Backup Documents 12/09/2014 Item #16A11 ORIGINAL DOCUMENTS CHECKLIST & ROUTING Slep
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TOL Li A 1 1
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNAT E
Print on pink paper. Attach to original document. the completed routing slip and original documents are to be forwarded to the County Attorney Office
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or information needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3. County Attorney Office County Attorney Office
i5
4. BCC Office Board of County
Commissioners
5. Minutes and Records Clerk of Court's Office
406- ([2,q 5:t634-1,
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above,may need to contact staff for additional or missing information.
Name of Primary Staff John Houldsworth Phone Number x-5757
Contact/ Department
Agenda Date Item was December 9,2014 Agenda Item Number — 8
Approved by the BCC t e-'A—t\
Type of Document Plat- Siracusa Number of Original One
Attached Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column,whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? JH
2. Does the document need to be sent to another agency for additional signatures? If yes, JH
provide the Contact Information(Name;Agency; Address; Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be JH
signed by the Chairman,with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JH
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's
signature and initials are required.
7. In most cases(some contracts are an exception),the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on December 9,2014 and all changes made
during the meeting have been incorporated in the attached document. The County
Attorney's Office has reviewed the changes, applicable.
Y' �if
9. Initials of attorney verifying that the attached document is the version approved by the I
BCC,all changes directed by the BCC have been made,and the document is ready for the �, t
Chairman's signature.
1: Forms/County Forms/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revised 2.24.05;Revised 11/30/12
ORIGINAL DOCUMENTS CHECKLIST & ROUTING SLIP
TO ACCOMPANY ALL ORIGINAL DOCUMENTS SENT TO
� A
THE BOARD OF COUNTY COMMISSIONERS OFFICE FOR SIGNA
1
Print on pink paper. Attach to original document. The completed routing slip and original documents are to be forwarded to the County Attorney 0 ice
at the time the item is placed on the agenda. All completed routing slips and original documents must be received in the County Attorney Office no later
than Monday preceding the Board meeting.
Complete routing lines#1 through#2 as appropriate for additional signatures,dates,and/or intbrmation needed. If the document is already complete with the
exception of the Chairman's signature,draw a line through routing lines#1 through#2,complete the checklist,and forward to the County Attorney Office.
Route to Addressee(s) (List in routing order) Office Initials Date
1.
2.
3. County Attorney Office County Attorney Office \
47/
4. BCC Office Board of County
Commissioners -VC l t Z-ck5
5. Minutes and Records Clerk of Court's Office
12_16S
PRIMARY CONTACT INFORMATION
Normally the primary contact is the person who created/prepared the Executive Summary. Primary contact information is needed in the event one of the
addressees above,may need to contact staff for additional or missing information.
Name of Primary Staff John Houldsworth Phone Number x-5757
Contact/ Department
Agenda Date Item was December 9,2014 / Agenda Item Number
Approved by the BCC jjj/// U9—Kt""k
Type of Document Construction& Maintenance Agreement Number of Original Two
Attached and Letter of Credit - Siracusa Documents Attached
PO number or account
number if document is
to be recorded
INSTRUCTIONS & CHECKLIST
Initial the Yes column or mark"N/A" in the Not Applicable column, whichever is Yes N/A(Not
appropriate. (Initial) Applicable)
1. Does the document require the chairman's original signature? JH
2. Does the document need to be sent to another agency for additional signatures? If yes, JH
provide the Contact Information (Name; Agency;Address; Phone)on an attached sheet.
3. Original document has been signed/initialed for legal sufficiency. (All documents to be JH
signed by the Chairman, with the exception of most letters, must be reviewed and signed
by the Office of the County Attorney.
4. All handwritten strike-through and revisions have been initialed by the County Attorney's N/A
Office and all other parties except the BCC Chairman and the Clerk to the Board
5. The Chairman's signature line date has been entered as the date of BCC approval of the JH
document or the final negotiated contract date whichever is applicable.
6. "Sign here"tabs are placed on the appropriate pages indicating where the Chairman's
signature and initials are required.
7. In most cases(sone contracts are an exception),the original document and this routing slip
should be provided to the County Attorney Office at the time the item is input into SIRE.
Some documents are time sensitive and require forwarding to Tallahassee within a certain
time frame or the BCC's actions are nullified. Be aware of your deadlines!
8. The document was approved by the BCC on December 9,2014 and all changes made
during the meeting have been incorporated in the attached document. The County snip
Attorney's Office has reviewed the changes,if applicable.
9. Initials of attorney verifying that the attached document is the version approved by the
BCC, all changes directed by the BCC have been made,and the document is ready for t '
Chairman's signature.
I: Forms/County Forts/BCC Forms/Original Documents Routing Slip WWS Original 9.03.04,Revised 1.26.05,Revises . 4.05;Revised 11/30/12
16 A 11
MEMORANDUM
Date: January 29, 2015
To: John Houldsworth, Senior Engineer
Engineering Services Department
From: Ann Jennejohn, Deputy Clerk
Minutes & Records Department
Re: Final Plat for Siracusa; Construction and Maintenance
Agreement and Letter of Credit FGAC-14273
Attached for recording is the final Plat for Siracusa and for your records copies
of the Agreement and Letter of Credit referenced above, (Item #16A11) approved
by the Board of County Commissioners on December 9, 2014.
If you need anything further, please feel free to contact me at 252-8406.
Thank you.
Attachment
16A 11
CONSTRUCTION AND MAINTENANCE AGREEMENT FOR SUBDIVISION
IMPROVEMENTS
THIS CONSTRUCTI N ND MAINTENANCE AGREEMENT FOR SUBDIVISION IMPROVEMENTS
entered into this 1(4 day of INti t4 AI J , 2015 between
Lennar Homes LLC hereinafter referred to as "Developer," and the Boatd of County Commissioners of Collier
County, Florida, hereinafter referred to as the "Board.
RECITALS:
A. Developer has, simultaneously with the delivery of this Agreement, applied for the approval by the
Board of certain plat of a subdivision to be known as: Siracusa
B. Chapter 4 and 10 of the Collier County Land Development Code required the Developer to post
appropriate guarantees for the construction of the improvements required by said subdivision
regulations, said guarantees to be incorporated in a bonded agreement for the construction of the
required improvements.
NOW, THEREFORE, in consideration of the foregoing premises and mutual covenants hereinafter set
forth, Developer and the Board do hereby covenant and agree as follows:
1. Developer will cause to be constructed: Roadway, drainage, water& sewer improvements
within 12 months from the date of approval said subdivision plat, said improvements
hereinafter referred to as the required improvements.
2. Developer herewith tenders its subdivision performance security (attached hereto as Exhibit "A" and
by reference made a part hereof) in the amount of$ 743.617.00- which amount represents 10% of
the total contract cost to complete the construction plus 100% of the estimated cost of to complete
the required improvements at the date of this Agreement.
3. In the event of default by the Developer or failure of the Developer to complete such improvements
within the time required by the Land Development Code, Collier may call upon the subdivision
performance security to insure satisfactory completion of the required improvements.
4. The required improvements shall not be considered complete until a statement of substantial
completion by Developer's engineer along with the final project records have been furnished to be
reviewed and approved by the County Manager or his designee for compliance with the Collier
County Land Development Code.
5. The County Manager or his designee shall, within sixty (60) days of receipt of the statement of
substantial completion, either: a) notify the Developer in writing of his preliminary approval of the
improvements; or b) notify the Developer in writing of his refusal to approve improvements,
therewith specifying those conditions which the Developer must fulfill in order to obtain the County
Manager's approval of the improvements. However, in no event shall the County Manager or his
designee refuse preliminary approval of the improvements if they are in fact constructed and
submitted for approval in accordance with the requirements of this Agreement.
6. The Developer shall maintain all required improvements for a minimum period of one year after
preliminary approval by the County Manager or his designee. After the one year maintenance period
by the Developer has terminated, the Developer shall petition the County Manager or his designee to
inspect the required improvements. The County Manager or his designee shall inspect the
improvements and, if found to be still in compliance with the Land Development Code as reflected by
final approval by the Board, the Board shall release the remaining 10% of the subdivision
performance security. The Developer's responsibility for maintenance of the required improvements
shall continue unless or until the Board accepts maintenance responsibility for and by the County.
16A11
7. Six (6) months after the execution of this Agreement and once within every six (6) months thereafter
the Developer may request the County Manager or his designee to reduce the dollar amount of the
subdivision performance security on the basis of work complete, Each request for a reduction in the
dollar amount of the subdivision performance security shall be accompanied by a statement of
substantial completion by the Developer's engineer together with the project records necessary for
review by the County Manager or his designee. The County Manager or his designee may grant the
request for a reduction in the amount of the subdivision performance security for the improvements
completed as of the date of the request.
8. In the event the Developer shall fail or neglect to fulfill its obligations under this Agreement, upon
certification of such failure, the County Manager r his designee may call upon the subdivision
performance security to secure satisfactory com letion, repair and maintenance of the required
improvements. The Board shall have the right to c nstruct and maintain, or cause to be constructed
or maintained, pursuant to public advertisem nt and receipt and acceptance of bids, the
improvements required herein. The Developer, as principal under the subdivision performance
security, shall be liable to pay and to indemnify th Board, upon completion of such construction, the
final total cost to the Board thereof, including, but not limited to, engineering, legal and contingent
costs, together with any damages, either direct o consequential, which the Board may sustain on
account of the failure of the Developer to fulfill all q' the provisions of this Agreement.
9. All of the terms, covenants and conditions here r contained are and shall be binding upon the
Developer and the respective successors and assig ,s of the Developer.
IN WITNESS WHEREOF, the Board and the Developer h:eve caused this Agreement to be executed by
their duly authorized representatives this V.M day of y _ ' . s.�. " It , 20 16 .
SIGNED IN THE PRESENCE OF: (Name • Entity)
By:
Printed Name Darin McMurray/Vice President
Printed Name/Title
(President,VP, or CEO)
(Provide Proper Evidence of Authority)
Printed Name
Sc0t1 i w/t S oain Oa,v t vet cioct,
mama‘ _ �, �-,14 .1 ,x..
A44,2-6+: �'
E. B
DWIGHT tQC)�S, CLERK Bc)AIRD OF COUNTY COMMISSIONERS
OF COLLIER •UNT , LORIDA
�•, a
By: L. 4/..-,./1„,„„Zw • C • By:
DepU_ty CP-4to f ►e 1 otan's -r=irn NAt� Chairman
Appr red pjpfF legality: �,
Scott A. Stone barit le4,11
Assistant County Attorney
,:nda fr�/
ice,ie I t-
ec'd
FIDELITY GUARANTY AND ACCEPTANCE CORD 1 I.
700 NW 107 AVENUE - SUITE 240
MIAMI , FLORIDA 33172
PHONE ( 305 ) 553 - 8724
IRREVOCABLE STANDBY LETTER OF CREDIT NO. MAC-14273
ISSUER: FIDELI FY GUARANTY AND ACCEPTANCE CORP.(HEREINAFTER"ISSUER")
700 NW I07M AVENUE,SUITE 240
MIAMI. FLORIDA 33172
PHONE(305)553-8724
DATE OF ISSUE: DECEMBER 17,2014
PLACE OF EXPIRY: AT ISSUER'S COUNTERS LOCATED AT 700 NW 107 AVE,SUITE 240
MIAMI, FLORIDA 33172
DATE OF EXPIRY: THIS CREDIT SHALL BE VALID UN'T'IL DECEMBER 17, 2015,AND SHALL THEREAFTER
BE AUTOMATICALLY RENEWED FOR SUCCESSIVE ONE-YEAR PERIODS ON THE
ANNIVERSARY OF THE ISSUE UNLESS AT LEAST SIXTY (60) DAYS PRIOR TO ANY
SUCH ANNIVERSARY DATE, THE ISSUER NOTIFIES THE BENEFICIARY IN WRITING
BY REGISTERED MAIL THAT THE ISSUER ELECTS NOT TO RENEW THIS CREDIT.
APPLICANT: LENNAR HOMES,LLC.(HEREINAFTER"DEVELOPER")
10481 SIX MILE CYPRESS PARKWAY
FORT MYERS,FLORIDA 33966
BENEFICIARY: THE BOARD OF COUNTY COMMISSIONERS,COLLIER COUNTY.FLORIDA
(HEREINAFTER"BENEFICIARY")
C/O ENGINEERING REVIEW SERVICES
2800 NORTH HORSESHOE DRIVE
NAPLES, FL 34104
AMOUNT: UP TO AN AGGREGATE AMOUNT OF $743.617.00 (SEVEN HUNDRED FORTY THREE
THOUSAND SIX HUNDRED SEVENTEEN AND 00/100 US DOLLARS)
RE: TREVISO BAY-INFRASTRUCTURE CONSTRUCTION
PROJECT NAME: SIRACUSA
CREDIT AVAILABLE
WITH: ISSUER
BY: PAYMENT AGAINST DOCUMENTS DETAILED HEREIN AND BENEFICIARY'S DRAFTS
AT SIGHT DRAWN ON THE ISSUER.
DOCUMENTS REQUIRED: AVAILABLE BY BENEFICIARY'S DRAFT(S) AT SIGHT DRAWN ON THE ISSUER AND
PRESENTED AT PLACE OF EXPIRY ACCOMPANIED BY BENEFICIARY'S STATEMENT PURPORTEDLY
MANUALLY SIGNED AND DATED BY THE COUNTY MANAGER,OR HIS DESIGNEE,CERTIFYING THAT:
A. (I) "DEVELOPER HAS FAILED TO CONSTRUCT AND/OR MAINTAIN THE SUBDIVISION IMPROVEMENTS
ASSOCIATED WITH THAT CERTAIN PLAT OF A SUBDIVISION KNOWN AS TREVISO BAY - SIRACUSA AS
REQUIRED BY COLLIER COUNTY ORDINANCES AND RESOLUTIONS (THE "LAND DEVELOPMENT
REGULATIONS"); (II) DEVELOPER HAS BEEN GIVEN WRITTEN NOTICE DESCRIBING THE EVENT OR
CONDITION OF SUCH DEFAULT IN REASONABLE DETAIL BY CERTIFIED MAIL, RETURN RECEIPT
REQUESTED: AND (III) THE DEFAULT HAS NOT BEEN CURED WITHIN THE CURE PERIOD PROVIDED FOR
THEREIN. IF ANY;"
OR
B. "A FINAL INSPECTION OF THE SUBDIVISION IMPROVEMENTS FOR TREVISO BAY - SIRACUSA AS
REQUIRED BY COLLIER COUNTY ORDINANCES AND RESOLUTIONS (THE "LAND DEVELOPMENT
REGULATIONS") SATISFACTORY TO COLLIER COUNTY HAS NOT BEEN PERFORMED PRIOR TO TIIE DATE
OF EXPIRY, AND A SATISFACTORY ALTERNATIVE PERFORMANCE SECURITY HAS NOT BEEN PROVIDED
TO AND ACCEPTED BY THE BENEFICIARY."
c\ ti II 'A"
FIDELITY GUARANTY AND ACCEPTANCE C106IA
700 NW 107 AVENUE - SUITE 240
MIAMI , FLORIDA 33172
PHONE ( 305 ) 553 - 8724
THIS IS AN INTEGRAL PART OF LETTER OF CREDIT NO.FGAC-14273 PAGE 2
DRAFT(S) DRAWN UNDER THIS LETTER OF CREDIT SHALL BE MARKED: "DRAWN UNDER FIDELITY
GUARANTY AND ACCEPTANCE CORP. CREDIT NO. FGAC-14273, DATED DECEMBER 17, 2014" AND MUST BE
ACCOMPANIED BY THIS ORIGINAL LETTER OF CREDIT AND ALL ORIGINAL AMENDMENTS, IF ANY. FOR
PROPER ENDORSEMENT.
THIS LETTER OF CREDIT SETS FORTH IN FULL THE TERMS OF THE ISSUER'S UNDERTAKING, AND SUCH
UNDERTAKING SI-TALL NOT IN ANY WAY BE MODIFIED. AMENDED. OR AMPLIFIED BY REFERENCE TO ANY
DOCUMENT, INSTRUMENT, OR AGREEMENT REFERENCED TO HEREIN OR IN WHICH THIS LETTER OF CREDIT
RELATES, AND ANY SUCH REFERENCE SHALL NOT BE DEEMED TO INCORPORATE HEREIN BY REFERENCE
ANY DOCUMENT. INSTRUMENT OR AGREEMENT.
ISSUER HEREBY ENGAGES WITH BENEFICIARY THAT DRAFT(S) DRAWN UNDER AND IN COMPLIANCE WITH
THE TERMS AND CONDITIONS OF THIS CREDIT WILL BE DULY HONORED BY ISSUER IF PRESENTED WITHIN
THE VALIDITY OF THIS CREDIT TOGETHER WITH THE DOCUMENTS REQUIRED HEREIN AT THE PLACE OF
EXPIRY PRIOR TO 4:00 P.M. EST.ON OR PRIOR TO THE DATE OF EXPIRY.
THIS CREDIT IS SUBJECT TO THE UNIFORM CUSTOMS AND PRACTICE FOR DOCUMENTARY CREDITS (2007
REVISION)INTERNATIONAL CHAMBER OF COMMERCE PUBLICATION NO.600.
FIDELITY GUARANTY AND ACCEPTANCE CORP.
4€.4jtAlt
DIANE BESSETTE,TREASURER
1 6 A 11
F'PL-PL20140001844 REV: 1
SIRAC:USA
DATE: 10/2/14
•• DUE: 10/23/14
sta n ite t..
.e,
Siracusa
September 2014
Engineer's Opinion of Probable Construction Costs
SUMMARY
Earthwork $ 15,88()
Paving $ 155,067
Drainage $ 187,816
Sanitary Sewer $ 88,593
Potable Water $ 88,484
Irrigation $ 4,000
Landscape $ 2:3,000
Lighting $ 25,000
Sub Total: $ 587,840
15% Contingency $ 88,176
Grand Total: 676,016
No. 70177 ( _ -
STATE 01 c, = y
c7c7r . � �,�` Allyson Holland, PE
,'✓#°#,•�`5�'t )��Q, f,'14,0���`N�
FL License No. 70177
��'"+r►a►n►►k►`"`` Stantec Authorization No. 27013
STANTEC CONSULTING SERVICES, INC. 1 6 A 1 1
Siracusa
OPC for Construction
Earthwork
Estimated
Descriplon Quantity Unit Unit Price Amount
Retailing Wall(with railing) 68 LF $ 150.00 $ 10,200.00
Final Grading 28,400 CV $ 0.20 $ 5,680.00
Paving Total $ 15,880.00
STANTEC CONSULTING SERVICES, INC.
Siracusa
OPC for Construction16 A 1 1
Paving
Estimated
Description ___--- ------�- Quantity Unit Unit Price Amount
ROADWAY
3/4"Asphaltic Concrete, Type S-III (first lift) 4,251 SY $ --- 4.35 S 18,491.85
3/4"Asphaltic Concrete, Type S-ill (second lift) 4,251 SY $ 4.35 $ 18,491.85
6" Limerock Base(compactec &primed) 5,069 SY $ 7.60 $ 38,524.40
12"Stabilized Subgrade(compacted) 5,240 SY $ '--1.95 $ 10,213.00
SIDEWALK —�
4"Limerock Base 1,454 SY $ 4.50 $ 6,543.00
4"Thick Reinforced Concrete Sidewalk 1,454 SY $ 2 3.40 $ 34,02 3.60
MISCELLANEOUS
Saw-Cut and Connect to Ex. Pavement 1 LS $ 500.00 $ 500.00
Type"F"Curb and Gutter 72 LF $ 10.20 $ 733.40
Type"A"Curb 491 LF $---�- 8.35 $ 4,099.85
Valley Gutter 2,525 LF $ --------_8.60 $ 21,715.00
Transition Curb 10 LF $ 18.00 $ 180.00
Blue-Blue Reflector 3 EA _$__ 15.00 $ 45.00
Signin.und Striping 1 LS $ — 1,500.00 $ 1,500.00
Paving Total $ 155,061L95
STANTEC CONSULTING SERVICES,INC. 4
Siracusa
OPC for Construction 1 6 A 1
Drainage 1
Estimated
Description Quantity Unit Unit Price Amount
12" PVC 270 LF _$_____ _18.00_ $ 4,860.00
15"RCP 612 LF $ 26.00 $ 15,912.00
18" RCP 1,733 LF $ 29.00 $ 50,257.00
30" RCP 802 LF _$______�r_— 56.00 $ 44,912.00
30"Headwall 1 EA $_ _2,500.00 $ 2,500.00
Yarc drain 3 EA $ 725.00 $ 2,175.00
Grate Inlet 19 EA $ 2,400.00 $ 45,600.00
Couble Valley Gutter Inlet 6 EA $_ _2,900.00 $ 17,400.00
J.jnc.tion Box 2 EA $ 2,100.00 $ 4,200.00
Drainage Total $ 187,816.00
STANTEC CONSULTING SERVICES, INC. 16 A 11 5 i
Siracusa
OPC for Construction
Sanitary Sewer
Estimated
Description Quantity Unit Unit Price Amount
Single Sanitary Sewer Service 5 EA _ $N_______515.00 $ 2,575.00
Double Sanitary Sewer Service 7 EA $ 575.00 $ 4,025.00
8" PVC Sanitary Sewer(SDR 26)
(0' -6'cut) 97 Ll= $ 24.50 $ 2,376.50
8" PVC Sanitary Sewer(SDR 26)
(6' - 8'cL.t) 400 LF $ 28.75 S 11,500.00
8"PVC Sanitary Sewer(SDR 26)
(8'- 10'c:ut) 138 LI: $ 3:3.00 S 4,554.00
8" PVC Sanitary Sewer(SDR 26)
(10'- 12' cut) 94 LI: $___—_______ 38.25 $ 3,595.50
8" PVC Sanitary Sewer(SDR 26) �~
(12'- 14'cut) 407 LF $ 43.50 $ 17,704.50
8" PVC Sanitary Sewer(SDR 26)
(14'- 16'cut) 113 LF $ 5310 $ 6,003.30
Manhole, 4'Diameter
(6' -8 cut) 2 EA $__—__,5,055.00 $ 10,11100
Manhole, 4' Diameter
(10'- 12'cut) 1 EA $__�__�6_835_00 $ 6,835.00
Manhole, 4' Diameter
(12'- 14'cut) 2 EA $ 7,660.00 $ 15 320.00
TV Sewer w/mandrel(preliminary) 1,249 LF $ 1.60 $ 1,998A0
TV Sewer w/mandrel_(final)_M1,249 IS $__�_�____ 1.60 $ 1,99880
Sanitary Sewer Total $ 88,592.60
STANTEC CONSULTING SERVICES, INC. 6
:Siracusa 1 6 A 1 1
OPC for Construction 1
Potable Water
Estimated
Description -w---r--�� Quantity Unit Unit Price Amount
Connect to Existing 10"Water Main with Gap
Configuration 1 EA $ 2,500.00 $ 2,500.00
Single Water Service 3 EA $ 665.00 $ 1,995.00
Double Water Service 8 EA $ 865.00 $ 6,920.00
6"PVC Water Main (C-900, CL-200) 38 LF $ 17.00 $ 646.00
10" PVC Water Main (C-900, CL-150) 1,552 LF $ 29.00 $ 45,0013.00
10" PVC Water Main (C-900. CL-200) 49 LF $ 31.00 $ 1,519.00
Fire Hydrant Assembly, Complete 3 EA $ 3,670.00 $ 11,010.00
Permanent Bacterial Sample Point 1 EA $ 1,525.00 $ 1,5215.00
10"Gate Valve 4 EA $ 2,175.00 $ 8,700.00
Automatic Flushing Device w/Gate Valve 1 EA $ 6,650.00 $ 6,650.00
4"3M Magnetic Ball Markers Allowance
(Every 200 LF and at Each Pipe Elbow Location) 28 EA S 27.00 $ 76'1.27
Chlorination&Testing-- _---- ____ -_-- 1 - EA__S______ 1,250.00 - $ 1,250.00
Potable Water Total $ 88,484.27
STANTEC CONSULTING SERVICES, INC. 16 A 11
Siracusa
OPC for Construction
Irrigation
Estimated
Description Quantity Unit Unit Price Amount
Irri3tion Allowance 1 LS S 4,000.00 $ 4,000.00
Irrigation Total $ 4,000.00
STANTEC CONSULTING SERVICES, INC. 16A
Siracusa
OPC for Construction
Landscape
Estimated
Descri tion ------�—�- Quantity Unit Unit Price Amount
Landscape Allowance 1 LS $ 23,000.00 $ 23,00 .00
Landscape Total $ 23,0019.00
STANTEC CONSULTING SERVICES, INC. 1 6 A 1 1 9
Siracusa 1
OPC for Construction
Lighting
Estimated
Descrion ti
L Quantity Unit Unit Price Amount
Lighting Allowance 1 LS $ 25,000.00 $ 25,00100
Lighting Total $ 25,000.00