa1 n a�a\ `° -02-b_ sa,3x.,1,1„13, ,3 1,i 7/12/2016 16.A.12. Project: Anthem Parkway Phases 1 and 2 A �k: Task: OPC-Permit fee Calculations t ' Prepared By: JML Date: 02!05716 Checked By: JCE Date: 02/05/16 Project Summary Area(Ac.) Number of Residential Units Linear foot of roadway 6,535 Non-Residential Area(SF) Lake Acreage Calculation Summary SUB-TOTAL CONTINGENCY TOTAL PERCENT DOLLAR Phase 1 Earthwork $ 647,26840 5% $ 32,363.42 $ 679,631.82 Paving $ 844,211.90 5% $ 42,210.60 $ 886,422.50 Drainage $ 239,026.00 5% $ 11,951.30 $ 250,977.30 Sanitary Sewer $ 108,339.00 5% $ 5,416.95 $ 113,755.95 AMUC Potable Water $ 186,452.40 5% $ 9,322.62 $ 195,775.02 AMUC Irrigation $ 413,038.30 5% $ 20651.92 $ 433,690.22 AMUC Effluent $ 65,767.60 5% $ 3,288.38 $ 69,055.98 AMUC Miscellaneous $ 87,200.00 5% $ 4,360.00 $ 91,560.00 Offsite $ 45,000.00 5% $ 2.250.00 $ 47,250.00 Phase 1 Sub-Total $ 2,636,303.60 5% $ 131,815.18 $ 2,768,118.78 SUB-TOTAL CONTINGENCY TOTAL PERCENT DOLLAR Phase 2 Earthwork $ 274,488.45 5% $ 13,724.42 $ 288,212.87 Paving $ 332,209.50 5% $ 16,610.48 $ 348,819.98 Drainage $ 61,010.00 5% $ 3,050.50 $ 64,060.50 Sanitary Sewer $ 64,010.00 5% $ 3,200.50 $ 67,210.50 AMUC Potable Water $ 71,266.20 5% $ 3,563.31 $ 74,829.51 AMUC Irrigation $ 91,312.10 5% $ 4,565.61 $ 95,877.71 AMUC Effluent $ - 5% $ - $ - AMUC Miscellaneous $ 65,000.00 5% $ 3.250.00 $ 68,250.00 Phase 2 Sub-Total $ 959,296.25 5% $ 47,964.81 $ 1,007,261.06 Total Subdivision $ 2,595,414.25 $ 129,770.71 $ 2,725,184.96 Total AMUC Utilities $ 1,000,185.60 $ 50,009.28 $ 1,050,194.88 Total $ 3,595,599.85 $ 179,779.99 $ 3,775,379.84 NOTES: 1)This Opinion of Probable Cost is based on Peninsula Engineering's understanding of the current rules,regulations,ordinances,and construction costs in effect on the date of this document.Interpretations of these construction costs may affect this Opinion of Probable Cost,and may require adjustments to delete, decrease,or increase portions of this Opinion of Probable Cost. 2)All costs provided in this OPG are based on recent comma prices,or the engineers'latest known unit costs.These . `V - --j =ed al this time due to unpredictable and uncontrollable increases in the cost of concrete,petroleum,or the availability of materials a( "= 4 C� h '4�r /�,!_ ir 1'V 3)This cost estimate assumes dry utilities(FPL.cable,telephone)will be installed at no-cost to the developer0".0.00,41:166'i'4.1:4:7*.G ``�•:. ; 4)This cost estimate includes a 5%contingency in each section. �• fi 4. V' G ' * : 0 $6 _e1 ;_,= 5)This OPC Was prepared for the purposes of Permit Fee Calculations only t""10 I: ',Alt L,Otr L" : 14 Joh ""s e 1 :�y ,� FL Re'tR t i-#P..•*....‹.7 s," Penlnsul r`,rr ter rc tl'Oco` on 428275 v.....4+0uvwxee1sws_un......tye :ra.. s„-..,otmeNi nr.n, aaeeens 1 cf 18 jft'�liJJlflll�ItiN4111ttt���t` Packet Page -286- 7/12/2016 16.A.12. P ENNSU .,. Project: Anthem Parkway Extension Phases 1 and 2 _ Task: Fee Calculation Worksheet L-L- Prepared By: KDD Date: 2/10/2016 Checked By: 10E Date: 2/10/2016 Purpose: Calculate the Collier County PPL review fees for Anthem Parkway Extension Phases 1 and 2 Calculation: Review Fees 1) Plat Review Fee Base Fee $1,000.00 Plus$10.00 per acre (40 x$10.00) $400.00 $1,400.00 2) Subdivision Total OPC (Collier County) $2,040,933.25 0.75%for Review Fees $15,307.00 1.5%for Inspection Fees Not due at this time $15,307.00 3) Listed Species Review $1,000.00 4) Clearing$250 first acre $250.00 $50.00 per additioinal (39.20 acres) (38.20 x$50.00) $1,910.00 5) Pre App Mtg Credit ($500.00) -_,� Total Fees Paid = $19,367.00ea, , Packet Page -287-