Loading...
Agenda 07/12/2016 Item #11E 7/12/2016 11 .E. EXECUTIVE SUMMARY Recommendation to approve a $1,602,777 purchase order to Stantec Consulting Services, Inc., under contract number 14-6345, for Construction, Engineering, and Inspection Services for the integrated Wastewater Basin 101 Project commonly referred to as the "Vanderbilt Drive Cul-de- sacs Public Utility Renewal Project," project numbers 60122 and 70122. This is a companion to Item 11D. OBJECTIVE: To obtain professional Construction, Engineering, and Inspection (CEI) services during construction of the integrated Wastewater Basin 101 Project commonly referred to as the Vanderbilt Drive Cul-de-sacs Public Utility Renewal Project (the "Project"). A companion executive summary is requesting Board of County Commissioners (Board) approval for the construction contract for the Project. CONSIDERATIONS: On July 7,2015, as Agenda Item 16C6,the Board awarded Contract#14-6345 for CEI Services for the Wastewater Basin Programs to three different firms for each of the designated wastewater basins projects. Contract # 14-6345 encompassed CEI services pertaining to wastewater collection, water distribution and stormwater system construction projects within each basin. The Board selected Stantec Consultant Services, Inc., for the Basin 101 construction project (now referred to as the Vanderbilt Cul-de-sacs Public Utility Renewal Project), which at the time of solicitation and award contemplated and encompassed an integrated water,wastewater and stormwater construction project. The proposed scope of work under project number 60122, "Vanderbilt Drive Stormwater Improvements" is consistent with the Stormwater Five-year Work Program of the 2015 Stormwater Management AUIR/CIE, approved by the Board on November 10, 2015, and with the goals, objectives and policies of the Conservation and Coastal Management Element and the Drainage Sub-Element of the Growth Management Plan. The proposed scope of work under project number 70122, "Vanderbilt Dr./Cul-de- sacs PUR Basin 101" is consistent with the Capital Improvement Program (CIP) contained in the 2014 Water, Wastewater, Irrigation Quality Water, and Bulk Potable Water Master Plan/CIP Plan approved by the Board on November 10, 2015, as Agenda Item 9C, as Appendix III of the 2015 AUIR/CIE. On May 18, 2016, Stantec Consulting Services, Inc. provided the County a time and materials proposal in the amount of $1,602,777 to provide CEI services during construction of the Vanderbilt Cul-de-sacs Public Utility Renewal Project, see Attachment 1. The scope of services proposal includes construction observation and documentation services, general management and oversight, and public outreach services. The cost of CEI-related services is 9% of the project construction cost. The Project scope includes replacing and rehabilitating water, wastewater, and stonnwater assets in one coordinated project designed to minimize cost and neighborhood impact as opposed to multiple separate mobilizations. FISCAL IMPACT: Funding is available in, and is consistent with, the FY2016 Capital Budget approved by the Board on September 24, 2015. The sources of funding are the Stormwater Capital Fund (325) through a transfer from the General Fund (001) and Unincorporated Area General Fund (111), Water Capital Fund(412)and Wastewater Capital Fund(414), allocated as shown below. FUNDING SOURCE AMOUNT BID % Stormwater Capital Fund(325) $256,444.32 16% Water Capital Fund(412) $336,583.17 21% Wastewater Capital Fund(414) $1,009,749.51 63% Total $1,602,777.00 100% Packet Page-111- 7/12/2016 11 .E. LEGAL CONSIDERATIONS: This item is approved as to form and legality, and requires majority vote for Board approval.—SRT GROWTH MANAGEMENT IMPACT: This project meets current Growth Management Plan standards to ensure the adequacy and availability of viable public facilities. RECOMMENDATION: That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, approves a $1,602,777 purchase order to Stantec Consulting Services, Inc. under contract number 14-6345 for CEI services during the Basin 101 construction project (now referred to as the Vanderbilt Cul-de-sacs Public Utility Renewal Project), which work is all encompassed within Basin 101. Prepared By: Diana Dueri, PMP, Project Manager, Public Utilities Planning and Project Management Division Attachments: Attachment 1- Stantec Proposal Attachment 2-Power Point Explaining Project Packet Page-112- 7/12/2016 11 .E. COLLIER COUNTY Board of County Commissioners Item Number: 11.11.E. Item Summary: Recommendation to approve a $1,602,777 purchase order to Stantec Consulting Services, Inc., under contract number 14-6345, for Construction, Engineering, and Inspection Services for the integrated Wastewater Basin 101 Project commonly referred to as the "Vanderbilt Drive Cul-de-sacs Public Utility Renewal Project," project numbers 60122 and 70122. This is a companion to Item 11C. Meeting Date: 7/12/2016 Prepared By Name: Diana Dueri Title: Project Manager, Public Utilities Engineering 6/16/2016 4:28:33 PM Submitted by Title:Project Manager,Public Utilities Engineering Name: Diana Dueri 6/16/2016 4:28:35 PM Approved By Name: ChmelikTom Title: Division Director-Public Utilities Eng,Public Utilities Engineering Date: 6/17/2016 7:01:29 AM Name: Steve Messner Title: Division Director-Water,Water Date: 6/17/2016 10:28:50 AM Name: TaylorLisa Title: Management/Budget Analyst, Senior, Capital Construction&Maintenance Budget/Fiscal Date: 6/17/2016 11:21:58 AM Name: HapkeMargie Title: Recycling Coordinator, Solid&Hazardous Waste Management Packet Page-113- 7/12/2016 11 .E. Date: 6/17/2016 3:09:54 PM Name: Joseph Bellone Title: Division Director-Operations Support,Utilities Finance Operations Date: 6/20/2016 2:11:24 PM Name: KurtzGerald Title: Project Manager,Principal, Capital Project Planning, Impact Fees and Program Management Date: 6/21/2016 2:20:02 PM Name: HallSwainson Title: Procurement Specialist,Procurement Services Date: 6/21/2016 3:00:27 PM Name: PattersonAmy Title:Division Director-IF, CPP&PM, Capital Project Planning,Impact Fees and Program Management Date: 6/21/2016 3:25:11 PM Name: JohnsonScott Title: Manager-Procurement, Procurement Services Date: 6/23/2016 10:35:20 AM Name: KearnsAllison Title: Interim Procurement Director Date: 6/23/2016 1:44:41 PM Name: MarcellaJeanne Title: Executive Secretary, Transportation Administration Date: 6/23/2016 5:01:11 PM Name: YilmazGeorge Title: Department Head-Public Utilities,Public Utilities Department Date: 6/24/2016 9:09:22 AM Name: TeachScott Title: Deputy County Attorney, County Attorney Date: 6/24/2016 11:24:09 AM Name: KlatzkowJeff Title: County Attorney, Date: 6/24/2016 12:19:51 PM Name: UsherSusan Packet Page-114- 7/12/2016 11 .E. Title: Management/Budget Analyst, Senior, Office of Management&Budget Date: 7/1/2016 1:41:20 PM Name: CasalanguidaNick Title: Deputy County Manager, County Managers Office Date: 7/3/2016 4:26:03 PM Packet Page-115- 7/12/2016 11 .E. Stantec May 18,2016 Attention:Craig Pajer, PE Collier County Public Utilities Planning and Project Management Division 3339 Tamiami Trail E.,Suite 303 Building H,3rd Floor Naples, FL 34112 Dear Craig, Reference: CEI Services for the Wastewater Basin Program Contract#14-6345 Vanderbilt Drive and Finger Street Improvements S-03 Please find enclosed the Scope of Services for the above referenced project for your review and approval. We thank you for the opportunity to provide CEI services for this project and look forward to working with Collier County on this and upcoming utility infrastructure projects. We are prepared to begin work on this assignment as soon as you direct us to proceed. Regards, Stantec Consulting Services Inc. tit/ 0 :7:,"(14 C , • Kelly K.Blake, PE /Guy Le Patorel,MBA, PE,LEED AP, ENV SP Senior Associate Water Sector Leader,US East Phone: (239)649-4040 ext.6403 Phone:(941)365-5500 Cell: (941)544-2569 Cell:(941)735-7797 Kelly.Blake@stantec.com Guy.LePatourel@stantec.com Attachment:Scope of Services 5-02 c. Joe Greeley, PE-Stantec Marc Lean,PE-Stantec Design with community In mind 1x v:\1773\buslness_developmeni\coiner county\14-6345 cel services for the wastewater basin programs\work ossipnment development\s- 03_IInger steels\scope_fee\lei cpaler vand Linger.docx Packet Page -116- 7/12/2016 11 .E. StanteC Stantec Consulting Services Inc. 3200 Bailey Lane,Suite 200 Naples, FL 34105 SCHEDULE A -SCOPE OF SERVICES Collier County Contract 14-6345 Construction Engineering & Inspection (CEI) Services Work Authorization S-03 Vanderbilt Drive and Finger Street Improvements r Ir .r r Collier County Utilities Public Utilities Planning and Project Management Division (PPMD) is implementing a series of utility improvement projects within Wastewater Basin 101, known as the Naples Park area, in an effort to optimize existing wastewater infrastructure and maximize wastewater treatment and conveyance system capacity. Naples Park is predominantly a residential community located west of Tamiami Trail North to the Gulf of Mexico and between Vanderbilt Beach Road and 111th Ave. North. The sanitary sewer system includes approximately 142,000 linear feet of gravity sewer, twenty (20) duplex pump stations, and 33,500 LF of force main. Wastewater flows are generally pumped North towards 111th Ave., and east towards Tamiami Trail through a manifolded force main system. This system ultimately conveys wastewater to the County's North Water Reclamation Facility (NCWRF) located on Goodlette- Frank Road south of the intersection with Immokalee Road. 1.1 VANDERBILT DRIVE AND FINGER STREET IMPROVEMENTS PPMD has retained Stantec Consulting Services Inc. (Stantec) to provide construction and engineering and inspection services throughout the duration of the preconstruction, construction, and commissioning of the Naples Park Basin 101 Program Improvements, specifically the Vanderbilt Beach Drive Finger Street Improvements. The Vanderbilt Beach Drive Finger Street Improvements project includes potable water, wastewater, and stormwater improvements. A breakdown of the proposed improvements is provided below: Street Road Length(ft) Water(ft) Gravity(ft) FM(ft) Storm(ft) Flamingo 1,700 59% 1,003 100% 1,700 53% 901 100% 1,700 Heron 1,900 0% 0 100% 1,900 56% 1,064 100% 1,900 Egret 1,850 55% 1,018 100% 1,850 58% 1,073 100% 1,850 Conners 2,000 100% 2,000 100% 2,000 45% 900 100% 2,000 Seabee 850 0% 0 100% 850 0% 0 100% 850 Germain 720 100% 720 100% 720 0% 0 100% 720 Seagull 650 100% 650 100% 650 0% 0 100% 650 Willet 650 100% 650 100% 650 0% 0 100% 650 Tradewinds 1,330 61% 811 100% 1,330 0% 0 100% 1;330 Lagoon 1,280 59% 755 100% 1,280 0% 0 100% 1,280 Bayside 630 100% 630 100% 630 0% 0 100% 630 Pine 620 0% 0 100% 620 0% 0 100% 620 Oak 1,170 63% 737 100% 1,170 0% 0 100% 1,170 Palm 260 0% 0 100% 260 0% 0 100% 260 Vanderbilt Drive 7,000 100% 7,000 100% 7,000 0% 0 100% 7,000 TOTAL 22,610 15,974 22,610 3,938 22,610 D car)viiln commtlnly inn hs v:\1773\business_development\collier county\14-6345 cei services for the wastewater basin programs\work assignment development\s- 03_finger_steets\scope_fee\vbd finger_streets_14635_scope_r4_20160518.docx 1 Packet Page-117- 7/12/2016 11 .E. C*2- Stantec Stantec Consulting Services Inc. 3200 Bailey Lane,Suite 200 Naples,FL 34105 Collier County requires certain professional services during the services for construction water main, force main and storm sewer improvements on Vanderbilt Drive and connected Finger Streets. Stantec's CEI services will assess whether the work is in general conformance with the Contract Documents. r q7;t , ,.c a�tr ," i a, ff �'` The tasks presented below include the following: Task 1 -Construction Observation and Documentation Task 2- CEI Construction and Project Oversight Task 3- Public Involvement This scope of services pertains to the Vanderbilt Drive and Finger Streets improvements Project. This project is constructed under on construction contact. If Work done with multiple contracts. additional scope and fees will be required. The following scope of services was developed based on an estimated construction time frame of 730 calendar days. TASK 1.0 CONSTRUCTION INSPECTION AND DOCUMENTATION Services provided as part of this task will include the following: 1.1 Construction/Testing Observation -Stantec will conduct on-site observations and inspections of construction/testing activities on the Project on a full time basis, unless directed otherwise by the County's Project Manager, to assess whether work is completed in general conformance with the Contract Documents. Stantec will notify the contractor of any issues related to conformance of the work with the Contract Documents and document these notifications on the Daily Work Report (DWR). Stantec will provide interpretation of plans and specifications and assist the contractor develop solutions to field issues/conflicts at the project level. If the issue/conflict cannot be resolved at the project level, Stantec will submit a Request For Information (RFI) to the Design Engineer/Engineer of Record (EOR) within one business day and provide a copy to the County's Project Manager. The EOR will review the issue and provide a written response to Stantec so that written direction can be given to the Contractor. Stantec will maintain an RFI log to track the final disposition of all issues/ conflicts and keep the County's Project Manager updated as the project progresses. 1.2 DWR and Construction Documentation -Stantec will prepare a Daily Work Report (DWR) with pictures recording activities and details related to the work on a form approved in advance by the County's Project Manager. Information will be recorded in the DWR when at the Project Site. The DWR will record relevant aspects of the construction observed while on site including, but not limited to: construction crew (labor) details, equipment used, materials used, compliance testing and inspection performed, , site conditions, trench conditions, backfill material used, dewatering methods, compaction methods, location of the work, and other details related to the Work. The DWR will reference the digital photographs and or video taken Dcsig if ,a c om•,mur ty, ,mina hs v:\1773\business_development\collier county\14-6345 cei services for the wastewater basin programs\work assignment development\s- 03_finger_steets\scope_fee\vbd finger_streets_14635_scope_r4_20160518.docx 2 Packet Page -118- 7/12/2016 11 .E. Stantec Consulting Services Inc. `�' 3200 Bailey Lane,Suite 200 Naples,FL 34105 with appropriate file names and file locations. In addition to the construction details, the DWR will contain information related to: time and hours on the job site, weather conditions, data pertaining to questions of quantities of materials used, extras or deductions, list of visiting officials and representatives of manufacturers, fabricators, suppliers and distributors, observations in general and specific observations in more detail as in observing test procedures, conformance inspection of materials and fittings, name plate data for equipment and material installed, customer service field log, and other information requested by the County's Project Manager. DWRs, photograph files and other construction documentation will be provided to the County's Project Manager by Stantec on a daily basis in an electronic file via E-mail, on a digital CD, if requested by the County's Project Manager, and a printed copy to be maintained on the project site in the inspector's trailer. All daily reports will be prepared in the field. 1.3 Photographic and Video Record —Stantec will provide a digital photographic record of construction activities related to the Project. The digital file names will be referenced in the DWR along with a brief description of the photograph, the date and time of the photograph and the name of the photographer. The digital files will be transferred via E-mail to the County's Project Manager on a daily basis, to a digital CD if requested by the County's Project Manager, and submitted on a daily basis along with the construction documentation. The photographs may be electronic sent via E-mail to the County's Project Manager on a daily basis. The video will be provided in digital format on DVD. 1.4 General Coordination - Stantec will coordinate information related to the Project between the construction contractor, the EOR and the County's Project Manager. Stantec will oversee substantial and final completion inspections, and prepare and maintain the punch list, including follow-up inspections to confirm whether punch list items are corrected and/or completed. Stantec will coordinate with the County Utilities Department for testing and construction of required connections to existing facilities. Stantec will communicate, as directed by the County's Project Manager, with community members, business owners, and the general public. 1.5 Construction Progress Meetings - Stantec will conduct bi-weekly progress meetings to review project status and identify issues that may affect the Project. Stantec will prepare a DRAFT Agenda at least two (2) business days in advance of the meeting and produce meeting minutes within two (2) days after the meeting for distribution to the County's Project Manager, EOR, and the construction contractor. 1.6 Substantial Completion Inspections - Stantec will conduct Substantial Completion inspections when requested by the construction contractor and the EOR recommends that the work is sufficiently complete to warrant a Substantial Completion inspection. During the Substantial Completion inspection, Stantec will prepare a punch list of items requiring completion or correction to the satisfaction of the EOR and the County's Project Manager. Stantec will be responsible for maintaining the punch-list and issuing updates to the punch-list on a weekly basis. Stantec will coordinate and participate in the final walk-through to confirm whether the punch-list items are completed to the satisfaction of the EOR and the County's Project Manager. All services related to the Substantial Completion Inspection will be provided in writing and pictures provided to the County's Project Manager. 1.7 Final Completion Inspection - Upon the request of the construction contractor and concurrence of the EOR and the County's Project Manager, Stantec will conduct Final Completion inspections of portions of the project, as they are finished, to determine if construction has been completed in conformance with the Contract Documents and the construction contractor has fulfilled all obligations therein. Based on the results of the Final Completion inspection, the EOR, County's Project Manager, and Stantec will judge the work hs v:\1773\business_development\collier county\14-6345 cei services for the wastewater basin programs\work assignment development\s- 03_finger_steets\scope_fee\vbd finger streets_14635_scope_r4_20160518.docx 3 Packet Page-119- 7/12/2016 11 .E. c.1Std , Stantec Consulting Services Inc. 3200 Bailey Lane,Suite 200 Naples,FL 34105 complete or not complete. If the work is judged complete, Stantec will issue a "notice of final acceptance and recommendation for final payment". If the work is judged not complete, Stantec will issue written notification to the construction contractor identifying the work judged not complete. Upon provision of the construction contractor's evidence or assurance that the deficiencies noted above have been corrected or completed, a second Final Completion inspection will be scheduled to verify that the outstanding issues have been resolved and Stantec can issue a "notice of final acceptance and recommendation for final payment". All services related to the Final Completion Inspection will be provided to the Project Manager. 1.8 Final Construction Certification - Upon issuance of a "notice of final acceptance and recommendation for final payment" Stantec will provide the County's Project Manager a signed and sealed certification by a professional engineer stating that the "Project has been completed by the construction contractor in reasonable conformance to the Contract Documents, and as amended by the Engineer of Record". TASK 2.0 CEI CONSULTANT AND PROJECT OVERSIGHT Services provided for this task will include the following: 2.1 General Management and Oversight - Stantec will provide support services customarily related to the construction observation and inspection of similar projects including, but not limited to the following: a. Participate in a pre-construction meeting with the County's Project Manager, EOR, the construction contractor, and all other interested parties. b. Participate in other meetings as described or implied herein. c. Review and verify correctness of the construction contractor's monthly applications for payment and accompanying data and recommend approval of payments due and payable to the construction contractor. Stantec's recommendation of any payment requested in an application for payment will constitute a representation by Stantec to the County's Project Manager as an experienced and qualified professional, that based on Stantec's onsite observations and inspections of construction in progress, that the quantities of work completed in the applications for payment accurately reflect the progress of the work completed in conformance with the Contract Documents. Stantec will process pay requests in accordance with the Florida Prompt Payment Act. All incoming pay requests processed by the Stantec will be mechanically stamped with the date received. d. Stantec will review the monthly updates to the construction schedule prepared by the construction contractor and provide written comments to the County's Project Manager and EOR. e. Stantec will oversee such field testing and provide an opinion whether materials, equipment and supplies installed or utilized on the Project are in conformance with the Contract Documents and Shop Drawings approved by the EOR. f. Stantec will have access to, collate, file, and distribute required Project records, including but not limited to construction contractor's progress schedules, DWRs, and testing reports. 2.2 Coordination of Shop Drawings, Contract Interpretations and Clarifications -Stantec will coordinate with the design engineer (EOR) regarding the issuance of interpretations and clarifications of Contract Documents during construction. The EOR will be responsible for n Vt.-1 --1mun t,r .mind hs v:\1773\business_development\collier county\14-6345 cei services for the wastewater basin programs\work assignment development\s- 03_finger_steets\scope_fee\vbd finger_streets_14635_scope_r4_20160518.docx 4 Packet Page-120- 7/12/2016 11 .E. s Stantec Consulting Services Inc. 3200 Bailey Lane,Suite 200 Naples,FL 34105 technical review and decisions regarding interpretation and clarification of Contract Documents. Stantec will communicate the EOR's decisions and responses with the construction contractor. 2.3 Change Orders - Upon identification of an unforeseen condition or additional work, analyze the extent of the change and compare it to the proposed change order cost submitted by the construction contractor. If necessary, Stantec will negotiate the cost of the Change Order, and issue a Work Directive and subsequent Change Order. 2.4 As Constructed Field Drawings - Stantec will maintain red pencil "mark-up" notations and sketches on full size construction plans that reflect the actual details of constructed facilities. These As Constructed Field Drawings will be used by Stantec to validate the "As Built" documentation provided by the construction contractor. 2.5 Start-up and Re-commissioning Support - Stantec will assist the County's Project Manager, the EOR, and the construction contractor during start-up of each segment, as designated for Beneficial Use by the EOR, and provide general coordination during these activities. TASK 3.0 PUBLIC INVOLVEMENT Collier County has emphasized that communicating project initiatives, plans, and progress with community members is a high priority during the completion of the Basin projects. For Basin 101, Stantec will provide one full time Public Information Officer (PIO) to assist the County with the following: 3.1 Vision and Public Outreach Plan - Work with the County to develop the vision of the project which includes identifying why the project are needed, what work will be done, how the project will benefit customers, how the project fit into the community, and how the the project fit into the broader County initiative plans. The vision, once defined will be provided to the public through various methods throughout the duration of this project. Develop a plan to educate, engage, and inform residents, business owners, local and seasonal visitors and, in general, the impacted community; to continue to build community trust, and to provide a solid messaging process to in-house departments and the medial. This will include Grassroots communication efforts paired with the use of technology including social media, e- newsletters, etc. The plan will be prepared to assist the team with review, assess input, and will be updated quarterly. 3.2 24 Hour Project Hot Line - The PIO or representative will be accessible 24 hours a day, seven days a week, for activities associated with public information. Project representatives will receive community member complaints and concerns to prevent interruptions of Public Utility Department staff. The PIO will also be capable of communicating about the project vision, progress, goals, and objectives, as well as the specifics of day to day activities. A single number will be provided for this service. All calls will be documented and databased. Periodic reports will be provided to the Stantec team. 3.3 Coordination with Collier County Communications & Customer Relations Department - The PIO will work in partnership (seamlessly) to serve the community. Our Public Outreach professional will provide Mike Sheffield with accurate, timely and useful information. Our approach mirrors that of the County and use a multi-media approach already in place to include access television, printed publications and media releases. cont.J n •t'vi.... hs v:\1773\business_development\collier county\14-6345 cei services for the wastewater basin programs\work assignment development\s- 03_finger_steets\scope_fee\vbd finger_streets_14635_scope_r4_20160518.docx 5 Packet Page-121- 7/12/2016 11 .E. Stantec Stantec Consulting Services Inc. 3200 Bailey Lane,Suite 200 Naples,FL 34105 3.4 Annual Report Information-The PIO will compile information to be included in an annual report to provide quality feedback, reporting and materials to Collier County Government staff members such as County Manager. 3.5 Outreach and Meetings 3.2.1 Project Specific Community Outreach - Participate in community meetings before and after the project bid, as well as during construction progress of each project. Professional Communications Services during construction will be proactive to assist with minimizing disturbances and restoration efforts to residents, as well as to all project stakeholders 3.5.2 Project Progress - The PIM will provide ongoing messages to keep public and other stakeholders informed about the project including project schedule, traffic impacts, major milestones, etc. 3.5.3 Additional Outreach Efforts include: • Coordinate with community members and contractor during construction to sequence construction as necessary to provide community members continuous, reasonable access to their property during construction. • Provide coping information to residents and business that may have inconveniences caused by the project. This could include details regarding access, services, etc. and can be in the form of formal and informal communications as necessary. • Provide community members with advance notice of scheduled service outages. • Coordinate use of variable message boards (VMBs) to inform community members of when and where work activities will be occurring. • Coordinate with Naples Park HOA. 3.6 Graphic Design for Publications - Stantec will provide a graphic designer to assist the County and project staff in developing graphic content for the website, publications, and materials to be utilized to provide information to the public and project personnel. ... All work will be charged on an hourly basis in accordance with the Project Budget Form. Many facets that control the length of the project and necessary effort are outside the control of Stantec. Hours shown in this work assignment are only estimates. Any additional work that may be required will be performed under a separate Work Assignment, or as an amendment to this one. Task Estimated Fee Fee Type Task 1 Construction, Observation and Documentation $891,795 T&M Task 2 CEI Consultant and Project Oversite $371,942 T&M Task 3 Public Involvement $339,040 T&M Total Fee $1,602,777 T&M 1 i-11, fix`itn orrrn.J'iy in rninc hs v:\1773\business_development\collier county\14-6345 cei services for the wastewater basin programs\work assignment development\s- 03_finger_steets\scope_fee\vbd finger_streets_14635_scope_r4_20160518.docx 6 Packet Page-122- 7/12/2016 11 .E. Stantec Stantec Consulting Services Inc. 3200 Bailey Lane,Suite 200 Naples,FL 34105 Stantec will provide services throughout the duration of the project as directed by the County in accordance with the scope of services listed above. Many facets that control the length of the project and necessary effort are outside the control of Stantec. Work in anticipated to be completed within 820 calendar days. Task Estimated Task Completion Duration (Days Following NTP Issuance) Task 1 Construction, Observation and Documentation 820 Task 2 CEI Consultant and Project Oversite 820 Task 3 Public Involvement 820 Total Duration 820 ^ v,-- ocmcrurvty hs v:\1773\business_development\collier county\14-6345 cei services for the wastewater basin programs\work assignment development\s- 03_finger_steets\scope_fee\vbd finger_streets_14635_scope_r4_20160518.docx 7 Packet Page-123- 7/12/2016 11 .E. x; Stantec Stantec Consulting Services Inc. 3200 Bailey Lane,Suite 200 Naples,FL 34105 SCHEDULE B - FEES Collier County Contract 14-6345 Construction Engineering & Inspection (CEI) Services Work Authorization S-03 Vanderbilt Drive and Finger Street Improvements rj vn with ca sunny in r n:^ hs v:\1773\business_development\collier county\14-6345 cei services for the wastewater basin programs\work assignment development\s- 03_finger_steets\scope_fee\vbd finger_streets_14635_scope_r4_20160518.docx 8 Packet Page-124- Collier County RFP 14-6345 Fee for Construction Engineering and Inspections(CEI)Services Work Authorization 5-03 Vanderbilt Drive and Finger Street Improvements J4f rrrf e s,} 4 .1.0'6f,§1 o4',., srf Q6 'a,.j Q.'!,,, P.L 4 G C ge 1< Jr ', irfr B 'P `vi i q"u/ ?v?n TASK i, h'o.,o-� gyp`&,af.�tr,,,ry' ., %,...`zr rh 4't32. '�., Z oe•'„'e A44J , "'q 44E i t,%''',4% % , '9.4'% '1,''''<,i s 3roy�N o '�rp44,',e k n hL,�"aa��� r� .:�°' �\? `q,J�bb ty l''°::.‘°-.4°":"'":44.: e;r3°,r F a`'�'}`"4��` °'y� °a e �'°4p,%`oe, 'n, ',„ `'a, 'w bits �'o as,k,, 4,4f ,, off",,b!•!o. Position Rate Total Hours Sub-Total 05 Principal IDA/DC) 5202.00 21 23 0 0:: 21 $4,242.00 Senior Protect Manager-CEI Leader 5157.00 72 72 72 72 68 48 36 16 456 126 120 90 86 86 508 40 40 1004 8157,628.00 Senior Protect Manager.Program Leader $157.00 40 21 61 48 40 86 ':0:: 149 $23,393.00 Project Manager 5147.00 834 250 17 23 14 3 9 2 1152 •1210 100 200 40 60 1610 40:40 2802 5411,894.00 Senior Engineer 5157.00 0 0 0 0 10.00 Engineer $123.00 0 0 0 0 50.00 Engineer Intern 595.00 0 0 0 0 50.00 01 Senior Inspector $110.00 4166 1250 84 112 68 14 42 8 5744 120 120 0 5864 5645,040.00 P1 Inspector 595.0 0 0 0 O 50.00 N Senior Planner $172.0 0 0 0. 0 0.0 e41....., Planner $139.0 0 0 0 0 50.0 , ,_��,,,/Senior Designer 5114.0 0' 0 0'.' 0 50.00 6✓lEnv ro Designer $94.0 0 0 0: 0 50.0 oral Specialist 5109.0 0. 0 0 0 50.00 hj Senior Envromental Specialist $134.0 0 'o 0 0 50.00 N Scientist/Geologist 593.0 0 0 0 O $0.0 U9 Senior Scientist/Geologist 5118.0 0 0 :0. 0 50.00 Marine Biologist/Hydrogeologist $110.0 : 0 0 '0 0 S0.0 Senior Marine gilolglst/Hydrogeoligist 513800 0 0 '0 0 $0.0 Senior GIS specialist $147.00 0 '0 0.. D 50.00 GIS Specialist 395.0 0 0 0 0 $0.0 Clerical/Administrative $65.0 40 40 80 0 0 80 $5,20.0 - Senior Technician 595.0 0 0 0 0 50.00 Technician $72.00 0 0 .::0 0 $0.00 Surveyor mapper 5120.0 0 0 0 0 50.00 CADD Technician 195.0 0 300 30 0 300 $28,500.0 Survey Crew-2 Man $130.0 0 0 0 0 50.0 Survey Crew-3 Man $161.0 0 0 0 0 $0.0 Survey Crew-4 Man $189.0. 0 - 0 0 0 $0.0 Senior Archoen $154.0 0. 0 0 0 50.00 \ Architect $121.0 0 0' '::0: 0 $0.0 Public Information Manager $120.0 0 0 60 60. 60 57,200.00 Ni Public information Officer 5115.00 O 0 2 050 2050 2050 5235,250 00 N Public Information Assistant $105.0 0 0 470 470 470 $49,350.0 0 Graphic Designer 595.0 0. 0 240.240 240 522,800.00 Website Designer 595.0 0 0 124 124 124 511,780.0 �T Task Total Hours 7514 2626 '3024 13164 VA Task Total Fee 5891,795.0 $371,942.0 $339,040.0 Total Fee 01,602,777.0 .i Sub.Consultatant% 19.95% ...I.T III Collier County I Florida Construction , Engineering , and lnspection Services for VanderbiIt • Drive Cul-de-Sacs Public Utilities Renewal Project Public Utilities Department • Growth Management Department July 12, 2016 r�r. C Objectives To obtain professional Construction, Engineering, and Inspection (CEI) services - Vanderbilt Drive is, Public Utility Renewal Project Encompassed in Basin 101 ••-, Provide informative, considerate :neighborhood outreach during construction s b. ,�s' '',.s ,,s4,II ;$k ' m ^, ai n �s � s 5;ar,;,' &,.$ '�. ,S ^ k ` �--a�g `�i� , ,� �a+ 5r'r,rr, r3 , , )Ybr'tietom+�S$!em't ae5r tS x rS u , t r i„l � tr RM' �.., � 7kd �-, , s, v F 1'k Er , . . , fi+* A� �"':9'41, : `: -� •„ a _.,> sa. li4i� "ei AVL: w1 i; 2'�. - 1..:' t774�T.i ,,4 t ,fi Sf # � , � , uw ; a, , rx �Y, iA.',wFiyt, � a3ru . �L ,,.i � ) � �70,-;0'!.A.4,:!. „( i.# `• ' . a #s�' q��ii � S $iifi` a.� � ieto� �'� '�i �`" t �kkwr ' . � , " � � n x'( r �, i� '; f�f ' y4s` � 3q W" � � iki � i� t� ., rgF a, .n t �i.. j( tec„ . `t� �^tls !# crd a"r_ Krs ._ �(All,ad ?rI .ia_ " < Public Utilities Department� ma k 1 F '� r C;', r z ,; a d 'a t A w . + +' s;e.+ i ,.aa x,.. `ir st,l ^t i* ” t'1 a r m'� 7;'' n 3 ;' ''` t.' ? -"i,' ni'; r s f r et S, ! tF t i �`� s h" o f d e f"+'4 , ` -' i V �!� ' 1 g� 6 .. BASIN 101 _ } LOCATION __I Vanderbilt 1.11 t" �. -1 1-- Drive __ Avenue -1. ,r m x•• g. I z ® S........- &' . xs,....,; .a, 11Q • eolgek ,, __ _ e i.... 'i l,4ve H , ak.Aa e i,�l dik # t a d t z7iYmt t F 7 r & ,, ". t Ig _ I d Y 3 ` 4 .. ,:, W F ' _ 2.Sr 85vS m, b',rw ' :',.s.,;-,,,,„1.„„y,,,.::,., +P vk.. a@ - -CD:1 .*: ' N'''':t 1.'j :5,'". �.. [,Dt•thAve�, 130414 AveN (' PROJECT Iia LOCATION w ,,13U,A.re1, Vanderbilt M 133[h AvpA Beach Rd. �9Ln1,A,+rN f� 'a ,, rltt Ave N bk �, ,„,,,.,,,*,.,.....v.,0,,,,,..,.,-, , ri,� t mAwaty ,,61,„J' 1 : 5 n t 3� 5. 0 195Th Ave N � �4 4' x + 5� tl T.:v ` i2"�'ZSr */.,‘:,!:.:'':5,4:: 1 wau,Avu. "�^q`, x a t r 9 d Aur rd J'A..? { , i r - P�'' .0 S{„,yr 1. Sinn AveH r h, %�`y� yr R 0, h' ., 'b N z;t dd,r 1 4 t 91 ry e .Mercato N O , �u 4`�r --0,0t)tfdoh .3..;"7'-''''''..''''1"'''' Sr '4',.r:".,. .':-41,'.--::', t` 7 y x @ <7'S Aip® ■ v n_.t It-F !7 i' , s x64;;i'.e,ka} 2' t”`'' x d v ?�; t� *' m S`�' n'.'+,144,"4";15' ``. %r r a 4, ;ku. -'''!'# .,s, �+•,.. 4 x� k t �1`.Vit: -... >. r.,,,,,,,,:,:; �' '4` 4a+ >#,� '�"�' a.,.. { bt. . ' ' -'k4��.,4"�i+SSv.._#°,e.a!a°="5v` a^6 ,.:,� ,ti>fF:-tet�°5,'d�..�� tt a. .;rtt., a..,,rli d��r;,. .%Y �4�%S?, N .�F?, 4e ,�3, , .� . ,,.,h:. � ..'c!s ts�428'.v '`'' �. �., .. y y. �^1 Pro ect J 4 ..,._,,...ig,74. - .- M . 111 '_� Avenue Location ,. ,:....._„, ,' 4 1 1/ ipti,::11.4..;4,, ,,-.:,.,:,.,,_, . .4 '" 4 •, `o ,' i -, 6 ,.. �' ..t � ,�a. .� -Alts 4 , r4i-4',6 SR. ,,„,,...„1.' � § , ri 's „q,. �}`'}: r Y'„.,,r..' ,s '! ,'„rt `#a�.:•• !g1. Gulf Shore Vanderbilt '' '� "o ^ i ,, ..,.. tl , : t a k Drive Drive ,. _-it � � . , + �•+ ', �a " : F° rY"m•xsY' i u P' • �fA.} ' y C k 0. L i • et ` Sot ,Y� 'af M. � f1! j�,Sf -, .-,� 1 o t a .„£ . t. o1r1Y:1-r,"'„-i-‘,41,3,3-4.4-,- fa rr�s. 1 i • �� Va n d e rb i I t '' gx Beach Rd . ATfaifYtitittlINZAi6i"L*Lr �a�,, i e � t - s ti .t �*h � $r`� i ..; ;- t oM" a l ,',.T:,,',, „ ` t � 9 ^h i. w e L ��s:yY� tr -'�§ i,.aF -.n.�, r ;�,{�,,'ni' aa, a � �","' e,,*w ' ,�'l .-'� *•1'4; `'` ;v.., 0 Public Outreach . Public Information Sources Website - Email - Phone hotline • Project Website Containing - Public Notices (past and future) Phasing Schedule - Project Updates Public Utilities Renewal links Water, Wastewater and Stormwater projects to provide one-stop Customer Service <@�,� +,ks r.l g�E x k �':t��& ; aH 4t,: 5: a t 5 '.urs Si „. l ; 4;' ltd! gy ' t'lb v:i� `'k-n$ - �,�, -� t r; � � �w�a 4�-'- :c�? atu tt ¢3� 1 c � 4 �`xk ....K.x; i a f� h�t� {l i i4. r .., �1 ';{ Y 1 ,:t! .; to..�} � �S.-9bc ����! `� ��� '.'F� �,�, i "i �:�R t :V 5Q � ' ..s;a:s ,k y ^i;. 7,, .•S �. .t ,}a t ,1.�r .t,Y Gr ## s1,s '' . C' o-�..�,���`�.�� P`��itf m'� �'�'r�i...�:� a ,iA�s<",..{{ � � i� e"°,�"r n�', .".., z�,� f M-t�1 �:",jy``dr '4«� '7�-. IN C Recommendation That the Board of County Commissioners, Ex-officio the Governing Board of the Collier County Water-Sewer District, approves a $ 1,602,777 purchase order to tantec Consulting Services, Inc, under contract fig.Amber 14-6345 for CEI services during the Basin 101 onstruction project (now referred to as the Vanderbilt Cul-de-sacs Public Utility Renewal Project), which work is all 'encompassed within Basin 101 . N N 0 0) Public Utilities Department hi